FORALPSKick-offMeetingTrento
10-11 March 2005
2
Welcome to:
• Joint Technical Secretariat:
- Dr. Sarah Magniez - FORALPS Project Officer
• Representatives of other Universities:
- Prof. Giovanni Perona
- Prof. Maurizio Maugeri
2
3
Tomorrow:
• At 9 am:
Welcome by the Rector of the University of
Trento, Prof. Davide Bassi
4
AGENDA:
10/03/2005
10.10 INTRODUCTORY REMARKS
10.30 PARTNER PRESENTATION
11.30 ORGANIZATIONAL ISSUES/1
13.00 Lunch break
14.30 REPORTING
15.30 ORGANIZATIONAL ISSUES/2
16.30 Coffee break
17.00 WORK PACKAGES 4, 7 and 8
18.00 End of the first day
20.00 Dinner – Please sign up at conference desk
3
5
AGENDA:
11/03/2005
9.00 RECTOR’S WELCOME
9.10 WORK PACKAGES 5, 6, 9
10.30 ANY OTHER BUSINESS AND
CLOSING REMARKS
11.00 REPORTING RULES (FOR THE
ITALIAN PARTNERS only)
13.00 End of the Kickoff Meeting
6
Practicals:
• LUNCH BREAK13:00 – 14:301st floor
• COFFEE BREAK16:30 – 17:00Here
• Toilette: on the opposite side of the entrance hall
4
7
Project overview
SPEAKERS: Dino Zardi, Stefano Serafin, Project Managers
SUMMARY• Project history• Partners’ presentation
8
FORALPS History
22/04/2004 Preparation meeting - Trento
04/06/2004 Preparation meeting - Verona
22/06/2004 Preparation meeting - Verona (WP6)
02/07/2004 Submission of the Application Form (AF)
27/07/2004 Amendments to formal inconsistencies 1/2
04/08/2004 Amendments to formal inconsistencies 2/2
25/10/2004 Project Approval
5
9
FORALPS History
19/11/2004 Reply in fulfillment of the Conditions and
Recommendations for final approval
19/11/2004 Fixing of Minor Deficiencies
Dec. 2004 Signing of the Partnership Agreement
01/01/2005 Project Startup
04/01/2005 Mailing of the Partnership Agreement
02/02/2005 Mailing of the Subsidy Contract
10/03/2005 Kick-Off Meeting
10
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
UniversitUniversitàà degli Studi di Trento, Dipartimento di Ingegneria Civile ed degli Studi di Trento, Dipartimento di Ingegneria Civile ed
Ambientale Ambientale -- UnitUnitàà del Consorzio Interuniversitario Nazionale per la del Consorzio Interuniversitario Nazionale per la
Fisica delle Atmosfere e delle IdrosfereFisica delle Atmosfere e delle Idrosfere
Acronym:Acronym: UNITNUNITN
Nationality:Nationality:
Mission of the body:Mission of the body: Research and educationResearch and education
Project Manager:Project Manager: profprof. Dino Zardi. Dino Zardi
6
11
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: LeadLead PartnerPartner
Role in Role in WPsWPs::
-- WP2: WP2: Transnational Project Management Transnational Project Management (WP Leader)(WP Leader)
-- WP3: WP3: Coordination of internal activities Coordination of internal activities (WP Leader)(WP Leader)
-- WP4: WP4: Managing the project's website, presentation of the project Managing the project's website, presentation of the project
results to the public.results to the public.
-- WP8: WP8: Pilot application of rainfallPilot application of rainfall--runoff models in the runoff models in the AdigeAdige Valley. Valley.
Analysis of the impact of hydraulic works on surface runoff.Analysis of the impact of hydraulic works on surface runoff.
-- WP9: WP9: Cost/benefit analysis of water resources management Cost/benefit analysis of water resources management
practices practices (WP Leader)(WP Leader)
12
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
Agenzia per la Protezione dellAgenzia per la Protezione dell’’Ambiente e per i Servizi Tecnici Ambiente e per i Servizi Tecnici –– Italian Italian
National Agency for Environmental Protection and Technical ServiNational Agency for Environmental Protection and Technical Servicesces
Acronym:Acronym: APATAPAT
Nationality:Nationality:
Mission of the body: Mission of the body: Technical and scientific branch of the Technical and scientific branch of the
Environment and Territory Ministry. Main areas of intervention aEnvironment and Territory Ministry. Main areas of intervention are: re:
environmental monitoring & control; soil and water protection; cenvironmental monitoring & control; soil and water protection; coastal oastal
management; environmental data collection; modeling and forecastmanagement; environmental data collection; modeling and forecasting ing
activities (SIMM); ARPA and APPA coordination. activities (SIMM); ARPA and APPA coordination.
Project Manager:Project Manager: Eng. Eng. GiuseppinaGiuseppina MonacelliMonacelli
Manager of the Hydrological and Internal Manager of the Hydrological and Internal
Waters ServiceWaters Service
7
13
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project Partner (Project Partner (WP8 LeaderWP8 Leader))
Role in various WP:Role in various WP:
-- WP3: WP3: Project Management (all partners)Project Management (all partners)
-- WP4:WP4: Presentation of the project results to the publicPresentation of the project results to the public
-- WP5: WP5: Share historical data with partnersShare historical data with partners
-- WP7:WP7: 1010--km BOLAM case forecast; interfacing meteorological km BOLAM case forecast; interfacing meteorological
forecasts with verification (statistical and deterministic) forecasts with verification (statistical and deterministic)
procedures and hydrological modelsprocedures and hydrological models
-- WP8: WP8: Analysis of rainfallAnalysis of rainfall--runoff models, to identify and suggest the runoff models, to identify and suggest the
most useful in the alpine space; exchange and update of stagemost useful in the alpine space; exchange and update of stage--
discharge relationships discharge relationships (WP Leader)(WP Leader)
14
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
ARPA ARPA -- Agenzia Regionale per la Protezione Agenzia Regionale per la Protezione
delldell’’Ambiente della LombardiaAmbiente della Lombardia
SubcontractorsSubcontractors: Universit: Universitàà degli Studi di Milano degli Studi di Milano –– Istituto di Fisica GeneraleIstituto di Fisica Generale
ISAC ISAC –– CNR CNR –– Istituto di Scienze dellIstituto di Scienze dell’’Atmosfera e del ClimaAtmosfera e del Clima
Acronym:Acronym: ARPALombardiaARPALombardia
Nationality:Nationality:
Mission of the body:Mission of the body: environmental monitoring and controlenvironmental monitoring and control
Project Manager:Project Manager: Dr. Mauro Dr. Mauro ValentiniValentini
8
15
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner
Role in various WP:Role in various WP:
-- WP4: WP4: Presentation of project results to the public at local scale.Presentation of project results to the public at local scale.
-- WP5: WP5: Creation of a hydro meteorological data base for Creation of a hydro meteorological data base for LombardiaLombardia
with homogenized long time series. with homogenized long time series.
-- WP7: WP7: Choice and application of a Choice and application of a spatializationspatialization technique for:technique for:
-- real time data from real time data from LombardiaLombardia meteorological network meteorological network
-- homogenized long time series.homogenized long time series.
16
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO
Acronym:Acronym: ARPAVARPAV
Nationality:Nationality:
Mission of the body:Mission of the body: Environmental Monitoring, Climatic and Environmental Monitoring, Climatic and
Meteorological ForecastingMeteorological Forecasting
RoleRole in FORALPS: in FORALPS: Project Partner 3Project Partner 3
9
17
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE
DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO
CENTRO METEOROLOGICO DI TEOLO (PADOVA)CENTRO METEOROLOGICO DI TEOLO (PADOVA)
Project Manager: dr. Alessandro Project Manager: dr. Alessandro BenassiBenassi
-- WP6: WP6: MonitoringMonitoring
XX--band band microradarmicroradar around around
Verona e Verona e TeoloTeolo with with
factivityfactivity study;study;
Aim: develop a composite Aim: develop a composite
with the existing with the existing dopplerdoppler--
radar at radar at TeoloTeolo
18
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE
DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO
CENTRO METEOROLOGICO DI TEOLO (PADOVA)CENTRO METEOROLOGICO DI TEOLO (PADOVA)
Project Manager: dr. Alessandro Project Manager: dr. Alessandro BenassiBenassi
-- WP7: WP7: weather and water resource weather and water resource availabilyavailabily
forecastingforecasting ComparisonComparison rainrain--gaugegauge
network (network (toto havehave
inproveinprove) and LAM ) and LAM
productsproducts over Garda over Garda
LakeLake regionregion
UnpredictUnpredict supercellsupercell 04/08/200204/08/2002
-24 h 0 h
10
19
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE
DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO
DIPARTIMENTO DI VERONADIPARTIMENTO DI VERONA
Project Manager: dr. Project Manager: dr. AttilioAttilio TacconiTacconi
-- WP9: Managerial, Economic and financial aspectsWP9: Managerial, Economic and financial aspects
Possible benefit deriving of Possible benefit deriving of new monitoring and new monitoring and dissemination facilities (Xdissemination facilities (X--band radar, alarmband radar, alarm--alert web alert web information) in Lake of information) in Lake of GardaGarda, a , a touristictouristic and and economic area particularly economic area particularly sensitive to severe eventssensitive to severe events
20
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
Environmental Agency of the Republic of SloveniaEnvironmental Agency of the Republic of Slovenia
Acronym:Acronym: EARSEARS
Nationality:Nationality:
Mission of the body:Mission of the body: National institution for National institution for
Environmental IssuesEnvironmental Issues
Project Manager:Project Manager: drdr. . Gregor GregoriGregor Gregoričč
11
21
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner 44
Role in various WP:Role in various WP:
-- WPWP55: : Digitalization of local historical datasets and homogenization Digitalization of local historical datasets and homogenization
of climatological datasets. Study of impacts of of climatological datasets. Study of impacts of
homogenisation on local climate parameters.homogenisation on local climate parameters.
