for inspection purposes only. consent of copyright owner ... · trickling filters upgraded with...

58
For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:02:37:59

Upload: others

Post on 22-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 2: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 3: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 4: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 5: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 6: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 7: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 8: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Kilkenny County Council, Castlecomer Agglomeration WS - Water Quality Monitoring - WW - Discharge License - WW200 - Castlecomer

Page 26

B.6 Previous Planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 9: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008

PLANNING & APPROVAL FOR SCHEME

DOE APPROVAL, FUNDING AND OUTLINE PROGRAMME

PART 8 DOCUMENTS:

REPORT TO COUNCIL, ADOPTION OF SCHEME &

PUBLIC DISPLAY DOCUMENTS

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 10: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008

PLANNING & APPROVAL FOR SCHEME

DOE APPROVAL, FUNDING AND OUTLINE PROGRAMME

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 11: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

…Water Services Section

19 t h September 2008 Michael Ar thurs SEO, Water Serv ices Section, County Hal l

Re Castlecomer Sewerage Scheme Upgrading 2008

A chara,

P lease note that:

1. This Scheme is in the Water Services Investment Programme.

2. There is at this moment an appl i cation for Project Approval and Funding wi th the Depar tment of the Environment, Heri tage and Local Government.

3. The Counci l is awai ting the necessary Depar tmental Approval for the Scheme.

Mise, le meas,

Dermot Druhan, Senior Executive Engineer, Water Serv ices Section

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 12: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Appendix 1 WATER SERVICES SECTION

Serviced Land Initiative Application Form for Funding Approval

COUNTY: KILKENNY LOCAL AUTHORITY: KILKENNY COUNTY COUNCIL

Name of Scheme: CASTLECOMER SEWERAGE SCHEME TREATMENT WORKS UPGRADING 2007 DEPARTMENT

NOTE: Attach A4 or A3 drawing showing plan of overall project and interface with existing system. Drawing should show planning status and area to be served by the project. Map should be sufficient to allow referencing to Ordinance Survey maps Short Description of Proposal: Castlecomer, Co Kilkenny Location: Kilkenny 16km south via N77-N78; Dublin 100km north via N78-M9-M7-N7,

Carlow 23km east via N78-R431-R430; Thurles 52km west via R694-R693-N8-N75; Portlaoise 32km north via R426.

Population: 2006 = 1,531 (Census data); 2008 = 1614 (Planning Section); 2028 = 4,038. The human population is almost all connected to the Town Sewerage Scheme.

Existing Treatment Works, Loadings etc. 1980: 1500 PE (Population Equivalent) Works constructed: — Imhoff Tank, Trickling

Filters and Sludge Drying Beds. 2000: 2500 PE Works upgrade constructed: — Self-cleaning Spiral Inlet Screen added;

Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to the River Dinan, a major tributary of the River

Nore, which is a salmonid river. Loadings: The total loads on the Treatment Works at present are:

Average Biological Load = 3,000 PE; Average Hydraulic Load = 486 m³/day. Treatment Proposals, Funding etc. Proposal: To provide for future residential development, Kilkenny Co Council proposes:

1. Upgrading the Plant to a total capacity of 6,000 PE 2. Removing stormwater from the main collecting sewers in the town centre 3. Upgrading the pumping station serving the town centre

Funding: Kilkenny County Council proposes: 1. 40% of Capital Cost: Serviced Land Initiative Grant 2. 60% of Capital Cost: Council Development Contribution Scheme

Attached: Detailed Reports on Design, Planning, Environmental and related issues.

