for personal use only - australian securities · pdf fileinvestment conference. for personal...

41
OCTOBER 2012 WWW.OZMINERALS.COM OZ MINERALS CITI’S 4 TH AUSTRALIAN INVESTMENT CONFERENCE For personal use only

Upload: doandung

Post on 26-Feb-2018

215 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OCTOBER 2012 WWW.OZMINERALS.COM

OZ MINERALS CITI’S 4TH AUSTRALIAN INVESTMENT CONFERENCE

For

per

sona

l use

onl

y

Page 2: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 2

DISCLAIMER This presentation has been prepared by OZ Minerals Limited (“OZ Minerals”) and consists of written materials/slides for a presentation concerning OZ Minerals. By reviewing/attending this presentation, you agree to be bound by the following conditions. No representation or warranty, express or implied, is made as to the fairness, accuracy, or completeness of the information, contained in the presentation or of the views, opinions and conclusions contained in this material. To the maximum extent permitted by law, OZ Minerals and its related bodies corporate and affiliates, and its respective directors, officers, employees, agents and advisers disclaim any liability (including, without limitation any liability arising from fault or negligence) for any loss or damage arising from any use of this material or its contents, including any error or omission there from, or otherwise arising in connection with it. Some statements in this presentation are forward-looking statements within the meaning of the US securities laws. Such statements include, but are not limited to, statements with regard to capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals and metals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward-looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside OZ Minerals’ control. Actual results and developments may differ materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation. Given these risks and uncertainties, undue reliance should not be placed on forward-looking statements which speak only as at the date of the presentation. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, OZ Minerals does not undertake any obligation to publicly release any updates or revisions to any forward looking statements contained in this presentation, whether as a result of any change in OZ Mineral’s expectations in relation to them, or any change in events, conditions or circumstances on which any such statement is based. Certain statistical and other information included in this presentation is sourced from publicly available third party sources and has not been independently verified. OZ Minerals financial results are reported under International Financial Reporting Standards (IFRS). This presentation also includes certain non-IFRS measures including Underlying EBITDA, Underlying EBIT and Underlying NPAT. These measures are presented to enable understanding of the underlying performance of the Company without the impact of non-trading items such as impairment, impairment reversal and litigation settlement expense. Non-IFRS measures have not been subject to audit or review. All figures are expressed in Australian dollars unless stated otherwise. F

or p

erso

nal u

se o

nly

Page 3: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 3

OZ MINERALS

WHY INVEST? • Highly regarded, strongly performing Australian copper asset in

Prominent Hill.

• Strong operating cash flows: $126.6 million, H1 2012.

• Significant cash balance, no debt: actively looking for value adding growth options.

• Developing project pipeline: Carrapateena copper project.

• Dividend Policy: 30–60% of annual normal operating profits.

• Track Record of Capital Management – Capital Return and Buyback.

• Experienced operating, project and management team.

• Leverage to copper plus gold credits.

Our strategy

For

per

sona

l use

onl

y

Page 4: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 4

OZ MINERALS - STRATEGY Why invest?

• Copper focus.

• Achieving consistent excellence in performance.

• Building a project pipeline.

• Major exploration commitment.

• Capital management discipline.

For

per

sona

l use

onl

y

Page 5: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 5

OZ MINERALS - SNAPSHOT • Share price - $8.52.

• Market capitalisation ~ $2.5 billion.

• Issued share capital - 303.47 million.

• Shareholders: − ~77,400 Shareholders − Institutional 68% − Retail 32%

− Australian 60% − Offshore 40%

• Equity investments − ~39% of Toro Energy. − ~20% Sandfire Resources. − ~9% IMX Resources.

*Subject to receipt of permits and clearances.

Prominent Hill copper operation • To average between 100,000t to 110,000t per annum

of copper over LOM plus gold credits. • In production since 2009.

Carrapateena • Updated drilling

results. Significant copper deposit – exploration and studies underway.

Growth strategy • Looking to deploy cash balance for value adding opportunities -

$750 million allocated for potential M&A. • Exploration – a focused program to add to the resource inventory at

Prominent Hill and to upgrade resource status at Carrapateena (expected in Q1 2013).

• Exploration decline at Carrapateena to commence in early 2013*.

For

per

sona

l use

onl

y

Page 6: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 6

SAFETY

• Continued improvement in lost time injury frequency rate (LTIFR).

