1 1 FORALPS Kick-off Meeting Trento 10-11 March 2005 2 Welcome to: Joint Technical Secretariat: - Dr. Sarah Magniez - FORALPS Project Officer Representatives of other Universities: - Prof. Giovanni Perona - Prof. Maurizio Maugeri

Upload: truonglien

Post on 19-Feb-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

1

1

FORALPSKick-offMeetingTrento

10-11 March 2005

2

Welcome to:

• Joint Technical Secretariat:

- Dr. Sarah Magniez - FORALPS Project Officer

• Representatives of other Universities:

- Prof. Giovanni Perona

- Prof. Maurizio Maugeri

2

3

Tomorrow:

• At 9 am:

Welcome by the Rector of the University of

Trento, Prof. Davide Bassi

4

AGENDA:

10/03/2005

10.10 INTRODUCTORY REMARKS

10.30 PARTNER PRESENTATION

11.30 ORGANIZATIONAL ISSUES/1

13.00 Lunch break

14.30 REPORTING

15.30 ORGANIZATIONAL ISSUES/2

16.30 Coffee break

17.00 WORK PACKAGES 4, 7 and 8

18.00 End of the first day

20.00 Dinner – Please sign up at conference desk

3

5

AGENDA:

11/03/2005

9.00 RECTOR’S WELCOME

9.10 WORK PACKAGES 5, 6, 9

10.30 ANY OTHER BUSINESS AND

CLOSING REMARKS

11.00 REPORTING RULES (FOR THE

ITALIAN PARTNERS only)

13.00 End of the Kickoff Meeting

6

Practicals:

• LUNCH BREAK13:00 – 14:301st floor

• COFFEE BREAK16:30 – 17:00Here

• Toilette: on the opposite side of the entrance hall

4

7

Project overview

SPEAKERS: Dino Zardi, Stefano Serafin, Project Managers

SUMMARY• Project history• Partners’ presentation

8

FORALPS History

22/04/2004 Preparation meeting - Trento

04/06/2004 Preparation meeting - Verona

22/06/2004 Preparation meeting - Verona (WP6)

02/07/2004 Submission of the Application Form (AF)

27/07/2004 Amendments to formal inconsistencies 1/2

04/08/2004 Amendments to formal inconsistencies 2/2

25/10/2004 Project Approval

5

9

FORALPS History

19/11/2004 Reply in fulfillment of the Conditions and

Recommendations for final approval

19/11/2004 Fixing of Minor Deficiencies

Dec. 2004 Signing of the Partnership Agreement

01/01/2005 Project Startup

04/01/2005 Mailing of the Partnership Agreement

02/02/2005 Mailing of the Subsidy Contract

10/03/2005 Kick-Off Meeting

10

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

UniversitUniversitàà degli Studi di Trento, Dipartimento di Ingegneria Civile ed degli Studi di Trento, Dipartimento di Ingegneria Civile ed

Ambientale Ambientale -- UnitUnitàà del Consorzio Interuniversitario Nazionale per la del Consorzio Interuniversitario Nazionale per la

Fisica delle Atmosfere e delle IdrosfereFisica delle Atmosfere e delle Idrosfere

Acronym:Acronym: UNITNUNITN

Nationality:Nationality:

Mission of the body:Mission of the body: Research and educationResearch and education

Project Manager:Project Manager: profprof. Dino Zardi. Dino Zardi

6

11

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: LeadLead PartnerPartner

Role in Role in WPsWPs::

-- WP2: WP2: Transnational Project Management Transnational Project Management (WP Leader)(WP Leader)

-- WP3: WP3: Coordination of internal activities Coordination of internal activities (WP Leader)(WP Leader)

-- WP4: WP4: Managing the project's website, presentation of the project Managing the project's website, presentation of the project

results to the public.results to the public.

-- WP8: WP8: Pilot application of rainfallPilot application of rainfall--runoff models in the runoff models in the AdigeAdige Valley. Valley.

Analysis of the impact of hydraulic works on surface runoff.Analysis of the impact of hydraulic works on surface runoff.

-- WP9: WP9: Cost/benefit analysis of water resources management Cost/benefit analysis of water resources management

practices practices (WP Leader)(WP Leader)

12

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

Agenzia per la Protezione dellAgenzia per la Protezione dell’’Ambiente e per i Servizi Tecnici Ambiente e per i Servizi Tecnici –– Italian Italian

National Agency for Environmental Protection and Technical ServiNational Agency for Environmental Protection and Technical Servicesces

Acronym:Acronym: APATAPAT

Nationality:Nationality:

Mission of the body: Mission of the body: Technical and scientific branch of the Technical and scientific branch of the

Environment and Territory Ministry. Main areas of intervention aEnvironment and Territory Ministry. Main areas of intervention are: re:

environmental monitoring & control; soil and water protection; cenvironmental monitoring & control; soil and water protection; coastal oastal

management; environmental data collection; modeling and forecastmanagement; environmental data collection; modeling and forecasting ing

activities (SIMM); ARPA and APPA coordination. activities (SIMM); ARPA and APPA coordination.

Project Manager:Project Manager: Eng. Eng. GiuseppinaGiuseppina MonacelliMonacelli

Manager of the Hydrological and Internal Manager of the Hydrological and Internal

Waters ServiceWaters Service

7

13

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project Partner (Project Partner (WP8 LeaderWP8 Leader))

Role in various WP:Role in various WP:

-- WP3: WP3: Project Management (all partners)Project Management (all partners)

-- WP4:WP4: Presentation of the project results to the publicPresentation of the project results to the public

-- WP5: WP5: Share historical data with partnersShare historical data with partners

-- WP7:WP7: 1010--km BOLAM case forecast; interfacing meteorological km BOLAM case forecast; interfacing meteorological

forecasts with verification (statistical and deterministic) forecasts with verification (statistical and deterministic)

procedures and hydrological modelsprocedures and hydrological models

-- WP8: WP8: Analysis of rainfallAnalysis of rainfall--runoff models, to identify and suggest the runoff models, to identify and suggest the

most useful in the alpine space; exchange and update of stagemost useful in the alpine space; exchange and update of stage--

discharge relationships discharge relationships (WP Leader)(WP Leader)

14

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

ARPA ARPA -- Agenzia Regionale per la Protezione Agenzia Regionale per la Protezione

delldell’’Ambiente della LombardiaAmbiente della Lombardia

SubcontractorsSubcontractors: Universit: Universitàà degli Studi di Milano degli Studi di Milano –– Istituto di Fisica GeneraleIstituto di Fisica Generale

ISAC ISAC –– CNR CNR –– Istituto di Scienze dellIstituto di Scienze dell’’Atmosfera e del ClimaAtmosfera e del Clima

Acronym:Acronym: ARPALombardiaARPALombardia

Nationality:Nationality:

Mission of the body:Mission of the body: environmental monitoring and controlenvironmental monitoring and control

Project Manager:Project Manager: Dr. Mauro Dr. Mauro ValentiniValentini

8

15

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner

Role in various WP:Role in various WP:

-- WP4: WP4: Presentation of project results to the public at local scale.Presentation of project results to the public at local scale.

-- WP5: WP5: Creation of a hydro meteorological data base for Creation of a hydro meteorological data base for LombardiaLombardia

with homogenized long time series. with homogenized long time series.

-- WP7: WP7: Choice and application of a Choice and application of a spatializationspatialization technique for:technique for:

-- real time data from real time data from LombardiaLombardia meteorological network meteorological network

-- homogenized long time series.homogenized long time series.

16

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO

Acronym:Acronym: ARPAVARPAV

Nationality:Nationality:

Mission of the body:Mission of the body: Environmental Monitoring, Climatic and Environmental Monitoring, Climatic and

Meteorological ForecastingMeteorological Forecasting

RoleRole in FORALPS: in FORALPS: Project Partner 3Project Partner 3

9

17

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE

DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO

CENTRO METEOROLOGICO DI TEOLO (PADOVA)CENTRO METEOROLOGICO DI TEOLO (PADOVA)

Project Manager: dr. Alessandro Project Manager: dr. Alessandro BenassiBenassi

-- WP6: WP6: MonitoringMonitoring

XX--band band microradarmicroradar around around

Verona e Verona e TeoloTeolo with with

factivityfactivity study;study;

Aim: develop a composite Aim: develop a composite

with the existing with the existing dopplerdoppler--

radar at radar at TeoloTeolo

18

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE

DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO

CENTRO METEOROLOGICO DI TEOLO (PADOVA)CENTRO METEOROLOGICO DI TEOLO (PADOVA)

Project Manager: dr. Alessandro Project Manager: dr. Alessandro BenassiBenassi

-- WP7: WP7: weather and water resource weather and water resource availabilyavailabily

forecastingforecasting ComparisonComparison rainrain--gaugegauge

network (network (toto havehave

inproveinprove) and LAM ) and LAM

productsproducts over Garda over Garda

LakeLake regionregion

UnpredictUnpredict supercellsupercell 04/08/200204/08/2002

-24 h 0 h

10

19

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE AGENZIA REGIONALE PER LA PREVENZIONE E PROTEZIONE

DELLDELL’’AMBIENTE DEL VENETOAMBIENTE DEL VENETO

DIPARTIMENTO DI VERONADIPARTIMENTO DI VERONA

Project Manager: dr. Project Manager: dr. AttilioAttilio TacconiTacconi

-- WP9: Managerial, Economic and financial aspectsWP9: Managerial, Economic and financial aspects

Possible benefit deriving of Possible benefit deriving of new monitoring and new monitoring and dissemination facilities (Xdissemination facilities (X--band radar, alarmband radar, alarm--alert web alert web information) in Lake of information) in Lake of GardaGarda, a , a touristictouristic and and economic area particularly economic area particularly sensitive to severe eventssensitive to severe events

20

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

Environmental Agency of the Republic of SloveniaEnvironmental Agency of the Republic of Slovenia

Acronym:Acronym: EARSEARS

Nationality:Nationality:

Mission of the body:Mission of the body: National institution for National institution for

Environmental IssuesEnvironmental Issues

Project Manager:Project Manager: drdr. . Gregor GregoriGregor Gregoričč

11

21

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner 44

Role in various WP:Role in various WP:

-- WPWP55: : Digitalization of local historical datasets and homogenization Digitalization of local historical datasets and homogenization

of climatological datasets. Study of impacts of of climatological datasets. Study of impacts of

homogenisation on local climate parameters.homogenisation on local climate parameters.

