Manila Water Company, Inc. Manila, Philippines Environmental Impact Statement (EIS) for Manila Third Sewerage Project Volume 3: Annex on Public Consultations February 11, 2005 (Revised Draft) E1288 v 3 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: truongdieu

Post on 04-Feb-2017

298 views

Category:

Documents


18 download

TRANSCRIPT

Page 1: for Manila Third Sewerage Project Volume 3

Manila Water Company, Inc. Manila, Philippines

Environmental Impact Statement

(EIS)

for

Manila Third Sewerage Project

Volume 3: Annex on Public Consultations

February 11, 2005 (Revised Draft)

E1288v 3

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

1 Manila Third Sewerage Project (MTSP)

TABLE OF CONTENTS PUBLIC CONSULTATION .............................................................................................. 4 I. PROJECT BACKGROUND .......................................................................................... 4

a. Taguig Sewerage System ........................................................................................ 4 b. Riverbanks Sewage Treatment Plants..................................................................... 4 c. Sanitation for Low-Income Communities.............................................................. 5 d. QC-Marikina Sewerage System............................................................................. 5 e. Quezon City Sanitation Upgrading ........................................................................ 5 3. Technical Assistance.............................................................................................. 5

II. CONSULTATION WITH LOCAL GOVERNMENT UNITS/AGENCIES................. 5 III. PUBLIC CONSULTATION ........................................................................................ 6 A. Representation................................................................................................................ 6 B. Tools............................................................................................................................... 8

Surveys........................................................................................................................ 8 Focus Group Discussions............................................................................................ 8 Public Consultations ................................................................................................... 9

C. General Proceedings of Meetings .................................................................................. 9 IV. GENERAL ISSUES/CONCERNS AND RESOLUTIONS....................................... 10 V. ISSUES AND CONCERNS – Component-Specific ................................................... 13 VI. CONCLUSION........................................................................................................... 16

Page 3: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

2 Manila Third Sewerage Project (MTSP)

LIST OF TABLES

Table 1 Schedule and Venues of the Second Level Consultations ............................... 7 Table 2 Summary of General Issues and Corresponding Resolutions....................... 10 Table 3 Summary of Issues and Corresponding Resolutions per Component.......... 13

Page 4: for Manila Third Sewerage Project Volume 3

LIST OF ANNEXES

Annex 1 – Endorsements of Local Government Units for MTSP Annex 2 - EIA Process flowchart Annex 3 – Scoping Section 3.1 Scoping with DENR Section 3.2 Scoping with World Bank Section 3.3 First Level Consultation/Scoping Workshop for MTSP Annex 4 – Focused Group Discussion Annex 5 – Public Consultations Transcripts and Attendance and Invitations Annex 6. Copies of Presentation Materials

Page 5: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

4 Manila Third Sewerage Project (MTSP)

PUBLIC CONSULTATION This annex forms part of the environmental documents in support of the proposed Manila Third Sewerage Project (MTSP). The attached details the process and results of the public consultation conducted for the MTSP. I. PROJECT BACKGROUND In 1980, the World Bank in cooperation with the Asian Development Bank, supported the Metropolitan Waterworks and Sewerage System (MWSS) and financed the Manila Sewerage and Sanitation Project. However, project components were not completed and others failed to attain the desired impacts. Not until 1996 did the World Bank resume its assistance to the MWSS for the improvement of the general environmental conditions in Metro Manila. The US$57 million Manila Second Sewerage Project (MSSP) was finalized in June 1996. The MSSP implementation started in 1997 which coincided with the privatization of the MWSS. The MWSS privatization led to the operation of two concessionaires: Manila Water Company Inc. (MWCI) in the east zone and the Maynilad Water Services Inc (MWSI) in the west zone. Under the terms of the Concession Agreements, the concessionaires took over the implementation of the MSSP. The MSSP is due for completion by June 2005. As a continuation to the MSSP, MWSS and MWCI proposed the Manila Third Sewerage Project (MTSP) for World Bank funding. The MTSP, which consists of three components, has the ultimate objective of improving sewerage and sanitation conditions in the East Zone concession area. The MTSP, estimated to cost $86 million, will benefit 3.3 million population in the East Zone. It will have the following components:

1. Septage Management This project is essential in providing sanitation services in the whole East Concession Area Two (2) Septage Treatment Plants (SpTPs) will be constructed: one in the North to serve Quezon City, Marikina and San Juan; and one in the South to serve Mandaluyong, Pasig, Makati, Pateros, Taguig and most of the towns in the Rizal province.

2. Sewage Management a. Taguig Sewerage System

This project is in line with the flood control project of the Department of Public Works and Highways (DPWH) covering Taguig. The DPWH will construct four (4) drainage/flood retention ponds in Taguig, adjacent to the Laguna de Bay. The proposed sewerage project will involve the construction of off-line primary treatment plants while using the retention ponds as secondary clarifier prior to discharge to Laguna de Bay.

b. Riverbanks Sewage Treatment Plants

This project will involve the construction of at least three (3) underground STPs along the riverbanks of Pasig River, located in Makati, Mandaluyong, and Pasig. Sewage will be

Page 6: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

5 Manila Third Sewerage Project (MTSP)

intercepted and collected from existing drainage lines in these areas for treatment before discharge to Pasig River.

c. Sanitation for Low-Income Communities

This project will involve the construction of STPs to treat combined sewage-drainage flows from low-income communities in the concession area, particularly in Taguig and Manggahan East Bank, which have inadequate sanitation facilities.

d. QC-Marikina Sewerage System

This project will utilize the space available along the Marikina River in front of the Industrial Valley Complex (IVC). A main drainage collector pipe which collects combined sewage and drainage from communities in Quezon City and Marikina is located in the site. The project will involve the construction of an STP which will treat the sewage before discharge to the Marikina River.

e. Quezon City Sanitation Upgrading

This project will involve the upgrade of existing Communal Septic Tanks (CSTs) to STPs in Quezon City, as well as installation of new separate sewerage system to serve East and West Kamias. Seven (7) of these existing CSTs will be upgraded into a full wastewater treatment plant by either converting them into a pumping station and joining them into an STP, or transferring the current flow to existing STPs. This will ensure compliance with environmental standards of effluent for wastewater.

3. Technical Assistance

Considered as a pilot project for making use of the combined storm-sewage system, MTSP will have to be monitored and studied closely. This component would finance the information campaign on proper liquid waste disposal and environment preservation, consultant services during implementation of the project, and the preparation of follow-up programs on sewerage and sanitation, with emphasis on low-cost sanitation systems.

II. CONSULTATION WITH LOCAL GOVERNMENT UNITS/AGENCIES During the development phase of the project, the Project Development team, consisting of representatives from MWSS and MWCI, presented to the local government units (LGUs) to be directly affected by MTSP the concepts and approaches which are proposed for implementation. The LGUs and agencies involved agreed with the project objectives and suggested inclusion of possible projects on sewerage and sanitation. These suggestions will be considered when additional projects are proposed for MTSP. The matrix below shows the sequence of consultations from conception of the MTSP.

Page 7: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

6

Matrix 1

Manila Third Sewerage Project (MTSP)

Annex 1 shows the endorsements of the different LGUs for MTSP. III. PUBLIC CONSULTATION Table 1 shows the sequence of consultations conducted. These, along with the complete details, are separately presented in Annexes 2-4. A. Representation The project is classified under Category B: Projects that are not categorized as Environmentally Critical Projects (ECPs), but which may cause negative environmental impacts because they are located in Environmentally Critical Areas (ECAs) (PD 1586, AO No. 42, DENR AO No. 30 Series of 2003). The MTSP sewage management component has an estimated service population of 992,396. The people were informed and consulted about the project through surveys, focused group discussions and/or public consultations. A First Level Consultation (Scoping Workshop) was held in November 2003 at the Bahay ng Alumni at the University of the Philippines in UP Diliman. This consultation meeting was attended by Barangay officials from the MTSP-affected communities. The MTSP was presented by MWCI and issues and concerns on the project components were discussed. Annex 3 presents the attendance and minutes of the scoping workshop.

Project presentation to LGU (Mayor, Councilors)

Project Conceptualization

LGU endorses the MTSP

Prepare EIS for MTSP

Project presentation to RDC

MMDA endorses the MTSP

Project presentation to MMDA

Council endorses the MTSP

Conducts FGD with DENR Representatives

Conducts FGD with LGU Representatives

Invites Stakeholders for Public Consultation

2003 2004

Approval of EIS

2002

Page 8: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

7 Manila Third Sewerage Project (MTSP)

The table below summarizes the schedule of Second Level Consultations. Table 1 Schedule and Venues of the Second Level Consultations

COMPONENT LOCATION DATE TIME BARANGAY/COMMUNITY INVITED

Nature of Consultation

ATTENDEES

1 Taguig Sewer System

Brgy. Hall Signal Vill., Taguig

June 15 ‘04

9-11.30

Residents of Brgy. Signal,W.Bicutan,Pinagsama Ph1,Ph2A&B, AFP/PNP Ph2

To orient the community of the MTSP Project

35 out of 48 attended

2 Taguig Sewer System

Villa Salud Resort, Taguig

June 16 ‘04

1-4pm Residents of Brgy. Wawa, Calzada, Tipas Ibayo

To orient the community of the MTSP Project

35 out of 48 attended

3 QC-Marikina Sewerage System

Brgy. Hall Blue Ridge A, QC

June 17 ‘04

8-12nn Residents of Blue Ridge A & B and St. Ignacius Subd.

To orient the community of the MTSP Project

23 out of 40 attended

4 Riverbanks Sewage Treatment Plant

HQ of special Brgy force, Pasig

June 18 ‘04

9.30-11.30

Residents of Barangay Capitolyo and Pineda

To orient the community of the MTSP Project

58 out of 65 attended

5 Riverbanks Sewage Treatment Plant

Brgy. Poblacion Sports Com., Makati

June 18 ‘04

2-4pm Residents of Barangay Poblacion Makati, Ilaya, Barangka Itaas, Ibaba Mandaluyong

To orient the community of the MTSP Project

65 out of 73 attended

6 QC-Marikina Sewerage System

Brgy. Health Center of IVC, Marikina

June 19 ‘04

9.30-12nn

Residents of Brgy Industrial Valley, Olandes, Cinco Hermanos, Monte Alta Subd

To orient the community of the MTSP Project

34 out of 50 attended

7 Sanitation for Low Income Communities

Fish port Training Center, Taytay

June 19 ‘04

2-4pm Residents of Anakpawis, Exodus, Dimagta/Sumagta, Genesis, Brgy San Juan, PCFI, Kabisig, San Francisco

To orient the community of the MTSP Project

48 out of 55 attended

8 Upgrade of existing Sewer system

Yakap Day Care Center, QC

June 21 ‘04

9.30-12nn

Residents of East and West Kamias, QC

To orient the community of the MTSP Project

74 out of 85 attended

9 Upgrade of existing Sewer system

Barangay Hall of Laging Handa, QC

June 21 ‘2004

1.30-4 Residents of South Triangle, Sacred Heart and Laging Handa

To orient the community of the MTSP Project

35 out of 60 attended

10 Upgrade of existing Sewer system

Covered Court of Brgy. Quirino 2A, QC

June 22 ‘04

1.30-4 Residents of Brgys. Quirino 2A, 2B, 2C, 3A, 3B, and Duyan Duyan

To orient the community of the MTSP Project

88 out of 100 attended

11 Upgrade of existing Sewer system

Barangay Hall of Central

June 23 ‘04

10-11.30

Residents of Brgy Central, Old Capitolyo and UP

To orient the community of the MTSP

53 out of 65 attended

Page 9: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

8 Manila Third Sewerage Project (MTSP)

Village Project 12 Upgrade of

existing Sewer system

Covered Court of Barangay Project 6

June 23 ‘04

2-4pm Residents of Barangay Project 6

To orient the community of the MTSP Project

24 out of 45 attended

13 North Septage Treatment Plant

Chapel in La Mar Village, Kambal Road, Bgy. Gitnang Bayan II, San Mateo

February 9, 2005

1:00-2:00 pm

Residents of La Mar Village, Riza Village, Brgy. Captain and councilmen, Mayor’s representative, World Bank, DENR RevCom

To orient the community with the septage treatment plant to be constructed in the area

68 out of 102 attended

B. Tools Surveys

Statistical studies focused on the identified project location of each component, as the primary impact area. The Metropolitan Manila including Taytay and Cainta in Rizal were included in data gathering and considered as the secondary impact area. The period of the study was from November 17–28, 2003. Interviews were conducted to community residents and other stakeholders on public perception on the Project. Questions consist of the following:

• Basic information on the social status of the respondent • Knowledge about the project

- effects - environmental benefits

• Acceptability of the project - charging - acceptability - economic impact - social impact

The results of the survey gathered were used to establish public perception on the project. Reason for project refusal was taken into consideration to subsequently improve the presentation for public consultations.

Focus Group Discussions

The Bank’s review of the FS in February 2004 recommended the expansion of the MTSP coverage to keep certain levels of efficiency in the project components. This expansion resulted in the addition of fourteen (14) barangays in the service coverage and thereby necessitated the inclusion of these barangays in the consultative process. In addition to the new barangays, there was also a need to consult barangay representatives that were not able to participate in the scoping workshop held last November 2003.

Page 10: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

9 Manila Third Sewerage Project (MTSP)

Courtesy visits to barangay offices were done from April 12 to 14, 2004. The visits aimed to meet barangay officials, to inform them of the proposed project, and to ask for a formal discussion with the barangay council to present the project. Proof of consultations with the additional communities is shown in the attendance sheet and photographs attached as Annex 4

The Focus Group Discussions (FGDs) with barangay officials were conducted from April 15 to 26, 2004 at the barangay offices. The discussions of the meeting included an overview of the situation of sewerage systems in the area and the presentation of the MTSP and its components. Group discussion ensued after the presentation where queries, issues and concerns in relation to the sewerage system, proposals and recommendations for the improvement of the sewerage system were gathered. Proofs of FGDs with various barangay officials are shown in the attendance sheets and photographs shown in Annex 4

Public Consultations

In accordance with the Bank’s requirement, Second Level Consultations were held from June 15-23,2004 and on February 9, 2005. Thirteen (13) public consultations were conducted among the concerned barangays and communities. Table 1 shows the schedule and venues of the consultations. The consultations were participated by barangay/community officials and residents as well as representatives from government and non-government organizations (NGO). On hand to facilitate the consultations were representatives of the consultants. Representatives from MWSS and MWCI also participated in the consultations while a representative from the Environmental Monitoring Bureau (EMB) of the DENR observed the proceedings. The general proceedings of the consultations are listed below. C. General Proceedings of Meetings The meetings generally proceeded as follows: I. Introduction of participants II. Presentation of the Philippine EIS System III. Presentation of the MTSP including background of present sanitation conditions IV. Presentation of Project Plans V. Presentation of the highlights and results of the EA VI. Open Forum The Philippine EIS System and the MTSP concept were previously presented during the first level consultations. However, these presentations were purposely repeated in the program for the benefit of new participants and those who were not able to participate during the first level consultations. The project details refer to the proposed plans and layouts of specific project component in relation to the concerned communities. This includes the location and size of the proposed development, nature of construction, and coverage area. After the project plans were explained, the consultants presented the highlights of the EA study as follows:

Page 11: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

10 Manila Third Sewerage Project (MTSP)

• baseline environmental conditions with emphasis to water and wastewater quality and the survey results regarding the perception of the communities about the proposed project;

• major environmental impacts (adverse and beneficial) and proposed mitigations; and • the Environmental Management Plan

The EA presentation was followed by an open forum where the concerned community was allowed to voice out their queries, issues and opinions. Responses to their queries were addressed by the MWCI. Presentations of the Project Highlights and the results of the EA for the different MTSP project components are shown in Annexes 5 and 6. IV. GENERAL ISSUES/CONCERNS AND RESOLUTIONS Results of the perception surveys conducted in November 2003 and April 2004 indicated a low project awareness of about 32%. The public consultations, which included the presentation of the key project activities and the results of the EIA greatly increased the community’s knowledge regarding sanitation, sewerage treatment, environmental impacts and project benefits. The consultations also validated and updated the results of the EA. One of the major issues raised during the meetings was regarding sewerage fees. The communities felt that the present sewerage tariff equivalent to 50% of the basic water charge is excessive. This issue was even emphasized by communities that are covered by existing sewerage systems. They felt that the sewerage fees they are paying are not commensurate with the services they are receiving. Overall, the response of the communities regarding the project is favorable. They realize the benefits the project would offer to their health and to the environment. Continuing dialogues with the stakeholders are encouraged so that they are promptly informed of the project developments. This approach will promote transparency and sincerity on the part of the proponent. Table 2 summarizes the general issues and the corresponding responses/resolutions during the consultations. Table 2 Summary of General Issues and Corresponding Resolutions

Issues / Concerns Responses / Recommendations/Resolutions

Sewer charges

Charging for Sewer Charges (50% of the Water Charge)

The sewer charge is intended to cover the maintenance, operation and manpower cost of the sewage/septage treatment plants. It was a scheme/policy that was adopted by MWSS and carried over by the concessionaires as written in the respective Concession Agreements. MWSS/MWCI will review and consider changing the charging scheme in the 2008 Rate Rebasing.

Charging for Environmental Charge (10% of At the time of MWSS privatization, the

Page 12: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

11 Manila Third Sewerage Project (MTSP)

Issues / Concerns Responses / Recommendations/Resolutions

the Water Charge) Environmental Charge was part of the bid assumptions and is included in the overall tariff composition.

Services to be provided by MWCI if not covered by sewerage projects under MTSP

A major component of the MTSP involves the construction of septage treatment plants and the procurement of vacuum tankers to expand the provision of sanitation services which will be extended to the whole East Zone.

Mandatory sewer connection Under the Sanitation Code and the recently enacted Clean Water Act, households are required to connect to the sewerage system if the system is available.

Construction phase

Traffic during construction Truck trips will be properly scheduled (during non-peak hours) in coordination with concerned officials

Health and safety Contractors Construction Program will be implemented and will include health and safety procedures.

Operation and Maintenance Foul odor from STP STP will be underground and equipped with

carbon filter system to eliminate foul odor during operations. It will be monitored by MWCI representatives to prevent any untoward incident

Flooding due to poor drainage system Part of the project includes improvement/rehabilitation of drainage system which would reduce sewage overflows in the area

Use of Individual Septic Tanks (ISTs) MWCI emphasized that with the combined sewerage system, the residents will continue to use their ISTs as primary treatment. MWCI provides free desludging of ISTs if scheduled.

Noise from STP STPs will be equipped with sound proofing materials

Daily monitoring will be conducted to ensure that all mitigations are in place

Smoke emissions from STP Back-up generator sets may produce emissions but this will be maintained properly to minimize emissions.

Disposal of sludge Thickened sludge will be collected by vacuum trucks and will be transferred to a Septage Treatment Plant for dewatering. The sludge can

Page 13: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

12 Manila Third Sewerage Project (MTSP)

Issues / Concerns Responses / Recommendations/Resolutions

be used as soil conditioner

Treated water This will conform to DENR Standards and can be used for watering plants, or for other non-potable uses.

Project Benefits

Health benefits Reduce risk of direct contact with untreated sewage

Environmental benefits Reduce pollution loading to water bodies

Re-use of water Water coming from the treatment plant can be used to water plants and for flushing of toilets.

Soil conditioner Thickened sludge will be collected by vacuum trucks and will be transferred to a Septage Treatment Plant for dewatering. The sludge can be used as soil conditioner

Page 14: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

13 Manila Third Sewerage Project (MTSP)

V. ISSUES AND CONCERNS – Component-Specific Table 3 summarizes the components’ major issues and the corresponding responses/resolutions during the consultations.

Table 3 Summary of Issues and Corresponding Resolutions per Component

Issues / Concerns Responses / Recommendations/Resolutions

Taguig Sewerage System

Charging for Sewer Charges (50% of the Water Charge)

The sewer charge is intended to cover the maintenance, operation and manpower costs of the sewage/septage treatment plants. It was a scheme/policy that was adopted by MWSS and carried over by the concessionaires as written in the respective Concession Agreements. MWSS/MWCI will review the charging scheme in the 2008 Rate Rebasing.

Charging for Environmental Charge (10% of the Water Charge)

At the time of MWSS privatization, the Environmental Charge was part of the bid assumptions and is included in the overall tariff composition.

Coverage of Taguig Sewer System Other contiguous areas will be considered in later phases

Drainage-sewer combination Separate sewer systems are capital intensive and will result to higher water rates. Laying of separate sewers will also cause significant inconvenience to the public.

Closure of gates from fishermen The issue with the fishermen is already resolved by DPWH which will construct a wharf outside the dike.

Flooding due to poor drainage system Using the drainage as sewerlines would work to the advantage of the communities since MWCI will maintain the lines to ensure the flow of wastewater to the treatment plant

Riverbanks Sewage Treatment Plants

Charging for Sewer Charges (50% of the Water Charge)

Sewer fees cover the maintenance, operation and manpower cost of the treatment plant. It was imposed during MWSS time

Charging for Environmental Charge (10% of the Water Charge)

At the time of MWSS privatization, the Environmental Charge was part of the bid assumptions and is included in the overall tariff composition.

Foul odor from STP The treatment plant will be equipped with a carbon filter system to eliminate foul odor during operation. It will be monitored by MWCI representatives to prevent any untoward incident

Page 15: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

14 Manila Third Sewerage Project (MTSP)

Issues / Concerns Responses / Recommendations/Resolutions

Noise from STP STPs will be equipped with sound proofing materials

Daily monitoring will be conducted to ensure that all mitigations are in place

Quezon City-Marikina Sewerage System

Charging for Sewer Charges (50% of the Water Charge)

Sewer fees cover the maintenance, operation and manpower cost of the treatment plant. It was imposed during MWSS time

Charging for Environmental Charge (10% of the Water Charge)

At the time of MWSS privatization, the Environmental Charge was part of the bid assumptions and is included in the overall tariff composition.

Direct benefits from having a treatment plant In addition to the general environmental benefits, the effluent water could be used for fire prevention and watering the plants. The solid waste could be used as soil conditioner

Foul odor from STP The treatment plant will be equipped with a carbon filter system to eliminate foul odor during operation. It will be monitored by MWCI representatives to prevent any untoward incident

Quezon City Sanitation Upgrading Foul odor from STP The treatment plant will be equipped with a

carbon filter system to eliminate foul odor during operation. It will be monitored by MWCI representatives to prevent any untoward incident

Clogged sewer lines We have a Pollution Control Officer and a Territory Business Manager assigned in your area to cater to your water and wastewater services. We also have a hotline 1627 for emergencies

Noise from STP STP is equipped with sound proofing materials and pumps/aerators will be powered by electricity which produce minimal noise;

Daily monitoring will be conducted to ensure that all mitigations are in place

Note: Residents under this component are not concerned with the sewer charges since they are already paying the 50% sewer fee.

Sanitation for Low Income Communities

Charging for Sewer Charges (50% of the Water Charge)

Sewer fees cover the maintenance, operation and manpower costs of the treatment plant. It was imposed during MWSS time

Charging for Environmental Charge (10% of the Water Charge)

At the time of MWSS privatization, the Environmental Charge was part of the bid

Page 16: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

15 Manila Third Sewerage Project (MTSP)

Issues / Concerns Responses / Recommendations/Resolutions

assumptions and is included in the overall tariff composition.

Foul odor from STP The treatment plant will be equipped with a carbon filter system to eliminate foul odor during operation. It will be monitored by MWCI representatives to prevent any untoward incident

Noise from STP STPs will be equipped with sound proofing materials

Daily monitoring will be conducted to ensure that all mitigations are in place

Page 17: for Manila Third Sewerage Project Volume 3

ENVIRONMENTAL ASSESSMENT Public Consultation

16 Manila Third Sewerage Project (MTSP)

VI. CONCLUSION The proposed project for the improvement of the sewerage system in the areas is acceptable to most people. They signified their willingness to support the MTSP. The support is concretized by the results of the information dissemination, barangay consultations and continuous presentation of the Project to the community residents regarding the nature, objectives and outputs of MTSP. The most outstanding issue during the consultation with the stakeholders is the 50% sewerage charge. The stakeholders pointed out that it would be an additional financial burden to households. A program of continuing information and education campaign is necessary to increase public awareness on the benefits of sewerage and sanitation and the correlation between wastewater treatment/sanitation, public health and the environment.

Page 18: for Manila Third Sewerage Project Volume 3

Annex 1 Endorsements of Local

Government Units (LGUs)

Page 19: for Manila Third Sewerage Project Volume 3
Page 20: for Manila Third Sewerage Project Volume 3
Page 21: for Manila Third Sewerage Project Volume 3
Page 22: for Manila Third Sewerage Project Volume 3
Page 23: for Manila Third Sewerage Project Volume 3
Page 24: for Manila Third Sewerage Project Volume 3
Page 25: for Manila Third Sewerage Project Volume 3
Page 26: for Manila Third Sewerage Project Volume 3
Page 27: for Manila Third Sewerage Project Volume 3
Page 28: for Manila Third Sewerage Project Volume 3
Page 29: for Manila Third Sewerage Project Volume 3

Annex 2 EIA Process Flowchart

Page 30: for Manila Third Sewerage Project Volume 3
Page 31: for Manila Third Sewerage Project Volume 3

Annex 3 Scoping

Page 32: for Manila Third Sewerage Project Volume 3

SCOPING Scoping, which is required under the Philippine Environmental Impact Assessment (EIA) System, is the first and most critical step in the EIS process where most of the key issues and concerns are identified, discussed, clarified and agreed upon by the involved parties (such as the proponent, EIA preparer, EMB, DENR Regional Office, Local Government Units, government agencies and stakeholders). Scoping is part of the process of assessing social acceptability of the project and the EIA review process. It helps the proponent in handling social acceptability and provides a focus for the review process through the agreed scope.

World Bank Scoping The region to be covered by the Regional Environmental Assessment (REA) consists of the MWCI east concession areas of the National Capital Region consisting of Quezon City, Makati, Pasig, Marikina, Mandaluyong, and Taguig, plus the Municipality of Taytay and Cainta, Rizal Provinces. The methodology in the conduct of the REA will follow the WB Category A guidelines. The scope of the REA will include:

• Policy, legal and administrative framework; • Baseline conditions; • Description of development plan and associated projects; • Inventory of other plans and projects; • Cumulative impact assessment • Analysis of alternatives; • Recommendations toward optimal regional investment plan; and • Environmental management strategy.

Environmental Management Bureau (EMB) Scoping A scoping meeting with the Environmental Management Bureau (EMB)-National Capital Region (NCR) was held on 28 October 2003 for the processing of the Environmental Compliance Certificates (ECCs) for the proposed priority projects. The scoping with the EMB-CO was held on 19 December 2003 at the EMB Central Office and was attended by the representatives of the MWCI (Proponent), the EMB, the EIA Review Committee (EIARC), and MWCI consultants. The meeting commenced with the introduction of the participants, thereafter, the proponent presented the project brief. After the project presentation, clarifications were raised by the EIARC regarding the project. The clarifications and the corresponding responses are shown in the following table.

Page 33: for Manila Third Sewerage Project Volume 3

First Level Consultation/Scoping Workshop A first level consultation/scoping workshop was conducted by MWCI consultants on November 15, 2003 at the Bahay ng Alumni at the University of the Philippines in Diliman. The meeting was attended by officials of MTSP-affected Barangays (see attendance sheets below).

Page 34: for Manila Third Sewerage Project Volume 3
Page 35: for Manila Third Sewerage Project Volume 3
Page 36: for Manila Third Sewerage Project Volume 3
Page 37: for Manila Third Sewerage Project Volume 3
Page 38: for Manila Third Sewerage Project Volume 3
Page 39: for Manila Third Sewerage Project Volume 3

A summary of the issues raised during the scoping workshops is listed in the table below. Summary of Clarification Table

Clarification Response Computation given in the project description indicated only discharges during the dry weather flow. What will happen during the wet season? Will this be included in the study?

Discharges during the wet season were considered in the Feasibility Study (FS) and will be presented in the EIA.

The use of the regulation ponds for the Taguig Sewerage System will be limited during the dry season.

The ponds will have to remain empty during the wet season so they can function as balancing ponds during periods of high storm runoff. This is in accordance with the Metro Manila Flood Control Project of the Department of Public Works and Highways.

Possibility of separating sewer and stormwater. Separation of sewer and stormwater would require additional space and would entail huge capital costs.

On septage treatment, what will happen to the sludge? The EIARC would be in a dilemma to issue Environmental Compliance Certificate (ECC) if the disposal is not included in the EIA.

Initial tests have been conducted by MWCI for dried sludge to be used for agricultural purposes. Septage disposal experiments on lahar areas are being conducted with promising results. The lahar septage disposal will be conducted as a separate study which will be submitted to EMB.

Will there be any resettlement involved with other components?

None, treatment plants will be constructed in open space either as above- or below-ground structures.1

1 The revised Feasibility Study on February 2004 indicated possible relocation of three households at Road 5, Project 6, Quezon City as well as 11 households in the San Mateo site for the north septage treatment plant.

Page 40: for Manila Third Sewerage Project Volume 3

Summary of Issues and Concerns from the Scoping Workshops

MTSP Component

Environmental Aspect Issues / Concerns Suggested / Recommendations Proposed Activities

Greater project participation of barangay constituents

Action planning must involve barangay.

Public consultations

Educational program, cleanliness, health, unemployment

Educate the people on proper sewage disposal Prioritize residents in the hiring of workers during the project implementation.

Information, Education and Communication Program

Give full information of the advantages of MTSP

Full information of the MTSP and the results of the environmental assessment will be presented to the communities.

Public consultations

Socio-economic

Cooperation from all agencies involved in the project

Adherence to the vision of the project

Coordination with concerned agencies

Air and water pollution

Strict implementation of the environmental laws.

Environmental monitoring program

Clogging of drainage causes flooding

Rehabilitation of drainage. Included in the MWCI services; quick response through area managers

Riverbanks Sewage Treatment Plants Sanitation for Low-Income Communities Upgrade of Existing Sanitation System

Biophysical

Unpleasant odor during the STP operation

STPs should have odor control device.

Environmental monitoring program

Page 41: for Manila Third Sewerage Project Volume 3

MTSP Component

Environmental Aspect Issues / Concerns Suggested / Recommendations Proposed Activities

Presence of informal settlers along creeks cause severe polluted due to rampant disposal of waste.

Proper construction of septic tanks. Installation of a sewer line along the banks that will collect sewage from the households along creeks.

Coordination with concerned agencies to ensure proper construction of septic tanks; Included in the MWCI services; quick response through area managers

Some of the barangays are composed of middle-class, low-income families or depressed population. Middle class homes have septic tanks, while those houses along the creek flush their waste directly to the creek, thus, polluting the environment.

Construct communal septic tanks Government should provide housing projects for informal settlers. Government subsidy for the payment of sewer fees.

To be considered in future MWCI projects; Coordination/consultation with concerned government agencies

Infrastructure

Sewer lines do not function. Sewer comes out of the manholes.

Rehabilitation of sewer lines There must be full implementation of the Building Code. There must be structural plan and scope of work that will protect the properties of the barangay. Households with their own septic tanks must not be made to pay sewerage fees.

Included in the MWCI services; quick response through area managers

Page 42: for Manila Third Sewerage Project Volume 3

MTSP Component

Environmental Aspect Issues / Concerns Suggested / Recommendations Proposed Activities

Some projects of other government agencies / private organization, after completion of construction works do not restore the site.

Strict adherence of contractors to the conditions in implementing the project.

Monitoring of project activities

Graft and corruption Barangay should not accept any gift or bribe with regards to the Project.

Transparency with concerned communities

Page 43: for Manila Third Sewerage Project Volume 3

Annex 4 Focus Group Discussion

(FGD)

Page 44: for Manila Third Sewerage Project Volume 3

Summary of Issues and Recommendations Raised during the FGDs

ISSUES AND CONCERNS RECOMMENDATIONS Sewerage System Absence of sewer lines or no functional sewer lines; only drainage canal available but also used as sewer line

Overflowing of wastewater from septic tanks Clogged sewer lines; sewage comes out of the manhole; backflows were observed in some sewer lines. Some households direct wastewater to the river; sewer lines used as toilets and septic tanks in blighted areas. Lack of complete knowledge about sewerage condition; indiscriminate dumping of garbage in drainage system.

Prioritize the construction of sewer lines along the street. Regular desludging of septic tanks Rehabilitation or upgrade of sewer lines Strict implementation of sanitation and building code; sanitation inspection needed. Households along the creek must be connected to the sewer lines. Information, education and communication program on proper sanitation and waste management

Project Implementation Some projects take considerable time to complete; there are instances that construction sites are not properly restored. Lack or absence of coordination among government agencies (DPWH, MMDA) and private utility providers (MWCI, Meralco, PLDT) Traffic disturbance during roadworks/excavations.

Projects should be completed on time to avoid prolonged inconvenience Contractors should fully adhere to project conditions; strict monitoring should be performed to ensure that projects are done according to plans. Government and private entities should sit together and discuss project plans. Traffic re-routing during construction of sewer lines; mobilization of community or barangay residents as traffic control officers

Sewerage Charge High sewerage fees Payment of sewerage fees but without corresponding improvement of sewerage services

Affordable sewerage fees and commendable services. Transparency in computation of

Page 45: for Manila Third Sewerage Project Volume 3

ISSUES AND CONCERNS RECOMMENDATIONS sewerage fees

Information on cost-benefit feature of the project Households with their own septic tanks must not be made to pay Sewerage Fees Justification of increased sewerage fees; consultation with affected communities before any additional or new sewerage fee is implemented.

Page 46: for Manila Third Sewerage Project Volume 3
Page 47: for Manila Third Sewerage Project Volume 3
Page 48: for Manila Third Sewerage Project Volume 3
Page 49: for Manila Third Sewerage Project Volume 3
Page 50: for Manila Third Sewerage Project Volume 3
Page 51: for Manila Third Sewerage Project Volume 3
Page 52: for Manila Third Sewerage Project Volume 3
Page 53: for Manila Third Sewerage Project Volume 3
Page 54: for Manila Third Sewerage Project Volume 3
Page 55: for Manila Third Sewerage Project Volume 3
Page 56: for Manila Third Sewerage Project Volume 3
Page 57: for Manila Third Sewerage Project Volume 3
Page 58: for Manila Third Sewerage Project Volume 3
Page 59: for Manila Third Sewerage Project Volume 3
Page 60: for Manila Third Sewerage Project Volume 3
Page 61: for Manila Third Sewerage Project Volume 3
Page 62: for Manila Third Sewerage Project Volume 3
Page 63: for Manila Third Sewerage Project Volume 3
Page 64: for Manila Third Sewerage Project Volume 3
Page 65: for Manila Third Sewerage Project Volume 3

Annex 5 Public Consultations

Page 66: for Manila Third Sewerage Project Volume 3

Barangay Signal Village Public Consultation Meeting with Barangay Officials and Residents of Barangay Signal Village and Western Bicutan including Pinagsama Phase 1, Pinagsama Phase 2-A and 2-B and AFP/PNP Phase 2 held on June 15 2004 from 9-11:30 AM at the Covered Court of Barangay Signal, Taguig City, Metro Manila

Page 67: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Transcription of the Public Consultation Meeting with Barangay Officials and Residents of Barangay Signal Village and Western Bicutan including Pinagsama Phase 1, Pinagsama Phase 2-A and 2-B and AFP/PNP Phase 2 held on June 15 2004 from 9-11:30 AM at the Covered Court of Barangay Signal, Taguig City, Metro Manila The consultation workshop aims to present to stakeholders the existing sewerage and sanitation conditions to arrive on a concensus at early stages of the project to avoid conflicts which can harm the implementation and success of the project. With these regard, it lead to the transparency of public and private actions, as these actions are monitored by the different stakeholders. It also built trust between the project proponent and the civil society, which lead to long-term collaborative relationship. Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc. (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Mr. Velasco, Senior Project Development Officer of MWCI presented the background and proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Eva Matibag Manager - Proj Development Office Waste Water Christoper Calamiong Senior Project Development Officer Lynn Almario Senior Project Development Officer Beth Bagaipo Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Joy Tamayo Public Consultation Coordinator Wilva Lin Deocades Facilitator Participants 77 out of 93 invitees attended the scoping session Note: Attendance sheets of participants with their signatures are attached to this report.

Page 68: for Manila Third Sewerage Project Volume 3

Mr. Soncuya : Magandang umaga po sa inyong lahat, ito ho ang consultants ng Manila Water tungkol ho dito sa Sewerage Project. Ipapakilala ko ang mga kasamahan ko ho, si Engr. Anacleto Suelto sa EDCOP-LTI din. Si Joy Tamayo, kasama din ho namin. Iyon hong sa Manila Water, si Eva Matibag, Manager ng PDO wastewater; si Christopher Calamiong, Senior Project Development Officer; si Lynn Almario, Senior Project Development Officer at saka si Beth Bagaipo, Senior Project Development Officer. Bago ho tayo magsimula, puwede po ba mag-request kantahin po natin ang national anthem. Kung puwede tayo tumayo lahat…

Joy Tamayo: Magandang umaga po sa inyong lahat, nagpapasalamat po kami dahil

nakarating po kayo ngayong umaga. Ok ah…. Lupang Hinirang, puwedeng ilagay ang ating kamay sa ating dibdib… (pag-awit ng Lupang Hinirang)

Mr. Soncuya: Puwede ho mag-request ng welcome remarks galing sa City of Taguig,

kung sino ho man, Barangay official, kung sino man. Joy Tamayo : Andito ho kanina si Kagawad Lino, mas may dating kung si Kagawad

Lino ang magsasalita to welcome you people … (palakpakan) Kagawad Lino: Magandang umaga po sainyong lahat, sa ating mga panauhin at sa mga

nagsisidalo ngayon. Ito po siguro ay isang pagkakataon para makita natin ang mga improvements na dapat gawin sa isang kalidad na community, at nandito po ang ating mga panauhin upang ipaliwanag sa atin ang mga bagay-bagay, and of course, gusto nilang malaman ang ating opinion tungkol sa kanilang project, kasi kung ang project ay labag sa ating kalooban, hindi magiging maganda. So, ipapaliwanag po nila sa ating lahat ang tungkol dito. Sana ay maging makabuluhan at mabunga ang ating partisipasyon ngayong umaga. Welcome to you people.

Mr. Soncuya: Salamat po, ang sisimulan ko ho, kung bakit ho tayo nagmimiting ngayon

dito, ano ho ba talaga ang purpose. Ito hong consultation na ito ay bale validation ho ng Environmental Impact Assessment. Meron ho tayong project dito, Manila Third Sewerage Project, may mga components ho ito na ipe-present ng representatives ng Manila Water. Pero bakit ho ba tayo nandito? Ah… natapos na ho iyong Environmental Impact Statement, ito ho ‘yong pinag-aralan ang aspeto ng biological, physical at social, kung ano ho ang epekto, kung mayroon man, sa ating kapaligiran. So, yun hong resulta nito ang ipe-present ho ng representative ng consultants sa Lichel Technologies. Pagkatapos ng presentation, may open forum tayo, gusto ho naming malaman, base doon sa resulta ng pag-aaral at sa presentation ng project kung ano ho ang maidadagdag ninyo sa pag-aaral, para ito hong dokumentong ito, ito hong isa-submit namin sa DENR para sa application ho ng ECC, ang ECC po ay Environmental Compliance Certificate. Ah, sa ngayon ho, ang purpose ho ‘non, noong nag-conduct po ng meeting ho doon sa U.P. noong November 9, 2003 at tapos ay mayroon hong ginanap na focused group discussions, tapos ho mayroong ginawang surveys. Ito ho din ipe-

Page 69: for Manila Third Sewerage Project Volume 3

present sainyo para malaman kung ano ho ang opinyon ninyo dito. Ang susunod po ay iyong project presentation na gagawin ng Manila Water.

Eva Matibag: Magandang good morning po sainyong lahat. Ako po si Eva Matibag,

taga Manila Water, pero ‘wag ninyo po akong puputaktihin ng tanong tungkol sa tubig, iba po ang pag-uusapan natin ngayon, tungkol naman sa waste water. Sino po sa inyo ang naka-attend ng scoping session na kinonduct naming noong November sa U.P? Naku, walang naka-attend! Ay kayo po, ayan buti naman at mayroon naman palang nakarating noon na nandito ngayon. So, ang marami po wala noon. Ipe-present po naming ang project. Ang Manila Water po kasi marami nang ginagawa sa water side ano po, pero ang di alam ng marami, meron din po kaming ginagawa sa maduming tubig, iyong tubig matapos nating gamitin, iyon po iyong tinatawag na waste water. Mayroon din po kaming mga responsibilidad para ayusin iyong sanitation, saka tinatawag na waste water services namin sa inyo. Sa kasalukuyan po, mayroon kaming ginagawang proyekto, ang lead agency po actually ay ang MWSS tapos kami po ang mag-iimplement ng proyekto. Karamihan po, iyong ginagawa naming proyekto ngayon ay funded ng World Bank. Ngayon, ito pong proyekto na ito patapos na, ‘yung financing po ng World Bank hanggang ngayong Disyembre na lang. So lahat po ng pinu put-up naming planta, ‘yon pong tinatawag na wastewater treatment plants, ah patapos na po ‘yon ngayong December. At binigyan po kami ng oportunidad ng World Bank na maka-avail ng isa pang set ng financing para dito sa tinatawag na Manila Third Sewerage Project. So, bago po ibigay nila sa amin ‘yung loan, kailangan ho kaming dumaan sa proseso ng requirement of the government of the Philippines saka requirement po ng World Bank. Isa pong requirement, ‘yong pagko-conduct ng feasibility studies kung saan aalamin ang technical o financial, kung tamang gawin ang proyekto considering ang technical at financial na aspeto. At kailangan din po naming I-conduct ‘yong ganitong consultations para malaman kung ano iyong impact ng proyekto sa magiging beneficiaries nito. So meron na nga pong ginawa ang consultants po namin, ang EDCOP saka Lichel para gawin itong consultations at makabuo ng Environmental Impact Assessment para makakuha ng permit sa Department of Environment and Natural Resources (DENR) pagdating ng panahon na dapat ng I-implement ‘yong project. So, meron na po silang ginawang maliliit na meetings kung saan mga grupo ng tao mula sa komunidad, inexplain nila ‘yong project at kinuha kung ano ‘yong opinyon ng tao ukol sa project. Mamaya ho, puwede ninyong idagdag kung ano man, ano pang ire-raise na issue o opinyon tungkol sa project matapos kong mai-present kung ano ngang binabalak ng MWSS at Manila Water sa inyong community, ito po ang tinatawag na Manila Third Sewerage Project. Una po, alam nyo po ba kung ano ‘yong wastewater? Iyan po ang dumi ng tao na pumupunta sa poso negro, o kaya, kung walang poso negro, didiretso po sa ano, sa drainage o kaya sa creek. Bibigay po ako ng background tungkol sa kondisyon ng sanitation sa Maynila, at saka ano na pong mga facilities mayroon ang MWSS at ang Manila Water tungkol dito sa sewerage. At dito, ang mga pinagkakaabalahan naming ngayon, ikukuwento ko po at iyong mga component nitong Manila Third Sewerage Project.

Page 70: for Manila Third Sewerage Project Volume 3

Ito na po ang picture ng kung ano nga ang sewage o wastewater (presentation done in Microsoft Power Point). Matapos ho nating gamitin ang tubig, magiging wastewater po iyon, 60 to 70 % ng tubig na ginagamit natin nagiging tinatawag na wastewater po. Iyon ‘yong pumupunta sa poso negro, kung masuwerte, sa isang wastewater plant o dumideretso sa kabal o sa creek. Ngayon, ah, mapanganib po sa kalusugan itong tinatawag na wastewater, dahil isipin ninyo naman po ang dumi, kapag nahawakan ninyo or di sinasadya thru iba’t ibang kontak, mapunta sa sistema ng katawan, puwede po itong magdulot ng sakit. So nagkakasakit po gawa ng wastewater ‘di lang ang tao, pati na iyong environment nasisira din. Kapag tinatapon lang at ‘di inaaalis ‘yong mga harmful na microorganisms.

Ito po ang normal na hitsura ng isang normal na septic tank ano po, dalawang compartments po siya, ang mangyayari po sa septic tanks, nagkakaroon ng sedimentation, nahihiwalay ang solid at liquid part, so ang nababawas lang po discharge sa creek at rivers, solids lang. Pero ‘yong mga harmful na microorganisms at pollutants nandoon pa rin sa likidong dumadaloy sa septic tanks at lumalabas. Ito po dapat ang ideal na situwasyon sa anumang developments ng community, o ng industrial, commercial o subdivision type na development. Dapat po may ganito, lahat ng dumi ng tao kokolektahin ng linya mula sa bahay-bahay o establisyemento, pupunta sa linya at ‘yong pupunta sa tinatawag na wastewater treatment plant, kung saan ang dumi dadaan nga sa mga proseso. So pagkalabas sa treatment plant, puwede na siyang ilabas sa ating mga rivers ng walang masamang epekto o kaya po, ‘yong nagamot o nalinis na tubig, puwede pong gamitin muli ng komunidad para sa pagdidilig, paglilinis ng kotse, basta ‘wag lang, di pa po puwedeng inumin, pero malinis na siya, di na siya nakaka- pollute.