OZ Minerals Lost Time and Total Recordable Injury Frequency Rate 12 month moving average *

0

1

2

3

4

9

11

13

15

17

19

21

23

Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12

LTI F

requ

ency

Rat

e

TRI F

requ

ency

Rat

e

OZ Minerals TRIFR OZ Minerals LTIFR* Injuries per million man hours

For

per

sona

l use

onl

y

Page 7: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 7

H1 2012 FINANCIAL OVERVIEW

• Prominent Hill revenue of $514.8 million.

• OZ Minerals’ underlying EBITDA of $225.0 million, a reduction on the first half of 2011 due to;

− Lower realised prices for both copper and gold

− Higher costs due to increased material movement and depth of pit

− Increased expenditure on exploration including Carrapateena.

• OZ Minerals’ underlying NPAT of $119.5 million.

• Cash flow from operations $126.6 million.

• Cash balance of $651.1 million at 30 June 2012.

− Trade receivables balance at 30 June 2012 $207.0 million. For

per

sona

l use

onl

y

Page 8: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 8

1,400

1,500

1,600

1,700

1,800

1,900

Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12

$

US$/oz A$/oz

2.9

3.2

3.4

3.7

3.9

4.2

Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12

$

US$/lb A$/lb

0

2

4

6

8

10

12

14

16

18

20

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000

kg Cu/capita

GDP/capita at PPP

South Korea peak

Germany peak

Japan peak

US peak

China current

China expected?

OZ MINERALS’ COMMODITIES & COPPER MARKET

Chinese GDP & copper consumption 1980-2010

Source: Bloomberg

Source: CRU International, Wood Mackenzie, Goldman Sachs Research Estimates

Global Consumption and Mine Supply (Mt)

Source: Bloomberg

Source: Global Insight, AME, McKinsey Global Institute, Wood Mackenzie, EIU, J.P. Morgan

Gold price Copper price

10

12

14

16

18

20

22

24

26

2009 2010 2011 2012f 2013f 2014f 2015f 2016fGlobal Consumption Mine Production Disruption Allowance

For

per

sona

l use

onl

y

Page 9: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 9

SOUTH AUSTRALIA PROMINENT HILL & CARRAPATEENA

• Very favourable mining jurisdiction.

• Excellent infrastructure including: road and rail, grid power to site and water supply.

• Export route via Adelaide. Utilising containerised land transport from mine into ships hold.

• Highly competitive shipping times to Asia.

• Access to extensive, 8,000km2, area of exploration ground in South Australia (including IMX JV ground). F

or p

erso

nal u

se o

nly

Page 10: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 10

PROMINENT HILL SITE • Commissioned in February 2009.

• Flat terrain.

• Fly in fly out workforce – competitive rosters and conditions, employee agreement in place until July 2015.

• Workforce of 1,200.

• High standard accommodation.

• Current operation open pit and underground mine.

• Ankata underground mine successfully ramped up during Q3 2012 to reach its annualised production rate of 1.2 million tonnes per annum.

TAILINGS DAM

MALU PIT

ROM PAD PROCESSING PLANT

VILLAGE

ANKATA UNDERGROUND

MINE

NORTHERN WASTE DUMP

SOUTHERN WASTE DUMP

For

per

sona

l use

onl

y

Page 11: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 11

PROMINENT HILL PRODUCTION & GUIDANCE

Product: High grade (~50% Cu), high quality, copper concentrate.

Production 2011: 107,744t contained copper, 160,007oz gold.

Production guidance 2012:

Contained copper 100,000t to 110,000t.

Contained gold 130,000oz to 150,000oz.

Mine and Plant: Open pit and underground mine, crush, grind, flotation.

Cash costs: Competitive C1 cash costs US70.4c/lb for 2011.

C1 cost guidance 2012: US$1.10-US$1.20/lb. (increase primarily as a result of underground mining)

Workforce: Approximately 1,200 (including contractors). For

per

sona

l use

onl

y

Page 12: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 12

PROMINENT HILL - DESIGN OF FINAL PIT CROSS SECTION: NORTH-SOUTH

Stage 1

Stage 2

Stage 3

Stage 4

0m

100m

200m

300m

400m

500m

280m (Current level)

221m (Stage1)

353m (Stage3)

473m (Stage4)

333m (Stage2)

• Geotechnical studies complete. • Re-optimisation using flatter wall angles to

increase stability. • Additional 30Mbcm over five years.

