form - structural concrete pre-pour conference agenda 1

Upload: masahin

Post on 07-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    1/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA

    The items in the following agenda are minimum requirements that should be covered during the conference. The agendamay be used as is or as a base to develop a customized agenda.

    Project Number: Resident Engineer:

    Project Code (SA): Project Engineer:

    Location: Contractor:

    Date: Superintendent:

    Time: Foreman:

    I. Attendance Roster 

    Name: !!ice Number:Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Page

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    2/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    I. Attendance Roster (continued)

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Name: !!ice Number:

    Representing: Fa" Number:

    Street Address: Ce## Number:

    Cit$% State% &ip: E'ai# Address:

    Page *

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    3/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    II. Proect Or!ani"ation and Status

    A. Co#orado De$art%ent o& Trans$ortation Personne#'

    + Personne# in C,arge at Site:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    *+ Assistant'in'C,arge (/,en personne# identi!ied in A+ is not present):

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:obi#e Number: E'ai# Address:

    0+ Tester:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    1+ 2nspector-Duties:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    3+ 2nspector-Duties:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:4+ 2nspector-Duties:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    5+ t,er:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    Comments:

    . Contractor Personne#'

    + 6ua#it$ Contro# Super7isor:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    *+ t,er:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    0+ t,er:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    1+ t,er:

    Name-Tit#e: Fa" Number:

    !!ice Number: .ome Number:

    obi#e Number: E'ai# Address:

    Comments:

    Page 0

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    4/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    III. Scedu#in!

    A. *ateria#s'

    ateria#s /i## be a7ai#ab#e !or samp#ing on:

    . Concrete P#ant'

    Concrete p#ant /i## be read$ to be c,ec8ed on:

    C. Finisin! E+ui$%ent'

    Finis,ing e9uipment /i## be set up and read$ !or appro7a# on:

    D. P#ace%ent Scedu#e'

    P#acement is sc,edu#ed !or:

    E. Concrete atcin!'Concrete batc,ing /i## start at:

    F. P#ace%ent Location'

    Concrete p#acement /i## start at:

    G. Len!t o& Pour'

     Anticipated #engt, o! pour:

    ,. Oter Scedu#ed Ite%s'

    t,er sc,edu#ing items t,at /i## a!!ect t,e start o! t,e concrete pour inc#ude:

    +

    *+

    0+

    1+

    Page 1

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    5/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    I. S$ecia# Proision Re+uire%ents

    The following Special Provisions are reviewed and discussed below:

    A. S$ecia# Proision'

    Comments:

    . S$ecia# Proision'

    Comments:

    C. S$ecia# Proision'

    Comments:

    D. S$ecia# Proision'

    Comments:

    E. S$ecia# Proision'

    Comments:

    F. S$ecia# Proision'

    Comments:

    G. S$ecia# Proision'

    Comments:

    ,. S$ecia# Proision'

    Comments:

    Page 3

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    6/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    . P#an Notes and Unusua# Re+uire%ents

    The following plan notes and unusual requirements, experimental features, research items, and other unusualrequirements are reviewed and discussed below:

    A. P#an Note'

    Comments:

    . P#an Note'

    Comments:

    C. P#an Note'

    Comments:

    D. P#an Note'

    Comments:

    E. Oter Re+uire%ent'

    Comments:

    F. Oter Re+uire%ent'

    Comments:

    G. Oter Re+uire%ent'

    Comments:

    ,. Oter Re+uire%ent'

    Comments:

    Page 4

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    7/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    I. Pre-Pour Ins$ections

    The ontractor is hereby informed that no concrete shall be placed prior to review, inspection, and approval of thefollowing items:

    A. For%s'

     Are !orms set on proper #ine and grade% ade9uate#$ supported% !ree o! grout #ea8s% c#ean and proper#$ sied+ Comments:

    . Fa#s/or0'

    + Are !a#se/or8 dra/ings re9uired per subsection 4;+(b) o! t,e Standard Specifications<

    *+ 2! !a#se/or8 dra/ings are re9uired% t,e Contractor=s pro!essiona# engineer must certi!$ in /riting to t,e Project Engineer   t,at !a#se/or8 materia#s and construction are in con!ormance /it, t,e !a#se/or8 dra/ings submitted to t,e Project  Engineer prior to p#acement% in accordance /it, subsection 4;+(a) o! t,e Standard Specifications+ Comments:

    0+ P#acement o! te##ta#es+ Comments:

    C. Rein&orcin! Stee#'

    Rein!orcing stee# must be o! t,e proper grade% and t,e bars must be o! t,e correct number and sie p#aced in t,e correct#ocation+ >ars must be proper#$ tied and a## areas /,ere t,e epo"$ coating ,as been damaged must be correct#$ repaired+Comments:

    D. E1$ansion Deices'E"pansion de7ices must be set on correct #ine and grade% !ormed and secured to a##o/ concrete to !#o/ around anc,orde7ices /it, no resu#ting 7oids+ Comments:

    E. Line and Grade'

    2nspected !or proper #ine and grade+ Comments:

    F. Finisin! *acine and Testin! rid!e'

    T,e !inis,ing mac,ine must be adjusted to !inis, on t,e proper #ine% grade% and s8e/% and t,e support rai# or string #inemust be set proper#$ and supported ade9uate#$+ A test run must be comp#eted and measurements ta8en to c,ec8uni!ormit$+ T,e testing bridge must be read$ !or use b$ CDT !orces+ Comments:

    Page 5

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    8/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    II. Concrete atcin! and De#ier2 (su3sections 456.54 and 456.57)

