for lease - loopnet€¦ · as well the new central subway are both slated for completion in 2018....

6
855 HOWARD For Lease Presented by Danny Yadegar Lic #02019430 415.432.2093 [email protected]

Upload: others

Post on 14-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: For Lease - LoopNet€¦ · as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new

855HOWARD

For LeasePresented by

Danny YadegarLic #02019430415.432.2093

[email protected]

Page 2: For Lease - LoopNet€¦ · as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new

context855 Howard lies in the heart of San Francisco’s South of Market District (SoMa). Built in 1922, the cast concrete building is a short walk from Market Street and many of the City’s most visited destinations—the Moscone Center, the Westfield Mall, and SFMoMA. The building is well-served by transit with BART and SF Muni stations nearby, including stations at Powell Street and Folsom & 4th, a new central subway station.

Major hotels such as the W, Intercontinental and Marriott Marquis contribute to over 22,000 hotel rooms only minutes away. There are over 5,000 parking spaces within walking distance to 855 Howard.1

855HOWARD

YERBA BUENA

GARDENS

1/3 m

ile ra

dius

MOSCONE NORTH

SFMOMA

MOSCONE WEST

METREON

5TH &MISSIONGARAGE

JEWISHMUSEUM

MOSCONE SOUTH

WESTFIELDSHOPPINGCENTRE

5M PROJECT

WHOLE FOODS

1 SF Travel2 San Francisco Business Times

Page 3: For Lease - LoopNet€¦ · as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new

opportunity

SoMa, the tech and startup epicenter of San Francisco, is changing. Exciting new bars and restaurants open monthly. The Transbay Terminal will soon welcome thousands of commuters daily. In addition, several large projects will redefine the neighborhood. The Moscone Center expansion as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new and renovated office space. While 855 Howard is located just beyond its boundaries, the Central SoMa Plan will pave the way for 7,800 new housing units and over 40,000 new jobs.2

Moscone Center Expansion Central Subway Yerba Buena/Moscone StationSocketSite

Central SoMa PlanSF Planning Department

MWA Architects

5M ProjectForest City

Danny YadegarLic #02019430(415) 432-2093

Page 4: For Lease - LoopNet€¦ · as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new

buildingBuilding Profile

12,000sf building3 floors @ 4,000sf eachAll floors serviced by elevator Extensive structural upgrades300-amp electrical serviceFull sprinkler systemFull air-conditioningConcrete perimeter wallsEfficient open floor plans

Allowable Uses on all floors

Formula RetailLaboratory & Life Science

Design ProfessionalEntertainment & Arts

Light ManufacturingTrade School

Institutional UsesRetail Sales & Service Uses

Restaurant

Office Use

Office use is currently permitted on the Second Floor only at 855 Howard. In order to accommodate an office tenant on the Ground Floor and in the Basement, a Conditional Use application was submit to the Planning Department on July 7, 2017. It is anticipated that the change will be complete Q1 of 2018.

Renderings of potential buildout for second floor

Ground Floor

Page 5: For Lease - LoopNet€¦ · as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new

floor plans

Basement

Ground Floor

Second Floor

PLA

NS

JOH

N Y

AD

EG

AR

& A

SS

OC

IATE

S

REMODEL

855 HOWARD STREETSAN FRANCISCO, CA

PLA

NS

JOH

N Y

AD

EG

AR

& A

SS

OC

IATE

S

REMODEL

855 HOWARD STREETSAN FRANCISCO, CA

PLA

N

JOH

N Y

AD

EG

AR

& A

SS

OC

IATE

S

REMODEL

855 HOWARD STREETSAN FRANCISCO, CA

Danny YadegarLic #02019430(415) 432-2093

Page 6: For Lease - LoopNet€¦ · as well the new Central Subway are both slated for completion in 2018. Forest City’s 5M project, a half block away, plans to add over 800,000sf of new

repositioningYour company is looking for an exceptional location for a corporate headquarters, close to rich transit. You want to be in a building with high-visibility, high pedestrian and vehicle counts. You want to be in a hip neighborhood chockfull of bars, restaurants, and culture. SoMa would be perfect.

Ideally it would be an entire building, so that you can maximize security and place branding on the building’s facade. You also want an industrial building with character—exposed wood beams and concrete walls.

You are looking for 855 Howard.

Formerly used as a three-floor restaurant, 855 Howard will need significant improvements to accommodate its next user. The interior is being prepared for demolition down to a structural shell, leaving tremendous creative license for its next user. There will be a generous tenant improvement allowance in order to prepare the building for its next user. The ideal tenant will be interested in a shell building or, for more immediate delivery, be willing to complete demolition with an allowance.

Tenant Improvements

Rents Available Upon Request

Headquarters Opportunity

Rendering of potential facade renovation.

Danny YadegarLic #02019430(415) 432-2093