for personal use only - asxmar 25, 2015 · the wim150 product suite will be approximately...
TRANSCRIPT
![Page 1: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/1.jpg)
WIM150 Mineral Sands Project15th Anniversary Mineral Sands Conference 24-25 March 2015
For
per
sona
l use
onl
y
![Page 2: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/2.jpg)
Legal statements
2
DisclaimerThis presentation does not comprise a prospectus, disclosure document or other offering document under Australian Law or any other Law. It does not constitute provision of financial product advice. None of the directors of AZC, its related bodies corporate, officers, employees or advisors makes or gives any representation, warranty or guarantee in relation to this presentation (whether orally, in document form or in any form whatsoever) or in relation to any information (“Information”) contained in it to the recipient of this presentation or any of its related bodies corporate, officers, employees and advisors (“Recipient(s)”). Information sourced from third parties and reported in this presentation has not been verified or updated; it is important that Recipient(s) take care to verify and update before taking in to account in any process of evaluation. The presentation is provided expressly on the basis that the Recipient(s) will carry out its own independent inquiries into the Information and make its own independent decisions about the affairs, financial position or prospects of AZC. AZC reserves the right to update, amend or supplement the Information at any time in its absolute discretion (without incurring any obligation to do so).
Forward Looking StatementsThe information in this presentation includes statements containing forecasts and forward looking information. Although AZC believes that the statements, estimations, projections, beliefs and opinions reflected in such forward looking statements arereasonable, such statements involve risks and uncertainties and no assurance can be given that actual results and outcomes will be consistent with these forward looking statements.
Competent Persons Statement
The Mineral Resource estimates for the WIM150 deposit were prepared by Mrs Christine Standing (Principal) and reviewed by MrIan Glacken (Director and Principal) of Optiro. Mrs Standing visited the WIM150 Project in March 2013 and observed the drilling andsampling procedures used for collection of the density data. Mrs Standing is a Member of the Australasian Institute of Mining andMetallurgy and the Australian Institute of Geoscientists, and Mr Glacken is a Fellow of the Australasian Institute of Mining andMetallurgy and a Chartered Professional Geologist. Mrs Standing has sufficient experience that is relevant to the style ofmineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 edition of theAustralasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012).
The Ore Reserve statement was as reported to the ASX on the 26 July 2013 and compiled in accordance with the guidelines ofthe Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). The Ore Reserves statement was compiled by Andrew Law of Optiro, Fellow of the Australasian Institute of Mining and Metallurgy. Mr Lawhas sufficient experience in Ore Reserve estimation relevant to the style of mineralisation and type of deposit underconsideration to qualify as a Competent Person as defined in the Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC 2012).
For
per
sona
l use
onl
y
![Page 3: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/3.jpg)
The WIM150 Joint Venture comprises
• 80% Australian Zircon NL
• 20% Orient Zirconic Resources (OZR) (Australia) Pty Ltd
WIM150 Offtake Agreement
• 50% of life-of-mine production is secured by OZR
WIM150 Project - ownership and offtake
3
For
per
sona
l use
onl
y
![Page 4: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/4.jpg)
Standing on the shoulders of Giants • Discovered early 1980s by CRA/Rio
Tinto
• The Project was developed to pilot scale
• Titanium Minerals focus
• Extensive progress made to address issues of fine grain size material by using mineral flotation
• Rio Tinto withdrew in the late 1990s
WIM150 - History
4
For
per
sona
l use
onl
y
![Page 5: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/5.jpg)
Australian Zircon NL• Has worked on the WIM150 Project since 2004, focussed exclusively since 2012
Orient Zirconic Resources (Australia) Pty Ltd. • Current majority shareholder in Mindarie Mineral Sands mine.
• Owned by Guangdong Orient Zirconic Industry Science and Technology Co., Ltd (OZC), one of China’s leading zircon processing companies.
• OZC is listed on the Shenzhen Stock Exchange with a market capitalisation approx. RMB 6.7 Billion (A$1.25 billion).