• Remaining life of mine strip ratio now 5.5:1. • 2012/2013 sees significant waste movement.

The Malu open pit will ultimately be 200 metres deeper than current level.

For

per

sona

l use

onl

y

Page 13: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 13

PROMINENT HILL – Q3 2012 • Record tonnage movement for

Prominent Hill with a 9% increase in open pit material mined.

• Implementation of several initiatives resulting in improved utilisation and efficiencies.

• Ankata successfully ramped up to reach annualised production rate of 1.2m tonnes with excellent grades achieved.

• 2012 production guidance of 100,000 to 110,000 tonnes of copper and 130,000 to 150,000 ounces of gold on track to be achieved.

PROMINENT HILL PRODUCTION STATISTICS

JUN 12 QTR

SEP 12 QTR

2012 YTD

MINED (TONNES) MALU ORE 1,699,331 1,712,058 5,356,806

ANKATA ORE 76,559 130,441 224,653

WASTE 17,755,300 19,442,709 53,300,260

MINED GRADE MALU COPPER (%) 1.27 1.19 1.19

ANKATA COPPER (%) 2.74 3.19 3.03

GOLD (G/T) 0.53 0.49 0.50

ORE MILLED (TONNES) 2,425,495 2,433,836 7,319,728

MILLED GRADE COPPER (%) 1.20 1.18 1.21

GOLD (G/T) 0.59 0.60 0.60

RECOVERY COPPER (%) 87.7 89.6 88.9

GOLD (%) 75.4 75.4 76.3

COPPER CONCENTRATE PRODUCED

TONNES 51,465 49,633 156,420

CONTAINED METAL IN CONCENTRATES

COPPER (TONNES) 25,521 25,738 78,441

GOLD (OZ) 34,475 35,111 108,473

TOTAL CONCENTRATE SOLD (DM TONNES) 65,047 42,737 149,479

For

per

sona

l use

onl

y

Page 14: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 14

PROMINENT HILL UNDERGROUND DEVELOPMENT

• Production commenced at Ankata with first stopes blasted in March 2012.

• Ankata underground mine successfully ramped up during Q3 2012 to reach its annualised production rate of 1.2 million tonnes per annum.

• Annual mine production of 1.2Mt of high grade copper ore contributing ~25,000t of copper and ~ 12,000oz of gold in concentrates.

• Expected life of the Ankata underground mine is 5 years.

• Average grade range for 2012 to be 2.3-2.8% copper.

• Total capital within 10% of budget at $148 million.

For

per

sona

l use

onl

y

Page 15: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 15

PROMINENT HILL: UNDERGROUND MINE DEVELOPMENT

UPPER EVE

LOWER EVE

AUDREY

GLADYS IRENE KATHLEEN

• Ankata successfully ramped up during the quarter. • Mining commenced from Irene stope during the quarter and will provide a better

guide to underground mining conditions and performance. • Good metallurgical recoveries maintained with underground ore processing.

Completed Development for 2012

Ankata Decline

BESSIE

Distance between drives

is approx. 30 metres.

For

per

sona

l use

onl

y

Page 16: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 16

PROMINENT HILL: MALU EXPLORATION DECLINE UPDATE

• Exploration decline advanced to 1,042 metres, with 678 metres remaining.

For

per

sona

l use

onl

y

Page 17: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 17

OBLIQUE VIEW

PROMINENT HILL: PIT DESIGN & RESOURCES UNDERGROUND

• Now drilling from underground.

• Decline extension to provide access beneath pit completed by Q4 2012.

• Under pit resource drilling 2012/2013.

• Objective is to add 1-3 years mine life from immediate near-mine program.

• Deeper infill drilling to follow with access. Copper Domain

Gold Domain

Current Pit Shell

Final Pit Shell

Underground Development

Exploration Decline

LEGEND

For

per

sona

l use

onl

y

Page 18: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 18

PROMINENT HILL: MALU TO BE DRILLED FROM UNDERGROUND

100

mR

L 200 mE

Copper Domain

Gold Domain

Current Pit Shell

Final Pit Shell

Underground Development

Exploration Decline

LEGEND

Underground Drilling Zone OBLIQUE VIEW

• Exploration drilling under the open pit commenced in late September.

• Initial objective is to add 1 to 3 years mine life at current production rate from immediate near mine exploration.

For

per

sona

l use

onl

y

Page 19: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 19

CARRAPATEENA: COPPER – GOLD DEPOSIT IN SOUTH AUSTRALIA

• Acquired in May 2011.