-- WPWP66: : Correction of radar data with average reflectivity profiles. Correction of radar data with average reflectivity profiles.

Testing preformance of XTesting preformance of X--band microradar systems in alpine band microradar systems in alpine

valleys.valleys.

-- WPWP77: : Testing verification methods for various limited area Testing verification methods for various limited area

numerical weather forecasting model runsnumerical weather forecasting model runs

22

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

ARPA FVG ARPA FVG -- Agenzia Regionale per la Protezione dellAgenzia Regionale per la Protezione dell’’Ambiente del Ambiente del

FriuliFriuli--Venezia Giulia, settore OSMER Venezia Giulia, settore OSMER -- Osservatorio Meteorologico Osservatorio Meteorologico

RegionaleRegionale

Acronym:Acronym: OSMEROSMER

Nationality:Nationality:

Mission of the body:Mission of the body: Observing, understanding and forecasting Observing, understanding and forecasting

weather phenomena in FVG, diffusing related products and weather phenomena in FVG, diffusing related products and

broadening of meteorological culturebroadening of meteorological culture

Project Manager:Project Manager: dr. dr. FulvioFulvio StelStel

12

23

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner

Role in various WP:Role in various WP:

-- WP3: WP3: Coordination of internal activitiesCoordination of internal activities

-- WP4:WP4: Spreading information about project activities and Spreading information about project activities and

achievements to authorities and general public; organization of achievements to authorities and general public; organization of local local

workshops.workshops.

-- WP6: WP6: Test XTest X--band band microradarsmicroradars, installing weather stations, training , installing weather stations, training

volunteer observers volunteer observers (WP Leader)(WP Leader)..

-- WP7: WP7: High resolution numerical nonHigh resolution numerical non--hydrostatic experimental hydrostatic experimental

weather forecasts for case and sensitivity studies weather forecasts for case and sensitivity studies (WP Leader)(WP Leader)..

24

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

Name of institution:Name of institution:

UfficioUfficio IdrograficoIdrografico, , ServizioServizio MeteorologicoMeteorologico e e PrevenzionePrevenzione ValangheValanghe

RipartizioneRipartizione ProtezioneProtezione CivileCivile

ProvinciaProvincia AutonomaAutonoma di di BolzanoBolzano

Acronym: PABAcronym: PAB

Nationality:Nationality:

Mission of the body: Mission of the body:

-- HydrometeorologicalHydrometeorological monitoringmonitoring

-- Support in sustainable water resources management Support in sustainable water resources management

-- WeatherWeather--, Avalanche, Avalanche-- and Flood Forecasting and Flood Forecasting

-- Research and EducationResearch and Education

Project Manager: Project Manager: DottDott. . MichelaMichela MunariMunari

13

25

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner

Role in various WP:Role in various WP:

-- WP5: WP5: HydrometeorologicalHydrometeorological and glacier data processing and glacier data processing

quality control and quality control and visualisationvisualisation

-- WP6: WP6: Detail monitoring of the different contribution to surface and Detail monitoring of the different contribution to surface and

subsub-- subsurface runoff in a representative alpine subsurface runoff in a representative alpine catchmentcatchment

(snowmelt, (snowmelt, icemelticemelt, groundwater, rainfall), groundwater, rainfall)

-- WP8: WP8: Implementation of effective tools for water resources Implementation of effective tools for water resources

management in representative mountainous river basins, management in representative mountainous river basins,

suitable for different applications (ecology, hydropower suitable for different applications (ecology, hydropower

generation, risk assessment)generation, risk assessment)

26

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

Name of institution:Name of institution:

Provincia Autonoma di Trento Provincia Autonoma di Trento –– Servizio Prevenzione CalamitServizio Prevenzione Calamitàà

pubbliche pubbliche –– Ufficio Neve, Valanghe e MeteorologiaUfficio Neve, Valanghe e Meteorologia

Acronym: PATAcronym: PAT

Nationality:Nationality:

Mission of the body: Weather ServiceMission of the body: Weather Service

Project Manager: Project Manager: DottDott. Alberto . Alberto TrentiTrenti

14

27

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of institutioninstitution::

Regione Autonoma Valle dRegione Autonoma Valle d’’AostaAosta

Ufficio Meteorologico Ufficio Meteorologico -- Direzione Protezione CivileDirezione Protezione Civile

Acronym:Acronym: RAVARAVA

Nationality:Nationality:

Mission of the body:Mission of the body: regional authority, operational weather regional authority, operational weather

forecastingforecasting

Project Manager:Project Manager: dr. dr. GiulioGiulio ContriContri

28

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner

Role in various WP:Role in various WP:

-- WP3: WP3: internal activitiesinternal activities

-- WP4: WP4: improving the diffusion of specific meteorological information improving the diffusion of specific meteorological information

by disseminating products specifically studied for particular puby disseminating products specifically studied for particular purposes rposes

(mountaineering, road network maintenance, tourism); making the (mountaineering, road network maintenance, tourism); making the

high resolution data and forecasts obtained within the project high resolution data and forecasts obtained within the project

available to the public.available to the public.

-- WP6: WP6: lowlow--cost cost sitingsiting of the Xof the X--band radar (microband radar (micro--radar) in the radar) in the

bottom of a valley, where meteorological stations and bottom of a valley, where meteorological stations and

telecommunication facilities are already present; monitoring of telecommunication facilities are already present; monitoring of the the

rainfall close to the ground; natural integration of microrainfall close to the ground; natural integration of micro--radar data radar data

with Cwith C--band radar estimates aloft (collaboration with band radar estimates aloft (collaboration with PoliTOPoliTO))..

15

29

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

Name of institution:Name of institution:Zentralanstalt fZentralanstalt füür Meteorologie und Geodynamik Regionalstelle fr Meteorologie und Geodynamik Regionalstelle füür Tirol und r Tirol und

VorarlbergVorarlberg

Acronym:Acronym: ZAMGZAMG--II

Nationality:Nationality: AUSTRIAAUSTRIA

Mission of the body:Mission of the body: national meteorological service for Tyrol Region, national meteorological service for Tyrol Region,

Since 1990: one part of ZAMG Tyrol acting as legal person (Since 1990: one part of ZAMG Tyrol acting as legal person (““TeilrechtsfTeilrechtsfäähigkeithigkeit””), from ), from

this point on: 6 Meteorologists which are financed through projethis point on: 6 Meteorologists which are financed through projects, commercial weather cts, commercial weather

services and scientific studiesservices and scientific studies..

Project Manager: Project Manager: Karl Gabl (head)Karl Gabl (head)

Project Coworkers:Project Coworkers: Harald Schellander Harald Schellander (resp. FORALPS, METEORISK)(resp. FORALPS, METEORISK)

Susanne LentnerSusanne LentnerManfred BauerManfred Bauer

Georg ErlacherGeorg Erlacher

Markus Buchauer Markus Buchauer (resp. METEORISK, link to FORALPS)(resp. METEORISK, link to FORALPS)

Monika WeisMonika Weis

Alfred NeururerAlfred Neururer

30

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

Role in FORALPS:Role in FORALPS: Project PartnerProject Partner

Role in various WP:Role in various WP:

-- WP4: WP4: Data Set: Setting up a metadata data base for the Data Set: Setting up a metadata data base for the ““FliriFliri””

Dataset, merging existing datasetsDataset, merging existing datasets

(HZB,HD,FLIRI)(HZB,HD,FLIRI)

-- WP7: WP7: Subjective Precipitation Forecast Verification through Subjective Precipitation Forecast Verification through

comparison of grid point precipitation forecast ofcomparison of grid point precipitation forecast of

available Models and human precipitation forecasts available Models and human precipitation forecasts

Development of a forecast matrix for endDevelopment of a forecast matrix for end--users with anusers with an

extended parameter catalogue (sunshine duration, extended parameter catalogue (sunshine duration,

precipitation yes/no) for all kind of clientsprecipitation yes/no) for all kind of clients

Optimum Interpolation of precipitation fields for the north Optimum Interpolation of precipitation fields for the north