Ganito po ang hitsura ng Metro Manila ngayon, napaka-familiar sa atin ito. Isang malaking cause ng traffic po ‘yong walang nagpaplano tungkol sa pag e-excavate ng mga linya ng telepono o drainage, ah, short term lang po ‘yong plano hindi long term kaya parati tayong nagkakagulo pagdating sa excavations. Tapos, ito po, ‘yon pong nasa kanan na litrato, pictures po yan ng communities along the Pasig River. So mapapansin n’yo po ito, itong malaking parang kanal sa litrato, iyan po ang Pasig River, ganyan na po kadumi ang Pasig River. Para na talaga s’yang kanal, kung saan pumupunta ang dumi ng Metro Manila, mapa-solid waste or liquid waste. Ito po ang ordinaryong hitsura ng congested na communities kung saan halo-halo na, basta paglabas mo ng bahay, ayan ang makikita mo, ang tubo ng tubig, ‘yong drainage, ‘yong wastewater, lahat na po ‘yan napupunta sa kanal. Ganyan na po kasama ang hitsura ng ating urban sectors sa Kamaynilaan. Ito po ay based po sa recent statistics ng National Statistics Office (NSO). Ang meron lang pong access sa papunta sa sewer lines, papunta sa wastewater treatment plant, wala pa pong limang porsiyento (5%) ng population ng Metro Manila, tapos ang karamihan ‘ yong 85% ng population, gumagamit ng individual septic tank. ‘Di ba po nabanggit ko ang individual septic tanks, wala naman siyang malaking reductions in pollution na nagagawa, ano lang siya, solids lang

Page 71: for Manila Third Sewerage Project Volume 3

nare-reduce niya. So, kaya po ganoon na ‘yong hitsura ng Pasig River at Marikina River na apektado na rin, dahil 60% to 70% ng pumapasok na pollution dito sa ating dalawang major rivers, ay ah, dalawang major bodies of water, mula po sa untreated na domestic waste water or wastewater na galing sa maduming likido na galing sa tao. Ito po ‘yong sistemang mayroon tayo sa Metro Manila ngayon ano po. Iyon pong dalawang sistema, ‘yong Central Manila Sewerage System, at saka po ‘yung Dagat-dagatan Sewerage System. Yan ang mine-maintain ng kabilang concessionaire, ‘yung Maynilad concessionaire. Tapos ‘yong Manila Water po, inaalagaan po namin ‘yong Magallanes po, sa loob ng Magallanes Village, mayroon pong isang napakalaki na wastewater treatment plant, at saka ‘yong waste ng bahagi ng Makati, pumupunta po ‘don , tapos tini-treat po doon, bago I-release ‘don sa treat at ultimately sa Manila Bay po pumupunta ‘yong treated na effluent. Ito po ‘yong dalawang project na pinagkaka-abalahan ng MWSS at Manila Water ngayon, pagdating sa sewerage at saka sanitation services. Isa po dito ‘yong World Bank na assisted na Manila Second Sewerage Project kung saan magtatayo kami ng twenty seven (27) pa na katulad ng nasa Magallanes. Maliliit nga lang po at saka underground iyong mailalagay natin para magamit ng community ‘yong ibabaw ng planta for parking o park, ‘yon po ‘yung paggagamitan. Merin din po kaming ADB assisted naman na projects. Kasi naman po, maraming porsiyento ng population gumagamit pa ng individual septic tanks, eh para po mapanatili ‘yung effective na pagre-reduce ng solids ng septic tanks, dapat po na ini-empty o pinapasipsip ang septic tanks kada limang (5) taon. So, may programa po kami na bibili ng maraming tankers, at magtatayo ng planta, kung saan dadalhin ‘yung laman ng tankers at doon po ito iti-treat. Sa lahat po ng pinaka-objective ang pabawasan ‘yong pollution sa ating mga water bodies at saka I-improve ‘yung ah effect sa health ng mga tao. So, ito po, ‘yung nasa mapa, ‘yung mga pin heads, ito po ‘yung location ng gagawin nating 27 na Waste Water Treatment Plant. Nado-doble po ‘yung capacity natin in terms of treatment pagka natapos na itong mga plantang ito ngayong Disyembre. Ito po ay perspective ng gagawin naming thru ADB assistance, ‘yung Pasig River Rahabilitation Project. Ayan po, mayroong mga facilites na magre-receive ng galing sa septic tanks tapos iko-compress po ‘ yun. So, paglabas po ng planta, dalawang by-products: ‘yung solids, maaaring gamitin as soil conditioner, saka ‘ yung liquid na puwedeng gamitin ng katulad ng nasabi ko kanina. So, bukod po sa pagre-reduce ng pollution, ‘yun pong Manila Third Sewergae Project ah gagawin namin with your cooperation sa 2005. Ang tina-target po namin, ‘yung lahat ng component ng project, maimplement natin ng three-year period, from 2005 to 2008. Mayroon po siyang anim na component. Ang isa pong component nito ay ah ifo-focus dito sa inyong barangay, ang isa pong component nito ang Taguig Sewer System, nabalitaan nyo na ba iyong ginagawang mga ponds? Ah Laguna Lake Shore Dike Project ng DPWH, kung saan iyon pong naka-align sa C-6 . Mayroon pong ginagawang C-6 project ang DPWH, mayroon po silang gagawing apat na regulation ponds na sa Hagonoy, sa Labasan, Taguig saka Tapayan, doon po gagawin iyong mga ponds, so ang binabalak po namin, di ba magiging taga-kolekta po ng floodwater iyong mga pond, ang balak po namin bago siya I-release sa Laguna Bay, iti-treat po muna naming yon nako-collect na

Page 72: for Manila Third Sewerage Project Volume 3

combined waste water saka flood water, iyon po iyong isang component ng Manila Third. Isa rin pong component nito, makikipagtulungan kami sa mga Munisipyo tsaka sa Pasig River Rehabilitation Commission para makapagtayo ng ilang planta sa, along the Pasig River Bank. Isa rin pong components nito mako-concentrate naman sa Quezon City kung saan meron na kaming malalaking communal septic tanks, ia-upgrade po namin ‘yon, gagawin na namin talagang planta. Isa pa po ‘yong Quezon City-Marikina Sewerage System kung saan sa mga komunidad, iyong mga dito sa area sa Quezon City tsaka ‘yong Olandes sa Marikina, kukuhanin po naming ‘yong combined na wastewater tsaka storm water, at gagawa din po kami ng planta. Tapos, isa rin pong malaking proyekto ‘yong pagtatayo ng septage treatment plant, iyon pong pagdadalhan ng mga laman ng poso negro kung saan iti-treat ‘yong mga laman ng pozo negro, gagawa po kami ng ganyan tsaka isa sa north, isa sa south. Tapos ang, ito pong magiging subject ngayon, itong wastewater ‘to mula sa Pinagsama, sa part ng Signal, tsaka sa Pinagkaisahan, AFP Village, sa PNP Village, ah kukunin po naming ‘yung… gagamitin po naming ‘yung drainage, pinag-aaralan po naming ngayon, isa pong option gagamitin naming ‘yong existing drainage system kasi dito po naman lumalabas ultimately ‘yong mga laman ng inyong septic tank, so gagamitin po namin ‘yon, tapos iyong laman idi-direct po namin sa isang planta na gagawin. Ang pangalawa pong option na iniisip naming ay maggagawa ng mga linya na hiwalay na kukuha ‘nung dumi mula sa inyong bahay, na pagka-flush n’yo po diretso na sa linya. Tapos pupunta na doon sa gagawing wastewater treatment plant. Papakita ko lang po ‘yong picture ng ano, isang option po doon ah maggawa kami ng separate wastewater treatment plant o ‘yung community, iko-connect po namin siya sa isang pond, kasi malapit lang po mga eh sa isang pond ng project ng DPWH. Ito pong lahat ng ito, ‘yong mga project namin na ginagawa, ito pong mga kulay pula ‘yong gagawing Manila Third Sewerage Project. Sabi ko po, ‘tong area n’yo dito puwede po naming I-connect sa isang pond or gagawa ng isang kahiwalay na wastewater treatment plant. Ah, ito po ang location ng mga ponds, ‘eto, eto, tsaka ‘eto pong apat na ito. Pero malamang dito po kayo ma-connect sa Taguig pond or gagawa po kami ng isang planta malapit sa Pinagsama Creek ‘don po sa may isang basketball court, siguro po si Boy mamaya ang maide-detalye ‘yung lokasyon, ‘yung gagawin naming waste water treatment plant. Ito nga po ‘yong gagawin naming dalawang approaches ano po, puwede kaming maggawa ng separate na linya o gamitan ng drainage para mai-collect ‘yong waste papunta sa planta. Ito pong hitsura ng mga nangyayari ngayon, lahat na lang ng wastewater natin ganyan ultimately pumupunta sa Marikina River, o sa Pasig River, or sa Taguig River, or sa Laguna Lake ultimately. Ngayon, ito po ‘yong mga problemang kakaharapin namin at gusto naming I-raise sainyo ah… gusto po naming malaman ‘yung opinyon n’yo at ‘yung inyong saloobin tungkol sa buong proyekto specifically dito sa mga issue na ito. Kasi po isang requirement namin para makapagpagawa ng planta, para ma-implement ‘yong

Page 73: for Manila Third Sewerage Project Volume 3

project ay kailangan ng lupa na pagtatayuan ng waste water treatment plant ‘don po sa location na iniiisip po naming malapit sa Pinagsama Creek. Kailangan po namin ah… kailangan po naming magkaroon ng agreement with the local government para magamit ‘yung lupa, puwede naman sa ilalim ho kami magtayo para ‘yung ibabaw magamit pa rin ng community. Tapos, ‘yong cost po nito para ma-improve ‘yung sanitation ng community, ‘yung capital cost po sa amin po ‘yon sa MWSS at sa Manila Water. Pero ‘pag nag-operate ‘yung planta, magkakaroon po ng additional na charges na maipapasok sa tubig. Ah sa kasalukuyan po, iyong mga areas na tinatawag naming sewered, kung saan may mga sewer lines at wastewater treatment plant, mayroon po kaming tinatawag na sewer charge na 50% po ng basic charge sa tubig, pero ito pong papasukin po naming project, kinakausap po naming ‘yung regulatory office ng MWSS para ayusin, yung charging dahil sa amin pong experience, ‘di nga siya encouraging sa pagi-implement ng project. So, pinag-uusapan po ngayon ang maaaring gawin para maiba ‘yung structure ng charging pagdating sa ganitong proyekto. Dahil sa amin pong palagay malaki talaga ‘yung 50% sa sewer charge. Tapos aalamin din po ngayon, sa EDCOP, meron din po silang initial results noong environmental tsaka social impact ng projects. So, hinihingi po namin ngayon na measures para I-minimize ‘yung mga masasamang environmental at social impact ng proyekto. So, sa summary, malaki po talaga iyong summage pagdating sa waste water, kasi po habang dumadami iyong kino-consume natin na tubig, dumadami ‘yong pino-produce natin na waste water na sa kahuli-hulihan pumupunta lang sa environment. Eh di pa po natin nare-realize na dapat I-prioritize natin ang ganitong project, so malaki pong challenge pagdating sa pagbabalik, pagpapa-alam sa mga tao na ito ang magiging problema at kailangan na nating kumilos bago pa lumaki ang problema. So, kasama po ‘don sa Manila Third, magkakaroon po kami ng information & education campaign para patuloy na maintindihan ng mga mamamayan ‘yung pangangalaga sa environment at ‘yung pagi-improve ng sanitation ng communities at ng mga sarili nila at kung ano-anong mga proyekto ang maaari para lang ma-improve talaga ang ating environment in relation to wastewater. So, ‘yun lang po kung mayroon kayong katanungan or mamaya na lang daw po, si, may sasabihin po si Doy.

Mr. Soncuya: Iyong mga tanong nyo po tandaan n’yo lang, pagkatapos ho ng

presentation ng results ng Environmental Impact Assessment ah… mag-o open forum ho tayo. Ii-state ko lang ho kung ano ‘yong proseso ng EIA ano ho (shows flowchart of the EIA process). So, ah ito po no, bale ang project ay Manila Third Sewerage Project, so project plan bale MWSS at saka Manila Water. Pagka-pasok ho dito, ano ho ba ‘yong scoping workshop? Eto ho natapos na ho lahat ito no, andito na ho ngayon tayo. So, ‘yong scoping workshop ano ba ‘to? Eto ho, pumupunta ho don sa mga residente na maapektuhan at kinakausap ho ‘yong mga tao, at tinatanong kung ano ho ‘yong mga nakikita nila sa una… ‘yong mga nakikita nila sa una na puwedeng lumabas na problema. So, bale ho sa una, sinasabi ng mga residente na maaring magkaroon ng problema, yon ho, doon ho pino-focus ho iyong study. So, ito ho ‘yung sinasabi ho namin na tayo biological, physical at saka social, so tatlong components po ito. Palagay ho natin sa

Page 74: for Manila Third Sewerage Project Volume 3

physical, baka ‘yun ho ba yang project na ‘yan, magdadala ba ng baha ‘yan? So, example po ng physical yan. Iyon hong biological ho, ito ho ba may epekto sa mga ibon? Sa mga puno? Iyong social, ano naman ang epekto sa tao? So, base ho doon sa scoping workshop, nabibigyan na ho ng paunang hint ‘yung study team para malaman kung saan ngayon ipo-focus ito. So, eto ngayong scoping workshop, pagkatapos ho ‘non pupunta nga yon sa communities ho to. Bale dalawa ho ang pinag-uusapan dito, ‘yung primary data, ito ho ‘yung data na kinukuha ho sainyo mismo kamukha ho sa social, mayroon pong focused group discussions, tapos mayroon hong sinasabi natin na survey na pumupunta ho doon sa mga household at tinatanong ho ‘yung mga pamilya. Ito ho ‘yong mga primary data na nakukuha doon sa communites. ‘Yung secondary data naman, ‘yun ‘yong mga dokumento o mga inpormasyon na nakuha na ‘nong mga previous studies, at kamukha ho nang kung ano na ‘yung nakuhang dokumento’t inpormasyon na nakuha na noong mga previous studies, at saka ‘yung kamukha ‘nong kung ano ‘yung population, binabasehan ho naming ‘yan ‘don sa 2000 population ng National Census Office, tapos pino-project na lang namin ho yan. So, bale ito baseline data collection. Ito ho’yung pagkukuha ng mga data tungkol ho sa project. At pagkatapos ho nito, ‘eto ho ‘yung tinatawag na environmental impact assessment. Ito ho ang ina-analyze ho naming kung ano ho ang epekto, mabuti o masama na puwedeng panggalingan ‘don mula sa project, ah so bale ang example nito eh baka kapag ilagay ‘yung sewerage system, baka humina o bumagal ‘yung labas ng tubig galing sa ulan. So, kung ano, kung meron man hong lalabas, do ko ho sinasabing meron, kasi ipi-present pa ho ng kasamahan namin yan eh. Kung merong ganong epekto, ano ho ngayon ang dapat gawin para hindi mangyari ‘yong ganong problema. So, ‘yun ho ang analysis, tapos makatapos na ho ang analysis n’yan, babalik ho naman kami dito sa mga lugar na pinagkuhanan naming nang data na naapektuhan ng project at bina-vaidate ho namin ‘yung resulta ho ng pag-aaral namin dito. So andito ho ‘yung mga sasabihin ho n’yo mamaya, ‘yung mga opinyon ninyo ay isasama pa rin ho namin ‘dun sa Environmental Impact Assessment documentation namin na isa-submit ho namin sa Environmental Management Bureau (EMB) ng DENR. Kung inaakala ho ng EMB na kailangan ho, o kontrobersyal ho ‘yung project at kinakailangan ho mag-conduct ng public hearing, ise-set ho ng public hearing para ‘yun ho papatakbuhin na ho ng DENR ‘yun, para malaman talaga kung makakasama o makakabuti ‘yung project. Kung hindi man ah sinet sa opinyon ng DENR-EMB na hindi masyadong makaka-apekto, kokonti lang ang maapektuhan, hindi na ho sini-set itong public hearing. So, pagkatapos ho ng review ng EMB, dadalawa lang ho ang pupuntahan ho n’yan, approved or disapproved. So pag na-approve ho ‘yan, diyan ho ‘yung lalabas na ang tinatawag na ECC. ‘Yung ECC ay Environmental Compliance Certificate. Ito ho ang nagtatakda ng mga kondisyon na dapat sundin po ng project proponent na kung ano ang dapat gawin o hindi dapat gawin, nakalagay ho diyan. Minsan ho umaabot ng mga limampung (50) kondisyones ang inilalagay ng EMB. At bukod ho doon, meron pang… kung kakailanganin sa opinyon ng DENR, kakailanganin hong mag set-up po sila ng Multi-partite Monitoring Team, nagsi set-up po sila. Ito ‘yung team na kasama ho ‘yung mga barangay officials, kasama ho ‘yung mga residente na binubuo ng

Page 75: for Manila Third Sewerage Project Volume 3

team para tingnan na sinusunod ng project proponent ‘yung mga kondisyon na nailagay sa ECC. Iyon ho ‘yung proseso ‘don. Ah, may mga proyekto na ino-obliga ho din ng DENR na ‘yung mag set-up ng fund para mag-finance ho ng monitoring at evaluation. Bukod ho ‘don, mayroon hong kakailanganin ang DENR, nagpapa set-up po din sa proponent ng Environmental Guarantee Fund (EGF). ‘Yung EGF hong ito, ito ho ‘yung pondo na nilalagay ho sa bangko para magamit ho ng project kung mayroong masamang epekto na ‘don sa mga communities. ‘Yun kung sino man ang maperhuwisyo ‘don, eh doon nga iyon kukunin na nakalaan na exclusively ‘don sa project na ito. So bale ganito ho ang EIA Process. So, ang susunod hong magpe-present ay ‘yun hong resulta na nang EIA. Samalat ho.

Engr Suelto: Magandang umaga po sainyong lahat, ako pala si Boy Suelto, sa EDCOP-

LTI. Kami po ay ‘yung inatasan ng MWSS saka MWCI na mag-conduct ng Environmental Impact Assessmnt para sa Manila Third Sewerage Project. Katibayan po ng sinabi ng kaibigang Dodoy kanina ‘don sa proseso natin, nagkameron po kami ng workshop nooong November po sa U.P at ah… base po ‘don sa nakuha naming initial na mga opinyon at mga kuro-kuro ng mga nagsidalo, ‘dun po namin binase ‘yung pag-aaral namin. Ito po ‘yung plano po na ginawa ng technical consultants ng MWCI, na ‘eto na po ‘yung nasasakupan po ng sewerage project na gagawin po (shows map of the coverage area). Ah eto po ‘yung C-5, ‘yung nandito po sa baba, dito po ‘yung AFP-PNP Village, nandito po ‘yung Pinagsama Phase 1, 2A at 2B at saka ‘yung Brgy. Signal, part lang po ng Signal Village. Kung mapapansin n’yo po, hindi natin mako-cover ‘yung lahat ng area. Kasi po parang ‘yung direkyon ng sewer nung maduming tubig ay iko-concentrate lang po sa parang isang basin, na iipunin po ito sa pamamagitan ng existing na mga drainage lines at dadalhin po sa isang open space na lugar. Dito po, proposed lang po ito. Dito po ito sa Signal Village, sa may Ipil-ipil St., may bakanteng lupa po ‘ron sa may malapit katabi ng basketball court, covered basketball court. Ito po ‘yung basketball court, so ito pong mga consultants namin, tinitingnan nila kung ano ‘yong kalagayan ‘nung ah paligid ng proposed site po ng treatment plant. Ito po, may mga konteng mga halaman, mga ipil-ipil na kinuha nila habang nagso-survey. So, bukod po pala doon sa ano, sa sinabi kanina ng taga-MWCI na proposed wastewater treatment plant para sa komunidad po, isa po doon sa Septage Treatment Plant na gagawin po ng MWCI ay ilalagay sa loob po ng FTI. Ito po ay ‘yung tinatawag nating septage treatment plant ay mangongolect nang dumi… yung mga vacuum trucks dadalhin ho ‘yung mga dumi dito po sa Southern area, ‘yung galing sa mga poso negro natin, kokolektahin ng mga vacuum trucks, dadalhin po ito sa planta para I-treat bago ho ma-release ‘yung malinis na tubig at saka ‘yung dumi upang gawing soil conditioner. So, ito ‘yung site sa loob ng FTI, malapit po ito, katabi po itong existing wastewater treatment plant nila. So, ‘yun hong pinuntahan po namin, ‘yung likod po nito ay sakop po din ng Brgy. Signal Village. So, ito po ‘yung outlet po ng

Page 76: for Manila Third Sewerage Project Volume 3

treatment plant. Pinuntahan po namin ‘yan at kumuha po kami ng sample ng tubig na lumalabas po dito. Mamaya, ipapakita po namin ho sa inyo ‘yung resulta n’yan para malaman n’yo ‘yung quality, kalidad ho ng tubig na lumalabas. Ito po noong November 15, bago po kami mag-umpisa ng survey, nagkameron nga po kami ng workshop sa U.P., pini-present din po ng MWCI dito ‘yung proyekto tapos noong Abril ho, pumasyal ho kami dito upang makipag-sangguni sa council ng Signal Village. Nagkameron po kami ng focused group discussions. Dito po, hiningi namin ang opinyon ng mga representative ng barangay at ipapakita ko rin sainyo mamaya ‘yung resulta. So ung isa pang pag-aaral namin, hindi lang kami nagko-concentrate po sa tubig, pinag-aaralan din namin ‘yung hangin sa paligid, katulad po dito, nag sampling po kami ng hangin dito sa Barangay Outpost sa may Pinagsama. Ito po, sa may Western Bicutan po. So, ito po, kumuha kami ng mga sample ng mga tubig, at ‘yung mga ibang characteristics po nila, pinag-aralan po namin mismo ‘don sa site at ‘yung iba pong mga samples, pinadala namin sa laboratoryo para sa ibang analysis. Ito po ‘yung resulta ng analysis po nang sinampulan naming tubig. Dito po ‘yung kanina, nakita n’yo ‘yung litrato dyan sa nilalabasan ng tubig sa may FTI. ‘Dun ho lumalabas sa Signal Village ‘yon, sa baba ho ‘non. Kung mapapansin po ninyo, ang pinaka-mahalagang tinitingnan po namin pagdating sa mga wastewater treatment plant ay ‘yong tinatawag nating BOD. Ito po ay ‘yung ‘biochemical oxygen demand’, ito po ‘yung sukat nito, halimbawa ‘yung isang bagay na mabubulok, bago po siya mabulok kailangan niya ng oxygen para ma-decompose po siya. Ngayon, ‘yung level po ng BOD pagka habang tumataas po ‘yon, ibig sabihin mataas din po ang polusyon dahil maraming kailangan na oxygen para mabulok ang mga, bagay. Sa DENR po, ang acceptability po ng Class C ng BOD ay dapat nasa 7 hanggang 10. Isang sinampulan po namin dito sa baba po ng FTI, ang lumalabas po na BOD ay 149, so mahigit ah 15 times above the acceptable levels ang nakukuha nating quality ng tubig. Bukod po dito, mayroon din po tayong ibang parameters katulad ng mga heavy metals, wala naman po kaming nakitang mataas na levels, nasa standard pa rin ho naman ‘yung mga metals sa DENR, hindi rin po… lumampas din po sa maximum na 2, ang nakuha natin ay 10. Tapos pagdating po dito sa ‘coliform’ po, siguro narinig nyo na po ang ‘coliform’, familiar ho kayo ang coliform po, ito ‘yung bacteria sa dumi. Ang acceptable pong level ay nasa 5,000 ah… Most Probable Number per 100 ml. Ang nakuha po naming resulta sa laboratoryo ay lumalampas po sa 160,000, so napakalayo po sa standard na sini-set ng DENR po yan. Gayon din po ‘yung creek sa tabi po ng Signal na balak din pong pagtayuan ng treatment plant. Ito po ‘yung nakuha naming sa BOD ano po… mataas din po, 221 at ‘yung dito po sa Pinagsama Village, dito po sa may bandang yun pong nasa baba, may tulay po doon, malapit na sa dulo eh, nakukuha ho namin ay 512, so lalong mas mataas ho sa standard na sini-set ng DENR ho. At pati rin dito sa oil and grease, 38 po, 4.3, saka ito pong ‘total coliform’ ganon din pong lumabas; more than 160,000 ang level ng mikrobyo ‘dun po sa tubig na sinampulan po naming. So, nung nakipag-discussion po kami sa mga opisyal ng Barangay Signal po dito po noong Abril, ‘eto po ‘yung lumabas na mga issues na nilahad ‘samin ng mga opisyal ano ho.

Page 77: for Manila Third Sewerage Project Volume 3

Unang-una nga po, sinabi nila na dito po sa lugar nila medyo may kakulangan po ‘yung sewerage line, bukod po ron, ung ibang line, dahil nga po walang sewerage line, ‘yung ibang dumi, talagang dumidiretso na sa mga sapa kaya nagiging marumi nga ‘yong mga sapa dito, tapos ‘yong meron silang mga issue tungkol sa mga factory na nagdi-discharge daw ng … ng kanilang waste dito sa kanila ding village ano ho kasama rin ‘yung mga lumang sewerage tapos ‘yung meron pa daw ‘yong mabahong amoy silang nanggagaling sa FTI, tapos ‘yung ibang sewerage line nga, dahil wala nga tayong ibang waste water treatment plant ay dumidiretso lang sa creek. So, ‘yun sa mga rekomendasyon po nila, ito po siguro ah… kaya isa po sa dahilan kaya kung bakit nakikipag-konsulta po kami sainyo siguro para madagdagan ang kaalaman n’yo po tungkol dito sa magiging proyekto ng MWCI. So, kung tungkol naman po don sa mga issue sa mga illegal siguro na nagtatapon ng dumi, rekomendasyon po nila na mag-mobilize po ng tao, tapos–irehabilitate po ‘yung mga drainage lines, tapos habang iinspeksyunin po sinabi po sa amin ‘yun, bago po siyempre, kailangan po magkameron ng inspeksyon doon sa proposed site dito po sa may Signal Village. At saka kung maaari po sigurong I-redirect po ‘yung mga dumi na nanggagaling sa FTI. Ito po ‘yung mga importante po, mayroon pong mga minor na impact po siguro hindi naman masyadong magiging importante, ang idi-discuss ko po ay ‘yung talagang pinaka major impacts po. ‘Pag sinabi po kasi naming minor, meron ho siyang konti pero hindi naman nakaka-apekto, katulad po halimbawa sa hangin, hindi naman ho magpo-produce ng alikabok ano habang nag-ooperate ‘yung planta pero habang ginagawa posibleng magkameron ng alikabok dahil sa mga paghuhukay ano, so Idi-discuss ko ‘yung mga importanteng epekto ng proyekto no. Ito po dalawang… hinati po namin ‘yung epekto ng proyekto sa dalawang stage. Habang ginagawa po ‘yung proyekto, o ‘yung construction period, at saka po ‘yung operation period, kapag nag-ooperate na po ‘yung planta, ito po ang mga mahahalagang epekto po na maaring mangyari habang ginagawa ‘yung planta. Unang-una po siyempre hindi po natin maiaalis na ‘yong open space doon, gaya ng sinabi ng taga-MWCI ay mako-convert po sa treatment plant. So, talaga pong di natin maiiwasan ‘yan, kaya nakikipag-coordinate po ang MWCI sainyo upang mapag-usapan po ang tungkol sa bagay na ito. ‘Yung paghuhukay ho siguro familiar naman kayo, kahit ang proyekto ng MWSS o PLDT. Pag may hukay siyempre may konting disturbance ‘yan … medyo inconvenient sa inyo no? Ano ho bang maaaring maging solusyon na maaaring gawin ng MWCI. Siguro, hindi naman ‘yung paghuhukay na gagawin, hindi naman ho sabay-sabay eto no, gagawin ito ‘in stages’ para hindi masyadong malaki ‘yung disturbance na nangyayari doon sa community. So, natural, makikipag-coordinate o makikipag-sangguni po ang MWCI or ‘yung contractor ang aatasan nilang maghukay sa mga kinauukulang opisyal po ng barangay. Tapos kung meron po kasing… kung saka-sakaling mayroon pong kailangang pansamantalang isar ang kalsada habang hinuhukay po siguro kailangan lang po siguro natin ng ‘re-routing’ ng trapiko. Ah… siguro po pagka may construction kahit papaano po mayroon pong ingay ‘yan na mapo-produce, so para naman hindi masyadong maka-istorbo sa komunidad, ili-limit lang po siguro ng proponent ‘yung construction pagka sa

Page 78: for Manila Third Sewerage Project Volume 3

umaga, kasi sa gabi alam naman natin na nagpapahinga ang mga tao. ‘Yung para po sa konstraksyon, siyempre ah meron tayong construction waste na mapo-produce diyan, aatasan po ng MWCI ang kontraktor na siguraduhin na ‘yung mga kalat ay iipunin sa isang lugar, ‘yung ah… maglalagay sila ng mga kaukulang basurahan, ah ‘agarang pagsasa-ayos eh ‘yong mga hinukay ‘pag natapos na talaga, kailangan ibalik nila sa dating anyo or pagagandahin pa nila lalo, paglalagay ng mga temporary toilets para doon sa mga manggagawa nila, kasi siyempre pagdudumi din sila habang nasa konstraksyon ano. Ito po ‘yung mga importanteng ‘impact’ habang nag-ooperate po ‘yung planta. ‘Yung planta po siyempre magkokolekta po siya ng waste water, may solid part po iyan, eh ang tawag po nila dyan ay ‘sludge’ o ‘bio solids’ para ‘yung iba kasi habang tumatagal parang nagiging ‘fertilizer’ sila nagiging ‘bio solids’. Pero, makakapag-produce po sila ng approximately, mga 6 cu.m. kada isang araw ng solids. So, ano pong mangyayari ‘don no? ‘Yung sludge na ‘yan, regular po na aalisin ng vacuum truck po yan, dadalhin po ‘yan sa kaukulang tapunan, ah… so kaya hindi po magtatagal yung solid part po ‘don palaging kokolektahin ng mga traps nila ano ho, ‘yun ano ito… siyempre alam naman natin na tubig po ito, baka sakaling may ma-generate pong amoy po ‘yan, ‘yung teknolohiya naman po nila ay may sapat na mga ‘safeguards’ para mai-minimize o ma-eliminate po ang amoy ano po, gagamit sila ng mga ‘bio filter’, gagamit sila ng mga bentilasyon. Tapos’ ‘yong mga istraktura nila kung ito ay _______ talagang selyado ‘yan ano ho, para ring ordinaryong malaking septic tank, siguro naman ‘yung mga septic natin wala naman kayong naaamoy sa ganyan ano. ‘Yung pagdaan ng vacuum truck no, ah… dahil mga anim (6) na kubiko metro lang naman ng siguro ang ma-gegenerate niya sa isang araw, ‘pag malamang ano… ‘yung truck na gagamitin kasi nila mga mula 5 hanggang 12 cu.m. So, ang lalabas niyan araw-araw, kung kukunin mong dumi siguro isang biyahe lang ng trak, minsan lang pupunta ‘yon sa isang araw para kunin lang ‘yung dumi. Tapos, bukod nga diyan sa wastong pagdating o pag-sasa oras ng pagdating ng trak, siyempre iko-coordinate po nila, ng MWCI, ng kontraktor, ‘yung oras po ng pagkuha nila ng dumi. Ito po ‘yung sinabi po kanina, ng taga-MWCI na once na mag-operate, siyempre mayroon po tayong corresponding na ‘sewerage charges’ na ipapatong po sa mga beneficiaries ano. So, na-explain naman sainyo ng taga-MWCI na sa ngayon po ay masusi nilang pinag-aaralan ang magiging pinakamagandang paraan para maminimize ‘yung mataas na maaring ipataw sa mga beneficiaries. So, siguro isa ‘ron sa makakatulong ay ‘yung ma-realize ng komunidad na siyempre kailangan din naman nating pag-ukulan ‘yung sa sanitasyon, siguro ‘yung malawak at masusing kampanya para ma-educate po ang lahat ng mga residente sa magiging benepisyo po ng proyektong ito. Ito po ‘yong ano ho… ‘yung parang pinaka-benefit po ng project na unang-una po dahil malinis na ‘yung sewerage natin, magiging malinis na ‘yung kapaligiran natin. Iyong tubig na lalabas sa planta po ay magiging malinis, ah… ito po ay magiging sang-ayon sa mga standards na iaano ng DENR, sabi nila I-release ito sa sapa o ultimately pupunta rin ito sa Laguna de Bay.’Yung kalusugan po ng mamamayan, ng beneficiary, siyempre po mababawasan siguro ‘yung sakit na dulot ng maruming tubig, kasi di lang naman…may posibilidad din

Page 79: for Manila Third Sewerage Project Volume 3

po halimbawa sa nakikita rin namin sa mga creek po ninyo na medyo marumi na, mayroon po tayong mga langaw, mga lamok na maaring makapag-presuade po ng mga dumi na ito sa mga tao po no, na siyang nagiging sanhi ng pagkakasakit. So, kung ma-miminimize o mababawasan po natin ang pagkakasakit, eh ito po ay parang magiging katipiran narin sa gastusin na ating… ah pinag-uukulan natin siya ng pera, lalo na sa mga sakit na dulot ng mga maruruming tubig. So, kanina po binanggit po namin ‘yung impact ano, ‘eto po ni-rerequire po ng DENR na mag-submit po ang proponent ng tinatawag nilang Environmental Management Plan. Dito po sa Environmental Management Plan, lahat po ng mga epekto na masama ay gagawan po ng iba’t ibang programa upang ma-minimize po o mabawasan kung hindi man, maalis ang masamang epekto no. Unang-una po, ‘yung during construction, kung sino man ‘yong kontraktor na maatasang gumawa ng proyekto ah… ire-required po sila siguro ng MWCI na mag submit po ng isang ‘construction contractor’s program’. Dito po sa programa sa mga may contractor’s po, nandito po ‘yung mga programa sa paglalagay ng mga wastong markers, ‘yung pagtatapon ng mga _____ sa mga kaukulang mga tapunan, halimbawa kapag medyo maalikabok yung construction site kailangan diligin para ma-supress ‘yong dusts. Ah gagawin rin po ng contractor po ‘ yan, pati po ‘yung waste na mage-generate nila ‘don sa kampo, ‘don sa construction site tapos din po sigurong mga alituntunin ang MWCI na dapat nilang sundin. ‘Yung mga makina po ah pangangalagaan, hangga’t maari, siguro kasi meron po siguro diyang mga makina na malakas magbuga ng masasamang usok, siguro ire-require po nila na dapat man lang na ‘yung mga makinang gagamitin habang nasa construction ay nasa kondisyon para ‘di naman mag-emit ng masamang usok ano. ‘Yung pagsusuot ng mga safety equipment ng mga workers ay ire-require din po ng… masasakupan din dito sa contractor’s program. Ito po ‘yung septage management plan na kailangan din pong I-implement ng MWCI para ma-manage po ‘yung mapo-produce na septage ano. Iyon pong collection vehicles po nila, siguro kung may mapapansin po kayong mga bago nilang truck ngayon, medyo high-tech na po ngayon, ‘yung mga kulay puti na talagang vacuum trucks. Kung iko-compare ninyo sa mga ordinaryong mga nangongolekta ng septage ay up-to-date naman po ‘yung kanilang mga kagamitan po no. Saka mayroon po tayong alituntunin, ‘yung R.A. 6969, ‘yung ‘transfer permit po’, hindi naman po tayo basta-basta puwedeng mag transfer ng dumi, dapat po ito ay ipaalam sa DENR, ah para mabigyan ng permiso. ‘Yung ‘accidental spill’ po pagka natatapon kailangan sigurong linisin kaagad ng malinis na tubig at I-disinfect ‘yung spill kung mangyayari ito no. ‘Yung pagtsi-tsek ng collection vehicles periodically saka ‘yung pagsusuot din po ng protective devices para doon sa mga taong mangongolekta ng septage. Meron din pong ano…kung minsan meron pong mga aksidente na puwedeng mangyari, kailangan po ay handa rin sila. So, magde-devise din po sila ng ‘contingency plan’ na sasagot po sa maaaring mangyari habang nag-ooperate po ang planta, katulad po ng ‘injury’, sumunod po ‘falling debris’ actually ‘yung nahuhulog during construction, at saka po ‘yung exposure ng mga manggagawa sa mga mikrobyo. So, mayroon pong kaukulang response na gagawin ang proponent para kung mangyayari man po

Page 80: for Manila Third Sewerage Project Volume 3

itong mga aksidenteng ito ay mabibigyan po nang agad na lunas. Abandonment plan po, siguro hindi naman po maaring… sa matagal-tagal pa na panahon kung saka-sakaling ma-abandon po itong project, iyong structure, gagawa po o magsa-submit din po ang MWCI at ipe-present na rin po sainyo kung ano ang gagawin nila sa planta kung saka-sakaling ito ay iaabandona nila. Saka iyong tuloy-tuloy na konsultasyon at information communication, gagawin din po ng MWCI para maging activate naman po ang komunidad na mabibigyan ng benepisyo. ‘Dun po sa ano, eto po sa nabanggit po kanina ‘yung mga impact no, one way po para maging involve po ‘yung community at saka masigurado na lahat ng solusyon sa mga impact ay nasa lugar, maari pong magtayo ng isang environmental monitoring plan no, dito po sa construction base, habang ginagawa po itong mga planta, maari pong I-monitor ‘yung air, ‘yung noise, saka‘yung water quality. Ganoon din po sa operation phase na imo-monitor po ‘yong sludge at saka ‘yung lumalabas na liquid, at saka health monitoring ng mga taong nasa paligid po para masigurado po natin na walang epekto ‘yung operasyon ng planta. So, ‘yung monitoring team po na gagawin para mag-conduct po ng pagmomo-monitor ay maaaring manggaling po sa DENR, dito po sa representatives po ng Manila Water, kayo po mga community, barangay representative community po or maari din pong imbitahin ang taga Department of Health (DOH) dahil sila po ang lead agency pagdating sa sanitasyon po eh. So para naman mag-function ‘yung monitoring team, kailangan pong may pondo ‘yan so magsi-setup din po ang proponent ng environmetal monitoring fund . Ito po ‘yung pondo na gagamitin ng team para ma-monitor ‘yung proyekto . So nabanggit na po kanina ng kasama ko po na bukod sa environmental monitoring fund, maari din pong mag set-up ng environmental guarantee fund, ito po ‘yong pondo na gagamitin ng proyekto ‘pag may nangyari na aksidente. So, naka set aside na po ‘yang pondo na ‘yan, kung ire-require po ng DENR na maglagay ng environmental guarantee fund ay magsi-set-up ang ano... Dito na ho matatapos ang aking presentation. Salamat ho. (palakpakan)

Mr. Soncuya : Bago ho tayo mag-umpisa ng open forum, puwede hong humingi

ng additional information? More or less gaano ho ba kalaki ‘yong in terms of square meters ‘yung planta para magkaroon ho tayo ng ideya.

Engr. Suelto : Hindi ako sure no, ah… pero ‘don sa nakita kong plano na

isinabmit sa akin, ‘yung tentative ano nila, maaring umabot ng between 700 to 1,000 sq.m. ‘yung planta, nasa ganong ano, pero ‘yun nga maaari itong maging underground so pinag-aaralan po nila kung ano ang pinakamagandang structure, kung ito ay above ground o below ground. Pero bukod po sa mga planta, magsi-setup din po sila ng maliliit na sampling stations kasi po, katulad po ng mga duming nanggagaling sa Pinagsama, kailangan pong bombahin po ‘yan, parang stage, so from one parking station hanggang sa makarating po sa planta. So may maliliit na parking stations po silang ise-setup, maaring mga siguro 5x5 or 3x3 meters lang ito no, pero malalim ito para maipon ‘yung tubig para maibomba sa susunod na istasyon hanggang sa makarating doon sa planta.

Page 81: for Manila Third Sewerage Project Volume 3

Mr. Soncuya : Gusto lang ho naming I-acknowledge ‘yung presence ni Barangay Chairman Henry Dueñas, maraming salamat ho…. (palakpakan) Ah, meron ho kayong ah…bago ho tayo mag-open forum uunahan na ho naming kayo na magpasalamat ho dahil binigyan n’yo ho kami ng opportunity para mag-conduct ho ng public consultation ditt, at saka maraming salamat din ho sa paggamit ng lugar…….. (palakpakan)

Barangay Capt. Dueñas: Ganon din po sa amin, kami din po ay nagpapasalamt

sainyo, sa magandang inpormasyon tungkol ito sa napakaganda at napakalaking project para sa Taguig, iyon lang po.

Mr. Soncuya : Maraming salamat ho, ah… simulan na ho natin ang open forum

ah kung ‘yun ‘don ho sa presentation nung Manila Third Sewerage Project at saka mismo ‘don sa Environmental Impact Asssessment or kung anuman ang gusto ninyong itanong ay puwede na ho tayong magsimula. Baka mayroon ho kayong tanong.

Roger Estuer (community resident) : Ako ho si Roger Estuer po, ang zone

leader ng Zone II, maganda po ang project ng Manila Water, ang gusto lang po naming malaman kasi ‘yang project na ‘yan ah… gagawin pa lang. Itong ginagawa ngayon ay para sa patubig na nang aming komunidad, ngayon kailan po kami ba magkakaroon ng tubig katulad ng Manila Water?

Eva Matibag : Sayang ano po, hindi naming naisama ‘yung aming territory

business manager, si Taggy de Castro, siguro po familiar kayo kay Taggy ano po, nasa main office po kasi siya kaya ‘di siya makakarating ngayon pero naka-programa po ‘yung mga projects niya dito sa Taguig. For expansion po kasi itong Taguig tsaka Rizal area. Iyong pong particulars ng kung… ‘exact dates’ kung kalian, eh hindi po namin kabisado ‘yung exact date.

Roger Estuer (community resident) : Naitanong ko lang po ‘yon, maganda nga po

itong ating project at ah… ayon naman sa aking pakiramdam ay napakaganda, kung ito ay maitutuloy sana po matuloy sa madaling panahon.

Mr. Solucio (community resident) : Ako naman po si Mr. Solucio, zone leader

ng Sulyahan at ang pagkakaalam ko yata ay ang isa ninyong naging treatment plant ay doon sa pinakita kanina sa covered court, ah… proposed. Ngayon ang gusto ko sanang maitanong, ito ba kailangan maghukay ng daluyan sa mga kalsada papunta doon sa treatment plant. Kasi karamihan ngayon na mga sewer sa bahay-bahay ay puro pozo negro di ba, eh papaano kaya ipinaliwanag n’yo kanina eh mayroong ding aakyat na vaccuum truck, alin po kaya ang talagang magiging dapat na gamitin sa ganoong paraan?

Page 82: for Manila Third Sewerage Project Volume 3

Eva Matibag : Tama po kayo po sir no’, puwede pa ring kuhanin ‘yung laman ng septic tank ng vacuum truck at tapos ‘yung lalabas na likido na lalabas sa pozo negro, idi-direkta pa rin ‘don sa linya na ilalatag, pero ang isa-suggest po namin, ang binabalak po naming gawin kapag maglalatag na kami ng sewer lines na mangongolekta ng dumi mula sa bahay-bahay, ipapa-abandon na po naming ‘yung mga pozo negro na gamit ng mga tao. Kung ‘yun naman pong nabanggit naming isang option kanina na gagamitin naming ‘yung drainage system eh pagka po ganoong sistema nandoon pa rin po ‘yung septic tank, pagaganahin pa rin po natin. So lilinawin ko lang po ‘yung presentation kanina, wala po tayo actually na talagang sewer lines o sewer system sa komunidad dito sa Taguig, at ang karamihan sa Kamaynilaan. Ang meron lang po talaga ‘yung mga septic tank, siguro po ang mga pinapa tungkol nong mga tao ‘pag binanggit nila ‘yung sewer system ‘dun sa mga maliliit na meeting, siguro po ‘yung tinatawag na drainage… drainage system saka mga pozo negro.

Gloria dela Peña (community resident) : Ako po si Gloria dela Peña, Asst.

Zone leader. Eh… halimbawa po magpakolekta po kami ng mga waste namin, magkano naman ho kaya ang kailangan naming gastusin para sa pagpapakolekta?

Eva Matibag : Sa ngayon po di ba naka-septic pa po kayo, no po. Mayroon po

kaming programa na libreng pasipsip pagka nandoon po kayo sa schedule, pero kapag wala po kayo sa schedule ‘pag tumawag lang kayo sa hotline naming, tapos nag-request, kailangan pong magbayad ng mga P800 plus para ma-empty, para masipsip ‘yung laman ng pozo negro. So, yun po ‘yung sistema ngayon, pero… Opo, mas mahal po sa Malabanan, mga 2 plus ‘ata po 3plus, ‘yan po ‘yung sistema ngayon, pero ‘pag ginawa na po natin ‘yung proyekto kung saan magkakaroon na po tayo ng waste water treatment plant, ang magkakaroon lang po… meron lang ng kaunting karagdagan sa halaga ng tubig. So, ‘yon po ‘yung sinasabi namin kanina na sewer charges na 50% ng basic charge na pinag-uusapan po namin sa regulatory office kung ano ‘yong karapat-dapat lang na singilin gawa ng additional na serbisyo. So, kung meron po kayong mga request ng ‘desludging’, puwede po kayong tumawag sa hotline naming sa 1-627.

Mr. Soncuya : Dadagdagan ko ho ‘yung tanong ano ho? Saan ho malalaman

‘yung schedule, papaano po naming malalaman ‘yung lugar naming naka-schedule ho?

Eva Matibag : ‘Yun pong territory business manager po dito, si Taggy de Castro

katulong po siya sa nag-I schedule, kung aling area ang seserbisyuhan ng pagpapasipsip ng pozo negro. Tapos pagka tumawag po kayo sa 1-627, ibibigay po sa amin ‘yung inyong pangalan, address at telepono at babalikan po namin kayo kung kailan ‘yung schedule.

Lorna Corachea (community resident) : Good morning po sainyong lahat,

ako po si Mrs. Lorna Corachea, zone leader po sa Pag-asa Zone 1C. Napakaganda po ng proyekto na ito no, ifever na matuloy, hopefully matuloy.

Page 83: for Manila Third Sewerage Project Volume 3

Ah, itatanong ko kung ano ang period of time nang paggawa nito, gaano siya katagal, and then, di ba sabi ninyo finance nito’y World Bank, so habang ginagawa ho ito, ibig sabihin ang magpi-finance World Bank, so sinasabi ninyo ‘yung babayaran naming later na lang pag nag-ooperate na po. So, ‘don narin worth ng bayad, so ang ma-suggest, siguro maganda ‘yung sinasabi mo na hindi na kailangan hakut-hakutin pa ng mga vacuum trucks, siguro mas maganda na ‘yung sinasabi ninyo I-abandon na ‘yung mga ano… tapos ‘don na mismo gagawa ng mga small na dadaluyan ng mga… pero I’m sure kaya n’yo naman gawin siguro ‘yan dahil mga may malaki kayong budget, so mas maganda siguro, ako, mas prefer ako na hindi na hakut-hakutin kundi ‘yung talagang I-abandon na yung mga septic tank, dun na mismo mag-flow ‘yung mga dumi sa mismong maliliit na tubo na ilalagay ninyo, na hopefully mangyayari, at saka sana, ay kaya nga ho nandito sila kasi project, biruin mo World Bank ‘yung magpi-finance so ibig sabihin nila kayang-kaya nila for as long na susuportahan namin. So, itatanong ko lang ma’am, mas prefer ako ‘don sa mga tubo na iano na lang no, ang tanong ko ano ‘yung period of time na matatapos n’yo tong project na ‘to. Thank you very much.