-- WPWP66: : Correction of radar data with average reflectivity profiles. Correction of radar data with average reflectivity profiles.
Testing preformance of XTesting preformance of X--band microradar systems in alpine band microradar systems in alpine
valleys.valleys.
-- WPWP77: : Testing verification methods for various limited area Testing verification methods for various limited area
numerical weather forecasting model runsnumerical weather forecasting model runs
22
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
ARPA FVG ARPA FVG -- Agenzia Regionale per la Protezione dellAgenzia Regionale per la Protezione dell’’Ambiente del Ambiente del
FriuliFriuli--Venezia Giulia, settore OSMER Venezia Giulia, settore OSMER -- Osservatorio Meteorologico Osservatorio Meteorologico
RegionaleRegionale
Acronym:Acronym: OSMEROSMER
Nationality:Nationality:
Mission of the body:Mission of the body: Observing, understanding and forecasting Observing, understanding and forecasting
weather phenomena in FVG, diffusing related products and weather phenomena in FVG, diffusing related products and
broadening of meteorological culturebroadening of meteorological culture
Project Manager:Project Manager: dr. dr. FulvioFulvio StelStel
12
23
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner
Role in various WP:Role in various WP:
-- WP3: WP3: Coordination of internal activitiesCoordination of internal activities
-- WP4:WP4: Spreading information about project activities and Spreading information about project activities and
achievements to authorities and general public; organization of achievements to authorities and general public; organization of local local
workshops.workshops.
-- WP6: WP6: Test XTest X--band band microradarsmicroradars, installing weather stations, training , installing weather stations, training
volunteer observers volunteer observers (WP Leader)(WP Leader)..
-- WP7: WP7: High resolution numerical nonHigh resolution numerical non--hydrostatic experimental hydrostatic experimental
weather forecasts for case and sensitivity studies weather forecasts for case and sensitivity studies (WP Leader)(WP Leader)..
24
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
Name of institution:Name of institution:
UfficioUfficio IdrograficoIdrografico, , ServizioServizio MeteorologicoMeteorologico e e PrevenzionePrevenzione ValangheValanghe
RipartizioneRipartizione ProtezioneProtezione CivileCivile
ProvinciaProvincia AutonomaAutonoma di di BolzanoBolzano
Acronym: PABAcronym: PAB
Nationality:Nationality:
Mission of the body: Mission of the body:
-- HydrometeorologicalHydrometeorological monitoringmonitoring
-- Support in sustainable water resources management Support in sustainable water resources management
-- WeatherWeather--, Avalanche, Avalanche-- and Flood Forecasting and Flood Forecasting
-- Research and EducationResearch and Education
Project Manager: Project Manager: DottDott. . MichelaMichela MunariMunari
13
25
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner
Role in various WP:Role in various WP:
-- WP5: WP5: HydrometeorologicalHydrometeorological and glacier data processing and glacier data processing
quality control and quality control and visualisationvisualisation
-- WP6: WP6: Detail monitoring of the different contribution to surface and Detail monitoring of the different contribution to surface and
subsub-- subsurface runoff in a representative alpine subsurface runoff in a representative alpine catchmentcatchment
(snowmelt, (snowmelt, icemelticemelt, groundwater, rainfall), groundwater, rainfall)
-- WP8: WP8: Implementation of effective tools for water resources Implementation of effective tools for water resources
management in representative mountainous river basins, management in representative mountainous river basins,
suitable for different applications (ecology, hydropower suitable for different applications (ecology, hydropower
generation, risk assessment)generation, risk assessment)
26
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
Name of institution:Name of institution:
Provincia Autonoma di Trento Provincia Autonoma di Trento –– Servizio Prevenzione CalamitServizio Prevenzione Calamitàà
pubbliche pubbliche –– Ufficio Neve, Valanghe e MeteorologiaUfficio Neve, Valanghe e Meteorologia
Acronym: PATAcronym: PAT
Nationality:Nationality:
Mission of the body: Weather ServiceMission of the body: Weather Service
Project Manager: Project Manager: DottDott. Alberto . Alberto TrentiTrenti
14
27
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of institutioninstitution::
Regione Autonoma Valle dRegione Autonoma Valle d’’AostaAosta
Ufficio Meteorologico Ufficio Meteorologico -- Direzione Protezione CivileDirezione Protezione Civile
Acronym:Acronym: RAVARAVA
Nationality:Nationality:
Mission of the body:Mission of the body: regional authority, operational weather regional authority, operational weather
forecastingforecasting
Project Manager:Project Manager: dr. dr. GiulioGiulio ContriContri
28
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner
Role in various WP:Role in various WP:
-- WP3: WP3: internal activitiesinternal activities
-- WP4: WP4: improving the diffusion of specific meteorological information improving the diffusion of specific meteorological information
by disseminating products specifically studied for particular puby disseminating products specifically studied for particular purposes rposes
(mountaineering, road network maintenance, tourism); making the (mountaineering, road network maintenance, tourism); making the
high resolution data and forecasts obtained within the project high resolution data and forecasts obtained within the project
available to the public.available to the public.
-- WP6: WP6: lowlow--cost cost sitingsiting of the Xof the X--band radar (microband radar (micro--radar) in the radar) in the
bottom of a valley, where meteorological stations and bottom of a valley, where meteorological stations and
telecommunication facilities are already present; monitoring of telecommunication facilities are already present; monitoring of the the
rainfall close to the ground; natural integration of microrainfall close to the ground; natural integration of micro--radar data radar data
with Cwith C--band radar estimates aloft (collaboration with band radar estimates aloft (collaboration with PoliTOPoliTO))..
15
29
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
Name of institution:Name of institution:Zentralanstalt fZentralanstalt füür Meteorologie und Geodynamik Regionalstelle fr Meteorologie und Geodynamik Regionalstelle füür Tirol und r Tirol und
VorarlbergVorarlberg
Acronym:Acronym: ZAMGZAMG--II
Nationality:Nationality: AUSTRIAAUSTRIA
Mission of the body:Mission of the body: national meteorological service for Tyrol Region, national meteorological service for Tyrol Region,
Since 1990: one part of ZAMG Tyrol acting as legal person (Since 1990: one part of ZAMG Tyrol acting as legal person (““TeilrechtsfTeilrechtsfäähigkeithigkeit””), from ), from
this point on: 6 Meteorologists which are financed through projethis point on: 6 Meteorologists which are financed through projects, commercial weather cts, commercial weather
services and scientific studiesservices and scientific studies..
