frame rigid assembly
TRANSCRIPT
![Page 1: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/1.jpg)
Deluxe
Construction Guide
June 2007
© Copyright – All Rights Reserved.
![Page 2: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/2.jpg)
TYPICAL SLAB & PAD FOOTING DETAIL
Applicable to all Engineering Drawings up to 7.5 metres wide
Typical heavy Industrial Slabs
100mm thick 20 MPa concrete with F62 mesh50mm sand
Under columnthicken as tables
1 Y12 BAR 600 LONG ( for 33 & 41m/s )
FootingBracket
FOOTING PAD TABLES ( with 100mm thick slab )
2 Y12 BAR 600 LONG ( for 50 & 60 m/s )
150mm thick 25 MPa concrete with F72 mesh50mm sand
FootingBracket
Piers and Reo,as per Engineering Drawings
TYPICAL SIZEL x W x D (mm x mm x mm )
300 X 300 X 350400 X 400 X 300450 X 450 X 300 450 X 450 X 450
CONCRETE VOLUME
0.032 m3 0.048 m3 0.06 m3 0.09 m3
DESIGN SPEED m/s 33 41 50 60
Page 1
![Page 3: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/3.jpg)
FOOTING BRACKET DETAIL
FOOTING BRACKET DETAIL
BHP Sections
BHP Sections
Domestic Range up to 7.5m wide use 61mm girtsIndustrial Range greater than 7.5 wide use 120mm girts
61mm Girt = 130mm
120mm Girt = 140mm
61mm Girt = 50mm
120mm Girt = 109mm
C-Section Domestic Industrial100 81150 88 147200 94 153250 94 153300 163350 177
Dimension of columnas per footing bolt plan
Bolt brackets together to form U shape. Inside width to suit column.
Page 2
![Page 4: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/4.jpg)
TYPICAL GABLE ROLLER DOOR ENTRY DETAILOnly where Roller Doors fit right across the gable end.
Rebate to allow sheeting to wrap around the corner
40x40 Rebateto width of Bracket
Page 3
![Page 5: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/5.jpg)
Place truss sections centered into apex plates and screw or bolt through holes provided. Follow engineering drawing all throughout construction for all sizes and specifications, also retain bill of materials supplied with kit for reference.
After assembling first truss, lay others on top and use as template so all end up the same.
TRUSS ASSEMBLY
ScrewedApex plate
BoltedApex plate
Bolted Apex & Knee plates overlap each other and bolt together on the center in the same hole.
Page 4
![Page 6: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/6.jpg)
ASSEMBLE & STAND PORTAL COLUMNS
Knee plate
Top knee plate
1. Lay portal columns in footing brackets2. Attach loosely with 2 bolts (not 4)3. Position bottom knee plates and lay pre-
assembled truss in plates4. Measure diagonally and when measurment
is the same, screw or bolt bottom plate5. Position and screw or bolt top knee plate6. Screw eave purlin bracket in position7. Hinge portal upright and position other
two bolts
Fit eave purlinbrackets beforestanding
Bottom kneeplate
Page 5
![Page 7: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/7.jpg)
Eave purlin
14 x2O tek screw orkwikspan bolts
4 Kwikspan bolts +
Buft join eave purlin in thecentre of column and fix
top hat
12x20 tek screwto portal frames
Follow engineeringdrawings for spacings andspecifications
Page 6
![Page 8: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/8.jpg)
Kwikspan boltsDyna boltsInside View
FRONT MULLION, FRONT ENTRY ONLY
Front mullion plateOutside View
14 x 20 tek screws
Fix mullion angle with 6 - 14 x 20 tek screws
Dyna bolts
Kwikspan bolts
REAR MULLION
Apex Plate
Page 7
![Page 9: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/9.jpg)
SIDE ENTRY ROLLER DOOR JAME & HEADERFIXING DETAIL
Fix door jamb to eave purlin & doorheader to jamb with connectorbrackets & 12 x 20 tek screws
Mullion bracket
Page 8
![Page 10: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/10.jpg)
SINGLE DOOR FRONT ENTRYFixing angle brackets 75 105
SINGLE DOOR OFFSET ENTRY
TYPICAL GABLE END ROLLER DOOR FIXING DETAIL
VIEW FROM INSIDE
Fixing angle brackets 75 105
Page 9
![Page 11: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/11.jpg)
DOUBLE DOOR FRONT ENTRY
TYPICAL GABLE END ROLLER DOOR FIXING DETAIL
Fixing angle brackets 75 105
