fpl march 23, 2012 · 2012. 7. 20. · 0 fpl florida power & light company, 6501 s. ocean...

24
0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request for Minor Revision to IWW Permit No. FL0002208 Pursuant to Section 3.2.4 of the St. Lucie Environmental Protection Plan, Florida Power & Light Company (FPL) is hereby providing the enclosed copy of the requested revision to the Industrial Wastewater Facility Permit (Permit Number FL0002208) at the same time that it is being submitted to the State of Florida Department of Environmental Protection. Please contact Vince Munnd (772) 263-2847 should you have any questions on this matter. Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/kdr Enclosure an FPL Group company

Upload: others

Post on 10-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

0FPL

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957

March 23, 2012

L-2012-13510 CFR 50.4

EPP 3.2.4

U. S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555

Re: St. Lucie Units 1 and 2Docket Nos. 50-335 and 50-389Environmental Protection Plan ReportRequest for Minor Revision to IWW Permit No. FL0002208

Pursuant to Section 3.2.4 of the St. Lucie Environmental Protection Plan, Florida Power &Light Company (FPL) is hereby providing the enclosed copy of the requested revision to theIndustrial Wastewater Facility Permit (Permit Number FL0002208) at the same time that it isbeing submitted to the State of Florida Department of Environmental Protection.

Please contact Vince Munnd (772) 263-2847 should you have any questions on this matter.

Sincerely,

Eric S. KatzmanLicensing ManagerSt. Lucie Plant

ESK/kdr

Enclosure

an FPL Group company

Page 2: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

LFPL

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957

March 16, 2012

Marc Harris, P.E.Florida Department of Environmental ProtectionIndustrial Wastewater Section2600 Blair Stone Road, MS 3545Tallahassee, Florida 32399-2400

CERTIFIED MAILRETURN REC[PT REQUESTED

7006 3450 0003 0174 4752

RE: Florida Power & Light CompanySt. Lucie Power Plants Units 1 and 2IWW Permit No. FL0002208Request for Minor Revision

Dear Mr. Harris:

St. Lucie is requesting a Minor Revision to our NPDES Permit that addresses a change indischarge pumping methodology from the Outfall 1-008.

The following enclosures are included herein:I) Three (3) signed and sealed copies of FDEP Form 62-620,910(9), Application for a

Minor Revision to Wastewater Facility or Activity Permit (Enclosure 1),2) Three (3) signed and sealed copies of FPL - St. Lucie Nuclear Steam Power Plant

FDEP IWW Permit # FL0002208 - Attachment 1 - Evaporation / Percolation Basin -Emergency Discharge Structure (Enclosure 2),

3) Three signed and sealed drawings of the proposed 1-008 Discharge Structure,DRAWING NO. PSL-C-275630-001 (Enclosure 3),

4) FPL check payable to the State of Florida, Department of Environmental Protectionin the amount of $250.00 for application fee (Enclosure 4).

If you have any questions or need additional information, please contact Vince Munnr at(772) 263-2847.

Sincerely,

Richard L. AndersonSite Vice PresidentSt. Lucie Plant

Enclosures

VPPSL006

cc: Siting Office

VPPSL006

an FPL Group company

Page 3: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

VPPSL006ENCLOSURE 1

Three (3) signed and sealed copies of FDEP Form 62-620.910(9)Application for a Minor Revision to Wastewater Facility or Activity Permit

(Cover + 6 pages)

Page 4: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

APPLICATION FOR A MINOR REVISION TOA WASTEWATER FACILITY OR ACTIVITY

"tao FLOA _PERMIT

1. Instructions

a. In accordance with Rule 62-620.325, F.A.C., this form must be submitted to the appropriate Department districtoffice or approved local program when requests for minor revisions to a permit or minor modifications to afacility are made by a permittee, except for transfer of a permit to a new permittee and addition of a major user ofreclaimed water to a Part III reuse system. Application for transfer of a permit to a new permittee shall be madeon DEP Form 62-620.910(11). Application for addition of a major user of reclaimed water shall be made onDEP Form 62-610.300(4)(a)1.