Project Manager: Project Manager: Karl Gabl (head)Karl Gabl (head)
Project Coworkers:Project Coworkers: Harald Schellander Harald Schellander (resp. FORALPS, METEORISK)(resp. FORALPS, METEORISK)
Susanne LentnerSusanne LentnerManfred BauerManfred Bauer
Georg ErlacherGeorg Erlacher
Markus Buchauer Markus Buchauer (resp. METEORISK, link to FORALPS)(resp. METEORISK, link to FORALPS)
Monika WeisMonika Weis
Alfred NeururerAlfred Neururer
30
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
Role in FORALPS:Role in FORALPS: Project PartnerProject Partner
Role in various WP:Role in various WP:
-- WP4: WP4: Data Set: Setting up a metadata data base for the Data Set: Setting up a metadata data base for the ““FliriFliri””
Dataset, merging existing datasetsDataset, merging existing datasets
(HZB,HD,FLIRI)(HZB,HD,FLIRI)
-- WP7: WP7: Subjective Precipitation Forecast Verification through Subjective Precipitation Forecast Verification through
comparison of grid point precipitation forecast ofcomparison of grid point precipitation forecast of
available Models and human precipitation forecasts available Models and human precipitation forecasts
Development of a forecast matrix for endDevelopment of a forecast matrix for end--users with anusers with an
extended parameter catalogue (sunshine duration, extended parameter catalogue (sunshine duration,
precipitation yes/no) for all kind of clientsprecipitation yes/no) for all kind of clients
Optimum Interpolation of precipitation fields for the north Optimum Interpolation of precipitation fields for the north
Tyrol region in collaboration with the Tyrol region in collaboration with the
hydrological service of Tyrolhydrological service of Tyrol
16
31
FORALPS – PROJECT PARTNERSTrento, 10., 11. 03. 2005
Name of Institution:Zentralanstalt für Meteorologie und Geodynamik
Regionalstelle für Kärnten
Acronym: ZAMG-K
Nationality:
Mission of the body:
operational met services for district of Carinthia
(weather & climate, station network)
consultancy services
Project Manager: Dr.Franz Stockinger
32
FORALPS – PROJECT PARTNERSTrento, 10., 11. 03. 2005
• Role in FORALPS: Project Partner
Role in various WPs:
- WP6 Monitoring
coordinated operation of microradar equipment
between OSMER, EARS and ZAMG-K in selected target regions
data evaluation & comparison
- WP7 Weather & Water Resource Availability
Forecasting
verification of numerical model output & subjective forecasts
to improve quantitative precipitation forecasts
via optimized employment of numerical data
17
33
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of InstitutionInstitution::
Zentralanstalt fZentralanstalt füür Meteorologie und Geodynamik, Regionalstelle fr Meteorologie und Geodynamik, Regionalstelle füür Salzburg r Salzburg
und Oberund Oberöösterreich sterreich
Acronym:Acronym: ZAMGZAMG--SS
Nationality:Nationality:
Mission of the body:Mission of the body: WWeather Service eather Service
Project Manager:Project Manager: Dr. Michael Dr. Michael StaudingerStaudinger
34
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
NameName of of InstitutionInstitution::
CentralCentral InstituteInstitute forfor MeteorologyMeteorology and and GeodynamicsGeodynamics, ,
RegionalRegional ServiceService forfor LowerLower Austria, Vienna and Austria, Vienna and BurgenlandBurgenland,,
Project Project implementationimplementation: : DepartmentDepartment of Climatologyof Climatology
–– SubSub--DivisionDivision ClimatologicalClimatological SurveySurvey
Acronym:Acronym: ZAMGZAMG--WW
Nationality:Nationality:
Mission of the body:Mission of the body: WWeather Service eather Service
(Divisions of Forecast, Environment, Geophysics, (Divisions of Forecast, Environment, Geophysics,
data processing, data processing, technicstechnics, , ClimatologyClimatology
–– to keep the to keep the climatologicalclimatological archivearchive (paper, digital, metadata)(paper, digital, metadata)
–– data rescue and recoverydata rescue and recovery
–– allocation of climate data and productsallocation of climate data and products
Project Manager:Project Manager: Dr. Dr. IngeborgIngeborg AuerAuer
Project teamProject team: : DiplDipl. . GeogrGeogr. Eva Korus, . Eva Korus, ReinhardReinhard BBööhmhm, ,
digitisingdigitising staff, Roland staff, Roland PotzmannPotzmann, Wolfgang , Wolfgang LipaLipa, ,
18
35
FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS
RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner
Role in various WP:Role in various WP:
-- WP5: WP5: Dataset Dataset (WP Leader)(WP Leader)
36
Organisational Issues/1
SPEAKERS: Dino Zardi, Serena Beber
SUMMARY• Project Steering Committee• Advisory Board• Information and Publicity Committee• Role of the Lead Partner
19
37
Project Steering Committee (PSC)(from Partnership Agreement)
1. The PSC is composed of the project managers of all project participants […] In case of need, project managers may delegate a substitute to attend PSC meetings, appointing to him the full mandate in representing the project participant.
2. The tasks of the PSC are the following: decisions on the technical, administrative and financial management of the project, decisions on reallocations in the budget, settlement of any disputes among project participants. […]
38
Project Steering Committee(from Partnership Agreement)
3. PSC meetings are convoked by the LP. The LP can invite representatives of the JTS, MA and INTERREG National Contact Points to attend to the PSC meetings as observers.
4. The members of the PSC shall make an effort to reach the widest agreement; if this is not reached in due time, decisions are taken by simple majority vote among the project managers and substitutes present at the meeting. In case of parity, the final decision is the one of the LP. Decisions taken by the PSC are binding for project participants.
20
39
Advisory Board(from Partnership Agreement)
“An Advisory Board (AB) composed by experts in the fields covered by the project activities will be appointed by the PSC.
The AB will follow and monitor the project, and give recommendations in order to achieve high-quality results and secure the outputs of the project.”
40
Information and Publicity Committee(from Partnership Agreement)
“An Information and Publicity Committee (IPC) will be set up, in order to coordinate the actions, style and timing of dissemination initiatives. Members of the IPC are appointed by the PSC. Representatives of the JTS can attend the IPC meetings as observers.”
21
41
PSC Meetings:
- When?
- Where?
- In connection with other events?
DISCUSSION
42
DISCUSSION
-20078°
2007
2006
2006
2005
2005
YEAR
7°
5°
4°
2°
1°
RELATED EVENTSMONTHVENUE
April ?
November
March
-
-
-
-
-
MILAN ?
VERONA ?
TRENTO
Tentative Schedule of PSC Meetings
22
43
Proposed appointments for the
Advisory Board
- Col. Giuseppe Frustaci Italian National Weather Service
- Eng. Reinhold Godina Bundesministerium für Land- und Forstwirtschaft, Umwelt und Wasserwirtschaft (BMLFUW)
- Prof. Ekkehard Dreiseitl University of Innsbruck
- Prof. Maurizio Maugeri University of Milan
- Prof. Giovanni Perona Politecnico of Turin
- Prof. Joze Rakovec University of Ljubljana
- Prof. Antonio Speranza University of Camerino
- Prof. Reinhold Steinacker University of Vienna
- Dr. Arnold Tafferner German Aereospace Centre (DLR)
44
Proposed appointments for the Information and Publicity Committee
- Dr. Serena Beber University of Trento, FORALPS Staff
- Dr. Massimo Boni ARPA FVG
- Dr. Michela Cavallini JTS – Publicity Officer
- Dr. Tanja Cegnar Environmental Agency of the Republic of Slovenia
- Dr. Elisabetta Nones University of Trento
- Dr. Elena Giusta APAT
- Dr. Michael Staundinger ZAMG-S
- ………………………… ……………….
23
45
Role of the Lead Partner(from Partnership Agreement)
The LP shall take all the steps needed to correctly manage the project in accordance with the project application, the decisions of the Steering Committee and the subsidy contract.
In addition, the LP shall:• keep the project partners informed on a regular basis about all relevant communication between LP and Joint Technical Secretariat (JTS) and LP and MA
• complete all actions foreseen for each year of the project implementation and have these expenditures certified within 12 months after receipt of the respective invoice or equivalent accounting document at the latest. Any expenditure not certified accordingly may not be reimbursed by the Paying Authority
46
THE LEAD PARTNER HAS TO BE AUTHORISED TO:
1. Directly interact with the partners in order to
achieve the purposes of the project
2. Participate to each WP-group and be informed on
their results
3. Invite external guests to the meetings
4. Call meetings involving only WP Leaders
24
47
To be approved
1. Website = www.unitn.it/foralpswww.unitn.it/foralpsPleasePlease, link , link itit in in youryour websitewebsite !!
2.2. Logo = Logo =
48
Further points
1.1. FORALPS FORALPS contactcontact list list ((pleaseplease, find , find itit in in youryour folderfolder))
2.2. The The LeadLead Partner Partner ee--mailmail addressaddress isis: :
[email protected]@unitn.it
Please, do not send messages relatedto the Project to personal e-mailaddresses of staff members!!
3.3. Official Official presentationpresentation
DISCUSSION
25
49
Practicals:
COFFEE BREAK16:30 – 17:00Here
50
Reporting
SPEAKERS: Sarah Magniez, Serena Beber
SUMMARY• Reporting procedure• Reporting deadlines
26
51
PROJECT PARTNERSREPORTING DEADLINES
Keep in mind the following deadlines:
• 31 March (REPORT + CERTIFICATION)
• 30 June (REPORT)
• 30 September (REPORT + CERTIFICATION)
• 31 December (REPORT)
52
DOCUMENTS TO BE PROVIDED
At all deadlines:
- Each Partner sends to the LEAD PARTNER:
1) Its contribution to the Financial Report2) Its contribution to the I&P Report
- Each WP RESPONSIBLE sends to the LP:
3) WP Activity Report (WP responsibles: please arrange accordingly with your Partners!)
27
53
FURTHER DOCUMENTS TO BE PROVIDED:
Within 31 March and 30 September:
Each Partner sends to the LEAD PARTNER:4) Certification of expenditure
****Make sure about timing of your national Make sure about timing of your national certification procedurecertification procedure
Within 30 April and 31 October:The LP sends national certifications of all PP to the MA
54
BUDGET REALLOCATION: CRITERIA
(from Subsidy Contract and Practicalguidelines on project implementation)
1. NO reallocation among Partners
2. The Lead Partner is allowed to reallocate funds
between categories of costs up to 20% of the total
amount indicated in each cost category in the AF
3. The Lead Partner is allowed to reallocate funds
between workpackages up to 20% of the total
amount indicated in each cost category in the AF
28
55
BUDGET REALLOCATION: PROCEDURES
(from Subsidy Contract and Practicalguidelines on project implementation)
A.PROGRAM LEVEL ���� Program Steeering Committee
For changes up to 20%:the JTS and the MA have to be informed through the regular
reporting routines.
For changes exceeding 20%:• They have to be reported to the MA via the JTS
immediately, independently from the submission of a report
• A new approval by the Steering Committee is necessary on the basis of a well-founded request for reallocation
submitted by the Lead Partner to the JTS.