Eva Matibag : Salamat po ma’am ha… para kang engineer ma’am po ha. Medyo

ganon nga po ‘yung iniisip naming idea, maglagay nga po ng sewer lines na tinatawag para nga I-kolect ‘yung mga dumi na galing sa bahay-bahay. Tapos, habang nag-uusap usap po tayo dito, tuloy naman ‘yung proseso para mapa-aprubahan namin ‘yung funding from The World Bank. So, hopefully po by the end of 2005, magkaroon na po ng funding, so that by 2006 maimplement na po ‘yung project. So, kapag nasimulan na ‘yon ng 2006, pagka…. within 2006, matatapos po ‘yung proyekto… kapag nasimulan ng maaga sa 2006.

Mr. Soncuya : ‘Don po sa likod, baka mayroong magtatanong. Community Resident : Ah, ako ulit ha… napakaganda ‘yung sinabi ni Sir, ang ano

ko lang baka naman kagaya ‘yung sinasabi ng NAWASA. Sabi sa amin, P12 yata or P10 pesos per cubic, ‘yung nagsingilan na, may SERA, may ganire, may ganire, tapos ngayon at that certain amount, naniningil na nang 28, 21 centavo, ay! P21, I think pesos per cubic. So, sana ipaliwanag n’yo sana kung magkano! Hindi ‘yung sasabihin n’yo dose (P12), tapos ‘pag tiningnan mo ‘yung bill mo, you will find out na hindi dose (P12), eh ang daming dekorasyon, ang daming ano-ano, tapos biktima din kami ng additional, na may SERA, may ganire, may VAT, I-include n’yo. Kasi, I have talked to… ‘yung prinayvetized na NAWASA no’, ang kanila eh I think mga 35 or 25. Sa 25 na iyan, wala ka nang iintindihan, sila pa ang mangongolekta sainyo. Itong sa amin ganon din, at tapos mayroon pang, kapag tumaas pa ang bill mo, mas tataas pa ang ano mo... Sana sa project na ito, I-straight natin ang salita, hindi ‘yung “ganyan lang kaliit yan” tapos darating, “kasi mayroong changes dahil tumaas ang dolyar, kailangan tumaas kami”. So ‘ika nga ‘straight’ ang ating ‘dealings’, kasi kami dito puro kami mahirap, we want to know actually how much at saka ‘yung talagang sigurado na, hindi ‘yung marami pang rekwisitos rekwisitos. Isa pa, I want to find out also

Page 84: for Manila Third Sewerage Project Volume 3

kung alin sa Signal Village, anong sona ang kasali na sa project. Eh kami, nandito kami mga Zone 4, kamukat-mukat mo nito di pala kami kasali. At kung hindi kami kasali ngayon, kailan kami maisasali? Kasi it’s a nice project, andon kami, we buy the idea that it’s a nice project. Ngayon, kung kami’y di kasali, kailan naman kami maisasali? Yun lang po, maraming salamat.

Eva Matibag : Ah, yun po, tama po kayo ma’am, at kaya nga po kami nandito

ngayon para transparent ang lahat, gusto po naming malaman ninyo bago kami magsimula at humataw dito sa project. Ah… kung mapapansin n’yo po bawat pagtataas ng tubig ng Manila Water tsaka ng Maynilad, mayroon po parating inilalabas sa pahayagan. Isa po, mayroon pa pong mga imbitasyon para sa mga public hearing para makuha ho ‘yung mga opinyon sa tuwing may magkakaroon ng increase sa tubig. So ganon din po ang mangyayari sa project na ito, so bago po talagang magsimula, babalik po kami sa inyo para sabihin kung itutuloy na ang proyekto, ganito ang charges na mangyayari. Ganito na ang napag-usapan namin sa regulatory office na I-implement na mga patakaran. At ‘don po sa tinatanong ni ma’am na kung kalian masasakop, kanina po mayroong ipinakitang mapa. ‘Yun po ‘yung initially masasakop ng proyekto pero ah, hindi pa po naming masabi kung kailian mae-expand ‘yung project kasi limited lang po ‘yung budget na na-allocate muna ng World Bank para sa proyektong ito. So, sa simula, inaral po kasi naming ‘yung mga drainage system sa lugar at ang pinaka typical, kumbaga technically na lagyan ay ito pong naka-delineate sa pulang linya. Later on po, maari naming dagdagan ito kapag makita naming okey ‘yung drainage system. ‘yun lang po ang di ko sure, ‘yung technical na limitasyon.

Engr. Suelto : Kung madaragdag ko lang po no, kung mapapansin n’yo, parang

kasi, ito po kasi ‘yung binigay ng consultant nila na ah kinompeyr ko po sa ano ‘no, sa mga street lot, ito yatang nasa itaas na ‘to, itong pula, itong boundary na ito, ito yata ‘yung 8th Street. So more or less ‘ yan ang boundary niya sa taas ‘no, tapos itong nasa ibaba ito C-5, ‘yan C-5.

Eva Matibag : Kung hindi man kayo kasama dito sa proyektong ito, maaring pong

covered kayo ng Taguig ponds, kung saan pupunta ‘yung mga waste water sa Taguig pond, sa Labasan, sa Tapayan, at saka Hagonoy na pond.

Community resident : Patanong ulit ha, hindi kami kasama d’yan sa

project, d’yan sa mga daloy-daloy, but can we avail of the use of vacuum trucks. Puwede naman ah… salamat, kasi mura mura ‘yan kaysa sa Malabanan.

Eva Matibag : ‘Yun pong ginagawa naming programa na libreng pasipsip ‘pag

nasa schedule eh pang buong area po ng Manila Water, so marami pong magbe-benefit dito sa project.

Luz de Leon (community resident) : Good morning po, ako po si Luz de Leon,

zone leader ng Zone 5 po, ah itatanong ko lang po, napakaganda po ng proyect na ito, kaya lang po ang baha po ba ay mai-eliminate din po? Kasi iyong lugar ‘dun

Page 85: for Manila Third Sewerage Project Volume 3

sa sona namin is pataas bago pababa, ‘yung nakita po naming imburnal ‘don na nanggagaling ng FTI, ‘ yun po ‘yung tubig na bumabaha ‘don sa sona namin pagka malakas na malakas ang ulan. Gusto ko lang itanong kung ‘yun po ba ay ma-eliminate din, ‘yung sobrang lakas ng bulusok ng tubig pagka mayroon na tayong treatment plant doon sa FTI?

Eva Matibag : Iyon pong issue na ni-raise n’yo ma’am, ‘ yun pong napag-usapan

na namin with World Bank at saka malaking isyung nire-raise ng tao ay ‘yung pagbabaha. Ah maari pong makatulong ‘yung project kung ang gagamitin naming option ay gagamitin namin ‘yung drainage system, kasi ‘pag ‘yon po ang ginamit namin ah… kasabay ‘non kailangan naming I-improve ‘yung drainage system. Pero kung ang pipiliin po naming option eh maglagay ng separate na sewer lines, hiwalay sa drainage system, kailangan makikipagtulungan po kami sainyo at sa local government para maisa-ayos naman ‘yung drainage system para ‘yung lalabas naman sa planta, ‘yun ang ibabalik sa planta.

Mr. Soncuya : Ah… meron pa pong tanong, d’yan sa likod baka meron pong

gustong magtanong. Wala na ho bang gustong magtanong. So, naintindihan na po nating lahat ito?

Eva Matibag : Baka meron pa po kayong mga suggestions o opinyon na dapat

naming malaman para maiayos po namin kung ano mga ang dapat na I-consider para ma-minimize ‘yung mga impacts nitong proyekto.

Mr. Soncuya : ‘Yun hong mga… may nagsabi po diyan hong mga sona ho nila

hindi pa included sa ah… initial plan ano ho, puwede ho ba at the side na gusto ho nilang makasama parang magsulat sila ng address ninyo na gusto nilang I-include ‘yung lugar nila sa.. or maka 4th ah, fourth page na’to.

Eva Matibag : Huwag po kayong mag-alala, ito pong meeting na ito, naka-record

po lahat, may minutes, may …naka-record po ‘yung mga pinag-uusapan at personally ko pong narinig na gusto ninyong isama ‘yung inyong zone ‘don sa project. Ah katulad po ng nasabi ko kanina, gusto ho naming lakihan ‘yung covered area ng proyekto. Nali-limit lang ho kami sa ngayon ng mga technical na konsiderasyon. So kapag nalunasan naming ‘yung mga technical na konsiderasyon, idadagdag po namin ‘yung inyong lugar.

Community resident : Mangyari po kasi, itong proposed site ay sa Signal Village,

nandoon sa GHQ. GHQ po ang 8th street na sinasabi po ninyo. Ngayon mayroon po tayong pinaka main plant po ba? Dito sa FTI? Kung halimbawa from GHQ dito na lang idaan sa main street ditto… papunta dito sa amin, para sa ganoon magkaroon din kami ng linya dito sa amin, sa aming nasasakupan. Kasi napakalayo ‘non eh, GHQ. Eh ito Zone 2 palang ito, dadaanan ninyo ang Zone 1, Zone 2, Zone 5, Zone 3, Zone 4, Zone 6, palabas na po roon sa FTI. Kasi ang FTI, sa gawi namin diyan ‘yung FTI eh.

Page 86: for Manila Third Sewerage Project Volume 3

Eva Matibag : I-evaluate po namin kung technically pupwede nga po ‘yung sina-

suggest n’yo po or kung ah… sa ngayon , kasama na po kayo ‘don sa mga covered area papunta ‘dun, ‘nung sa mga ponds na ginagawa ng DPWH.

Community resident : Palagay ko siguro dapat I-expand ‘nyong konti ‘yun eh.

Kasi katulad po… sa Zone 1 nga ‘yan pero dahil ang hangganan natin ay 8th street, at papunta rito sa Engineer’s St , actually ang bahay ko hindi sakop ‘yan, sa kabila ako ng 8th street, eh sa banda roon sa kabila, kaya sa palagay ko dapat I-expand ng konti ‘yan eh.

Eva Matibag : Noted, eh malaking note po ‘yung inyong comment na I-expand. Community resident : Ma’am, itatanong ko lang po, ‘yun po bang proposed site,

‘don po babagsak ‘yung tubig? Eva Matibag : ‘Dun po papupuntahin ‘yung dumi ng inyong waste water at iti-

treat, ang binabalak po naming ay underground para magamit pa ‘yung ibabaw. Community resident : So, ibig sabihin malapit po kami diyan eh baka puwede ng

idaan ‘yung area namin, ‘yung Pag-asa Zone 1C, baka puwede ng isali kami kasi di kami kasali di ho ba, at saka itanong ko pa, gaano ba…is this a lifetime project, kasi iwawala natin ang ating mga pozo negro, ito ba’y panghabangbuhay na proyekto talaga?

Eva Matibag : Ipapaliwanag ko po muna ‘yung sitwasyon sa FTI. Ang FTI po

mayroon pong mga sewer lines, wala na po silang septic tanks ‘yung bawat building ‘don kundi meron silang sewer lines, doon dumidiretso ‘yung dumi, tapos pumupunta sa in___ tank , mayroon po sila ngayong in____ tank , tapos katabi po ng in____ tank, doon po naming balak maggawa ng Septage Treatment Plant. So, ‘yun pong Septage Treatment Plant, lahat po o 50% ng mga makukuha mula po sa mga pozo negro sa aming mga concession area, doon po dadalhin. Doon po dadalhin ang laman ng mga trucks at iti-treat. So, in terms of coverage area, malaki po. Malaki po ‘yung maseserbisyuhan ng planta, kaya lang ibang sistema, hindi po dumadaloy sa linya ‘yung dumi kundi ita-truck papasok doon sa planta.

Community resident : Ah, yan ba ‘yung kokolektahin mula sa Pasig,

Mandaluyong at saka sa Marikina, kasama iyong… ilan kaya naman dito sa Taguig naman ang maseserbiyuhan?

Eva Matibag : Tuloy-tuloy po ‘yung programa namin na libreng pasipsip lalo na

kapag dumating ‘yung mga marami naming mga tankers na binibili, saka tatlo po kasi ‘yong gagawin naming Septage Treatment Plant yung magti-treat ng mga laman ng mga pozo negro. Isang pina-proposed sa FTI, isa sa may Quezon City, tapos isa ang kini-construct na somewhere in Antipolo. So, ‘yun pong tatlong

Page 87: for Manila Third Sewerage Project Volume 3

lugar na ‘yon ‘yung pagdadalhan ng septage. Katulad ng nasabi namin, lahat po ay dadaan sa proseso para maging malinis at ‘yung by-products po puwede pang gamitin, puwedeng maging soil conditioner o fertilizer tapos ‘yung tubig puwede pong ire-use for landscape irrigation or kung anumang nanaising paggamitan ‘nung… ng lugar na malapit sa pagtatayuan namin ng mga planta.

Community Resident : Ako ay isa sa mga konsehal dito, para mapag-aralan

ninyong mabuti. Ang area lang po ng Signal Village, 164 hectares, kaya sinabi ko ito para mai-plot ninyo sa inyong kuwan… sa inyong trabaho, 164 hectares ang Signal Village lang.

Eva Matibag : Ok sir, huwag po kayong mag-alala, naka-mapa po ‘yung buong

area natin. ‘Yun nga lang pong mga technical na konsiderasyon ‘yung maglilipat dun sa initial na coverage noong aming proyekto.

Community Resident : Magandang umaga po sainyo, Purok leader po ng

Pinagsama, itatanong ko lang po ‘dun sa sinasabi ninyong proyekto na tatamaan ho ang katabi ng covered court sa Phase 1. ‘Yun pong lugar na ‘yan eh tinatawag na Public Market. Anyway, meron tayong another usage, ‘yung gagawing treatment plant din na sinasabi ninyo po na underground, ‘yun bang upper place na ‘yon ay may gagawin o may pakikinabangan po ba? Nabanggit n’yo po na magiging puwedeng parking space. Puwede bang malaman kung ano pang ……

Eva Matibag : Mas makakamura po actually kung ang gagawin naming ay above

ground, pero dahil nga po gusto naming mapakinabangan ‘yung ibabaw kaya ang ginagamit underground na. Ah, sa mga susunod na araw, makikipag-coordinate na po kami sa local government para ayusin ‘yung mga plano tungkol sa lokasyon ng planta.

Mr. Soncuya : Meron pa ho? Last two questions … Community Resident : Kailangan magtanong po ‘yung nandoon sa likod ko po.

Pinatatanong, sabi ko may bayad yan. ‘Di ba ‘pag umandar may bayad yan ? Sabi ko may bayad, so malinaw may bayad. Ngayon ang tinatanong naman nila, kagaya na yan ng NAWASA may metro? So, by the house or by the family o proposed yon or what? Kasi ‘yon ang basis kung magkano. Kasi ‘yung isang bahay ko ako lang mag-isa, eh di dapat piso lang. Eh ‘yung kapitbahay ko labing-dalawa sila, beinte pesos sila, so ‘yun ang gusto nilang malaman.

Eva Matibag : Ah, ano naman po, di ba nasabi ko na ma’am naman kanina na

habang gumagamit kayo ng tubig, dumarami din ‘yung pino-produce na waste water. So ‘yung existing po na sistema ng charging ngayon sa mga areas, sa mga local na may sewer system, eh meron pong kung mapapansin n’yo ah ‘yung taripa ng tubig naming may mga naka-itemized ano po? So basic charge, SERA or CDA, ah magdadagdag po kami ng 50% ng sewer charge ‘don po sa mga areas na meron kaming sistema ngayon. Pero nare-realize po naming at nahihirapan nga

Page 88: for Manila Third Sewerage Project Volume 3

po kaming mag-implement ng radyet gawa ‘nung malaking intercept ng sewer charge. Kaya ngayon, pinag-aralan po naming sabay-sabay nitong pag-a apply nitong financing, pag-a apply ng technical tsaka social accessibility ng radyet. Kasabay po naming inaaral kung ano ‘yung dapat na charging pagdating sa ganitong project. So, depende po sa konsumo. Kasama po ‘yan sa policy na pinag-aaralan kung paano, kung paano maa-account ‘yung total amount ng waste water na mapo-produce.

Mr. Soncuya : Baka naman ho’yung other source of water n’yo nas mahal, so

baka hindi rin kayo makamura ‘dun. Kasi ah…baka poso… meron pa hong isang katanungan? Ah dalawa po pala ito.

Community resident : Taga-Pinagsama po ako, isang Purok leader, karampatan

lang pong tanong ‘don sa paglalagay ng treatment water sa area ng maraming bahay. Ito po ba ay hindi makaka-apekto? Ah kaparis po ‘don sa nakikita ko na mayroon ho silang water treatment na ‘pag napadaan ka, magkakaroon ka po ng amoy na nalalanghap. Ito po bay ay hindi nakaka-apekto?

Eva Matibag : Iyon pong sinasabi n’yo sir, isang risk na maaring mangyari kapag

hindi maganda ‘yong pagka-design ng planta, o ‘pag magkakaroon ng malfunction doon sa planta, pero pag dinesign po namin ‘yung planta, maglalagay po kami ng odor control facility para hindi maamoy.

Community resident : So, itatanong ko lang po kung ano… lahat po ba ng bahay

‘yung may koneksyon o kaya ‘yung walang koneksyon obligado bang magbayad sa ano… halimbawa ‘yung mga maliliit na squatter. Kumbaga marami po sa kanila eh walang septic tank, naobserbahan naman ‘yan, eh pano sila? ‘Pano ‘yung dumi nila na kami ang maapektuhan? ‘Yung halimbawa kahit ‘yung malaking bahay ‘yung septic tank nila inano lang sa drum, ‘pano ‘yun puwede silang ano rin?

Eva Matibag : Sa Pinagsama to ma’am? Sa ibang lugar? Meron din ho sa

Pinagsama. Meron po nga kasing nakikitang mga ganong sitwasyon ano po. Ah wala po s’ya dito sa component, sa regional component ng Manila Third. Pero ang susunod po naming gagawing proyekto, ‘yung pagta-target ‘don sa mga areas na walang septic tank o dumidiretso, mga flying saucer. So, sa totoo lang, pinag-iisipan pa lang ‘yung proyekto na para ‘don sa mga areas na nabanggit ni ma’am. Tapos ‘yun pong tinatanong n’yo kung required na kumolekt pagka nandyan na iyong sistema, ah basta po may connect na kayo sa tubig at nandyan naman po ‘yung sistema, ire-require po namin na kumolekta.

Mr. Soncuya : Salamat ho, ah mayroon pong mga natitirang katanungan pero

baka may iba ho sainyo na medyo gusto nang umuwi, baka magluluto. So, kung wala na hong katanungan, ah… in behalf ho doon sa team ho namin tsaka ho sa Manila Water, ay nagpapasalamat po kami at naka-attend po kayo at binigyan n’yo ho kami ng pagkakataon para mag-explain ‘don sa project. Ah,

Page 89: for Manila Third Sewerage Project Volume 3

makakarating din ho ‘yung mga request n’yo na I-expand ho ‘yung coverage noong project para ma-include po ang Zone 4, Zone 5 saka pa po ‘yung iba na hindi included. Maraming salamat ho.

(palakpakan) Project coverage – Many of the participants are questioning the coverage of the proposed project. They realized that this is a good project and wanted their own zones especially in Signal Village to be included in the coverage of the project. MWCI replied that the project coverage is limited because of financial and technical constraints. The topology of the area with its rolling hills will be costly at this stage if all the areas cited by participants will be included. This will involve a series of pumping stations that will pump the wastewater to the proposed sewerage treatment plant. Other areas in Taguig City may be covered by the Taguig, Labasan or Hagonoy facilities. Other areas not covered by this project will be considered in the future plans of the company. Alternative routes to the STP. – MWCI has two options to connect the households to the STP. The first option is to lay down its own independent sewerage line, which will connect all households in the coverage area. In this option, residents will be encouraged to abandon their septic tanks because the STP will process the wastewater more efficiently. The second option is to use the existing drainage system and intercept and treat the wastewater in the proposed STP. In this instance, residents are encouraged to still maintain their individual septic tanks. In this area, there is only the drainage system, which will be utilized by the proposed project. Some residents are in favor of the option of abandoning their septic tanks. It was pointed out that this would entail huge financial resources to undertake a separate sewer line. Septage Treatment plant –The septage treatment plant to cover Taguig will be located in the Food Terminal Inc, which will treat the sludge, vacuumed from individual septic tanks. Another proposed plant will be located in Quezon City. There is an on-going construction in Antipolo to build a septage treatment plant. The by-products of these spetage treatment plants will be used as soil conditioner for the lahar areas in Pampanga and Tarlac and the water possibly for irrigation.

Page 90: for Manila Third Sewerage Project Volume 3

Flooding -- The issue of flooding in some places will be mitigated because if the company choose the option to use the existing drainage system, part of the project will involve the improvement or rehabilitation of the existing drainage system. If the other option is chosen, the company will coordinate with the local government to improve the existing drainage system. Basis of payment – Payment of sewerage fees will be based on a certain percentage of the basic water charge. In the sewered areas of MWCI, the prevailing sewerage fee is fifty percent of the basic water charge. Presently, the company is still studying what percentage will be charge to the beneficiaries. One of the aims of this consultation is to elicit reactions and suggestions from stakeholders of the proposed project including the charging of sewerage fees. Two sources of water – The basis of sewerage fees is on the actual water consumption. If a household has two sources of water (deep well), sewerage fee will be based on the basic water charge levied by MWCI. Transparency in computation – It was suggested that transparency should be exercised in the computation of the sewerage fees. This public consultation is part of the transparency process. It was explained that before any charge may be levied on the residents, public hearings will be conducted after due notice to the public, by MWSS as the regulatory body in charge of water supply and sanitation. In the monthly statement of account, the breakdown of the various charges is enumerated in that document. Houses without septic plants – Houses without septic tanks are not included in the project but will be studied and may be included in the next project. If the sewerage system is in place already, MWCI will require the houses without septic tanks to connect to the system and will be charge correspondingly. Use of Septic tanks – MWCI emphasized that the residents will still use their septic tanks. The project involves the construction of interceptors and pumping stations to further treat the waste water that are being produced from the individual septic tanks. As part of their service, MWCI is conducting for free, desludging of individual septic tanks, provide that it is properly scheduled. Otherwise, the desludging will cost around 800 pesos, way below the charge of private contractors of around 2,500 pesos. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWCI. The total loan amount is more than 100 million dollars. MWCI will be responsible for the payment of the loan that will finance the Manila third Sewerage Project. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008.

Page 91: for Manila Third Sewerage Project Volume 3

Location of the treatment plant – A treatment plant is cheaper above ground but the proposed treatment plant will be located in an open space near existing basketball court in Signal Village owned by the National Housing Authority so that the above area may be used for other purposes. The needed area is between 700 to 1000 square meters. A barangay official asked if the area might be used as a public market after plant has been constructed. The use of the area should be coordinated with the local officials of Taguig. Odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. The participants expressed support for the project and requested that MWCI expand the project coverage to cover their other areas. The Barangay Chairman pledged his support and will assist in traffic management and other problems that may arise from project construction and operation.

Page 92: for Manila Third Sewerage Project Volume 3

PICTURES TAKEN DURING THE MEETING

Page 93: for Manila Third Sewerage Project Volume 3

Minutes of the Public Consultation Meeting with Barangay Officials and Residents of Barangays Signal Village and Western Bicutan including Pinagsama Phase 1, Pinagsama Phase 2-A and 2-B and AFP/PNP Phase 2 held on June 15 2004 from 9-11:30 AM at the Covered Court of Barangay Signal, Taguig City, Metro Manila Project coverage – Many of the participants are questioning the coverage of the proposed project. They realized that this is a good project and wanted their own zones especially in Signal Village to be included in the coverage of the project. MWCI replied that the project coverage is limited because of financial and technical constraints. The topology of the area with its rolling hills will be costly at this stage if all the areas cited by participants will be included. This will involve a series of pumping stations that will pump the wastewater to the proposed sewerage treatment plant. Other areas in Taguig City may be covered by the Taguig, Labasan or Hagonoy facilities. Other areas not covered by this project will be considered in the future plans of the company. Alternative routes to the STP. – MWCI has two options to connect the households to the STP. The first option is to lay down its own independent sewerage line, which will connect all households in the coverage area. In this option, residents will be encouraged to abandon their septic tanks because the STP will process the wastewater more efficiently. The second option is to use the existing drainage system and intercept and treat the wastewater in the proposed STP. In this instance, residents are encouraged to still maintain their individual septic tanks. In this area, there is only the drainage system, which will be utilized by the proposed project. Some residents are in favor of the option of abandoning their septic tanks. It was pointed out that this would entail huge financial resources to undertake a separate sewer line. Septage Treatment plant –The septage treatment plant to cover Taguig will be located in the Food Terminal Inc, which will treat the sludge, vacuumed from individual septic tanks. Another proposed plant will be located in Quezon City. There is an on-going construction in Antipolo to build a septage treatment plant. The by-products of these spetage treatment plants will be used as soil conditioner for the lahar areas in Pampanga and Tarlac and the water possibly for irrigation. Flooding -- The issue of flooding in some places will be mitigated because if the company choose the option to use the existing drainage system, part of the project will involve the improvement or rehabilitation of the existing drainage system. If the other option is chosen, the company will coordinate with the local government to improve the existing drainage system. Basis of payment – Payment of sewerage fees will be based on a certain percentage of the basic water charge. In the sewered areas of MWCI, the prevailing sewerage fee is fifty percent of the basic water charge. Presently, the company is still studying what percentage will be charge to the beneficiaries. One of the aims of this consultation is to elicit reactions and suggestions from stakeholders of the proposed project including the charging of sewerage fees. Two sources of water – The basis of sewerage fees is on the actual water consumption. If a household has two sources of water (deep well), sewerage fee will be based on the basic water charge levied by MWCI. Transparency in computation – It was suggested that transparency should be exercised in the computation of the sewerage fees. This public consultation is part of the transparency process. It was explained that before any charge may be levied on the residents, public hearings will be conducted after due notice to the public, by MWSS as the regulatory body in charge of water

Page 94: for Manila Third Sewerage Project Volume 3

supply and sanitation. In the monthly statement of account, the breakdown of the various charges is enumerated in that document. Houses without septic plants – Houses without septic tanks are not included in the project but will be studied and may be included in the next project. If the sewerage system is in place already, MWCI will require the houses without septic tanks to connect to the system and will be charge correspondingly. Use of Septic tanks – MWCI emphasized that the residents will still use their septic tanks. The project involves the construction of interceptors and pumping stations to further treat the waste water that are being produced from the individual septic tanks. As part of their service, MWCI is conducting for free, desludging of individual septic tanks, provide that it is properly scheduled. Otherwise, the desludging will cost around 800 pesos, way below the charge of private contractors of around 2,500 pesos. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWCI. The total loan amount is more than 100 million dollars. MWCI will be responsible for the payment of the loan that will finance the Manila third Sewerage Project. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. Location of the treatment plant – A treatment plant is cheaper above ground but the proposed treatment plant will be located in an open space near existing basketball court in Signal Village owned by the National Housing Authority so that the above area may be used for other purposes. The needed area is between 700 to 1000 square meters. A barangay official asked if the area might be used as a public market after plant has been constructed. The use of the area should be coordinated with the local officials of Taguig. Odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. The participants expressed support for the project and requested that MWCI expand the project coverage to cover their other areas. The Barangay Chairman pledged his support and will assist in traffic management and other problems that may arise from project construction and operation.

Page 95: for Manila Third Sewerage Project Volume 3

Barangay Hall Blue Ridge B, Quezon City Public Consultation Meeting with Barangay Officials and Residents of Barangay St. Ignatius, held on June 17, 2004 from 9:30 to 12 NN at the Barangay Hall Blue Ridge B, Quezon City, Metro Manila

Page 96: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with Barangay Officials and Residents of Barangay St. Ignatius, Blue Ridge A and B held on June 17, 2004 from 9:30 to 12 NN at the Barangay Hall Blue Ridge B, Quezon City, Metro Manila The consultation workshop aims to present to stakeholders the existing sewerage and sanitation conditions to arrive on a concensus at early stages of the project to avoid conflicts which can harm the implementation and success of the project. With these regard, it lead to the transparency of public and private actions, as these actions are monitored by the different stakeholders. It also built trust between the project proponent and the civil society, which lead to long-term collaborative relationship. Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc. (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Mr. Velasco, Senior Project Development Officer of MWCI presented the background and proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendees: Manila Water Company, Inc. Christopher Calamiong Senior Project Development Officer Ben Velasco Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Joy Tamayo Public Consultation Coordinator Wilvalin Deocadis Facilitator Jinelyn Marie Guazon Representative EMB-DENR Participants 23 out of 38 invitees attended the scoping session Mr. Soncuya : Magandang umaga po sainyong lahat, nandito ho kami… Ako ho si Dodoy Soncuya, ah consultant ho ng EDCOP at Lichel Technologies na gumagawa ho ng Environmental Impact Statement ho tungkol ho sa project ng Manila Waters na ang

Page 97: for Manila Third Sewerage Project Volume 3

pangalan ho ay Manila Third Sewerage Project. Ah gusto ko pong ipakilala sainyo ang aking mga kasama: si Mr. Anacleto Suelto ng LTI, si Bing sa LTI ho; galing sa Manila Waters, si Topet Calamiong ho, si Nelson Peñales, at si Ben Velasco. Ah meron din tayo ditong representative from EMB, Environmental Management Bureau ng DENR, Jinelyn Guazon. Ah, uunahan ko na ho, maraming salamat kay Kapitan Clemente ah para binigyan ho kami ng pagkakataon na maglunsad dito. Ah, I-explain ko lang ho yung proseso ng Environmental Impact Assessment ano… Yun hong Environmental Impact Assessment ay ito po yung ipinadadala sa EMB ng DENR ayon sa Department Administrative Order (DAO) 96-37. Narito ho yung proseso para ho magkaroon ho ng sapat na pag-aaral para sa lahat ng pino-proposed na project, at mabigyang pansin yung biological, physical at saka social impacts po ng isang proposed project. Ah eto hong konsultasyon na ito ay pangatlo sa labing-isang konsultasyon na ginagawa namin sa East Zone na sakop ng Manila Waters. At dito po sa parte ng Taguig, Quezon City, Marikina, iyong tatlong iyon. So natapos na po kami sa Signal Village. Tapos kahapon, kinonsulta po namin yung mga tao sa don sa Lake, don po sa ginagawang site sa Laguna de Bay na kasama po ang mga barangay ng Tipas Ibayo, Calzada, Wawa, Hagonoy. So bale ito ay mayroon ho kasing pino-proposed ang Manila Waters na ang lahat na tubig na nanggaling dito ho sa parte nyo ho simula St. Ignatius, Blueridge A tsaka dito sa B, tsaka ho yung parte ng Marikina, Olandes, Sinco Hermanos, Alta Vista, eto hong matataas na to ay gagawa po ng sewage treatment plant na located po dito sa bago po Camp Atienza. At kung yun sa Riverbanks po, ito po yung halos sa boundary ng Marikina at saka Quezon City. Kung mapapansin nyo po at magagawi po kayo doon, ito yung natambakan ho na portion, nandoon po yung mga kawayan. So lahat po ng tubig po dito, na nanggaling sa household ay dadalhin po doon, at iti-treat po yung tubig, bago ilabas sa Marikina River. Ah yun pong sludge na mage-generate ho diyan, mayroon hong pino-proposed na septage treatment plant sa dalawang lugar ho. Iyon hong isa ay nasa Taguig, sa FTI, proposal po nila. Tapos yung isa po sa may Batasan (Payatas) para po to cover itong Quezon City. Pagkatapos pong I-treat po yon, mayroon hong component itong project na to para dalhin yung treated sludge para gamitin na soil conditioner sa lahar areas, sa Pampanga, so ito ho yung parang sistema ng projects. So, lumalabas ho niyan, ito ho ay isang bahagi ng… yung ng component ng Manila Third Sewerage Project. Sisimulan ko lang po sa EIS, ang project proponent po dito ay Manila Waters, ang panggagalingan po ng funding ay loans to World Bank, so yun hong ah… lalabas na borrower ay yung MWSS na isang government-owned corporation na siya pong humaharap sa World Bank para makakuha ho tapos papasok po sa Manila Waters, yun ho ang panggagalingan ng funding na to. So ang proposal nga po, ang presentation po namin ay una ay I-explain ko nga ho; yung susunod sa akin magpi-present ho ng study; yung pangatlo hong component ho nito, ipi-present ho namin yung resulta ng environmental impact study. So ang unang proseso po niyan base sa project description, pumupunta ho sa communities, nagko-conduct po ng scoping workshops, focused group discussions at among don sa mga stakeholders, yung maapektuhan para magkaroon ho ng direksyon o focus dun sa kung ano ang mapapag-aralan. So bale, ayon ho don sa initial consultation ho namin, medyo meron na po kami ng probable effects, probable positive or negative effects ho. At yung effects don ho pino-focus yung study. So pagkatapos ho ng initial

Page 98: for Manila Third Sewerage Project Volume 3

consultations ho diyan sa scoping worskshops, pumupunta na ho ngayon sa baseline data collection. Dito nga ho binanggit ko na ho yung tatlong components: biological, physical at social. Ano ho ba ang epekto ng pino-proposed na project na ito sa biological? Makakasira ho ba ng halaman ito, nakakasira ho ba ng lupa to? Naaapektuhan ho ba ang mga hayop? Iyong sa pisikal naman, ito ho ba ay magdudulot ng trapik? Sa sosyal naman, ano naman ang epekto nito, ito ba’y makakaapekto sa tao? Mayroon bang matatanggal na mga bahay? Madi-dislocate ba mga kababayan natin, so ganoon ho ang pag-aaral. So pagkatapos ho ng data collection, pumupunta na ho sa analysis. Ano ho ba ang talagang impacts nito? So pagkatapos ho non nandito na ho tayo sa stage ng validation, bumabalik po kami doon sa mga communities na mga naapektuhan at pini-present po namin yung mga data collected at saka yung impact assessment. So andito ho kami sa stage na ito para maibahagi kung ano yung resulta. So pagkatapos po namin na matapos itong consultation na ito, ay ipa-finalize po namin ang report at isa-submit po namin sa EMB, sa Environmental Management Bureau. So, kung sa opinyon ng EMB ay kontrobersyal ang project o malaki ang maapektuhan nito, ay magko-conduct ho ng public hearing. Sila ho ang magko-conduct ng public hearings para malaman ho talaga kung papaano mare-resolve kung mayroon hong mga isyung hindi napagkasunduan. Tapos ho non ay didisisyunan na ho ng DENR kung approved o hindi approved ang project. At kung approved naman po, ito na iyong ini-isyuhan ng ECC (Environmental Compliance Certificate). So ito po bale ang proseso, andito ho tayo sa validation, so nandito ho tayo sa proseso para malaman ng Manila Waters kung tuloy o hindi tuloy yung project. So, ang susunod hong magpe-present ho ay yung representative ng Manila Waters para ho I-explain sainyo yung project. Ben Velasco : Magandang umaga po, ako po Ben Velasco, taga Manila Waters po, sa Wastewater Department, under Project Development Section. Ah ipi-present ko ho sainyo yung Manila Third Sewerage Project. So this is not just a project para dito sa komunidad ninyo, marami din ho kaming komunidad na seserbiyuhan dito ho sa Metro Manila. So, ito po yung papakita ko sainyo, kumbaga bibigyan ko ng background kung saan nanggagaling yung wastewater natin, tapos yun nga, yung kasalukuyang status natin dito sa Metro Manila, at ano iyong situation natin ngayon in regards with wastewater. So, yung existing facilities, di ba alam natin na naging private na ho ang MWSS at ang naging concession naman po dito ay yung Manila Water. Meron din po kaming na-take over na facilities dito sa Quezon City at sa Makati po. Ito po bale ay another World Bank funded na kasunod ng Manila Second Sewerage Project, kasi ito pong pino-proposed namin sainyo eh Manila Third, eh meron ho kaming on-going na Manila Second, at ipapakita ko rin sainyo yung mga project components ho non. And of course, ang pakay po namin ngayong araw na ito ay yung Manila Third Sewerage Project components po namin, state po namin and the issue that we have encountered and probably you might bring up issues regarding the project… Question: Sabi mo yung first and the second project, this will be the third eh, san ang first? Ben Velasco : Yung first project po? Ang first po ay yung sa Tondo areas. Tondo is actually hawak po ng MWSS before. Iyong second po actually ang rehabilitation ho ng

Page 99: for Manila Third Sewerage Project Volume 3

mga facilities na natake-over ng MWSS noong panahon ho nila. So, yung first sewerage project ay doon po sa Manila side, kasi may existing pong sewerage system doon sa Manila side, doon po yung una nila, tapos iyon pong 2nd and 3rd ipaliliwanag ko po sainyo... Question : Ano po yung article few weeks ago sa U.P., is that not one of your project? Ben Velasco : Ito po yung under sa Manila Second Sewergae Project, tapos ito yung on-going project, matatapos na po yung sa U.P. To continue po no, bigyan ko rin ng description, yung wastewater po usually ito yong ginagamit natin in any domestic activity na gumagamit ng tubig especially po yung paggamit ng kubeta. So kung mapapansin nyo po no, ano ba ang meron ang mga untreated wastewater natin? Ang nangyayari po kasi, meron tayong sinusunod na batas dito sa Metro Manila, dito sa bansa natin, pati na rin sa ibang bansa na mayroong environmental standards, meron pong tuntunin ang mga wastewater dito na dapat ganito lang kadami, kung hindi, kung mag-exceed yan, pollutant na siya, mas hazardous na siya and what kung maging risk na siya sa growth ng marine life? Now, hindi lang ito sa water body na tinatapunan natin ng wastewater, pati rin sa komunidad natin. Una, baka maging cause ito ng any water-borne diseases, and if we expand sa mga ganitong klaseng dumi ay maaring magdulot ng sakit, ng mga diarrhea, mga typhoid fever, ganyan ho. So ano bang alam nating technical na paggamit natin ng treatment sa wastewater? Di ba yon pong pozo negro, alam ko ho halos lahat ng bahay dito sa Blueridge at St. Ignatius, naka-septic tank po. Ngayon, ito pong septic tank, 89% ng dito ay nakatira ay gumagamit ng septic tank. Now ang nangyayari po kasi, meron nga pong treatment, pero ang treatment po talaga nito sa wastewater is within 25 to 40%, so what happens to the rest of it? Still, nandoon pa rin ang dumi. Kung mapapansin ninyo, yung lumalabas na tubig sa pozo negro ninyo, chances are meron pa ring untreated no. So para maging safe itong septic tank natin, at mai-maintain nga yong 25 to 40% nong pag-treat ng tubig, kailangan sinisipsip yan every 6 or 7 years. Pero ano nga pong magandang sistema ang dapat nating sundan? Ito yung sewerage system talaga which is a wastewater treatment plant. Ideal po ito kasi, kung mapapansin ninyo, ang pinaka base nito, ang mga bahay po na nakakonekta po sa isang tubo, na didiretso na po yung dumi ninyo sa isang treatment plant bago itapon po natin sa mga rivers natin, sa Manila Bay or sa mga creeks. Ang nangyayari po nito sa kasalukuyan, actually noong panahon bago ang Manila Second Sewerage Project, 5% or less than 5% dito sa Metro Manila ang mayroong ganitong sistema. Ang majority po niyan ay nandoon sa Makati, sa Makati Business District. Ito tingnan ninyo nga ho ang kalagayan natin sa Metro Manila. Isa po, nagkulang po na magkaroon ng mga plano pagdating dito sa wastewater, hindi po nagplano masyado ang Metro Manila dito. Kung mapapansin ninyo po, dito sa may Pasig River, merong kababayan nating nakatira doon at ang mga iba ay nagdi-diretso ng dumi sa ating mga ilog. Tapos, kung mapapansin ninyo rin, medyo may kasikipan na rin dito sa dami ng tao. So, kung maraming tao, maraming mage-generate na pollution. And what, meron din na ‘no proper sanitation facilities’ ang iba doon na masasabi natin na kahit pozo negro na mismo ay wala ito. So, didiretso na lang silang maglalabas ng dumi nila sa mga ilog natin. Ito ho yung 85% which are using septic tanks. Tapos, itong sewerage nasa 3

Page 100: for Manila Third Sewerage Project Volume 3

to 5%. Napapansin ninyo po, na medyo mas malaki pa ho ang di ho gumagamit ng anumang facilities para mag-treat ng wastewater. Now, may study po ang World Bank, na 70% ng pollution load sa Pasig River ay sa domestic waste. Yun pong industrial waste hindi po ganoon kadami ngayon. Well, for one reason naman, mas marami po kasing residential ang nagko-contribute sa pollution dito sa river natin. Ito napansin ninyo po sa mapa, ito po yung tinatanong ni Kap na first project naming, nang MWSS, yung Manila Central Sewerage System. Ang problema ho dito, hawak po yan ng Maynilad, hindi po namin hawak yon sa kasalukuyan, pero dito po yan sa area na ito. Tapos, noon pong na privatized, nadagdagan po ng isang sistema, iyong Dagat-dagatan System. Dito naman kasi iyon sa Manila side. Ang nakuha po namin sa Manila Water eh yung Magallanes ho na wastewater treatment plant. Dito po yun… nase-service po namin dito ang Forbes, Dasmariñas, Magallanes Village saka dito po sa commercial area sa Makati. Tapos meron ho kaming mga communal septic tanks dito sa may Proj.4, Proj. 6. Ngayon, ito ho, itong Manila Second Sewerage Project, ito ho kasing project na ito, under World Bank, mag e-end na ho ang aming loan diyan this year. And base on our studies, we need to provide more wastewater services sa tao kaya nagbanggit na rin kami sa World Bank ng Manila Third Sewerage Project. And now, yan na po… on-going na po yung consultation sa tao. Tapos, dumoble naman yung aming negotiations sa World Bank para don sa pera. Now, meron po kaming isang project na ginagawa, iyong Pasig River Rehabilitation Project. Dati po kasi, under ito sa Malacañang, sa Office of the President, nung nailipat sa office ng MWSS, this will put a septage treatment plant. Ano po yung septage treatment plant? Medyo iba ho ito sa wasterwater treatment plant. Kasi po ito, lahat ng nasisipsip namin sa mga pozo negro ng bawat bahay, dito po namin dadalhin for treatment. So, makakakuha din po kami ng 36 na vacuum tankers na pansipsip, additional ho, kasi ang existing lang ho namin ngayon mga pito, meron nga hong dumating this year ho na pito ulit. Pero sa dami po ng aming sine-serbisan, medyo kailangan pa namin nitong mga trucks na ito. Now, ito ho no, yung Manila Second Sewerage Project ho namin, meron ho kami diyang tinatawag na package sewer treatment plants, at medyo po kanina isa po doon, yung nasa U.P. Ang ginawa kasi namin sa UP, ang UP po kasi mayroon silang existing na linya ng sewer, ang problema ho hindi ho nila natayo yung treatment plant. So, ang proposal ho namin sa UP, kami na lang ang gagamit ng system, iti-take over namin yung mga linya, kami na rin ang gagawa ng mga treatment plant. So, kung nung huling Friday po nakapag-inaugurate po kami ng treatment plants sa U.P, expected din ho namin siyang tumakbo within a year. Sa UP meron po kaming 28 na treatment plant na nakakalat doon sa buong Metro Manila. Ang sini-serve po namin diyan ay yung mga government housing projects tulad po ng BLISS, alam ko yung sa tabi ng Pasig River yung Mandaluyong Bliss, sa likod ng SM City yung Pag-asa Bliss, and there’s also maliliit na subdivision na nakakalat din ho. Ang capacity ho nito, lahat lahat, pagka kinombayn ho namin, it will be 37,000 cu/m a day and will serve around 250 to 280,000 people. Ito hong sa Pasig River, meron ho kasing kasalukuyan, sa may Antipolo, na tatayuan namin ng planta. And base on our design para sa treatment plant, ganito ho magiging hitsura niya. So, lahat po nung facilities namin na sumisipsip ng pozo negro, didiretso na ho ng Antipolo para doon na ho iti-treat yung mga tubig din. Now, for Manila Third, ah base on Manila First and Manila Second, the same objective is to reduce pollution loading to our major rivers and waterways specially Pasig River and Marikina River. And base on this, nagko-conduct po under ng

Page 101: for Manila Third Sewerage Project Volume 3

Manila Third, yung sewerage and sanitation projects. Ang sewerage po, yun nga paggawa ng mga treatment plants. Tapos meron po kaming sanitation projects, yung sanitation po, meron po kaming mga komunidad, nakikita ko ho dito, wala man hong gaanong facilities, lalagyan po namin ng communal septic tanks. So, it is a sanitation project. So, this is under World Bank loan na will be available hopefully by the end of next year. And for that time, ah yung construction po namin will reach until 2008 hopefully. So ito ho yun no, yung isa ho naming system is Taguig, meron ho kami sa Taguig na malapit sa may Laguna Lake na area, ginagawa din po ng DPWH na parang retention ponds para ho di bahain yung mga tao doon. Nilalagyan nila ng parang dike para ma-strain yung flood. Pero sa amin namang proposal, meron naman pong available doon, might as well I-treat na rin namin yung tubig pagka magkaroon ng tapunan, magdala man ng tubig sa Laguna Lake, at least malinis-linis naman yung tubig. Yung pangalawa ho naming component na dito pupunta, ano pong sites to? Meron ho sa Makati, meron sa Pasig, meron sa Mandaluyong. All wastewater facilities should be adjacent to Pasig River. So, iko-connect nga lahat ng mga drainage and wastewater ng mga taong nakatira malapit sa Pasig River. Bago ho sila magtapon ng tubig ho diyan, iti-treat muna natin. Nandito ho yung Quezon City and Marikina Wastewater Treatment Plants, dito po kayo nakabahagi. Ang nakita po kasi namin dito, yung lupa sa tabi ng Camp Atienza diyan sa baybayin ng Marikina River. And we are eyeing po yung mga residents adjacent dito sa Marikina River, which is kayo po sa Blueridge, dito po sa St. Ignatius, sa Industrial Valley, dito po sa may Sitio Olandes, kasama din po sila sa mga seserbisyuhan namin. Tapos, ito pong sanitation prelude to middle income communities, meron po kaming nakita dito sa Pasig. Ang marami po kasi dito yung sa Manggahan floodway. Kung mapapansin nyo rin po kung mapadaan kayo, marami din pong kabahayan na doon nakatayo sa may floodway. So, balak po naming lagyan sila ng communal treatment para sa kanila. And aside po doon sa Pasig River na Septage Treatment Plant po namin, nagpadagdag po kami don sa component po namin ng dalawang treatment plant para sa Septage. Ang site po natin ay dito sa Antipolo po no, medyo don po siya sa west side. Ang gusto po naming lagyan ng serbisyo para mas efficient po kami, sa may Quezon City po sa bandang Payatas. Meron din po kami sa South, sa may bandang Taguig. So, ang pinaka-konsepto po naming gawin para for Manila Third is to combine na yung for treatment na pong combined storm at saka sewer. So, ang mangyayari po dito, ito po yung components po namin no, kasama din po kayo dito. Ang pinaka-ideya po naming dito eh, iintercept po namin lahat ng mga dumi ng drainage papunta sa Marikina River, papunta sa treatment plant, tapos doon na ho ito iti-treat. So, nandiyan pa rin yung mga septic tanks ninyo pero all the wastewater, didiretso na po don sa treatment plants. Tapos meron din ho kaming treatment plants sa Quezon City, tulad ng nabanggit natin ano ho, mga na-take over namin. Yung iba po doon, ina-update na naming para sa treatment plant. Ito pong binabanggit ko mga ho, yong treatment of septage sa mga STPs, isa pong site naming sa FTI, ay masi-serve nga po diyan sa Makati, nandiyan po sa mga may Taguig areas. Malamang po yung seserban nyong area eh mahahati po dito sa Antipolo saka dito sa Quezon City. So, ito po no, yung ise-serve po naming mga communities dito sa Manila Third Sewerage Project, ah may mga floodway, yung Pinagsama Village dito sa may Taguig po yan no. Tapos yung Anak Pawis, Exodus, dito po yan sa may Pasig po.