Tyrol region in collaboration with the Tyrol region in collaboration with the

hydrological service of Tyrolhydrological service of Tyrol

16

31

FORALPS – PROJECT PARTNERSTrento, 10., 11. 03. 2005

Name of Institution:Zentralanstalt für Meteorologie und Geodynamik

Regionalstelle für Kärnten

Acronym: ZAMG-K

Nationality:

Mission of the body:

operational met services for district of Carinthia

(weather & climate, station network)

consultancy services

Project Manager: Dr.Franz Stockinger

32

FORALPS – PROJECT PARTNERSTrento, 10., 11. 03. 2005

• Role in FORALPS: Project Partner

Role in various WPs:

- WP6 Monitoring

coordinated operation of microradar equipment

between OSMER, EARS and ZAMG-K in selected target regions

data evaluation & comparison

- WP7 Weather & Water Resource Availability

Forecasting

verification of numerical model output & subjective forecasts

to improve quantitative precipitation forecasts

via optimized employment of numerical data

17

33

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of InstitutionInstitution::

Zentralanstalt fZentralanstalt füür Meteorologie und Geodynamik, Regionalstelle fr Meteorologie und Geodynamik, Regionalstelle füür Salzburg r Salzburg

und Oberund Oberöösterreich sterreich

Acronym:Acronym: ZAMGZAMG--SS

Nationality:Nationality:

Mission of the body:Mission of the body: WWeather Service eather Service

Project Manager:Project Manager: Dr. Michael Dr. Michael StaudingerStaudinger

34

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

NameName of of InstitutionInstitution::

CentralCentral InstituteInstitute forfor MeteorologyMeteorology and and GeodynamicsGeodynamics, ,

RegionalRegional ServiceService forfor LowerLower Austria, Vienna and Austria, Vienna and BurgenlandBurgenland,,

Project Project implementationimplementation: : DepartmentDepartment of Climatologyof Climatology

–– SubSub--DivisionDivision ClimatologicalClimatological SurveySurvey

Acronym:Acronym: ZAMGZAMG--WW

Nationality:Nationality:

Mission of the body:Mission of the body: WWeather Service eather Service

(Divisions of Forecast, Environment, Geophysics, (Divisions of Forecast, Environment, Geophysics,

data processing, data processing, technicstechnics, , ClimatologyClimatology

–– to keep the to keep the climatologicalclimatological archivearchive (paper, digital, metadata)(paper, digital, metadata)

–– data rescue and recoverydata rescue and recovery

–– allocation of climate data and productsallocation of climate data and products

Project Manager:Project Manager: Dr. Dr. IngeborgIngeborg AuerAuer

Project teamProject team: : DiplDipl. . GeogrGeogr. Eva Korus, . Eva Korus, ReinhardReinhard BBööhmhm, ,

digitisingdigitising staff, Roland staff, Roland PotzmannPotzmann, Wolfgang , Wolfgang LipaLipa, ,

18

35

FORALPS FORALPS –– PROJECT PARTNERSPROJECT PARTNERS

RoleRole in FORALPS:in FORALPS: Project PartnerProject Partner

Role in various WP:Role in various WP:

-- WP5: WP5: Dataset Dataset (WP Leader)(WP Leader)

36

Organisational Issues/1

SPEAKERS: Dino Zardi, Serena Beber

SUMMARY• Project Steering Committee• Advisory Board• Information and Publicity Committee• Role of the Lead Partner

19

37

Project Steering Committee (PSC)(from Partnership Agreement)

1. The PSC is composed of the project managers of all project participants […] In case of need, project managers may delegate a substitute to attend PSC meetings, appointing to him the full mandate in representing the project participant.

2. The tasks of the PSC are the following: decisions on the technical, administrative and financial management of the project, decisions on reallocations in the budget, settlement of any disputes among project participants. […]

38

Project Steering Committee(from Partnership Agreement)

3. PSC meetings are convoked by the LP. The LP can invite representatives of the JTS, MA and INTERREG National Contact Points to attend to the PSC meetings as observers.

4. The members of the PSC shall make an effort to reach the widest agreement; if this is not reached in due time, decisions are taken by simple majority vote among the project managers and substitutes present at the meeting. In case of parity, the final decision is the one of the LP. Decisions taken by the PSC are binding for project participants.

20

39

Advisory Board(from Partnership Agreement)

“An Advisory Board (AB) composed by experts in the fields covered by the project activities will be appointed by the PSC.

The AB will follow and monitor the project, and give recommendations in order to achieve high-quality results and secure the outputs of the project.”

40

Information and Publicity Committee(from Partnership Agreement)

“An Information and Publicity Committee (IPC) will be set up, in order to coordinate the actions, style and timing of dissemination initiatives. Members of the IPC are appointed by the PSC. Representatives of the JTS can attend the IPC meetings as observers.”

21

41

PSC Meetings:

- When?

- Where?

- In connection with other events?

DISCUSSION

42

DISCUSSION

-20078°

2007

2006

2006

2005

2005

YEAR

RELATED EVENTSMONTHVENUE

April ?

November

March

-

-

-

-

-

MILAN ?

VERONA ?

TRENTO

Tentative Schedule of PSC Meetings

22

43

Proposed appointments for the

Advisory Board

- Col. Giuseppe Frustaci Italian National Weather Service

- Eng. Reinhold Godina Bundesministerium für Land- und Forstwirtschaft, Umwelt und Wasserwirtschaft (BMLFUW)

- Prof. Ekkehard Dreiseitl University of Innsbruck

- Prof. Maurizio Maugeri University of Milan

- Prof. Giovanni Perona Politecnico of Turin

- Prof. Joze Rakovec University of Ljubljana

- Prof. Antonio Speranza University of Camerino

- Prof. Reinhold Steinacker University of Vienna

- Dr. Arnold Tafferner German Aereospace Centre (DLR)

44

Proposed appointments for the Information and Publicity Committee

- Dr. Serena Beber University of Trento, FORALPS Staff

- Dr. Massimo Boni ARPA FVG

- Dr. Michela Cavallini JTS – Publicity Officer

- Dr. Tanja Cegnar Environmental Agency of the Republic of Slovenia

- Dr. Elisabetta Nones University of Trento

- Dr. Elena Giusta APAT

- Dr. Michael Staundinger ZAMG-S

- ………………………… ……………….

23

45

Role of the Lead Partner(from Partnership Agreement)

The LP shall take all the steps needed to correctly manage the project in accordance with the project application, the decisions of the Steering Committee and the subsidy contract.

In addition, the LP shall:• keep the project partners informed on a regular basis about all relevant communication between LP and Joint Technical Secretariat (JTS) and LP and MA

• complete all actions foreseen for each year of the project implementation and have these expenditures certified within 12 months after receipt of the respective invoice or equivalent accounting document at the latest. Any expenditure not certified accordingly may not be reimbursed by the Paying Authority

46

THE LEAD PARTNER HAS TO BE AUTHORISED TO:

1. Directly interact with the partners in order to

achieve the purposes of the project

2. Participate to each WP-group and be informed on

their results

3. Invite external guests to the meetings

4. Call meetings involving only WP Leaders

24

47

To be approved

1. Website = www.unitn.it/foralpswww.unitn.it/foralpsPleasePlease, link , link itit in in youryour websitewebsite !!

2.2. Logo = Logo =

48

Further points

1.1. FORALPS FORALPS contactcontact list list ((pleaseplease, find , find itit in in youryour folderfolder))

2.2. The The LeadLead Partner Partner ee--mailmail addressaddress isis: :

[email protected]@unitn.it

Please, do not send messages relatedto the Project to personal e-mailaddresses of staff members!!

3.3. Official Official presentationpresentation

DISCUSSION

25

49

Practicals:

COFFEE BREAK16:30 – 17:00Here

50

Reporting

SPEAKERS: Sarah Magniez, Serena Beber

SUMMARY• Reporting procedure• Reporting deadlines

26

51

PROJECT PARTNERSREPORTING DEADLINES

Keep in mind the following deadlines:

• 31 March (REPORT + CERTIFICATION)

• 30 June (REPORT)

• 30 September (REPORT + CERTIFICATION)

• 31 December (REPORT)

52

DOCUMENTS TO BE PROVIDED

At all deadlines:

- Each Partner sends to the LEAD PARTNER:

1) Its contribution to the Financial Report2) Its contribution to the I&P Report

- Each WP RESPONSIBLE sends to the LP:

3) WP Activity Report (WP responsibles: please arrange accordingly with your Partners!)

27

53

FURTHER DOCUMENTS TO BE PROVIDED:

Within 31 March and 30 September:

Each Partner sends to the LEAD PARTNER:4) Certification of expenditure

****Make sure about timing of your national Make sure about timing of your national certification procedurecertification procedure

Within 30 April and 31 October:The LP sends national certifications of all PP to the MA

54

BUDGET REALLOCATION: CRITERIA

(from Subsidy Contract and Practicalguidelines on project implementation)

1. NO reallocation among Partners

2. The Lead Partner is allowed to reallocate funds

between categories of costs up to 20% of the total

amount indicated in each cost category in the AF

3. The Lead Partner is allowed to reallocate funds

between workpackages up to 20% of the total

amount indicated in each cost category in the AF

28

55

BUDGET REALLOCATION: PROCEDURES

(from Subsidy Contract and Practicalguidelines on project implementation)

A.PROGRAM LEVEL ���� Program Steeering Committee

For changes up to 20%:the JTS and the MA have to be informed through the regular

reporting routines.