• 250km south-east of Prominent Hill.

• Tenement package consists of over 1,070sq km.

• Large IOCG deposit – similar to Prominent Hill.

• First drill results 1,060m @ 1.88% Cu.

• An initial Inferred Resource of 203Mt at 1.31% copper, 0.56g/t gold and 270ppm U3O8 in the southern area of the Carrapateena deposit.

For

per

sona

l use

onl

y

Page 20: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 20

CARRAPATEENA: DECLINE DESIGN (SECTION VIEW)

• OZ Minerals Board approved Exploration Decline in June 2012.

• Commencement in early 2013 – Phase 1 includes, completion down to 625m for geotechnical testing by mid-2016.

• Exploration decline will continue to a depth of approximately 1,000m for further exploration access.

Geotechnical Level 1 West Exploration Access Drive

Geotechnical Level 3

Geotechnical Level 4

Geotechnical Level 2

South East Exploration Access Drive

Exploration Decline Approved by OZ Minerals Board

Development Subject to Further Approval by Board

LEGEND -3600RL-

-4100RL-

-4475RL-

5100RL

N

~ 475 metres below surface

For

per

sona

l use

onl

y

Page 21: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 21

CARRAPATEENA: Q3 DRILLING & SIGNIFICANT ASSAY RESULTS (PLAN VIEW)

Inferred Resource Area

April 2011

Exploration Target Area April 2011

• Exploration works continue to upgrade Inferred Resources to Indicated status.

• 17 holes completed for a total of 12,460m.

• Outstanding results received this quarter from two holes:

- 1,131.8m @ 1.52% Cu and 0.63g/t Au; - 1,492.3m @ 0.90% Cu and 0.38 g/t Au

• High grade mineralisation extending beyond current resource envelope.

• Work on accelerating the timeline for potential development of Carrapateena includes evaluation of a tunnel boring machine to develop the exploration decline.

DD12CAR107W1

DD12CAR090W1

DD12CAR097 DD12CAR095

DD12CAR092W2 & DD12CAR092

DD12CAR078W1

DD12CAR094W1

DD12CAR108W1

DD12CAR100

DD12CAR105W1

DD12CAR077W1

DD12CAR096

DD12CAR084W2

Bornite Zone

Bornite Zone

Chalcopyrite Zone

For

per

sona

l use

onl

y

Page 22: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 22

CARRAPATEENA Q3 DRILLING RESULTS: DD12CAR084W2 ASSAYS (CROSS SECTION)

65m @ 4.48% Cu, 0.67 g/t Au , from 520m

143m @ 2.65% Cu, 1.16 g/t Au , from 622m

60.8m @ 2.07% Cu, 1.22 g/t Au , from 772m

91m @ 1.79% Cu, 1.31 g/t Au , from 876m

74m @ 2.55% Cu, 0.39 g/t Au , from 992m

111.5m @ 2.96% Cu, 0.40 g/t Au , from 1302.9m

Looking North

Continuous mineralisation extending beyond current resource

*Intervals calculated using a 0.7% Cu cut-off grade and include up to 4m internal dilution.. Intersections are all down hole measurements.

Upper Bornite Zone

Lower Bornite Zone

Hole DD12CAR084W2 1,131.8m @ 1.52% Cu and 0.63g/t Au

Continuous mineralisation extending beyond current resource envelope. Chalcopyrite Zone

For

per

sona

l use

onl

y

Page 23: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 23

CARRAPATEENA Q3 DRILLING RESULTS: DD12CAR090W1 ASSAYS (CROSS SECTION)

89m @ 2.21% Cu, 1.12 g/t Au , from 1179m

44m @ 3.14% Cu, 0.44 g/t Au , from 1287m

54.2m @ 2.15% Cu, 0.87 g/t Au , from

1335.6m

78m @ 2.88% Cu, 1.03 g/t Au , from 1398m

91m @ 1.01% Cu, 0.55 g/t Au , from 1737m

*Intervals calculated using a 0.7% Cu cut-off grade and include up to 4m internal dilution.. Intersections are all down hole measurements.

Looking West

Continuous mineralisation extending beyond current

resource

Upper Bornite Zone

Lower Bornite Zone

Chalcopyrite Zone

Hole DD12CAR090W1 1,492.3m @ 0.90% Cu and 0.38 g/t Au Continuous mineralisation extending beyond current resource envelope.