Estimated Cost: € 4,496,302.50 (Contract and Non-Contract)

Area to be Serviced: Purpose for which area served is zoned in Development Plan: Housing

Reference:_______________

Date Received:___________

Checked by: ___________

Recommendation:

________________________

________________________

Reason:

________________________

________________________

________________________

________________________

________________________

No. of acres to be opened up: 67 Approved:

Yes No Cost per Acre (Project Cost / No. of Acres): €67,109

No. of Housing Units: 662

Cost per Housing Unit (Project Cost / No. of Units): €6,792 Signed: _________________

No Planning Permissions granted on land in question: Yes/No

Granted: Pending: Date: _________________

-1-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 13: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

GENERAL

Existing undeveloped serviced land within area to be served by scheme: Housing (acres) Other (acres)

67 53.7

Yes No ü Existing capacity adequate (treatment, storage, pumping, etc.):

Yes ü No If “No” (a) does project as proposed address these inadequacies ?:

(b) is a separate scheme proposed to address capacity constraint?. If so, name of scheme:

Assessment of demand for serviced land: (e.g. planning applications increase in house prices, population growth and projections, etc.)

2,272 Planning Applications were processed in County Kilkenny in 2007, a marginal decrease on the 2006 figure of 2,346. To 1st July in 2008, 903 Planning Applications were processed. This would represent a decrease of 20% if carried through to a full year. A majority of applications are for housing. The average house price in County Kilkenny in 2008 is about €260,000 approximately; this is more or less the same as in 2007 (Housing Section, KCC). Castlecomer is a Scheduled Town under the 2002 Kilkenny County Development Plan. The Zoning Objectives Map shows a total of 23.57 ha of undeveloped land available for housing development within the Plan area. Development in Castlecomer is at present retarded by limitations in public services particularly the sewerage system. A number of pending applications (see Consultant’s report) for a total of 120 houses are held up, the prospective Applicants having been advised that their applications are premature pending the upgrading. These Developers have formed the Castlecomer Developers Group, which is funding the Consultancy for the Design and Construction of the upgrade.

Other Impacts of Scheme (Environmental, Economic)

The proposed upgrading will result in a significant improved in the quality of treated effluent discharged from the Works to the adjoining River Dinan. This is currently well below the required Standards. The increase in population in the Town arising from the proposed developments will result in an increased downstream demand for services, which will be accommodated in a future extension to the upgraded Plant; these will be funded from future Development Contributions.

Status of Scheme (Contract Documents, Tender, etc.):

Part 8 completed; Consultants Report completed; Process Design completed; Draft Tender Documents being reviewed.

Earliest Date Construction Could Start: 1 Dec 2008

Estimated Contract Duration: 9 months

Expenditure Profiles €m 2008 €m

2009 €m

2010 €m

Total €m

Total Expenditure: 0.5 4.0 0 4.5

Exchequer element only: 0.2 1.6 0 1.8

- 2 -

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 14: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Project Costs:

Estimated Project Costs €

Contract Costs (for each contract)

Mechanical & Electrical 2,132,665

Civil 2,363,638

Direct Labour Costs (if any) None

Survey, Site Investigation, etc. Included

Consultants Fees* (Design & Supervision) none

Site Supervision Included

Miscellaneous Costs** (Electricity, Communications)

0

Total €4,496,303

* Local Authorities may allow 7% of costs where design/planning is carried out in-house and Consultants’ Fees are not being claimed

** General administration costs should not be included nor any apportionment of salaries of local authority staff

I enclose the following documentation:

ü (a) Outline Drawing for the Scheme (A3 or A4)

ü (b) Programme for Delivery

(c) (Where the Project involves refurbishment of a Treatment Works or an increase in treatment

capacity), details of the size, condition and state of repair of the existing Works and details of the proposed upgrading and/or uprating of the Works envisaged

ü (d) Statement from the Council’s Planning Department confirming the zoning of the land, and that

development enabled through the Scheme will conform with the current Development Plan for the area, any Regional Planning Guidelines in force and the National Spatial Strategy.1

Signed:

Date: 4 July 2008

Director of Services

This form should be sent direct to: The Secretary, Water Services Investment Programme, Department of the Environment Heritage and Local Government, Floor 2 Block 1, Irish Life Centre, Lr Abbey Street, Dublin 1.