VIEW FROM INSIDE
Page 10
![Page 12: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/12.jpg)
FRONT ENTRY ROLLER DOOR MULLION DETAIL
Where roller doors arepositioned away fromcorner portal columns
Screw Top Hat betweencolumn and frontmullion using a Top Hatsupport bracket
Bolt front mullions inposition usingRoller Door headerto set width
Mullion
Page 1 1
![Page 13: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/13.jpg)
ROD GABLE BRACE (END PORTAL)Fix gable brace onto mullion and column using brace angle and rod supplied
Up to 9m wide 60m/sM12 bolt & M10 rod
12m wide full rangeM16 bolt & M12 rod
15m & 18m full rangeM16 bolt & M16 rod
2 x 12 x 20Tek Screws
STRAP GABLE BRACE
Brace tensioner
30mm strap
After fixing strap, tension using brace tensioner
Page 12
![Page 14: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/14.jpg)
SIDE ENTRYROLLER DOOR JAMB DETAIL
\-r\\
Roller Door Header\-r\\
Side Entry Roller Door Jamb
Gutter bracketString line and fix every1m apart and allow't5mm fall in 6mFixed using Pop rivets
Gutter Fixing Detail
Column
bracket I Eave Purlin
, I /enecxet
Assemble gutter with poPrivets and silicone all joints toprevent leaks.
Column
P a g e ' 1 4
![Page 15: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/15.jpg)
Pop riverts
MachineryFlashingEnd Portal
column
Top Hat
MACHINERY SHED CORNER FLASHING
Open Front
1. Commence cladding at open front, flush with column2. Use machinery corner flashing provided to finish off corner
Page 15
![Page 16: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/16.jpg)
Step sheets from corner shortest to tallest and trim after
fixing
GABLE WALL CLADDING DETAILS
Dynabolt
PA Door jamboutside view
PA Door jambinside view
Fix with 10x16tek screws
Page 16
![Page 17: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/17.jpg)
Door jamb Top Hat connection
Door jamb eave purlinconnection
Door head drip attach with 2/ x 10 x 16 tek screws
DOMESTIC PA DOOR JAMB DETAIL
Door jamb
inside view
Trim door jamb to create tongue to fix to eave purlin or top hat
Page 17
![Page 18: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/18.jpg)
PA Door Frame
PA Door Brace Angle
PA Door Frame
PA Door Lock Rail
PA Door Jamb
DOMESTIC PA DOOR (PRESSED METAL)
Assemble using 10 x 16 Wafer tek screws provided at all connecting points
PA Door Frame
PA Door Lock Rail
PA Door Brace Angle
Set P.A. Door frame width at:820 for domestic1000 for industrial
PA Door Jamb
2040
P.A. Door Hinge
Page 18
![Page 19: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/19.jpg)
PA Door Frame
Knock in corners
PA Door Frame
PA Door Lock Rail
PA Door Jamb
DOMESTIC PA DOOR (SHS COLUMN)
Assemble as detailusing 10 x 16 Wafer tek screws
PA Door Frame
Door width for domestic is 820 & 1000 for Industrial
PA Door Jamb
2040
PA Door Lock Rail
Page 19
![Page 20: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/20.jpg)
Score throughhalf the sheetand bend
Scored sheet bentaround thecorner
Sheet bentaround thecorner on the crest
START HERETuck sheet behind lip of portal & pop rivet
On a continuous wall where sheets do not meet, score right through the sheet for a neat cut and underlap
BENDING THE SHEETS ON CORNERS
Lay sheet on a board and run scoring knife alonga straight edge to cut through half the sheet forbending or almost through to cut sheet.( to cut sheet through just bend back and fourth )
Roller Door
Page 20
![Page 21: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/21.jpg)
Window jamb
Window jamb
Notch window jamb to fit top hat or eave purlin as required, fix flashing over window where not fitting under gutter. Cut and fit sheeting to suit.
WINDOW JAMB DETAIL
Sheeting
Sheeting
Window
Page 21
![Page 22: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/22.jpg)
TRIM ANGLE & ROLLER DOOR FLASHING DETAILS
-/
Door Flashing
Page 22
![Page 23: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/23.jpg)
Bend roof sheeting pan upwards to prevent water blowing under ridge and into shed.
