Page 1: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

FP6-511513

OntoGrid: Paving the way for Knowledgeable

Grid Services and Systems

www.ontogrid.net

WP8: Use case 1: Quality Analysis for Satellite Missions

Review Meeting Deft, 11-13 April 2005

Manuel Sánchez Gestido (DEIMOS)

Page 2: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

2Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current Status Cross Work Package Relationship Technical aspects Dissemination Spent Effort per Task and Deliverable Conclusions

Page 3: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

3Review Meeting - Delft, 11-13 April 2005

Table of Contents

IntroductionIntroductionGeneral ObjectivesSatellite Mission quality analysis of data (QUARC)

Current Status Cross Work Package Relationship Technical aspects Dissemination Spent Effort per Task and Deliverable Conclusions

Page 4: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

4Review Meeting - Delft, 11-13 April 2005

Introduction

General objectives:Main objective is to use the development of a

semantic Grid-based application with distributed access to heterogeneous resources in real system (Satellite Mission environment).

Utilization of processes that behave as agents allows to automate most of the tasks involved in the management of the information that is saved in and retrieved from a database.

Page 5: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

5Review Meeting - Delft, 11-13 April 2005

Introduction

Satellite Mission quality analysis of data (QUARC):

Page 6: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

6Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current StatusCurrent Status

Phase goalsPhase achievements

Cross Work Package Relationship Technical aspects Dissemination Spent Effort per Task and Deliverable Conclusions

Page 7: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

7Review Meeting - Delft, 11-13 April 2005

Current Status

Phase Goals: Follow-up of the definition of the general

architecture to be considered (T8.1 ”Software study of the deliverables provided in WP1-WP7”).

Enumeration of the particular needs for a Satellite Mission use case (T8.2  ”Business case and user requirements analysis for resource distributed access”).

Page 8: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

8Review Meeting - Delft, 11-13 April 2005

Current Status

Phase achievements:Analysis and Test set Definition Deliverable D8.1:

“OntoGrid Business Case and User Requirements for Quality Analysis Plattform” (Report)

Precise definition of the use cases in the Data product handling of a Satellite mission (I and II).

Definition of the general design.Initial version of the application architecture.

Page 9: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

9Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current Status Cross Work Package RelationshipCross Work Package Relationship Technical aspects Dissemination Spent Effort per Task and Deliverable Conclusions

Page 10: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

10Review Meeting - Delft, 11-13 April 2005

Cross Work Package Relationship

Cross Work Package relationship with WP8

WP8 (Satellite Missions use case)

WP3WP4

MultiAgent systems for automation of processes

MultiAgent systems for automation of processes

Application in a particular environment

Application in a particular environment

WP1 WP5

Example of a real world case (for conceptualization)

Example of a real world case (for conceptualization)

WP2 WP6 WP7

Semantic Grid structure

Semantic Grid structure

Ontologies in a Grid environment

Ontologies in a Grid environment

Annotation services

Annotation services

Intelligent debugging tools

Intelligent debugging tools

MethodologyMethodology

Page 11: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

11Review Meeting - Delft, 11-13 April 2005

Cross Work Package Relationship

Software study of the deliverables produced in WP1-WP7 (with updates if any)

Business case and user requirements

analysis

0 6 12 18 24 30

Tasks and deliverables

Develop domain ontologies and formalize knowledge

Develop Application architecture

Integration

Documentation

Software development (SW life-cycle)

Page 12: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

12Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current Status Cross Work Package Relationship Technical aspectsTechnical aspects Dissemination Spent Effort per Task and Deliverable Conclusions

Page 13: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

13Review Meeting - Delft, 11-13 April 2005

Technical aspects

Ontogrid Functionality applied to Satellite Mission case:Adapted to a subset of QUARC (Quality analysis of

data)Focuses in:

• Input in Data Model (events, processes, annotations)• Output through:

Objects (Timelines, filters)Sentences: management timelines and filters

• Presentation: Gantt, Plot XY or tables

Page 14: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

14Review Meeting - Delft, 11-13 April 2005

Technical aspects

Design Drivers:Application is conceived to provide a prototype

which is able to be adapted to the evolving needs of the Quality Analysis and Calibration activities without system-reengineering.

Allows ingestion and reporting plug-ins at the corresponding interfaces for monitoring new gauges.

Core system, that is mission independent, can be re-used for different Earth Observation Missions (very similar needs and requirements).

Ontogrid will be developed using standards tools for development and implementation

Page 15: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

15Review Meeting - Delft, 11-13 April 2005

Technical aspects

Business Processes: All business processes are in charge of monitor and control of a satellite or a set of satellites for getting valuable data (products) from the instruments. These data justifies the mission of the satellite.

Conceptual definitions:• Satellite is a hardware and software equipment with a concrete

mission.• Instrument is a hardware and software component, which allows

making measures of specific type. • Mission is the objective of any element, in this case of the satellite (i.e.

Envisat data supports earth science research and allows monitoring of the evolution of environmental and climatic changes.

• Products or product files are files generated by an instrument directly (level 0) or processed (level 1b/level2) after being generated by an instrument.

Page 16: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

16Review Meeting - Delft, 11-13 April 2005

Technical aspects

Page 17: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

17Review Meeting - Delft, 11-13 April 2005

Technical aspects

PDS Architectural elements

Payload data handling stations for off-line users

Page 18: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

18Review Meeting - Delft, 11-13 April 2005

Technical aspects

Data downlink

General navigation process:

Verify and control the navigation of the satellite.

