Behans Land Restoration Ltd. Waste Licence Application Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry JBA3746/WLA/dl May 2008 Page 1 of 1 ATTACHMENT E2 – EMISSIONS TO SURFACE WATER The nearest watercourse to the application site site is the River Morell, which is a tributary of the River Liffey, and located within the Eastern Liffey River Basin District. The River Morell runs parallel to the local road to the south and west of the application site. There are no other surface watercourses within the site boundary or in the immediate vicinity. All existing water features within the application site are considered to be groundwater features. Meteoric water falling over existing and/or future landforms at the application site will either run over the surface to groundwater ponds forming in closed depressions within the site or will percolate through backfilled and/or natural soil to the underlying groundwater table. There have been no emissions to watercourses or ponds beyond the boundary of the application site in undertaking site restoration works to date. At no time during the future restoration works will surface water run-off be directed to the River Morell or any watercourses or ponds beyond the site boundary. With the exception of the sealed concrete slab at the waste inspection and quarantine area, it is not intended to provide any site drainage infrastructure to collect and remove surface water run-off at the application site. The temporary waste inspection and quarantine area, will be sealed by a 100mm thick reinforced concrete slab over 150mm of granular sub-base and bunded to a design storm volume. Any surface water running over the surface of the concrete slab will be directed toward buried storage tanks with double skin protection located on the western side of the hardstanding / recycling area indicated on Figure E2.1. Surface water will only be collected in the buried tanks when suspect waste consignments are stored at the quarantine facility. Any wastewater collected in the buried tanks will be emptied by licensed waste collectors and transferred to a collection tanker for disposal off-site at an approved waste water treatment facility. For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:00:47:39

Upload: others

Post on 02-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Behans Land Restoration Ltd. Waste Licence Application

Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry

JBA3746/WLA/dl May 2008 Page 1 of 1

ATTACHMENT E2 – EMISSIONS TO SURFACE WATER

The nearest watercourse to the application site site is the River Morell, which is a tributary of the River Liffey, and located within the Eastern Liffey River Basin District. The River Morell runs parallel to the local road to the south and west of the application site. There are no other surface watercourses within the site boundary or in the immediate vicinity. All existing water features within the application site are considered to be groundwater features. Meteoric water falling over existing and/or future landforms at the application site will either run over the surface to groundwater ponds forming in closed depressions within the site or will percolate through backfilled and/or natural soil to the underlying groundwater table. There have been no emissions to watercourses or ponds beyond the boundary of the application site in undertaking site restoration works to date. At no time during the future restoration works will surface water run-off be directed to the River Morell or any watercourses or ponds beyond the site boundary. With the exception of the sealed concrete slab at the waste inspection and quarantine area, it is not intended to provide any site drainage infrastructure to collect and remove surface water run-off at the application site. The temporary waste inspection and quarantine area, will be sealed by a 100mm thick reinforced concrete slab over 150mm of granular sub-base and bunded to a design storm volume. Any surface water running over the surface of the concrete slab will be directed toward buried storage tanks with double skin protection located on the western side of the hardstanding / recycling area indicated on Figure E2.1. Surface water will only be collected in the buried tanks when suspect waste consignments are stored at the quarantine facility. Any wastewater collected in the buried tanks will be emptied by licensed waste collectors and transferred to a collection tanker for disposal off-site at an approved waste water treatment facility.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

New

Weighbridge

and Site O

ffices

Wheel W

ash

Runoff C

ollection Drain

Buried R

unoffS

torage Tank

Recycling A

rea

Crushing P

lant

Portable

Toilet

Skips

Restored A

rea

Waste Inspection andQ

uarantine Area

(over concrete slab)

Bunded Waste

Oil Tank

Site E

ntranceJOH

N B

AR

NE

TT

& A

SS

OC

IAT

ES

7 DU

ND

RU

M B

US

INE

SS

PA

RK

WIN

DY

AR

BO

UR

DU

BLIN

14

BE

HA

N'S

LA

ND

RE

ST

OR

AT

ION

LT

D.