For changes exceeding 20%:• They have to be reported to the MA via the JTS

immediately, independently from the submission of a report

• A new approval by the Steering Committee is necessary on the basis of a well-founded request for reallocation

submitted by the Lead Partner to the JTS.

56

BUDGET REALLOCATION

B: Partnership level (for each singleProject Partner) ���� Project Steering Committee

The Project Partners agree that:

• As general rule, each Project Partner is entitle to reallocate

funds between categories of costs only up to 20% of the

amount which the Project Partner itself stated in each cost

category in the AF, unless the approval by the Project Steering

Committee

• As a general rule, each Project Partner is entitle to reallocate

funds between WPs only up to 20% of the amount which the

Project Partner itself stated in each WP in the AF , unless the

approval by the Project Steering Committee

29

57

BUDGET REALLOCATION

The Project Partners are invited to:

• Attach to every Financial Report a statement about the expenses that the Project Partner is planning for the following 3 months.

58

NEXT DEADLINE:31 MARCH 2005

The LEAD PARTNER shall receive:

From EACH Partner1) Certification of expenditure2) Its contribution to the Financial Report3) Its contribution to the I&P Report

From the WP RESPONSIBLES4)WP Activity Report(Partners: please arrange accordingly with

your WP responsibles!)

30

59

ACCOUNTING AND AUDITS

Remember also that:

• it is necessary to have the expenditure certified within 12 months after receipt of the respective invoice or equivalent accounting documents at latest

• each Project Partner shall retain all files, documents and data about the project at least until 31 December 2012, either in original or as certified copies on commonly used data media safely and orderly

60

Organizational Issues/2

SPEAKER: Dino Zardi

SUMMARY• Project conferences• Subcontractors• Role of WP Responsibles

31

61

DISCUSSION

-

2007

2006

YEAR

RELATED EVENTSMONTHVENUE

-

October

Oct/Nov?

-

-

-

-

SALZBURG

LJUBLJANA

Project Conferences

62

Subcontracts

• Remember: entrusting consultings to externalexperts could take longer because of requiredadministrative or legal procedures (tenders, etc.)

• If the project partners require the support of subcontractors, the project partner MUST transferthe obligations deriving from the PartnershipAgreement and from the Application Form ontosuch subcontractors.

32

63

Role of WP Leaders(from Partnership Agreement)

Each responsible of a work-package shall:

1. take all the steps needed to correctly manage the work-package in accordance with the project application, the decisions of the Steering Committee and the Subsidy Contract.

2. inform Lead Partner and project partners involved in that work-package about all essential issues connected to its implementation without any delay.

64

Role of WP Leaders

3. Provide the LP with a work-package activity reportevery 3 months after the project startup:

� 31 March� 30 June� 30 September� 31 December

Meetings of the single WPs

a)Up to each WP Leader.

b)Please, just remember to inform the LP !

33

65

Workpackages/1

SPEAKERS: Dino Zardi, WP Responsibles

SUMMARY• Workpackage 4 • Workpackage 7 • Workpackage 8

66

WP4: WP4: InformationInformation and and PublicityPublicity

Objectives: Objectives:

a)a) SpreadingSpreading informationsinformations aboutabout project project activitiesactivities and and

achievementsachievements toto authoritiesauthorities and the and the generalgeneral publicpublic

b)b) Disseminating project products to the public, including Disseminating project products to the public, including

subjects in the fields of tourism, mountaineering, traffic subjects in the fields of tourism, mountaineering, traffic

assistance etc. assistance etc.

c)c) Making data and forecasts Making data and forecasts abtainedabtained within the project within the project

available to the public.available to the public.

Output:Output:

a)a) Developing, hosting and managing the project website.Developing, hosting and managing the project website.

b)b) Contact with the media.Contact with the media.

c)c) Diffusion of the project deliverables in the relevant Diffusion of the project deliverables in the relevant

languages (English, German, Slovenian, French, Italian).languages (English, German, Slovenian, French, Italian).

d)d) Organization of workshops where local authorities and Organization of workshops where local authorities and

scientific institutions interested in meteorological and scientific institutions interested in meteorological and

hydrological applications over the Alpine Space will be hydrological applications over the Alpine Space will be

invited to show the FORALPS outcome to a broad range invited to show the FORALPS outcome to a broad range

of endof end--usersusers7.796 €ZAMG-W

35.000 €ZAMG-S

2.400 €ZAMG-K

15.651 €ZAMG-I

23.727 €RAVA

5.430 €PAT

3.600 €PAB

10.990 €OSMER

17.881 €EARS

21.130 €ARPAV

11.092 €ARPA

Lombardia

APAT

UNITN

7.910 €

48.000 €

34

67

Role of each Project Partner:Role of each Project Partner:

ZAMGZAMG--S: Planning and organization of a general meeting to disseminateS: Planning and organization of a general meeting to disseminate the the

Foralps results to decision making authorities, the media and thForalps results to decision making authorities, the media and the public.e public.

RAVA: RAVA: bulletins targeted to: road network, tourism, mountaineering, abulletins targeted to: road network, tourism, mountaineering, agriculturegriculture

UniTNUniTN -- CINFAlCINFAl: managing the projects website.: managing the projects website.

WP4: WP4: InformationInformation and and PublicityPublicity

68

Milestones: see timetable in each WP4 activityMilestones: see timetable in each WP4 activity

WP Meetings: 2 per year, possibly joined with the other WP Meetings: 2 per year, possibly joined with the other

WP meetingsWP meetings

Related events: Related events:

-- Central event will be the workshops and the general Central event will be the workshops and the general

meetingsmeetings

-- InterregInterreg III B meetingsIII B meetings

-- ICAM 2007ICAM 2007

-- EMS/ECAM meeting 2007EMS/ECAM meeting 2007

-- ……....

WP4: WP4: InformationInformation and and PublicityPublicity

35

69

WP4: WP4: InformationInformation and and PublicityPublicity

Activity 1 : Developing, hosting and managing the Activity 1 : Developing, hosting and managing the

project websiteproject website

-- UniTNUniTN: Creating the structure, defining the necessary content : Creating the structure, defining the necessary content

-- RAVA: bulletins targeted to: road network, tourism, RAVA: bulletins targeted to: road network, tourism,

mountaineering, agriculturemountaineering, agriculture

-- ZAMGZAMG--S: Implementation of experiences made with the METEORISK S: Implementation of experiences made with the METEORISK

websitewebsite

-- APAT: Forecast outputs from BOLAMAPAT: Forecast outputs from BOLAM

-- OSMER: Examples of forecasts displayed on the Website OSMER: Examples of forecasts displayed on the Website

2005 2006 2005 2006 20072007initial setup contents addedinitial setup contents added full performancefull performance

open to publicopen to public PR in other mediaPR in other media

Open question:Open question: which operational forecasts will be in which operational forecasts will be in www.foralps.netwww.foralps.net??

70

WP4: WP4: InformationInformation and and PublicityPublicity

Activity 2 Activity 2 -- Contact with the mediaContact with the media

ZAMGZAMG--S: S:

-- Collecting and preparing texts for press announcementsCollecting and preparing texts for press announcements

-- Collecting Collecting infosinfos for press mirror (for press mirror (ForalpsForalps in the media)in the media)

-- Collecting informal, but structured feedback from journalists abCollecting informal, but structured feedback from journalists about out

the the ForalpsForalps presence in the mediapresence in the media

UniTNUniTN: :

preparation and installation of media releases on the preparation and installation of media releases on the ForalpsForalps websitewebsite

ALL PARTNERS: ALL PARTNERS:

preparation of leafletspreparation of leaflets

2005 2006 2005 2006 20072007collecting textscollecting texts first media first media structuredstructured

announcementsannouncements PR activitiesPR activities

Open question: number of leaflets on Open question: number of leaflets on ForalpsForalps??

36

71

WP4: WP4: InformationInformation and and PublicityPublicity

Activity 3 Activity 3 --

Diffusion of the project deliverables in the relevant Diffusion of the project deliverables in the relevant

languages languages (English, German, Slovenian, French, Italian). (English, German, Slovenian, French, Italian).

-- ZAMGZAMG--S: Collecting and preparing texts for translations with the S: Collecting and preparing texts for translations with the

help of the Project Partnershelp of the Project Partners

-- UniTNUniTN: implementation of these texts on the website (public part): implementation of these texts on the website (public part)

-- RAVA: bulletins targeted to: road network, tourism, RAVA: bulletins targeted to: road network, tourism,

mountaineering, agriculture in nonmountaineering, agriculture in non--local languageslocal languages

-- EVERY SINGLE PARTER: translation into its national languageEVERY SINGLE PARTER: translation into its national language

2005 2006 2005 2006 20072007collection of textscollection of texts multilingual websitemultilingual website enlargement of theenlargement of the

content of thecontent of themultilingual websitemultilingual website

Open question: Open question: which parts of the website shall be multilingual?which parts of the website shall be multilingual?