b. Each applicable item must be completed in full in order to avoid delay in processing of this form. Whereattached sheets or other technical documentation are provided, indicate appropriate cross-references.

c. Three (3) copies of this application with supporting documentation shall be submitted with this form.d. All infonnation is to be typed or printed in ink. Dates are to be entered in MM/DD/YR format.e. This application and attachments shall be signed in accordance with Rule 62-620.305, F.A.C. Also, as

applicable, this application and all attachments shall be signed and sealed by a professional engineer registered inFlorida in accordance with Rule 62-620.310, F.A.C.

2. Facility Information

a. Permit Number FL0002208 b. Facility Identification Number; FL0002208c. Project/Facility Name: FPL - St Lucie Nuclear Steam Power Plantd. Contact Name: Vince Munne

Number and Street: 6501 South Ocean DriveCity/State/Zip Code: Jensen Beach/FL/34957Telephone 772-263-2847

3. Type of Revision

LI Correct Typographical Errors' - Submit one copy of each page of the permit showing revisions beingrequested.

[] Change Improvement Schedule' - Provide a description of the improvement, a list of the dates to be revised,and a reason for the proposed change in each date.

[]Change Expiration Date of Permit' - Provide the current and proposed expiration dates for the permit and thereasons for the proposed change.

[1 Change Staffing Requirements2 - Describe the proposed change and submit justification for the change inaccordance with Chapter 62-699, F.A.C.

[A prccessiag fee is not required. DI.P Form 62-620,910(9))A procereng fee is required with the application Effective October 23, 2000in accordance with Rule 62-4.050, F. C.

Page 5: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

El Change Monitoring and Reporting Requirements' - Describe the proposed change and submit justification forthe change in accordance with Chapter 62-601, F.A.C.

El Modify Approved Pretreatment Program' - Describe the proposed modification and provide the informationrequired by Rule 62-625.540, F.A.C.

El Delete Point Source Outfall' - Identify the outfall and explain why the outfall is being eliminated.

EL Modify or Expand Approved Residuals Land Application Sites2 - Attach a new or updated Agricultural Useor Dedicated Site Plan as required by Chapter 62-640, F.A.C.

[ Minor Modification to the Facility2 - Provide a description of the proposed modification. If applicable, attachany reports, plans, and specifications which have been developed to implement this modification.

Li Other 2 - Provide appropriate documentation. Describe.

4. Certifications

a. Applicant or Authorized Representative

I certify under penalty of law that I have personally examined and am familiar with the information submitted inthis application and all attachments and that, based on my inquiry of persons immediately responsible forobtaining the information contained in the application, I believe that the information is true, accurate andcomplete. I am aware that there are significant penalties for submitting false information, including thepossibility of fine and i urisonment.

(Signatureof 4A cat Authorized Representative) (Date)

Name (please type) Richard L. AndersonTitle Site Vice PresidentPhone: 772-467-7100

Company Name FPL St Lucie PlantCompany Address: 6501 South Ocean Drive

City/State/Zip Code: Jensen Beach/FL/34957

b. Professional Engineer Registered in Florida

I certify that the engineering features of this project have been (designed) (examined) by me and found toconform to engineering principles applicable to such projects. In my professional judgement, this facility, whenproperly constructed, operated, and maintained, will comply with all applicable statutes of the State of Floridaand rules of the Department.

Name (please type): Glenn M. AndrewsFlorida Registration Number: 65772Company Name: Absolute Consulting, Inc.Company Address: 7552 Navarre Parkway, Suite 63City/State/Zip Code: Navarre/FL/32566Phone Number: 772-361-5865

(Seal, Signature, Date, and Registration Number)

'If signed by the authorized representative,

attach a letter ofaulhorization in accordanceRule 62-620.305, F.A.C.