BLA

CK

HA

LL, PU

NC

HE

ST

OW

NN

AA

S, C

O. K

ILDA

RE

Site:

Project:

Title:

Draw

n: MK

Job. No: 3746

Scale: 1:1000

Date: M

arch 2008F

IGU

RE

E2.1

Rev.

Date

By

Description

LAN

DS

AT

BLA

CK

HA

LL, CO

. KILD

AR

E

RE

ST

OR

AT

ION

OF

FO

RM

ER

GR

AV

EL P

IT

SU

RF

AC

E W

AT

ER

CO

LLEC

TIO

N

0F

EB

08LM

C

1F

EB

08M

K

LEG

EN

D &

NO

TE

S:

Hardstanding A

rea

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

Behans Land Restoration Ltd. Waste Licence Application

Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry

JBA3746/WLA/dl May 2008 Page 1 of 3

ATTACHMENT E4 – EMISSIONS TO GROUNDWATER

All existing water features within the application site are considered to be groundwater features. All meteoric water falling over existing and/or future landforms at the application site will either run over the surface to groundwater ponds forming in closed depressions within the site or will percolate through backfilled and/or natural soil to the underlying groundwater table. Groundwater in the gravel aquifer has been intercepted by the former quarry workings and is evidenced by a spring in the quarry floor below the electricity pylon in the north-eastern corner of the site. Groundwater emerging at this spring is collected by a buried drainage pipe and discharged to the groundwater pond over the quarry floor in the northern part of the site varies seasonally. A closed depression in the south-western corner of the site also intercepts the groundwater table at its base, giving rise to a pond feature. The location and extent of existing groundwater ponds within the application site is shown on Figure E4.1 Available groundwater test data indicates that there is no disparity between groundwater quality of samples recovered at the upgradient and downgradient end of the application site. This suggests that historical and/or ongoing site operations have had no adverse impact on groundwater quality. As the restoration of the former gravel quarry at Blackhall entails placement and backfilling using only inert soil and recycled construction and demolition wastes, no leachate will be generated by percolation of rainfall through the backfilled and/or natural ground. Consequently, there is no requirement for a lining system or leachate collection system at this waste facility. At each phase of the proposed restoration works, the backfilled ground surface will be graded so as to ensure surface water run-off falls toward a local low point. In order to prevent high concentrations of suspended solids entering existing groundwater ponds, intermediate temporary surface water ponds will be constructed to hold any surface waster run off from the active backfill area. These temporary ponds will encourage settling out of suspended solids and control discharge to groundwater ponds at a lower level. During the development and operation of the site, there is a small risk of groundwater pollution from the following potential sources:

• accidental spillage of fuels and lubricants by construction plant placing the inert fill and other operational procedures;

• increase in suspended solids and potential for contaminated runoff entering groundwater during development of the site; and

• rogue loads of contaminated material being deposited at the site. In order to minimise the risk of pollution to groundwater occurring during the site restoration works, a number of mitigation measures are proposed. These measures give effect to Council Directive 80/68/EEC on the protection of groundwater against pollution and are outlined in Section 6.4.1 of the Environmental Impact Statement. The engineering works associated with the spring discharge are proposed to comprise the following:

• granular fill of 40mm single sized granular material will be placed with a thickness of 600mm above the existing 300mm concrete pipe and will be separated from the inert waste by means of a geotextile protector;

• a new 300mm concrete pipe will be connected to the existing pipe and will be placed within a trench in the in-situ sand and gravels deposits. The pipe will have a granular surround of 40mm. This will in turn be separated from the in-situ soils by a geotextile separator;

• the join will form a 90 degree bend encased in a concrete thrust block with 400mm gravel surround and a geotextile separator to prevent leakage in or out;

• the new drainage trench and concrete pipe will be directed to a soakaway (10m by 10m) to discharge directly into insitu sand and gravel deposits;

• the soakaway will be partially constructed within the in-situ sands and gravels and will extend below the groundwater level. The base of the soakaway will be laid with 100mm single sized granular material or similar approved grading. The geotextile separator which is placed below the concrete pipe will continue and will be placed in the soakaway

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

Behans Land Restoration Ltd. Waste Licence Application

Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry

JBA3746/WLA/dl May 2008 Page 2 of 3

above the 100mm single sized granular material and below the 40mm single size granular material which forms most of the soakaway.