56
BUDGET REALLOCATION
B: Partnership level (for each singleProject Partner) ���� Project Steering Committee
The Project Partners agree that:
• As general rule, each Project Partner is entitle to reallocate
funds between categories of costs only up to 20% of the
amount which the Project Partner itself stated in each cost
category in the AF, unless the approval by the Project Steering
Committee
• As a general rule, each Project Partner is entitle to reallocate
funds between WPs only up to 20% of the amount which the
Project Partner itself stated in each WP in the AF , unless the
approval by the Project Steering Committee
29
57
BUDGET REALLOCATION
The Project Partners are invited to:
• Attach to every Financial Report a statement about the expenses that the Project Partner is planning for the following 3 months.
58
NEXT DEADLINE:31 MARCH 2005
The LEAD PARTNER shall receive:
From EACH Partner1) Certification of expenditure2) Its contribution to the Financial Report3) Its contribution to the I&P Report
From the WP RESPONSIBLES4)WP Activity Report(Partners: please arrange accordingly with
your WP responsibles!)
30
59
ACCOUNTING AND AUDITS
Remember also that:
• it is necessary to have the expenditure certified within 12 months after receipt of the respective invoice or equivalent accounting documents at latest
• each Project Partner shall retain all files, documents and data about the project at least until 31 December 2012, either in original or as certified copies on commonly used data media safely and orderly
60
Organizational Issues/2
SPEAKER: Dino Zardi
SUMMARY• Project conferences• Subcontractors• Role of WP Responsibles
31
61
DISCUSSION
-
2007
2006
YEAR
3°
2°
1°
RELATED EVENTSMONTHVENUE
-
October
Oct/Nov?
-
-
-
-
SALZBURG
LJUBLJANA
Project Conferences
62
Subcontracts
• Remember: entrusting consultings to externalexperts could take longer because of requiredadministrative or legal procedures (tenders, etc.)
• If the project partners require the support of subcontractors, the project partner MUST transferthe obligations deriving from the PartnershipAgreement and from the Application Form ontosuch subcontractors.
32
63
Role of WP Leaders(from Partnership Agreement)
Each responsible of a work-package shall:
1. take all the steps needed to correctly manage the work-package in accordance with the project application, the decisions of the Steering Committee and the Subsidy Contract.
2. inform Lead Partner and project partners involved in that work-package about all essential issues connected to its implementation without any delay.
64
Role of WP Leaders
3. Provide the LP with a work-package activity reportevery 3 months after the project startup:
� 31 March� 30 June� 30 September� 31 December
Meetings of the single WPs
a)Up to each WP Leader.
b)Please, just remember to inform the LP !
33
65
Workpackages/1
SPEAKERS: Dino Zardi, WP Responsibles
SUMMARY• Workpackage 4 • Workpackage 7 • Workpackage 8
66
WP4: WP4: InformationInformation and and PublicityPublicity
Objectives: Objectives:
a)a) SpreadingSpreading informationsinformations aboutabout project project activitiesactivities and and
achievementsachievements toto authoritiesauthorities and the and the generalgeneral publicpublic
b)b) Disseminating project products to the public, including Disseminating project products to the public, including
subjects in the fields of tourism, mountaineering, traffic subjects in the fields of tourism, mountaineering, traffic
assistance etc. assistance etc.
c)c) Making data and forecasts Making data and forecasts abtainedabtained within the project within the project
available to the public.available to the public.
Output:Output:
a)a) Developing, hosting and managing the project website.Developing, hosting and managing the project website.
b)b) Contact with the media.Contact with the media.
c)c) Diffusion of the project deliverables in the relevant Diffusion of the project deliverables in the relevant
languages (English, German, Slovenian, French, Italian).languages (English, German, Slovenian, French, Italian).
d)d) Organization of workshops where local authorities and Organization of workshops where local authorities and
scientific institutions interested in meteorological and scientific institutions interested in meteorological and
hydrological applications over the Alpine Space will be hydrological applications over the Alpine Space will be
invited to show the FORALPS outcome to a broad range invited to show the FORALPS outcome to a broad range
of endof end--usersusers7.796 €ZAMG-W
35.000 €ZAMG-S
2.400 €ZAMG-K
15.651 €ZAMG-I
23.727 €RAVA
5.430 €PAT
3.600 €PAB
10.990 €OSMER
17.881 €EARS
21.130 €ARPAV
11.092 €ARPA
Lombardia
APAT
UNITN
7.910 €
48.000 €
34
67
Role of each Project Partner:Role of each Project Partner:
ZAMGZAMG--S: Planning and organization of a general meeting to disseminateS: Planning and organization of a general meeting to disseminate the the
Foralps results to decision making authorities, the media and thForalps results to decision making authorities, the media and the public.e public.
RAVA: RAVA: bulletins targeted to: road network, tourism, mountaineering, abulletins targeted to: road network, tourism, mountaineering, agriculturegriculture
UniTNUniTN -- CINFAlCINFAl: managing the projects website.: managing the projects website.
WP4: WP4: InformationInformation and and PublicityPublicity
68
Milestones: see timetable in each WP4 activityMilestones: see timetable in each WP4 activity
WP Meetings: 2 per year, possibly joined with the other WP Meetings: 2 per year, possibly joined with the other
WP meetingsWP meetings
Related events: Related events:
-- Central event will be the workshops and the general Central event will be the workshops and the general
meetingsmeetings
-- InterregInterreg III B meetingsIII B meetings
-- ICAM 2007ICAM 2007
-- EMS/ECAM meeting 2007EMS/ECAM meeting 2007
-- ……....
WP4: WP4: InformationInformation and and PublicityPublicity
35
69
WP4: WP4: InformationInformation and and PublicityPublicity
Activity 1 : Developing, hosting and managing the Activity 1 : Developing, hosting and managing the
project websiteproject website
-- UniTNUniTN: Creating the structure, defining the necessary content : Creating the structure, defining the necessary content
-- RAVA: bulletins targeted to: road network, tourism, RAVA: bulletins targeted to: road network, tourism,
mountaineering, agriculturemountaineering, agriculture
-- ZAMGZAMG--S: Implementation of experiences made with the METEORISK S: Implementation of experiences made with the METEORISK
websitewebsite
-- APAT: Forecast outputs from BOLAMAPAT: Forecast outputs from BOLAM
-- OSMER: Examples of forecasts displayed on the Website OSMER: Examples of forecasts displayed on the Website
2005 2006 2005 2006 20072007initial setup contents addedinitial setup contents added full performancefull performance
open to publicopen to public PR in other mediaPR in other media
Open question:Open question: which operational forecasts will be in which operational forecasts will be in www.foralps.netwww.foralps.net??
70
WP4: WP4: InformationInformation and and PublicityPublicity
Activity 2 Activity 2 -- Contact with the mediaContact with the media
ZAMGZAMG--S: S:
-- Collecting and preparing texts for press announcementsCollecting and preparing texts for press announcements
-- Collecting Collecting infosinfos for press mirror (for press mirror (ForalpsForalps in the media)in the media)
-- Collecting informal, but structured feedback from journalists abCollecting informal, but structured feedback from journalists about out
the the ForalpsForalps presence in the mediapresence in the media
UniTNUniTN: :
preparation and installation of media releases on the preparation and installation of media releases on the ForalpsForalps websitewebsite
ALL PARTNERS: ALL PARTNERS:
preparation of leafletspreparation of leaflets
2005 2006 2005 2006 20072007collecting textscollecting texts first media first media structuredstructured
announcementsannouncements PR activitiesPR activities
Open question: number of leaflets on Open question: number of leaflets on ForalpsForalps??
36
71
WP4: WP4: InformationInformation and and PublicityPublicity
Activity 3 Activity 3 --
Diffusion of the project deliverables in the relevant Diffusion of the project deliverables in the relevant
languages languages (English, German, Slovenian, French, Italian). (English, German, Slovenian, French, Italian).
-- ZAMGZAMG--S: Collecting and preparing texts for translations with the S: Collecting and preparing texts for translations with the
help of the Project Partnershelp of the Project Partners
-- UniTNUniTN: implementation of these texts on the website (public part): implementation of these texts on the website (public part)
-- RAVA: bulletins targeted to: road network, tourism, RAVA: bulletins targeted to: road network, tourism,
mountaineering, agriculture in nonmountaineering, agriculture in non--local languageslocal languages
-- EVERY SINGLE PARTER: translation into its national languageEVERY SINGLE PARTER: translation into its national language
2005 2006 2005 2006 20072007collection of textscollection of texts multilingual websitemultilingual website enlargement of theenlargement of the
content of thecontent of themultilingual websitemultilingual website
Open question: Open question: which parts of the website shall be multilingual?which parts of the website shall be multilingual?