For

per

sona

l use

onl

y

Page 24: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 24

CARRAPATEENA: REGIONAL EXPLORATION

• Reviewing the regional exploration data has produced a number of high quality, drill ready exploration targets.

• Logistics for drill testing regional targets currently underway.

• An ‘in-house’ ground gravity survey has commenced to refine new targets prior to drilling.

Drill target

Planned Gravity

Completed Gravity

For

per

sona

l use

onl

y

Page 25: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 25

COPAQUIRE (CHILE): SURROUNDING MINERS

• OZ Minerals has entered into a joint venture (JV) with International PBX Ventures Ltd. (PBX) on its 100% owned Copaquire project in Northern Chile.

• PBX shareholders approved the JV in early August.

• Copaquire in a highly prospective region – surrounded by major mining houses.

• OZ Minerals to target porphyry copper style mineralisation.

• Drilling commenced in mid October. F

or p

erso

nal u

se o

nly

Page 26: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 26

CENTENARITO: LOCATOR

• OZ Minerals has entered into a joint venture (JV) with Cascadero Copper. For its Centenarito project in Northern Argentina.

• Drilling commenced in mid October 2012.

For

per

sona

l use

onl

y

Page 27: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 27

BUSINESS DEVELOPMENT

• VALUE-ADDING GROWTH Through exploration JVs and M&A remains an important focus.

• COMMODITY Copper or copper dominant mineralisation.

• SCALE 50,000t – 150,000tpa production or future production potential.

• JURISDICTION Low to medium risk countries.

• TERMS 100% ownership or with partners depending on project.

• STAGE Advanced exploration, feasibility study, development, in production.

For

per

sona

l use

onl

y

Page 28: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 28

OZ MINERALS

WHY INVEST?

• Highly regarded, strongly performing Australian copper asset in Prominent Hill.

• Strong operating cash flows: $126.6 million, H1 2012.

• Significant cash balance, no debt: actively looking for value adding growth options.

• Developing project pipeline: Carrapateena copper project.

• Dividend Policy: 30–60% of annual normal operating profits.

• Track Record of Capital Management – Capital Return Buyback.

• Experienced operating, project and management team.

• Leverage to copper plus gold credits.

Our strategy

For

per

sona

l use

onl

y

Page 29: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

APPENDICES

1. PROMINENT HILL TENEMENT PACKAGE

2. PROMINENT HILL MILL PERFORMANCE

3. CARRAPATEENA

4. FINANCIAL INFORMATION

For

per

sona

l use

onl

y

Page 30: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 30

OZ MINERALS TENEMENT PACKAGE INCLUDING IMX JOINT VENTURE GROUND

LEGEND OZ Minerals tenements

IMX tenements Prominent Hill

Mine

• 4,000km2 of 100% owned Prominent Hill ground.

• 3,000km2 of IMX Joint Venture ground.

For

per

sona

l use

onl

y

Page 31: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 31

PROMINENT HILL PRODUCTION SUMMARY

• Consistent milling performance 25% above nameplate capacity. • Plant availability 92%, Copper recoveries of 91%.

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Q1 2010 Q2 2010 Q3 2010 Q4 2010 Q1 2011 Q2 2011 Q3 2011 Q4 2011 Q1 2012 Q2 2012 Q3 2012

tonnes % Cu - Au g/t 2010-2012 Ore milled and grades

Ore Milled actual (dmt) Ore Milled name plate (dmt) Head Grade Au (g/t) Head Grade Cu (%)For

per

sona

l use

onl

y

Page 32: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 32

CARRAPATEENA: DEPOSIT LOOKING WEST (CROSS SECTION)

Chalcopyrite shell in yellow

Exploration & Inferred Resource status area

Exploration area

0m 250m

Mineralisation deepens to the

south

Exploration & Inferred Resource status area

Exploration area

Target range:

25-45Mt @ 1% Cu, 0.4g/t Au, 140ppm U3O8, 4g/t Ag

Inferred resource:

203Mt @ 1.31% Cu, 0.56g/t Au, 270ppm U3O8, 6g/t Ag

• In-fill drilling to be completed by end of 2012 and Inferred Resource & Target Range to be upgraded by Q1 2013.

For

per

sona

l use

onl

y

Page 33: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 33

MINING OPTIONS STUDY

Options: • Block caving. • Inclined sublevel caving. • Selective mining. • Stoping at higher levels, then caving.