• the concrete pipe will allow discharge of the spring water into this granular material and above the groundwater table in the soakaway.

These proposed engineering measures are presented as Figure E4.2.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

Behans Land Restoration Ltd. Waste Licence Application

Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry

JBA3746/WLA/dl May 2008 Page 3 of 3

TABLE E.4.1 EMISSIONS TO GROUNDWATER

Emission Point or Area:

Emission Point / Area Ref. No: SA1

Emission Pathway: (borehole, well, percolation area, soakaway, landspreading, etc.)

Soakaway

Location Northern Quarry Area

Grid Ref.(10 digit, 5E,5N):

Elevation of discharge: (relative to Ordnance Datum)

Approx 148-149mOD (seasonal variation)

Aquifer classification for receiving groundwater body

Locally Important Aquifer

Groundwater vulnerability assessment (including vulnerability rating)

High Vulnerability

Identity and proximity of groundwater sources at risk (wells, springs, etc)

Well 1 at 140m upgradient / sidelong Well 2 45mupgradient

Identity and proximity of surface water bodies at risk

No connected watercourses in immediate area

Emission Details

(i) Volume to be emitted

Normal/day 1550 m3 Maximum/day 33,600 m

3

Maximum rate/hour 1,400 m3

Period or periods during which emissions are made, or are to be made, including daily or seasonal variations (start-up /shutdown to be included):