Page 102: for Manila Third Sewerage Project Volume 3

Question: Will all of them be connected to the Camp Atienza plant? Ben Velasco: Hindi po, meron pong separate, kasama po dito sa Camp Atienza area na treatment plant Blueridge A & B. Mamaya po, ipapakita ko sainyo… Question : Are we assuming that a plant will be located in Camp Atienza? Ben Velasco : Ay hindi po sir sa Camp Atienza. Sa may tabi po sa may Marikina side po. Question : Sa tabi ng ilog? Ben Velasco : So, ito po for example yung kalsada no, papunta tayo ng riverbanks, ditto sa right side… side ng river. Question : Magkano sabi ninyo inuutang ninyo sa World Bank? Ben Velasco : Well, base ho dun, kasi nong nag-present… nung ginawa namin yung detailed engineering designs, pumasok po ang World Bank to say na “ uy, total naman maglalagay kayo ng facilities diyan, might as well dagdagan ninyo na yung inyong coverage.” So, ang initial po naming loan ay $650 M loan, pero base don sa kanilang proposal sa mga gagawin naming iba, pina-expand po nila, naging mga over $100M pa po yung mga nakikita nating gastos doon… Question: How many years to pay yan? Ben Velasco : Ah so far ho dito, di ko masyadong kabisado, pero sir it’s about ten (10) to fifteen (15) years, 20 years to date… Question : At what interest, graduated ba o fix? Bem Velasco : Eh hindi ko po kabisado… Comment/ Question : Kasi ang feeling namin, itong Manila Third Sewerage Project, parang your just letting us know that the government intends to borrow this much, which will be chanelled through you that you say will benefit us. But later on that will be charged also to us. I’m pretty sure naman kasama yan sa aming biling. Ben Velasco : Actually po yes, kaya idi-discuss ko sainyo yan mamaya. Comment/ Question: That’s the bottomline eh (giggles). So we just want to know how many barangays are affected ng work na sinasabi ninyo kanina… Ben Velasco : Mamaya po nalang idi-discuss ko po…. Comment/ Question : I’m sure you’re also going to discuss the timetable.

Page 103: for Manila Third Sewerage Project Volume 3

Ben Velasco : Yes, we are eyeing nga po, its really going to be between 2005, 2006 to 2008… Question : So it will take two years to finish it? Ben Velasco : For the whole component, so base po dito sa Quezon City/ Marikina Treatment, baka almost a year lang or less than two years yung construction. So ito nalang yung idi-discuss ko muna. Ang nagiging issue po namin sa pagko-conceptualize ng Manila Third, yun hong availability ho ng lupa. Ang nangyari po kasi dahil congested na dito sa Metro Manila, its hard to for us to find yung tamang lugar para ho lagyan ng treatment facilities. Marami ho diyan, pero maliit-liit lang ho na parcel. Ang nangyari po, with the help din po ng local government, may mga na-eye din po kami na lupa na puwede naming gamitin for treatment plant. And aside po doon, yung cost po para magtayo. Of course you are concerned with the cost po namin. Ang nangyari po kasi, we decided to confine sewer flow, well in a way to minimize the cost. But for us din naman ho para di ma-burden sa tao kung maglalagay kami ng sewer lines to all connecting to the houses. It will cost everybody a lot. So, we tried in our way to minimize whatever cost we’ll have for Manila Third Sewerage Project. And in environmental impact, positively we’ll be helding our waterways, and sana, our communities not to be exposed sa wastewater. And probably, the environmental impact na negative as nabanggit dito, siguro yung baka may mga natamaan pa kami diyan sa mga residente who are staying probably doon sa land sa side ng Marikina river. And another po yung sa social impacts, your concerns. Ah there may be concerns, technically or kung anuman, financially ang maibanggit ninyo sa amin. So, dito po kasi no, sa Manila Third, and the other previous projects namin, we wanted to go to the communities and expressed to them that gagawin namin itong facilities na ito. Ifever the plant, hindi ho pumasa yon sa national laws and standards ng DENR, kami po ang mananagot. Yan ho ang aming proposed sa tao. Kami ho ang hahabulin ng DENR, kami rin ang hahabulin ng MMDA, lahat po ng mga pozo negro nyo riyan, remember yung mga linya po riyan o sewer lines po, magkakaroon ng bara o magkaproblema, o kailangan linisin, kami na pong lahat bahala diyan. Ang ano lang po namin lang kasi, under po sa sanitation laws ng MWSS, everybody who is connected to a sewer facility will be paying for a sewer charge. So ang meron po kami diyan, galing don sa MWSS, namana po namin is paying the 50% sewer charge from your basic charge of your water consumption. That will enter for all cost of maintenance po ng facility, which is mostly kuryente, the manpower, the equipment that we’ll be needing. So, dun po papasok yung 50%. But in truth, ah actually hindi po mako-cover ng 50% yung cost ng buong combinations; but we are forced as Manila Water and probably Maynilad, kaya kailangan po naming magtayo ng ganitong facility. But, meron ho kaming targets. Pagka nanalo po ang private dun sa MWSS, mayroon pong susundin na schedule na kailangan ang compliance namin. Eh kasi po, in terms of water, we’re very much complying. But now, we are on our way to comply with wastewater with sewerage. So ngayon, naka-tie po kami dun sa MWSS, na kailangan din ho naming makagawa ng mga services na ito for our concessionary.

Page 104: for Manila Third Sewerage Project Volume 3

So, ito po na water pollutant due to this water, madalas po nangyayri yung mga cases ng diarrhea, mga water contaminations, nagkakasakit… If you heard about the situation in Tondo in Manila, yung nagkaroon ng outbreak ng ano… We are trying to avoid that for the communities, sana naman kapag nagawa naming tong proyekto na ito eh mabawas-bawasan yung mga ganitong sitwasyon sa atin… Question : What outbreak you are referring to? Ben Velasco : Yung tungkol sa Tondo about few months ago. Tolerant maybe, hundred people yata got affected. This is in Tondo area, this is under Maynilad. Nagkaroon ng contamination, I think dun sa water supply. So, meron pong naapektuhan na isang barangay dito po. So we ask naman, yun nga ho to give them the initiative regarding this Manila Third. We wanted to address din naman na hindi ito mangyayari. And Manila Third will help us to expand the sanitation condition. As I mentioned, yung mga concerns and target namin with MWSS. Kasi ho, base ho dun sa mga rulings namin, pagka di kami sumunod sa mga concession targets namin eh baka hindi ho kami… katulad ng Maynilad, they are having problems with MWSS. Luckily and fortunately, hindi naman ho kami nagkakaroon ng ganitong problema with MWSS. And ito po, education and policy issues is again a challenge. This is one of them because hindi naman lahat-lahat ng kababayan natin ay naiintindihan ang importansya ng paglilinis ho ng dumi ng tubig natin. Kasi naman po ano, gusto rin nating magawa din, napansin po natin ang Pasig, napabayaan po natin yan for about 50 years. Ayan po ang nangyari ngayon. Ang problema po natin, kapag pinabayaan po natin yan, baka po mas mahirap buhayin o kaya hindi na ho natin malinis yung mga waterways natin. Might as well address the concerns as soon as we can. Kung meron po tayong tanong ho sana… mamaya magkakaroon po tayo ng maganda-gandang discussion ho sana about it. Kung meron ho kayong concerns… Question : Wala ba kayong projects aside from this one na iha-harness ninyo ang salt water ng sea, para ma-convert into potable water para there is enough water for Metro Manila. Kasi, there was a move during the early stage ng time of Senator Honasan, meron yatang foreign funding wanted to use that system, pero because of the lobbying na sistema ng ano natin, hindi natuloy ito. Ben Velasco : Well, in terms of water supply, ah ina-eye po namin actually ay salt water, kasi medyo malaki po ang sea. Pero, meron po kaming initially ginagawang study to take water from Laguna Lake to treat people dito sa may Rizal area. Sa kasalukuyan po diyan, meron po diyan sa Rizal area na nangangailangan po ng tubig. And so far, meron tayong binibigyan, nanggaling pa rin sa supply natin sa Metro Manila. Might as well, kami ho, gumagawa ho kami ng study baka yong Laguna Lake can supply to the Rizal areas… Question: So, if the what your treating coming from us, so you’re trying to divide it into something that could turn over into a fertilizer, the other pwede ring I-recycle back to the people.

Page 105: for Manila Third Sewerage Project Volume 3

Ben Velasco: Maam, ito po kunwari no, if for example dito po sa planta po dito sa Quezon City, we have two products ho iyon na nage-generate. One po is the treated water, isa po yung sludge, yung natanggal po nating dumi. But yung treated water wag po nating inumin. So, sa amin, sinunsundan lang namin yung DENR Effluent Standards. But there is a different standards po for drinking water. So, ang suggestion po namin sa mga ginawa po naming treatment like po sa UP, ang proposal po ng UP sa amin is to treat back the water, then the treated water back to the lagoon. Di ba may lagoon sa gitna. Dati po kasi, yung effluent ng septic tank, pumupunta sa lagoon eh, siguro yung mga taga-UP doon nagsasabi na mabaho dun sa gitna. Talaga dahil galing pozo negro yon. Ngayon, ang gusto ng UP, yung treated water namin dalhin na sa lagoon. So, at least malinis na don. Sa amin lang po, ang proposal namin sa ibang residents is they can use it for irrigation, sa mga sunog, etc. Question : Yung sinsabi mong sa lagoon, kasi meron kami dito. What can we get from it? Ben Velasco: Exposure to untreated wastewater. Exposure to it… there may be chances kung mahina yung immune system, baka ho magkasakit kayo like mga cholera, typhoid fever. Yes, these are waterborne diseases. Question : Yes, meron ho kasi kaming open canal ano ho that comes from Area A and goes down here, goes down sa lagoon. Tapos, may pipe kami na papalabas. Sir, whose jurisdiction is that? Ben Velasco : Well, ang mangyayari po, hindi naman sa hindi safe, but we are avoiding these cases. Ang balak po kasi namin is to maintain your area dito rin po sa loob… Question : But what I’m trying to say, who do we turn to? Who will going to provide the pipe going out? Ben Velasco : Pipe closure po… and I’m not sure po when it comes to private subdivisions. Kasi don po sa mga open areas, its really DPWH. Question : Manila Water na kasi cover ang mga roads natin sa government, so part of that Manila Water also, concern din nyo yon…. Ben Velasco : Well actually po, sa amin po at present we are not handling drainage, this is just part po sa aming pino-propose project in the future, which is the Manila Third to combine. So, eventually kami na rin po ang magme-maintain rin po niyan, with your help po sana na pagdating dito sa loob… Comment : Kasi wastewater din yan eh… actually ang problema ngayon eh… Ben Velasco : Yun po kasi, napansin ninyo kasi na its not really na-disflow kasi dry season. So majority po ng flow diyan ang level ng tubig is tag-ulan. But in the case like

Page 106: for Manila Third Sewerage Project Volume 3

in the Tondo area, mayroon talaga doong mga creek na pang wastewater nila, hindi pantubig-ulan. So medyo concentrated ang kanilang waste. Question : Saan dinadala yung sludge? Ben Velasco : Yung sludge naman sir, at present what we’re doing now, dinadala naming sa lahar, sa Pampanga and Tarlac, and ah may mga on-going studies kami diyan regarding sugar-cane planting. Now, pagdating po sa planta, if in case may latak po tayo, ang mangyayari mag ge-generate po yan ng parang lupa , soil. So in the case in Magallanes, may mga homeowners po diyan na nakikihakot, whether ornamental plants or they are planting. So with that they get, but malaki yung production namin so minsan nagbibigay din kami sa mga provinces sa North for their agricultural use. So, at least kami we provide for them. So, kung humingi man sila, binibigay namin. Question : Manila Water… what is in there, in this project that you are interested? Ben Velasco : Well, sa amin naman po no, ang pakay po namin ngayon is to inform you, there will be a project. Like kung meron kayong concern, like for example yung mga ganitong concerns ninyo… Comment: No, but I’m talking of either when the system will be established, will you be collecting…? Or… Ben Velasco : Yun po, yung nabanggit ko nga pong 50% sewer charge. Question: So, why should it be… so it means if your water bill is something like P800 a month… Kasi kung sewer line to a sewer line, that will be different di ba dahil hindi mo na kailangan ng pozo negro eh. Pero lahat kami may pozo negro kami and we will be debit P100 more, average di ba mga P300 ang bill natin or more or less… Comment: Have you notice the bill, meron kasi silang tsina-charge sa atin na septic tank collection, others do not know that… pero is I think its I% that’s why they are doing services every ten years to collect. Actually, they tell us free pero sa totoo lang we have been paying for that a long long time ago. Comment: How much? Comment : I think 1% of the collectible… Comment: Yah, but they are saying they are going to charge us 50%… Comment: Another pa yan , another pa yan, and that’s no joke di ba… Comment: Itong paglilinis nila ng pozo negro, lets say every 8 years they do that, they have been charging us 1%, others do not know that yet… So, it has been… parang Meralco yan eh na katakot-takot na makikita. So ito naman, they want to put up a treatment plant, a big one, so we are going to pay. Dapat they should give us a factor, how much more or less are we going to pay? Is it gradual every 5 years. Kasi, it is a loan, maski 100M yan nakapasa sa atin yan. Yan ang tanong ko kanina, ilang barangay ang involved diyan. Kasi ang iniisip ko kung 100M lang naman ang kukunin nila, they might

Page 107: for Manila Third Sewerage Project Volume 3

as well also produce not only for treatment but harness more water for us para di tayo nagkaka-problema. They’re killing two birds at the same time, pero… Comment: But, what I’m concerned about ma’am is, if we don’t have any sewage line, why should we pay a sewage fee? Wala namang sewage line eh… Comment: Hindi, ang ano kasi nila sir, eventually mapupuno yung ating mga pozo negro, inaalis nila yon but they have to also… Ben Velasco : Clarifications lang ma’am actually 10% po yun, hindi 1%… Comment: Ah, 10%.. Oh my golly 10% pa pala. Oh I should be aware of that… Ben Velasco : Actually, meron ho kasi kaming representative na kasamahan ni Nelson that are scheduling works, ginagawa po dito po. Kasi po ang under kay Nelson Peñales is Cubao area. So, on-going po meron kaming ginagawang iba, so if you want a schedule, probably you can request to…Maganda po sana kasi kung maibibigay ninyo… Comment/ Question: So, hijo, kaya you are holding this workshop for us, since you are going to be a partner of MWSS dahi itsa-channel sainyo yon, you’re just letting us know na 50% of our… humihingi din kayo ng tulong sa community na bayaran pa? Ben Velasco : Actually, ang mangyayari po kasi, you will be paying po to Manila Water. Ang magiging cost sa mga residents will be the sewer charge, that’s it. Comment: Can we have a fixed rate or give us a sample para bago naman ma-release yung loan, may idea na kami before the hearing… bracket man lang, for example like 500, bago mag-hearing man lang, alam natin. Kasi ilang years na bubunutin namin yan, kaya kung wala na kami, at least yung mga children namin, grandchildren namin, at least alam nila. Kaya nga sinabi ko 100M, dollars yon no, kung treatment lang naman, and disposition is to convert it into fertilizer, sabi ko you might as well look for ways and means na mag-produce din ng clean water for us out of that 100M, kasi at least parating ninyo sa gobyerno, kasi ila-lobby yan, eh kung puro sa dumi lang at maging fertilizer, tapos nagkaka-problema kami ni Kapitan, walang tubig, tinatawagan kami na walang tubig, hindi balance yung inuutang ninyo. Kung uutang man kayo, lubus-lubusin na ninyo… Ben Velasco: Actually po ma’am, this law is under the wastewater department, pagdating sa water supply, we have another department doing it. So, hindi talaga ho papasok dito sa … Comment: Pero siyempre coordination… This company is supplying the water and maintaining and servicing, you might as well do that also. Hindi ninyo naman puwedeng ipasa lang sa iba kasi may kontrata kayo with the government eh. And since it’s a mass of loan, gusto naman naming kumpleto yung serbisyo dahil we want to know how much yung ipapasa sa amin…

Page 108: for Manila Third Sewerage Project Volume 3

Comment: Actually, isa pang puwede ninyong gawing project dito sa amin, kasi very hilly ang mga lugar namin eh specially dito sa Blueridge, is how the water can reach to the top, mga high levels of the community… Ben Velasco: Sayang umalis na si Nelson… Comment: Kaya umalis na yon, kasi alam niya maraming problema. Walang tubig ano eh na higher, kahit St. Ignatius. Comment: Alam ninyo bakit nangyayari, you know our pipes are so… you cannot put pressure on the pipe, parang saasabog eh. The only way is to change the pipe which I think is what they are doing little by little. Comment: Napansin ko yung line ng ano…nung nagpagawa kami ng bahay dun sa min. Yung pipe ng water, halos katabi lang ng pipe ng sewerage. Yun ang cholera! Nako-contaminate. Comment/ Question: Hindi mo sinagot yung question niya kanina, ano ang direct benefit naming dito sa Blueridge since meron kang diniscuss kanina, aside from the general environmental benefits for everybody. Kami dito sa Blueridge and St. Ignatius, what is the direct benefit that we will get? Comment: Bakit kami magbabayad ng 400 a month or 500 a month, eh at the ring na may increase with the water charges, maybe pagkatapos niyan eh baka P2,000 na isang buwan ang tubig natin eh di ba? Dati dati P80 lang ako sa MWSS, ba ngayon eh P900, P1,000 ay eh baka pagdating ng 2005 niyan eh baka P2,000 na; P1,000 babayaran ko sa sewer na wala namang sewer line di ba… Ben Velasco : Well, para lang po maano ko yung concern nyo po… I can see your point that there will be a directed fee but there will be a direct benefit for the community. Kasi anuman ang dini-discharge nating wastewater, Manila Water is assuring na pagdating sa river, may masusundan na yang standards eh. At present, we assure you hindi pasok sa standards yung nadi-discharge. Well, that’s one question, but the benefit for the environment… Question: Is everybody will be charged for that ano… I mean, not just our barangays here but yung lahat ng sineserbis ng MWSS? Ben Velasco : Yun pong lahat ng sineserbis po nitong facilities, yan po yung usual naming ano… Question : Does that also include Manila? Ben Velasco : Manila meron na po sila. Actually meron na silang existing na sewerage system. Well, yun pong ginagawa naming mga project sa mga base, once nasa planning

Page 109: for Manila Third Sewerage Project Volume 3

and operation na, we will charge the 50%. Magallanes Commercial Business District, they are paying the 50% because they already have the facilities. Kayo ho, dahil walang facility dito, di kayo nagbabayad. Comment: Pero ilan lang naman kami sabi mo, Blueridge A & B, St. Ignatius… Ben Velasco : St. Ignatius, yung mga riverbanks po naming projects, yung sa Pasig, yung Taguig areas. All of these will fall under the Manila Third… Question : Statistically how many houses, may one million? Ben Velasco: Wala naman po siguro… Question: Yun bang White Plains is part of that project? Ben Velasco: I think portion lang. Question: Ang gusto kasi naming makita, yung medyo concrete na project, meron ba kayong plano na ayusin tong mga linyang to, at itong linyang ito eh dire-diretso sa… Ben Velasco : Ngayon ho kasi ginagawa pa lang yung contingency. But if you want to see, we could show it to you pagka nagawa na po. Question: Ilan bang percentage toxicity yung effluent? Ben Velasco: Hindi naman ho siya talagang toxic. Question: But ano nga ang percentage? Ben Velasco: Well, depende po yun kung ano ang coliform that causes the sickness, yung coliform po talaga galing sa tubig na nasa dumi ng tao. Mr. Soncuya: Yun hong results, ipi-present ho namin sainyo. Ito po yung in terms of BOD, saka yung coliforms na kinuhanan ho ng water samples ho dito, kasama ho dun sa presentation on sludge… Comment: No, but I think 50% of your water charge is too much for us to bear. Malabo iyon, mataas yon masyado. Unang-una ang aming discharge, di bale yung mga planta diyan na walang water treatment plant, na dini-discharge lang nila yung mga waste or yung mga squatter along the river. Pagka-flush nila tuloy-tuloy sa river yung kanilang waste no. Meron kami ditong poso negro at ita-tap ninyo lang yung aming exit pipe diyan sa planta nyo, and you expect to charge us 50% percent of our water bill, I think that’s excessive. Why? This is a basic responsibility of government, so this is excessive additional taxation ang mangyayari ron eh, lahat ng tao gagamit ng tubig eh di ba?

Page 110: for Manila Third Sewerage Project Volume 3

Engr. Suelto : Kaya nga po, ito nga po iyong pinaka main purpose nga ng discussion natin is to come up with the issues you’ll bring out. Ito naman ho is really documented and this will be submitted to MWCI as consultants, kami yon. So, kailangan pag-aralan namin kung paano namin ma-address yung issues. So, ito po yung purpose po nito. So let’s say, they’ll charge 50% , ayaw ninyong pumayag, so dapat alamin din po namin yon. Comment: Yung charge ninyo sa amin, for that kind of a facility, hindi ko lang mai- 1+1 equals two eh, hindi eh. Parang ganon eh… Comment: At saka di ba dapat, DENR ang mas concerned dito, baka naman puwede yung ibang cost eh sa kanila ipasa hindi sa amin. Ben Velasco: Based on our existing facilities, the 15% collection namin sa mga customers namin, does not even come close to what we pay for our operation and expense ng mga facilities. Comment: Kaya nga mamaya magbigay kayo ng sample supposed to be, ano ang ini-expect namin sa 100M na inuutang ninyo… Ben Velasco: Ang sinasabi ko ma’am eh yung ano, like a treatment plant needs electricity, it needs equipment, it needs maintenance. So, monthly meron po kaming mga operating costs and monthly of course we get bills from the community na may 50%. The 50% itself compare nyo po yung total po non plus yung expenses for the facilities, kulang pa po yung nage-generate na 50%. Question: How much are you expecting sa aming area na ito na cost to operate? Ben Velasco: Well, nasa study din po namin. Question: May projected studies, ipi-present ba rin yan. Ben Velasco : We’ll try to get hold of that copy para sa atin. Pero, I’m just speaking in base ho doon sa existing facilities ho namin. Dito po sa amin, parang ganoon po talaga eh, it’s a rate passed on by MWSS to us eh. Wala rin kaming maaano don eh. So, because of your concerns, we can raise it up naman again to MWSS. Question: Hindi ba puwedeng grant ang kunin mo instead of a loan? Ben Velasco: Hindi ma’am actually, loan man yan or grant, its still a 50% charge to the people. Question : Ito bang ibang water treatment plant, is it income generating? Ben Velasco: Dapat lang po.

Page 111: for Manila Third Sewerage Project Volume 3

Comment: … that you can convert wastewater into potable water? Yun ang pagkaka-alam namin no… Ben Velasco : Ang sa amin nga po, yun nga yung effluent ng treatment plant, imbes na gawing… not for drinking water but if the community that is being served by the treatment plant wants water for irrigation, they could get from there. If they want biosolids, then… Question: Do we have a secondary pipe system for that? Ben Velasco : Opo, or if not ang ginagawa po namin existingly, meron kami sa mga communities na malaking tank where nandoon na po yung water na puwedeng gamitin. Question: Kagaya for example yung bang other effluent na nadi-discharge, nakakamatay ba ng isda yon? Ben Velasco : Di po… ah yung ngayon po? Opo. Question: Hindi, yung effluent galing pozo negro, hindi yung direktang waste galing sa mga planta planta diyan, iyon ang nakakamatay or if you desludge your waste directly into the river. Pero kung dumadaan sa pozo negro at lumalabas siya sa Pasig River, nakakamatay ba ng isda? Ben Velasco : Ganito po yan no, merong component ang wastewater na tinatawag nating biochemical oxygen demand which is the BOD. Comment: … bacteria yan, pag lumalabas hindi na toxic? The toxic barres the chemicals which comes from the plants … but not the effluents Ben Velasco : …hindi lang naman po, meron din po sa atin, kasi kung malakas ang biochemical oxygen demand ng effluent ninyo, this is the one restricting kasi the oxygen sa mga ano eh. Sila, kumbaga yung mga dumi na yon, nangangailangan sila ng oxygen . Now if kung yung dumi na ito malaki yung concentration niya, to the point malaki gusto niya ng malaking oxygen, aagawan niya ng oxygen ang marine life. Comment: Alam mo, my question is very very simple, yun bang effluent nakakamatay ba ng isda? Ben Velasco: Yes. Quantification yan… Question: Nakakamatay? Ba’t diyan sa pond naming diretso ang effluent, natatamaan ang isda. But ang tinatanong ko saiyo ang percentage ng toxicity ng effluent, hindi ninyo masagot eh… Ben Velasco : Depende ho kasi yan sa effluent standards ng septic tanks nyo eh. Question : So yung dumi niya, iba sa percentage ng dumi ko?

Page 112: for Manila Third Sewerage Project Volume 3

Ben Velasco : Probably, probably… Question/ Comment: Ang major focus ninyo is to put a treatment plant to accommodate the barangays to these areas. Lahat ng dumi na lumalabas papunta doon sa pinakamalaking pozo negro para doon iti-treat. Parang isang major pozo negro ang gagawin ninyo, tama? So, kung yung mga nalinis namin sa pozo negro namin, may dumi pang lumalabas, nililinis pa ninyo ng konti, pati yung lumabas iyon ang iti-treat ninyo. So, iyon ang pinaka main line ninyo. And the issues we’re talking around is that idea, or the project that you’re supposed to do, if the cost which we’re bringing up in putting... First, you’ve mentioned that there’s a loan; and then secondary that there is a 50% that you’ll going to add to us. So, that’s one issue that we’re putting up, trying to raise no. Secondly, ano ba ang specific na project na gagawin ninyo, yun lang bang pinakamalaking pozo negro na ilalagay ninyo sa diyan labas, or you’ll also put up or trying to maintain the line that will go to your pozo negro? Ben Velasco: Initially wala pa po kaming ganon… Comment: Wala pang ganon, so baka half-baked yang ating proyekto na yan. For a 100 M dollar project. Dollars ha, were talking about dollars, eh parang napakamahal naman nun… Ben Velasco: Eh, hindi nga lang naman po kasi to. Actually, pag tiningnan ninyo… Ang cost naman po for the Quezon City Marikina Plant is not the $100M, kasi malaki po yung component ng project namin sa Taguig. Taguig, halos it covers the whole area of our project… Question : So your talking of the Manila First, Manila Second, Manila Third… Ben Velasco : No, Manila Third. Manila Third is six (6) components. Six (6) components po yun, and one of the components is just this project. Comment: Kaya nga siguro you will give us details… kailangan detailed kung yung anong benefit sa amin. Tapos yung 100M, will there be a secondary pipe and you’re going to produce… Kasi dapat talaga detalyado, because you cannot just accept 50% payment na not knowing where it is going… Comment: Are you going to upgrade our pipe, kasi ang dami namin ngayong pipe na wasak. Kaya ang nangyayari, yung mga wastewater bumubulusok, lumalabas sa kalye. Lumalabas sa kalye yan, di ba? Comment/Question: Ako, sa tingin ko parang nangyari, this consultation right now, what you have presented us are the issues about the water that’s coming out from the houses. Ang punta namin dito, akala namin you’re going to present to us something a more technical detail on specifically na you’re going to provide… your planning to provide based on a 100M dollar funding, your going to provide a line. I mean the cost of that line

Page 113: for Manila Third Sewerage Project Volume 3

going to the main set-up, ano yung gagawin ninyo, anong output non, anong input non, anong benefit? Right now it is going around the bush, nakikita… Well, alam naming yung effluent problem, alam naming yung pollutant problems, nakikita naming araw-araw yan, nakikita naming yang butas na yan. We’re still on that issue right now based on your presentation. And what we are trying to find out right now is where are we going? What are your plans right now? Are you going to present us plans or you just want to hear us? Ben Velasco : Well, ang purpose po naming dito is to hear your other concerns, for us to address din naman your concerns sa office po naming. And at the same time din kasi no, yung gusto kasi ninyong detailed plan kung ganyan, technically, we cannot provide you that right now eh… Question/Comment: Dapat talaga may details eh. Besides, will connection to the sewage facility be cumpolsory or if I don’t want to connect to the system, then will I be charged or what? Ben Velasco : Ay hindi, ang mangyayari po kasi diyan, once your covered area is concerned, may isa po diyan na hindi di pupuwede, lahat po diyan is… Comment/ Question: Yah, if you want to do that, you do it. But its another story that there will be 50% charge to us, iba yon di ba? Comment : You said that you just collecting the water for the farms,etc. Why don’t you put in your study also that daycares. You know, there’s nothing free in this world anymore. You mean you’re going to give that water there libre ay kung kami nagbabayad ng tubig, magbabayad pa kami sa sewage sa susunod… Ben Velasco : As I mentioned nga po sa Magallanes, the homeowners there po are getting the biosolids… Question/Comments: I was facing my attendance here, when they invited me to come over. I was basing it on your press release last Friday, yung press release ninyo sa UP. I think probably kayo yung nagpa-press release sa UP, kung ano yung ginagawa ninyo sa UP ngayon, yung nag-inaugurate kayo ng wastewater treatment. Anong benefit ng water na gagawin don, saan pupunta based on this X number of years that will be operational. Are we going to see that in your presentation now? Ben Velasco: No, not yet. Probably there will be a time na once we have finalized our designs, saka na lang po kami magtatawag sainyo… Question : Yan bang loan na yan nandiyan na? Ben Velasco : Proposal pa lang po… Question : Then what is the main purpose of this..?

Page 114: for Manila Third Sewerage Project Volume 3

Ben Velasco : We want to hear you… Comment: Well in short, you want to borrow, and then Juan dela Cruz to pay for the loan, yung ang mangyayari don eh… Comment: They want to have our opinion so that they can finalize their plans and afterwards they can arrange for the loan… Comment : Yes, but what they are going to do is they’ll be getting the loan and they will let us pay for that loan… I suppose this is only one of the consultations, there will be similar ones… Comment: Let me point out also no, this project is very laudable, maganda yung ginagawa ninyo. And very important and timely, lets put that in record also. Ako, personally, maganda yung nakikita ko na dapat magkaroon ng ganyan. But the manner of presenting it or the manner of giving us the information, medyo hindi namin makita yung pinakamagandang proyekto. Saka yung planning it and how to implement it… Ben Velasco : Kasi, we understand no. If you seek kasi the specific details of your project itself, baka may lumabas pang mga concerns diyan di ba? Yet, wala pa po kami doon, I apologize po if ever were still on that stage of the planning, pero we really cannot give you what you want, yung details pa… Comment : Maganda nga if you do case study of what you did in UP so that we can actually see na ganyan ang ginagawa no. Wala kaming nakikitang case study eh.. Ben Velasco : Wala pa… Comment: Dapat prepared kayo when your going to do this consultation. Wag ninyo kaming basta konsu-consultation lang basta. Its unfair for us and unfair for the time of the people coming here who attend the consultation. We have to start on time… Comment: Ako naman hijo, if you want a project as big as that, mag-isip din kayo di lang yung pag-dispose ng wastewater but also to produce clean and drinking water as well as for industrial use for us. Kasi malaki yung loan eh, you should have at least two laudable projects hindi lang yung dini-dispose ninyo yung wastewater namin then makikinabang yung ibang lugar. Eh yan your also having complaints na wala tayong clean water, we don’t have enough 24 hours. So, ang iniisip na natin yung pag-dispose ng marumi, pero yung to provide drinking and clean which let even give that, ilang years na silang… Comment: In other words, yung basic muna ang inaasikaso ninyo before something like this na napaka-complex na. Like yung mga pipes ninyo na ang liliit, sira na, chop-chop na, walang tubig…

Page 115: for Manila Third Sewerage Project Volume 3

Comment: For every input there’s supposed to be… well in fairness to Manila Water, in Blueridge B at least we have had good service since about 5 years ago, 6 years ago and specially with this augmentation of the pumping station here in Blueridge A. Comment: Kami rin naman sa St. Ignatius din ok naman, ang ina-advise lang natin is there is not really 24 hours service. There is water but not 24 hours. Ang ini-air ko lang sainyo is we’re satisified but not very happy, you know what I mean. So, if you borrow money, shoot two birds, provide 24 hours service plus disposing, why not? Then, I-lower naman ninyo yung factor ng pagtsa-charge ninyo sa amin, bakit hindi we will support you, kasi magaganda naman yung project. Pero yung bibiglain ninyo kami, wala naman kaming clean water then we’ll start paying another 50%, nakakasama ng loob… Ben Velasco : All of these naman eh documented so ok lang po… Comment: Like alam namin yung mga pipes naming supposedly nung araw pa pinalitan, di pa napapalitan. Kung sana yung mga yon nagawa na, then we are ready to face another… Engr. Suelto : Actually ma’am, yung isang consultant nila na isang Japanese firm, came up with a feasibility study. So, dun sa feasibility study nila, they’re using several options. Ang unang option which is I think economical, kung anuman yung nandito, kung magagamit, gamitin na. So ano ang nandito… itong areang ito, dahil wala tayong separate sewerage system, so they have to make use muna the combined system na tinatawag. So the storm and the wastewater goes into one drainage, yun ang iti-treat nila. Pero, meron din silang… tinitingnan na rin nila yung mga options to put up a separate sewerage system. So, alam naman nating pag may sariling sewerage, may additional cost. One thing po, kung kasi magtatayo din naman sila ng planta, siguro naman hindi rin sila magtatayo ng planta kung alam nilang na yung dadaluyan ng tubig papunta sa planta ay hindi rin maganda. So, kasama din sa options yon. So, during the start siguro, doon sa actual implementation, hindi naman agad sinabing magtatayo ng planta, they still have to look at the lines. Titingnan nila kung okey pa yung lines, so if they have to upgrade, then Ia-upgrade nila yon. So, there are many options doon sa feasibility study… Comment/ Question : Your project po sir, marami pong barangay ang covered, bakit hindi natin isali para less ang impact sa amin. Ben Velasco : Kasi po this consultation is just for the project here. Pero meron po kaming separate consultation with the other areas. Comment : So bakit, the more the merrier para less ang cost… Engr. Suelto : Ang objective naman ng MWCI… Ako personally dahil consultant lang naman ako, is to talaga to cover the entire area, kaya lang we have to start from somewhere lang, by phases, di pupuwedeng kaagad. Anyways tama yung ano… pero all taken po yung concerns ninyo kaya nga nandito kami, consultations, para makuha namin. Like for example ano ho kung titingnan ninyo, meron tayong treatment plant, ito yung

Page 116: for Manila Third Sewerage Project Volume 3

treatment plant, so ito yung location niya, may area siya, ito yung capacity its about 10,000 cu/m per day for year 2025 pero ang project implementation niyan is I think sa feasibility, kinonsider na nila yung up to year 2025. Yan yung magiging capacity pero the project will start around year 2007 or 2008. Ang plano kasi nila up to year 2025. So sa for structure, meron silang interceptive sewer, parang linya yan eh, it’s a drainage that will be put along the Pasig River to connect down. So its about 710 meters, meron silang mga lift stations. Eto pong pini-present namin, isang option lang po ito na sa tingin ng consultation is at this point the most economical, kasi kung lets say yung isang option nga tatayo kayo ng sewer lines baka hindi maging pabor sa MWCI yung pagbabayad nila ng … I’m not an economist, pero ang nakikita ko lang yung their talking about yung hindi ba feasible ngayon kung gagawin kaagad yung option na yon. So, ito na yung lumalabas na most probably, na para naman sa MWCI, na kung ito ang gagawin, kikita sila, I mean hindi naman sila kikita ng malaki, pero yung di naman sila malulugi, parang ganoon. So, marami pong options diyan na sinasabi, yung upgrading, tapos yun ngang separate sewer system. Question : Yun bang let say for example yung Greenhills area na yan, Valle Verde area, hindi yan kasama diyan? Ang ibig kong sabihin sa year 2008 ba, I may be paying P500 more, one half of my water bill, but only our subdivision. Bakit ganon, bakit lang kami. Dahil akala ko kasi, itong consultation na ito dahil gagawa kayo ng sewer treatment plant just outside the subdivision, parang nagpapaalam kayo sa amin, na maglalagay kayo at assuring us that it will be not harmful to the environment, etc, etc. Pero bakit naman kami, ilelevel ninyo ng ganoon, Olandes, Blueridge, ang konti eh. Kasi ibig sabihin yung mga sa Valle Verde na yan, yung sa year 2005, yun pa rin ang water bill nila? Dapat itataas ng 50%… Why should we pay? Sila ba wala ba silang pozo negro na nagdi-discharge ng effluent? Meron din… so ganoon din… Bakit tayo mape-penalize? Engr Suelto : Ah ano po no, base don sa study ng feasibility kaya ho na-determine yung area, may statement na isi-simplify mo lang, yung slope ng line parang sa basic, nasa isang basic po yun eh… Comment: Oo, alam ko yun eh, it is ideal… this location is ideal for you… nasa mababang lugar… pero iba yung ile-level ninyo kami, yun ang akin eh… Comment: Parang naano ko yung point niya no. For example gusto kang umutang no, ang gusto naming I-cover up mo na lahat. Tapos ito, mayroon ka ditong lalabasan… may lalabasan dito… at least isang loan lang. Lahat naman nagko-contribute, ang ginagawa ninyo piece by piece 100M, another piece 100M, napakataas na noon, that’s too much… Comment : Pagka natapos ito.. itong nakalista dito… that will be levied that amount Eh ikaw ba kung ganyan ang ginawa sa area mo papayag ka? Hindi siguro… Mr. Soncuya : Ah clarification lang po no, yun hong sinasabi ninyong levy, kung makikita ninyo dito… yun hong included sa Manila Third. Yan po isang component lang ho yan eh. Yun hong sinasabi namin Taguig Sewer Plants doon bale apat, yung Manggahan, tapos yung Quezon City yung Quirino 2A, 2B, 2C, 3A, 3B, East Kamias,

Page 117: for Manila Third Sewerage Project Volume 3

West Kamias, Laging Handa, South Triangle, Sacred Heart. So, ang dami hong makokoberan ng Manila Third Sewerage Project. Comment : Di babanatan nyo na to. Pagkatapos niyan ang aking bill tataas, papaano yung bill ng bahay doon sa Valle Verde, hindi siya tataas. Kasi hindi siya covered eh… Engr. Suelto: Actually ho, isa po sa mga study namin, kasi alam naman namin na… na-anticipate naman namin na eto yung talagang-major issue ano ho. So, isa naman sa mga recommendations namin, yung sa paggawa namin ng ano… one of our recommendations, kasi hindi naman por que kayo lang naman ang malalagyan ng sewers kayo lang ang magbabayad kasi kahit na sinabi ng taga-MWCI, siguro downstream area yun makikinabang din yung mga residente. So, one of our recommendations is to… sa mga downstream communities, to shoulder some of the expenses. Isa sa recommendations namin yan kasi yung itatapong… yung iti-treat na tubig, saan mapupunta yan eh di doon sa ibang lugar, so dapat kahit papaano mayroon din silang share. Yun ang mga recommendations namin. Question/ Comment: Sir, excuse me, sa totoo lang may mga improvements na rin sa aming barangay ano. But two years ago when we approach you problem na wala kaming tubig. Ganito po ang naging problema, everytime kasi after our constituents are complaining, “bakit po Kagawad o Barangay Captain wala kaming tubig, ganoon ganoon, tapos tinapat ho kami ng MWCI, “ma’am pasensiya na po kayo, sa totoo lang wala kaming pera ngayon, naka-ano ang aming mga loans… naipit kami so maraming basted pipes na hindi namin alam, so one at a time lang kami makakapag-ano, kulang ang aming resources…” Kaya ako kinakabahan ako, baka ito mapatong na naman, kumusta na ba ang mga kondisyon ng inyong mga loans ninyo ngayon? Ben Velasco : Ok pa naman ho, kaya nga paunti-unti lang kami hindi namin sinasaid… Comment: Yan, iyan ang problem nila, tapos uutang na naman uli, yun ang ikinakaba ko eh… Question/ Comment : Alam mo mas believeable ito eh, that you have a program according to your coverage, do it step by step but in your billing you charge everybody, hindi iyong eto lang ipapatong mo sa amin lahat yan di ba? Christopher Calamiong : Ayaw po namin sa inyo magbigay ng promise, pero naka-log din po kami sa Congress, pati sa senate na I-fix na po yung price sa lahat. Hindi pa po kami nagpa-promise kasi kami rin po namomroblema din po kami sa pag-present ng projects. Kayo po katulad nyo, mako-cover kayo na area 50% tapos yung kapitbahay ninyo hindi pa nacovered, wala silang 50%, eh talagang magmumukha kayong lugi dahil pare-parehas naman kayong nagdudumi… Comment : We realize that we have to contribute in the environment po natin no, pero yung charge naman na 50% of your water bill, masyadong excessive naman yun…

Page 118: for Manila Third Sewerage Project Volume 3

Comment: Mayroon lang akong sasabihin no, one time mayroong nag-suggest no, yung fire hydrant, kung may sunog. Minsan in fact walang tubig di ba? So pag naubusan pa ng tubig, maghihintay pa ng magrarasyon, so we’re talking about kung papaano yung fire hydrant, and we found out that you direct a dedicated line from the reservoir. Is that true? Kasi gusto naming magkaroon ng fire hydrant dito sa subdivision, paano? Ben Velasco : Well, its under Nelson Peňales jurisdiction di ba ho? Comment: Well, binigay sa akin ni Nelson its about a 100,000 to tap your… Comment: Pasensiya ka na hijo ha, as a taxpayer we keep on paying, we want also to know what we’re taking. I thought your boss ninyo will not mind, want to know kung ilang porsiyento na ang napapalitan ninyong mga pipes within this area para at least maiabot naman namin sa mga tao, mainform naman namin sila… Mr. Soncuya : Basically, yun pong very important point po na lumabas dito e yung issue po ng pagbabayad. So bale po ang first concern eh ano ba ang direktang benepisyo na justified yung increase ng 50%. Pero may correction po ako, 50% ho ng basic rate, kasi kung titingnan ninyo don sa resibo ninyo may basic water rate, tapos may currency, may adjustment, yun pong sinasabing 50% ay base po doon sa basic water rate… Christopher Calamiong : So not the total… kunwari P800 ho ang water bill ninyo, ciguro yung pinaka 50% non yung water charge lang. Ben Velasco : That’s why we want nga rin to show the bracket so at least makita ninyo yung actual amount na makita ninyo yung rate… Question: And your foreign currency rate is based on your loans, mga standing loans ninyo na pinapasa ninyo sa mga customers ninyo? Christopher Calamiong : Sa fluctuation po ng dollars… Comment : Kaya nga, oo, kaya nga nagse-share pa kami doon. Kaya nga ang gusto naman ng community, maganda naman yung sinabi ninyo na your going to bring it to Congress, na magkaroon na tayo ng fixed rate, hindi every two years taas sila ng taas no, taas taas ng loan, eh mabigat yon sa bulsa. Christopher Calamiong : Yun din po, don din po kami nahihirapan on our side, don kami nahihirapan na ipasok sa community yung 50% charge kaya inaayos din namin yon… Mr. Soncuya : Yung sa drainage system dito, kanino ba talagang jurisdiction, is it DPWH? Is it MMDA? Is it you? Ben Velasco : At present hindi ho sa amin yan, and I guess it’s not with DPWH kasi nasa loob ng subdivision.

Page 119: for Manila Third Sewerage Project Volume 3

Question : Then why you conduct projects with wastewater? Ben Velasco : Yun nga ho, base on our mga options na susundan combined treatment po yung lumalabas na mas efficient naming gawin for treatment eh, which is kasama na yung storm… Mr. Soncuya : Yan ho, kasi ho mayroon ho tayong Clean Water Act, na napasa ho nung this year. Na yung responsibilities ho ng nagde-develop ng tubig na Manila Water eh siya ring may responsibility pag-dispose. Comment: Like sa amin sa kuryente, sa NAPOCOR, if we purchase generator worth to 100M, ang magbabayad is the consumers of the Philippines, pero itong generator na ito dadalhin halimbawa ito sa Negros, pero ang magbabayad from Tawi-tawi to Batanes… Christopher Calamiong : Yan din po yung inaayos naming ngayon kasi we are regulated ng MWSS. Di po kami makakakilos ng ganoon na mas mapapagaan yung mga sineserbisyuhan namin kasi regulated po kami ng MWSS and thereby the government. So before we act on it, dapat ma-approve muna ng government para at least mapagaan kasi kami rin po ang naiipit eh. Gusto naming I-implement pero hindi ho natatanggap ng community dahil sa charge po.

