formato sena ingles 2013

5
Dirección General Dirección de Formación Profesional NATIONAL SERVICE OF LEARNING FORM FORMATION`S PROJECT Name: Sergio Andres Giraldo Lopez Grade: 9A Direction Web: sergio9a.blogspot.com Tel: 5481143 1.1 Educational Institution: I.E.T.I Simona Duque 1.2 MUNICIPALITY: Marinilla 1.2 Name of the project: BANTRACORT 1.3 Training Program that responds to 1.4 Estimated time of execution of the project (months): Estimated 5 months

Upload: sergio-1998

Post on 14-Aug-2015

11 views

Category:

Education


2 download

TRANSCRIPT

Page 1: Formato sena ingles 2013

Dirección GeneralDirección de Formación Profesional

NATIONAL SERVICE OF LEARNING

FORM FORMATION`S PROJECT

Name: Sergio Andres Giraldo Lopez Grade: 9A

Direction Web: sergio9a.blogspot.com Tel: 5481143

1.1 Educational Institution: I.E.T.I Simona Duque

1.2 MUNICIPALITY:

Marinilla

1.2 Name of the project: BANTRACORT

1.3 Training Program that responds to

1.4 Estimated time of execution of the project (months):

Estimated 5 months

1.5 Companies or institutions that take part in his formulation or financing : (if exist)

none

1.7 Key words of search Transport-mobility-production-sensors

Page 2: Formato sena ingles 2013

2. Structure of the Project2.1 Approaching the Problem

¿As making a black line follower robot carrying cotton to the company JGB and improve transport and production?

2.2 Justification of The Project

This Project is done in order to show how well the line follow robot and its application in everyday life for the implementation in the transport and theReduction of cost in the factories.

2.3 General objetive

Develop a black line follower robot that allows the transport of products for better performance and economy

2.4 Specific objetive:

1. Improve the quality of life of people through the creation of artifacts that optimize the production and quality of the products of the company2. Look for materials that are friendly to the environmental and improve the economy

2.5 scope2.5.1 Beneficiaries of The Project

Employers of big factories seeking a better production

2.5.2 ImpactSocial

Economic Will have a positive Economic impact that will reduce costs an increase profits

Enviro mental Will have a positive environmental impact that its composition will be environmentally friendly

Technological Technological impact will improve the economy and innovator in the field of robotics

2.5.3 Restrictions or associated risks:

Could be at risk in terms of the height of the sensors and this would make Reading the line

Page 3: Formato sena ingles 2013

2.5.4. Products or results of the project

Improve transportation of goods within large factories and optimizes the quality of the products and will reduce high costs

2.6:Innovation/ Technological management

The project addresses a need of the productive sectoryes/no

NO

The project improves the process / product / service exists?.yes/no

YES

The project involves the use of new techniques and process technologies

yes/noYES

The end products are susceptible to industrial protection and / or copyright

yes/noNO

The products obtained in the project can be positioned in the market.

yes/noYES

2.7 Productive assessment

With the development of the project can meet the need for a potential customer.

yes/no

YES

Feasibility of project business planYES

Page 4: Formato sena ingles 2013

3. Planning

3.1 PROCESS STAGES3.2

ACTIVITIES OF THE

PROJECT

3.3. RESULTS OF LEARNING(a partir of the program of formation)

3.4 ASSOCIATE COMPETITION

DESCRIPTION OF THE ACTIVITY TEACHERSTHAT TAKE PART

HOURS EVIDENCES

Fase 1: Fundamentación

PHASE 2: formulación

PHASE 3:DIAGNOSTIC

4 PHASE: ANALYSIS AND CONSTRUCTION

OF THE PROPOSAL

5 PHASE:

Page 5: Formato sena ingles 2013