francis turbines – horizontal - · pdf filescope of supply: main data: turbines type: 2...
TRANSCRIPT
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHC6,7/38Generators Output: 2 x 4980 kW Inlet valves Head: 172,4 mDigital and hydr. governors Speed: 750 min-1Electrical equipment Year: 2010Erection and commissioning Country: Turkey
BULAM
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHC-9.6V37Output: 7180 kW Head: 180,4 mSpeed: 900 min-1Year: 2010Country: Canada
AISHIHIK
SHANYIN
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 4 x FSH - 9,0V80Output: 4 x 826 kWHead: 21,8 mSpeed: 425 min-1Year: 2010Country: Hungary
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHC-5.20V49Hydraulic governor Output: 392 kW Erection and commissioning Head: 45,3 m
Speed: 750 min-1Year: 2009Country: Austria
NASSWALD
SEVINDIK
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-7,1/53Generators Output: 2 x 2857 kW Inlet valves Head: 104,47 mHydraulic governor Speed: 750 min-1Digital turbine controller Year: 2007Erection and commissioning Country: Turkey
POROI
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: FSHc-5,15/66Generators Output: 1093 kW Inlet valves Head: 67,1 mHydraulic governor Speed: 1000 min-1Digital turbine controller Year: 2007Erection and commissioning Country: Greece
DONAWITZ
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHC-8,5/74Generators Output: 2 x 1474 kW Inlet valves Head: 35,4 mHydraulic governor Speed: 500 min-1Digital turbine controller Year: 2007Erection and commissioning Country: Austria
SUSHERI
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 6 x FSHc-7,50/53Generators Output: 6 x 2000 kW Inlet valves Head: approx. 75 mHydraulic governor Speed: 600 min-1Digital turbine controller Year: 2007Erection and commissioning Country: Turkey
KATZLING
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-7,85/75Generators Output: 2 x 1100 kW Inlet valves Head: 32 mHydraulic governors Speed: 500 min-1Erection and commissioning Year: 2006
Country: Austria
QORLORTORSUAQ
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-7.75/58Generators Output: 2 x 3803 kW Inlet valves Head: 96,6 mHydraulic governors Speed: 750 min-1Digital turbine controller Year: 2006Erection and commissioning Country: Greenland
PUNTILLA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHc-12,5/55Generator Output: 8274 kW Inlet valve Head: 90,8 mHydraulic governor Speed: 428 min-1Electrical equipment Year: 2006Erection and commissioning Country: Chile
MAUER
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHc-5,3/75Hydraulic governor Output: 550 kW Erection and commissioning Head: 35 m
Speed: 750 min-1Year: 2005Country: Austria
ROTACHE
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHc-5,3/75Generator Output: 404 kWInlet valve Head: 33 mHydraulic governor Speed: 750 min-1Erection and commissioning Year: 2005
Country: Austria
KERASOVOSCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 1 x FSHc-4,62/38 Generators 1 x PV4c-640/200Inlet valves Output: 1 x 1770 kW / 1 x 744 kWHydraulic governors Head: 140 m / 141 mErection and commissioning Speed: 1000 min-1 / 750 min-1
Year: 2005Country: Greece
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHc-3,6/48Inlet valve Output: 294 kW Generator Head: 55,5 mHydraulic governor Speed: 1000 min-1Intake structure Year: 2004Erection and commissioning Country: Austria
HOLZHÜTTENBODEN
PERIVOLISCOPE OF SUPPLY: MAIN DATA:
Turbines Type: FSHc-7,50/63Generators FSHc-5,15/58Inlet valves Output: 3037 kW / 1248 kWHydraulic governors Head: 78 m / 81 mErection and commissioning Speed: 750 min-1 / 1000 min-1
Year: 2003Country: Greece
MAE KA NAI
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-3,15/48Inlet valves Output: 2 x 452 kWGovernor systems Head: 95,4 mGenerators Speed: 1500 min-1Erection and commissioning Year: 2002
Country: Thailand
MOLUSCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-7,85/75Inlet valves Output: 2 x 1700 kWGovernor system Head: 42,4 mGenerators Speed: 600 min-1Electrical equipment Year: 2001Erection and commissioning Country: Turkey
DUSS
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSHc-4.25Inlet valve Output: 193 kWDigital turbine controller Head: 23,5 mHydraulic power pack Speed: 750 min-1Erection and commissioning Year: 1998
Country: Switzerland
KANDERSTEG
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSHc-2,8/120Inlet valve Output: 2 x 508 kWDigital turbine controller Head: 97,7 mHydraulic power pack Speed: 1500 min-1Erection and commissioning Year: 1995
Country: Switzerland
ERZBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: FSH 6,3 / FSH 4,75Inlet valve Output: 849 kW / 507 kWDigital turbine controller Head: 46,2 m / 48,2 mHydraulic governor Speed: 750 / 1000 min-1Erection and commissioning Year: 1983
Country: Austria
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: FSV10,65V49LGenerator Output: 5309 kW Inlet valve Head: 78,1 mElektr. and hydr. governor Speed: 600 min-1Draft tube gate Year: 2010Erection and commissioning Country: Austria
HOLLERSBACH
ZOGNO
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 4 x FSVc-7,6/63Inlet valves Output: 4 x 1801 kWGenerators Head: 55,1 mHydraulic governors Speed: 600 min-1Erection and commissioning Year: 2005
Country: Italy
VÄNNEBO
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSVc-4,5/220Inlet valves Output: 2 x 354 kWBifurcation pipe Head: 39,5 mHydraulic governor Speed: 1000 min-1Generators Year: 2002Erection and commissioning Country: Sweden
GÖNEN
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x FSV-11,2/72Generators Output: 2 x 5783 kWInlet valves Head: 60,3 mGovernors Speed: 500 min-1Electrical equipment Year: 1997Erection and commissioning Country: Turkey