72
WP4: WP4: InformationInformation and and PublicityPublicity
Activity 4 Activity 4 --
Organization of workshops Organization of workshops –– general meeting general meeting
-- ALL PARTNERS: ALL PARTNERS: preparing contents and text for workshops in preparing contents and text for workshops in
order to create interfaces of local authorities and scientific order to create interfaces of local authorities and scientific
communities interested in meteorological and hydrological communities interested in meteorological and hydrological
applications over the Alpine Space in the context of FORALPS applications over the Alpine Space in the context of FORALPS
outcomeoutcome
-- ZAMGZAMG--S: Preparing and planning of the general meeting in 2007S: Preparing and planning of the general meeting in 2007
-- EARS: Preparing and planning of the general meeting in 2006EARS: Preparing and planning of the general meeting in 2006
2005 20062005 2006 20072007workshop forworkshop for general meetinggeneral meetingdedicated usersdedicated users
Open question: Open question: which potential target groups to include?which potential target groups to include?
37
73
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
ObjectivesObjectives: :
a) High resolution meteorological forecast in the Alps to a) High resolution meteorological forecast in the Alps to
improve the integrated modeling of the water cycle.improve the integrated modeling of the water cycle.
b) Evaluation of standards for verification of model b) Evaluation of standards for verification of model
forecasts, to be used by participating regional services.forecasts, to be used by participating regional services.
c) Optimization of forecasts for verification procedures.c) Optimization of forecasts for verification procedures.
Output:Output:
a) High resolution experimental forecasts for case and a) High resolution experimental forecasts for case and
sensitivity studies in complex orography.sensitivity studies in complex orography.
b) A checkb) A check--list of suitable techniques for list of suitable techniques for spatialisationspatialisation of of
measured data and their use in model verification.measured data and their use in model verification.
c) Operational tools for verification of numerical models.c) Operational tools for verification of numerical models.
d) A checkd) A check--list for setup of operative identification of list for setup of operative identification of
precursors of deep moist convection in the forelands of precursors of deep moist convection in the forelands of
Alps.Alps.
0 €ZAMG-W
20.000 €ZAMG-S
40.100 €ZAMG-K
106.280 €ZAMG-I
0 €RAVA
127.140 €PAT
0 €PAB
101.220 €OSMER
54.150 €EARS
13.500 €ARPAV
128.815 €ARPA
Lombardia
APAT
UNITN
99.000 €
0 €
74
Role of each Project Partner:Role of each Project Partner:
OSMER: OSMER: High resolution experimental forecast for case and sensitivity sHigh resolution experimental forecast for case and sensitivity studies tudies
over specific target areas, and verification.over specific target areas, and verification.
ARPALombardiaARPALombardia: : SpatialisationSpatialisation of measured data and comparison with of measured data and comparison with
forecasts. forecasts.
ARPAV: ARPAV: Standard comparison between the ARPAV rainStandard comparison between the ARPAV rain--gauge network data and gauge network data and
forecast products available over the forecast products available over the GardaGarda Lake and Lake and AdigeAdige basin. basin.
EARS: EARS: Standardized verification methods for various limited area numerStandardized verification methods for various limited area numerical ical
weather forecasting model runs. weather forecasting model runs.
PAT: PAT: Verification and skill assessment of operational models under diVerification and skill assessment of operational models under different fferent
weather conditions.weather conditions.
ZAMGZAMG--I: Optimum interpolation of precipitation fields in Tyrol; develI: Optimum interpolation of precipitation fields in Tyrol; development of a opment of a
forecast matrix for endforecast matrix for end--users; subjective forecast verification. users; subjective forecast verification.
ZAMGZAMG--K: Verification of models in weakK: Verification of models in weak--moderate precipitation episodes to moderate precipitation episodes to
optimize forecasts for agriculture, construction and leisure indoptimize forecasts for agriculture, construction and leisure industry. ustry.
Coordinated definition of model quality standards. Coordinated definition of model quality standards.
APAT: APAT: Interfacing meteorological forecasts with verification procedureInterfacing meteorological forecasts with verification procedures and s and
hydrological models.hydrological models.
ZAMGZAMG--S: Interfacing meteorological forecasts with verification procedS: Interfacing meteorological forecasts with verification procedures and ures and
hydrological models.hydrological models.
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
38
75
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
Milestones: see Milestones: see ““time arrowtime arrow”” for each WPfor each WP--actionaction
WP Meetings: 2/yr, possibly joined with other eventsWP Meetings: 2/yr, possibly joined with other events
The next on November 2005The next on November 2005
Related events: Related events: MAP meeting, scuola estiva di Udine sulla convezione,
meeting ALP-IMP, meeting di Meteorisk, Training workshop on
homogeneization 16/17 Maggio
76
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
action 1 - experimental weather forecastsequipm. exp.
OSMER - case & sensitivity HR-NWF 6’000 €ZAMG-I - forecast matrixAPAT - case studies using 10-km
operational parallel BOLAM
open questions:
• how to select case studies
• long series vs. case studies to apply different verification
methods
2005 2006 2007WRF model set up exp. runs check-list dmc
fcst matrix: definition of parameters, procedures, ?
Case select., I.C./B.C collect. runs
39
77
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
action 2 - data spatialization
ARPALombardia - quality control and spatialization of measured data
ZAMG-I - optimum interpol. of precipitation fields in TyrolAPAT - Barnes (obj. anl.) tech. for point-to-grid;
Remapping for grid-to-grid transformation
open questions:
• what are the spatialization techniques to be used?
• how are the various techniques to be harmonized?
2005 2006 2007spatialization & opt. interp. check-list
ARPALombardia: quality control spatialization
78
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
action 3 - numerical forecast verificationequipm. exp.
EARS - Standard. verification methods for LAMsPAT - Verification and skill assess. oper. mdls 6’000 €
ZAMG-K - Verification NWP precip. fcst; develop tools for operat. fcst
definition of model quality standards.ZAMG-S - Interfacing meteor. fcsts with verification proced.APAT - Implementation of statist./determin. verif. tech. for LAMs;
Interfacing meteor. fcsts with verification proced.
ARPALombardia - qualit. comparison of measurements with forecasts (LAM)
open questions:
• how are the various techniques to be harmonized
and standardized?
2005 2006 2007initial test verification set up operational tools
40
79
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
action 4 - subjective forecast verification
equipm. exp.
ARPAV - std. comp. gauges data - Garda+Adige fcsts 9’000 €ZAMG-I - subjective forecast verification
ZAMG-K - Verific. subj. precip. fcst; develop tools for operat. fcst.
open questions:
• how are the various techniques to be harmonized
and standardized?
• verification results for internal or/and external use?
2005 2006 2007initial test verification set up verific. standards adopted
80
WP7: WP7: Weather and Water Resource Weather and Water Resource
Availability ForecastingAvailability Forecasting
action 5 - interfacing meteo fcst & hydro modelsequipm. exp.
APAT - Interfacing meteo. forecasts with hydrological modelsZAMG-S - Interfacing meteo. forecasts with hydrological models
open questions:
• how to define an initial state of the art to start with?
• how to deal with subgrid space/time rain variability
(downscaling/upscaling problem)? See WP8
• what is the goal of the coupling (land use / civil defense / …)?
2005 2006 2007initial review interface set up coupling running
41
81
WP8: WP8: SustainableSustainable ResourceResource ManagementManagement
ObjectivesObjectives: :
a)a) Identification of an optimal combination of input Identification of an optimal combination of input
parameters for hydrological models in different regions parameters for hydrological models in different regions
of the Alpine arch.of the Alpine arch.
b)b) Quantitative estimation of water supplies in alpine Quantitative estimation of water supplies in alpine
catchments.catchments.
Output:Output:
a)a) A survey of stateA survey of state--ofof--thethe--art hydrological models in use in art hydrological models in use in
regional/national services.regional/national services.
b)b) Operational coupled Operational coupled meteometeo--hydrological models.hydrological models.
c)c) Estimation of resources availability in alpine water Estimation of resources availability in alpine water
bodies, including glaciers and underground water.bodies, including glaciers and underground water.
0 €ZAMG-W
97.080 €ZAMG-S
0 €ZAMG-K
0 €ZAMG-I
0 €RAVA
0 €PAT
72.800 €PAB
0 €OSMER
0 €EARS
0 €ARPAV
0 €ARPA
Lombardia
APAT
UNITN
60.180 €
89.000 €
82
Role of each Project Partner:Role of each Project Partner:
APAT: APAT: Analysis of runoff models with respect to available data, to ideAnalysis of runoff models with respect to available data, to identify and ntify and
suggest the most useful in the alpine space; suggest the most useful in the alpine space; exhangeexhange and update of stage and update of stage
discharge relationships.discharge relationships.
PAB: PAB: Detailed monitoring of various contributions to surface and subDetailed monitoring of various contributions to surface and sub--surface surface
runoff in a representative alpine runoff in a representative alpine catchmentcatchment: pilot application to the : pilot application to the
RidannaRidanna river basin. Quantitative description of the hydrological cycleriver basin. Quantitative description of the hydrological cycle in in
valleys with glaciers.valleys with glaciers.
UniTNUniTN: : Pilot application of rainfallPilot application of rainfall--runoff models in the runoff models in the AdigeAdige Valley. Analysis of Valley. Analysis of
the impact of hydraulic works on surface runoff and water resourthe impact of hydraulic works on surface runoff and water resource ce
availability.availability.