Periods of Emission (avg) 60 min/hr 24 hr/day 365 day/yr

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

Pond

2936

00E

293600E

216000N

O/H WIRE

O/H

WIR

E

160.79

164.99

165.39

164.75

165.27

165.12

165 .04

164.74

164.24

164.48

165.97

166.46

167.18

167.62

167.20

166 .33

165.05

165.31

165.51

167.65

168.23

168.51

168.44168.07

167.53

167.13

169.09

169.14

168 .73

164.71

165.75

167.03

168.84

170.24

170.42

170.35

169 .82

169.28

169.28

168.92168.93

167.39

167.25

168.02

168.32

168.89

169.72

167.78

168.25

165.06

164.61

164.07

163.55

163.37163.11

163.13

163.33

163.54163.75

163.79

163.71

163.62163.59

163.74163.79

164.02

164.29

164.71

163.971

63.891

63.35

163.49

162.86

162.40

164 .39

163.94

163.45

163 .28

163.18

162.40

162 .63

163.23

163.75

164.88

166 .01

165.90

165.29

162 .83

162.40

162.46

162.60

162.50

162.47

162.87163.25162.89162.90

163.13

163.52

163.79

164.92164.79

152.72

O/H

WIR

E

O/H

WIR

E

O/H

WIR

E

O/H

WIRE

O/H WIRE

O/H

WIR

E

150.17

150.95

151.73

153.42

152.37

152.55

151.90

EP

EP

Spread:8.00

Girth:0.3

162.22

163.97

Spread:12.00

Girth:0.7

Spread:6.00

Girth:0.3

Spread:8.00

Girth:0.5

Spread:18.00

Girth:1.1

EP

EP

Spread:12.00

Girth:0.8

O/H WIRE

O/H WIRE

O/H WIRE

O/H

WIR

E

O/H

WIR

E

O/H

WIR

E

O/H

WIR

E

O/H

WIR

E

153.05

153 .87

154.32153.34

153.80153.42

152.61

149.58

148.99

149.28

154.07 154.11

152.79

153.90

153.17

153.87

163.11

156.41

160.04

163.45

163 .22

163 .14

149.43

155.24

155.31

155.18

154.71 154.63153.50

153.72

155.92

152.68

151 .47

149.46

153.33

155 .04

155.86

156.92

155.65

156.18

156.65

156.87

157.71

154 .01

152.24

153.05

157.11

157.14

153.51

152.79

152.34

152.24

151.53

153.50

153.01

152.37

152.04

151.91

151.70

151.32

154.63

155.77

158.81

157.22

157.54

157.27

157.22

155.85

154.88

156.17

156.65 155.57

155.14

160.04

164.19163.15

162.67

160.54

156.08

156.49

154.95

155.58

156.65

157.65

156.22

154.15154.81

156.53

157.04157.25

156.79

154.24

154 .94

155 .94

155.85

153.96

169.64

170.23

170.50

170.53

168.99

168.50

168.58

169.04

168 .88

169.23

169.31

167.72

167.12

168.05

168.06

168.07

EP

159.85

161.26

161.97

162 .52

162.51

162.14

161.72

162 .02

162.11

162.78163.61

163.41

163 .90

163.65

152 .80

153 .44

154.14

154.62

O/H WIRE

O/H WIRE

EP

Spread:8.00

Girth:0.3

Spread:10.00

Girth:0.3

TP

TPSpread:6.00

Girth:0.3

Spread:8.00

Girth:0.4

Spread:6.00

Girth:0.4

Spread:8.00

Girth:0.4

TP

O/H WIRE

O/H WIREO/H WIRE

O/H W

IRE

EP

Spread:8.00

Girth:0.3

Spread:8.00

Girth:0.3

Spread:8.00

Girth:0.3

167.36

167.30

167.31

166.88

166.52

166.21

166 .54

166.74

167.27

166.28167.01

167.16167.38167.26

168.11

168.64

168.69168.51

169.08

169.05

168.64

164.52

164.60

165.03

165.40

165.54

164.91

165.01

165.63

166.96

165.51

165.24

164.51

163.48

163.59

164.21

CL: 155.27

MH 153.52

WATER LEVEL

166.81

166.46

166.05

165.31

165.42

166.82

167.04

167.49

166.95

167 .17

165.78

166.77

166 .96

167.49

165.65

164.86

155.96

154.79

154.15

149.67

150 .18

150.65

151 .42

152.26

152.34

152.44

153.08

153.65

154.77

156.18

148.78

148.63

149.04

152.64

152.60

152.51

152.071

53.34

154.89

153.89

153.27

152 .75

152 .18

150 .64

149.89

148.96

148.52

158.75

158.55

158.52

