    Foundation Cookbook

    Building Outer CanTools and Supplies:

    (3) 1/2 inch electric impact wrenches

    (5) inch impact sockets J-hooks- take round bar and bend it into a "J" and then weld a plate on the top of

    the "J". the plate needs a 9/16" hole to accept a shackle.

    NEED PICTURES

    Setting Outer Can

    Dig hole that is the same height as the outer can and 2 foot larger in diameter.

  • 8/6/2019 Foundation Cookbook

    2/19

    Pick can using 3-20 foot slings with shackles and tail can with forklift

    Once can is completely upright center over hole and then signal crane operator tolower can into hole.

  • 8/6/2019 Foundation Cookbook

    3/19

    Center can in excavation.

    Make sure you have enough clearance on all sides of can to meet engineeringspecifications.

    Can needs to be level with high side of hole.

    Call supervisor to verify that placement of can is acceptable.

    Place 2 plumb bobs on top of can 90 from each other, these plumb bobs should

    reach to within 1 of bottom of can.

  • 8/6/2019 Foundation Cookbook

    4/19

    Place eco blocks in 2 places 90 from each other and hook can to eco blocks usingcome alongs.

    Using man basket, enter hole.

    Take shovels, pick, sledge hammer, and tape measure.

    Using tools stated above, level can to +/- 1.

    Snug come alongs to keep can in place.

  • 8/6/2019 Foundation Cookbook

    5/19

    Fill any gaps between can and bottom of excavation with loose dirt from

    bottom of hole.

    Compact these areas so concrete can not run under can.

    Call supervisor so they can verify can is +- 1.

    Remove plumb bobs and rigging on way out

    Fill area between can and excavation with cement/slurry as perengineering specifications.

  • 8/6/2019 Foundation Cookbook

    6/19

    10 lifts then give cement/slurry cure time to avoid crushing can.

    Pay careful attention to distribute concrete/slurry evenly around can to

    avoid can movement (if can does move contact supervisor immediately).

    Check inside of can to make sure that no concrete/slurry is coming undercan into the inside (if it does, stop immediately and contact supervisor).

    Concrete/slurry up to 4 feet from top of can. Let cure.

    Call electricians so they can install their fiber conduits and grounding.

    Continue to concrete/slurry until you have reached top of can. Using aconcrete rake make a smooth level sidewalk around can for the outer

    form to set on.

    Dig pockets for inner can threaded rod.

    Stuffing BoltsTools and Supplies:

    Hoist-(YSFD-024-10-10 hoist with lug mounted trolley, purchased at Jack Rubin& Sons 310-635-5407, the sales man is Bill).

    25 to 30 foot of 3/8 cable with loops and 1/4' shackles on both ends to go

    between hoist and bolts.

    Hooks that attach to cable and can grab bottom of anchor bolts. Moto-X shoulder pads (Must be worn by everybody that is in the hole while

    stuffing bolts.

    Generator.

    100 foot extension cords.

    Using a 10 foot strap, choke bolts and lower each bundle into the hole, spacing

    them evenly around the hole.

    Put plywood in bottom of hole if it is soft or muddy, so the bolts do not sink.

  • 8/6/2019 Foundation Cookbook

    7/19

    Center template over hole and crib evenly on all four corners in order to getthe desired height from the engineering specifications.

    Pay special attention that cribbing is stacked in a fashion that it will not fall orshift.

    Place trolley ring on top of template using crane or forklift.

    Lower desired number of men into hole using crane and man basket

    (remove man basket from hole).

  • 8/6/2019 Foundation Cookbook

    8/19

    How ever number of bolt stuffing crews you have, have the same amountof men at the top guiding the bolts into the holes on the template.

    Using the hoist, lower the hook to bottom of anchor bolt, hook the bolt

    then guide the anchor bolt through the template hole.

  • 8/6/2019 Foundation Cookbook

    9/19

    After bolt is thru hole, thread nut on it to the desired height specified by

    the engineer.

    After all bolts are stuffed, remove any extra bolts, and send man basketback in to get crew (pick up all trash prior to exiting hole).

    Remove trolley ring.

    Pull bolt cage out of hole using crane and signal operator to move cagea safe distance from the hole.

    Install embedment rings and splice plates.

    Make sure you put full nuts in the four leveling locations on the top

    and bottom of the embedment ring Hand tighten all nuts all the way around.

    Then use 2 wrench and pipe wrench to tighten nuts (pay special

    attention not to turn bolt, because if you do it will mess up the boltelevation on top of the template).

    Check for bolt straightness, and to make sure they are not bowed (Ifthey are loosen nut and adjust accordingly).