• OZC has the most comprehensive range of zirconium products in the world, including zirconium dioxide, zirconium oxychloride, fused zirconia, zirconia structural ceramic as well as zirconium sponge and other products.
WIM150 – Joint Venture Partners
5
For
per
sona
l use
onl
y
![Page 6: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/6.jpg)
Location Plan
6
For
per
sona
l use
onl
y
![Page 7: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/7.jpg)
WIM150 Project
7
The Project’s principal characteristics are:
• Quality product suite and attractive ore grade
• Excellent logistics, infrastructure and services.
• Large and shallow ore body
• Low Waste/Ore Ratio - of 0.5 to 1.
• Stable sovereign regime
• Off-the-shelf equipment for all mining and processing operations.
• Long productive life
• 55 years underwritten by Ore Reserves,
• 160 years by Mineral Resources.
For
per
sona
l use
onl
y
![Page 8: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/8.jpg)
Logistics and infrastructure
kilometres
0 5
AZ_WIM_31
5,940,000 mN
620,000 mE
Horsham
5,920,000 mN
Railway
Highwa
y
Major road
Gas pipeline
National
Park/Reserve River
Lake
275kv power line
Production facilities
Water Authority TrunkLine
Project Area
Ore Reserve boundary
RL2007 and part EL4521
WIM150Project area
Substation
TAS Tas
SANSW
QLD
Vic
WIM150Project area
Social amenities
and engineering
services
Existing 66,000 voltline to beupgraded
State Electricity
Victoria substation ‘SEP’ 275,000volts to 66,000
volts
Regional road-rail
freight hub
Standard gauge
railway to PortMelbourne and PortAdelaide
275,000volt SEV
line
Water Authority trunk line
Natural Gas trunk
line
Western highway to Port Melbourne and Port Adelaide
8
For
per
sona
l use
onl
y
![Page 9: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/9.jpg)
Site Plan
9
For
per
sona
l use
onl
y
![Page 10: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/10.jpg)
Mineral resources
Ore reserves
Independent mining expert Optiro Pty Limited has determined a Waste/Ore ratio - after removal of soiland subsoil - of 0.5 to 1.
Resources and Reserves
10
Classification Million tonnes
% THM Slimes Particle Classification % within –75+20 µm THM
(–75+20 µm) (–20 µm) Zircon Monazite Xenotime Rutile Leucoxene Ilmenite
Measured 415 4.3 18.1 21.7 2.3 0.41 11.5 5.8 32.2
Indicated 580 4.0 18.4 20.4 2.0 0.37 11.6 6.1 31.0
Inferred 655 3.1 21.9 20.1 1.9 0.35 11.8 6.2 31.1
1,650 3.7 19.6 20.7 2.1 0.38 11.7 6.0 31.4
Category Million tonnes
HM Grade (%)
HM Mineral Assemblage (%)
Zircon Monazite Xenotime Rutile Leucoxene Ilmenite Other HM
Proved 268 4.5% 22.0 2.4 0.4 11.7 5.9 32.7 24.9
Probable 283 4.2% 21.3 2.2 0.4 11.6 5.9 30.8 27.7
552 4.3% 21.6 2.3 0.4 11.7 5.9 31.7 26.4
For
per
sona
l use
onl
y
![Page 11: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/11.jpg)
Planned mining methodology
11
Mining Unit Plant – scrub, screen, slurry ore
For
per
sona
l use
onl
y
![Page 12: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/12.jpg)
Mineral processing
Mineral concentration
Mineral separation
Oversize removed Spiral and jig concentration
Heavy Mineral Concentrate– feed to the Mineral Separation Plant
Heavy Mineral Concentrate
Raw zircon to upgrade Raw rare earth mineralsto upgrade
Titanium minerals to upgrade
12
For
per
sona
l use
onl
y
![Page 13: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/13.jpg)
Mineral processing
13
Wet Concentrator Plant
• Desliming• Pre-screening - to remove barren oversize• FM1 spirals• Kelsey jigsTo produce heavy mineral concentrate
Mineral Separation Plant
• Flotation to produce • Zircon followed by CSIRO Pure Zircon Process to reduce U+Th• Rare Earth Concentrate, with a gravity upgrade
• Conventional Titanium mineral circuit to produce• T95• T90• T65• Sulphatable Ilmenites
For
per
sona
l use
onl
y
![Page 14: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/14.jpg)
Mineral product suite
Zircon flour
Rare Earth Mineral Concentrate
Titanium Minerals
Sulphatable Ilmenite
T95 T90 T65
14
For
per
sona
l use
onl
y
![Page 15: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/15.jpg)
50% of the Project’s production is secured by OZR for life-of-mine
Offtake discussions for the balance of production are well-advanced
Product offtake
15
For
per
sona
l use
onl
y
![Page 16: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/16.jpg)
The WIM150 product suite will be approximately comprise:
Zircon flour 56%
Rare earth mineral concentrate 23%
Titanium products 21%
T95
T90
T65
Sulphatable ilmenites #1 and #2
WIM150 is principally a zircon development project.