72

WP4: WP4: InformationInformation and and PublicityPublicity

Activity 4 Activity 4 --

Organization of workshops Organization of workshops –– general meeting general meeting

-- ALL PARTNERS: ALL PARTNERS: preparing contents and text for workshops in preparing contents and text for workshops in

order to create interfaces of local authorities and scientific order to create interfaces of local authorities and scientific

communities interested in meteorological and hydrological communities interested in meteorological and hydrological

applications over the Alpine Space in the context of FORALPS applications over the Alpine Space in the context of FORALPS

outcomeoutcome

-- ZAMGZAMG--S: Preparing and planning of the general meeting in 2007S: Preparing and planning of the general meeting in 2007

-- EARS: Preparing and planning of the general meeting in 2006EARS: Preparing and planning of the general meeting in 2006

2005 20062005 2006 20072007workshop forworkshop for general meetinggeneral meetingdedicated usersdedicated users

Open question: Open question: which potential target groups to include?which potential target groups to include?

37

73

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

ObjectivesObjectives: :

a) High resolution meteorological forecast in the Alps to a) High resolution meteorological forecast in the Alps to

improve the integrated modeling of the water cycle.improve the integrated modeling of the water cycle.

b) Evaluation of standards for verification of model b) Evaluation of standards for verification of model

forecasts, to be used by participating regional services.forecasts, to be used by participating regional services.

c) Optimization of forecasts for verification procedures.c) Optimization of forecasts for verification procedures.

Output:Output:

a) High resolution experimental forecasts for case and a) High resolution experimental forecasts for case and

sensitivity studies in complex orography.sensitivity studies in complex orography.

b) A checkb) A check--list of suitable techniques for list of suitable techniques for spatialisationspatialisation of of

measured data and their use in model verification.measured data and their use in model verification.

c) Operational tools for verification of numerical models.c) Operational tools for verification of numerical models.

d) A checkd) A check--list for setup of operative identification of list for setup of operative identification of

precursors of deep moist convection in the forelands of precursors of deep moist convection in the forelands of

Alps.Alps.

0 €ZAMG-W

20.000 €ZAMG-S

40.100 €ZAMG-K

106.280 €ZAMG-I

0 €RAVA

127.140 €PAT

0 €PAB

101.220 €OSMER

54.150 €EARS

13.500 €ARPAV

128.815 €ARPA

Lombardia

APAT

UNITN

99.000 €

0 €

74

Role of each Project Partner:Role of each Project Partner:

OSMER: OSMER: High resolution experimental forecast for case and sensitivity sHigh resolution experimental forecast for case and sensitivity studies tudies

over specific target areas, and verification.over specific target areas, and verification.

ARPALombardiaARPALombardia: : SpatialisationSpatialisation of measured data and comparison with of measured data and comparison with

forecasts. forecasts.

ARPAV: ARPAV: Standard comparison between the ARPAV rainStandard comparison between the ARPAV rain--gauge network data and gauge network data and

forecast products available over the forecast products available over the GardaGarda Lake and Lake and AdigeAdige basin. basin.

EARS: EARS: Standardized verification methods for various limited area numerStandardized verification methods for various limited area numerical ical

weather forecasting model runs. weather forecasting model runs.

PAT: PAT: Verification and skill assessment of operational models under diVerification and skill assessment of operational models under different fferent

weather conditions.weather conditions.

ZAMGZAMG--I: Optimum interpolation of precipitation fields in Tyrol; develI: Optimum interpolation of precipitation fields in Tyrol; development of a opment of a

forecast matrix for endforecast matrix for end--users; subjective forecast verification. users; subjective forecast verification.

ZAMGZAMG--K: Verification of models in weakK: Verification of models in weak--moderate precipitation episodes to moderate precipitation episodes to

optimize forecasts for agriculture, construction and leisure indoptimize forecasts for agriculture, construction and leisure industry. ustry.

Coordinated definition of model quality standards. Coordinated definition of model quality standards.

APAT: APAT: Interfacing meteorological forecasts with verification procedureInterfacing meteorological forecasts with verification procedures and s and

hydrological models.hydrological models.

ZAMGZAMG--S: Interfacing meteorological forecasts with verification procedS: Interfacing meteorological forecasts with verification procedures and ures and

hydrological models.hydrological models.

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

38

75

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

Milestones: see Milestones: see ““time arrowtime arrow”” for each WPfor each WP--actionaction

WP Meetings: 2/yr, possibly joined with other eventsWP Meetings: 2/yr, possibly joined with other events

The next on November 2005The next on November 2005

Related events: Related events: MAP meeting, scuola estiva di Udine sulla convezione,

meeting ALP-IMP, meeting di Meteorisk, Training workshop on

homogeneization 16/17 Maggio

76

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

action 1 - experimental weather forecastsequipm. exp.

OSMER - case & sensitivity HR-NWF 6’000 €ZAMG-I - forecast matrixAPAT - case studies using 10-km

operational parallel BOLAM

open questions:

• how to select case studies

• long series vs. case studies to apply different verification

methods

2005 2006 2007WRF model set up exp. runs check-list dmc

fcst matrix: definition of parameters, procedures, ?

Case select., I.C./B.C collect. runs

39

77

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

action 2 - data spatialization

ARPALombardia - quality control and spatialization of measured data

ZAMG-I - optimum interpol. of precipitation fields in TyrolAPAT - Barnes (obj. anl.) tech. for point-to-grid;

Remapping for grid-to-grid transformation

open questions:

• what are the spatialization techniques to be used?

• how are the various techniques to be harmonized?

2005 2006 2007spatialization & opt. interp. check-list

ARPALombardia: quality control spatialization

78

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

action 3 - numerical forecast verificationequipm. exp.

EARS - Standard. verification methods for LAMsPAT - Verification and skill assess. oper. mdls 6’000 €

ZAMG-K - Verification NWP precip. fcst; develop tools for operat. fcst

definition of model quality standards.ZAMG-S - Interfacing meteor. fcsts with verification proced.APAT - Implementation of statist./determin. verif. tech. for LAMs;

Interfacing meteor. fcsts with verification proced.

ARPALombardia - qualit. comparison of measurements with forecasts (LAM)

open questions:

• how are the various techniques to be harmonized

and standardized?

2005 2006 2007initial test verification set up operational tools

40

79

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

action 4 - subjective forecast verification

equipm. exp.

ARPAV - std. comp. gauges data - Garda+Adige fcsts 9’000 €ZAMG-I - subjective forecast verification

ZAMG-K - Verific. subj. precip. fcst; develop tools for operat. fcst.

open questions:

• how are the various techniques to be harmonized

and standardized?

• verification results for internal or/and external use?

2005 2006 2007initial test verification set up verific. standards adopted

80

WP7: WP7: Weather and Water Resource Weather and Water Resource

Availability ForecastingAvailability Forecasting

action 5 - interfacing meteo fcst & hydro modelsequipm. exp.

APAT - Interfacing meteo. forecasts with hydrological modelsZAMG-S - Interfacing meteo. forecasts with hydrological models

open questions:

• how to define an initial state of the art to start with?

• how to deal with subgrid space/time rain variability

(downscaling/upscaling problem)? See WP8

• what is the goal of the coupling (land use / civil defense / …)?

2005 2006 2007initial review interface set up coupling running

41

81

WP8: WP8: SustainableSustainable ResourceResource ManagementManagement

ObjectivesObjectives: :

a)a) Identification of an optimal combination of input Identification of an optimal combination of input

parameters for hydrological models in different regions parameters for hydrological models in different regions

of the Alpine arch.of the Alpine arch.

b)b) Quantitative estimation of water supplies in alpine Quantitative estimation of water supplies in alpine

catchments.catchments.

Output:Output:

a)a) A survey of stateA survey of state--ofof--thethe--art hydrological models in use in art hydrological models in use in

regional/national services.regional/national services.

b)b) Operational coupled Operational coupled meteometeo--hydrological models.hydrological models.

c)c) Estimation of resources availability in alpine water Estimation of resources availability in alpine water

bodies, including glaciers and underground water.bodies, including glaciers and underground water.

0 €ZAMG-W

97.080 €ZAMG-S

0 €ZAMG-K

0 €ZAMG-I

0 €RAVA

0 €PAT

72.800 €PAB

0 €OSMER

0 €EARS

0 €ARPAV

0 €ARPA

Lombardia

APAT

UNITN

60.180 €

89.000 €

82

Role of each Project Partner:Role of each Project Partner:

APAT: APAT: Analysis of runoff models with respect to available data, to ideAnalysis of runoff models with respect to available data, to identify and ntify and

suggest the most useful in the alpine space; suggest the most useful in the alpine space; exhangeexhange and update of stage and update of stage

discharge relationships.discharge relationships.

PAB: PAB: Detailed monitoring of various contributions to surface and subDetailed monitoring of various contributions to surface and sub--surface surface

runoff in a representative alpine runoff in a representative alpine catchmentcatchment: pilot application to the : pilot application to the

RidannaRidanna river basin. Quantitative description of the hydrological cycleriver basin. Quantitative description of the hydrological cycle in in

valleys with glaciers.valleys with glaciers.

UniTNUniTN: : Pilot application of rainfallPilot application of rainfall--runoff models in the runoff models in the AdigeAdige Valley. Analysis of Valley. Analysis of

the impact of hydraulic works on surface runoff and water resourthe impact of hydraulic works on surface runoff and water resource ce

availability.availability.