    Wrap wire around bottom of bolt to prevent nut from falling off.

  • 8/6/2019 Foundation Cookbook

    10/19

    Contact supervisor so they can inspect embedment ring.

    Center bolt cage back over hole.

    Install rebar hoops as stated by engineer.

    After all rebar hoops are installed, final set template centered in the

    hole (measure from outside anchor bolt to outer can in 4 spots 90apart, tolerance is +-2).

    Shoot template in the same height as the top of your outside form, witha minimum of 15 between top of template and template frame.

    Reenter the hole using man basked and use #4 bar to center

    embedment ring. Wire tie top and bottom rebar on the inside and

    outside of embedment ring in 4 places 90 apart.

    Leave atleast 3 of rebar on the inside to make sure you get your

    clearance between the embedment ring and the inner can.

    Paint ground with bright paint where inner can should be set.

    Setting Inner CanTools and Supplies:

    Torch with atleast 100 of hose.

    3/4 threaded rod

  • 8/6/2019 Foundation Cookbook

    11/19

    Hook up same rigging you used on outer can.

    Tail with forklift.

    Center can over hole.

    Slowly lower can into hole, being careful not to move the template.

    Using spotlights make sure can is centered in the bottom of the hole and not

    touching embedment ring (3 min. clearance).

  • 8/6/2019 Foundation Cookbook

    12/19

    Set can on ground and take off rigging.

    Torch holes in 4 places 90 apart(big enough for threaded rod to go thru)on inner can and outer can (where you dug the pockets), making sure the inner

    can holes are a few inches higher.

    Center can in hole measuring from outer can to inner can, and secure with

    threaded rod in the 4 places where you torched the holes.

  • 8/6/2019 Foundation Cookbook

    13/19

    Make sure you use washers and flat plate on the inside and outside of both theinner and outer can to prevent movement.

    Filling Inner CanTools and Supplies:

    Tarp

    Shovel

    Plug inner can with specified concrete from engineer (pay special attentionthat no concrete is running from under inner can.).

    If you believe this may be a problem, have 5 loads of crush run put in inner

    can before the placement of the concrete.

  • 8/6/2019 Foundation Cookbook

    14/19

    Place tarp over template frame into inner can to help prevent dirt fromgetting between inner and outer can.

    Fill can with dirt until you are 4 foot from top, then call electricians tocome do the fiber conduits and grounding.

    Fill remainder of can with dirt, being extra careful not to spill any over theedge. When nearing the top it is best to use a worker to evenly spread outthe dirt and make a level surface to as close to the top of the inner can as

    possible, without spilling dirt over the edge.

    Remove tarp.

    Preparing Foundation for Structural PourTools and Supplies:

    Tie wire

    Pliars

    Sprayers

    Wood Spacers for outside form

    Place and bolt together outside form.

    Center outside form using wood spacers (make sure these are wired to

    something so they cant fall into hole. Make sure outside form is level or higher than template.

    Install foam blockouts over leveling nuts as specified by engineer.

  • 8/6/2019 Foundation Cookbook

    15/19

    Place cable tray in position as specified by engineer.

    Install conduits (making sure to wire them to something so they wont fall)

    as specified by the engineer, foaming the ends to stop any concrete fromentering them.

    Before tying rebar spray outer form, template and cable tray with formrelaeas.

    Tie rebar as specified by engineering, paying close attention to spacing

    and clearances (min 3).

  • 8/6/2019 Foundation Cookbook

    16/19

    Ready for pour

    Pouring FoundationTools and Supplies:

    Generators

    Vibrators

    Shovels

  • 8/6/2019 Foundation Cookbook

    17/19

    Wet down foundation, paying special attention that there is no dirt or debris

    on embedment ring (if there is contact supervisor immediately).

    Back concrete trucks up to the four sides.

    Pour between outside form and bolts

    Watch for concrete balls and dispose of them.

  • 8/6/2019 Foundation Cookbook

    18/19

    Concrete shall be brought up uniformly and vibrated in accordance with ACI.

    The bottom 5 feet can be poured with slumps up to 7 and vibrated until the

    embedment ring has been completely surrounded.

    Once you have reached to top, the concrete chute is moved into the middle of the

    foundation where it is completed.

  • 8/6/2019 Foundation Cookbook

    19/19

    Continue to vibrate concrete. Go all around the edge on the inside and outside of

    template to make sure concrete becomes flush with underside of template.

    Once foundation is full, make sure you have adequate concrete to fix any low

    spots.

    Finish concrete with steel or wood trowel

    Chamfer all edges.

    Spray with cure and seal.