2 DEP Form 62-620.910(9)Effweti-e October 23, 2000

Page 6: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

APPLICATION FOR A MINOR REVISION TOFA WASTEWATER FACILITY OR ACTIVITYSFLOR A PERMIT

1. Instructions

a. In accordance with Rule 62-620.325, F.A.C., this form must be submitted to the appropriate Department districtoffice or approved local program when requests for minor revisions to a permit or minor modifications to afacility are made by a permittee, except for transfer of a permit to a new perrnittee and addition of a major user ofreclaimed water to a Part Ill reuse system. Application for transfer of a permit to a new permittee shall be madeon DEP Form 62-620.910(11). Application for addition of a major user of reclaimed water shall be made onDEP Form 62-610.300(4)(a)1.

b. Each applicable item must be completed in fall in order to avoid delay in processing of this form. Whereattached sheets or other technical documentation are provided, indicate appropriate cross-references.

c. Three (3) copies of this application with supporting documentation shall be submitted with this form.d. All information is to be typed or printed in ink. Dates are to be entered in MMv/DD/YR format.e. This application and attachments shall be signed in accordance with Rule 62-620.305, F.A.C. Also, as

applicable, this application and all attachments shall be signed and sealed by a professional engineer registered inFlorida in accordance with Rule 62-620.310, F.A.C.

2. Facility Information

a. Permit Number: FL0002208 b. Facility Identification Number: FL0002208c. Project/Facility Name: FPL - St Lucie Nuclear Steam Power Plantd. Contact Name: Vince Munne

Number and Street: 6501 South Ocean DriveCity/State/Zip Code: Jensen Beach/FL/34957Telephone 772-263-2847

3. Type of Revision

LI Correct Typographical Errors' - Submit one copy of each page of the permit showing revisions beingrequested.

El Change Improvement Schedule' - Provide a description of the improvement, a list of the dates to be revised,and a reason for the proposed change in each date.

LI Change Expiration Date of Permit' - Provide the current and proposed expiration dates for the permit and thereasons for the proposed change.

El Change Staffing Requirements 2 - Describe the proposed change and submit justification for the change inaccordance with Chapter 62-699, F.A.C.

'A procesing fme is "ot required. . DEP Form 62-620.910(9)A processing fee is required with the applimtion Effeutive October 23, 2000in accordance wit Rule 62-4. 050, F. AC.

Page 7: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

El Change Monitoring and Reporting Requirements2 - Describe the proposed change and submit justification forthe change in accordance with Chapter 62-601, F.A.C.

[] Modify Approved Pretreatment Program' - Describe the proposed modification and provide the informationrequired by Rule 62-625.540, F.A.C.

El Delete Point Source Outfall' - Identify the outfall and explain why the outfall is being eliminated.

[i Modify or Expand Approved Residuals Land Application Sites2 - Attach a new or updated Agricultural Useor Dedicated Site Plan as required by Chapter 62-640, F.A.C.

[ Minor Modification to the Facility2 - Provide a description of the proposed modification. If applicable, attachany reports, plans, and specifications which have been developed to implement this modification.

[ Other' - Provide appropriate documentation. Describe.

4. Certifications

a. Applicant or Authorized Representative

I certify under penalty of law that I have personally examined and am familiar with the information submitted inthis application and all attachments and that, based on my inquiry of persons immediately responsible forobtaining the information contained in the application, I believe that the information is true, accurate andcomplete. I am aware that there are significant penalties for submitting false information, including theposs ty of fine and T rsonment.

(Signature of Applicant or )Cothorized Representative7) (Date)

Name (please type) Richard L. AndersonTitle Site Vice PresidentPhone: 772-467-7100

Company Name FPL St Lucie PlantCompany Address: 6501 South Ocean Drive

City/State/Zip Code: Jensen Beach/FL/34957

b. Professional Engineer Registered in Florida

I certify that the engineering features of this project have been (designed) (examined) by me and found toconform to engineering principles applicable to such projects. In my professional judgement, this facility, whenproperly constructed, operated, and maintained, will comply with all applicable statutes of the State of Floridaand rules of the Department.