Ridge cap
Roof sheet
Roof sheet
Ridge cap 1. Bend end of roof sheets2. Screw roof sheets to top hats except at ridge3. Position ridge capping on ridge line4. Scribe crest of roof sheeting on ridging and cut with tin snips to allow ridging to sit in pan of roof sheeting5. Screw ridge with 12 x 45 tek through crest of sheeting into top hat batten
RIDGE CAP DETAIL
A piece of 75 x 30 timber with a saw cut in the end will do as a pan bending tool
Page 23
![Page 24: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/24.jpg)
Gutter
Down Pipe
Down Pipe Drop
DOWNPIPE & FRONT FLASHING DETAIL
Cut hole in base of gutter, fix down pipe drop with Pop rivets and silicone.
Barge Flashing
Cut Barge Flashingto overlap gutter stop ends and fix with Pop rivets
Fix to mullion with Pop rivets
Front Mullion flashingFit Roller Doors
to manufacturers instructions
Fix base of downpipe with pop rivet from inside of shed through wall cladding
Page 24
![Page 25: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/25.jpg)
Removable mullion
Mini Mullion Brace
Mini Mullion
REMOVABLE MULLION DETAIL
Mini Mullion Bracefixing plate
Mini Mullion Bracefixing plate
Fitting instructions with kit
Page 25
![Page 26: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/26.jpg)
DOMESTIC ROLLER DOOR
LOCK PIN DETAIL FOR 50M/S SHEDS
INDUSTRIAL ROLLER DOOR
LOCK PIN DETAIL FOR 50M/S SHEDS
Roller Door Curtain
Roller Door Curtain
Roller Door Jamb
Roller Door Jamb
Guide
Guide
Tek Screw
Fencing Chain
Cyclone Lock Pin @ 600 crs
Tek Screw
Cyclone Pin Bracket
Fencing Chain
Cyclone Lock Pin @ 600 crs
Page 26
![Page 27: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/27.jpg)
Wall Sheeting
Awning Flashing
Awning Roof Sheeting
Roof Sheeting
12 x 45 Tek Screwsthrough sheets into eave purlin
Awning roof sheet with pan bent up to prevent water blowing up and over the edge
Wall Sheeting
Awning FlashingAwning roof sheet with pan bent up to prevent water blowing up and over the edge
Awning Roof Sheeting
AWNING DETAIL WHERE AWNING IS LOWER THAT EAVE HEIGHT
AWNING DETAIL WHERE AWNING IS AT EAVE HEIGHT
Page 27
![Page 28: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/28.jpg)
3mm Splice Plate Fixed using 4 x 12 O mm bolts
Bridge Jambs cut to suit fixed to the lips with4 - 12 x 20 Tek screws
Portal Frame
AWNING CONNECTION DETAIL
Create a 50mm slot using angle grinder for awning splice plate
Awning rafter
Eave purlin
Eave height awning detail
Inside view of portal
Intermediate Rafter
Lower than eave height awning detail
Page 28
![Page 29: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/29.jpg)
AWNING ASSEMBLY DETAIL
Facia Beam
Rafter Beam
Post
Inside View
Inside View
Outside View
Outside View
Post
Post
Post
Facia Beam
Facia Beam
Splice plate with6 x 12mmflat head bolts
Splice plate with6 x 12mmflat head bolts
General Purpose Bracket4 x 12mmKwikspan bolts
3mm Corner plate with4 x 12mmflat head bolts
Rafter Beam
Page 29
![Page 30: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/30.jpg)
Apron
DOMESTIC 3M WIDE SLIDING DOOR
1000 1000 1000 1000 1000 1000
Sliding Door Track
Eave Purlin
Awning Connector
Sliding Door Bracket
Sliding Door Flashing
Sliding Door Rail
Sliding Door Rail
Sliding Door Frame
Building Slab
3000
6000
HeightSliding Door
Page 30
![Page 31: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/31.jpg)
Apron
INDUSTRIAL 4.5M WIDE SLIDING DOOR
1000 1000 1000 1000 1000 1000
Sliding Door Track
Eave Purlin
Awning Connector
Sliding Door Bracket
Sliding Door Flashing
HeightSliding Door
Sliding Door Rail
Sliding Door Rail
Sliding Door Frame
Building Slab
4500
9000Page 31
![Page 32: Frame Rigid Assembly](https://reader037.vdocuments.site/reader037/viewer/2022100223/543ca57aafaf9fbe618b46bd/html5/thumbnails/32.jpg)