ZAMGZAMG--S: Extensive study for the application of hydrological models inS: Extensive study for the application of hydrological models in the northern the northern

Alps, with the main focus on the sensitivity of models to the Alps, with the main focus on the sensitivity of models to the catchmentcatchment

size, the relevant time constants and the different meteorologicsize, the relevant time constants and the different meteorological input al input

parameters.parameters.

WP8: WP8: SustainableSustainable ResourceResource ManagementManagement

42

83

Milestones: see timetable in each WP8 activityMilestones: see timetable in each WP8 activity

WP Meetings: 2 per year, possibly joined with the other WP Meetings: 2 per year, possibly joined with the other

First WP meeting in ROME (11 April)First WP meeting in ROME (11 April)

Related events: Related events:

-- JRCJRC--European Flood Alert System (EFASEuropean Flood Alert System (EFAS--LISFLOOD)LISFLOOD)

-- CRUECRUE--ERANET (VI FP) activities ERANET (VI FP) activities

-- DD--PHASE (MAP project) activitiesPHASE (MAP project) activities

-- NETWET2NETWET2––WaternetWaternet (INTERREG III B(INTERREG III B--CADSES) activities CADSES) activities

-- CADSEALAND (INTERREG III BCADSEALAND (INTERREG III B--CADSES) activities CADSES) activities

-- HYDROCARE (INTERREG III BHYDROCARE (INTERREG III B--CADSES) activitiesCADSES) activities

-- METYDE (LIFE Environment), to be approvedMETYDE (LIFE Environment), to be approved

-- HH--SAF (EUMETSAT), Hydrology Satellite Application SAF (EUMETSAT), Hydrology Satellite Application

Facility Facility

WP8: WP8: Sustainable Resource ManagementSustainable Resource Management

84

WP8: WP8: Sustainable Resource ManagementSustainable Resource Management

Activity 1 Activity 1 -- Assessment of the stateAssessment of the state--ofof--thethe--art rainfallart rainfall--

runoff models (links with activity 2)runoff models (links with activity 2)

-- APAT: APAT: Analysis of rainfallAnalysis of rainfall--runoff models in use in regionalrunoff models in use in regional--

national servicesnational services to select the most suitable ones toto select the most suitable ones to

the alpine spacethe alpine space

-- ZAMGZAMG--S: S: Extensive study for the application of hydrological Extensive study for the application of hydrological

models in the northern Alps, with the main focus models in the northern Alps, with the main focus

on model sensitivity to the on model sensitivity to the catchmentcatchment sizesize

-- PAB & PAB & UniTNUniTN:: Possible suggestions Possible suggestions

2005 2006 2005 2006 20072007initial review model selection initial review model selection �������� activity 2activity 2

& strategies& strategies

Open question:Open question: How to select the best one for the alpine space?How to select the best one for the alpine space?

43

85

WP8: Sustainable Resource ManagementWP8: Sustainable Resource Management

Activity 2 Activity 2 -- Coupling meteorological and hydrological Coupling meteorological and hydrological

models in target areas (links with WP7)models in target areas (links with WP7)

-- APAT: APAT: Coupling operational BOLAM with Coupling operational BOLAM with hydrolhydrol. models. models

-- ZAMGZAMG--S:S: Interfacing Interfacing meteorolmeteorol. forecasts with . forecasts with hydrolhydrol. models. models

-- PAB: PAB: GIS based runoff model with GIS based runoff model with RidannaRidanna data + validationdata + validation

-- UniTNUniTN::Pilot application of rainfallPilot application of rainfall--runoff models in runoff models in

the the AdigeAdige Valley via Valley via meteometeo--hydro couplinghydro coupling

2005 2006 2005 2006 20072007review downscaling interface set up + coupling (review downscaling interface set up + coupling (�������� WP7)WP7)techniques GIS model techniques GIS model + validation+ validation

Open question: Open question: MeteorolMeteorol. variable . variable postpost--processingprocessing + + downscaldownscal. . techntechn. & optimal . & optimal interpolinterpol. + interface . + interface

86

WP8: Sustainable Resource ManagementWP8: Sustainable Resource Management

Activity 3 Activity 3 -- Exchange and update of stageExchange and update of stage--discharge discharge

relationships & knowledge on runoff relationships & knowledge on runoff

processes for alpine basin processes for alpine basin

-- APAT: APAT: Exchange and update of stageExchange and update of stage--discharge discharge

relationshipsrelationships

-- PAB: PAB: Monitoring of hydrological cycle, including surface Monitoring of hydrological cycle, including surface

and suband sub--surface runoff, in a pilot alpine surface runoff, in a pilot alpine catchmentcatchment

((RidannaRidanna river) and in valleys with glaciers (glacier river) and in valleys with glaciers (glacier

mass balance mass balance �������� links with WP6)links with WP6)

2005 2006 2005 2006 20072007observations update of stageobservations update of stage--on on RidannaRidanna basin + discharge basin + discharge relatrelat. + divulgation + . + divulgation + glacier study glacier study glaglacier study glacier study glacier studycier study

Open question: Open question: Ice melt mod. for glacier mass balance validationIce melt mod. for glacier mass balance validation

44

87

WP8: Sustainable Resource ManagementWP8: Sustainable Resource Management

Activity 4 Activity 4 -- Analysis of the impact of hydraulic works on Analysis of the impact of hydraulic works on

surface runoff & water resource availabilitysurface runoff & water resource availability

-- UniTNUniTN: : Analysis of the impacts of hydraulic works, Analysis of the impacts of hydraulic works,

such as dams, over the such as dams, over the AdigeAdige valley (links valley (links

with activity 2)with activity 2)

-- PAB:PAB: Implementation of effective tools for water resources Implementation of effective tools for water resources

management in representative alpine catchments, management in representative alpine catchments,

suitable for suitable for various task including water resource various task including water resource

managementmanagement

2005 20072005 2007Hydraulic works impact + water resource Hydraulic works impact + water resource managemmanagem. after monitoring & calibration. after monitoring & calibration

Open question: Open question: Optimization of operations of hydraulic works to Optimization of operations of hydraulic works to satisfy economical, human & environ. needssatisfy economical, human & environ. needs

88

•DINNER20.00Vicolo del Vo‘, 11

• TOMORROW MORNING BE HERE ON TIME !!8.45

• SHORT VISIT AND WELCOME BY THE UNIVERSITY RECTOR 9:00

45

89

Practicals:

• WELCOME BY THE UNIVERSITY RECTOR 8:45 a.m.

• CLOSURE 10:30 a.m.

• A DISCUSSION ABOUT THE ITALIAN REPORTING PROCEDURE WILL FOLLOW

90

Workpackages/2

SPEAKERS: Dino Zardi, WP Responsibles

SUMMARY• Workpackage 5 • Workpackage 6 • Workpackage 9

46

91

WP5: WP5: DatasetDataset

ObjectivesObjectives::

Investigate frequency, seasonality, Investigate frequency, seasonality, arealareal extent and extent and

spatial pattern of precipitation events in the Alpine spatial pattern of precipitation events in the Alpine

Space region, with particular focus on the return periods Space region, with particular focus on the return periods

of extremes (droughts, intense precipitation).of extremes (droughts, intense precipitation).

Output:Output:

a) An accurate and complete a) An accurate and complete climatologicalclimatological dataset for the dataset for the

Alpine area, to be used for land resources management Alpine area, to be used for land resources management

as well as for research.as well as for research.

b) An instrument (webb) An instrument (web--GIS) to make GIS) to make climatologicalclimatological

information easily available to the general public.information easily available to the general public.

174.728 €ZAMG-W

0 €ZAMG-S

0 €ZAMG-K

14.080 €ZAMG-I

0 €RAVA

40.000 €PAT

10.000 €PAB

0 €OSMER

63.930 €EARS

0 €ARPAV

70.000 €ARPA

Lombardia

APAT

UNITN

7.000 €

0 €

92

Role of each Project Partner:Role of each Project Partner:

ZAMGZAMG--W: Digitalization of daily values of precipitation, snow and temW: Digitalization of daily values of precipitation, snow and temperature for perature for

the period 1901the period 1901--1950 to extend the existing series; selection of about 50 1950 to extend the existing series; selection of about 50

centennial daily series over the Austrian territory and investigcentennial daily series over the Austrian territory and investigation into ation into

frequency, seasonality and return periods of extreme events. frequency, seasonality and return periods of extreme events.

APAT: APAT: Collect and share historical data with partners. Collect and share historical data with partners.

ARPALombardiaARPALombardia: : Creation of a hydroCreation of a hydro--meteorological database for the meteorological database for the LombardiaLombardia

region. region.

EARS: EARS: Homogenization of local historical digitalized data. Creation ofHomogenization of local historical digitalized data. Creation of a a

homogenized database for Slovenia. Study of impact of homogenizahomogenized database for Slovenia. Study of impact of homogenization tion

on climate parameters. on climate parameters.

PAB: PAB: HydrometeorologicalHydrometeorological and glacier data processing, quality control, and glacier data processing, quality control,

visualisation and analysisvisualisation and analysis::

PAT: PAT: Analyses of validated weather data to make a climatic map of thAnalyses of validated weather data to make a climatic map of the e

TrentinoTrentino Province. Study the climatic occurrence of extreme weather Province. Study the climatic occurrence of extreme weather

events concerning rainfall, snowfall, winds and temperatures. events concerning rainfall, snowfall, winds and temperatures.