Name (please type): Glenn M. AndrewsFlorida Registration Number: 65772Company Name: Absolute Consulting, Inc.Company Address: 7552 Navarre Parkway, Suite 63City/State/Zip Code: Navarre/FL!32566Phone Number: 772-361-5865

(Seal, Signature, Date, and Registration Number)

'If sigped by the authorized repreentative,attach a letter ofauttorization in accordanceRule 62-620.305, F.AC.

2 DEP Form 62-620 910(9)FffertCvM OCtober 23, 2000

Page 8: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

APPLICATION FOR A MINOR REVISION TOA WASTEWATER FACILITY OR ACTIVITY

_PERMIT

1. instructions

a. In accordance with Rule 62-620;325, F.A.C., this form must be submitted to the appropriate Department districtoffice or approved local program when requests for minor revisions to a permit or minor modifications to afacility are made by a permittee, except for transfer of a permit to a new permittee and addition of a major user ofreclaimed water to a Part IIl reuse system. Application for transfer of a permit to a new permittee shall be madeon DEP Form 62-620.910(11). Application for addition of a major user of reclaimed water shall be made onDEP Form 62-610.300(4)(a)1.

b. Each applicable item must be completed in full in order to avoid delay in processing of this form. Whereattached sheets or other technical documentation are provided, indicate appropriate cross-references.

c. Three (3) copies of this application with supporting documentation shall be submitted with this form.d. All information is to be typed or printed in ink. Dates are to be entered in MM/DD/YR format.e. This application and attachments shall be signed in accordance with Rule 62-620.305, F.A.C. Also, as

applicable, this application and all attachments shall be signed and sealed by a professional engineer registered inFlorida in accordance with Rule 62-620.310, F.A.C.

2. Facility Information

a- Permit Number: FL0002208 b. Facility Identification Number: FL0002208c. Project/Facility Name: FPL - St Lucie Nuclear Steam Power Plantd. Contact Name: Vince Munne

Number and Street: 6501 South Ocean DriveCity/State/Zip Code: Jensen Beacb/FL/34957Telephone 772-263-2847

3. Type of Revision

[E Correct Typographical Errors' - Submit one copy of each page of the permit showing revisions beingrequested.

[]Change Improvement Schedule' - Provide a description of the improvement, a list of the dates to be revised,and a reason for the proposed change in each date.

[I Change Expiration Date of Permit' - Provide the current and proposed expiration dates for the permit and thereasons for the proposed change.

El Change Staffing Requirements2 - Describe the proposed change and submit justification for the change inaccordance with Chapter 62-699, F.A.C.

A procesing fee is not required. DEP Form 62-620.910(9)'A processing fee is required with the application Effective October 23, 2000in accordance with Rule 62-4.050, F.A.C.

Page 9: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

[] Change Monitoring and Reporting Requirements2 - Describe the proposed change and submit justification forthe change in accordance with Chapter 62-601, F.A.C.

[] Modify Approved Pretreatment Program' - Describe the proposed modification and provide the informationrequired by Rule 62-625.540, F.A.C.

F- Delete Point Source Outfall' - Identify the outfall and explain why the outfall is being eliminated.

[ Modify or Expand Approved Residuals Land Application Sites2 - Attach a new or updated Agricultural Useor Dedicated Site Plan as required by Chapter 62-640, F.A.C.

[ Minor Modification to the Facility7 - Provide a description of the proposed modification. If applicable, attachany reports, plans, and specifications which have been developed to implement this modification.

El Other2 - Provide appropriate documentation. Describe.

4. Certifications

a. Applicant or Authorized Representative

I certify under penalty of law that I have personally examined and am familiar with the information submitted inthis application and all attachments and that, based on my inquiry of persons immediately responsible forobtaining the information contained in the application, I believe that the information is true, accurate andcomplete. I am aware that there are significant penalties for submitting false information, including thepossibility of fine and imprisonment.