ZAMGZAMG--S: Extensive study for the application of hydrological models inS: Extensive study for the application of hydrological models in the northern the northern
Alps, with the main focus on the sensitivity of models to the Alps, with the main focus on the sensitivity of models to the catchmentcatchment
size, the relevant time constants and the different meteorologicsize, the relevant time constants and the different meteorological input al input
parameters.parameters.
WP8: WP8: SustainableSustainable ResourceResource ManagementManagement
42
83
Milestones: see timetable in each WP8 activityMilestones: see timetable in each WP8 activity
WP Meetings: 2 per year, possibly joined with the other WP Meetings: 2 per year, possibly joined with the other
First WP meeting in ROME (11 April)First WP meeting in ROME (11 April)
Related events: Related events:
-- JRCJRC--European Flood Alert System (EFASEuropean Flood Alert System (EFAS--LISFLOOD)LISFLOOD)
-- CRUECRUE--ERANET (VI FP) activities ERANET (VI FP) activities
-- DD--PHASE (MAP project) activitiesPHASE (MAP project) activities
-- NETWET2NETWET2––WaternetWaternet (INTERREG III B(INTERREG III B--CADSES) activities CADSES) activities
-- CADSEALAND (INTERREG III BCADSEALAND (INTERREG III B--CADSES) activities CADSES) activities
-- HYDROCARE (INTERREG III BHYDROCARE (INTERREG III B--CADSES) activitiesCADSES) activities
-- METYDE (LIFE Environment), to be approvedMETYDE (LIFE Environment), to be approved
-- HH--SAF (EUMETSAT), Hydrology Satellite Application SAF (EUMETSAT), Hydrology Satellite Application
Facility Facility
WP8: WP8: Sustainable Resource ManagementSustainable Resource Management
84
WP8: WP8: Sustainable Resource ManagementSustainable Resource Management
Activity 1 Activity 1 -- Assessment of the stateAssessment of the state--ofof--thethe--art rainfallart rainfall--
runoff models (links with activity 2)runoff models (links with activity 2)
-- APAT: APAT: Analysis of rainfallAnalysis of rainfall--runoff models in use in regionalrunoff models in use in regional--
national servicesnational services to select the most suitable ones toto select the most suitable ones to
the alpine spacethe alpine space
-- ZAMGZAMG--S: S: Extensive study for the application of hydrological Extensive study for the application of hydrological
models in the northern Alps, with the main focus models in the northern Alps, with the main focus
on model sensitivity to the on model sensitivity to the catchmentcatchment sizesize
-- PAB & PAB & UniTNUniTN:: Possible suggestions Possible suggestions
2005 2006 2005 2006 20072007initial review model selection initial review model selection �������� activity 2activity 2
& strategies& strategies
Open question:Open question: How to select the best one for the alpine space?How to select the best one for the alpine space?
43
85
WP8: Sustainable Resource ManagementWP8: Sustainable Resource Management
Activity 2 Activity 2 -- Coupling meteorological and hydrological Coupling meteorological and hydrological
models in target areas (links with WP7)models in target areas (links with WP7)
-- APAT: APAT: Coupling operational BOLAM with Coupling operational BOLAM with hydrolhydrol. models. models
-- ZAMGZAMG--S:S: Interfacing Interfacing meteorolmeteorol. forecasts with . forecasts with hydrolhydrol. models. models
-- PAB: PAB: GIS based runoff model with GIS based runoff model with RidannaRidanna data + validationdata + validation
-- UniTNUniTN::Pilot application of rainfallPilot application of rainfall--runoff models in runoff models in
the the AdigeAdige Valley via Valley via meteometeo--hydro couplinghydro coupling
2005 2006 2005 2006 20072007review downscaling interface set up + coupling (review downscaling interface set up + coupling (�������� WP7)WP7)techniques GIS model techniques GIS model + validation+ validation
Open question: Open question: MeteorolMeteorol. variable . variable postpost--processingprocessing + + downscaldownscal. . techntechn. & optimal . & optimal interpolinterpol. + interface . + interface
86
WP8: Sustainable Resource ManagementWP8: Sustainable Resource Management
Activity 3 Activity 3 -- Exchange and update of stageExchange and update of stage--discharge discharge
relationships & knowledge on runoff relationships & knowledge on runoff
processes for alpine basin processes for alpine basin
-- APAT: APAT: Exchange and update of stageExchange and update of stage--discharge discharge
relationshipsrelationships
-- PAB: PAB: Monitoring of hydrological cycle, including surface Monitoring of hydrological cycle, including surface
and suband sub--surface runoff, in a pilot alpine surface runoff, in a pilot alpine catchmentcatchment
((RidannaRidanna river) and in valleys with glaciers (glacier river) and in valleys with glaciers (glacier
mass balance mass balance �������� links with WP6)links with WP6)
2005 2006 2005 2006 20072007observations update of stageobservations update of stage--on on RidannaRidanna basin + discharge basin + discharge relatrelat. + divulgation + . + divulgation + glacier study glacier study glaglacier study glacier study glacier studycier study
Open question: Open question: Ice melt mod. for glacier mass balance validationIce melt mod. for glacier mass balance validation
44
87
WP8: Sustainable Resource ManagementWP8: Sustainable Resource Management
Activity 4 Activity 4 -- Analysis of the impact of hydraulic works on Analysis of the impact of hydraulic works on
surface runoff & water resource availabilitysurface runoff & water resource availability
-- UniTNUniTN: : Analysis of the impacts of hydraulic works, Analysis of the impacts of hydraulic works,
such as dams, over the such as dams, over the AdigeAdige valley (links valley (links
with activity 2)with activity 2)
-- PAB:PAB: Implementation of effective tools for water resources Implementation of effective tools for water resources
management in representative alpine catchments, management in representative alpine catchments,
suitable for suitable for various task including water resource various task including water resource
managementmanagement
2005 20072005 2007Hydraulic works impact + water resource Hydraulic works impact + water resource managemmanagem. after monitoring & calibration. after monitoring & calibration
Open question: Open question: Optimization of operations of hydraulic works to Optimization of operations of hydraulic works to satisfy economical, human & environ. needssatisfy economical, human & environ. needs
88
•DINNER20.00Vicolo del Vo‘, 11
• TOMORROW MORNING BE HERE ON TIME !!8.45
• SHORT VISIT AND WELCOME BY THE UNIVERSITY RECTOR 9:00
45
89
Practicals:
• WELCOME BY THE UNIVERSITY RECTOR 8:45 a.m.
• CLOSURE 10:30 a.m.
• A DISCUSSION ABOUT THE ITALIAN REPORTING PROCEDURE WILL FOLLOW
90
Workpackages/2
SPEAKERS: Dino Zardi, WP Responsibles
SUMMARY• Workpackage 5 • Workpackage 6 • Workpackage 9
46
91
WP5: WP5: DatasetDataset
ObjectivesObjectives::
Investigate frequency, seasonality, Investigate frequency, seasonality, arealareal extent and extent and
spatial pattern of precipitation events in the Alpine spatial pattern of precipitation events in the Alpine
Space region, with particular focus on the return periods Space region, with particular focus on the return periods
of extremes (droughts, intense precipitation).of extremes (droughts, intense precipitation).
Output:Output:
a) An accurate and complete a) An accurate and complete climatologicalclimatological dataset for the dataset for the
Alpine area, to be used for land resources management Alpine area, to be used for land resources management
as well as for research.as well as for research.
b) An instrument (webb) An instrument (web--GIS) to make GIS) to make climatologicalclimatological
information easily available to the general public.information easily available to the general public.
174.728 €ZAMG-W
0 €ZAMG-S
0 €ZAMG-K
14.080 €ZAMG-I
0 €RAVA
40.000 €PAT
10.000 €PAB
0 €OSMER
63.930 €EARS
0 €ARPAV
70.000 €ARPA
Lombardia
APAT
UNITN
7.000 €
0 €
92
Role of each Project Partner:Role of each Project Partner:
ZAMGZAMG--W: Digitalization of daily values of precipitation, snow and temW: Digitalization of daily values of precipitation, snow and temperature for perature for
the period 1901the period 1901--1950 to extend the existing series; selection of about 50 1950 to extend the existing series; selection of about 50
centennial daily series over the Austrian territory and investigcentennial daily series over the Austrian territory and investigation into ation into
frequency, seasonality and return periods of extreme events. frequency, seasonality and return periods of extreme events.
APAT: APAT: Collect and share historical data with partners. Collect and share historical data with partners.
ARPALombardiaARPALombardia: : Creation of a hydroCreation of a hydro--meteorological database for the meteorological database for the LombardiaLombardia
region. region.
EARS: EARS: Homogenization of local historical digitalized data. Creation ofHomogenization of local historical digitalized data. Creation of a a
homogenized database for Slovenia. Study of impact of homogenizahomogenized database for Slovenia. Study of impact of homogenization tion
on climate parameters. on climate parameters.
PAB: PAB: HydrometeorologicalHydrometeorological and glacier data processing, quality control, and glacier data processing, quality control,
visualisation and analysisvisualisation and analysis::
PAT: PAT: Analyses of validated weather data to make a climatic map of thAnalyses of validated weather data to make a climatic map of the e
TrentinoTrentino Province. Study the climatic occurrence of extreme weather Province. Study the climatic occurrence of extreme weather
events concerning rainfall, snowfall, winds and temperatures. events concerning rainfall, snowfall, winds and temperatures.