Product suite by value
16
For
per
sona
l use
onl
y
![Page 17: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/17.jpg)
Ports of export
AZ_Aus_01
17
Port Adelaide
Export fordrummed andcontainerised Rare EarthMineral Concentrate
Port of Melbourne
Export for containerised:
• Zircon flour
• T95
• T90
• T65
• SulphatableIlmenite #1 & #2
For
per
sona
l use
onl
y
![Page 18: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/18.jpg)
Project Financial Modelling Australian Zircon holds an 80% interest in the WIM150 Joint Venture.
Project Value (Pre-Tax, assuming 50/50 debt: equity funding for AZC share)Nett Present Value (10%)
Internal Rate of Return
Payback period
$1286 million
34.2%
2.75 years
Project Costs (nominal, AUD)Base Construction Cost
Contingency
Working Capital
$458 million
$37 million
$55 million
Project Key Metrics (life of mine average, 100% project)Annual Total Site Operating Costs
Annual Total Site Revenue
Annual Gross Operating Margin
Annual Inflation
AUD/USD Exchange Rate
State Royalty (% of market value)
Discount Rate
$94 million
$233 million
59%
2.5%
87.5 cents
2.75%
10%
The Project has an Ore Reserve mine-life of 55 years and a Mineral Resource life of more than 160 years at the planned throughput rate of 10 million tonnes annually.
18
For
per
sona
l use
onl
y
![Page 19: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/19.jpg)
AZC – Marketing plan Product by description Product by value Actual or probable
contracted destinationContract with Joint Venture
PartnerBalance ofAZC product
Zircon flour of exceptional purityZrO2 >66%TiO2 <0.1%Fe2O3 >0.01%Al2O3 >0.01%U + Th <500 ppm
Zircon flour 56%
50% of production contracted for life-of-mine
Contracts to be finalised withceramic manufacturers in 2015.
Rare earth mineral concentrate with enhanced levels of heavy rare earth elementsMonazite + Xenotime >88% Light REO >45%Heavy REO >10%
Rare earth mineral concentrate 23%
Contracts to be finalised withend-users in 2015
Titanium mineralsIlmenite to supply sulphate pigment plants. T95, T90, T65 to supply welding electrode producers.Marketing discussions underwaywith end-users
19
Sulphatable Ilmenite #1 & #2
T95
T90
T65
For
per
sona
l use
onl
y
![Page 20: For personal use only - ASXMar 25, 2015 · The WIM150 product suite will be approximately comprise: Zircon flour 56% Rare earth mineral concentrate 23% Titanium products 21% T95](https://reader031.vdocuments.site/reader031/viewer/2022011915/5fcf3857530a221a781e8a68/html5/thumbnails/20.jpg)
Project schedule
20
• Project Funding 2015
• Development – pre-site access 2016
• Site access and approval including work authority 2017
• Development – on-site 2017
• Name-plate production 2018