(Signature of Applicant or\ uthorized Representative3) (Date)

Name (please type) Richard L. AndersonTitle Site Vice PresidentPhone: 772-467-7100

Company Name FPL St Lucie PlantCompany Address: 6501 South Ocean Drive

City/State/Zip Code: Jensen Beach/FL/34957

b. Professional Engineer Registered in Florida

I certify that the engineering features of this project have been (designed) (examined) by me and found toconform to engineering principles applicable to such projects. In my professional judgement, this facility, whenproperly constructed, operated, and maintained, will comply with all applicable statutes of the State of Floridaand rules of the Department.

Name (please type): Glenn M. AndrewsFlorida Registration Number: 65772Company Name: Absolute Consulting, Inc.Company Address: 7552 Navarre Parkway, Suite 63City/State/Zip Code: Navarre/FL/32566Phone Number: 772-361-5865

(Seal, Signature, Date, and Registration Number)

'if signed by the authodzcd reprsentative,atuch a letter of authorization in accordanceRole 62-620,305, F.AC

2 DEP Forem 62-620.910(9)Fffective October 23, 2000

Page 10: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

VPPSL006ENCLOSURE

2

FPL - St. Lucie Nuclear Steam Power Plant

FDEP IWW Permit # FL0002208Attachment I

Evaporation / Percolation

Basin - Emergency Discharge

Structure(Cover + 3 pages)

Page 11: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FPL - St Lucie Nuclear Steam Power PlantFDEP IWW Permit # FL0002208

Attachment I

Evaporation/ Percolation BasinEmergency Discharge Structure

Project Narrative

Discharges from the existing onsite Stormwater Management Evaporation/Percolation Basin areallowed and governed by existing Industrial Wastewater Permit FL0002208 dated September 29,2011. Specifically, permit condition I.B.8 states, "...permittee is authorized to discharge stormwaterfrom Internal Outfall 1-008 to the intake canal." In preparation for forecast extreme inclementweather (hurricane warning issued) commonly experienced at the plant, plant procedures dictate thatthe level in the basin be drawn down to 3.5' NGVD29. In times of unexpected extreme weather(i.e. Tropical Storm Faye 15" rainfall instead of forecast 3"), plant procedures dictate that if thewater level reaches 5.5' NGVD29, the basin is drawn down to elevation 3.5' NGVD29. Failure tocontrol the basin water level as described can result in the forced shutdown of the plant (i.e.Tropical Storm Faye). The current method of drawing down the water level is by the use ofportable pumps. These pumps must be monitored and refueled during operation in the midst of thestorm, which introduces safety and environmental risks. High winds have prevented the successfulplacement of the portable pumps. In accordance to the permit conditions, the volume of waterdischarged is monitored, recorded, and reported to FDEP when the discharge becomes necessary.

The proposed alternative draw down method is to construct a permanent discharge structure that isnormally closed, but can be manually opened to drain the basin. The attached sketches show aprecast concrete structure that has a control weir cast into the face of the structure. A manuallyactivated sluice gate is mounted on the inside of the structure to control the flow into the structure.The invert of the control weir will be set at the elevation described by the existing procedures. Theexisting procedures will be revised accordingly. Discharge pipe(s) will be installed between thedischarge structure and the intake canal. The number and size of the pipe(s) is dependent upon theconstruction method chosen. The discharge pipe(s) will protrude through the existing intake canalrevetment system slightly above normal operating level taking advantage of the energy dissipatingcharacteristics of water. The discharge pipe(s) will be equipped with flap gates to prevent backflowfrom the canal. The flow through the structure is automatically metered and recorded per the permitconditions. Since the proposed system is a passive system once activated and can be monitored byexisting plant surveillance systems, the safety and environmental hazards are greatly reduced.