Inputs: Configuration data

Outputs: Products files and auxiliary files

Actors: · MCS PDS· Satellite

Page 19: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

19Review Meeting - Delft, 11-13 April 2005

Technical aspects

: PDS : QualityAnalysis&ReportGeneration

: MCS : ConfigurationData&DataSatellite

: Satellite

Distribute Quality Reports

Modification configuration: satellite and instruments

Store the configuration data from satellite

Send telecommands

Send telemetry

Store product files

Build product files from telemetry and processing of telemetry

Data downlink

General navigation process:

Page 20: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

20Review Meeting - Delft, 11-13 April 2005

Technical aspects

Quality process: Monitorization and control of the instruments included in the satellite and all the parameters involved in the data acquisition.

Inputs: Products files and auxiliary files

Outputs: Reports for “Research and developers”.

Actors: PDS Research and

Development DEIMOS ESA Maintenance

Page 21: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

21Review Meeting - Delft, 11-13 April 2005

Technical aspects

DIM or Data Ingestion Module

: PDS :

ESAMaintenance : QualityAnalysis&ReportGeneration

: MCS

: ConfigurationData&DataSatellite : ResearchAndDevelopment

Modification configuration: satellite and instruments

Generate the data to be included in database based in product files

DPM or Data Presentation Module

Generate the Quality Report

Product file discovery

Distribute Quality Report

Distribute Quality Report

Configure a Use Case

Subscribe to a specific Quality Report

Subscribe to a specific Quality Report

Quality process:

Page 22: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

22Review Meeting - Delft, 11-13 April 2005

Technical aspects

Development process: Creation of a customized solution for providing new specific reports from the data extracted from the satellites.

Inputs: Description of the report content

Outputs: DIM, DPM and new configuration

Actors: DEIMOS ESA Development ESA Maintenance Research and

Development

Page 23: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

23Review Meeting - Delft, 11-13 April 2005

Technical aspects

Quality Platform: QUARC in grid Use Cases

Generate and distribute report (DPM/DIM)

Add subscription to a report

Monitor System Configure Use

Case Control System

Actors: PDS ESA Maintenance

• Administrator• Configurer

Research and Development

Monitor system Configure Use Case

Administrator

Control system

Configurer

Client Report could be one of these two actors:

ESA Maintenance could be one of these two actors:

Researcher and Developer

Add subscription to a report

PDS

Generate and Distribute reports

Page 24: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

24Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current Status Cross Work Package Relationship Technical aspects DisseminationDissemination Spent Effort per Task and Deliverable Conclusions

Page 25: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

25Review Meeting - Delft, 11-13 April 2005

Dissemination

Contact with potential users: The person responsible for the QUARC project (Quality Analysis application for Satellite data) in the European Space Agency (ESA-ESRIN) has been informed about the development of the use case for Satellite Missions. Other ESA groups could be interested in the project. 

Dissemination of the project: OntoGrid information is present at the Deimos company website (http://www.deimos-space.com/Eng/ref_gss.html) with an additional link to the OntoGrid portal for further details.

Page 26: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

26Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current Status Cross Work Package Relationship Technical aspects Dissemination Spent Effort per Task and DeliverableSpent Effort per Task and Deliverable Conclusions

Page 27: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

27Review Meeting - Delft, 11-13 April 2005

Spent Effort per Task and Deliverable

1 MM =150h

CS1 TotalEst Act Est Act

WP1: Grid 0,00 0,00 0,00WP2: MAS 0,00 0,00 0,00WP3: Ontologies 0,00 0,00 0,00WP4: P2P 0,00 0,00 0,00WP5: Annotation 0,00 0,00 0,00WP6: Debugging 0,00 0,00 0,00WP7: Methodologies 0,00 0,00 0,00WP8: Satellite 2,08 5,42 12,50 5,42WP9: Insurance 0,00 0,00 0,00WP10: Dissemination 0,50 0,70 3,00 0,70WP11: Colaboration 0,08 0,10 0,50 0,10WP12: Management 0,17 0,52 1,00 0,52WP13: Impact 0,17 0,20 1,00 0,20Total 3,00 6,94 18,00 6,94

OntoGrid - Deimos

Page 28: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

28Review Meeting - Delft, 11-13 April 2005

Table of Contents

Introduction Current Status Cross Work Package Relationship Technical aspects Dissemination Spent Effort per Task and Deliverable ConclusionsConclusions

Page 29: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

29Review Meeting - Delft, 11-13 April 2005

Conclusions

Contact with potential users has shown that:General acceptance for use of new Information Technologies

in a bussines environment should come from actual and inmediate benefits (i.e. time/money saving).

Hard-to-understand technology concepts should be kept away from the user. Difficult concepts better to stay within the system.

Potential users feel reluctant to new terminology, specially when they have some equivalence with their particular (technical) vocabulary. Use of this vocabulary, finding connections with new OntoGrid concepts, enhances enormously their interest.

Very difficult to change working habits in a specific professional community (interfaces, etc.). Those parts probably not to be changed drastically.

Page 30: FP6-511513 OntoGrid: Paving the way for Knowledgeable Grid Services and Systems  WP8: Use case 1: Quality Analysis for Satellite Missions

30Review Meeting - Delft, 11-13 April 2005

Conclusions

Open points:In order to progress in the development of the

application to the Satellite Mission use case it is necessary to define clearly the scope of those specific activities required to be implemented in this particular frame, alongside with the activities covered in the general scheme.

Detailed architecture applicable to the use cases should be frozen at least 4 months before software delivery.