ZAMGZAMG--I: I: Collect historical metadata, setup and run a database.Collect historical metadata, setup and run a database.
WP5: WP5: DatasetDataset
47
93
WP5: WP5: DatasetDataset
MostMost common common activitiesactivities -- lookinglooking forfor synergysynergy effectseffectsZZAAMMGG:: ddaattaa ccoolllleeccttiioonn ((ccoonncceennttrraatteedd oonn tthhee 11sstt hhaallff ooff tthhee 2200tthh cceennttuurryy)),, ddaattaa ssoouurrcceess:: HHZZBB,, rreegg.. hhyyddrrooggrraapphhiicc sseerrvviicceess
sseerriieess ooff TT,, RRRR aanndd ssnnooww,, DDiiggiittiissiinngg,, qquuaalliittyy ccoonnttrrooll,, hhoommooggeenniissaattiioonn AApppprrooxx.. rreepprreesseennttaattiivvee sseerriieess ffoorr 5500 rreeggiioonnss
IInnvveessttiiggaattiioonnss::
ffrreeqquueenncciieess ooff eexxttrreemmee eevveennttss,, rreettuurrnn ppeerriiooddss,, sseeaassoonnaalliittyy
AARRPPAALL:: ddaattaa ccoolllleeccttiioonn ffrroomm aauuttoommaattiicc aanndd mmaannuuaall ssttaattiioonnss,, 2200tthh cceennttuurryy
series of T and RR, ddaattaa ccoolllleeccttiivvee 227700 mmaannuuaall ++ 112200 aauuttoommaattiicc ssttaattiioonnss
eessttiimmaatteedd rreessuullttss:: hhoommooggeenniisseedd ~~1100 lloonngg--tteerrmm TT,,~~ 2200 lloonngg--tteerrmm RRRR,,
EEAARRSS:: ddiiggiittaattiioonn ooff hhiissttoorriiccaall ddaattaa ((TT aanndd RRRR)) ddaaiillyy bbeeffoorree 11996611,, qquuaalliittyy cchheecckkss aanndd hhoommooggeenniissaattiioonn sseerriieess ooff TT aanndd RRRR ,, eessttiimmaatteedd 99 ffoorr TT aanndd 2244 ffoorr RRRR vvaalliiddaattiioonn wwiitthh AAuussttrriiaann aanndd IIttaalliiaann bboorrddeerr ssttaattiioonnss
iinnvveessttiiggaattiioonnss:: oonn tthhee iimmppaacctt ooff hhoommooggeenniissaattiioonn oonn tthhee llooccaall cclliimmaattee
cchhaarraacctteerriissttiiccss tteemmppoorraall aanndd ssppaattiiaall aannaallyysseess ooff SSlloovveenniiaann
cclliimmaattee ssttuuddiieess oonn tthhee bbiiaasseess dduuee ttoo iinnssuuffffiicciieenntt ddaattaa iinn ccoommpplleexx tteerrrraaiinn
94
WP5: WP5: DatasetDataset
SynergiesSynergies: : Data recovery, data rescue, Data recovery, data rescue, digitalisationdigitalisation
Methods existing and to be developedMethods existing and to be developed
Data exchangeData exchange
Share of data and metadata (ZAMGShare of data and metadata (ZAMG--I, ZAMG W)I, ZAMG W)
Milestones: Milestones:
WP5 Meeting:WP5 Meeting:1212--13 May Ljubljana13 May Ljubljana
0ther hosts are welcome: 0ther hosts are welcome:
important topics to be discussed:important topics to be discussed:
network density, data quality control procedures, network density, data quality control procedures, visualisationvisualisation,,
relevant metadata and homogeneity tests (methods and impacts)relevant metadata and homogeneity tests (methods and impacts)
data and metadata exchange for validationdata and metadata exchange for validation
extreme events, extreme value statistics, extreme events, extreme value statistics,
Input of METEORISK (databank, Input of METEORISK (databank, programmesprogrammes etc).etc).
48
95
WP5: WP5: DatasetDataset
Open questions (Output?)Open questions (Output?): : a) An accurate and complete a) An accurate and complete climatologicalclimatological dataset for the Alpine area, to be used dataset for the Alpine area, to be used
for land resources management as well as for research.for land resources management as well as for research.
b) An instrument (webb) An instrument (web--GIS) to make GIS) to make climatologicalclimatological information easily available to information easily available to
the general public.the general public.
96
WP5: WP5: DatasetDataset
Related events: Related events: 2424--29 29 April 2005: EGU 2005 in Vienna: April 2005: EGU 2005 in Vienna:
CL12 Extreme Climate Events: Observations, Modelling and impactsCL12 Extreme Climate Events: Observations, Modelling and impactsCL 20 Climate of the last CL 20 Climate of the last milleniummillenium: reconstructions, analyses etc.: reconstructions, analyses etc.AS1.06 GIS in meteorology and climatologyAS1.06 GIS in meteorology and climatologyetcetc
17.17.--18 May 2005: 18 May 2005: Training session on homogeneity in BolognaTraining session on homogeneity in BolognaSupported by FORALPSSupported by FORALPSThe Lead Partner helps in disseminationThe Lead Partner helps in dissemination
2323--27 May 2005: ICAM/MAP 27 May 2005: ICAM/MAP ZadarZadar (HR)(HR)snow and ice in mountainous terrainsnow and ice in mountainous terrainmountain climates, extreme weather events and forecastingmountain climates, extreme weather events and forecasting
12 12 -- 16 September 2005, 5th Annual Meeting of the EMS, 7th European 16 September 2005, 5th Annual Meeting of the EMS, 7th European Conference on Conference on Applications of Meteorology (ECAM)Applications of Meteorology (ECAM)
CL 1 Global change activities (observed climate trends, climate CL 1 Global change activities (observed climate trends, climate changechangescenariosscenariosCL 2 weather and climate extremes (windCL 2 weather and climate extremes (wind--related extremes, climatology of related extremes, climatology of storms),storms), etcetcCL5 Climate data products and data policy , etcCL5 Climate data products and data policy , etc
49
97
WP5: WP5: DatasetDataset
Related activities: Related activities: ALPALP--IMP (ZAMG): IMP (ZAMG): MultiMulti--centennial climate variability in the Alps based centennial climate variability in the Alps based on Instrumental data, Model Simulations and Proxy data (EU, FP5)on Instrumental data, Model Simulations and Proxy data (EU, FP5), , -- Alpine Alpine longlong--term data sets of air temperature, precipitation, snow is under term data sets of air temperature, precipitation, snow is under preparationpreparation77--8 April: 38 April: 3rdrd ALPALP--IMP Meeting in Bologna IMP Meeting in Bologna CLIVALP (ZAMG): FWF, CLIVALP (ZAMG): FWF, Austrian Science funds Alpine longAustrian Science funds Alpine long--term data term data sets of air pressure, sunshine duration and cloudiness (under prsets of air pressure, sunshine duration and cloudiness (under preparation), eparation), HISTALP databank for data administrationHISTALP databank for data administration. . ANNALI (APAT): ANNALI (APAT): homogenous hydrological database (rainfall, temp, homogenous hydrological database (rainfall, temp, wind, water level, discharge, groundwaterwind, water level, discharge, groundwater))MOMBASA, WURTEN, MOMBASA, WURTEN, MassenbilanzMassenbilanz PasterzePasterze (ZAMG), (ZAMG), ((national national funded Austrian glaciology projects)funded Austrian glaciology projects)Alpine Temperature Climatology (ZAMG), Alpine Temperature Climatology (ZAMG), CLINOsCLINOs 19611961--1990, 1990, ~1700 stations~1700 stations
42
43
44
45
46
47
48
49
50
51
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20deg E
de
g N
T01-CLINO network (1961-90)
black-black squ. 6: HISTALP
black-yellow squ. 4: Uni-Pad
(Carrer)
black-green squ. 4: ZAMG-Clino
green circ. 4: HZB-Clino
black-blue squ. 4: DWD (M-
Westerm.)
blue-red squ. 4: CHMI (Kveton)
violet squ. 4: (Zaninovic)
black-green triang 4: SMI
(Mercalli)
black-pink circ. 4: MeteoSwiss
(Begert)
orange squ.. 4: Météo France
black-red circ. 4: Slovenia
short+long list
black-orange triang. 4: Italian
sampler (isac, Rossi,...)
red squ. 4: BA-sampler
black-yellow triang. 4: Uni-Torino
black-blue circ.: Nola-Motta-
dataset (Uni-Pavia, Uni-Torino)
red stars: Maugeri
violet stars 6: Maugeri 27-1-2005
red-white squ. 5: Bosn.
yearbooks
green stars 6: Maugeri 3-2-2005
light yellow squ. 5: Carrer 2005-
02
98
WP6: WP6: MonitoringMonitoring
ObjectivesObjectives: :
High resolution monitoring and optimal observation High resolution monitoring and optimal observation
coverage for the Alpine Space.coverage for the Alpine Space.