Applicant's Signature: ý:- 3 /)J I.2 /, I-Richard L. Ande on Date

Engineer's Signature: & , - 03/06/12Glenn M. Andrews, PE #65772 Date

Page 12: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FPL - St Lucie Nuclear Steam Power PlantFDEP IWW Permit # FL0002208

Attachment 1

Evaporation/Percolation BasinEmergency Discharge Structure

Project Narrative

Discharges from the existing onsite Stormwater Management Evaporation/Percolation Basin areallowed and governed by existing Industrial Wastewater Permit FL0002208 dated September 29,2011. Specifically, permit condition I.B.8 states, "...permittee is authorized to discharge stormwaterfrom Internal Outfall 1-008 to the intake canal." In preparation for forecast extreme inclementweather (hurricane warning issued) commonly experienced at the plant, plant procedures dictate thatthe level in the basin be drawn down to 3.5' NGVD29. In times of unexpected extreme weather(i.e. Tropical Storm Faye 15" rainfall instead of forecast 3"), plant procedures dictate that if thewater level reaches 5.5' NGVD29, the basin is drawn down to elevation 3.5' NGVD29. Failure tocontrol the basin water level as described can result in the forced shutdown of the plant (i.e.Tropical Storm Faye). The current method of drawing down the water level is by the use ofportable pumps. These pumps must be monitored and refueled during operation in the midst of thestorm, which introduces safety and environmental risks. High winds have prevented the successfulplacement of the portable pumps. In accordance to the permit conditions, the volume of waterdischarged is monitored, recorded, and reported to FDEP when the discharge becomes necessary.

The proposed alternative draw down method is to construct a permanent discharge structure that isnormally closed, but can be manually opened to drain the basin. The attached sketches show aprecast concrete structure that has a control weir cast into the face of the structure. A manuallyactivated sluice gate is mounted on the inside of the structure to control the flow into the structure.The invert of the control weir will be set at the elevation described by the existing procedures. Theexisting procedures will be revised accordingly. Discharge pipe(s) will be installed between thedischarge structure and the intake canal. The number and size of the pipe(s) is dependent upon theconstruction method chosen. The discharge pipe(s) will protrude through the existing intake canalrevetment system slightly above normal operating level taking advantage of the energy dissipatingcharacteristics of water. The discharge pipe(s) will be equipped with flap gates to prevent backflowfrom the canal. The flow through the structure is automatically metered and recorded per the permitconditions. Since the proposed system is a passive system once activated and can be monitored byexisting plant surveillance systems, the safety and environmental hazards are greatly reduced.

Applicant's Signature: _______RiharL._____,___D___ •Richard L. An ,rson Date

Engineer's Signature: 03/06/12Glenn M. Andrews, PE #65772 Date

Page 13: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FPL - St Lucie Nuclear Steam Power PlantFDEP LWW Permit # FL0002208

Attachment 1

Evaporation/Percolation BasinEmergency Discharge Structure

Project Narrative

Discharges from the existing onsite Stormwater Management Evaporation/Percolation Basin areallowed and governed by existing Industrial Wastewater Permit FL0002208 dated September 29,2011. Specifically, permit condition I.B.8 states, ".. permittee is authorized to discharge stormwaterfrom Internal Outfall 1-008 to the intake canal." In preparation for forecast extreme inclementweather (hurricane warning issued) commonly experienced at the plant, plant procedures dictate thatthe level in the basin be drawn down to 3.5' NGVD29. In times of unexpected extreme weather(i.e. Tropical Storm Faye 15" rainfall instead of forecast 3'", plant procedures dictate that if thewater level reaches 5.5' NGV-D29, the basin is drawn down to elevation 3.5' NGVD29. Failure tocontrol the basin water level as described can result in the forced shutdown of the plant (i.e.Tropical Storm Faye). The current method of drawing down the watcr level is by the use ofportable pumps. These pumps must be monitored and refueled during operation in the midst of thestorm, which introduces safety and environmental risks. High winds have prevented the successfulplacement of the portable pumps. In accordance to the permit conditions, the volume of waterdischarged is monitored, recorded, and reported to FDEP when the discharge becomes necessary.

