FORM KA 1/1 (Rev. 2007) Your Ref. Our Ref. Syarikat Bekalan Air Selangor Sdn. Bhd (SYABAS) Melalui, Ketua Wilayah (Pengurus Besar/Penolong Pengurus Besar/Pengurus Kanan) SYABAS Wilayah……………………………………… PART A Handing Over of Water Reticulation System On Lot No : ………………………………………………………………………………. ………………………………………………………………………………………………….. ………………………………………………………………………………………………….. I/We, the undersigned being the developer / proprietor of the abovementioned development hereby agree :- i. To surrender without any conditions to Syarikat Bekalan Air Selangor Sdn. Bhd (SYABAS) all rights to all pipelines and waterworks fittings within the development, after which these water supply installations shall be the properties of the State Government of Selangor or Federal Government (as case may be) to be operated and maintained at SYABAS’s expenses unless otherwise provided for in the Water Supply (Selangor) Rules and Enactment 1997 and any other rules made hereunder. ii. That SYABAS shall be relieved of all financial responsibility in respect of liabilities incurred in the execution of water supply system by developer. iii. We, confirm that there is no financial encumbrances on SYABAS in respect of pipelines and ancillary works surrendered hereby to SYABAS. …………………………………………. ……………………………………………………….. Name + Signature of Consultant Name + Signature of Developer / Proprietor Date …………………………………. Date ……………………………………………… SYARIKAT BEKALAN AIR SELANGOR SDN BHD

Upload: mie-ee

Post on 03-Oct-2015

85 views

Category:

Documents


4 download

DESCRIPTION

Form Syabas Devforms_01

TRANSCRIPT

  • FORM KA 1/1

    (Rev. 2007)

    Your Ref.

    Our Ref.

    Syarikat Bekalan Air Selangor Sdn. Bhd

    (SYABAS)

    Melalui,

    Ketua Wilayah

    (Pengurus Besar/Penolong Pengurus Besar/Pengurus Kanan)

    SYABAS Wilayah

    PART A

    Handing Over of Water Reticulation System

    On Lot No : .

    ..

    ..

    I/We, the undersigned being the developer / proprietor of the abovementioned development hereby agree :-

    i. To surrender without any conditions to Syarikat Bekalan Air Selangor Sdn. Bhd (SYABAS) all

    rights to all pipelines and waterworks fittings within the development, after which these water

    supply installations shall be the properties of the State Government of Selangor or Federal

    Government (as case may be) to be operated and maintained at SYABASs expenses unless

    otherwise provided for in the Water Supply (Selangor) Rules and Enactment 1997 and any

    other rules made hereunder.

    ii. That SYABAS shall be relieved of all financial responsibility in respect of liabilities incurred in

    the execution of water supply system by developer.

    iii. We, confirm that there is no financial encumbrances on SYABAS in respect of pipelines and

    ancillary works surrendered hereby to SYABAS.

    . ..

    Name + Signature of Consultant Name + Signature of Developer / Proprietor

    Date . Date

    SYARIKAT BEKALAN AIR SELANGOR SDN BHD

  • PART B FORM KA 1/1

    (Rev. 2007)

    (To be completed by Consulting Engineers/Developer)

    Handing over of Water Reticulation System.

    On Lot .

    .

    1. Pipeline :

    Nominal Diameter

    (mm)

    Material Type Class/Rating Name of Approved

    brand

    Length

    (m)

    2. Sluice Valve 3. Air Valves

    4. Fire Hydrants: 5. Scour Valves:

    Size

    (mm)

    Name of

    Approved brand

    Nos.

    SYARIKAT BEKALAN AIR SELANGOR SDN BHD

    Size

    (mm)

    Name of

    Approved brand

    Nos.

    Size

    (mm)

    Name of

    Approved brand

    Nos.

    Size

    (mm)

    Name of

    Approved brand

    Nos.

  • FORM KA 1/1

    (Rev. 2007)

    6. Butterfly Valves 7. Zone Meters

    Size

    (mm)

    Name of

    Approved brand

    Nos.

    8. Water Sampling Points 9. Others :.

    (Specify details)

    10. Construction Costs

    i. Pipes and joints supply RM

    ii. Specials and valves supply RM

    iii. Labour for lay and fix RM

    .

    iv. Others RM

    .

    Size

    (mm)

    Name of

    Approved brand

    Nos.

    SYARIKAT BEKALAN AIR SELANGOR SDN BHD

    Size

    (mm)

    Nos.

    Location

    Nos.

  • FORM KA 1/1

    (Rev. 2007)

    11. We enclosed herewith the following :-

    i. Copies of Invoices of pipes, joints and fittings, value of tender/ Quotation works.

    12. These pipelines cover the following requirement :-

    No of Units

    i. Low Cost

    ii. Terrace House

    iii. Bungalow Semi Detached

    iv. Shop House

    13. a. We hereby certify that the above installation have been supervised by us and laid in

    accordance with the plans and specifications approved by SYABAS vide letter reference no.

    . Dated

    b. We hereby undertake full responsibility for the design and construction of water reticulation

    works, any non-compliance and deviations of the said external water supply works.

    Agreed by Developer, Certified by Consultant,

    . ..

    Signature Signature

    Name : Name :

    Stamp of developer : Stamp of Consultant : .

    Date : .. Date : .

    SYARIKAT BEKALAN AIR SELANGOR SDN BHD

    v. Others 11 Units .... (Shop Office)

  • PART C (For Office Use) FORM KA 1/1

    (Rev. 2007)

    Handing over of Water supply Reticulation

    On Lot

    .

    1. As Built Plans Ref : No

    2. Checking and approval of As-built plans.

    Checked by Technician Reviewed by Head of Development

    section/ Technical Manager :

    Signature Signature

    Name : Name : .

    Date : Date : .

    3. Updating of plans by Mapping unit.

    Updated by Head of Mapping unit:-

    .

    Signature

    Name :

    Designation :

    Date :

    4. Approved by Ketua Wilayah,

    .

    Signature

    Name :.

    Date :.

    SYARIKAT BEKALAN AIR SELANGOR SDN BHD