Page 120: for Manila Third Sewerage Project Volume 3

PICTURES TAKEN DURING THE MEETING

Page 121: for Manila Third Sewerage Project Volume 3

Attendance: Manila Water Company Inc. Christopher Calamiong Senior Project Development Officer Ben Velasco Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Joy Tamayo Public Consultation Coordinator Wilva Lin Deocades Facilitator Ginelyn Mary Guanzon Representative EMB, DENR Note: Attendance sheets of participants with their signatures are attached to this report. Location of STP – The proposed STP will not be located at the left side of the FVR Loop coming from Marikina, along the river banks before reaching Camp Atienza. (Sitio Olandes) Loan – Initial amount is 60 plus million dollars but World Bank suggested expanding the project coverage. The amount increased to more than 100 million dollars. The terms of the loans on the maturity and interest rate are still under negotiations. A participant pointed out that the loan will be contracted by MWCI but ultimately the customers of the company will shoulder the payment of the loan in terms of increase in monthly payments. It was pointed out that the amount of the loan should be used also to produce potable water because in these three barangays, the water supply is not for 24 hours. The high portions of their areas have minimal water supply. In addition, the pipes are very old and rusty and if MWCI will increase the pressure, the pipes might burst. If this combination is undertaken, their children and grandchildren will also benefit from the project. It was pointed out that the total amount will be used for a sewerage project and that amount is the total amount for the six project components. It was suggested that the by-products of the plant namely water and soil conditioner be sold to partly defray the water charge of 50%. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The whole project will be implemented from early 2006 up to 2008. This particular component in QuezonCity - Marikina STP will take around one year. Desalination -- Any project to harness salt water into domestic water? Desalination is an expensive process. MWCI is studying alternative sources of fresh water in Rizal to supply additional water to its customers. BY-products of STP --STP will produce sludge and water. The sludge will be further treated into soil conditioner. The water may be used for irrigation, for fighting fires or for cleaning the streets but is not recommended for domestic use. This is being done in UP where wastewater is being used for irrigation. Sludge – After further treatment in the septage treatment plants, the solids will be delivered to the lahar areas in Pampanga and Tarlac were MWCI together with the Sugar Regulatory Authority

Page 122: for Manila Third Sewerage Project Volume 3

are conducting tests for sugar cane. Presently, the company is giving the soil conditioner produced in the Magallanes STP for free to anyone interested in the by-product. Risks -- A person exposed to untreated wastewater has a higher probability of getting sick to water borne diseases because of the presence of pathogens. It terms of aquatic life, high BOD demand means that the dissolved oxygen in the water is being used in the decomposition process of organic matter. Hence, aquatic life can literally be suffocated if the water system is highly polluted. Jurisdiction -- The roads of the subdivisions were already turned over to the government, who has the responsibility of the maintenance of the drainage canals? MWCI is not sure but drainage outside of subdivisions is either the jurisdiction of DPWH and the local government. MWCI has jurisdiction over the sewerage system. A participant pointed out that the local government is responsible for the drainage system. Environmental charge – All the households have septic tanks. MWCI has been collecting an environmental charge of 10% for environmental projects such as desludging. Why are the residents informed only now that MWCI is desludging tanks for free but has been charging the residents long time ago. MWCI has been providing free desludging and is continuously giving information of services available to its customers. A participant opined that the residents would not mind paying additional water charges as long as they receive better services and continuos water supply. Basis of sewer fees -- Why pay additional 50% of basic charge if the residents have no separate sewer line? In the feasibility study, the consultant considered the laying down of a separate sewerage system and the usage of the existing drainage system and connect it into the STP. Based on the costs, the second option is more economical and will result in a lower monthly cost to the residents than the separate sewerage line. Specific benefits -- In addition to the general environmental benefits what specific benefits will the residents get from the project? The quality of water in the waterways will improve in terms of lower BOD and coliform. In terms of health benefits, it could mean health care savings for medicines and medical consultations that would have been spend by families to address water borne diseases. Government assistance -- Sanitation is a basic responsibility of government, why charge the residents? Fifty percent of the basic water charge is excessive. Can other government agencies contribute something to lower the charges? One of the purposes of this public consultation is to get reactions, suggestions and recommendations. MWCI will study your recommendation on the possibility of having some kind of government assistance. The sewer charges are being levied on areas serviced by the sewerage systems of MWCI. Presently, these areas are not being charged. However, once, the STP is in place, the residents will be charged for sewerage fees. Why would the residents pay if residents in other areas without sewer lines were not made to pay? MWCI should also look for the possibility of charging all its customers for sewer fees. Details of project -- The technical aspects of project will be finalized in the detailed engineering stage. In this public consultation, the project concept is presented. MWCI is not still ready to answer details about the project.

Page 123: for Manila Third Sewerage Project Volume 3

Fire hydrant – The water supply department is the one responsible for this project. The barangay chairman of Blue Ridge B has coordinated will Ben Penales, territory business manager of MWCI and the cost is around 100,000. The participants lauded the aims of the project. However, they expressed reservations on the additional charges that will be levied on them once the project is operational. They also requested additional detailed information including the financial analysis of the project.

Page 124: for Manila Third Sewerage Project Volume 3

Villa Salud Bangay Lower Bicutan, Taguig City Transcription of Public Consultation Barangay officials and Residence of Barangays Hagonoy, Wawa, Calzada, and Tipas Ibayo held on June 16, 2004 from 1-4 PM at Villa salud Bangay Lower Bicutan, Taguig City, Metro Manila

Page 125: for Manila Third Sewerage Project Volume 3

MANILA THIRD WATER SEWERAGE PROJECT Transcription of Public Consultation Barangay officials and Residence of Barangays Hagonoy, Wawa, Calzada, and Tipas Ibayo held on June 16, 2004 from 1-4 PM at Villa salud Bangay Lower Bicutan, Taguig City, Metro Manila The consultation workshop aims to present to stakeholders the existing sewerage and sanitation conditions to arrive on a concensus at early stages of the project to avoid conflicts which can harm the implementation and success of the project. With these regard, it lead to the transparency of public and private actions, as these actions are monitored by the different stakeholders. It also built trust between the project proponent and the civil society, which lead to long-term collaborative relationship. Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc. (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Mr. Velasco, Senior Project Development Officer of MWCI presented the background and proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila water Company Inc. Lala Fabella Manager Waste Water Department Christopher Calamiong Senior Project Development Officer Erik Elarmo Senior Project Development Officer EDCOP-LTI Rachel A. Vasquez Project Director Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Wilva Lin Deocades Facilitator Allen Villanueva Representative DENR-EMB Becky De Vera Rerpesentative MWSS

Page 126: for Manila Third Sewerage Project Volume 3

Participants 35 out of 48 invitees attended the scoping session

Page 127: for Manila Third Sewerage Project Volume 3

Mr. Soncuya: Magandang hapon po sa inyong lahat. nais ko pong ipakilala sa inyo ah magsimula po tayo sa manager ng Waste Water Department na si Lala Fabella, at ang kasama niya na si Topet Callano at saka si Eric Melan. mayroon din representative ang taga MWSS dito si Benny Rivera. At mayroon din po dito na representative ng Environmental Management Bureau ng DENR si Allen Villanueva. So ah basi po don sa ating agenda ah kanina po nagtatanong po ako kong sino po ang magbibigay ng welcome remarks so, kinausap ko po si barangay Chairman Rolando Olazo ng Hagonoy at mayroon pong tinuturo kasi dito na ini-rekomenda nya so, ah bigyan po nating ng palakpakan si secretary Agapito Cruz ng Ibayo Tipas. (palakpakan)

Agapito Cruz: Di ko alam na kilalala ako ni Chairman Olazo sir. Ano po bang gagawin ko,

welcome address? Sige sa aking mga kababayan lalo na sa kagalang-galang na pinono ng Hagonoy. Yung aming Chairman kasi nasa DPWH pa siguro ng propotesta, hindi po may pinuntahan lang po doon para sa aming DPWH forecast. Sa kaugnay na sinasagawa ngayon na public consultation kong saan mahalaga na maintindihan nating mamamayan, kanina pa naming pinagusapan, ano ang posibling epekto ng Manila Third Sewerage Plant. Kong saan na binabanggit ang ilang bahagi ng bayan ng Tipas o ng katipasan ay gawing flood retention pond, sa madaling salita iponan ng tubig baha. Sa atin di na kinakailangan mag ipon eh, kasi taon-taon kapag matinidi ang buhos ng ulan kahit walang flood retention ponds lagi tayong binabaha. Actually umaabot sa tatlong buwan an ating baha, mahal na mahal nga tayo ng tubig baha ayaw tayong tigilan. Gayon pa man siguro mahalaga rin na makita natin kong ano ang kabutihan ang mga advantage at kong ano ang epekto na itatayo ng Manila Third Sewerage Plant sa bayan ng Taguig. Kaya po ang lahat ng ating kababayan na narito ngayon ay ating pong ini we-welcome at kong maaari pag isipan po nating kong ano ba ang epektong idudolot ng nabanggit na proyektong ng Manila Water. Kaya po sa lahat inaasahan ko ang inyong aktibong paglahok, partisipasyon at masiglang talakayan at sana po yung ating gagawin natin pagtalakay ngayon ay mag bunga ng mabuti at higit sa lahat at pakinabangan ng mamamayan ng Taguig. Welcome po sa inyong lahat.

Mr. Soncuya: Maraming salamat po. eh a-outline ko lang po ang kong papano ang proseso ngayong hapon. Una ho ay pre-present ko ang EIA process yung Environmental Impact Assessment, pangalawa e pre-present po ng Manila Water yung project, pangatlo po ay pre-present po ng kasamahan kong si Boy yung ah resulta ng Environmental Impact. Sisimunlan ko na po, ah yung project ay pangalan eh Manila Third Sewerage Project, ah ito po ay project ng MWSS at nang Manila waters. So, ah itong tungkol sa sewerage system na explain sa inyo mamaya. So ang e-explain ko lang po ay ang proseso ng EIA ano. So, lahat ho kasi, ah kumuha ng data at pumupunta ho muna sa mga communities na ma-aapektuhan at nag -coconduct po ng scoping workshop, focus group discussion ng mga stakeholders para maalaman ngayon ang direction na ang eifofocus nong study. Ang eksakto nito, kunyari sa scoping session ay meron na e-voice out na nong mga ibang residente na baka merong amoy, so ang gagawin po ng study ay pino-focus ho doon kong ano ang iniisp ng mga residente na probable effects nito sa community so ito yung

Page 128: for Manila Third Sewerage Project Volume 3

proseso. Ang kinukoha nyan ay tatlo, biological, physical at social. So, biological may epekto ba ito sa isda, sa physical merom po bang ah itong infrastructure nato, anong epekto kunyari sa pagbaha at sa social kong ano ang impact sa tao. So covered ho yung tatlong major component na yun. So, pagkatapos po na makakuha ng mga direction basi po doon sa mga scoping workshop at saka focus group discussions, kumukuha po ng baseline data collection. Ang lumalabas dito ay dalawang klase ho to no, yung primary data yung sinasabi na gene-generate nong study ibig sabihin dyan eh kong sa social ang pagkuha po nito ay interviews, ah pwede pong household surveys, pweding focus group discussions with informants. So, kumukuha po ng data dito kasama po ang biological and physical. Pagkatapos ho na makakuha ng data pumupunta ho dito at ina-analyze ho yan. Ano po bang epekto, positive or negative doon sa tatlong major components. So, kamukha ho nyan ang isang probable results nyan during construction, maingay ho so ano ngayon ang ilalagay ho dyan yung mga impacts, yung problable na epekto at sa saka anon ba ang dapat gawin para kong hindi man wala itong mga masasamang epekto ito, ma-minimize. So, ito ho yung, pagkatapos ho magawa lahat ito bumabalik ho ulit sa community. Ito po yung purpose ngayon ng consultations naming ngayon sa inyo. Humaharap po kami rito para e-present po yung tatlong steps or activities at pini-present ko sa inyo for validation. At nandito po kami ah, ipi-present ho ni, ng kasama ko ho yung mga resulta noong magkukuha po naming ng data at saka ng mga impacts dito. So pagkatapos po nito doon po naming epe-prepare yung final report na esa-submit naming sa EMB Environmental Management Bureau, so e-rereviewhin nila yan at kong sa akala ng EMB yung project ay medyo malaki masamang epekto or controversial ang project ay sila ang nagtatakda ng final public hearing na talagang dito tinatalakay yung mga serious effects ng project kong tutoloy. So pagkatapos ho noon dalawa po ang pweding gawin ng EMB either approved or disapproved. Kong disapproved ay compormi na sa proponent kong re-apply or approved e-isyohan muna ng Environmental Certificate of Compliance, ito ho yung ECC. Ito ho yung kailangang dokumento para masimunlan po yung project. So, tapos, ah basi, yung ECC ho, ilalagay ho doon ang mga conditions na dapat gawin ng project proponent para doon sa various stages ng development ho nila, so naglalabas din doon meron din silang tinatawag na multi-partite monitoring team yung MMT na compose yung ah kasama doon ang mga residente doon at mga barangay officials na mag momonitor na yung conditions ng ECC ay sinusunod ng project component. So maglalahad din po ng monitoring fund na para tumustos ho yun doon sa monitoring team at saka kong kakailanganin po magpuput-up po yung project proponent pag inatasan po ng EMB ng Environment Guarantee Fund ngayon po ang pundo na kong meron pong ma accidente or masamang nangyari na galing po doon sa project, yun po yung ah magagamit para ma compensate or e-ayos ho yung masamang epekto nong project. So in summary ganito po yung proseso. So andito po tayo sa validation. Ah yun ho ah kong meron pong tanong pwede po muna nating bigyan ng pagkakataon yung presentation nong ah project plus yung resulta ng EIS bago tayo mag tanong. maraming salamat po.

Christopher: Good afternoon po ako po si Topet representative po ng Manila Water. Ah siguro isipin ninyo pag sinabing manila water, tubig lang. So, ngayon, ah medyo na

Page 129: for Manila Third Sewerage Project Volume 3

parang nakakalimutan din natin na yung ginamit nating tubig eh may epekto din sa atin. So kailangan dapat din natin na pangangalagaan ang ating kalikasan. Ah, kamusta naman po ang tubig nyo dito? ang supply ok naman po, buti na naman po wala tayong problema doon. So ngayon kami po sa department namin ang waste water department kami po ang mangangalaga ng tubig na nagamit na, so di lang po porkit nagamit na natin ay kakalimuntan natin yujng napanggamitan natin basta nagamit natin ok na, hayaan mo na. Pero dapat ngayon maging ano tayo aware kong ano ang nangyayari sa tubig na ginagamit natin. Ito pong project naming at covered ng Manila Third Sewerage Project, ito po ang tawag sa project namin na marami po itong components. Ah, ito lang po ang magiging outline n gaming discussion. First is yung background ng waste water ito po yung ginagamit natin na tubig after effects, second is sanitation dito sa metro manila kong ano na po ang nangyayari, and pangatlo yung mga existing na facilities na mayroon na tayo dito sa metro manila and third is yung mga nagawa na naming na project at ang mga nangyayari ngayon na project na ginagawa namin para doon sa other projects namin. Then yung panglima is the Manila Third Sewerage Project, itong project na to. Ede-discuss din po natin na yung issues na na kinabibilangan natin din yung summary nong mismong presentation natin. Waste water, pag sinabi po na waste water ito pon yung nagamit na tubig. Katulad po ng nakalagay sa example natin ito po yung pinag-ligoan natin, pinag flush ng toilet, pinag hugasan ng plato, yung pinag labahan. So pag dumaloy na po yun sa ating ah system lumabas na po ibig sabihin iyon po ay waste water na. Ito po ay, malalaman po natin na ang untreated waste water ay nagiging sanhi po ng sakit sa atin. Di lang po natin alam na yung mga sakit na nakukuha natin ay sanhi din po ng waste water. Which is hindi po natin alam, dahil sympre mga lamok na mamahay dyan sa atin din ang bagsak noon. So, ito ngayon ay nagiging, masamang, nagkakaroon ng masamang epekto sa ating environment. Sympre di natin masyadong napapansin yun, pero unti-unti lalong napapasama ang environment natin, dahil din sa atin sa sarili natin. Next is ito po yung sample ng septic tank, siguro kalimitan sa atin sa mga bahay natin, eh ang bahay natin ay may septic tank na. So, ito po yung proseso, pagpasok po ng flush na tubig sa unang chamber po is yung mga dumi ay nag se -settle lang po sa baba, iniipon niya po yun , then yung tubig na somosobra is ah dumadaloy na po sa kabila hanging mag settle, magkaroon ulit ng settling tapos paglabas po tubig na po na sinasabi na malinis na, treated na. Pero hindi ho ibig sabihin na pag lumabas na sa septic tank ay malinis na po yun, na harmful pa rin po yun wala na po yung mga solids pero yung mga lumalabas na tubig doon ay medyo nakaka epekto pa rin po sa ating environment. Next... Ito po yun sa isa sa mga ahhh sanitation na nangyayari sa atin yung mga ibang area natin na may sanitation ay ganito po ang nangyayari. Nang-gagaling po siya sa may mga bahay, mga residente sa mga commercial centers, ah mayroon po silang mga pipelines ahh ito lang po ang masasabi ko, magkaiba po ang drainage at saka sewerline. Ang drainage po is yung mga rain water yung mga tubig ulan doon po dumadaloy, ang sewerage line doon po dumadaloy yung mga galing septic tank yung madudumi po, pero kalimitan po dito sa metro manila is drainage line din po ang pinag dugtongan ng septic tanks natin kaya medyo malaking deperensiya. So yung mga ideal na sanitation is yung mga katulad sa makati, ah para ipalaalam ko po sa inyo, yung makati yung central business district, yung

Page 130: for Manila Third Sewerage Project Volume 3

mga building doon ay konektado po siya sa isang sewer line na papunta po sa magallanes treatment plant.

Ang Manila Water po meron po Magallanes Treatment plant na tipo pong parang ganito siya, nadadaloy po siya sa isang linya, mayroon po siyang parang area na paglalagayan ng tubig, dito po tini-treat yung dumi na tubig after that ilalabas na po niya sa isang sa may likod po eh naglalabas na po siya ng malinaw na tubig. Hindi po siyang pweding inomin pero pwede na po siyang pang dilig basta wala lang po siyang contact pero malinis na po yun na nag aano na po yun sa DENR na pwede na pong pang diling ng halaman, pag linis ng mga ano nang mga lupa basta po pwede na syang panglinis. Ok, ito na po ang conditions natin sa Metro manila ah medyo nagkakaroon na tayo ng problema dahil nangayayari ngayon sa mga syudad is wala tayong plano, lack of planning. Naging polluted na yung water waste natin katulad nalang po kong titingnan po natin yung ilog Pasig ah Taguig river medyo madumi na ho. doon po kasi napupupunta ang ating dumi yung mga drainage system natin papunta sa Pasig kaya ganito po ng nangyayari. Ang sanitation condition po dito ngayon dito sa Metro Manila is kalimitan po sa ating ah covered po ng septic tanks. Yung pong sinasabi ko kanina septic tanks lang po ang kalamitan sa atin. And yung sewerage system na covered is only 3% so maliit lang siya. Ito po yung sinasabi ko na covered na area ng Sanitation natin, kong titinganan niyo, kong papansinin niyo po eh medyo po maliliit lang po yung area. Kami po dito sa Manila Water ah unti unti po naming kino-cover yung area para atleast magkaroon po nang magandang kalalabasan ang ating Environmental Assessment. Meron po sa Manila Central Sewage System sa Dagat-dagatan. Ito po yung covered ng Maynilad Water yung sa kabila po yun. Yun pong sinasabi ko kanina yung sa Magallanes yung mga communal septic tanks na maliliit sa Quezon City. Ito po ngayon ang on-going projects ng Manila Water, meron po sa Manila Second Sewerage Project, World Bank po ang nag fu-fund sa amin. Then yung Pasig River Rehabilitation which is yung 36 vacuum tanks, ito po yung ala malabanan na nagsisipsip. Naka pag order na po kami para umikot po sa aming concession area para sipsipin po yung mga septic tanks ninyo. Ito po yung Second Sewerage na sabi ko bago naging Manila Third bali second muna meron po kaming maliliit na project na nagkalat po sa boung concession area namin . Meron po tayong 28 na waste water treatment plants na ang iba gawa na yung iba ginagawa pa lang, pero ito po yung Manila Second Sewerage Projects. Sa, meron din po tayo sa Pasig River Rehabilitation project yung septage treatment plant, ito po yung ang septage treatment plant ito po yung pinaglalagyan nong mga dumi na nasipsip ng mga tanks natin. Yung sinabi ko na disludging tanks umiikot sa boung concession area ng Manila Water dito po natin ilalagay yung mga dumi. Di po kagaya ng sa malabanan na pagsinipsip, kunyari nasiraan sila doon din nila itatapon sa may drainage di ba, so bale wala din epekto. Kami po dito sa manila water pag ka sipsip po we make sure na sa itataponan namin eh ma-tretreat pa rin siya. So ang magiging end results po ng septage treatment plants is isa siya sa magiging soil conditioner na pweding gawin sa halaman na pataba at saka yung po yung pwedeng gawin na lalabas sa septage treatment plant. Ok sa Manila Third Sewerage Project eto po yung pinaka target namin is to reduce pollution loading to rivers kasi kalimitan nga po katulad ng sinasabi ko, yung lahat po ng dumi natin ay napupunta lang sa river, pansinin po natin e lahat ng rivers natin ay madudumi na. So next is yung meron po kaming mga sewerage and sanitation projects na nang yayari ngayon katulad

Page 131: for Manila Third Sewerage Project Volume 3

po ng MTSP eto po yung ginagawa namin na kilos para at least ma minimize po yung problema natin. Eto po yung mga components ng Manila Third, Taguig Sewerage System eto po yun, etong apat na dike lalagyan po namin ng treatment plant so magiging double purpose po yung ano natin yung ponds natin........kasama po natin yung pag pigil natin ng baha then lalagyan lang po natin ng isang maliit na planta para lahat ng dumi na lumalabas doon sa laguna lake is e-treat po namin yung po yung Taguig Sewerage System tapos yung sa River banks naman po ganon din po... pili lang po sa area ng river papunta sa Pasig river etetreat din po namin. So sunod po yung upgrade of existing sewer line sa Camp Atienza po magtatayo din po kami then Sanitation for Low Income at Septage Treatment plant kagaya po nong nabanggit ko.. ok eto po yung activities namin pagdating don sa construction ng waste water treatment plant...eto po yung treatment of combined flows...pinagsama na po yung isang linya di ba sabi ko hiwalay ang linya natin isa po sa drainage isa po sa sewerline ang ginagawa po namin. Meron pong isang ano isang systema na pagsasamahin na po yung linya na magkasama na po yung drainage and sewerline so ganon po ang gagawin namin sa Taguig system. Imbes na mag hukay po kami sa buong Taguig na para gawan po ng sewer line e yung mga drainage system nalang natin ang gawin nating linya. A magkakaroon po ng konting rehabilitation pero at least meron napo tayong existing lines na maglalagay papunta po sa mismong ponds natin at saka yung pangalawa yung upgrade of communal septic tanks for proper treatment. So siguro po yung mga communal septic tank eto po yung Quezon City part pero mas concern tayo dito po sa Taguig area. At ito pa po ang mga activities nandyan yung collection of septage from household septic tank so ito po ah pag dating ng mga 36 vacuums tankers namin mas mapaigi pa namin ang pag didislugde. So kong kayo po ay na sa concession area namin pwede kayong tumawag sa hotline namin na 1627 para mag pa disludge. Ito po ay may minimal fee pero pag nakasama kayo sa schedule namin sa disludging. Halimbawa kasi po per barangay po ang ginagawa namin. So kapag na schedule po yung barangay ninyo ng pasipsip ah libre ho yun pag schedule. Pero pag emergency po halimbawa po pag tumawag kayo sa amin mayroon pong minimal fee kayong babayaran kapag hindi po kayo schedule. Ito po yung sanitation for low to middle communities. Ito po yung ginagawa naming project ngayon sa mga maliliit na barangay na medyo maliliit ang kanialng kinikata. Kinakailangan din po namin ang activity na magkakaroon po silang sanitation. Hindi porket maliit lang ang kinikita nila pababayaan na lang natin sila ng ganoon. So meron din project ang manila water para doon sa sanitation ngmaliit na barangay. Ito po yung nabanggit na septage treatment plant, na dalawa ang ginawa namin. Ito po yung sa north area sa may banding Quezon City at meron din po doon sa South dito po sa may FTI area. Ok, ito po yung mga issues na na-encounter namin dito sa MTSP yung tungkol sa land, syempre ho sa ngayon mahirap ang maghanap ng lupa na pag tatayuan ng ano. So kami po nakikipag-coordinate sa mga LGU’s at sa mga barangay saka sa Mayors para atleast mahanapan kami ng area na mapaglalagayan na lupa ng planta. Then, ang pangalawa ay yung cost. Meron din tayong maliit na babayaran para doon sa services na ginagawa doon sa sanitation. Then, pangatlo ang Environmental Impact Assessment so kailangan na ipa-ano sa mga tao ipataggap sa mga tao na mayroong

Page 132: for Manila Third Sewerage Project Volume 3

nangyayari na unti-unti sa ating environment na di natin alam. So kailangan maging aware tayo tungkol doon sa part nayon. Kaya nandito po kami para bigyan kayo ng isang workshop atleast magawa kayong aware doon sa pagkakakroon doon sa environment natin. Then next is yung social impacts, syempre yung pagtanggap doon sa planta kasi hindi kagaya natin paggamit natin ng tubig hindi na natin alam o walan na tayong pakialam. So atleast dito ginagawa namin kayung aware doon sa areang yun. ok.

Summary, ito po yung water pollution due to the wastewater is one of the city present problems. So, hindi po ng LGU’s natin hindi masyadong mapag tutuunan ng pansin pagdating natin sa water pollution. Mapapabayaan na po natin yun. So kailangan din natin maging aware doon sa mga nangyayari sa paggamit natin ng tubig. Then, second the on-going initiative are insufficient to the wastewater problem, so ang ginagawa nating solution yung pa unti-utin lang hindi lang pang kalahatan. Kaya kami dito sa manila water ginagawan namin ng paraan na masakop yung boung concession area namin para ma-resolve ang pollution sa nangyayari dito sa ating concession area. Then, pangatlo MTSP will help expand the provision of sanitation of sewerage services. So, MTSP malaki po ang coverage area namin so, ito pong sinasabi ko pong naka lista, meron po tayong sa Taguig, meron po tayo sa Quezon city. So lahat po ng area of concerns ay ginagawan po natin ng paraan. Pang-apat is education and policy issues who make us challege. Katulad po nito ah unti-unti po namin pinopulong yung mga barangay para atleast maging aware tayo sa environment natin at paggamit ng mga tubig natin, yun po lang. Kung magtatanong po ah siguro po pagkatapos namin lahat saka tayo mag Question and Answer. Salamat po.

Mr. Soncuya: Maraming salamat po, ang susunod po na mag-present ay si geologist Suelto.

Epe-present po niya yung specific na mga results ng study natin. So heto po siya.

Anacleto Suelto: Magandang hapon po sa inyong lahat ako po si Boy Suelto, kinatawan po ng EDCOP-LTI. Kami po ang inatasan ng MWSS at MWCI upang mag conduct po ng Enviromental Impact Assessment ng MTSP. Ito po yung proyekto namin, ito pong pag-aaral namin ay nagsimula pa po ng Nobyembre noong isang taon. Siguro po ang nag explain na kasama ko yung sa EIA system mayroon po siyang binggit na workshop at saka ng FGD noong April po yata. Pumasyal po kami dito sa Tipas Ibayo, yung kasamahan po namin na si Dr. Roquia o si Jojie para magtanong kung ano yung mga issues na maari naming talakayain sa aming pag-aaral. Bukod doon noong November, meron po bang naka-attend dito noong Nobyembre ng workshop na ginanap sa Quezon city, meron po ba. Kasi po noong Nobyembre nag held po kami ng workshop. Ito po yung lahat ng barangay na nasasakupan po nitong project ay inimbitahan po namin upang dumalo sa ganitong workshop para makunan ng mga opinon at issues. So pag katapos po ng scoping at yung mga consultation o initial consultation po namin sa inyo dito po kami nag umpisa ng aming pag-aaral o ang tinatawag naming baseline study o eco profiling. Pinuntahan po namin lahat ng mga project nga mga projects ng MTSP at dito po katulad nito ito ang Taguig flood retention pond, ito yung Taguig river na sa tabi yata ng pond. Nasa kaliwa yung pond so kinunan din nsmi yung construction ng DPWH sa labasan. Di

Page 133: for Manila Third Sewerage Project Volume 3

lang po yan ng sampling po kami nagpunta kami sa Laguna Bay at nag kuha po kami ng samples sa sediment sa lawa, tapos po sa water bodies natin kinunan namin ng samples ng tubig para pag-aralan. Yan po, ito po yung sa Hagonoy. So ito po, ang pinagusapan natin dito ay ang wastewater po. Dito sa area ng Taguig sewerage system ng MTSP kumuha po kami ng samples ito po yung makikita ninyong berde, kumuha po kami ng isang sample dito po sa may sapa bago pumasok sa ng lawa at saka doon mismo sa may lawa. So mayroon dyan sa Hagonoy, meron po sa Taguig, meron po sa labasan, at meron po sa tapayan. Siguro po bago tayo mag patuloy e-explain ko lang po para klaro po sa inyo yung explaination po kanina ng aking kasama natin sa MWCI. Yun pong ito po ang Taguig ito pong Taguig Sewerage System po siguro po ilan sa inyo aware, na ang plano po kasi ng MWCI ang DPWH po ay gumawa ng pong mga retention ang tawag po ay flood retention ponds. Ang concept po ng MWCI ay yung flood retention pond po kapag tag-araw, kapag tag-araw alam naman natin po na pag tag-araw mahina ang ulan. So karamihan na lumalabas dito sa mga water waste ay karamihan galing sa mga domestic wastewater. So ang koncepto po nila kapag tag-araw po at hindi naman malaki ang tubig sa halip na dumiretso po yung wastewater sa lawa eh cupture po nila ito, eh bubumbahin po nila ito bago dumating sa flood gate. Dadalhin muna po dito sa retention pond at dito nila e-tetreat yung po yung konsepto po doon. So ang ibig sabihin nila yung structure po flood retention ponds ito po ay sa DPWH ang gagawin lang po nga MWCI ay parang makikigamit lang po siya dito sa mga flood retention pond tuwing summer. Kasi po kapag tag-ulan alam naman natin na gagamitin ng DPWH ito for flood protection pero kapag summer kasi mahina po yung tubig, binubuksan po yan so sa halip na buksan po yan para bago lumabas po yung tubig na marumi ma e-treat muna doon sa planta. So parang ganoon po yung concept ng taguig sewerage project po ng MWCI.

Kasama po doon sa pag-aaral namin, meron po bang nakatangap po ba sa inyo ng survey? may pumunta po ba sa mga bahay ninyo tungkol dito sa project na ito. Meron po bang nakapag ano, meron kasi kaming pinapunta mga surveyor na ng tanong po tungkol po sa social status po. Marami pong tanong na iyon ah siguro po sa boung project po kumuha po kami ng isang daan at sampung respondents pare interviehin po. So, ang pinaka tanong naimn, isa sa tanong namin yung kong aware kayo sa project ng MWCI. Yung lumabas po doon sa one hundred ten ang lumalabas po ay almost kalahati 51% po ang may kaalaman kahit papano meron narinig na nila ang project at yung almost kalahati 48% ay hindi pa. So, meron po kaming isang tanong kong sang ayon po ba kayo sa project? ito po ay random hindi po ito lahat random survey lang po ito. Doon po sa lumabas sa aming survey ah more or less almost 80% po yung sumasang-ayon doon sa proyekto ng MTSP ng MWCI. Ano po ba yung mga dahilan kong sumasang-ayon po sila, ito po yung halos na dahilan, bawas sa pollution, well, magkakaroon po ng sewerage systems, makaka tulong po sa kalusugan at saka overall po sa barangay mabibigayan ng benipesyo. Doon naman po sa di sumasang-ayon ang karamihang pong sagot nila ay tungkol sa dagdag na gastosin. Marami pa po kaming tinanong pero iton po yung pinaka importanting tanong na pwede naming present sa inyo ngayon.

Page 134: for Manila Third Sewerage Project Volume 3

Doon po kanina, nabanggit ko po na nag water sampling po kami ano kasi ang primary purpose po nitong mga retention ponds po ay e-treat po ang mga tubig po na marumi, specifically po yung Biological Oxygen Demand. Dito po yung BOD pag anmg isang bagay po ay nabubulok ito po ay nangangailangan ng oxygen para ma decompose po siya. So pag ka malaki ang BOD ng isang tubig ibig sabihin malaking ang kailangan para mabulok yung mga decomposable na bagay so, nababawasan yung oxygen ng tubig doon sa study namin halimbawa dito sa Hagonoy creek ang BOD dito sa taas along the channel pa, wala pa sa lake ay lumalabas na 82 mg/l ito po ay mataas compare po sa standard na binigay ng DENR which is maximum is 10 mg/l. Dito po sa lake sa lawa na 29 medyo mas mataas pa rin sa 10 na seni-set ng DENR. Pag dating po dito sa Taguig river ang BOD po na lumalabas sa analysis ay 227 mg/l almost 20 times mas mataas sa standard ng DENR 87, dito din sa labasan medyo lumalabas pa rin po sa standard ng DENR. Suma total ho talagang masasabi natin na polluted na ang river natin pati na ho yung lake na medyo mataas taas na rin ho humahabol na rin 87 na po. So bukod doon ang isang tinitingan nong wastewater treatment plant ay para bawasan ang total coliform. Siguro po aware naman kayo coliform, yung naririnig nyo po sa TV ang pag ka diarrhea, yan yung number one cause normally yung sa coliforms. So ang standard ng DENR ay nilalagay sa 5,000. Ang lumabas sa study namin umaabot sila sa mahigit 160,000 ang analysis. Merong 500 ito sa lake na ito pero normally ang sa lake medyo mas mababa kasi medyo dilluted nayan eh kasi na sa labas na sila. Pero ang nasa creek natin katulad dito sa Hagonoy 160,000, Taguig river ganoon din, ganoon din sa labasan at sa Tapayan 160,000 most probable number per milli-liters. So yung po ang lumabas sa study naming sa water quality. Doon po pala nong pumunta po kami sa Tipas nakipag Focus Group Discussion po kami, ito po yung lumabas na issues and concerns na binigay po sa amin ng mga barangay councils ano po. Ito po yung issue wala nga po silang functional sewer lines saka wala yung ibang lugar wala talagang sewer lines so meron po silang nilagay na recommendations. Ito po yung formation dissemination katulad po nitong ginagawa naming na consultation, ah mobilization of man-power for the construction of the sewerage lines. ah ang pag kakaintindi ko po doon sa meeting na binasa ko po yung minutes ito po yung kong sakasakali magkakameron ng malakihang project yung MWCI kong magtatayo po sila ng sewerline ay maging bahagi po sila ng construction yung mga barangay citizens po. Affordable sewerage fees and commendable services at saka yung time frame nong project. Siguro na explain na rin po sa inyo kanina na yung project po ay 2005 yung financing so kong, mabibigayan ng pondo ng World Bank ang MWCI mga 2006 to 2008 yata yung time table para sa boung project hind lang itong Taguig Sewerage.

Punta po tayo dito sa tinatawag na Impact Assessment. Dito po sa impact assessment hinati po namin sa dalawang stage yung project, habang ginagawa po yung project at pag nag o-operate na po ang project. So habang ginagawa yung project sa aming pag-aaral siguro masasabi nating na wala naming sigurong epekto habang ginagawa yung construction. Kasi unang-una nandyan na ho yung flood retention ponds na ginawa po ng DPWH. Ang gagawin lang po nang MWCI ay maglalagay lang po ng bumba para kunin yung tubig na mangagaling dito sa mga river o sa mga channels para lang dalhin dito sa mga retention ponds. So lumalabas sa pag-aaral naming na wala namang magiging epekto habang ginagawa ang project. Yan po ang mga retention ponds na gamit sa flood

Page 135: for Manila Third Sewerage Project Volume 3

control ay nagawa na ng DPWH. Ang lalagay lang po dyan ay ang mga pumps para mag irate aeration pond po ang lalabasan non at maglalagay lang sila ng maliit na parte para ilagay lang yung control panel. So pag dating naman dito, habang kong sakali nag operate na po ito ang treatment plant nila o sewerage pond, ang nakita naming na maaring epekto ay yung perception ng ibang tao yung amoy. Sa tingin namin di naman siguro magiging significant yung amoy. Unang-una yung amoy sa retention ponds kasi ito lang po yung tubig na nanggaling sa mismo sa creek so, ang amoy nito di na rin naiiba sa doon mismo sa creek. Ang ginagawa rin kasi naming habang tenitreat siya ay ini -aerate lang para mabawasan yung BOD at saka yung total coliform kasama din po pala sa proseso meron din silang gawin na di-infection para bumaba yung coliform bago nila ibalik sa Laguna Lake. Ito po yung pangalawang issue na maaring maka apekto sa mamamayan dito po. Kasi gaya ng sinabi ko po yung paggamit ng retention ponds ay tuwing tag-araw lang po. Kasi pag dating nag tag-ulan ang gagamit na po yan kasi ang unang gamit po ng mga retention ponds ay para flood. Parang makikigamit lang po ang MWCI tuwing tag-araw siguro sabihin nating kalahating taon pagka di masyadong umuulan para ma treat yung karamihan na lumalabas na wastewater. So ang mangyayari nyan kong mag-operate sila tuwing tag-araw ang magiging epekto nyan ay isara nila ang flood gate kasi kong hindi, di nila ma e-cupture yung tubig at di nila ma treat. So, yung po ang nakikita naming magiging epekto. Unang-una sa tingin ko po dito yata sa apat na ponds ninyo ang pinaka-malaking river po na ay sa Taguig. Ang pakakaintindi namin ay parang itong Taguig river ay dinadaanan nang mga fisher folks ano. So, ang mangyayari po nyan dahil masisiran po habang nag-ooperate po ang MWCI kong maisara yan mawalan po sila ng access. Yung po ang magiging epekto mostly sa fisher folks. So, kasi pag tag-ulan naman po alam naman natin kasi ang concept po na nakikita po ng MWCI kasi ang control po ng estraktura ay naging responsibilidad ng DPWH kasi sa kanila naman po yung structure. So anytime during sa tag-araw may biglang makameron po ng flush flood so kailangan talaga po mag give-way yung sewerage treatment para gamitin uli yung ponds ng DPWH. So yun lang po, pagdating sa solution so alam natin na kong masara mawawalan ng access, di ko lang po alam, ang nabasa po naming doon sa EIA ng DPWH para mitigate po yung problema. Ang access ng fishermen ay balak nila magtayo yata nong parang wharf dito yata sa may lawa para magkaroon ng station yung mangingisda kasi baka makukulong sila kong di sila maglalagay ng temporary wharf. So, ang solution lang naming dito kailangan malawakan at masusing kompanya para mailahad sa kanila ang mga benipesyo ng proyekto. So ano ang maging benipesyo nito.

Purpose ng Sewerage pond treatment pond ay para mababa yung BOD at total coliform levels. So, sympre kong alam natin na kapag malinis-linis na ah malinis na ang tubig ay ikalilinis din nito ng tubig na papunta din sa lake. So, mas malinis na tubig sa lawa ay makipag-ibayo sa ecolohiya to the enhancement to the environment lalong lalo na doon sa lake na nagbibigay din naman ng kabuhayan sa mga nakikinabang. Yung po kong e-sumarized po natin yun po ang pinaka beneficial na maibibigay ng project na ito. Bukod po doon meron din pong Health benefits po ito dahil malinis na ang tubig na yung ma tetreat ng waste water. Kahit papano o ito ay maka dagdag din sa kagaganda din ng kalusugan. Finally po dahil ah doon po sa EIA para mabawasan kong ano mang epekto ang maidudolot ng proyekto kong ere-require po ng EMB po ito kong may masamang

Page 136: for Manila Third Sewerage Project Volume 3

epekto ang proyektong ito sa mamamayan o sa palibot po at meron pong itatayo po ang proponent ito po yung Environmental Guarantee Fund. So ito lang po ang aming presentasyon sa araw na ito. Maraming salamat po. (palakpakan)

Mr. Soncuya: Maraming salamat ho. ah pwede na po nating simulan ang open forum alam ko po na medyo meron kayong mga tanong dyan. Kong sino po ang may tanong pwede po bang lumapit dito sa mic na to. Pwede po tanong, suggestion, comments ah kong ano man po ang iniisip nyo, pwede na pong magsimula. Community Resident: Magandang hapon. Ah tatanong ko lang kong magkaroon na nang sariling sewer ang manila water di na kayo magtatapon sa Laguna lake kasi ang programa niyo is year 2015. Pagdating ng 2015 marami ng tao dito sa Metro Manila di na makakayanan ang pagtatapon ng wastewater sa Laguna Lake. So, pagkagawa na po ba yun sa year 2015 sariling ninyong sewer din a kayo magtatapon sa laguna Lake. Kasi sa pagkaalam ko meron na kayong sariling ano. Pangsamantala lang pala itong gagawin niyo sa retention pond ng DPWH hindi pala panghabang panahon. Christopher : Parang ganoon na rin po ang mangyayari kasi po itong ginagawa namin ngayon eh kung toto-osin ay maliit na project lang. Kasi nakikisakay lang po tayo sa project ng DPWH. Pero itong sinasasabi, yung pinaka solution namin so malaki po yung coverage niya pero maliit lang po ang pondo. Pero habang tumatagal syempre dumadami po kayo ah magkaroon din po, na fo-forsee na po namin na magtatayo rin po kami nang sariling naming treatment plant. Community Resident: Ah kasi sa ngayon ang Tipas River gagawin ninyo munang pang samantalang sewer system ninyo. Yung wastewater sa mga household doon pupunta sa Tipas river tapos ete-treat ninyo papuntang ano kasi ang Manila Water is kasi nag babayad po kami ng tubig tapos magbabayad din kami ng sewer di ba, kong ilang litro ang ginamit naming yun din ang itatapon namin. So ngayon pang gumagana na yung sewer ninyo gaano madadagdag yung sa binabayad naming sa tubig. Christopher: Ang ano po natin, halimbawa gumagamit tayo ng tubig. Ang napupunta po sa wastewater po namin is 70% po nong nagagamit nating tubig. So ang magiging charging scheme namin dito po sa mga nagiging, na cocover po ng sewered area, halimbawa po nagawa napo yun maco-cover na po kayo ng sewered area namin. Magkakaroon po tayo ng 50% charge sa water charge po nila. Community Resident: Tataas po talaga ang babayaran. Christopher: Meron po kasi po ito po ay isang serbersyo rin na dinadagdag bukod po sa water service, meron din po tayong sewerage charge. Community Resident: Dapat naman talaga kasi para sa magandang serbesyo. So ang Tipas river pang samantala lang pong gagamitin. Hindi pala habang panahon. Yun lang po. salamat

Page 137: for Manila Third Sewerage Project Volume 3

Community Resident: Tanong ko po tungkol po doon dahil pag-isahin na ang sewer at yung drainage. Papano naman po sa amin na wala naman kaming drainage. Wala kaming drainage kaya ang aming area eh bale mga tubig na nang gagagaling sa mga households ay naroroon lahat sa kalye. Yun ang problema namin, wala pa kaming drainage papano namin magagamit yung sewer. Christopher: Di naman po namin pweding pabayaan na po naming ang mga walang drainage na mag tapon na rin sa canal o ano sa esteryo. Syempre kami po sa Manila Water ere-rehabilitate din po namin kasama po ang DPWH ere-rehabilitate po namin ang drainage line ninyo. Kasi yun po ang area of concern namin eh yun narin po yung pang catch namin ng maruruming tubig papunta po dito sa dike. So together with DPWH e-rehabilitate po naming yung mga may problemang area po. Di po pweding pababayaan po yung area ng ganon lang. Unti-unti lang po yun ha kasi di pu-pwede bubutasin namin ng sabaysabay kasi mag tra-traffic ho kayo. Siguro strategically bawat area ere-rehabilitate din namin yun. Mr. Soncuya: Matanong ko lang ho ano po ang area sa inyo at saka ano … Community Resident: Natividad, barangay Ibayo Tipas. Ah pwede po bang sabihin muna natin yung pangalan natin. Sige po. Felix Catigay: Ako po si Felix Catigay ng barangay Ibayo Tipas. Susunod ko lang po doon sa ilang statement nag mga kasama ko. Kasi nanatiling fairy tales sa amin yung mga ganyang proyekto, kasi alam namin na maganda eh talaga naman na napaganda ng mga ipinapangko. Pero nananatiling fairy tale dahil unang una sa dinami-dami na pinapangako ng ating mga local governments pati yung mga ahensiya, minimal po yung natatanggap naming binipesyo. Halimbawa sa 100% na pinagako ninyong maganda parang ang binipesyo lang namin eh yung nalaman namin na may pag-asa. Pero yung katuparan nong mga proyekto ay nananatiling vague pa kasi unang-una paano mapapakinabangan yung retention pond doon sa Labasan River kong saan malapit kami dahil sa Ibayo Tipas, kong yun namang tina-target ninyo magiging e-filter ninyo ang mga dumi di makakarating doon. Dahil unang-una barado ang mga ilog namin doon pa lang makikita na doon ang mga dumi na doon na na-decompose dina talaga nakakarating doon so kong siguro mas maganda na maluwang yung rivers namin talagang mapakinabangan. Pangalawa yung sinasabi na mga drainage system, meron talagang naka programa na drainage system, di naman sinabing wala eh meron kaya lang palpak. Ibig sabihin di na pakikinabangan, napupundohan ng maraming pundo, nasasayang, di namin napapakinabangan ng husto. So dalawang problema barado yung mga ilog namin di napapakinabangan ng husto. Pangalawa di maganda yung papagawa ng mga canal, although mayroong programa pero di maganda ang pagkakayari kaya hindi napakinabangan mabuti. So sa tingin namin siguro isama, suggestion namin di lang katanongan isama, ilagay na plata porma pasama ang pagpalinis ng mga ilog namin kung saan doon talaga magsisimula ng ano eh yung pinakaparte ng programa kasi magpagawa ka kaya nang tulay doon sa wala namang tatawiran ang tao hindi ba. Magpapagawa ka ba ng treatment plant kung di naman makakarating doon ang mga basura na ete-treat mo. So yun ang problema namin sa barangay Ibayo. Siguro … unang-una kami yata yung

Page 138: for Manila Third Sewerage Project Volume 3

catch basin doon na pag umulan nandoon yung tubig pag nag-summer nandoon pa rin yung tubig. So walang access yung tubig na nandoon sa basin namin papunta po doon sa tinatawag ninyong retention ponds. Na isa rin sa mga binigay sa amin noong deliberation pa tungkol dito sa dike, yung mga sagot sa baha namin yun. Na pag umuulan wala ng baha sa amin. Ang katanongan po namin paano po yung mga tubig na naipon sa amin na di naman lumalabas kung summer so nandoon pa rin sa amin yung baha. Hanggang ngayon hindi pa rin sinasagot sa amin yung katanungan nayun na nagsabi bigyan natin ng magandang pansin ang ilog ninyo para kung maipon yung tubig sa ilog ninyo pagdating nang panahon kahit mababa na yung tubig sa may lawa aagus ng kusa. Hanggang ngayon wala parin katuparan dahil barado pa rin ang ilog namin at naglaan na ng programa palpak pa rin yung nakaraan ng project ng DPWH na pag huhukay ng ilang creek sa amin na talagang nawaldas lang ang pera. So ang suggestion namin isama talaga sa plata porma hindi lang yung talagang programa ninyo na magkaroon lang ng retention pond kundi ilagay doon sa mga provision na ipa hukay yung mga ilog na talagang kasama doon sa programa. Hindi na para bang isang parte lang na saka na natin gagawin yan matapos muna yung pond tapusin muna yung mga pond na yan yung mga treatment plant bago natin ayusin ang mga ilog. Ang suggestion namin na gawin talagang fifty-fifty. Isa pa pag-ayos ang ilog namin kasabay sa pag-ayos ng treatment plant. Salamat po. Christopher: Maraming salamat po sa magandang suggestion. Na follow-up na po yung suggestion. Kasi po kami sir hindi naman po pwede kami magtatayo diyan na hindi naman po mapakinabangan. Siguro po nandito rin po ang Manila Water private company po kami na kumikilos din para sa e-kagaganda ng, meron din po kaming social responsibility regarding po that. Siguro po ang maganda din po is yung magkaroon tayo ng tuloy-tuloy na edukasyon sa mga tao rin. Hindi rin po pweding e-asa sa gobyerno. Magbubuo po tayo as one para po maalagaan natin yung mga estero natin hindi lang po ang government natin ang kikilos, hindi lang po ang private company ang kikilos, hindi lang po ang community, samasama po tayo na magtutulongan. Kasi hindi naman po pweding isa lang ang gagalaw. Kami as a private company handa po kaming tumulong sa inyo with regard to that matter sa pag pa clear po nang mga estero. Pero at the same time yung pag edukasyon sa mga tao na, kasi ang mentalidad natin ano eh tapon dito tapon doon syempre pupunta din doon. Babara pa rin kahit anong hukay ng gobyerno na ipagawa natin, nagtatapon parin tayo wala rin mangyayari. So siguro as a whole kikilos tayo at yung proper education tuloy tuloy na edukasyon para sa kommunidad kasama din po doon sa suggestion ninyo, maganda po yun. Pero hwag po kayong magalala kami po as a private company na regulated ng government ay kikilos din po hindi rin po nami pweding pabayaan kayo na pagkatapos ng project ay tapos na charge kayo, mayaman na kami, hindi naman pweding ganon. Meron po din tayong social responsibility. Salamat po. Omar Estacio: Omar Estacio ng barangay Ibayo Tipas. Nabanggit po ninyo na mag o-operation po kayo sa panahon ng tag-araw, at habang ng operation kayo sarado yung flood gate. Paano po yung mga mangingisda na mawawalan ng access, mawalan na po sila ng hanap buhay, meron po ba kayong inihanda na livelihood program para sa mga mangingisda na mawalan ng trabaho.