Lower mining costs

Lower development costs

<$10/t $10-20/t $20-50/t

Block caving

Sublevel caving

Sublevel open stoping

Visual representation of the Carrapateena deposit

For

per

sona

l use

onl

y

Page 34: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 34

THREE MINING OPTIONS

SUB LEVEL CAVING

BLOCK CAVING

SUB LEVEL OPEN

STOPING

For

per

sona

l use

onl

y

Page 35: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 35

CARRAPATEENA COMPARABLE WITH OTHER GLOBAL BLOCK CAVES

Cu/Au grades and relative deposit size global block caves (Mt)

Red Chris

Grasberg GBCGrasberg DOZNorthparkes Lift 2

Bingham Canyon SE mine

Grasberg IOZ

Northparkes E48

Northparkes Lift 1

Bingham Canyon NE mineWafi-Golpu

Carrapateena

Ridgeway Deeps

Oyu-Tolgoi Hugo North Lift

Cadia East

0.00

0.25

0.50

0.75

1.00

1.25

1.50

1.75

2.00

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

Au g/t

Cu %

Source: OZ Minerals research * NB: Carrapateena based on target range not Resource or Reserve

Operating mines Development project Size = Reserves Mt

For

per

sona

l use

onl

y

Page 36: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 36

BLOCK CAVING INCREASINGLY COMMON

Source: New Gold

For

per

sona

l use

onl

y

Page 37: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 37

CONSOLIDATED INCOME STATEMENT

• Lower copper pricing and decreased gold production reduced revenue compared to 2011. • Higher mining costs due to increased material movement and depth of pit. • Sale of Cambodian assets to Renaissance Minerals Limited completed in H1 2012.

Includes raw materials, consumables, direct employee costs, movements in inventory,

freight and royalties.

Prominent Hill, Carrapateena and foreign exploration.

Corporate and site administration (ex. Employee costs).

Lower tax expense due to lower taxable income.

Lower average Copper price (14% down from 2011).

Lower ore mined reduced depreciation.

A$MJun'12 Dec'11 Jun'11

Revenue 514.8 483.2 632.7 Cost of goods sold (240.8) (192.5) (210.8)Net foreign exchange gain/(loss) 2.2 38.0 (32.7)Exploration expense (47.7) (44.1) (33.6)Gain on sale of Cambodia 18.8 - - Other expenses (22.3) (30.1) (24.5)

Underlying EBITDA 225.0 254.5 331.1

Depreciation and amortisation (74.1) (80.9) (83.3)Underlying EBIT 150.9 173.6 247.8

Net financing income 11.4 13.4 20.7 Income tax expense (42.8) (53.4) (79.4)Underlying NPAT 119.5 133.6 189.1 Litigation settlement expense - 18.2 (60.0)Impairment - - (15.2)NPAT 119.5 151.8 113.9

For

per

sona

l use

onl

y

Page 38: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 38

UNDERLYING EBIT

0

50

100

150

200

250

300

350

247.8 (40.5) 1.8 35.3 244.4 (75.7) 59.9 (88.8) 11.1 150.9

2011Underlying

EBIT

CopperPrice

GoldPrice

FX SalesVolume

Non-CashCosts

CashCosts

Exploration/Sale of

Cambodia

2012Underlying

EBIT

A$M Variance Analysis - Underlying EBIT H1 2011 vs. H1 2012

MARKET DRIVEN CONTROLLABLE

14% reduction in US$ copper

price.

Increased waste deferral, offset

by drawdown of ROM stocks.

Increased mining costs

due to volume increases, input costs and depth

of pit.

Gain on disposal of Cambodia, partially offset by increased exploration activity.

Reduction in sales of copper (8%) and gold

(28%).

2012: FX movement flat

2011: 5% stronger A$:US$.

For

per

sona

l use

onl

y

Page 39: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 39

CASH FLOW

200

400

600

800

1,000

1,200

1,400

1,600

886.1 408.2 (239.8) (159.9) (47.7) (1.4) 845.5 (94.3) (100.1) 651.1

OpeningCash

Receiptsfrom

Customers

Suppliers and

employees

PP&E/ Investing

Exploration Other Cash beforedistribution

Dividend Sharebuyback

ClosingCash

(A$M) Cash flow for the half year - June 2012

• Ankata $44.4m • Deferred waste $65.5m • Sustaining $24.2m • Thiess lease $34.1m • Cambodia sale ($7.8m)

Consumables, contractors and employees.