The proposed alternative draw down method is to construct a permanent discharge structure that isnormally closed, but can be manually opened to drain the basin. The attached sketches show aprecast concrete structure that has a control weir cast into the face of the structure. A manuallyactivated sluice gate is mounted on the inside of the structure to control the flow into the structure.'The invert of the control weir will be set at the elevation described by the existing procedures. Theexisting procedures will be revised accordingly. Discharge pipe(s) will be installed between thedischarge structure and the intake canal. The number and size of the pipe(s) is dependent upon theconstruction method chosen. The discharge pipe(s) will protrude through the existing intake canalrevetment system slightly above normal operating level taking advantage of the energy dissipatingcharacteristics of water. The discharge pipe(s) will be equipped with flap gates to prevent backflowfrom the canal. The flow through the structure is automatically metered and recorded per the permitconditions. Since the proposed system is a passive system once activated and can be monitored byexisting plant surveillance systems, the safety and environmental hazards are greatly reduced.

Applicant's Signature: ?d ncL/ ... O/.a

Engineer's Signature: - 03/06/12Glenn M. Andrews, PE #65772 Date

Page 14: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

VPPSL006ENCLOSURE 3

Three signed and sealed drawings of the proposed 1-008 Discharge StructureDRAWING NO, PSL-C-275630-001

(Cover + 9 pages)

Page 15: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FDEP IWVW Permit # FL0002208Attachment 2

ATLANTIC OCEAN

HERMAN BAY

Glenn M. Andrews, P.E.

~1AR R~ 6 2612KEY MAP

Lic. No. 65772NPE

DIV: CIVIL OR: JCG

CH: OMA

DATE: 3/1/12

CAD fLE: PSL-C-275630-001

Page 16: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FDEP IWW Permit # FL0002208Attachment 2

x-ýi x S .R .A I A , r-x

x

/1 ~

"N0

'N

Nd

A1W.E. 5.2

PROPOSEDCONTROL STRUCTURE PIPE

x

/

- N

*

VERTICAL DATUM = NGVD 29

DRAWING NO.

PSL-C-275630-001DIV: CIVIL DR: JCG

CH: GMA

DATE: 3/1/12SHEET2 OF 3

Page 17: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FIDEP (WW Permit # FL0002208Attachment 2

EXIS77NG DRAINAGE POND EXIS77NG INTAKE CANAL

WHEEL ACTIVATED SLUICE GATEEQUIPPED WITH FLOW METERING& RECORDING DEVICE (SEE NOTE)-

SURFACE ELV7 - 3.20' NCVD 29

I I,-EXISI7NG GROUND

INTAKE CANAL

-FLAP GATE

ZPRECAST CONCRETECONTROL STRUCTURERIM EL. = 6.25NOTCH EL - 3.50INV. EL. = 0.50BOTTOM EL. - 0.00

/NOTE.'PROCEDURALLY ACTIVATE SLUICE GATE WHEN WATER SURFACEELEVATION REACHES 5.50' NGVD 29 AND IN PREPARATION TO SEVEREWEATHER AFTER ACCEPTABLE WATER QUALITY TESTiNG RESULTS.

CONCRET7 BLOCK (f

SECTION A-A

Glenn M.Andrews, RE

MAR 0 6 2012

Lic. No. 65772NPE DRAWING NO.

PSL-C-275630-001DIV: CIVIL DR: JC( APPROVAL

CH: GMA

DATE: 3/1/12

UNIT 1 & 2 <

TYPICAL CROSS SECTIONSECTION A-A

SHEET

3 OF 3 0 -CAD FILE: PSL-C-275630-001 SH2

Page 18: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FDEP JWV Permit # FL0002208Attachment 2

ATLANTIC OCEAN-PROJECTLOCATION

HERMAN BAY

KEY MAP

NPE

DIV: CIVIL DR: JCGCH: GMA

DATE: 3/1/12

CAD MLE: PSL-C-275630-O01

Page 19: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FDEP IWV Permit # FL0002208Attachment 2

X

-~ ~ , ------ - --

x x

ix x• •-S.R. A1A Nx---------------------------------

xtN

A ~I \

~/N '~.