158.38158.64

157.54 156.75

156.67 156.28

156.02

155.23

154.30

153.13

151 .88

150.67

149.89

149.74

156.78

157.69

157.90

158.18

158.48

159.08 156.43

161.41

156.77

161.59

160.88

158.17

159.61

160.86

156.44

163.22

164 .60

159.29

148.79

149.40

150 .59

149.64

149.94

150.24

150 .39

152 .43

155 .78

153 .84

155 .19

155 .52

150.35

149.54

149.40

149.07

149.62

149.11

148 .84

151.44

150.63

152.35

153.21

152.49

151.43

150.53

150 .53

150 .22

157.06

157.40

156.121

56.24

155 .35

155.63

156.091

55.77

155.81

155.13

153.78

154.31

150.01

153.18

151.74

151.07

155 .28

157.06

156.77

154.93

154 .26

154.55

155.69

155.41

155.361

54 .36

156.82

151.91

150.29

155.69

155.91

156.20

156.07

159.02

157.84

157.64

153.56

154.50

149.53

151.17

148.68

149.42

150.12

151.22

152.73

152 .18

154.97

153.76

155.86

155.85

155.79

155.59

155.25

146.28

145.50

147.36

146.58

146.84148.54

147.41148.52

149.23149.60

151 .81

150.60

150 .89

149.42

149.86

148.10

148.90

146 .69

147.29

146.98

146.61

146.78

146.63

146.53

152.37

146.56

146.67

152.74

152.69

153.53

153.25

153 .69

153.36

152.141

51.21

149.79

151.14

150.66

151.30

152.25

151.67

151 .09

149.53

149 .04

148 .98

148 .87

147.10

148.71

147.93

148 .46

148.76

155 .42

155.20

Tree Top: 172.51

Spread:14.00

Girth:0.7

Spread:14.00

Girth:0.6Spread:16.00

Girth:0.8

148.35

147.85

151 .00

151 .84

149.31

149.13

149.54

149.34

149.74

146.26

147.12

147.19

148.36

148.74

149.94

145.58146.00146.97

SP

150.06

150.69

150.92

150 .65

150.23

150.12

150.17

149.90

150.09

152.39

152.31

152.08

152 .41

153.13

153.38

153.55

154.04

EP

EP

EP

Spread:10.00

EP

169.71

Spread:10.00

Girth:0.6

166.12

168.84

Spread:10.00

Girth:0.7

Girth:0.4

Spread:10.00

Girth:0.5

Spread:12.00

Girth:0.5Spread:12.00

Girth:0.5

Spread:12.00

Girth:0.5

EP

Spread:12.00

Girth:0.8

167.28166.39

165.38

166.37

166.96

167.36

168.54

166.38

169.97

165.76

166.29165.39

166.43

167.31

166.11

Spread:10.00

EP

EP

162.39

162.56

162.10

161.74

160.88

162.24

162.88163.53

163.17

162.47164.09

Spread:10.00

Girth:0.4

Girth:0.5

163.47

165.97

166.04

12" Concrete Pipe

148.75

148.96

148.91

149.10149.41

149.62150.33150.72150.84152.14

153.77 CL: 152.62

Spread:12.00

Girth:0.7

EP

Spread:16.00

Girth:1.0

EP

Spread:10.00

Girth:0.7

EP

148.68W

AT

ER

LEV

EL

EP

145.52W

AT

ER

LEV

EL

INVERT: 151.67

156.18

156.57157.68

158.89

156.31

155.74

160.62

159.13

158.00

157.54

154.62

154 .50

154.27

154.00

153.95

154.13

154.56

154.95

1 55.05

154.96

157.55

157.52

157.37

157.46

157.69

157.28

157.32

157.60

ESB PYLON

ESB PYLON

163.29

164.20164.61

164.32

164.26

163.92

165.02

164.50163.54

162.41

162.38

162.07

161.92

158 .73

159.95

159.63

156.93

154 .96

154 .95 1

55.511

55.97

158.50

160.09

159.42

157.76

2936

00E

293600E

216000N

Wheel W

ash

Dwelling

ShedO

ffice

BuildingShed

Building

in Ruins

Post & Wire

Post & Rail

Post & Rail

Post & Wire

Wooden Panal

Post & Rail

Post & Rail

Post & Rail

Post & Rail

Post & Wire

Post & Wire

Fence

Young

Trees

Edge of

Trees

Pond

Field Drain

Post & Rail

Post & Wire

Block Wall

156.37

156.17

Spread:10.00

Girth:0.5

Spread:10.00

Girth:0.6

Spread:8.00

Girth:0.4

Spread:6.00

Girth:0.4

SP

Spread:10.00

Girth:0.6 S