ZAMGZAMG--I: I: Collect historical metadata, setup and run a database.Collect historical metadata, setup and run a database.

WP5: WP5: DatasetDataset

47

93

WP5: WP5: DatasetDataset

MostMost common common activitiesactivities -- lookinglooking forfor synergysynergy effectseffectsZZAAMMGG:: ddaattaa ccoolllleeccttiioonn ((ccoonncceennttrraatteedd oonn tthhee 11sstt hhaallff ooff tthhee 2200tthh cceennttuurryy)),, ddaattaa ssoouurrcceess:: HHZZBB,, rreegg.. hhyyddrrooggrraapphhiicc sseerrvviicceess

sseerriieess ooff TT,, RRRR aanndd ssnnooww,, DDiiggiittiissiinngg,, qquuaalliittyy ccoonnttrrooll,, hhoommooggeenniissaattiioonn AApppprrooxx.. rreepprreesseennttaattiivvee sseerriieess ffoorr 5500 rreeggiioonnss

IInnvveessttiiggaattiioonnss::

ffrreeqquueenncciieess ooff eexxttrreemmee eevveennttss,, rreettuurrnn ppeerriiooddss,, sseeaassoonnaalliittyy

AARRPPAALL:: ddaattaa ccoolllleeccttiioonn ffrroomm aauuttoommaattiicc aanndd mmaannuuaall ssttaattiioonnss,, 2200tthh cceennttuurryy

series of T and RR, ddaattaa ccoolllleeccttiivvee 227700 mmaannuuaall ++ 112200 aauuttoommaattiicc ssttaattiioonnss

eessttiimmaatteedd rreessuullttss:: hhoommooggeenniisseedd ~~1100 lloonngg--tteerrmm TT,,~~ 2200 lloonngg--tteerrmm RRRR,,

EEAARRSS:: ddiiggiittaattiioonn ooff hhiissttoorriiccaall ddaattaa ((TT aanndd RRRR)) ddaaiillyy bbeeffoorree 11996611,, qquuaalliittyy cchheecckkss aanndd hhoommooggeenniissaattiioonn sseerriieess ooff TT aanndd RRRR ,, eessttiimmaatteedd 99 ffoorr TT aanndd 2244 ffoorr RRRR vvaalliiddaattiioonn wwiitthh AAuussttrriiaann aanndd IIttaalliiaann bboorrddeerr ssttaattiioonnss

iinnvveessttiiggaattiioonnss:: oonn tthhee iimmppaacctt ooff hhoommooggeenniissaattiioonn oonn tthhee llooccaall cclliimmaattee

cchhaarraacctteerriissttiiccss tteemmppoorraall aanndd ssppaattiiaall aannaallyysseess ooff SSlloovveenniiaann

cclliimmaattee ssttuuddiieess oonn tthhee bbiiaasseess dduuee ttoo iinnssuuffffiicciieenntt ddaattaa iinn ccoommpplleexx tteerrrraaiinn

94

WP5: WP5: DatasetDataset

SynergiesSynergies: : Data recovery, data rescue, Data recovery, data rescue, digitalisationdigitalisation

Methods existing and to be developedMethods existing and to be developed

Data exchangeData exchange

Share of data and metadata (ZAMGShare of data and metadata (ZAMG--I, ZAMG W)I, ZAMG W)

Milestones: Milestones:

WP5 Meeting:WP5 Meeting:1212--13 May Ljubljana13 May Ljubljana

0ther hosts are welcome: 0ther hosts are welcome:

important topics to be discussed:important topics to be discussed:

network density, data quality control procedures, network density, data quality control procedures, visualisationvisualisation,,

relevant metadata and homogeneity tests (methods and impacts)relevant metadata and homogeneity tests (methods and impacts)

data and metadata exchange for validationdata and metadata exchange for validation

extreme events, extreme value statistics, extreme events, extreme value statistics,

Input of METEORISK (databank, Input of METEORISK (databank, programmesprogrammes etc).etc).

48

95

WP5: WP5: DatasetDataset

Open questions (Output?)Open questions (Output?): : a) An accurate and complete a) An accurate and complete climatologicalclimatological dataset for the Alpine area, to be used dataset for the Alpine area, to be used

for land resources management as well as for research.for land resources management as well as for research.

b) An instrument (webb) An instrument (web--GIS) to make GIS) to make climatologicalclimatological information easily available to information easily available to

the general public.the general public.

96

WP5: WP5: DatasetDataset

Related events: Related events: 2424--29 29 April 2005: EGU 2005 in Vienna: April 2005: EGU 2005 in Vienna:

CL12 Extreme Climate Events: Observations, Modelling and impactsCL12 Extreme Climate Events: Observations, Modelling and impactsCL 20 Climate of the last CL 20 Climate of the last milleniummillenium: reconstructions, analyses etc.: reconstructions, analyses etc.AS1.06 GIS in meteorology and climatologyAS1.06 GIS in meteorology and climatologyetcetc

17.17.--18 May 2005: 18 May 2005: Training session on homogeneity in BolognaTraining session on homogeneity in BolognaSupported by FORALPSSupported by FORALPSThe Lead Partner helps in disseminationThe Lead Partner helps in dissemination

2323--27 May 2005: ICAM/MAP 27 May 2005: ICAM/MAP ZadarZadar (HR)(HR)snow and ice in mountainous terrainsnow and ice in mountainous terrainmountain climates, extreme weather events and forecastingmountain climates, extreme weather events and forecasting

12 12 -- 16 September 2005, 5th Annual Meeting of the EMS, 7th European 16 September 2005, 5th Annual Meeting of the EMS, 7th European Conference on Conference on Applications of Meteorology (ECAM)Applications of Meteorology (ECAM)

CL 1 Global change activities (observed climate trends, climate CL 1 Global change activities (observed climate trends, climate changechangescenariosscenariosCL 2 weather and climate extremes (windCL 2 weather and climate extremes (wind--related extremes, climatology of related extremes, climatology of storms),storms), etcetcCL5 Climate data products and data policy , etcCL5 Climate data products and data policy , etc

49

97

WP5: WP5: DatasetDataset

Related activities: Related activities: ALPALP--IMP (ZAMG): IMP (ZAMG): MultiMulti--centennial climate variability in the Alps based centennial climate variability in the Alps based on Instrumental data, Model Simulations and Proxy data (EU, FP5)on Instrumental data, Model Simulations and Proxy data (EU, FP5), , -- Alpine Alpine longlong--term data sets of air temperature, precipitation, snow is under term data sets of air temperature, precipitation, snow is under preparationpreparation77--8 April: 38 April: 3rdrd ALPALP--IMP Meeting in Bologna IMP Meeting in Bologna CLIVALP (ZAMG): FWF, CLIVALP (ZAMG): FWF, Austrian Science funds Alpine longAustrian Science funds Alpine long--term data term data sets of air pressure, sunshine duration and cloudiness (under prsets of air pressure, sunshine duration and cloudiness (under preparation), eparation), HISTALP databank for data administrationHISTALP databank for data administration. . ANNALI (APAT): ANNALI (APAT): homogenous hydrological database (rainfall, temp, homogenous hydrological database (rainfall, temp, wind, water level, discharge, groundwaterwind, water level, discharge, groundwater))MOMBASA, WURTEN, MOMBASA, WURTEN, MassenbilanzMassenbilanz PasterzePasterze (ZAMG), (ZAMG), ((national national funded Austrian glaciology projects)funded Austrian glaciology projects)Alpine Temperature Climatology (ZAMG), Alpine Temperature Climatology (ZAMG), CLINOsCLINOs 19611961--1990, 1990, ~1700 stations~1700 stations

42

43

44

45

46

47

48

49

50

51

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20deg E

de

g N

T01-CLINO network (1961-90)

black-black squ. 6: HISTALP

black-yellow squ. 4: Uni-Pad

(Carrer)

black-green squ. 4: ZAMG-Clino

green circ. 4: HZB-Clino

black-blue squ. 4: DWD (M-

Westerm.)

blue-red squ. 4: CHMI (Kveton)

violet squ. 4: (Zaninovic)

black-green triang 4: SMI

(Mercalli)

black-pink circ. 4: MeteoSwiss

(Begert)

orange squ.. 4: Météo France

black-red circ. 4: Slovenia

short+long list

black-orange triang. 4: Italian

sampler (isac, Rossi,...)

red squ. 4: BA-sampler

black-yellow triang. 4: Uni-Torino

black-blue circ.: Nola-Motta-

dataset (Uni-Pavia, Uni-Torino)

red stars: Maugeri

violet stars 6: Maugeri 27-1-2005

red-white squ. 5: Bosn.

yearbooks

green stars 6: Maugeri 3-2-2005

light yellow squ. 5: Carrer 2005-

02

98

WP6: WP6: MonitoringMonitoring

ObjectivesObjectives: :

High resolution monitoring and optimal observation High resolution monitoring and optimal observation

coverage for the Alpine Space.coverage for the Alpine Space.