Page 139: for Manila Third Sewerage Project Volume 3

Mr. Soncuya: Gusto ko lang po malaman, doon po sa tatlo na proposed retention ponds dito sa Taguig. Ano yung river na napapasukan ho nang mangingisda. Community Resident: Labasan at saka Tipas river ah isa lang po yun. Maraming mangingisda po doon sa amin, may pumapasok din sa Taguig so dalawa yun. Yung Hagony di pinapasokan. Mr. Soncuya: Yung po kasing project po kasi nila ay nakiki-ride on po sa project ng DPWH ano, pero ang isang epekto nito yung sinasabi nila na yung magdating ng tag-init ay isasara yun dahilan sa para makuha po yung wastewater para e-treat. pero ang pagkaalam ko doon ay meron tinatayo, kasama doon sa project ng DPWH yung fishermen wharf dito sa dalawang ito. Tapos yung fishermen’s wharf ho connected po ng access roads ng DPWH papunta po doon sa mga lugar. Ang masasagot ko doon kung ano ho yung pweding gawin ho nang mangingisda during rainy season baka ho pwede din gawin ng manginigsda. Dahil nandoon naman po yung mga facilities. Omar: Talagang panahon ng mga mangingisda sa tag-araw kasi sarado na yung flood gates. Maglalakad siya at bubuhatin yung bangka papunta doon sa kabila. Mr. Soncuya: Aware po kami doon, pero yung pag tag-ulan po ba, ano ho ba ang ginagawa ninyo pag nandoon na po ang mga retention ponds. Omar: Typically yung aming mga mangingisda doon mismo doon pa rin sa ilog pumapasok galing lawa. Wala pa yung retention ponds. Felix: Bale po sir ang existing dyan, ang experience ng aming mga mangingisda tag-ulan man o tag-araw ang kanilang mga bangka nandoon sa kanilang likod bahay o di kaya nasa gilid ng ilog. Pag baha na sa loob na ng bahay mismo. Ngayon pag sila ay lalabas ng dagat ang access nila yung mismo ang Tipas Labasan River. Ngayon may nakatayo na Taguig pumping station at sabi nyo nga na may posibildad o talagang sasaradohan yung pumping station na yan sa panahon ng tag-araw para ma treat or mahuli yung wastewater. Ang tinatanong nang kasama namin rito ay wala bang ibang alternative na gagawin ang Manila Water gayon din ang DPWH para matiyak na ang mga manginigsda may mapoponduhan ng kanilang mga bangka sakaling sarado yung gates ng pumping stations. Kasi iba na ang situwasyon ngayon eh may isasara na kasi ngayon, dati kasi wala tuloy-tuloy lang yung aming mangingisda. Kasi malaking porsento parin ng aming mamamayan siguro nasa 20% pa rin umaasa sa lawa. Kaya kung masasaraduhan yun magkakaroon ng malaking problema ang aming barangay dahil karamihan ng aming mangingisda ay walang dadaanan ang kanilang bangka. Mr. Soncuya: Clarifcation lang ho ano, natapus na ho ba yung inyong flood gates ng dike. Dahil sa pagkaalam ko po dyan, dahil involve din ako dyan sa dike. Yung ho ang closure ng dike ang magdi-decide ho kung kailan ang bukas o kailan sarado DPWH. Ang sinasabi po ng DPWH pag dating po nag tag-ulan para hindi po papasokin ang bayanan ng Taguig isinasarado ho yung flood gates. Kaya during rainy season ho ang ibig sabihin

Page 140: for Manila Third Sewerage Project Volume 3

ho dyan yun hong mga bangka na nangingigsda sa lawa ay hindi mismo makakapundo sa mga bahay nila. Tama ho ba yun. So ang sinasabi ko ho na kung ano po yung situwasyon ng tag-ulan yun ang magiging situwasyon ngayon sa tag-init. So yun hong pinuponduan ho ng mga bangka nila during tag-ulan doon sa

Page 141: for Manila Third Sewerage Project Volume 3

wharf ay doon na rin po mapupundo yung mga bangka nila during dry season. Kasi sa pagkaalam ko din basi doon sa konsultasyon namin sa dike ginawan ng DPWH ng access road mula doon sa network system papunta doon sa wharf. Para may access yung mangingisda pag baba, yun ng mga motor at saka pag baba ng produkto at saka pag kuha po ng supplies so na-address ng DPWH po yan may mga wharf ho. Christopher: Siguro magandang rin pong isipin natin yung magiging magandang epekto sa lake natin. Kasi po habang di tayon nagtatapon ng maduduming tubig na galing sa ating na e-flush out natin sa Laguna Lake eh lalo po na magiging healthy yung Laguna mismo mas dadami ang huli natin. Yun lang po siguro ang pinaka magandang maiisip natin na paraan. Omar: Ano po yung sa labas lawa, paano yung dike, kasi nasa labas sila ng dike eh. Saan talaga yung exact location ng retention pond….. ah dito po. Mr. Soncuya: Yung konsultasyon natin ngayon nag bigay po kami ng inbitasyon kay Engineer Delos Reyes ng DPWH yung nangangasiwa ho dito para eka nga kung meron ho kasing tanong na hindi po related doon mismo sa project ng Manila Water ay medyo makasagot para makabigay ng paliwanag sa inyo pero may prior commitment ho. Yun ho sa Taguig dito po sa side na ito, ito po yung Taguig river ito po yung retention pond dito ho. So dito ho yung so kong naka face ho kayo sa dike nasa left side. So basically ito yung retention pond ng DPWH na eco-convert bago ng dike. Meron pa pong tanong, comments, suggestions. Ito suggestion ko lang po sa mga barangay officials, mga local officials nanarito ngayon. Dapat ngayon simulan na natin ang paglinis ng ating mga ilog, ng mga kalye, ng mga drainage kasi pag dating ng tag-ulan pupunta lahat yan sa ilog sa sinasabi sa treatment ng Manila Water. Pag marami bang waste treatment na inaano niyo madagdagan ang gastosin ninyo sa pag tetreat ninyo ng tubig. Syempre pag marami kayong teni-treat mas maramin kayong seni-segreggate na solids mas magastos sa amin na mga Bumibili ng tubig kasi habang mas marami kayong tini-treat mas magastos. Dapat sa simula pa lang malinis na agad yung mga drainage, at saka yung ilog na huwag ng magtapon ng basura ang mga tao. Sa inyo sir sa Manila Water mas magastos siguro pag marami kayong ete-treat. Christopher: Siguro po on your part di po maapektuhan yung charging pero sa amin po medyo magkakaroon po kami ng problema. Kasi po yung mga solid na tinatapon eh magkakaroon po ng karagdagang gastos at baka ho may possibility na masira po yung planta pagka basura basura yung ano ho. Atleast hangat maari ewasan po natin magtatapon ng mga plastic ng mga basura sa mismong drainage system natin kasi doon po yan dederetso sa planta. Siguro yung awareness lang po. Community Resident: Kasi problema talaga sa Pilipino yun eh. Ang Pilipino naman pwede naman sumunod eh. Nang pumunta po ako sa Olongapo hinuhuli ang mga traffic violator doon, sumusunod sila. Kong pupunta sila sa Palawan sa Baguio di sila nagtatapon ng basura sa kalye o sa ilog. Bakit dito sa Metro Manila di natin kayang gawin yun na mahuhuli na talaga, napagsabihan natin yung mga tao na huwag kayong magtapon ng basura, mag kalat sa kalye, sa drainage o sa ilog. Bakit hindi natin gawin dito sa atin yun sa bayan ng Taguig. Ito po sa mga local officials natin na naririto. Dapat simulan niyo na tapos na ang election pwede na ninyong simulan. Mr. Soncuya: Mayroon lang po akong ekwekwento nag conduct po kami ng ganitong konsultasyon kahapon po doon sa Signal. Mayroon pong tanong doon kong ang sewerage charge ninyo ay basi doon sa consumo ng tubig, eh mayroon naman akong sariling source ng tubig na di

Page 142: for Manila Third Sewerage Project Volume 3

naman naka konekta, deep well ako, papano ninyo ako sisingilin. Ayon kasi ang pagbabasihan eh yung paggamit ng tubig eh. So di siya daw masisingil pero nagtatapon din, ano ang tawag doon systems lost. Baka ho yung ibang lugar dyan ay nahahalata ko ay halos lahat ng nagtatanong ay taga Tipas Ibayo. Siguro ho ah si Chairman ah sino ba ito ah Flores yung, so ikaw po yung mayari ng Tipas bakery ah partly. Baka sa ibang barangay naman po may ibang tanong. Felix: Sana sa taga DPWH po ito eh, na sana pag gumawa po ng drainage mayroong standard na sinusunod wala na dapat yung gagawing drainage, barabara na lang ang paggawa wala sa sukat, wala sa level dapat ipasunod nyo na yung sisasabi ninyong rehabilitation. pag-renihab yung isang drainage dapat ay nasa standard ng DPWH. Yung level, yung lapad, yung taas. Kasi pang karaniwan sa Tipas ang drainage naming walang semento yung ilalim yun ang problema doon. Kaya wala talaga sa standard ang drainage namin sa Ibayo Tipas. Dapat meron talagang guidelines yung DPWH na ano bang susundin na standard. eh wala palang taga DPWH pala dito. Suggestion ko lang po yan sa inyo. Mr. Soncuya: makakarating po yun sa DPWH. Omar: Siguro po once and for all ma influence ninyo ay magkakaroon din ma-enpluhensyahan doon sa magiging yung future project nyo kasi tapos na ang election ibig sabihin magiipon ng pundo. Mga ilang taon pa lang magsisimula naman yung mga infrastructure project mainly yung mga drainage systems, etc. Baka pwede po maka inpluhensiya na kayo doon sa mga, total inalalakad nyo na ang pagkakaroon ng isang sewerage system, ma- enpluhensyahan na ninyo ang local government namin particular dito sa amin kasi nasa Taguig kami na maki-ayon na sa standard ninyo. Para bawas gastos plus bawas, yung disiplina ba na pagkatapos kasi gawin ang isang proyekto na maganda yung sunod na proyekto babasagin naman yung kalye. So ang ganda ng unang proyekto kasi may sumunod na proyekto nawawalan ng saysay yung una so ang palagi natin dinadahilan sa tao kapag may proyekto na hindi natin magawa walang pundo. Pero napakarami ng pagkakataon na mayroon isang magandang project na nasira dahil doon sa hindi pagkakaroon ng koordinasyon. Kagaya ngayon na nabanggit namin na nagawa na yung kalye sa amin yun pala mayroong bagong ilalagay na tubo sa ilalim sinira naman yung kalya. So ang apel naming uli bukod doon sa pagkaroon ng magandang beurokrasya sa paggawa ng proyekto na mag coordinate total may future project naman pala kayo na inilalakad ngayon baka pweding makipagusap sa munisipyo na may future plan kami, baka may project na kayong susunod dito para more or less nararanasan na namin yung gustong nyong mangyari sa amin. Kahit di pa yung proyekto nyoeh meron na nakalinya doon sa direction ng pagkakaroon ng treatment plant na yung wastewater naming ay mapupunta sa isang magandang canal. Hindi yung gagawa ngayon tapos meron naman pala kayong gagawin ulit, babasagin nyo nanaman di ba sayang yung pera di ba, eh wala na tayong madadahilan na walang pera kaya hindi natin magawa yun. Christopher: Siguro po ah maipagyayabang namin sa inyo na maganda po yung samahan namin ng Taguig government ng manila water. Kasi po ah ang Taguig government po eh kaakibat po namin yan kapag gumagawa po kami ng major projects patungkol po sa patubig. Ngayon po meron po kaming project tungkol po sa sanitation eh hindi po kami natatakot na iiwan kami ng Taguig government kasi po sila po ang nagiging arm namin pag dumating po dito sa mga ganitong projects. Kaya hwag kayong mag-alala ah nagtratrabaho po kami regarding doon. Sa DPWH hanggang ngayon nakikipag-usap po pa rin kami para sa pagtuloy po ng project na ito.

Page 143: for Manila Third Sewerage Project Volume 3

Mr. Soncuya: Ah ako naman po ang magtatanong, baka pwede nyo ma explain kong papano po yung aling mandate ng Manila Waters at saka ng DPWH in terms doon sa drainage. Ano ba yung responsibility ninyo, sewerage. Christopher: Sa Quezon City part meron kaming, ang covered namin is yung sewerline kasi meron silang existing sewerlines doon. So, ngayon lang nangyari na ang drainage system ng isang syudad ay gagamitin din naming. Hindi katulad sa Makati na hiwalay ang drainage rainwater hiwalay ang sewer line. So ngayon major project namin nakikipag-usap kami sa taga DPWH para mas maisaayos ang drainage system sa Taguig. Kasi doon din daan ang inyong waste water products so kailangan talagang maisaayos yung mga linya ninyo at the same time masosolve din natin yung pagbabaha. Kasi maisaayos na natin yung drainage system. So ngayon nga tuloy pa rin yung usapan ng DPWH at ng Manila Water ukol doon sa ganitong malaking proyekto. Mr. Soncuya: So, meron papo bang tanog, comments, suggestions, and kwento. Community Resident: Kailan ba ito sisimulan Christopher: Hopefully itong 2004 hanggang 2005 e-panay dakdakan muna at saka documentations. Kasama narin po doon yung mga MOA signing, approval ng mga local governments hanggang 2005 po yan. Ang funding naman po ay darating itong 2005 din so siguro sai-kakatuparan natin yan 2006, early 2006 or late 2005. Nag fund na ito ay galing sa World Bank kaya wala po tayong problema sa funding. Omar: Narinig ko kasi yung funding at sinabi mo sa World Bank. Ano ba ito e-chacharge bilang utang ng mamamayang Filipino or grant. Christopher: Ito po ay, ah ito ay utang ng isang private company, kami po ang umutang pero through the, ah ang ginamit po naming pangalan is MWSS kasi po sila ang base value sa World bank. So hinarap naming ang MWSS na mangutang sila para ipautang sa amin para makagawa ng ganitong kalalaking projects. Hindi po, kami pa rin po ang magbabayad. Manila Water pa rin an magbabayad ng utang ng, ginawa natin. Community Resident: Ok yun para malinaw. Mr. Soncuya: Maglalast two-question po tayo, kagaya po ng sa basketball ho. Baka meron naman dito banda na magtatanong. Omar: Bali isa sa mga nagiging mentalidad ng aming mga kababayan dito yun nga yung masamang experience pagdadating ang baha. Kaya habang pinag-uusapan namin dito eh yung mga proyekto naroon na kaagad na pumapasok sa isipan na panibagong problema natin yan. Lalo na kapag dumarating yung gagawing iponan ng tubig baha yung Labasan river. Kami lagi yung na aapektuhan, kaya para ang magiging dating ay baka magkakaroon ng negative na dating doon sa mga mamamayan kung hindi natin e-educate ng malinaw. Kasi iponan tayo ng tubig baha, taon-taon binabaha na tayo gagawin pa tayong iponan. Yun lang po ang ilang ano maaring makuha natin feedback doon sa mga mamamayan. Mr. Soncuya: Explain ko ho ito no, palagay na ho natin na andito ho yung dike so pag dating ng tag-ulan sinasarado ho yung dike dyan para hindi ho umatras yung tubig na galing sa lawa paupnta ho doon sa mga barangay ho natin. Pero ang tanong ho doon saan ngayon pupunta ang mga run-off water, yung tubig ulan so hindi rin siya makakalabas kasi andoon na rin yung dike

Page 144: for Manila Third Sewerage Project Volume 3

nandoon na rin po yung flood gate. So ito po yung ginagawa nilang retention pond impounding pond ho to na yung mga ulan na galing upstream ito ho yung pupunta ho doon at yun pong bubumbahin ng DPWH palabas kasi mas mataas na ho yung level ng tubig sa lake eh. So ito po yung sinasabi nilang pond na iponan ng tubig na nanggaling sa ulan tapos ilalabas ho ngayon yan yun ho yun. yun ho ang eriride-on ng manila water para doon naman nila itatayo, kasi pagtagtuyot naman di walang ulan ang papasok lang po doon sa sa river system ay yung galing sa bahay yung domestic waste water. So yun na yung isasarado ninyo at doon iiponin ibubumba ulit pagkatapos ho ng treatment. Community Resident: Kanina pa po ako gusting magtanong pero wala pa akong clue dahil ako ay nahuli ano. maganda ho yung binuksan ninyo pero ang tanong ho alam ninyo hwag kayong magagalit ano ho. Ang maintenance ng ating pamahalaan ay walang kasing palpak sa nakikita namin sa edad ko, kong sakasakali na masira yung pambumba na palabas gano katagal bago ulit-ulit na makapag ano kung halimbawa kung sagad na sagad na ang ulan. Meron po bang reserba na isa, o dalawa o tatlo. Mr. Soncuya : Ang project po ng Manila Water para linisin ang yung tubig na nang-gagaling sa mgas bahay. So kaya ho nabanggit yung retention pond ng DPWH ito lang ho ang gagamitin ng Manila Water pag-dating po ng tag-tuyot so yun hong usapin ng kong pumalpak yung bumba ng DPWH ay siguro ho ay di na sakop ng project proponent dahil ang Manila Water nag bibigay lang ho na tubig at naglilinis ho ng sewerage. Siguro ho ang dapat natin e-address dyan ay yung DPWH na sa kanila yung project na yan. Yun hong project office na yan ay nasa upper Bicutan. Kaya pasensya na kayo kong hindi namin masagot ho yun dahilan hindi ho kasama sa project namin yan. Community Resident: Kasi ho kaya ko naitanong yun dito po sa barangay nanasasakupan ng bayan ng Taguig kung meron po pinakamatigas ang ulo dito po sa bayan ng Taguig. Binabantayan na ang basura talagang di maaring isisingit ng isisingit yung gusto nila. Ang kinakatuwiran na nagbabayad naman dawa sila ng buwis ano. Eh yan lumulosot dito sa tabing dagat doon sa sinasabi ninyong iponan siguradong sigurado doon maiipon, pag maipon siguradong sigurado din na masisira yang mga makinang yan. Ang kinatatakot namin ng mga Taguig kung masira ng isang linggo o dalawang linggo palagay ko po lubog na kami rito. Sa dami ng basura iipitin yan kaya kong hindi magkakaroon ng disiplina ang bayan ng Taguig, yan po ang number one na problema namin dito. Allen Villanueva: Taga EMB DENR po ako no. Siguro esa-suggest ko na lang po para malinaw ho sa lahat kasi parang nag o-overlap yung project nong MWSS at ng DPWH. Siguro dapat kung magkarron pa namam kayo ng consultation di ba. Ilahad ninyo sa kanila kung ano yung limits o limitation ng project ninyo. Nag pinaka madali naka matrix eh at saka ano yung responsibility ng DPWH para malinaw atleast alam ng tao kung sino ang may responsibilidad at hanggang saan ba. Kasi narinig ko sila dahil ang gagamitin ninyo during dry season ano naman yung responsibility ninyo pagginagamit ninyo syempre meron kayong limits din baka my Memorandum of Agreements between DPWH. So siguro ipakita nyo rin yun sa mga tao para atleast malaman nila. Christopher: Note taken po yun kasi po sa ngayon nagkakaroon po kami ng MOA, nag susulat pa po kami kung ano pa po ah tulad po ng sinabi nyo yung limitation ng bawat company sa pag control ng dike kong ano kung hanggang san po ang sa amin at hanggang san po ang sa kanila. Hwag po kayong mag-alala dahil di pa po natatapos yung MOA sakasalukuyan pa po na sinusulat namin kong ano po ang magiging agreement between DPWH and Manila Water. Thank you po.

Page 145: for Manila Third Sewerage Project Volume 3

Mr. Soncuya: So sa susunod na consultation namin naka matrix na yun para mas malinaw. Salamat po doon sa suggestion. Community Resident: Di ho mangyari ho kasi sa sinabi kasi medyo natatakot yung mga tao kasi nga yung pagtatanong namin baka pag dating sa susunod at nandyan na ang problema, problema to ng DPWH eh problema po nito tapos magtuturonan wala na kaming mapagsasabihan. Kasi ang tinatakot lang na ang tubig ganyan, kasi ang nangyari sa manggahan bago nag ganyan pinangangalagaan ang tubig ng maynila hwag bahain ang malacañang, hwag bahain ang manila. yung isa o dalawang oras na pagbaha ng maynila dalwang buwan na sa amin yun sa Tipas sa Ibayo kami ang pinakamababa kasi eh. Ngayon pag tag-ulan at ganito man at yung na nga sasabihin na iponan ng tubig kami na nga ang pinakamababa kapag iyon ay umapaw saan ba ang punta noon kundi sa amni rin kami rin yung mapiperwesyo doon, kulong ng kulong na kasi kami eh wla na kasi kaming ah, ang pinakamababa lugar namin sa Ibayo. Kaya ang kinatatakot lang tapos doon pa yung iponan ng tubig o ano man eh baka mamaya yung naipon na tubig di naman kasi bubuksan ang ano eh nakasara na yun. Kasi ang gagawin bubuksan sa manggahan sasarado sa Napindan sa amin. Bubuksan sa manggahan sasara naman kaya ang tubig ipon sa amin. Christopher: Ang pag kakaalam ko lang po sa retention pond is inclose area yun doon po mapupunta yun. Hindi po ibig sabihin na iponan eh yung area ninyo iponan talaga meron po tayong isang covered area na may wall siya na doon pupunta yung tubig na sinasabi na iponan. Hindi po yung sinasabi na pag iponan yung Tipas, yung Tipas ang iponan talaga. Meron po syang pond na inclose, inclose po siya na may wall kung makikita niyo po sa picture meron po siyang wall at doon po iiponin yung tubig at e-papump out palabas. Yun po yung pinakasilbi ng retention ponds. Hindi po yung mismong Tipas ang iponan yung po ang pagkakalabas sa DPWH Project. Mr. Soncuya: Sir, ang pinaka maganda yan siguroyung sa mga susunod na consultation natin ilagay talaga natin kung ano talaga yung retention ponds. Oh baka kasi iniisip nila na yun nga ang boung Tipas eh hindi eh na mayroon talagang structure na talagang kino-construct ang DPWH eh. Omar: Para sa both parties kasi more or less palagi kami nandoon sa may ano sa may pumping station at saka ito yung isa sa mga pinuponto namin argumento kanina kayat sinasabi ko yung mga baradong ilog, yung mga baradong canal. Huwag munang matapos ang mga taga Tipas yun sa tinatawag nilang retention ponds. Dahil unang-una ang retention pond natinatawag ay parte na ng ilog yun na parang dini-vert yung ilog. Pero doon sa argumento namin na dahil barado yung ilog minimal yung pumupuntang tubig doon. Dahil nga barado ang ilog sa atin eh. Hindi umaagos na papunta doon sa sinasabi natin na palagi sa labasan river. So more or less itong retention pond na ito parang natural na estado ng lugar natin pag umulan man o hindi ganoon pa rin. Nabago lang siguro yung ideology natin Na takot don sa sinabing magkakaroon ng iponan ng tubig pero mas pinalalim yun. So yung retention pond o yung ilog dati na mas mababaw hinukay yun ng medyo na malalim na malalim na medyo kung mapapasyal kayo so more or less di talaga nabawasan ng volume ng lupa kaya nagkaroon tayo ng isang mangkok na malalim doon yung retention pond. So siguro sa kalalaman yung isang … doon sa isang argumento na parang hindi naman boung volume ng tubig naka pag tag-ulan mapupunta doon at maiipon, hindi kasi ang sabi ko barado yung mga ilong natin at saka barado yung mga arteries. Kaya minimal p arin yung estado natin kung baha yun, yung level, ganoo pa rin yung magiging level kung maiiponan tayo ng tubig. Saka yun siguro isa naming pinag-diinan na maging makakatotohanan na kung maging retention pony un ang pina ka apel namin gawing epektibo siya s pamamagitan nong

Page 146: for Manila Third Sewerage Project Volume 3

wastewater namin papunta doon. Kasi yung wastewater namin hindi pa pupunta doon eh. naiipon lang doon sa may ilog na mismo ngayon na tayo, kung umulan ng kunti mayroon tubig pero sa natural na anon g ilog dapat nag floflow yun ng malakas dahil ilog yun eh at malalim dapat yun pero sa estado yun sa ngayon wala kaya epekto ng pagkakaroon ng retention pond sa sa amin minimal pa kong magkakaroon man ng direction yung gagawing flood gate na yun ng DPWH. Hindi pa kayong makikinabang ng husto kasi barado pa yung mga ilog namin, hindi pa mapupunta doon ang tubig. yun lang po. Community Resident: In fairness po doon sa taga DPWH, effective talaga yung dike nayon. Kasi mayroon kaming pala isadaan sa Cambaba. Inahati lang ng dike, panaho pa ito ni Macapagal, effective talaga ang dike maganda pa sa baha sa kabila dito sa side namin walang baha. Kaya ang masasabi ko lang ito pinag-aralan talaga ng DPWH, na huwag kayong matakot na iyon ay palpak, matagal na pinag-aralan yun. Doon sa lugar namin, ako taga Taguig dito ako lumaki sa Taguig. Nagkaroon na kaim ng kunting pala-isdaan sa Cambaba, effective na effective talaga yung dike, yung wala silang pumping station doon pero pag ano lang isasara nila ang patubig ng mangingisda walang flood gate na malaki doon. Simpling lupa at dike lang, 48 kilometers nagging effective gaano po kaya dito sa atin na pinag-aralan na, sementado pa, matigas yung ilalim kaya hwag kayong matakot sa baha ngayon. Pagnatapos yan ah 100 percent siguro o 99 percent ang Taguig hindi na babahain rin. Maski hindi gumagamit ng pumping station eh, natural flow ang ulan dito sa Taguig dito sa labas ang dike aagus yan papuntang Manila bay. Kasi ma mataas yung elevation natin sa Manila bay kaya kahit hindi na gumagamit ng pumping station nay an hindi tayo babahain. Ynu ang pah kakaalam ko dito sa situwasyon natin sa Taguig. Yun lang po at maraming slalamat. Rachel A. Vasquez: Ito hindi tanong, additional information lang siguro para sa lahat. Ah, kong mag ka problema po tayo sa DPWH or sa MWSS na project later during operation kung tumakbo a yung project. May avenue parin kayong mga taga barangay na pweding gawin kasi if the Environmental Compliance Certificate o yung tinatawag na ECC makukuha. Ang EMB will require the monitoring team and yung isang member ng monitoring team will be sigurodong DPWH, siguroradong MWCI and a representative sa inyo sa mga tao. So kung may mga problema na magkaroon during the operation pwede ninyong ma-air sa representative na, sa inyong representative na pipiliin din ninyo. Kayo rin ang pipili sa gagawing representative ninyo sa lahat ng mga issues ninyo, lahat ng mga concerns ninyo pwede ninyong ma- raise diyan sa monitoring team. Community Resident: So pagkagawa na yung project na sinasabi niyo, syempre yung finish product ninyo eh yung malinis na tubig. Eh yung waste product ninyo paano yun. Christopher: Magandang tanong yan, ang maipon pong dumi na magiging by product po yung solids po, siguro pakunti meron tayong makukuha na solids. Yun po ay ginagawang soil conditioners. Ah, ito po ay nililipat gamit ang mga trucks namin, ang mga disludging trucks na sipsipin yung mga dumi naipon at itatanker po siya papunta sa sinabing planta na septage treatment plant. Doon po ilalagay yung mga dumi naiipon namin, so yung by-rpduct na yung solids na naka segreggate din at yung liquid na ano malinis po yun. Pwede na pong pagbuhayan ng isda. Ganoon ka linis yun. Community Resident: Pag napuno na yung septic tank na ilalagay na ng ibang mga bad materials saan iimbak yun, kapag puno na. Christopher: Doon po sa planta.

Page 147: for Manila Third Sewerage Project Volume 3

Community Resident: Sa septric tank na sinasabi ninyo Kasi sa Nasco may waste filter doon, yung mga waste producdt noo may mga lason. Ka[ag napuno na doon nilalagay sa drum. Yung mga natirang waste product may nag-tanin na guardiya doon ng gulay mga kangkong, kinain yun na ospital. Yun ang inaano ko baka maimbak doo sa ano at kumalat yun. maka epekto yun sa community yun. Siguraduhin niyo lang para walang problema. Christopher: Sa ngayon, nagkakaroon po kami ng study sa lahar area. Isa pa pong project proponent namin yun. Nahahabol po namin sa lahar soil yung mismong naipon namin na by-product yung mga sludge para e-condition yung lupa. Ito po ay binabantayan ng SRH – Sugar Regulatory para atleast matingnan kung talagang epektibo po yun. Ah sa ngayon naman po maganda naman yung feedback nila with regards doon sa ano na-approve na tayo ng Fertilizer and Pesticides Association na approve na tayo kaya. Pero, at saka walang access sa mga tao, doon angmay access lang doon ang personnel ng Manila water ang kumukuha lang yun kaya hindi pweding kakalat ho yun. Dahil binabantayan din po tayo ng DENR at saka LLDA with regars to that. Kaya hindi po pweding kumalat yun. Salamat po. Boy Suelto: Additional information lang po sa sinabi yung na-acucumulate na solid doon sa mga retention ponds. Doon sa pag-aaral ng consultant ng MWCI ang sa calculation nila sa kada isang taon magkakaroon ng one-inch na accummulation sa mga retention ponds. So lalabas siguro sa sampung taon mga ten inches, so hindi magiging malaki yung effect ng sedimentation sa retention. So kung sakasakaliing tumaas siya medyo makaka-abala sa operation, siguro natural lang na gagawin ng MWCI na e-disludge nila, linisin ulit para magamit pa ulit yung structure. Christopher: Oo nga pala yung mga solids eh papunta muna sa septic tank ang sinasabi natin. So bawat bahay may septic tank na yung mag tra-travel po yung mga nakalusot lang. So kunting-kunti lang po ang makakarating sa mismong pump natin. Kaya kayo po gusto ko sanang maging aware kayo na taga Taguig na nagpapa disludge po kami, nagpapa-sipsip po kami ng septic tanks ng libre kung schedule. Halimbawa na may lumapit sa inyong barangay officials kasi kami thru barangays nakikipag-usap po kami sa mga kapitan o kapitana para sa schedule ng disludging. Doon po kayo mag-avail ng libre, pero halimbawa nag bara na, tumawag po kayo sa amin mayroon po tayong minimal fee na 900 to 1000 plus ganoon lang po kaliit hindi po katulad sa Malabanan na umaabot po ng 2,500. Kaya sa amin na po kayo magpa-disludge. Sigurado po na malinis po yung septic tanks ninyo, itatapon po namin sa siguradong place hindi po yung katulad sa malabanan, di po natin alam kung saan nila tinatapon. Kasi regulated kami ng DENR, yun lang po. Mr. Soncuya: Advertisement yun ah. kadagdagan lang po no, doon sa sinasabi ninyong dry season. Bigyan ko po kayo ng idea, yung isang pamilya on an average gumagamit ho ng one cubic meter ng tubig a day. So base doon sa computation ng Manila Water 70 percent ho noon 0.7 cubic meter yun ho ang mapupunta doon, ah napupunta sa tinatapon. So yun po para mabgiyan ko kayo ng idea kung gaano kadami yung tubig na pupunta sa retention pond during summer, araw-araw ho ang number of household doon ho sa nasasakop sa inyo times 0.7 cubic meter, ganoon ho yun. So more or less manageable, hindi yun babaha. So para magkaroon ng idea kung gaano karami yung ano. Nag sinasabi nga ng Tipas Ibayo yung 0.7 nila siguro 0.2 lang ang nakakarating doon kasi naiimbak sa kanila ang 0.5, so more or less ganoon yung computation. So meron pa pong huling katanungan. So kung wala nang katanungan. Nagpapasalamat po kami sa inyong lahat na dumalo dito. Nabigyan kami ng pakakataon para ipaliwanag yung project lalo na sa only barangay chairman na umatend dito sa si barangay Chairman Ulaza. Maraming salamat sa inyo.

Page 148: for Manila Third Sewerage Project Volume 3

PICTURES TAKEN DURING THE MEETING

Page 149: for Manila Third Sewerage Project Volume 3
Page 150: for Manila Third Sewerage Project Volume 3

Blue Ridge A and B Public Consultation Meeting with Barangay Officials and Residents of Barangay St. Ignatius, held on June 17, 2004 from 9:30 to 12 NN at the Barangay Hall Blue Ridge B, Quezon City, Metro Manila

Page 151: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with Barangay Officials and Residents of Barangays Hagonoy, Wawa, Calzada and Tipas Ibayo held on June 16 2004 from 1-4 PM at Villa Salud Barangay Lower Bicutan, Taguig City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Mr. Calamiong, senior project development officer of Wastewater Department of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Ma. Fiorella Fabella Manager Waste Water Department Christoper Calamiong Senior Project Development Officer Erick Elarmo Senior Project Development Officer EDCOP-LTI Rachel Vasquez Project Director Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Wilva Lin Deocades Facilitator Allen Villanueva Representative EMB, DENR Becky De Vera Representative MWSS Note: Attendance sheets of participants with their signatures are attached to this report. Retention pond – During rainy season, the floodgates will be closed to prevent the lake water in inundating the coastal barangays of Taguig. The retention ponds are walled and dug areas within the DPWH areas that will collect the surface run off water from the protected areas of the dike. Pumping stations will then pump out the water to the lake. During dry season, the project will use the retention ponds of DPWH to collect the domestic wastewater and treat it before pumping out the water to the lake. It was pointed out by a participant that the dike has been thoroughly studied by DPWH and should afford adequate protection against floods.

Duration on the use of retention ponds – The retention ponds will be used temporarily up to 2015 wherein the construction of an independent sewerage line and treatment plant may become feasible because of the development in the area. Cost – Around seventy percent of household water consumption is generated as wastewater. If the area is covered by the sewer system, the charge will be 50% of the basic water charge because it is an additional service provided by MWCI. . It was suggested that barangay officials and residents should start cleaning their waterways because the volume of waste might affect the charges that they may be made to pay. It was pointed out by MWCI that the charges would be based on a certain percentage of their water consumption and not on the volume of pollution in their wastewater. However, more pollution in the wastewater will lead into higher operational cost to the company and the solid waste in the waterways might adversely affect the operations of the treatment plant.

Page 152: for Manila Third Sewerage Project Volume 3

Combined drainage and sewer system –Barangay Tipas has a non-functioning drainage system. What is the basis of the sewer charge? MWCI will rehabilitate these areas together with DPWH. It is suggested to clean the Labasan River and rehabilitate the drainage system so that their wastewater may reach the treatment plant because their area is the catch basin of the general area. There were many projects implemented in their area but the implementation was not properly done resulting in the perennial problem of flooding. MWCI has a social responsibility to their communities. It is not the sole responsibility of the government to pursue improvement in sanitation. It is important to educate the residents in proper sanitation practices and take care of the water system. Hence the residents, government and MWCI should work together to ensure that proper sanitation practices are observed to produce a healthier environment. Suggestions regarding drainage system – In drainage construction, standards should be set and implemented including pipe size, levels, width and depth. If MWCI will rehabilitate the drainage system, it should follow the standards set by DPWH. It was also suggested that this project be coordinated with the city officials of Taguig. MWCI is closely coordinating with these officials and they have been very supportive in the past and express their support in the proposed project. Effects on Tipas Ibayo This barangay is situated in the lowest part of the lake coast. During dry season, the barangay is still flooded. What will be the effect of the project? The proposed project includes the rehabilitation of the drainage system. It is expected that the rehabilitation will greatly improve the perennial flooding because the surface run-off water will be able to flow to the retention ponds along the dike. Effects of fisherfolk – If the floodgates are closed during dry season, how will the fisherfolk dock their boats especially in Labasan River? Based on the plans of DPWH on the construction of the dike, during the rainy season the floodgates of the Hagonoy, Taguig and Labasan Rivers will be closed to prevent the water from the lake in inundating the coastal barangays of Taguig. DPWH will construct two structures to address the issue of accessibility of the fisherfolk. First, wharves will be constructed to allow the docking of boats of the fisherfolk. Second, access roads will be constructed from the existing road network to the wharves. These access roads will allow the fisherfolk to bring their supplies, equipment and harvests to places where they want to go. During the dry season, the same facilities and roads will still be available to the fisherfolk. Hence, the construction of water treatment plants in the retention ponds of the dike project will not impede the fisherfolk in using the structures during the dry season. The implementation of the project will lessen the pollution going into the lake and will probably result in more fish catches because of more favorable environmental conditions in the lake. Effects on seasonal farmers – There will be no negative effects on the seasonal farmers planting crops during dry season along the lake bed when the water level recedes because the project will just ride on the dike project of DPWH. It might benefit the farmers because the wastewater coming from the treatment plant may be used for irrigation. Reliability of Pumps of DPWH – The project proponent is on water supply and sanitation. The project will just ride on the dike project of DPWH. MWCI is not the proper party to answer this question. Inquires may be made with the office of DPWH located in Upper Bicutan for details of the dike project. Participation of Residents -- As stakeholders, the residents will be represented in the multipartite monitoring team. This monitoring team will ensure that the project proponent will strictly follow the conditions contained in the ECC. It is also an avenue to ventilate issues and concerns of the affected residents and ensure that the interests of the residents are adequately protected.

Page 153: for Manila Third Sewerage Project Volume 3

Responsibilities of DPWH and MWCI –The representative of EMB suggested that a matrix of responsibilities be made available to delineate the responsibilities of DPWH and MWCI. This will enable the residents to pinpoint responsibilities if ever adverse effects are produced by the project. Presently, there is an on-going negotiation with DPWH to precisely identify the individual responsibilities. MWCI is responsible for sewer lines. This is the first project that will combine the sewer and drain system. MWCI will rehabilitate the existing drainage in the covered areas in Taguig. By-products –The treatment plants will produce sludge estimated at one inch per year and will be further treated in the proposed treatment facility in FTI. The water produced may be used for irrigation. The solids produced in FTI will be used as a soil conditioner in the lahar areas of Pampanga and Tarlac in coordination with the Sugar Regulatory Authority. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWCI. MWCI will be the one responsible for the payment of the loan. The Filipino people will not shoulder any amount for its payment. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. The residents in the Taguig communities expressed support for the project because it will improve the sanitary conditions in their areas. The participants suggested for close cooperation with municipal and barangay officials in the construction phase. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 154: for Manila Third Sewerage Project Volume 3

Barangay Pineda, Pasig City Public Consultation Meeting with the Barangay Officials and Residents of Barangays Capitolyo and Pineda held on June 18 2004 from 9:30-11:30 AM at the Headquarters of Special Barangay Force, Barangay Pineda, Pasig City, Metro Manila

Page 155: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangays Capitolyo and Pineda held on June 18 2004 from 9:30-11:30 AM at the Headquarters of Special Barangay Force, Barangay Pineda, Pasig City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and to gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Calamiong, senior project development officer of Waste Water Department of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Christopher Calamiong Senior Project Development Officer Ben Velasco Senior Project Development Officer Sterling Reyes Territory Business Manager EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Allen Villanueva Representative EMB, DENR Note: Attendance sheets of participants with their signatures are attached to this report. Charges – Our monthly statement of account can be broken down as follows; Basic water charge, CERA, foreign currency adjustment, environment and sewer charge and meter service charge. The total of these items is then subject to VAT of 10%. The sewer charge will be 50% of the basic water charge. The sewer rate is regulated by MWSS. Monitoring team – A representative of the community will be part of the monitoring team. One of the responsibilities of the monitoring team is to inform the residents about the project through proper signage and prepare a list of dos and donts during construction and operation phases. The monitoring team will also ensure that terms and conditions set in the environmental certificate of compliance will followed religiously by the project proponent. Additional services -- It was pointed out that MWCI is offering free desludging of individual septic tanks as part of its mandate to provide sanitation services and is one of the services under the environmental fee being charged monthly. To be free, the desludging should be scheduled otherwise the household will be charge a fee of around 800 pesos compared to some private contractors of 2,500 pesos. On the day of the desludging, households should remove the covers of their septic tanks to facilitate extraction. Disposal of sludge – The sludge generated by the proposed STP will be vacuumed and will be processed in the proposed septage plant that will be located at FTI complex. The processed waste will then be

Page 156: for Manila Third Sewerage Project Volume 3

applied in the lahar areas in Pampanga and Tarlac. There are negotiations with the Sugar Regulatory Authority (SRA), to use the soil conditioner in sugar plantations. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. Construction time in this component is expected to last a year. Location -- The treatment plant will be located in the open basketball court. The plant is below ground and after construction the community can resume using the area as a basketball court. During construction, the place will be dug up and that is the time that the community will suffer inconvenience in terms of its non-availability to the community. . The residents and barangay officials expressed support of the project. They are ready to assist the project proponent in the construction and implementation stages. Note: All other questions and suggestions are related to water supply issues such as alleged overcharging, meter disconnection, wrong meter reading, low water pressure. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 157: for Manila Third Sewerage Project Volume 3
Page 158: for Manila Third Sewerage Project Volume 3

Sports Complex, Barangay Poblacion Public Consultation Meeting with the with the Barangay Officials and Residents of Barangay Poblacion, Makati City and Barangays Ilaya, Barangka Itaas, Barangka Ibaba, Mandaluyong City held on June 18 2004 from 2-4 PM at the Sports Complex, Barangay Poblacion, Makati City, Metro Manila

Page 159: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangay Poblacion, Makati City and Barangays Ilaya, Barangka Itaas, Barangka Ibaba, Mandaluyong City held on June 18 2004 from 2-4 PM at the Sports Complex, Barangay Poblacion, Makati City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Me. Calamoing senior project development officer of PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Christopher Calamiong Senior Project Development Officer Ben Velasco Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Allen Villanueva Representative EMB, DENR Note: Attendance sheets of participants with their signatures are attached to this report. Charges – Our monthly statement of account can be broken down as follows; Basic water charge, CERA, foreign currency adjustment, environment and sewer charge and meter service charge. The total of these items is then subject to VAT of 10%. The sewer charge will be based on water consumption. Currently it is 50% of the basic water charge. It was correctly pointed out that owners of illegal water connections would not be charge because they are illegal. However, MWCI is coordinating with local officials to pinpoint these illegal connections. It was also emphasized that illegal connection is the major cause of water contamination. A participant said that customers of MWCI would surely complain about the additional sewer fees because it would be an additional financial burden to the families. Some families still do not have clean water supply. MWCI pointed out that their water is potable. The major cause of contaminated water supply is the illegal tapping from their pipes. During low pressure in their pipes, contaminated water enters into their lines. Hence, if there were illegal connections in your upstream, you would probably have contaminated water. In this respect, we would like ask for the residents’ cooperation in identifying these illegal connections. Confidentiality will be strictly maintained. Traffic – The proposed site will be located at a vacant lot along the Pasig River. There are two types of trucks, the ten and five cubic meter capacities. If the roads are narrow, the lower capacity trucks will be used. During construction and operations, MWCI will coordinate with local officials to minimize traffic. The contractor may be prohibited to deliver construction materials during peak traffic hours. Presently, MWCI is coordinating with MMDA if their activities will cause traffic in the area. The plant will provide parking space to accommodate trucks during desludging.