    A. P#ant and Truc0 Ins$ections' ?es No

     Are p#ant and truc8 inspections current<

    .a7e CDT Forms 14 @ Concrete Truc8 i"er 2nspection Certi!ication been submitted<

    Do a## truc8s ,a7e counters and manu!acturer=s p#ates t,at #ist t,e 7arious drum speeds<

    Comments:

    . Desi!n *i1' ?es No

    .as t,e Concrete i" Design Report been re7ie/ed and appro7ed b$ t,e ateria#s and eotec,nica#>ranc,<

     Are copies o! t,e CDT i" Design Re7ie/ S,eet a7ai#ab#e !or supp#ier and 2nspector<

     Are t,ere an$ unusua# !eatures in t,e concrete mi"es<

    Comments:

    C. *i1 Deiation' ?es No

    Does Contractor or supp#ier intend to de7iate !rom proposed proportions !or an$ reason (e+g+% admi"tures)<

    2! $es% prior appro7a# to ma8e t,e re7ision must be recei7ed+ Comments:

    D. A!!re!ate Stoc0$i#es' ?es No

    .a7e t,e !ine and coarse aggregate stoc8pi#es been tested !or comp#iance /it, speci!ications<

     Are t,e$ ade9uate !or t,e proposed p#acement<

    Bi## supp#ier samp#e aggregate stoc8pi#es !or moisture content /it,in *1',ours prior to p#acement

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    9/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    II. Concrete atcin! and De#ier2 (continued)

    G. E%er!enc2 u#0eads'

    2! it is necessar$ to p#ace an emergenc$ bu#8,ead% at /,at #ocations can t,is emergenc$ bu#8,ead be p#aced<

    ,. rid!e Desi!n and *ana!e%ent ranc' ?es No

    .as t,e >ridge Design and anagement >ranc, been contacted !or ad7ice<

    Comments:

    I. Concrete Tests'

    T,e Contractor is reminded t,at t,e concrete /i## be tested at t,e job site+ T,e resu#ts o! t,ese tests /i## be used to accept%price reduce% or reject t,e concrete+ T,e Project Engineer% or ,is de#egated representati7e% /i## be responsib#e !orin!orming t,e Contractor o! t,e test resu#ts and t,e acceptabi#it$ o! t,e concrete+ Comments:

    8. Concrete Reection'

    T,e Contractor is reminded t,at concrete can be rejected !or an$ o! t,e !o##o/ing reasons:

    + mi" e"ceeds t,e /ater'cement ratio criteria%

    *+ mi"ing-,au#ing e"ceed speci!ied time #imit%0+ /or8 is not meeting speci!ied concrete mi" temperatures% or 1+ a batc, tic8et is not !i##ed out comp#ete#$+

    Comments:

    9. atc Tic0ets'

    T,e concrete supp#ier is to !urnis, a batc, tic8et /it, eac, #oad o! concrete de#i7ered to t,e project+ T,ese tic8ets mustcontain a## t,e in!ormation speci!ied in subsection 4;+;4 o! t,e Standard Specifications+ T,e Contractor s,a## co##ect andcomp#ete t,e batc, tic8et at t,e p#acement site and de#i7er a## batc, tic8ets to t,e Project Engineer on a dai#$ basis as persubsection 4;+;4 o! t,e Standard Specifications+ Comments:

    Page

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    10/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    III. Concrete P#ace%ent (su3section 456.6: and 456.6;)

    A.

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    11/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    I=. Concrete Finisin! (su3sections 456.6:(0)> 456.6?> and 456.6;)

    A. Finisin! E+ui$%ent'

    B,at is t,e Contractor=s p#an in t,e e7ent o! a mec,anica# brea8do/n o! t,e !inis,ing mac,ine<

    . Strai!ted!e' ?es No

    2s a ;'!oot straig,tedge a7ai#ab#e !or c,ec8ing t,e to#erances o! t,e !inis,ed concrete<

    Comments:

    C. Tic0ness and Coer Cec0s'

    T,e Contractor is reminded t,at s#ab t,ic8ness and rein!orcing stee# co7er c,ec8s /i## be made continuous#$ and t,at t,eContractor ma$ be re9uired to adjust t,e screed periodica##$ or re!inis, a portion o! t,e s#ab to /it,in to#erance+ Comments:

    D. Addition o&

  • 8/20/2019 Form - Structural Concrete Pre-Pour Conference Agenda 1

    12/12

    STRUCTURAL CONCRETE PRE-POUR CONFERENCE AGENDA (continued)

    =. Concrete Curin! (su3sections 456.6@ and 456.64)

    A. Curin! *etod'

    B,at met,od o! curing /i## t,e Contractor use<

    . Ti%in! o& Curin!'

    B,en /i## t,e curing met,od begin and ,o/ #ong /i## it #ast<

    C. Protection o& Concrete' ?es No

    Does Contractor ,a7e e9uipment and materia#s at t,e site to pro7ide insu#ation-,eating o! t,e concrete<

    Comments:

    =I. Sa&et2 Re+uire%ents

    ?es No

    .as t,e Contractor pro7ided !or /or8 site sa!et$ in accordance /it, t,e ccupationa# Sa!et$ and .ea#t, Administration re9uirements (e+g+% ,ard,ats% ,andrai#s% sa!et$ be#ts% nets)<Comments:

    =II. Tra&&ic Contro#

    ?es No

    Bi## t,e concrete p#acement re9uire tra!!ic contro#<

    .as t,e et,od o! .and#ing Tra!!ic been submitted and appro7ed prior to p#acement<Comments:

    Page *