pread:10.00

Girth:0.5

Tree Top: 173.19

Spread:10.00

Girth:0.5

Spread:10.00

Girth:0.5

Spread:10.00

Girth:0.3

Spread:8.00

Girth:0.2

Spread:10.00

Girth:0.4

Spread:10.00

Girth:0.5

Spread:8.00

Girth:0.2

151.78

151.92

152.23

152.69

153.17

153.25

153.27

153.36

153.56

153.77

154.03

154.15

154.21

154.74

154.90155.12

155.26

155.31

155.38

155.55

155.63

155.84

156.15

156.34

151.70

151.90

152.26

152.71

153.24

153.30

153.37

153.47

153.71

153.91

154.42154.56

154.81

154.90155.04

155.32155.38155.38

155.43

155.61

155.79

155.99

TP

O/H WIRE

O/H WIRE

O/H WIRE

Tree Top: 170.53

TP

Spread:10.00

Girth:0.5

Spread:10.00

Girth:0.5

Spread:10.00

Girth:0.4

Wall Top: 156.30

TP

Spread:6.00

Girth:0.2 S

pread:8.00

Girth:0.4

Spread:8.00

Girth:0.3 S

pread:8.00

Girth:0.4

Spread:6.00

Girth:0.2 S

pread:10.00

Girth:0.4 S

pread:10.00

Girth:0.4

TP Spread:12.00

Girth:0.7

TP

TP

Sign

Tree Line

156.32

156.06

155.86

155.66

155.50

155.42

155.41

155.32

155.07

154.85

154.88

154.69

154.52

154.38

154.15

151.60

151.87

152.35

152.78

153.24

153.35

153.50

153.57

153.85

154.07

155

159

158

163

157

161

160

15515

5

15115

2153

15715

8

155

154

156

1591 6

0161

166165

16516

6

164

153

150

152

151152

151

14916

3

165

165

167168

166

146

147

148149

150151

152

153

154

152

150

151

149

149

162

162163

15916

0161

168

169

169

147148149150151

147

148

153

150151152153

158

159

157158159

156

160

161

15815

9

156157

158

165

168

148

146 147

151

155

155

1 56

157

160

158

159

166

166

156157

158

155

161162163

160

159

164165166167168

156 157

156157

155

164162 163

164

161

166 167

155

154

154

164165166167168

169

150

149

151

153

153

152 152

152

153

154

155

156

157

158

159

160

161

162

163

151

151

155154

154155156157158159160161162163164165166167

158

157

156

163

161162

152151

153

154

155

152

153

154

153

156

151

150

151

150

152153 154 155

15015

115215

315415

5156

157158159160161162163164165166167

152 153

152

154

1 53

156156

155

160

159

154155

152153

156157

158159

160

167

166

165

168

169

158

159

156

157

166164 165

162 163

160 161

159

155

156157

158

158

156157

155

158

155

149

149150 151 152 153 154

14915

015115

215315

4

154

153154

155

160

158159

157

156

152

164

164

166165

161

160

163

163

158

159

162

156156

157

150151

153

152

154

155

151152

150

149

164 165

163

153

154155

156157

158159 160 161 162

166167

167

167

167

164165

164

162 163 164 165

160 161

159

158

159160161162163

158

150 151

163

153 154 155 156 157

152

149

149

160 161 162

154 155 156 157 158 159

153

152

151

150

149

163

162163

160

161

156157

158

159

155154

150151

152153

149

168 169

166167

166167

169168

164165

Tree Line

Edge of

Trees

Outfall P

ipe

WL 145

WL 145

WL 150

WL 150

WL 155

WL 155

143.5 WL

143.65 WL

154.47 WL

SW

2

SW

1

Buried 12" C

oncrete Pipe

WE

LL 2

WE

LL 1

JOH

N B

AR

NE

TT

& A

SS

OC

IAT

ES

7 DU

ND

RU

M B

US

INE

SS

PA

RK

WIN

DY

AR

BO

UR

DU

BLIN

14

BE

HA

N'S

LA

ND

RE

ST

OR

AT

ION

LT

D.

BLA

CK

HA

LL, PU

NC

HE

ST

OW

NN

AA

SC

O. K

ILDA

RE

Site:

Project:

Title:

Draw

n: SLR

- BA

K

Job. No: 405-636-0004

Scale: 1:1250

Date: M

arch 2008F

IGU

RE

E4.1

Rev.