Page 160: for Manila Third Sewerage Project Volume 3

Safety – The construction in Barangay Ilaya will be done roughly for a year. MWCI will ensure that their contractors will implement safety measures especially in construction sites. Proper signage and roadblocks will be installed to prevent persons in entering the construction site. The monitoring team will address problems arising during construction stage including possible bad odor. Restoration of street diggings – MWCI pays excavation permits to the local government units. The fees include street restoration. After the diggings, the LGUs have the responsibility of street restoration. Value added tax – All charges in the monthly statements are subject to VAT. The rate is constant, about ten percent, if the sewer charge will be included, the rate remains the same but the amount will increase because the base of the VAT will include the sewer fees. Bad odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities usually carbon filters will be used to prevent bad odor from escaping from the plant and go to the nearby communities. The plant is located below ground and this will help in reducing the risk of bad odor from escaping into the nearby communities. Eviction – The proposed project will not cause any eviction because the proposed site will be located in an open area near the flagpole in the riverpark. The informal dwellers living under the Guadalupe Bridge will not be affected by the project. The project will intercept the wastewater from existing drainage and collect them before they discharge to the Pasig River. The structures along the creek including the school in Lions Road will not be demolished. These will not be affected by the project construction. Many of the structures directly discharge their wastewater into the creek. Health benefits – The EMB representative suggested that the project show the health benefits in terms of saved medical costs so that the residents will appreciate the health benefits from the project. Fire hydrant – The request for a fire hydrant can be channeled through Raymond or Daisy Cabrerra, MWCI territory business managers in your respective areas. The participants expressed support for the project because it will improve their sanitary conditions and drainage system. Some participants had reservation on the additional sewer charges considering the tight economic conditions. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 161: for Manila Third Sewerage Project Volume 3
Page 162: for Manila Third Sewerage Project Volume 3

Barangay Health Center of Barangay IVC Marikina City Public Consultation Meeting with Barangay Officials and Residents of Barangay Industrial Valley Complex (IVC) including Olandes, Cinco Hermanos, Industrial Valley Subdivision and Monte Alta Subdivision. Marikina City on June 19 2004 from 9:30-12NN at the Barangay Health Center of Barangay IVC Marikina City, Metro Manila

Page 163: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with Barangay Officials and Residents of Barangay Industrial Valley Complex (IVC) including Olandes, Cinco Hermanos, Industrial Valley Subdivision and Monte Alta Subdivision. Marikina City on June 19 2004 from 9:30-12NN at the Barangay Health Center of Barangay IVC Marikina City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Mr. Suelto, another consultant of EDCOP-LTI presented the proposed project and results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Joy Tamayo Public Consultation Coordinator Wilva Lin Deocades Facilitator Christopher Moster Manila Water Company Inc. Note: Attendance sheets of participants with their signatures are attached to this report. Charges – Our monthly statement of account can be broken down as follows; Basic water charge, CERA, foreign currency adjustment, environment and sewer charge and meter service charge. The total of these items is then subject to VAT of 10%. In sewered areas of MWCI, the sewer charge is 50% of the basic charge but is not enough to cover their operation expenses. The rate is regulated by MWSS. Hence, their water supply is partly subsidizing the wastewater component. In past consultations, some participants expressed their sentiments that the sewer fees are quite high. MWCI is continuous studying the rate of sewer fees. As part of the consultations, MWCI is open for your suggestions on sewer fees. Some possible solutions are partial government subsidy because government is mandated to provide its citizenry basic social services that include sanitation. Second, is the possible sale of the two by-products of the plants namely soil conditioner and water. Third is the partial subsidy of its water supply in favor of its sanitation function. It was suggested that the environment sewer charge collected over the years be used for this project. It was pointed out that part of the environment charge is the free desludging of septic tanks. Mandate --The mandate of MWCI is water supply and sewerage system. This may simple if there is a separate sewer line. However, in this project, the drainage system will be used also as a combined drainage and sewer system. The drainage system is partly the responsibility of DPWH, the city and the barangay. Affected Households – There is no affected houses because the project will use the existing drainage system and proposed STP site has no houses. Rainy season – During strong rains, the drainage system will by-pass the STP. Ordinarily, the dirtiest flows occur during the start of the rainy season because it will carry the polluted and stagnant wastewater. Hence in cases where the STP is by-passed because of strong rains, the water quality is not that polluted. If the rains subside, the STP will operate again. Additional services -- It was pointed out that MWCI is offering free desludging of individual septic tanks as part of its mandate and is one of the services under the environmental fee being charged monthly. To

Page 164: for Manila Third Sewerage Project Volume 3

be free, the desludging should be scheduled otherwise the household will be charge a fee of around 800 pesos compared to some private contractors of 2,500 pesos. On the day of the desludging, households should remove the covers of their septic tanks to facilitate extraction. It is encouraged to desludge your septic tanks every six years. In narrow streets, the company has long hoses to reach houses located in these areas. It is suggested that MWCI conduct an information campaign for this additional service. Hospital wastewater – The project covers this water basin which included some hospitals. Hospitals should have their own sewerage treatment plants. If the hospital has no STP, MWCI may disconnect the said hospital because they generate a different kind of wastewater. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWC because it is a private company. The total loan amount is 62 million dollars but increased more than 100 million dollars because of additional components. The loan will be paid by MWCI. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. Employment – MWCI will bid out the various components of the project. The winning bidders will be the responsible for construction. Residents will be given priority in employment. The project may be divided into construction phase and operation phase. The manpower requirement will definitely be larger in the construction phase where residents will be given priority in employment. We are not sure of the staffing requirements during operation phase. The company has a corporate responsibility especially to their concession area. Flow of wastewater -- The water coming out of the septic tanks will flow into the existing drainage system covering 132 hectares. In the map presented, the small arrows show the direction of the drainage flow originating from the highest points and eventually going to the Marikina River. In areas lower than the STP, pumping stations will be installed to pump the wastewater to the STP. It was pointed out that the water coming from the toilet facilities would first go to the septic tanks for initial treatment. The excess wastewater will then go to the drainage system because there is no separate sewerage system. The project will intercept the wastewater from existing drains and treat the water in the STP. This is the additional service being offered by MWCI and is the basis for the charging of sewer fees. Classification of water – The classification mentioned as class C based on DENR standards is applicable in bodies of water for fishing, recreation and irrigation. The other classification is potable water which should be zero in coliform. MWCI guarantees the quality of water. The standard of DOH is 95 but the company average 97. Contaminated water is a result of illegal connections because the connections to the main line are improperly connected. When there is negative pressure, dirty water will enter into the improperly connected illegal connections. Septic tanks should have at least two compartments. The first compartment will settle the solids and the second will further settle the suspended solids in the water. The wastewater will then flow out of the septic tank. If there is bad odor, it is an indication that the septic tank is not functioning properly and desludging is suggested. In the newly enacted Clean Water Act, three compartments are now required for new houses. Operation of STP – Desludging will be done every day but sufficient parking is provided because of space availability. Odor will be controlled technically. Noise will be minimal because of the site is far from houses and only electric motors for water pumps will be used. If there are complaints, the monitoring team will investigate the complaints and will be addressed accordingly. The nearest example of a STP is in Karangalan Village in Cainta Rizal. Some participants are requesting for a visit to the site. The president of MonteAlta homeowners Association and barangay officials lauded the goals of the project and expressed support for the project.

Page 165: for Manila Third Sewerage Project Volume 3
Page 166: for Manila Third Sewerage Project Volume 3

Fishport Training Center, Barangay San Juan Taytay, Rizal Public Consultation Meeting with Barangay Officials and Residents of Pawis, Exodus, Diimagta/Sumagta, Genesis, Barangay San Juan, Taytay, Rizal and PCFCI, Kabisig and San Francisco, Cainta, Rizal held on June 19 2004 from 2-4 PM at the Fishport Training Center, Barangay San Juan Taytay, Rizal

Page 167: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with Barangay Officials and Residents of Pawis, Exodus, Diimagta/Sumagta, Genesis, Barangay San Juan, Taytay, Rizal and PCFCI, Kabisig and San Francisco, Cainta, Rizal held on June 19 2004 from 2-4 PM at the Fishport Training Center, Barangay San Juan Taytay, Rizal Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI, explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. He also presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Joy Tamayo Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Disposal of sludge – The sludge generated by the proposed STP will be vacuumed and will be processed in the proposed septage plant that will be constructed in Food Terminal Inc. (FTI). The processed waste will then be applied in the lahar areas in Pampanga and Tarlac. There are negotiations with the Sugar Regulatory Authority (SRA), to use the soil conditioner in sugar plantations. Initial results are promising to increase the yield of sugar. Coverage – The proposed project will cover the seven housing areas mentioned earlier. It will involve the rehabilitation and laying down of new drainage systems (around 7 kilometers) in some areas in East Manggahan. During construction, some areas will experience disruptions in terms of noise generation and inconvenience in access. However, this is necessary to ensure that there is an efficient flow of wastewater from the households to the proposed STP. The project will not construct any structure for flood protection. It is purely a sanitation project and is not part of any housing development project. MWCI is a private company mandated to implement sanitation projects. There is no need to individually apply to be included in the coverage of the project. MWCI will construct the needed infrastructure and if the project is in operation, MWCI will start charging the sewer fees that will be included in the monthly statement of account. Households without individual water connections will also benefit from the project because it will cover the areas mentioned irrespective of the presence or absence of individual water connections. Charges – Our monthly statement of account can be broken down as follows; Basic water charge, CERA, foreign currency adjustment, environment and sewer charge and meter service charge. The total of these items is then subject to VAT of 10%. In sewered areas of MWCI, the sewer charge is 50% of the basic charge but is not enough to cover their operation expenses. The sewer rate is regulated by MWSS. Hence, their water supply is partly subsidizing the wastewater component. In past consultations, some participants expressed their sentiments that the sewer fees are quite high. To give an idea on cost of sewer fees, an average household consumes around 30 cubic meters a month. Based on that consumption, the residents can already compute the sewer fees. Some participants pointed out that they consume half of the average consumption.

Page 168: for Manila Third Sewerage Project Volume 3

Additional services -- It was pointed out that MWCI is offering free desludging of individual septic tanks as part of its mandate and is one of the services under the environmental fee being charged monthly. To be free, the desludging should be scheduled otherwise the household will be charge a fee of around 800 pesos compared to some private contractors of 2,500 pesos. On the day of the desludging, households should remove the covers of their septic tanks to facilitate extraction. Periodic desludging – Septic tanks should be desludged at least every 6 years to maintain its efficiency, otherwise, solids will be discharged to the drainage system. During rainy season, the water coming from these septic tanks will contaminate surface ran-off water. These have serious health complications. Affected households – It was pointed out by some residents that some structures are infringing on the creek where the proposed line will pass. What will happen to the houses and residents? World Bank, the project funder, is very strict on resettlement issues. There is a World Bank policy directive 4.30 that will guide a borrower in addressing resettlement issues. The guiding principle is to improve the conditions of the resettled families. If this cannot be done, the minimum requirement is to at least restore the conditions to their pre-resettlement. MWCI is considering compensation or resettlement after exhausting technical solutions to the displacement issue. It might be possible that between today and project implementation, informal squatters will construct their houses in the project alignment like in the lakeshore dike project. Hence, in the project implementation, problems on resettlement may arise and delay project implementation. Presently there are some houses in the creek where the proposed pipeline will pass especially in Exodus and Samagta. Houses where the inceptors will be constructed may also be adversely affected by the project. There are some houses already constructed in the opposite side of the creek. Sources of environmental funds – Both environmental monitoring and guarantee funds will be the responsibility of the project proponent, MWCI. The monitoring fund will take care of the expenses incurred by the monitoring team. The guarantee fund is an escrow account and will take care of any accidents or claims for damages directly attributed to the project. These two funds may be required by EMB-DENR as conditions in the ECC of the project. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWCI. The total loan amount is more than 100 million dollars. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. Construction time in this component is expected to last a year. STP location– The plant will be located in an open lot in Genesis near the slaughterhouse. The plant will occupy around 2,500 sqms including open spaces and parking lot. It will lower the BOD and coliform in the wastewater. Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. Tapayan sewer treatment plant – Ms. Chat Zapanta Cruz, the head of Urban Poor Affairs Office of Taytay, Rizal pointed out that the Tapayan area where DPWH is constructing the pumping station is free of informal dwellers. The structures inside the site are barracks of construction workers of the contractor. DPWH has been able to secure the area and has successfully prevented informal dwellers from invading the construction site. Additional information campaign – It was pointed out that further coordination should be conducted with the local government officials to inform the residents about the benefits of the project. Cooperation among residents will increase if they are properly informed about the project. Additional consultations should be conducted before actual project implementation.

Page 169: for Manila Third Sewerage Project Volume 3

Other discussions centered on water supply especially on connection fee of 6,000, igiban bayan, individual metering, bulk meter. Residents are requesting MWCI to conduct a seminar and/or workshop to clarify issues on water supply. The residents in the low-income communities expressed support for the project because it will improve the sanitary conditions in their areas. Some residents expressed concerns on the fate of the houses along the creek. The participants suggested for close cooperation with municipal and barangay officials in the construction phase. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 170: for Manila Third Sewerage Project Volume 3
Page 171: for Manila Third Sewerage Project Volume 3
Page 172: for Manila Third Sewerage Project Volume 3

Yakap Day Care Center, East Kamias, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of East and West Kamias, Quezon City held on June 21 2004 from 0-12 NN at the Yakap Day Care Center, East Kamias, Quezon City

Page 173: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of East and West Kamias, Quezon City held on June 21 2004 from 0-12 NN at the Yakap Day Care Center, East Kamias, Quezon City Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from MWCI and EDCOP-LTI, explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to gather the opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Almario and Bagaipo SPDOs of MWCI presented the background on wastewater management and the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: MWCI Lynn Almario Senior Project Development Officer Beth Bagaipo Senior Project Development Officer Jun Facun Territory Business Manager EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Coverage – Why is Q-Mart not included in the coverage? There are technical and financial considerations in the determination of the coverage of the project. In this case, the topography may have influenced the planners in excluding the said area. The issue of availability of land is also a consideration. Presently, MWCI have been able to tap NHA properties for the STP and pumping stations. The East and West Kamias were considered because this is part of a loop from Project 3 to the regional STP that will be located in East Avenue. The project entails the laying of new sewer pipes in these areas and a pumping station that will pump the wastewater to the next station. MWCI plans to cover the whole area with sewerage systems. However, the company has to prioritize areas for development. Maybe the said area will be included in the next phase. Basis of payment – Payment of sewerage fees will be based on a certain percentage of the basic water charge. In the sewered areas of MWCI, the prevailing sewerage fee is fifty percent of the basic water charge. Presently, the company is still studying what percentage will be charge to the beneficiaries. One of the aims of this consultation is to elicit reactions and suggestions from stakeholders of the proposed project including the charging of sewerage fees. Responsibility of MWCI – MWCI is responsible for sewer lines from their system to the property lines of the households. Lines inside the properties are the responsibilities of the households. MWCI will tap the existing pipes from the households and connect these pipes to the new sewer line. The company is aware that many of the existing septic tanks are at the back of the houses. This is one of the problems in desludging the tanks. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWCI. The total loan amount is more than 100 million dollars. MWCI will be responsible for the payment of the loan that will finance the Manila third Sewerage Project.

Page 174: for Manila Third Sewerage Project Volume 3

Coordination – A barangay official of West Kamias explained that there are proposed infrastructure projects in their barangay. She suggested that MWCI coordinate with City Hall to minimize disturbances in street diggings. MWCI explained that one of the requirements is an excavation permit, which is given by City Hall specifically with the Engineering Department. The permits include the cost of restoration of the streets after the project. MWCI assured the barangay officials that they would closely coordinate with them at the start of the project especially on traffic rerouting. Water billing – There was a case brought to the barangay that overcharge a resident more that 10%. The TBM of the area admitted the mistake and the bill was adjusted to reflect the true amount. The participants expressed support for the project. In addition, they wanted to expand the coverage to include Q-Mart because it is major contributor of pollution to the nearby creek. Note: Other queries were related to water supply and monthly billings. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 175: for Manila Third Sewerage Project Volume 3
Page 176: for Manila Third Sewerage Project Volume 3

Barangay Hall of Laging Handa, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of South Triangle, Sacred heart and Laging Handa held on June 21 2004 from 1:30-4 PM at the Barangay Hall of Laging Handa, Quezon City

Page 177: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of South Triangle, Sacred heart and Laging Handa held on June 21 2004 from 1:30-4 PM at the Barangay Hall of Laging Handa, Quezon City Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from MWCI and EDCOP-LTI, explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to gather the opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Almario and Bagaipo SPDOs of MWCI presented the background on wastewater management and the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: MWCI Lynn Almario Senior Project Development Officer Beth Bagaipo Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Standards of water – The standards used in the study is the DENR standards for bodies of water based on DAO 34. This is adopted from the international standards used in other countries. Class C water means that the maximum BOD is 10 mgs and the coliform is below 5,000 most probable number per 10 ml. The aim of the Pasig River project is at least to conform to class C water. It was pointed out that in the presentation of the water analysis in Sct. Santiago, the BOD and coliform are above the DENR standards. This is the reason of the project. The project aims to conform to class C standards of DENR. In existing STP of MWCI, the BOD and coliform being produced are in the range of 7 and 1,000 respectively. The DENR is monitoring the quality of wastewater being produced by the STP. It was suggested that a law should be enacted to periodically desludge individual septic tanks because poor maintained tanks are the main cause of pollution in the waterways. Presently there is no low mandating periodic desludging. Project concept – The project will pump the wastewater after being treated in the CST at Sct. Santiago to the STP located in the basketball court in Heroes Hills. The STP is far from houses and it is required that a buffer area be establish to further protect the houses from any adverse effects that the STP may cause. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. Coverage – the project will cover the whole of South triangle and portions of Laging Handa and Sacred Heart. The company’s vacuum trucks will regularly service areas not covered by this project. The project includes the purchase of additional vacuum trucks. Desludging is free for MWCI customers. If private contractors are used for desludging, MWCI can not reimburse the customers their expenses. In emergency cases of desludging where a customer is not scheduled, MWCI will charge a fee of 800 pesos.

Page 178: for Manila Third Sewerage Project Volume 3

Septage Treatment plant –The septage treatment plant to cover Quezon City will be located in Payatas, which will treat the sludge, vacuumed from individual septic tanks and regional STP. Another proposed plant will be located in Food Terminal Inc. There is an on-going construction in Antipolo to build a septage treatment plant. The by-products of these septage treatment plants will be used as soil conditioner for the lahar areas in Pampanga and Tarlac and the water for irrigation. Interested parties may get the soil conditioner for free provided it is pick up in the Magallanes treatment plant. Soil conditioner --It is classified as soil conditioner because it lacks the minimum quantity of nitrogen, phosphorus and potassium set by the Fertilizer and Pesticide Authority (FDA). A participant is requesting for an analysis of the chemical profile of the soil conditioner. Coordination – It was suggested in the future to notify City Hall about any meeting for the project and contact the barangay officials who will in turn mobilize other officials and residents. This can also be done during the implementation of the project so that barangay officials may assist in traffic management. Sewerage charge – Presently the communities covered by this project are already being charged monthly sewerage fees. There will be no additional payment for the proposed treatment plant. Presently, MWCI is reviewing the rate of water charge they will charge to their customers. MWSS, the regulatory body for water periodically reviews the water charges and decides on petitions for increase in water charges after prior notification and public hearings. Water by-product – the water generated by the STP is not potable. However, this can be used for other purposes such as for irrigation and fighting fires in the nearby areas. It is a very good project but the coverage is limited. They are looking forward to being covered in Manila Fourth Sewerage Project. They are requesting for additional information materials so they can inform other residents in their barangays. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 179: for Manila Third Sewerage Project Volume 3
Page 180: for Manila Third Sewerage Project Volume 3

Covered Court of Barangay Quirino 2-A Quezon City, Metro Manila Public Consultation Meeting with the Barangay Officials and Residents of Barangays Quirino 2-A, 2-B, 2-C, 3-A, 3-B, and Duyan-Duyan held on June 22 2004 from 1:30-4 PM at the Covered Court of Barangay Quirino 2-A Quezon City, Metro Manila

Page 181: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangays Quirino 2-A, 2-B, 2-C, 3-A, 3-B, and Duyan-Duyan held on June 22 2004 from 1:30-4 PM at the Covered Court of Barangay Quirino 2-A Quezon City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Matibag Manager PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Eva Matibag Manager PDO Waste Water Christopher Calamoing Senior Project Development Officer Lynn Almario Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Ginelyn Mary Guanzon Representative EMB, DENR Note: Attendance sheets of participants with their signatures are attached to this report. Sewerage charge – Presently the communities covered by this project are already being charged monthly sewerage fees. There will be no additional payment for the proposed treatment plant. This is also the case in certain parts of Makati and other parts of Quezon City. Presently, MWCI is reviewing the rate of water charge they will charge to their customers. MWSS, the regulatory body for water periodically reviews the water charges and decides on petitions for increase in water charges after prior notification and public hearings. All households located in the coverage area will be billed a monthly sewer charge even if these households do not want to connect to the system. This is provided in the Sanitation Code, wherein households should connect to the sewerage system if the system is available. Coordination with other agencies during construction phase – MWCI will investigate the diggings in Agoho Street and its status. It is better to for companies like MWCI, telephone and other utilities to lay pipes or lines at the same time. However, their projects depend on the available financial resources. All street diggings should have permits and there is an interagency group that coordinates the various street diggings. Another problem MWCI is encountering is the absence of “as built plan” of the various companies involved in street diggings. To safeguard accidental hits on the various utilities, there is a provision in the contract of the contractor to restore any accidental hit. MWCI gives priority on busted sewer pipes because of the disturbances that this may cause to the residents. Sewer pipes are PVC brown pipes. Displacement of families – The project intends to intercept the wastewater before or after the Rimas CST and pump the wastewater to the regional treatment plant located in East Avenue. This was the plan to

Page 182: for Manila Third Sewerage Project Volume 3

avoid the displacement of families already occupying the area around the Rimas CST. There will be no displacement of families in Rimas CST because of the project. Dirty water – If there are cases of dirty water in a general area the usual reason is illegal connection. MWCI will investigate the area and will keep the residents informed. MWCI gives highest priority on the issue of dirty water supply. It was pointed out that the supplier of mineral water is making brisk business because the water in the area in undrinkable. There is an adverse claimant (Pacundo) on the land where the Rimas CST is located. Around 5 meters were occupied. It was reported to MWSS and they investigated. However, there is no action taken. MWCI is aware of the claim and it was also reported in the feasibility study that part of a dormitory is occupying a portion of the CST. It was clarified that the lot is owned either by NHA or the LGU and actions have been taken to address the issue. Total Construction – A participant (engineer) pointed out that the sewer lines are in very poor conditions because of age, new development and the contours of their areas. He proposes that instead of rehabilitation, the project should change all the sewer lines because they are being charge sewer fees. It was clarified that the elevation of pipes is one of the considerations in the laying of pipes. This is being done to minimize operation costs. The are also dilapidated portions of the sewer line that may need new pipes. There is an agreement with NAWASA that houses within 60 meters of the CST are free of charge. Why are they being billed for sewer fees now? MWCI is not aware of this agreement. It was requested that if there is a written agreement, MWCI is requesting a copy. MWCI inherited the sewer lines from MWSS and is not aware of this agreement. Customer service --A participant reported to MWCI about a sewer problem but the one answering the phone did not know how to answer. She was reported to her superior and the problem was addressed. There was a recurrence of the problem and was again reported. The office claimed that the problem was under the jurisdiction of DPWH. MWCI will immediately investigate this matter. Institutional coordination – The Sanitation Code gives the responsibility to the Department of Health to implement the Code. However, DOH does not have the personnel to implement it. MWCI has no power to arrest anyone who discharges his or her wastewater directly to the creek. With the passage of the new Clean Water Act, the implementing rules and regulations will specify the institutional relationships with different government agencies. MWCI will provide updates on the IRR of the new law. The participants expressed support for the project. Some requested more information and coordination with the local officials. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 183: for Manila Third Sewerage Project Volume 3
Page 184: for Manila Third Sewerage Project Volume 3

Barangay Hall of Barangay Central, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of Barangay Central, Old Capitolyo and UP Village held on June 23 2004 from 10-11:30 AM at the Barangay Hall of Barangay Central, Quezon City, Metro Manila

Page 185: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangay Central, Old Capitolyo and UP Village held on June 23 2004 from 10-11:30 AM at the Barangay Hall of Barangay Central, Quezon City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Matibag manager, PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Eva Matibag Manager Project Development Office Waste Water Beth Bagaipo Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Maya Villaluz Representative World Bank Note: Attendance sheets of participants with their signatures are attached to this report. Eviction – The proposed site has informal dwellers and is the site of the day care center. What are the complications? The project design was made to minimize if not to totally avoid eviction and resettlement issues. If there will be displacement, the project will either relocate or compensate the displaced families. This is a World Bank assisted project, WB has strict policies on resettlement. The basic principle is to improve the conditions of the relocated families. The minimum is to at lease restore their conditions before their relocation. It was explained that the communal septic tank would be abandoned in favor of a pumping station that will be located in Maginhawa Street precisely to avoid displacement of informal dwellers around the communal septic tank. The residents were thankful that they would not be displaced by the project. The STP will be located at the vacant lot converted into a mini-park beside the Central Bank owned by the National Housing Authority. Previous evictions done in the past in this area is not in connection to the proposed project. A participant was evicted from this area August of 2003. It was pointed out that the existing communal septic tank located in East Avenue has tall trees above the communal septic tank. This area will be converted into a STP. Hence, the place were the participant was evict is different from the proposed site of the STP. Sewer charges –The sewer charge is presently based on 50% of basic water charge. However, your areas are already being charged the sewer fees, so there is no increase in your monthly water payment. Water charges are regulated by MWSS and MWCI has already requested a review of the present charges. Coverage – The project aims to intercept the wastewater before entering the communal septic tank and pump the wastewater to the STP in East Avenue. The project aims to cover the areas shown in the map

Page 186: for Manila Third Sewerage Project Volume 3

and in no way exclude areas that are presently covered by the communal septic tank located in Matiwasay Street. The proposed pump station will be located in Maginhawa St. Odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. Hospital wastewater -- The STP is near some hospitals. However, MWCI has presently no capacity to process wastewater from these hospitals. Hospitals are required by law to have their own wastewater treatment plants. The proposed STP will not process any wastewater from these hospitals. MWCI will consult DENR regarding the hospital wastewater. Barangay officials will support the project and will participate in cleanliness campaign and traffic enforcement. There are three barangays involved in the project and they assured MWCI their full support. Residents around the Matiwasay CST thanked MWCI for considering their houses in the design of the project. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 187: for Manila Third Sewerage Project Volume 3
Page 188: for Manila Third Sewerage Project Volume 3
Page 189: for Manila Third Sewerage Project Volume 3

Barangay Covered Court, Barangay Project 6, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of Barangay Project 6 held on June 23 from 2-4 PM at the Barangay Covered Court, Barangay Project 6, Quezon City, Metro Manila

Page 190: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangay Project 6 held on June 23 from 2-4 PM at the Barangay Covered Court, Barangay Project 6, Quezon City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Beth Bagaipo senior project development officer of PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Beth Bagaipo Senior Project Development Officer Benjie ??? Territory Business Manager EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Construction stage – The construction time for the proposed facility will be approximately one year. Usually, the contractor will rent a place nearby for the temporary quartering of their construction workers. MWCI discourages the construction of workers’ barrack if the construction site is near populated areas because of possible adverse effects on the nearby communities. MWCI has this kind of STP in Valle Verde and Makati Pabahay. In Project 1 (Roxas District) the vicinity of the communal septic tank was invaded by informal dwellers. As a response to this threat in other communal septic tanks, MWSS assigned some personnel to temporarily build their shelters in the vicinities of these other communal septic tanks and guard these areas against unlawful intruders. Presently, MWCI is negotiating with MWSS regarding these structures which are part of the project. The personnel of MWSS assigned to these areas are aware of the project and are just awaiting instructions from MWSS. Location – There are two types of sewerage treatment plants, below ground and above ground. The proposed treatment plant will be located on the present location of the communal septic plant located in Road 5.. The plant is below ground and after construction only the control panel will be visible to the community. During construction, the place will be dug up and that is the time that the community might suffer inconvenience in terms restricted access, noise and possible bad odor. However, mitigating measures as mentioned in the EIS will be put in place to address these effects.

Page 191: for Manila Third Sewerage Project Volume 3

Areas not included in this phase will be considered in other projects of the company. It was pointed out that the plant has a maximum capacity and if the plant will service other areas, existing customers may suffer deterioration in the quality of service. A participant pointed out that the existing septic tank is higher in than his house and alleged that he is not being serviced by the communal septic tank. MWCII will investigate immediately and if his house is not being serviced, a corresponding adjustment will be made on his monthly billing. Sewerage charge – Presently the communities covered by this project are already being charged monthly sewerage fees. There will be no additional payment for the proposed treatment plant. However, MWSS periodically reviews the water charges and decides if the requests for increase in water charges are meritorious or not after prior notification and public hearings. Increase in water charges after improvement in the water supply system may be attributed in the increase use of water. If the residents have noticed, the water rates increased last January but were lowered only last week. These decisions come from MWSS. All households located in the coverage area will be billed a monthly sewer charge even if these households do not want to connect to the system. This is provided in the sanitation law, wherein households should connect to the sewerage system if the system is available. Free Desludging -- As part of their service, MWCI is conducting for free, desludging of individual septic tanks, provide that it is properly scheduled. Otherwise, the desludging will cost around 800 pesos, way below the charge of private contractors of around 2,500 pesos. MWCI has problems in accessing some septic tanks because of their locations. Some septic tanks are in the back of houses or the top are used for kitchens or dining rooms of some houses. In these cases, MWCI let the customers sign waivers that the company will not be liable for any damages in connection with the desludging activities. Smoke emission – The STP will be run by electric motors. The process will involve aeration, settling of solids and disinfection to kill the pathogens. There will be no smoke emissions generated by the project in its ordinary operations. However, if there are power outages, it is possible that smoke emission will be generated if stand by power generators will be used. Odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. In addition, the STP is located below ground and this will prevent bad odor from going into nearby houses. Water by-product – the water generated by the STP is not potable. However, this can be used for other purposes such as for irrigation and fighting fires in the nearby areas. Equipment -- MWCI has the latest equipment for sewerage system. They have the CCTV which enable them to see the clogged lines. They have the sewer jetter and mini jetters, which declogged sewer lines. Drainage systems are the responsibility of the City Engineer’s Office while MWCI is responsible for the sewer lines. To determine if the line is a sewer or drainage line, the sewer line has manhole covers with the letter S. MWCI are replacing the sewerage covers into hinge type because removable covers are being stolen.

Page 192: for Manila Third Sewerage Project Volume 3

Responsibility of MWCI – MWCI is responsible for sewer lines from their system to the property lines of the households. Lines inside the properties are the responsibilities of the households. The rigid machine is being used to declogged these lines. Usually, residents who have upgraded their houses cover the cleanouts in their sewer lines. MWCI may assist clogged lines inside their properties provided that the cleanouts are identified. After the open forum, the participants expressed their support for the project because it will improve the environmental conditions of their communities. Note: other clarifications and questions were related to water supply. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 193: for Manila Third Sewerage Project Volume 3
Page 194: for Manila Third Sewerage Project Volume 3
Page 195: for Manila Third Sewerage Project Volume 3

Public Consultation February 9, 2005

La Mar Village, San Mateo, Rizal Eva: Magandang araw po, ngayon pa lang po ay nagpapasalamat na kami sa inyong pagdating dito sa napakahalagang miting na ito dahil sa ngayong hapong ito ilalahad po ng Manila Water ang programa namin para sa San Mateo on the water and wastewater side. So, bilang panimula, tayo po muna’y magdasal sa pangunguna ni Jojo de Guzman. Jojo: Magsitayo po tayo at sandali po tayong manahimik. Damhin natin ang presensya ng ating Panginoon. Sa ngalan ng Ama, ng Anak, ng Espiritu Santo, Amen. O, Amang makapangyarihan sa lahat, na may gawa ng langit at lupa. Panginoon maraming salamat po sa hapong ito. Sana nawa kami ay linawin nyo sa banal na lugar na ito para mapag-usapan po ang mga ilalahad na plano ng ating tinatawag na kumpanya na Manila Water. Nawa ay maunawaan po naming lahat ang kanilang isasaad. Nawa po Ama, gabayan mo po kami sa aming tatalakayin, mga plano pong ito sa pagtitipon. Sana nawa po’y kayo ang magsilbing gabay at mamagitan sa bawat isa. At kami po’y huminhingi at nananalig sa aming Inang Birheng Maria, at gabayan ng Espiritu Santo, magpakailanman, magpasawalang hanggan, Amen. Sa ngalan ng Ama, ng Anak at ng Espiritu Santo, Amen: Eva: Atin namang pong I-exercise ang ating mga vocal chords, kakanta po tayo ng Lupang Hinirang to be led by Ellen Artista. Ellen: Me kodigo po ako, kasi po ang kanta panahon pa ni Mc Arthur. Umawit po tayong lahat. (Kanta ng Lupang Hinirang) Eva: Si ma’am pala pwedeng sumali sa Star in a Million. So, amin pong ina-acknowledge ang presence ng mga special na people, mga presidente po at representative ng Mayor’s Office at presidente ng Riza subdivision si Mr. Reynaldo Torato. Nandito na po ba ang Presidente ng Riza Village 1 and 2? Wala pa? At ang ating pong host sa hapong ito, salamat sa inyo pong pagpayag na dito po ganapin ang pagpupulong na ito, kay Mr. Santiago Ramos. Maraming pong salamat. At amin din pong pinapasalamatan ang presensya ni Kapitan Ben Buenviaje. Kami naman po mga taga-Manila Water, basta ang mga representatives po ng Water at saka Wastewater side, nandito po ang mga katulong namin sa proyekto, nandito ang taga NHA, me mga taga bangko, me Environmental Expert. Bilang panimula po ilalahad po ni Romy David, sya po ang Manager ng Manila Water ng San Mateo. Sa kanya po natin pwedeng sabihin and ating mga hinaing sa water. Ito na po si Romy David. Romy: Salamat Eva. Magandang hapon kay Secretary, Kapitan at Presidente ng Homeowners. Magandang hapon po sa inyong lahat. Magbibgay lang po ako ng Updates sa tubig ng San Mateo. Kung ano man ang nagawa since nag start ang Manila Water noong 1997 at kung ano na ang ginagawa ngayon at kung ano pa ang gagawin namin. Yung water supply… Tubig Para sa Barangay at saka yung sewerage and sanitation, ide discuss nila mamaya, yung kasama natin ng taga Sewerage. Yung update ko ng water supply, yung water supply natin nanggagaling sa anim na river na strategically located sa San Mateo. Sa labing-lima ang barangay ng San Mateo. Yung sinasabi dito 15 barangay ng San Mateo kaya lang ang naseserbisyuhan sa ngayion ay eleven lang. So ito po ang data na per barangay. Yung mga nakita nyo, yung mga barangay na sakop ng Sto Niño, so wala pa tong tubig dito. So ang supply po natin nanggagaling sa anim na deepwells ang production po non ay is about 670, 6 million liters per day po yon. Plus yung nanggagaling sa Marikina yung tinatawag na surface water about 5 million liters per day. Sumusupply sa buong San Mateo. Yung limang deepwells, Sta Mria, yung Sta Ana, Public Market ito po ang nagsusupply sa Guitnang Bayan. Sa ngayon hindi pa po nakakarating dito kasi wala pa tayong lines pero mamaya po ide discuss natin kung kailan. So yung anim na deepwells plus yung surface water na nanggagaling sa Marikina yun ang nagsu supply sa atin. Noong 1997 po bago mag start ang Manila Water, ito ang itsura nya. Yung green po 24-hours yon, yung yellow 13-23, yung red 0-12 hours yung water availability po. Kung mapapansin po

Page 196: for Manila Third Sewerage Project Volume 3

ninyo halos red noong nag-start. At the end of 2004 ito na po and itsura nya. Hindi po sya 24-hours, kaya lang hindi po sya deepwell fed, surface water sya galing Marikina. Kung mapapansin nyo yung malapit sa Marikina yon lang ang 24 hours natin. The rest from red naging yellow na tayo 13 to 23 hrs. From 1997 to 2002 about 11 kilometers na yung line natin sa buong San Mateo. at the same time nakapag construct na tayo ng dalawang deepwells dito, yung Nursery at sa Dulong Bayan. 38 million ang investment ng Manila Water sa buong San Mateo. Ito naman po ang medyo ambisyosong target namin sa 2005. 17 kilometers pa ang ilalagay, ibig sabihin pag natapos, ang mga deepwells, mawawala na. Puro surface water na lang. Ang pipelaying natin mangagaling sa Bayan-Bayanan ikokonekta natin sa 600 diameter mainline from Bayan-Bayanan up to… actually, hindi lang San mateo baka makaabot pa sa Montalban. Initially, ang target po natin is Wawa Dam, kaya lang medyo matatagalan pa kaya nagkaroon ng panibagong proposal. Anyway, kung matuloy ang Wawa Dam magagamit din naman natin. Ito yong mga na-complete na natin yung Tubig Para sa Barangay, ang beneficiary po 1,900, yan po ang update sa tubig. Ngayon po ibibigay ko ulit kay Eva para sa Sanitation. Eva: Mamaya po ay mag Q and A portion po tayo. Ngayon naman po pakinggan po natin si Cherie Rivera para I-discuss ang wastewater. Cherie: Magandang hapon po. Kanina po pinag-usapan po ang tungkol sa water supply. Kung napansin po ninyo ang Manila Water ay hindi lang po binibigyang pansin ang tubig kundi yong mangyayari sa lalabas na dumi. Ina-address din po ng Manila Water ang sanitation. Kung titingnan po nation ang Santitation condition ng Metro Manila, marami pong problema tungkol sa sanidad dahil unang-una walang pagpa plano ng sewer system o yong mga daanan ng mga dumi galing sa ating mga bahay. Diretso ang tapon sa ating mga ilog, kaya mayroon tayong mga polluted na mga ilog. Isa pa pong problema yong congested o masisikip na daanan kaya nahihirapan ang ating gobyerno maglatag ng mga kanal para sa mga dumi galing sa ating mga bahay. At walang pagpa plano ng mga sanitation facilities. Me mga lugar po sa Metro Manila na kung saan diretso po ang dumi or individual septic tank sa kanal. Kung titingnan po natin, ito po ang mga ginagamit ng mga sanitation latrine, yong mga butas lang po na pinag-iimbakan ng dumi. Meron din pong over-hang latrine. Lalo na po yong bahay na nakatayo sa ibabaw ng ilog. Ibig sabihin paglabas diretso na lang. Meron namang 3% na sewerage. Ibig sabihin po me magandang pagpaplano sa mga sewerage o daluyan ng dumi kagaya po sa lugar sa Makati sa me Magallanes Village po, Makati Central Business District na kung saan meron silang centralized sewage treatment plant. Kung saan ang nanggagaling sa mga bahay at septic tank ay dumadaloy po don at nalilinis po. Yon po ang pinaka idea na sistema. Malaki po ang magagastos sa paggawa ng Sewage Treatment Plant at paglalatag ng linya. Kung titingnan po natin karamihan po sa Metro Manila ang ginagamit ay septic tank na pinag-iimbakan ng dumi. Dito naman po, meron po tayong tinatawag na Manila Third Sewerage Project kung saan nagbigay ng assistance ang World Bank para tukuyin o I-address ang ating problema sa sanidad. Hindi lang po ang tungkol sa tubig dahil po kadalasan yung tubig po ang iniuna dahil yon po ang pangangailangan ng lahat ng tao. Pero kung titingnan po nation kailangan din po nating I-address akung ano ang nangyayari sa dumi, ano ang gagawin natin sa dumi. Sa project pong ito mababawasan ang polusyon ng ating ilog o waterways at ating Manila Bay. Ito ang mangyayari sa 2005 o 10 years. At meron po itong combination ng sewer/drainage projects at meron din pong septic tank desludging. Kung saan karamihan po ng bahay natin ay may poso negro. Kung pamilyar po kayo sa operation po ng Manila Water na sinisipsip ang laman ng septic tanks dadalhin sa isang lugar para I-treat para maiwasan natin ang polusyon. Ito po ang pino propose sa San Mateo kung saan gagawa tayo ng septage treatment plant. Dito po dadalhin yung mga galing sa poso negro dadalhin po ng mga trucks na gaya nito. Kung nakakita na po kayo ng ganitong trucks ng Manila Water dadalhin po sa treatment plant. Lalagyan ng mga facilities, treatment, mga tangke para I treat kaya bago umabot sa mga ilog na treat na ang mga dumi. Para po ito ma retain ang kagandahan ng mga ilog natin at ma-improve ang ating ilog sa Metro Manila. Yong septage treatment plant na gagawin dito sa San Mateo, ito po ang pino propose sa San Mateo na kung saan itatayo sa Kalakaan yata ang tawag dito. Ngayon po bilang parte don sa tinatawag na Environmental Impact Septage Treatment na pinapatupad ng Department of Environment and Natural Resources ay kinakailangan daw po nga gaya nitong konsultasyon sa mga tao lalo na yong mga apektadong probinsya. Yong prosesong yon meron po tayong representante ng DENR dito para ma identify kung ano ang posibleng environmental impact nong project ng sa gayon sa konsultasyon malaman natin kung ano ang pwede nating gawin para maiwasan natin ang posibleng negatibong impact. Na identify po namin ang mga negatibong impact, inihiwalay po namin ang Negative Impact during construction at pag nag ooperate na po. Simulan po natin sa construction phase, merong po kaming na identify na air polusyon siyempre po pag nagko-construct sa area me nabubulabog na lupa, magke clearing po sa area. Ang prino propose po ng Manila Water ay

Page 197: for Manila Third Sewerage Project Volume 3

magkakaron po ng Clearing sa lugar lalo na po doon sa open. Maganda naman doon sa area ay may perimeter fence na. So maiiwasan yong talagang open sya at mabubulabog at makaapekto sa katabing kabahayan. Pangalawang pong impact ay yung sa ingay o noise pollution. Pag ganito pong construction ay I expect na natin ang ingay. Ay proposal po ng Manila Water ay ang construction ay gagawin during day time hours ng hindi naman makabulabong sa ating pagtulog. Kaya lang po me isang problema kapag nagko-construct na at specially pag magbubuhos na ng semento me mga pagkakataon na hindi po nating maaring pahintuin ang mixer sa pag deliver dahil titigas na po ang semento kaya me pagkakataon po na ma e extend ang time nya minsan po hanggang 10:00. Sa ganito pong pagkakataon po hihingi po ng permiso sa inyo sa pamamagitan ng ating kapitan. Upang po sa ganitong panahon ay maabisuhan po kayo na me magbubuhos ng semento kaya maari pong mag extend ng construction ng project. Ito naman pong water pollution, ito po ay tungkol sa creek na pinakadaanan ng ating dumi. Yong din po ay magiging natural na drainage ng ating wastewater galing doon sa ating septage treatment plant dahil yan ay papunta na rin sa Marikina River. Pagka panahon po ng malakas na ulan me posibilidad po na magkaroon ng erosion, landfalls o ang posibilidad ng pagbulabog ng tubig pupunta po ang lupa sa tubig. Para po maiwasan yon magkakaroon ng drainage kanal doon mismo mula sa construction site. Magkakaroon din po ng temporary trenches o mga hukay para po sa tambakan ng mga construction materials na posibleng ma erode kagayan ng mga buhangin pamunta sa mga daluyan ng tubig. Meron din pong Ini expect na magegenarate na construction materials at me posibilidad na me maaaring ma recycle na pwede pang magamit o pwedeng ibenta sa mga junk shops. Isa pa po yung sa vegetation. Mapuno po yung lugar, maraming tanim sa loob ng property na tatamaan. As much as possible ang gagawin po ay iiwasan ang mga puno na yon. Kasi po maganda po yong may puno para may panangga, kasi pay may puno maganda ang hangin. May mga puno pong maaapektuhan hindi po nating sinasabing walang maaapektuhan, yung maaapektuhan kung kayang mai full-out tanggalin itanim at itabi gagawin po. Bago po tanggalan ng puno hihingi po ng permiso sa DENR, barangay kung kailangan talagang putulin kung hindi kayang mai full-out o itabi. Sa water pollution po pag nag operate na po yong project, kapag hindi po hindi po nag operate ng maayos ang planta maaari din pong magresulta ng water pollution sa atin. So hindi po papasa o hindi magko comply sa standard ng DENR. Ang gagawin po nyan me mga controlled parameters po na minomotor po regularly kagaya po ng ginagawa sa Magallanes Sewage Treatment. Yong Magallanes Treatment Plant napakaganda po ng pagkaka operate nyan at na momonitor po regularly ang mga parameters para po hindi babagsak sa DENR. Yong tubig na nati treat po doon since yon po ay nilalagyan ng chemicals, me pinapatakbo po ng kuryente yan, gumagastos po ang Manila Water para maging malinis ang tubig na yan. Ang ginagawa po nila dinodonate po ang tubig sa MMDA para po pandilig sa mga halaman along EDSA. Meron pa pong isang impact tungkol po sa pahuhugas ng mga tankers, yon pong nakita ninyong picture kanina ng mga trucks, yong pinaghugasan pwede pong ipasok pa doon sa treatment plant, kaya hindi papasok sa drainage canal. Merong air and noise emission dahil po may mga truck tayo na dadaan sa Kambal Road at saka papasok ng kalye. Magkakaroong ng posibleng degradation, doon sa perimeter me mga puno. Yong mga tankers ay iiensure ng Manila Water na mapapasa standard ng Clean Air Act. Pasado yong kanilang binubuga at hindi makakapollute sa mga dinadaan nila. Itatapon ang malinis na tubig pero may mage genarate na sludge, yung mga solids. Ginagamit po itong soil conditioner sa ibang lugar para panaba sa lupa. Yong services ng MWSS, Manila Water at Maynilad ay hindi pa sapat ang treatment plant gaya ng sa Makati, ay 8% lang. Kailangang itaas ang ating edukasyon tungkol sa pollution sa ating kapaligiran. May mga tanong po? Eva: Kung mayroon po kayong mga tanong, oras na po para makilala kayo at sabihin ang inyong mga katanungan. Jojo de Guzman: Saan po kayo unang nakapag project ng ganito? Eva: Sa buong area ng Manila Water, tatlong planta ang gagawin. Para sa North dito po ang gagawin namin. Para sa South meron din sa may Taguig area, meron din gagawin sa Antipolo. Ano pa po? Resident 1: Ito po ba ay proyekto ng gobyerno o ng pribadong sekto? Malaking impact ang project na ito, ano po ba ang advantage? Eva: Ito po ay project ng Manila Water. Ang Manila Water po ay private na, pero po kami ay ahente ng MWSS, may permiso po ng developer ng La Mar Village. At binisita po nya ang aming isang planta. At wala naman po syang nakitang makakasama.