• Prominent Hill $22.4m • Carrapateena $19.3m

Timing of receivables and lower average commodity price.

For

per

sona

l use

onl

y

Page 40: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • PAGE 40

BALANCE SHEET

• Balance sheet remains strong with significant cash holdings and no debt.

• US$200m debt facility remains undrawn and in place.

Decrease in cash balance from December due to share

buyback and timing of sales receipts.

Includes investment in Carrapateena and Sandfire

shareholding.

Increase due to timing differences on deferred mining.

A$MConsolidated

Jun'12Consolidated

Dec '11

AssetsCash 651.1 886.1 Receivables 207.0 86.8 Inventories 276.9 297.1 Prepayment 9.9 7.1 Investments & exploration assets 519.1 502.0 PP&E and leased equipment 1,339.0 1,243.4 Total Assets 3,003.0 3,022.5

LiabilitiesCreditors 93.4 90.5 Current tax liability 24.7 16.2 Net deferred tax liability 128.0 100.2 Provisions 22.9 21.4 Total Liabilities 269.0 228.3 Net Assets 2,734.0 2,794.2

Increase in debtors due to timing of shipments.

For

per

sona

l use

onl

y

Page 41: For personal use only - Australian Securities · PDF fileINVESTMENT CONFERENCE. For personal use only . OZ MINERALS ... projections for sales growth, estimated revenues and reserv

OZ MINERALS • NOVEMBER 2009 • PAGE 41

WITHIN THIS PRESENTATION REFERENCES TO EXPLORATION RESULTS RELATING TO PROMINENT HILL AND CARRAPATEENA THIS INFORMATION HAS BEEN APPROVED FOR RELEASE IN THE FORM AND CONTEXT IN WHICH IT APPEARS BY MR JIM HODGKISON BSC MBA WHO IS A FULL TIME EMPLOYEE OF OZ MINERALS AND HAS SUFFICIENT EXPERIENCE WHICH IS RELEVANT TO THE STYLE OF MINERALISATION AND TYPE OF DEPOSIT UNDER CONSIDERATION AND TO THE ACTIVITY UNDERTAKEN TO QUALIFY AS A COMPETENT PERSON AS DEFINED IN THE 2004 EDITION OF THE ‘AUSTRALASIAN CODE FOR REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES.

WITHIN THIS PRESENTATION REFERENCES TO EXPLORATION RESULTS RELATING TO PROMINENT HILL ARE BASED ON INFORMATION COMPILED BY MR MARCEL VAN ECK MSC WHO IS A FULL-TIME EMPLOYEE OF OZ MINERALS, IS A MEMBER OF THE AUSTRALIAN INSTITUTE OF GEOSCIENTISTS AND HAS SUFFICIENT EXPERIENCE RELEVANT TO THE STYLE OF MINERALISATION AND TYPE OF DEPOSIT UNDER CONSIDERATION AND TO THE ACTIVITIES UNDERTAKEN TO QUALIFY AS A COMPETENT PERSON AS DEFINED BY THE JORC CODE (2004). MR VAN ECK HAS CONSENTED TO THE INCLUSION OF THE MATERIAL IN THE FORM AND CONTEXT IN WHICH IT APPEARS.

ALL OTHER REFERENCES TO EXPLORATION RESULTS WITHIN THIS PRESENTATION / STATEMENT ARE BASED ON INFORMATION COMPILED BY MR A HOUSTON BSC WHO IS A FULL-TIME EMPLOYEE OF OZ MINERALS, IS A MEMBER OF THE AUSTRALIAN INSTITUTE OF GEOSCIENTISTS AND HAS SUFFICIENT EXPERIENCE RELEVANT TO THE STYLE OF MINERALISATION AND TYPE OF DEPOSIT UNDER CONSIDERATION AND TO THE ACTIVITIES UNDERTAKEN TO QUALIFY AS A COMPETENT PERSON AS DEFINED BY THE JORC CODE (2004). MR HOUSTON HAS CONSENTED TO THE INCLUSION OF THE MATERIAL IN THE FORM AND CONTEXT IN WHICH IT APPEARS

WITHIN THIS PRESENTATION REFERENCES TO EXPLORATION RESULTS RELATING TO PROMINENT HILL AND CARRAPATEENA.

For

per

sona

l use

onl

y