Date

By

Description

Blackhall S

ite Restoration

Local Hydrogeology and H

ydrology

0F

EB

08LM

C

SU

RV

EY

INF

OR

MA

TIO

N P

RO

VID

ED

BY

ER

KIN

A S

UR

VE

YS

RE

F: 0941-1 R

EV

.0 DA

TE

D 22-8-07

Monitoring W

ell

Surface W

ater Monitoring

Groundw

ater Monitoring

Blackhall, P

unchestown, N

aas, Co. K

ildare

2007 Borehole /

Legend

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

293200E

293200E

293600E

293600E

294000E294000E

215600N

215600N

216000N

216000N

216400N

216400N

293200E

293200E

293600E

293600E

294000E294000E

215600N

215600N

216000N

216000N

216400N

216400N

Dw

elling

Shed

Office

Building

Shed

Building

in Ruins

Pos

t & W

ire

Post &

Rail

Post &

Rail

Pos

t & W

ire

Woo

den P

anal

Post &

Rail

Post &

Rail

Post &

Rail

Post &

Rail

Pos

t & W

ire

Pos

t & W

ire

Pos

t & W

ire

Pos

t & W

ire

Pos

t & W

ire

Pos

t & W

ire

Pos

t & W

ire

Fence

Fie

ld D

rain

Post &

Rail

Pos

t & W

ire

Bloc

k Wall

Sto

ne W

all

SO

AK

AW

AY

SA

1

EX

IST

ING

PIP

E T

OB

E R

ET

AIN

ED

90° C

ON

NE

CT

ION

TO

EX

IST

ING

(SE

E D

ET

AIL 1)

SE

CT

ION

A-A

- TH

RO

UG

H E

XIS

TING

SE

CTIO

N O

FS

PR

ING

DR

AIN

AG

E T

RE

NC

H1:50

GE

OT

EX

TILE

SE

PA

RA

TO

R40m

m S

ING

LE S

IZE

GR

AN

ULA

RM

AT

ER

IAL

EX

IST

ING

300mm

DIA

ME

TE

RC

ON

CR

ET

E P

IPE

INS

ITU

SA

ND

AN

D G

RA

VE

L

INE

RT

WA

ST

E

EX

IST

ING

GR

OU

ND

SU

RF

AC

E

SE

CTIO

N B

-B T

HR

OU

GH

NE

W S

EC

TION

OF

SP

RIN

G D

RA

INA

GE

TR

EN

CH1:50

GE

OT

EX

TILE

SE

PA

RA

TO

R

40mm

SIN

GLE

SIZ

E G

RA

NU

LAR

MA

TE

RIA

L

300mm

DIA

ME

TE

R C

ON

CR

ET

E P

IPE

100mm

PIP

E B

ED

DIN

G (10m

m S

ING

LE S

IZE

GR

AN

ULA

R M

AT

ER

IAL)

INS

ITU

SA

ND

AN

DG

RA

VE

L DE

PO

SIT

INE

RT

WA

ST

E

SE

CTIO

N C

-C T

HR

OU

GH

CO

NN

EC

TION

BE

TW

EE

N N

EW

AN

D E

XIS

TING

PIP

E W

OR

K1:50

GE

OT

EX

TILE

SE

PA

RA

TO

R

40mm

SIN

GLE

SIZ

E G

RA

NU

LAR

MA

TE

RIA

L

300mm

DIA

ME

TE

R 90

° BE

ND

CO

NC

RE

TE

PIP

E

CO

NC

RE

TE

TH

RU

ST

BLO

CK

INS

ITU

SA

ND

AN

DG

RA

VE

L DE

PO

SIT

INE

RT

WA

ST

E

SE

CT

ION

D-D

- SE

CT

ION

TH

RO

UG

H C

ON

CR

ET

EP

IPE

EN

TE

RIN

G S

OA

K A

WA

Y1:50

INS

ITU

SA

ND

AN

D G

RA

VE

L

INE

RT

WA

ST

E

300mm

DIA

ME

TE

R C

ON

CR

ET

E P

IPE

40mm

SIN

GLE

SIZ

E G

RA

NU

LAR

MA

TE

RIA

L

GE

OT

EX

TILE

SE

PA

RA

TO

R100m

m S

ING

LE S

IZE

GR

AN

ULA

R M

AT

ER

IAL

OR

SIM

ILAR

AP

PR

OV

ED

GR

AD

ING

GR

OU

ND

WA

TE

RLE

VE

L

DE

TA

IL 2 - PL

AN

OF G

RO

UN

DW

AT

ER

SO

AK

AW

AY

1:200

10mX

10m S

OA

K A

WA

Y

300mm

DIA

ME

TE

R C

ON

CR

ET

E P

IPE

DR

AIN

AG

E T

RE

NC

H

DE

TA

IL 1 - P

LA

N O

F C

ON

NE

CTIO

N B

ETW

EE

NN

EW

AN

D E

XIS

TIN

G C

ON

CR

ETE

PIP

ES1:50

CO

NC

RE

TE

TH

RU

ST

BLO

CK

300mm

DIA

ME

TE

R 90

°BE

ND

CO

NC

RE

TE

PIP

E

300mm

DIA

ME

TE

R N

EW

CO

NC

RE

TE

PIP

E

300mm

DIA

ME

TE

R E

XIS

TIN

GC

ON

CR

ET

E P

IPE

SIT

E P

LA

N1:8,000

SIT

E B

OU

ND

AR

Y

D1: D

US

T D

EP

OS

ITIO

N M

ON

ITO

RIN

G(M

ON

TH

LY: A

PR

IL - SE

PT

)