Output:Output:
a) Multiple tests of Xa) Multiple tests of X--band band microradarsmicroradars for operative for operative
monitoring of precipitation in mountain valleys.monitoring of precipitation in mountain valleys.
b) A high resolution network of field measurements for b) A high resolution network of field measurements for
monitoring and tuning monitoring and tuning XbandXband radars.radars.
c) Integration of Xc) Integration of X--band band microradarsmicroradars with existing Cwith existing C--band band
radars (composite), for widespread monitoring of radars (composite), for widespread monitoring of
weather.weather.
d) An automatic procedure for alert issuing, based on d) An automatic procedure for alert issuing, based on
observed data.observed data.
e) A network of trained volunteers for the monitoring of e) A network of trained volunteers for the monitoring of
local severe weather events in a target area.local severe weather events in a target area.
0 €ZAMG-W
0 €ZAMG-S
55.100 €ZAMG-K
0 €ZAMG-I
183.460 €RAVA
18.000 €PAT
70.000 €PAB
114.300 €OSMER
98.148 €EARS
83.740 €ARPAV
0 €ARPA
Lombardia
APAT
UNITN
0 €
0 €
50
99
Role of each Project Partner:Role of each Project Partner:
OSMER: OSMER: Test XTest X--band band microradarmicroradar systems in the valleys of systems in the valleys of FriuliFriuli region. Improve region. Improve
observational network by installing new highobservational network by installing new high--resolution weather stations resolution weather stations
in uncovered valleys. in uncovered valleys.
ARPAV: ARPAV: Use of XUse of X--band mobile band mobile microradarmicroradar systems in connection with the existing systems in connection with the existing
CC--band band dopplerdoppler radar. radar.
EARS: EARS: Correction of radar data with average reflectivity profiles andCorrection of radar data with average reflectivity profiles and
comparison to raincomparison to rain--gauge data. Tests with Xgauge data. Tests with X--band band microradarmicroradar systems in systems in
alpine valleys in close cooperation with partners from alpine valleys in close cooperation with partners from neighbouringneighbouring
countries. countries.
PAB:PAB: Detailed monitoring of contributions to surface and subDetailed monitoring of contributions to surface and sub--subsurface runoff subsurface runoff
on a representative alpine pilot on a representative alpine pilot catchmentcatchment (snowmelt, (snowmelt, icemelticemelt, ,
groundwater, rainfall), and glacier surveygroundwater, rainfall), and glacier survey. .
PAT: PAT: Development of software to continuously check the weatherDevelopment of software to continuously check the weather
using ground stations and radar data, and of automatic procedureusing ground stations and radar data, and of automatic procedures to alert s to alert
forecasters via forecasters via smssms message. message.
RAVA: RAVA: Adaptation of XAdaptation of X--band radar systems for use in complex orography; test in band radar systems for use in complex orography; test in
the Valle the Valle d'Aostad'Aosta region. region.
ZAMGZAMG--K: Providing K: Providing radiosonderadiosonde data to improve data coverage; cooperation in data to improve data coverage; cooperation in
testing Xtesting X--band band microradarsmicroradars with with neighbouringneighbouring partners and comparison partners and comparison
with precipitation measurements.with precipitation measurements.
WP6: WP6: MonitoringMonitoring
100
WP6: WP6: MonitoringMonitoring
Milestones: see Milestones: see ““time arrowtime arrow”” for each WPfor each WP--actionaction
WP Meetings: 2/yr, possibly joined with other eventsWP Meetings: 2/yr, possibly joined with other events
Related events: Voltaire Project, Utrecht, EMSRelated events: Voltaire Project, Utrecht, EMS
51
101
WP6: MonitoringWP6: Monitoring
action 1 - X-band microradars
equipm. exp.RAVA - adaptation, test 2 x 33’000 €
ARPAV - test 1 x 35’000 €
OSMER - test 1 x 35’000 €
ZAMG-K - test in Gailtal simult. OSMER during
selected/severe wea. period
EARS - test 1 x 35’000 €
open questions:
what type of X-band microradar?
what kind of procurement procedure?
how to arrange simultaneous tests in FVG-K?
2005 2006 2007step I step II step III
Meeting -when? procurement, set up ? field test phase
102
WP6: MonitoringWP6: Monitoring
action 2 - improv. exist. observational networks
PAB - monit. surf+sub-surf runoff in glacier basin 40’000 €
OSMER - installing new stations 19’000 €
ZAMG-K - launching radiosondes (Providing additional free-atmosphere data by
operating mobile radiosonde tracking equipment)
2005 2006 2007set up of the network glac. surv. glac. surv.
inst. new stations
radiosonde data
52
103
WP6: MonitoringWP6: Monitoring
action 3 - integration of measurements
vol. A) Xvol. A) X--band band µµradarradar vs. Cvs. C--band radarband radarARPAV - connection with existing C-band
vol. B) data correction and comparisonvol. B) data correction and comparison
ZAMG-K - verific./comp. of µradar data with rain gauge dataEARS - correction of radar data with aver. reflect. profiles,
comparison with rain gauge data
2005 2006 2007step I step II
correction radar data - profiles comparison X-band / gauges
connection X-band / C-band
open questions: logistics and coordination, weather
dependent timing of activity
104
WP6: MonitoringWP6: Monitoring
action 4 - automatic procedures for alertsPAT - observed data based aut. procedure for alerts 9’000 €
2005 2006 2007studies set up test & verification
open questions:
action 5 - volunteers trainingOSMER - network of trained volunteers 3’000 €
2005 2006 2007course, netw. manag. course, netw. manag. course, netw. manag.
53
105
WP9: WP9: Managerial, Economic and Managerial, Economic and
Financial AspectsFinancial Aspects
ObjectivesObjectives: :
a)a) Enhancement of the basic knowledge of the costs from Enhancement of the basic knowledge of the costs from
anomalous weather events, to improve decision making anomalous weather events, to improve decision making
processes and investments in resource management.processes and investments in resource management.
b)b) Assessment of the financial and economic impacts of Assessment of the financial and economic impacts of
correct and incorrect forecasts.correct and incorrect forecasts.
Output:Output:
a)a) Evaluation of the impact on water resources of the Evaluation of the impact on water resources of the
current management system in the Alps.current management system in the Alps.
b)b) Cost/benefit analyses of the improvement of available Cost/benefit analyses of the improvement of available
weather information in pilot areas within the Alpine weather information in pilot areas within the Alpine
Space.Space.
c)c) Integration of meteorological and hydrological Integration of meteorological and hydrological
information in the decision making process.information in the decision making process.
0 €ZAMG-W
38.000 €ZAMG-S
0 €ZAMG-K
0 €ZAMG-I
0 €RAVA
0 €PAT
0 €PAB
0 €OSMER
0 €EARS
79.000 €ARPAV
0 €ARPA
Lombardia
APAT
UNITN
0 €
99.000 €
106
Role of each Project Partner:Role of each Project Partner:
UniTNUniTN: : Cost/benefit analysis of water resources management practicesCost/benefit analysis of water resources management practices
(short(short--range and longrange and long--range impacts).range impacts).
ARPAV: ARPAV: Cost/benefit analysis of weather information availability.Cost/benefit analysis of weather information availability.
ZAMGZAMG--S: Transferring the results of WP 6 into complete analysis schemS: Transferring the results of WP 6 into complete analysis schemes,es,
for the evaluation of economic benefit in the context of decisiofor the evaluation of economic benefit in the context of decision making n making
in Austria.in Austria.
WP Meetings: 2/yr, possibly joined with other events,WP Meetings: 2/yr, possibly joined with other events,
together with WP8together with WP8
Related events: Related events:
12 - 16 September 2005, 5th Annual Meeting of the EMS, 7th
European Conference on Applications of Meteorology (ECAM)
WP9: WP9: Managerial, Economic and Managerial, Economic and
Financial AspectsFinancial Aspects
54
107
Possible application fields interested by the availability of advanced weather forecasting and water resource management technologies
1. Civil protection (cost of false alarms, …)
2. Tourism (false alarm)
3. Road transportation
4. Agriculture
5. Insurances
WP9: WP9: Managerial, Economic and Managerial, Economic and
Financial AspectsFinancial Aspects
108
action 1 – Application of cost/benefit analysis to some case studies (2005 and 2006)
action 2 - Cost/benefit analysis of the future availability of advanced weather forecasting and water resource management technologies (2007)
Pilot areas
• UNITN (in the Adige Valley)
• ARPAV (in the area around the Garda Lake)
• ZAMG-S (in the Nord-Österreich – Linz – small
basin- downscaling of output from LAMs to the
basin scale, which suffers from frequent flooding)
WP9: WP9: Managerial, Economic and Managerial, Economic and
Financial AspectsFinancial Aspects
55
109
WP9: WP9: Managerial, Economic and Managerial, Economic and
Financial AspectsFinancial Aspects
Comments: • What type of cost/benefit analysis ?
• Choice of the case studies.
• Connection between WP9 and the other WPs:- WP5: benefits deriving from the database of historical series
- WP7: benefits deriving from the optimization of NWF models
- WP8: benefits deriving from the optimization of operations in
dams
4. Connections between WP9 and WP6 (training of
volunteer observers)? Better to carry out polls?
5. Suggestions?
110
Thank you for your cooperation!
See youon the next Steering Committee