Page 198: for Manila Third Sewerage Project Volume 3

Resident 2: Ang project nyo ba ay hindi makakadagdag sa problema namin dito sa La Mar, gaya ng air pollution, gaya ng poultry? Eva: Yong planta po ay sisiguraduhin namin na may mga pasilidad para icontrol kung sakali man may problema sa amoy. Yung mga truck naman ay special mga vacuum sealed na walang problema sa amoy di tulad ng Malabanan. Talagang world class ang truck namin. Yong mga usok sa truck ay sisisguraduhin namin na magko-comply sa Clean Air Act. Resident 3: Yong ilalagay nyo bang planta, yong bayan lang ba namin ang magtatapon dyan? Eva: Ang buong San Mateo at ang mga karatig bayan. Yong ibang bayan naman doon sa Central at South STP. Resident 4: Papano po magpasipsip ng septic tank? Eva: Mayron kaming dalawang serbisyo sa pagsipsip ng poso negro. May mga kinakausap kami sa barangay at office ni Mayor kung paano ischedule yong pasipsip. Pag nasa schedule libre po iyon. Pag wala sa schedule may bayad po pero maliit lang na amount na P800 kumpara sa Malabanan ng naniningil ng P2,500 hanggang P3,000. Resident 5: Ano po ba ang presyo ninyo ng tubig? Romy David: Ang average nasa nine to ten pesos per cubic meter. Kaya lang parang kuryente na tumataas ang rate kapag tumataas din ang consumption. Resident 6: Ang akala po namin ang ipapaliwanag po ninyo ay tubig para sa La Mar Village. Eva: Maglalatag po kami ng linya sa Kambal Road sa last quarter ng year 2005. Magkakaroon na kayo ng tubig sa year 2006. Ito po namang project ng Wastewater huwag kayong mag-alala mayroon kaming sina submit na Environmental Management Plan sa DENR at sa aming mga nagpapautang. Resident 7: Dati po dito ay agricultural pero ngayon ay residential na. Bakit dito nyo gustong magtayo ng planta? Dapat malayo sa kabayanan. Eva: Na realize po namin iyan. Nakita po namin na feasible itong area. Maglalagay po kami buffer para I protect ang planta at ang komunidad. Yon naman pong papasok sa planta ay mayron ng partial treatment ng poso negro. Mayron pa ba kayong katanungan? Malou Borromeo: Bago po ang lahat Kung Hei Fat Choi! Ang miting pong ito ay hindi tungkol sa supply ng tubig. Kaya po sila nandito dahil ito po ang lugar na napili nilang pagdadausan nitong planta. Personally nagpunta po ako sa isang existing na planta ng Manila Water through the courtesy of Ronald Muana. I saw the plant na maayos po sya sa amoy at ingay.

Page 199: for Manila Third Sewerage Project Volume 3
Page 200: for Manila Third Sewerage Project Volume 3
Page 201: for Manila Third Sewerage Project Volume 3
Page 202: for Manila Third Sewerage Project Volume 3
Page 203: for Manila Third Sewerage Project Volume 3
Page 204: for Manila Third Sewerage Project Volume 3
Page 205: for Manila Third Sewerage Project Volume 3
Page 206: for Manila Third Sewerage Project Volume 3
Page 207: for Manila Third Sewerage Project Volume 3
Page 208: for Manila Third Sewerage Project Volume 3
Page 209: for Manila Third Sewerage Project Volume 3
Page 210: for Manila Third Sewerage Project Volume 3
Page 211: for Manila Third Sewerage Project Volume 3
Page 212: for Manila Third Sewerage Project Volume 3
Page 213: for Manila Third Sewerage Project Volume 3
Page 214: for Manila Third Sewerage Project Volume 3
Page 215: for Manila Third Sewerage Project Volume 3
Page 216: for Manila Third Sewerage Project Volume 3
Page 217: for Manila Third Sewerage Project Volume 3
Page 218: for Manila Third Sewerage Project Volume 3
Page 219: for Manila Third Sewerage Project Volume 3
Page 220: for Manila Third Sewerage Project Volume 3
Page 221: for Manila Third Sewerage Project Volume 3
Page 222: for Manila Third Sewerage Project Volume 3
Page 223: for Manila Third Sewerage Project Volume 3
Page 224: for Manila Third Sewerage Project Volume 3
Page 225: for Manila Third Sewerage Project Volume 3
Page 226: for Manila Third Sewerage Project Volume 3
Page 227: for Manila Third Sewerage Project Volume 3
Page 228: for Manila Third Sewerage Project Volume 3
Page 229: for Manila Third Sewerage Project Volume 3
Page 230: for Manila Third Sewerage Project Volume 3
Page 231: for Manila Third Sewerage Project Volume 3
Page 232: for Manila Third Sewerage Project Volume 3
Page 233: for Manila Third Sewerage Project Volume 3
Page 234: for Manila Third Sewerage Project Volume 3
Page 235: for Manila Third Sewerage Project Volume 3
Page 236: for Manila Third Sewerage Project Volume 3
Page 237: for Manila Third Sewerage Project Volume 3
Page 238: for Manila Third Sewerage Project Volume 3
Page 239: for Manila Third Sewerage Project Volume 3
Page 240: for Manila Third Sewerage Project Volume 3
Page 241: for Manila Third Sewerage Project Volume 3
Page 242: for Manila Third Sewerage Project Volume 3
Page 243: for Manila Third Sewerage Project Volume 3
Page 244: for Manila Third Sewerage Project Volume 3
Page 245: for Manila Third Sewerage Project Volume 3
Page 246: for Manila Third Sewerage Project Volume 3
Page 247: for Manila Third Sewerage Project Volume 3
Page 248: for Manila Third Sewerage Project Volume 3
Page 249: for Manila Third Sewerage Project Volume 3
Page 250: for Manila Third Sewerage Project Volume 3
Page 251: for Manila Third Sewerage Project Volume 3
Page 252: for Manila Third Sewerage Project Volume 3
Page 253: for Manila Third Sewerage Project Volume 3
Page 254: for Manila Third Sewerage Project Volume 3
Page 255: for Manila Third Sewerage Project Volume 3
Page 256: for Manila Third Sewerage Project Volume 3
Page 257: for Manila Third Sewerage Project Volume 3
Page 258: for Manila Third Sewerage Project Volume 3
Page 259: for Manila Third Sewerage Project Volume 3
Page 260: for Manila Third Sewerage Project Volume 3
Page 261: for Manila Third Sewerage Project Volume 3
Page 262: for Manila Third Sewerage Project Volume 3
Page 263: for Manila Third Sewerage Project Volume 3
Page 264: for Manila Third Sewerage Project Volume 3
Page 265: for Manila Third Sewerage Project Volume 3
Page 266: for Manila Third Sewerage Project Volume 3
Page 267: for Manila Third Sewerage Project Volume 3
Page 268: for Manila Third Sewerage Project Volume 3
Page 269: for Manila Third Sewerage Project Volume 3
Page 270: for Manila Third Sewerage Project Volume 3
Page 271: for Manila Third Sewerage Project Volume 3
Page 272: for Manila Third Sewerage Project Volume 3
Page 273: for Manila Third Sewerage Project Volume 3
Page 274: for Manila Third Sewerage Project Volume 3

Barangay Covered Court, Barangay Project 6, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of Barangay Project 6 held on June 23 from 2-4 PM at the Barangay Covered Court, Barangay Project 6, Quezon City, Metro Manila

Page 275: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangay Project 6 held on June 23 from 2-4 PM at the Barangay Covered Court, Barangay Project 6, Quezon City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Beth Bagaipo senior project development officer of PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Beth Bagaipo Senior Project Development Officer Benjie ??? Territory Business Manager EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Construction stage – The construction time for the proposed facility will be approximately one year. Usually, the contractor will rent a place nearby for the temporary quartering of their construction workers. MWCI discourages the construction of workers’ barrack if the construction site is near populated areas because of possible adverse effects on the nearby communities. MWCI has this kind of STP in Valle Verde and Makati Pabahay. In Project 1 (Roxas District) the vicinity of the communal septic tank was invaded by informal dwellers. As a response to this threat in other communal septic tanks, MWSS assigned some personnel to temporarily build their shelters in the vicinities of these other communal septic tanks and guard these areas against unlawful intruders. Presently, MWCI is negotiating with MWSS regarding these structures which are part of the project. The personnel of MWSS assigned to these areas are aware of the project and are just awaiting instructions from MWSS. Location – There are two types of sewerage treatment plants, below ground and above ground. The proposed treatment plant will be located on the present location of the communal septic plant located in Road 5.. The plant is below ground and after construction only the control panel will be visible to the community. During construction, the place will be dug up and that is the time that the community might suffer inconvenience in terms restricted access, noise and possible bad odor. However, mitigating measures as mentioned in the EIS will be put in place to address these effects.

Page 276: for Manila Third Sewerage Project Volume 3

Areas not included in this phase will be considered in other projects of the company. It was pointed out that the plant has a maximum capacity and if the plant will service other areas, existing customers may suffer deterioration in the quality of service. A participant pointed out that the existing septic tank is higher in than his house and alleged that he is not being serviced by the communal septic tank. MWCII will investigate immediately and if his house is not being serviced, a corresponding adjustment will be made on his monthly billing. Sewerage charge – Presently the communities covered by this project are already being charged monthly sewerage fees. There will be no additional payment for the proposed treatment plant. However, MWSS periodically reviews the water charges and decides if the requests for increase in water charges are meritorious or not after prior notification and public hearings. Increase in water charges after improvement in the water supply system may be attributed in the increase use of water. If the residents have noticed, the water rates increased last January but were lowered only last week. These decisions come from MWSS. All households located in the coverage area will be billed a monthly sewer charge even if these households do not want to connect to the system. This is provided in the sanitation law, wherein households should connect to the sewerage system if the system is available. Free Desludging -- As part of their service, MWCI is conducting for free, desludging of individual septic tanks, provide that it is properly scheduled. Otherwise, the desludging will cost around 800 pesos, way below the charge of private contractors of around 2,500 pesos. MWCI has problems in accessing some septic tanks because of their locations. Some septic tanks are in the back of houses or the top are used for kitchens or dining rooms of some houses. In these cases, MWCI let the customers sign waivers that the company will not be liable for any damages in connection with the desludging activities. Smoke emission – The STP will be run by electric motors. The process will involve aeration, settling of solids and disinfection to kill the pathogens. There will be no smoke emissions generated by the project in its ordinary operations. However, if there are power outages, it is possible that smoke emission will be generated if stand by power generators will be used. Odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. In addition, the STP is located below ground and this will prevent bad odor from going into nearby houses. Water by-product – the water generated by the STP is not potable. However, this can be used for other purposes such as for irrigation and fighting fires in the nearby areas. Equipment -- MWCI has the latest equipment for sewerage system. They have the CCTV which enable them to see the clogged lines. They have the sewer jetter and mini jetters, which declogged sewer lines. Drainage systems are the responsibility of the City Engineer’s Office while MWCI is responsible for the sewer lines. To determine if the line is a sewer or drainage line, the sewer line has manhole covers with the letter S. MWCI are replacing the sewerage covers into hinge type because removable covers are being stolen.

Page 277: for Manila Third Sewerage Project Volume 3

Responsibility of MWCI – MWCI is responsible for sewer lines from their system to the property lines of the households. Lines inside the properties are the responsibilities of the households. The rigid machine is being used to declogged these lines. Usually, residents who have upgraded their houses cover the cleanouts in their sewer lines. MWCI may assist clogged lines inside their properties provided that the cleanouts are identified. After the open forum, the participants expressed their support for the project because it will improve the environmental conditions of their communities. Note: other clarifications and questions were related to water supply. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 278: for Manila Third Sewerage Project Volume 3
Page 279: for Manila Third Sewerage Project Volume 3
Page 280: for Manila Third Sewerage Project Volume 3
Page 281: for Manila Third Sewerage Project Volume 3

Yakap Day Care Center, East Kamias, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of East and West Kamias, Quezon City held on June 21 2004 from 0-12 NN at the Yakap Day Care Center, East Kamias, Quezon City

Page 282: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of East and West Kamias, Quezon City held on June 21 2004 from 0-12 NN at the Yakap Day Care Center, East Kamias, Quezon City Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from MWCI and EDCOP-LTI, explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to gather the opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Almario and Bagaipo SPDOs of MWCI presented the background on wastewater management and the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: MWCI Lynn Almario Senior Project Development Officer Beth Bagaipo Senior Project Development Officer Jun Facun Territory Business Manager EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Coverage – Why is Q-Mart not included in the coverage? There are technical and financial considerations in the determination of the coverage of the project. In this case, the topography may have influenced the planners in excluding the said area. The issue of availability of land is also a consideration. Presently, MWCI have been able to tap NHA properties for the STP and pumping stations. The East and West Kamias were considered because this is part of a loop from Project 3 to the regional STP that will be located in East Avenue. The project entails the laying of new sewer pipes in these areas and a pumping station that will pump the wastewater to the next station. MWCI plans to cover the whole area with sewerage systems. However, the company has to prioritize areas for development. Maybe the said area will be included in the next phase. Basis of payment – Payment of sewerage fees will be based on a certain percentage of the basic water charge. In the sewered areas of MWCI, the prevailing sewerage fee is fifty percent of the basic water charge. Presently, the company is still studying what percentage will be charge to the beneficiaries. One of the aims of this consultation is to elicit reactions and suggestions from stakeholders of the proposed project including the charging of sewerage fees. Responsibility of MWCI – MWCI is responsible for sewer lines from their system to the property lines of the households. Lines inside the properties are the responsibilities of the households. MWCI will tap the existing pipes from the households and connect these pipes to the new sewer line. The company is aware that many of the existing septic tanks are at the back of the houses. This is one of the problems in desludging the tanks. Source of fund – The fund will come from a loan by MWSS from World Bank. MWSS will then pass on the loan to MWCI. The total loan amount is more than 100 million dollars. MWCI will be responsible for the payment of the loan that will finance the Manila third Sewerage Project.

Page 283: for Manila Third Sewerage Project Volume 3

Coordination – A barangay official of West Kamias explained that there are proposed infrastructure projects in their barangay. She suggested that MWCI coordinate with City Hall to minimize disturbances in street diggings. MWCI explained that one of the requirements is an excavation permit, which is given by City Hall specifically with the Engineering Department. The permits include the cost of restoration of the streets after the project. MWCI assured the barangay officials that they would closely coordinate with them at the start of the project especially on traffic rerouting. Water billing – There was a case brought to the barangay that overcharge a resident more that 10%. The TBM of the area admitted the mistake and the bill was adjusted to reflect the true amount. The participants expressed support for the project. In addition, they wanted to expand the coverage to include Q-Mart because it is major contributor of pollution to the nearby creek. Note: Other queries were related to water supply and monthly billings. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 284: for Manila Third Sewerage Project Volume 3
Page 285: for Manila Third Sewerage Project Volume 3

Barangay Hall of Laging Handa, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of South Triangle, Sacred heart and Laging Handa held on June 21 2004 from 1:30-4 PM at the Barangay Hall of Laging Handa, Quezon City

Page 286: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of South Triangle, Sacred heart and Laging Handa held on June 21 2004 from 1:30-4 PM at the Barangay Hall of Laging Handa, Quezon City Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from MWCI and EDCOP-LTI, explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to gather the opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Almario and Bagaipo SPDOs of MWCI presented the background on wastewater management and the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: MWCI Lynn Almario Senior Project Development Officer Beth Bagaipo Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Note: Attendance sheets of participants with their signatures are attached to this report. Standards of water – The standards used in the study is the DENR standards for bodies of water based on DAO 34. This is adopted from the international standards used in other countries. Class C water means that the maximum BOD is 10 mgs and the coliform is below 5,000 most probable number per 10 ml. The aim of the Pasig River project is at least to conform to class C water. It was pointed out that in the presentation of the water analysis in Sct. Santiago, the BOD and coliform are above the DENR standards. This is the reason of the project. The project aims to conform to class C standards of DENR. In existing STP of MWCI, the BOD and coliform being produced are in the range of 7 and 1,000 respectively. The DENR is monitoring the quality of wastewater being produced by the STP. It was suggested that a law should be enacted to periodically desludge individual septic tanks because poor maintained tanks are the main cause of pollution in the waterways. Presently there is no low mandating periodic desludging. Project concept – The project will pump the wastewater after being treated in the CST at Sct. Santiago to the STP located in the basketball court in Heroes Hills. The STP is far from houses and it is required that a buffer area be establish to further protect the houses from any adverse effects that the STP may cause. Time frame – The loan is expected to be approved by World Bank around 2005 provided all the necessary certificates, permits and other documents are in order. The project will be implemented from early 2006 up to 2008. Coverage – the project will cover the whole of South triangle and portions of Laging Handa and Sacred Heart. The company’s vacuum trucks will regularly service areas not covered by this project. The project includes the purchase of additional vacuum trucks. Desludging is free for MWCI customers. If private contractors are used for desludging, MWCI can not reimburse the customers their expenses. In emergency cases of desludging where a customer is not scheduled, MWCI will charge a fee of 800 pesos.

Page 287: for Manila Third Sewerage Project Volume 3

Septage Treatment plant –The septage treatment plant to cover Quezon City will be located in Payatas, which will treat the sludge, vacuumed from individual septic tanks and regional STP. Another proposed plant will be located in Food Terminal Inc. There is an on-going construction in Antipolo to build a septage treatment plant. The by-products of these septage treatment plants will be used as soil conditioner for the lahar areas in Pampanga and Tarlac and the water for irrigation. Interested parties may get the soil conditioner for free provided it is pick up in the Magallanes treatment plant. Soil conditioner --It is classified as soil conditioner because it lacks the minimum quantity of nitrogen, phosphorus and potassium set by the Fertilizer and Pesticide Authority (FDA). A participant is requesting for an analysis of the chemical profile of the soil conditioner. Coordination – It was suggested in the future to notify City Hall about any meeting for the project and contact the barangay officials who will in turn mobilize other officials and residents. This can also be done during the implementation of the project so that barangay officials may assist in traffic management. Sewerage charge – Presently the communities covered by this project are already being charged monthly sewerage fees. There will be no additional payment for the proposed treatment plant. Presently, MWCI is reviewing the rate of water charge they will charge to their customers. MWSS, the regulatory body for water periodically reviews the water charges and decides on petitions for increase in water charges after prior notification and public hearings. Water by-product – the water generated by the STP is not potable. However, this can be used for other purposes such as for irrigation and fighting fires in the nearby areas. It is a very good project but the coverage is limited. They are looking forward to being covered in Manila Fourth Sewerage Project. They are requesting for additional information materials so they can inform other residents in their barangays. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 288: for Manila Third Sewerage Project Volume 3
Page 289: for Manila Third Sewerage Project Volume 3

Covered Court of Barangay Quirino 2-A Quezon City, Metro Manila Public Consultation Meeting with the Barangay Officials and Residents of Barangays Quirino 2-A, 2-B, 2-C, 3-A, 3-B, and Duyan-Duyan held on June 22 2004 from 1:30-4 PM at the Covered Court of Barangay Quirino 2-A Quezon City, Metro Manila

Page 290: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangays Quirino 2-A, 2-B, 2-C, 3-A, 3-B, and Duyan-Duyan held on June 22 2004 from 1:30-4 PM at the Covered Court of Barangay Quirino 2-A Quezon City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Matibag Manager PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Eva Matibag Manager PDO Waste Water Christopher Calamoing Senior Project Development Officer Lynn Almario Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Ginelyn Mary Guanzon Representative EMB, DENR Note: Attendance sheets of participants with their signatures are attached to this report. Sewerage charge – Presently the communities covered by this project are already being charged monthly sewerage fees. There will be no additional payment for the proposed treatment plant. This is also the case in certain parts of Makati and other parts of Quezon City. Presently, MWCI is reviewing the rate of water charge they will charge to their customers. MWSS, the regulatory body for water periodically reviews the water charges and decides on petitions for increase in water charges after prior notification and public hearings. All households located in the coverage area will be billed a monthly sewer charge even if these households do not want to connect to the system. This is provided in the Sanitation Code, wherein households should connect to the sewerage system if the system is available. Coordination with other agencies during construction phase – MWCI will investigate the diggings in Agoho Street and its status. It is better to for companies like MWCI, telephone and other utilities to lay pipes or lines at the same time. However, their projects depend on the available financial resources. All street diggings should have permits and there is an interagency group that coordinates the various street diggings. Another problem MWCI is encountering is the absence of “as built plan” of the various companies involved in street diggings. To safeguard accidental hits on the various utilities, there is a provision in the contract of the contractor to restore any accidental hit. MWCI gives priority on busted sewer pipes because of the disturbances that this may cause to the residents. Sewer pipes are PVC brown pipes. Displacement of families – The project intends to intercept the wastewater before or after the Rimas CST and pump the wastewater to the regional treatment plant located in East Avenue. This was the plan to

Page 291: for Manila Third Sewerage Project Volume 3

avoid the displacement of families already occupying the area around the Rimas CST. There will be no displacement of families in Rimas CST because of the project. Dirty water – If there are cases of dirty water in a general area the usual reason is illegal connection. MWCI will investigate the area and will keep the residents informed. MWCI gives highest priority on the issue of dirty water supply. It was pointed out that the supplier of mineral water is making brisk business because the water in the area in undrinkable. There is an adverse claimant (Pacundo) on the land where the Rimas CST is located. Around 5 meters were occupied. It was reported to MWSS and they investigated. However, there is no action taken. MWCI is aware of the claim and it was also reported in the feasibility study that part of a dormitory is occupying a portion of the CST. It was clarified that the lot is owned either by NHA or the LGU and actions have been taken to address the issue. Total Construction – A participant (engineer) pointed out that the sewer lines are in very poor conditions because of age, new development and the contours of their areas. He proposes that instead of rehabilitation, the project should change all the sewer lines because they are being charge sewer fees. It was clarified that the elevation of pipes is one of the considerations in the laying of pipes. This is being done to minimize operation costs. The are also dilapidated portions of the sewer line that may need new pipes. There is an agreement with NAWASA that houses within 60 meters of the CST are free of charge. Why are they being billed for sewer fees now? MWCI is not aware of this agreement. It was requested that if there is a written agreement, MWCI is requesting a copy. MWCI inherited the sewer lines from MWSS and is not aware of this agreement. Customer service --A participant reported to MWCI about a sewer problem but the one answering the phone did not know how to answer. She was reported to her superior and the problem was addressed. There was a recurrence of the problem and was again reported. The office claimed that the problem was under the jurisdiction of DPWH. MWCI will immediately investigate this matter. Institutional coordination – The Sanitation Code gives the responsibility to the Department of Health to implement the Code. However, DOH does not have the personnel to implement it. MWCI has no power to arrest anyone who discharges his or her wastewater directly to the creek. With the passage of the new Clean Water Act, the implementing rules and regulations will specify the institutional relationships with different government agencies. MWCI will provide updates on the IRR of the new law. The participants expressed support for the project. Some requested more information and coordination with the local officials. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 292: for Manila Third Sewerage Project Volume 3
Page 293: for Manila Third Sewerage Project Volume 3

Barangay Hall of Barangay Central, Quezon City Public Consultation Meeting with the Barangay Officials and Residents of Barangay Central, Old Capitolyo and UP Village held on June 23 2004 from 10-11:30 AM at the Barangay Hall of Barangay Central, Quezon City, Metro Manila

Page 294: for Manila Third Sewerage Project Volume 3

MANILA THIRD SEWERAGE PROJECT Minutes of the Public Consultation Meeting with the Barangay Officials and Residents of Barangay Central, Old Capitolyo and UP Village held on June 23 2004 from 10-11:30 AM at the Barangay Hall of Barangay Central, Quezon City, Metro Manila Mr. Soncuya, a consultant of EDCOP-LTI, introduced the participants from EDCOP-LTI and Manila Water Company Inc., (MWCI), explained the purpose of the public consultation and the environmental impact assessment (EIA) process. This public consultation, as part of the validation process of the EIA, aims to clarify issues and gather opinions, suggestions and recommendations of stakeholders on the proposed Manila Third Sewerage Project. Ms. Matibag manager, PDO Waste Water of MWCI presented the proposed project. Mr. Suelto, another consultant of EDCOP-LTI presented the results of the environmental impact study. After the two presentations, an open forum ensued. The following are the highlights of this public consultation. Attendance: Manila Water Company Inc. Eva Matibag Manager Project Development Office Waste Water Beth Bagaipo Senior Project Development Officer EDCOP-LTI Rolando Soncuya Sociologist Anacleto Suelto Environmental Specialist Evelyn Nolasco Public Consultation Coordinator Wilva Lin Deocades Facilitator Maya Villaluz Representative World Bank Note: Attendance sheets of participants with their signatures are attached to this report. Eviction – The proposed site has informal dwellers and is the site of the day care center. What are the complications? The project design was made to minimize if not to totally avoid eviction and resettlement issues. If there will be displacement, the project will either relocate or compensate the displaced families. This is a World Bank assisted project, WB has strict policies on resettlement. The basic principle is to improve the conditions of the relocated families. The minimum is to at lease restore their conditions before their relocation. It was explained that the communal septic tank would be abandoned in favor of a pumping station that will be located in Maginhawa Street precisely to avoid displacement of informal dwellers around the communal septic tank. The residents were thankful that they would not be displaced by the project. The STP will be located at the vacant lot converted into a mini-park beside the Central Bank owned by the National Housing Authority. Previous evictions done in the past in this area is not in connection to the proposed project. A participant was evicted from this area August of 2003. It was pointed out that the existing communal septic tank located in East Avenue has tall trees above the communal septic tank. This area will be converted into a STP. Hence, the place were the participant was evict is different from the proposed site of the STP. Sewer charges –The sewer charge is presently based on 50% of basic water charge. However, your areas are already being charged the sewer fees, so there is no increase in your monthly water payment. Water charges are regulated by MWSS and MWCI has already requested a review of the present charges. Coverage – The project aims to intercept the wastewater before entering the communal septic tank and pump the wastewater to the STP in East Avenue. The project aims to cover the areas shown in the map

Page 295: for Manila Third Sewerage Project Volume 3

and in no way exclude areas that are presently covered by the communal septic tank located in Matiwasay Street. The proposed pump station will be located in Maginhawa St. Odor – Bad odor is one of the risks in water treatment plants if the designed is flawed or malfunctioned. In the proposed project, odor control facilities will be used to prevent bad odor from escaping from the plant and go to the nearby communities. Hospital wastewater -- The STP is near some hospitals. However, MWCI has presently no capacity to process wastewater from these hospitals. Hospitals are required by law to have their own wastewater treatment plants. The proposed STP will not process any wastewater from these hospitals. MWCI will consult DENR regarding the hospital wastewater. Barangay officials will support the project and will participate in cleanliness campaign and traffic enforcement. There are three barangays involved in the project and they assured MWCI their full support. Residents around the Matiwasay CST thanked MWCI for considering their houses in the design of the project. Prepared by: __ _____________

Rolando Soncuya Sociologist EDCOP-LTI-ISSI

Page 296: for Manila Third Sewerage Project Volume 3
Page 297: for Manila Third Sewerage Project Volume 3
Page 298: for Manila Third Sewerage Project Volume 3
Page 299: for Manila Third Sewerage Project Volume 3
Page 300: for Manila Third Sewerage Project Volume 3
Page 301: for Manila Third Sewerage Project Volume 3
Page 302: for Manila Third Sewerage Project Volume 3
Page 303: for Manila Third Sewerage Project Volume 3
Page 304: for Manila Third Sewerage Project Volume 3
Page 305: for Manila Third Sewerage Project Volume 3
Page 306: for Manila Third Sewerage Project Volume 3
Page 307: for Manila Third Sewerage Project Volume 3
Page 308: for Manila Third Sewerage Project Volume 3
Page 309: for Manila Third Sewerage Project Volume 3
Page 310: for Manila Third Sewerage Project Volume 3
Page 311: for Manila Third Sewerage Project Volume 3
Page 312: for Manila Third Sewerage Project Volume 3
Page 313: for Manila Third Sewerage Project Volume 3
Page 314: for Manila Third Sewerage Project Volume 3
Page 315: for Manila Third Sewerage Project Volume 3
Page 316: for Manila Third Sewerage Project Volume 3
Page 317: for Manila Third Sewerage Project Volume 3
Page 318: for Manila Third Sewerage Project Volume 3
Page 319: for Manila Third Sewerage Project Volume 3
Page 320: for Manila Third Sewerage Project Volume 3
Page 321: for Manila Third Sewerage Project Volume 3
Page 322: for Manila Third Sewerage Project Volume 3
Page 323: for Manila Third Sewerage Project Volume 3
Page 324: for Manila Third Sewerage Project Volume 3
Page 325: for Manila Third Sewerage Project Volume 3
Page 326: for Manila Third Sewerage Project Volume 3
Page 327: for Manila Third Sewerage Project Volume 3
Page 328: for Manila Third Sewerage Project Volume 3
Page 329: for Manila Third Sewerage Project Volume 3
Page 330: for Manila Third Sewerage Project Volume 3
Page 331: for Manila Third Sewerage Project Volume 3
Page 332: for Manila Third Sewerage Project Volume 3
Page 333: for Manila Third Sewerage Project Volume 3
Page 334: for Manila Third Sewerage Project Volume 3
Page 335: for Manila Third Sewerage Project Volume 3
Page 336: for Manila Third Sewerage Project Volume 3
Page 337: for Manila Third Sewerage Project Volume 3
Page 338: for Manila Third Sewerage Project Volume 3
Page 339: for Manila Third Sewerage Project Volume 3
Page 340: for Manila Third Sewerage Project Volume 3
Page 341: for Manila Third Sewerage Project Volume 3
Page 342: for Manila Third Sewerage Project Volume 3
Page 343: for Manila Third Sewerage Project Volume 3
Page 344: for Manila Third Sewerage Project Volume 3
Page 345: for Manila Third Sewerage Project Volume 3
Page 346: for Manila Third Sewerage Project Volume 3
Page 347: for Manila Third Sewerage Project Volume 3
Page 348: for Manila Third Sewerage Project Volume 3
Page 349: for Manila Third Sewerage Project Volume 3
Page 350: for Manila Third Sewerage Project Volume 3
Page 351: for Manila Third Sewerage Project Volume 3
Page 352: for Manila Third Sewerage Project Volume 3
Page 353: for Manila Third Sewerage Project Volume 3
Page 354: for Manila Third Sewerage Project Volume 3
Page 355: for Manila Third Sewerage Project Volume 3
Page 356: for Manila Third Sewerage Project Volume 3
Page 357: for Manila Third Sewerage Project Volume 3
Page 358: for Manila Third Sewerage Project Volume 3
Page 359: for Manila Third Sewerage Project Volume 3
Page 360: for Manila Third Sewerage Project Volume 3
Page 361: for Manila Third Sewerage Project Volume 3
Page 362: for Manila Third Sewerage Project Volume 3
Page 363: for Manila Third Sewerage Project Volume 3
Page 364: for Manila Third Sewerage Project Volume 3
Page 365: for Manila Third Sewerage Project Volume 3
Page 366: for Manila Third Sewerage Project Volume 3
Page 367: for Manila Third Sewerage Project Volume 3
Page 368: for Manila Third Sewerage Project Volume 3
Page 369: for Manila Third Sewerage Project Volume 3
Page 370: for Manila Third Sewerage Project Volume 3
Page 371: for Manila Third Sewerage Project Volume 3
Page 372: for Manila Third Sewerage Project Volume 3
Page 373: for Manila Third Sewerage Project Volume 3
Page 374: for Manila Third Sewerage Project Volume 3
Page 375: for Manila Third Sewerage Project Volume 3
Page 376: for Manila Third Sewerage Project Volume 3
Page 377: for Manila Third Sewerage Project Volume 3
Page 378: for Manila Third Sewerage Project Volume 3
Page 379: for Manila Third Sewerage Project Volume 3
Page 380: for Manila Third Sewerage Project Volume 3
Page 381: for Manila Third Sewerage Project Volume 3
Page 382: for Manila Third Sewerage Project Volume 3
Page 383: for Manila Third Sewerage Project Volume 3
Page 384: for Manila Third Sewerage Project Volume 3
Page 385: for Manila Third Sewerage Project Volume 3
Page 386: for Manila Third Sewerage Project Volume 3
Page 387: for Manila Third Sewerage Project Volume 3
Page 388: for Manila Third Sewerage Project Volume 3
Page 389: for Manila Third Sewerage Project Volume 3
Page 390: for Manila Third Sewerage Project Volume 3
Page 391: for Manila Third Sewerage Project Volume 3
Page 392: for Manila Third Sewerage Project Volume 3
Page 393: for Manila Third Sewerage Project Volume 3
Page 394: for Manila Third Sewerage Project Volume 3
Page 395: for Manila Third Sewerage Project Volume 3
Page 396: for Manila Third Sewerage Project Volume 3
Page 397: for Manila Third Sewerage Project Volume 3
Page 398: for Manila Third Sewerage Project Volume 3
Page 399: for Manila Third Sewerage Project Volume 3
Page 400: for Manila Third Sewerage Project Volume 3
Page 401: for Manila Third Sewerage Project Volume 3
Page 402: for Manila Third Sewerage Project Volume 3
Page 403: for Manila Third Sewerage Project Volume 3
Page 404: for Manila Third Sewerage Project Volume 3
Page 405: for Manila Third Sewerage Project Volume 3
Page 406: for Manila Third Sewerage Project Volume 3
Page 407: for Manila Third Sewerage Project Volume 3
Page 408: for Manila Third Sewerage Project Volume 3
Page 409: for Manila Third Sewerage Project Volume 3
Page 410: for Manila Third Sewerage Project Volume 3
Page 411: for Manila Third Sewerage Project Volume 3
Page 412: for Manila Third Sewerage Project Volume 3
Page 413: for Manila Third Sewerage Project Volume 3
Page 414: for Manila Third Sewerage Project Volume 3
Page 415: for Manila Third Sewerage Project Volume 3
Page 416: for Manila Third Sewerage Project Volume 3
Page 417: for Manila Third Sewerage Project Volume 3
Page 418: for Manila Third Sewerage Project Volume 3
Page 419: for Manila Third Sewerage Project Volume 3
Page 420: for Manila Third Sewerage Project Volume 3
Page 421: for Manila Third Sewerage Project Volume 3
Page 422: for Manila Third Sewerage Project Volume 3
Page 423: for Manila Third Sewerage Project Volume 3
Page 424: for Manila Third Sewerage Project Volume 3
Page 425: for Manila Third Sewerage Project Volume 3
Page 426: for Manila Third Sewerage Project Volume 3
Page 427: for Manila Third Sewerage Project Volume 3
Page 428: for Manila Third Sewerage Project Volume 3
Page 429: for Manila Third Sewerage Project Volume 3
Page 430: for Manila Third Sewerage Project Volume 3
Page 431: for Manila Third Sewerage Project Volume 3
Page 432: for Manila Third Sewerage Project Volume 3
Page 433: for Manila Third Sewerage Project Volume 3
Page 434: for Manila Third Sewerage Project Volume 3
Page 435: for Manila Third Sewerage Project Volume 3
Page 436: for Manila Third Sewerage Project Volume 3
Page 437: for Manila Third Sewerage Project Volume 3
Page 438: for Manila Third Sewerage Project Volume 3
Page 439: for Manila Third Sewerage Project Volume 3
Page 440: for Manila Third Sewerage Project Volume 3
Page 441: for Manila Third Sewerage Project Volume 3
Page 442: for Manila Third Sewerage Project Volume 3
Page 443: for Manila Third Sewerage Project Volume 3
Page 444: for Manila Third Sewerage Project Volume 3
Page 445: for Manila Third Sewerage Project Volume 3
Page 446: for Manila Third Sewerage Project Volume 3
Page 447: for Manila Third Sewerage Project Volume 3
Page 448: for Manila Third Sewerage Project Volume 3
Page 449: for Manila Third Sewerage Project Volume 3
Page 450: for Manila Third Sewerage Project Volume 3
Page 451: for Manila Third Sewerage Project Volume 3
Page 452: for Manila Third Sewerage Project Volume 3
Page 453: for Manila Third Sewerage Project Volume 3
Page 454: for Manila Third Sewerage Project Volume 3
Page 455: for Manila Third Sewerage Project Volume 3
Page 456: for Manila Third Sewerage Project Volume 3
Page 457: for Manila Third Sewerage Project Volume 3
Page 458: for Manila Third Sewerage Project Volume 3
Page 459: for Manila Third Sewerage Project Volume 3
Page 460: for Manila Third Sewerage Project Volume 3
Page 461: for Manila Third Sewerage Project Volume 3
Page 462: for Manila Third Sewerage Project Volume 3
Page 463: for Manila Third Sewerage Project Volume 3
Page 464: for Manila Third Sewerage Project Volume 3
Page 465: for Manila Third Sewerage Project Volume 3
Page 466: for Manila Third Sewerage Project Volume 3
Page 467: for Manila Third Sewerage Project Volume 3
Page 468: for Manila Third Sewerage Project Volume 3
Page 469: for Manila Third Sewerage Project Volume 3
Page 470: for Manila Third Sewerage Project Volume 3
Page 471: for Manila Third Sewerage Project Volume 3
Page 472: for Manila Third Sewerage Project Volume 3
Page 473: for Manila Third Sewerage Project Volume 3
Page 474: for Manila Third Sewerage Project Volume 3
Page 475: for Manila Third Sewerage Project Volume 3
Page 476: for Manila Third Sewerage Project Volume 3
Page 477: for Manila Third Sewerage Project Volume 3
Page 478: for Manila Third Sewerage Project Volume 3
Page 479: for Manila Third Sewerage Project Volume 3
Page 480: for Manila Third Sewerage Project Volume 3
Page 481: for Manila Third Sewerage Project Volume 3
Page 482: for Manila Third Sewerage Project Volume 3

Annex 6 Copies of Presentation

Materials

Page 483: for Manila Third Sewerage Project Volume 3
Page 484: for Manila Third Sewerage Project Volume 3
Page 485: for Manila Third Sewerage Project Volume 3
Page 486: for Manila Third Sewerage Project Volume 3
Page 487: for Manila Third Sewerage Project Volume 3
Page 488: for Manila Third Sewerage Project Volume 3
Page 489: for Manila Third Sewerage Project Volume 3
Page 490: for Manila Third Sewerage Project Volume 3
Page 491: for Manila Third Sewerage Project Volume 3
Page 492: for Manila Third Sewerage Project Volume 3
Page 493: for Manila Third Sewerage Project Volume 3
Page 494: for Manila Third Sewerage Project Volume 3
Page 495: for Manila Third Sewerage Project Volume 3

1

SAN MATEO , RIZAL

Updates and Development

February 3, 2005

OutlineOutline

Profile of San Mateo, Rizal

Project Updates

Water Supply

“Tubig Para Sa Barangay”

Sewerage and Sanitation

2

Municipality of San Mateo, RizalMunicipality of San Mateo, Rizal

PROFILE

3

San Mateo ProfileSan Mateo Profile

Land Area 50.4 sq. kmNumber of Barangays 15Population 152,681

4

WATER SUPPLY

Project UpdatesProject Updates

5

The Municipality of San Mateo, RizalThe Municipality of San Mateo, Rizal

8%1641491,97711,862Maly7955562Gulod Malaya2801957Pintong Bukawe

8%1631502,16412,985Malanday36%3503209695,815Dulong Bayan II

17%1651329985,985Guinayang

2,68718,808Silangan

43%3733418765,254Dulong Bayan I

27%6,7605,35025,447152,681TOTAL

24%3923581,6409,840Guitnang Bayan II

23%6475172,82816,970Guitnang Bayan I

47%7406751,5689,410Sta Ana

57%2962715163,097Ampid II

51%1,8701,1323,68622,125Ampid I64%1,6001,3052,47914,874Banaba

% HH ServedNo. of HH ServedNo. of WSCEstimated

HouseholdsEstimated PopulationBarangay

6

Page 496: for Manila Third Sewerage Project Volume 3

2

Source of Water SupplySource of Water Supply

10.65 TOTAL

4.7724SURFACE WATER

0.8618Cecilia St. Maly• Maly

1.008Monterock Cmpd Dulong BayanI• Monterock

1.4717Nursery Cmpd Guitnang Bayan I• Nursery

1.6224M. H. Del Pilar Guitnang Bayan II• Public Market

0.456Salvador St. Sta Ana• Sta. Ana

0.4817Sta Maria Subd, Ampid I• Sta. Maria

Production (mld)

Operating HoursLocationDeepwells

7

Water AvailabilityWater Availability

19971997 20042004

24 hours 13-23 hours 0-12 hours8

Pipelaying Projects

P 7 MTotal Investment

2Deepwell

P 31 MTotal Investment

11.41 kmTotal length of pipes

Completed (1997-2004)

9

PipelayingPipelaying ProjectsProjects

P 175 MTotal Investment

17.0 kmTotal length of pipes

PROPOSED (2005)

10

““TubigTubig Para Sa BarangayPara Sa Barangay””

4504PROPOSED

COMPLETED

1,10010

No. of Beneficiaries(Households)

Number of Projects

11

SEWERAGE & SANITATION

Project UpdatesProject Updates

12

Page 497: for Manila Third Sewerage Project Volume 3

3

No proper sanitation facilitiescongested landscape

Polluted waterwayslack of planning utilities

Sanitation Conditions in Metro ManilaSanitation Conditions in Metro Manila

13

Sanitation Conditions in Metro ManilaSanitation Conditions in Metro Manila

Latrine7%

Overhang1%

None4% Sewerage

3%

Septic Tank85%

70% of pollution load to major inland waterways and rivers due largely to absence of household

septic tank maintenance14

Manila Third Sewerage Project Manila Third Sewerage Project (MTSP)(MTSP)

15

Manila Third Sewerage Project (MTSP)Manila Third Sewerage Project (MTSP)

Aims to reduce pollution loading to rivers and waterwaysWorld Bank assistanceImplementation: 2005-2010Sewerage and sanitation projects

Combined sewage-drainage projectsSeptic tank desludging trucks and septage treatment plants

16

Manila Third Sewerage Project (MTSP)Manila Third Sewerage Project (MTSP)

Septage Treatment Plants

Sanitation for Low to Middle-Income Communities (East Bank, Marikina, Taguig)Taguig Sewerage SystemUpgrade of Existing Sanitation System (Quezon City)QC-Marikina Sewer SystemRiverbanks WwTPs (Mandaluyong, Pasig, Makati)

SUB-COMPONENTS

Barangay Gitnang Bayan II in San Mateo, Rizal

17

FTI Complex, Taguig

San Mateo Septage Treatment PlantSan Mateo Septage Treatment Plant

Around 30,000 households to be served annually30 tankers, 1 Septage Treatment Plant

18

Page 498: for Manila Third Sewerage Project Volume 3

4

Environmental ImpactsEnvironmental Impacts

19

& Mitigating Measures & Mitigating Measures

Construction PhaseConstruction Phase

20

Generation of dust Water sprinkling of the area should be done to reduce the occurrence of airborne dust.Construction area should be provided with perimeter fence.

Air PollutionAir Pollution

ImpactsImpacts Mitigating MeasuresMitigating Measures

Noise PollutionNoise Pollution

Noise pollution from the operation of construction equipment

Noise generating construction work will be scheduled during daytime hours.

Construction PhaseConstruction Phase

Erosion and surface soil runoff increasing turbidity of the receiving body of water

21

Water PollutionWater Pollution

ImpactsImpacts Mitigating MeasuresMitigating Measures

Temporary drainage canals should be constructed to block flow of silt into the drainage system.

Temporary barriers and trenches shall be constructed around the mounds of materials to abate spread of spoils through surface runoff

Construction PhaseConstruction Phase

22

Construction WasteConstruction Waste

ImpactsImpacts Mitigating MeasuresMitigating Measures

Generation of construction debris and other solid wastes

Collection and recycling of construction materials.To be offered to junk shops as scrap material

Vegetation ClearingVegetation Clearing

Clearing of vegetation The design of the project shall minimize cutting of trees.

Appropriate permits from the DENR / LGU shall be secured for affected trees.

Operation PhaseOperation Phase

23

Water PollutionWater Pollution

ImpactsImpacts Mitigating MeasuresMitigating Measures

Non-compliance of wastewater discharge

The SpTP should comply with the Effluent Standards of DENR for Class C waters. Regular monitoring and maintenance of the SpTP will be done.

Washing of tankers A tanker washing facility shall beincluded in the project plans.Wastewater from the washingoperations shall be channeledinto the SpTP

Operation PhaseOperation Phase

24

Air and Noise PollutionAir and Noise Pollution

ImpactsImpacts Mitigating MeasuresMitigating Measures

Noise and air emissions from the movement of tankers and the operation of the SpTP

Buffer zones will be part of the lay-out of the SpTP and silencers will be installed in the SpTP

Tankers should be required to pass the smoke emission test, in accordance with the Philippine Clean Air Act.

Page 499: for Manila Third Sewerage Project Volume 3

5

Operation PhaseOperation Phase

25

Sludge GenerationSludge Generation

ImpactsImpacts Mitigating MeasuresMitigating Measures

Sludge generation due to the operation of the SpTP

Treated sludge can be used as soil conditioner of agricultural lands in the vicinity.

Proper handling will be ensured for the removal and transportation of sludge.

MTSP RequirementsMTSP Requirements

endorsements from LGUssocial and financial acceptabilityendorsement from the Regional Development Council (RDC)NEDA – ICC approvalWorld Bank approval

SUMMARYSUMMARY

Water pollution due to wastewater is a pressing problem that has to be addressed

Ongoing activities are insufficient to arrest the wastewater problem

MTSP will help expand the provision of sanitation and sewerage services

Education and policy issues remain as challenges