-7/

N

/-

~

x I AWE. 5.2

PROPOSEDCONTROL STRUCTURE PIPE

x

\x •

./ /,-

PLAN

DIV: CIVIL DR: JCG

CH: GMA

DATE: 3/1/12

CAD FILE: PSL-C-275630-OO1 SH 2

Page 20: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FOEP IWVVN Permit # FL0002208Attachment 2

EXlS1"NG DRAINAGE POND

WHEEL ACTIVATED SLUICE GATEEQUIPPED WITH FLOW METERING& RECORDING DEVICE (SEE NOTE)

SURFACE EL.V_ =J.20' NGV 29

I XISTINC INTAKE CANA4L

{-EXISTING GROUND

F-FLAP GATE

r INTAKE CANAL

VD 29

PFRECAST CONCRETECONTROL STRUCTURE 1 LRIM EL. - 6.25NOTCH EL - 3.50INV. EL. = 0.50BOTTOM EL. = 0.00

PROCEDURALLY ACTIVATE SLUICE GATE WHEN WATER SURFACEELEVATION REACHES 5.50' NGVD 29 AND IN PREPARATION TO SEVEREWEATHER AFTER ACCEPTABLE WATER QUALrY TESTING RESULTS.

,00741

CONCRETE BLOCK (

SECTION A-A

~4~~nM n~rew, R__

MA 2062M

Li. o.69-77?2

NPE FLORIDA POWER & LIGHT COMPANY DRAWING NO.ST. LUCIE PLANT

DIV: CML DR JCG APPROVAL UNIT 1 & 2 PSL-C-275630-O01CH: GMA TYPICAL CROSS SECTION SHEETDATE: 3//12 T PL SECTION A-A 3 OF 3 0

i

CAD FLE PSL-C-275630-O01 SH2

Page 21: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FDEP IWWN Permit # FL0002208Attachment 2

ATLANTIC OCEAN

HERMAN BAY

KEY MAP

NPE

DIV: CIVIL DR: JCG

CH: GMA

DATE: 3/1/12

Page 22: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FDEP 'WW Permit # FL0002208Attachment 2

x x

x. x .. . - S.R. AlA Nx

--- ---------- ------------- ------

/1?f/4'ý

/ x AAW.E. 5.2IPROPOSEDCONTROL S

-PROPOSEDDISCHARGE PIPEx

toCd

-I

PLANNPE

DIV: CIVIL DR: JCG

CH: OMADATE: 3/1/12

CAD FILE: PSL-C-275630-00l SH 2

Page 23: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

FODEP IWI Permit # FL0002208Attachment 2

EXISTING DRAINAGE POND £XIT77NO INTAKE CANAL

WHEEL ACTIVATED SLUICE GATEEQUIPPED WITH FLOW METERING& RECORDING DEVICE (SEE NOTE)

SURFACE ELNV-3.20' NGIýV 29

EXIS77NG GROUND

rFLAP GATE

[ INTAKE CANAL

- --- -- -- -- -- -- -- -- ----- -

ZPRECAST CONCRETECONTROL STRUCTURE NV,. ESL 0.DDRIM EL = 6.25NOTCH EL = 3.50INV. EL - 0.50BOT'rOM EL = 0.00 /

PROCEDURALLY ACTIVATE SLUICE GATE WHEN WATER SURFACE COELEVATION REACHES 5.50' NGVD 29 AND IN PREPARATION TO SEVEREWEATHER AFTER ACCEPTABLE WATER QUALITY TESTING RESULTS.

SECTION A-A

"ISING ARTnCUL4-TNG iNCRETE BLOCK (rYP)

Glenn M. Andrews, P.E.

Li-ýR.[,', 62 2012Lic. No. G5772

ANPE DRAWING NO.

DIV: CIVIL DR: JCG APPROVAL

CH: GMA

DATE: 3/1/12TYPICAL CROSS SECTION

SECTION A-ASHEET3 OF 3CAD FILE' PSL-C-275630-O01 SH2

Page 24: FPL March 23, 2012 · 2012. 7. 20. · 0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 23, 2012 L-2012-135 10 CFR 50.4 EPP 3.2.4 U. S. Nuclear

VPPSL006ENCLOSURE 4

FPL check payable to the State of Florida, Department of Environmental Protection in the amountof $250.00 for application fee