Output:Output:

a) Multiple tests of Xa) Multiple tests of X--band band microradarsmicroradars for operative for operative

monitoring of precipitation in mountain valleys.monitoring of precipitation in mountain valleys.

b) A high resolution network of field measurements for b) A high resolution network of field measurements for

monitoring and tuning monitoring and tuning XbandXband radars.radars.

c) Integration of Xc) Integration of X--band band microradarsmicroradars with existing Cwith existing C--band band

radars (composite), for widespread monitoring of radars (composite), for widespread monitoring of

weather.weather.

d) An automatic procedure for alert issuing, based on d) An automatic procedure for alert issuing, based on

observed data.observed data.

e) A network of trained volunteers for the monitoring of e) A network of trained volunteers for the monitoring of

local severe weather events in a target area.local severe weather events in a target area.

0 €ZAMG-W

0 €ZAMG-S

55.100 €ZAMG-K

0 €ZAMG-I

183.460 €RAVA

18.000 €PAT

70.000 €PAB

114.300 €OSMER

98.148 €EARS

83.740 €ARPAV

0 €ARPA

Lombardia

APAT

UNITN

0 €

0 €

50

99

Role of each Project Partner:Role of each Project Partner:

OSMER: OSMER: Test XTest X--band band microradarmicroradar systems in the valleys of systems in the valleys of FriuliFriuli region. Improve region. Improve

observational network by installing new highobservational network by installing new high--resolution weather stations resolution weather stations

in uncovered valleys. in uncovered valleys.

ARPAV: ARPAV: Use of XUse of X--band mobile band mobile microradarmicroradar systems in connection with the existing systems in connection with the existing

CC--band band dopplerdoppler radar. radar.

EARS: EARS: Correction of radar data with average reflectivity profiles andCorrection of radar data with average reflectivity profiles and

comparison to raincomparison to rain--gauge data. Tests with Xgauge data. Tests with X--band band microradarmicroradar systems in systems in

alpine valleys in close cooperation with partners from alpine valleys in close cooperation with partners from neighbouringneighbouring

countries. countries.

PAB:PAB: Detailed monitoring of contributions to surface and subDetailed monitoring of contributions to surface and sub--subsurface runoff subsurface runoff

on a representative alpine pilot on a representative alpine pilot catchmentcatchment (snowmelt, (snowmelt, icemelticemelt, ,

groundwater, rainfall), and glacier surveygroundwater, rainfall), and glacier survey. .

PAT: PAT: Development of software to continuously check the weatherDevelopment of software to continuously check the weather

using ground stations and radar data, and of automatic procedureusing ground stations and radar data, and of automatic procedures to alert s to alert

forecasters via forecasters via smssms message. message.

RAVA: RAVA: Adaptation of XAdaptation of X--band radar systems for use in complex orography; test in band radar systems for use in complex orography; test in

the Valle the Valle d'Aostad'Aosta region. region.

ZAMGZAMG--K: Providing K: Providing radiosonderadiosonde data to improve data coverage; cooperation in data to improve data coverage; cooperation in

testing Xtesting X--band band microradarsmicroradars with with neighbouringneighbouring partners and comparison partners and comparison

with precipitation measurements.with precipitation measurements.

WP6: WP6: MonitoringMonitoring

100

WP6: WP6: MonitoringMonitoring

Milestones: see Milestones: see ““time arrowtime arrow”” for each WPfor each WP--actionaction

WP Meetings: 2/yr, possibly joined with other eventsWP Meetings: 2/yr, possibly joined with other events

Related events: Voltaire Project, Utrecht, EMSRelated events: Voltaire Project, Utrecht, EMS

51

101

WP6: MonitoringWP6: Monitoring

action 1 - X-band microradars

equipm. exp.RAVA - adaptation, test 2 x 33’000 €

ARPAV - test 1 x 35’000 €

OSMER - test 1 x 35’000 €

ZAMG-K - test in Gailtal simult. OSMER during

selected/severe wea. period

EARS - test 1 x 35’000 €

open questions:

what type of X-band microradar?

what kind of procurement procedure?

how to arrange simultaneous tests in FVG-K?

2005 2006 2007step I step II step III

Meeting -when? procurement, set up ? field test phase

102

WP6: MonitoringWP6: Monitoring

action 2 - improv. exist. observational networks

PAB - monit. surf+sub-surf runoff in glacier basin 40’000 €

OSMER - installing new stations 19’000 €

ZAMG-K - launching radiosondes (Providing additional free-atmosphere data by

operating mobile radiosonde tracking equipment)

2005 2006 2007set up of the network glac. surv. glac. surv.

inst. new stations

radiosonde data

52

103

WP6: MonitoringWP6: Monitoring

action 3 - integration of measurements

vol. A) Xvol. A) X--band band µµradarradar vs. Cvs. C--band radarband radarARPAV - connection with existing C-band

vol. B) data correction and comparisonvol. B) data correction and comparison

ZAMG-K - verific./comp. of µradar data with rain gauge dataEARS - correction of radar data with aver. reflect. profiles,

comparison with rain gauge data

2005 2006 2007step I step II

correction radar data - profiles comparison X-band / gauges

connection X-band / C-band

open questions: logistics and coordination, weather

dependent timing of activity

104

WP6: MonitoringWP6: Monitoring

action 4 - automatic procedures for alertsPAT - observed data based aut. procedure for alerts 9’000 €

2005 2006 2007studies set up test & verification

open questions:

action 5 - volunteers trainingOSMER - network of trained volunteers 3’000 €

2005 2006 2007course, netw. manag. course, netw. manag. course, netw. manag.

53

105

WP9: WP9: Managerial, Economic and Managerial, Economic and

Financial AspectsFinancial Aspects

ObjectivesObjectives: :

a)a) Enhancement of the basic knowledge of the costs from Enhancement of the basic knowledge of the costs from

anomalous weather events, to improve decision making anomalous weather events, to improve decision making

processes and investments in resource management.processes and investments in resource management.

b)b) Assessment of the financial and economic impacts of Assessment of the financial and economic impacts of

correct and incorrect forecasts.correct and incorrect forecasts.

Output:Output:

a)a) Evaluation of the impact on water resources of the Evaluation of the impact on water resources of the

current management system in the Alps.current management system in the Alps.

b)b) Cost/benefit analyses of the improvement of available Cost/benefit analyses of the improvement of available

weather information in pilot areas within the Alpine weather information in pilot areas within the Alpine

Space.Space.

c)c) Integration of meteorological and hydrological Integration of meteorological and hydrological

information in the decision making process.information in the decision making process.

0 €ZAMG-W

38.000 €ZAMG-S

0 €ZAMG-K

0 €ZAMG-I

0 €RAVA

0 €PAT

0 €PAB

0 €OSMER

0 €EARS

79.000 €ARPAV

0 €ARPA

Lombardia

APAT

UNITN

0 €

99.000 €

106

Role of each Project Partner:Role of each Project Partner:

UniTNUniTN: : Cost/benefit analysis of water resources management practicesCost/benefit analysis of water resources management practices

(short(short--range and longrange and long--range impacts).range impacts).

ARPAV: ARPAV: Cost/benefit analysis of weather information availability.Cost/benefit analysis of weather information availability.

ZAMGZAMG--S: Transferring the results of WP 6 into complete analysis schemS: Transferring the results of WP 6 into complete analysis schemes,es,

for the evaluation of economic benefit in the context of decisiofor the evaluation of economic benefit in the context of decision making n making

in Austria.in Austria.

WP Meetings: 2/yr, possibly joined with other events,WP Meetings: 2/yr, possibly joined with other events,

together with WP8together with WP8

Related events: Related events:

12 - 16 September 2005, 5th Annual Meeting of the EMS, 7th

European Conference on Applications of Meteorology (ECAM)

WP9: WP9: Managerial, Economic and Managerial, Economic and

Financial AspectsFinancial Aspects

54

107

Possible application fields interested by the availability of advanced weather forecasting and water resource management technologies

1. Civil protection (cost of false alarms, …)

2. Tourism (false alarm)

3. Road transportation

4. Agriculture

5. Insurances

WP9: WP9: Managerial, Economic and Managerial, Economic and

Financial AspectsFinancial Aspects

108

action 1 – Application of cost/benefit analysis to some case studies (2005 and 2006)

action 2 - Cost/benefit analysis of the future availability of advanced weather forecasting and water resource management technologies (2007)

Pilot areas

• UNITN (in the Adige Valley)

• ARPAV (in the area around the Garda Lake)

• ZAMG-S (in the Nord-Österreich – Linz – small

basin- downscaling of output from LAMs to the

basin scale, which suffers from frequent flooding)

WP9: WP9: Managerial, Economic and Managerial, Economic and

Financial AspectsFinancial Aspects

55

109

WP9: WP9: Managerial, Economic and Managerial, Economic and

Financial AspectsFinancial Aspects

Comments: • What type of cost/benefit analysis ?

• Choice of the case studies.

• Connection between WP9 and the other WPs:- WP5: benefits deriving from the database of historical series

- WP7: benefits deriving from the optimization of NWF models

- WP8: benefits deriving from the optimization of operations in

dams

4. Connections between WP9 and WP6 (training of

volunteer observers)? Better to carry out polls?

5. Suggestions?

110

Thank you for your cooperation!

See youon the next Steering Committee