N1: N

OIS

E M

ON

ITO

RIN

G (6 M

ON

TH

LYIN

TE

RV

ALS

)

SW

1: SU

RF

AC

E W

AT

ER

MO

NIT

OR

ING

(6 MO

NT

HLY

INT

ER

VA

LS)

GW

1: GR

OU

ND

WA

TE

R M

ON

ITO

RIN

G(6 M

ON

TH

LY IN

TE

RV

ALS

)

JOH

N B

AR

NE

TT

& A

SS

OC

IAT

ES

7 DU

ND

RU

M B

US

INE

SS

PA

RK

WIN

DY

AR

BO

UR

DU

BLIN

14

BE

HA

N'S

LA

ND

RE

ST

OR

AT

ION

LT

D.

BLA

CK

HA

LL, PU

NC

HE

ST

OW

NN

AA

SC

O. K

ILDA

RE

Site:

Project:

Title:

Draw

n:

Job. No:

Scale: as show

n

Date: M

arch 2008F

IGU

RE

E4.2

Rev.

Date

By

Description

Blackhall S

ite Restoration

Design of P

roposed Discharge and S

oakaway

SU

RV

EY

INF

OR

MA

TIO

N P

RO

VID

ED

BY

ER

KIN

A S

UR

VE

YS

RE

F: 0941-1 R

EV

.0 DA

TE

D 22-8-07

Blackhall, P

unchestown, N

aas, Co. K

ildare

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

Behans Land Restoration Ltd. Waste Licence Application

Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry

JBA3746/WLA/dl May 2008 Page 1 of 1

ATTACHMENT E5 – NOISE EMISSIONS

Noise at the application site is principally generated by traffic movements and mobile construction plant. There are no fixed (point) noise sources at the site. Baseline noise levels and an assessment of the short-term ambient noise levels generated by HGV movements, earthmoving plant and crushing and screening equipment during the proposed site restoration works are provided in Section 8 of the Environmental Impact Statement. There will be no additional noise generated at the application site over and above that currently generated by the ongoing site restoration works. In the longer-term, on completion of the restoration works, there will be no noise emissions from the site.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:00:47:39

Behans Land Restoration Ltd. Waste Licence Application

Lands at Blackhall, Co. Kildare Restoration of Former Gravel Quarry

JBA3746/WLA/dl May 2008 Page 1 of 1

ATTACHMENT E6 – ENVIRONMENTAL NUISANCES

Bird Control

Refer to Section 2.5.2 of the Environmental Impact Statement. Dust Control

Refer to Section 2.5.3 of the Environmental Impact Statement. Fire Control

Refer to Section 2.5.7 of the Environmental Impact Statement. Refer also to the outline contingency plan in Appendix 2J of the Environmental Impact Statement. Litter Control

Refer to Section 2.5.4 of the Environmental Impact Statement. Traffic Control

Refer to Section 2.2.8 of the Environmental Impact Statement. Vermin Control

Refer to Section 2.5.6 of the Environmental Impact Statement. Road Cleansing

All HGV traffic leaving the application site will be required to pass through the existing wheelwash facility at the end of the paved internal road, refer to Sections 2.2.4 and 2.2.8 of the Environmental Impact Statement. At the present time, Behans Land Restoration ensures that existing paved roads within its landholding as well as adjoining local public roads are subject to regular cleaning by road sweepers. The principal objective of the road sweeping is to remove soil or mud debris carried onto these roads by traffic entering and leaving the existing waste facility. The existing programme of road sweeping will continue throughout the proposed remediation process.