-3-

1 Planning Authorities are advised to consult with the Department’s Spatial Policy Section, where necessary, in addressing issue (d) above

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 15: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008 – OUTLINE PROGRAMME

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:37:59

Page 16: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008

PLANNING & APPROVAL FOR SCHEME

PART 8 DOCUMENTS:

REPORT TO COUNCIL, ADOPTION OF SCHEME &

PUBLIC DISPLAY DOCUMENTS

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 17: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008

PLANNING & APPROVAL FOR SCHEME

PART 8 DOCUMENTS:

ADOPTION OF SCHEME BY COUNCIL

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 18: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Comhairle Ch ontae Chill Cha inniqhH<llt il <I n Chontae Srald Eoin Cill Chalnn lqh

Kilkenny County CouncilCounty Hall John Street Kilkenny

KILKE o TY COUNCIL

COMHA ......"....... C. ON A LLCHA GH

E NG " ~ '0:

ROPOS BY:

SEeD DEDBY:AND SO VED

"That in a ccorda nce with Part VII I Pla nning Report an dRec ommend a tion to Members of Kilkenny County Counci l - Upgradingof Costlecomer Wastewater Treatm ent Pla nt to Cater for a Popula tionEq uivalent of 6000 is hereby approved"

~~~-0~~CAT iAOlRLEAC

DATE

Telephone, 056 7794000 Fax: 056 7794004 Emil il: mfo@kilkenn>'coco,ie Webpage: wv\'w,kilke nycoco.ie

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 19: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CALLAN WASTEWATER TREATMENT PLANT UPGRADING

(2003)

PLANNING & APPROVAL FOR SCHEME

REPORT TO COUNCIL

For in

spec

tion p

urpo

ses o

nly.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 20: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

UPGRADING OF CASTLECOMER WASTEWATER TREATMENT PLANT

TO CATER FOR A POPULATION EQUIVALENT OF 6000

PART V111 PLANNING REPORT AND RECOMMENDATION TO MEMBERS OF KILKENNY COUNTY COUNCIL

SEPTEMBER 2007

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 21: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 22: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

UPGRADING OF CASTLECOMER WASTEWATER TREATMENT PLANT TO CATER FOR A POPULATION EQUIVALENT OF 6000 CONTENTS

• PRELIMINARY REPORT ON SCHEME • COPY OF PART EIGHT NOTICE AS PUT ON PUBLIC

DISPLAY • SUBMISSIONS • RESPONSE TO SUBMISSIONS • REFERRAL TO PLANNING SECTION OF KILKENNY

COUNTY COUNCIL • REPORT BY PLANNING SECTION OF KILKENNY COUNTY

COUNCIL • DRAWINGS OF SCHEME

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 23: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

4th September 2007 Mr Denis Malone Senior Executive Planner Kilkenny County Council Re: NOTICE OF A PROPOSED DEVELOPMENT BY A LOCAL AUTHORITY

PROPOSED UPGRADE OF WASTEWATER TREATMENT PLANT AT CASTLECOMER

A Chara Kilkenny County Council proposes to upgrade its existing Wastewater Treatment Plant at Smithstown, Castlecomer, Co. Kilkenny to serve a population equivalent of 6000. Please find attached reports on the scheme. A Part V111 Notice was placed on the Kilkenny People on 15th June 2007 inviting submissions or observations in relation to the scheme. Drawings and reports in relation to the scheme were put on display in Castlecomer Area Office and County Hall, Kilkenny. Three submissions were received. Their observations are dealt with in an attached report. I would appreciate your report in relation the proposed development Mise le meas ____________ Eamon Mahon Executive Engineer Water Services Attachments: Part V111 Notice, Plans and Particulars of Scheme, Preliminary

Report on Scheme, Submissions and Responses

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 24: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

LOCAL GOVERNMENT (PLANNING

AND DEVELOPMENT) ACT 2000

PLANNING AND DEVELOPMENT REGULATIONS 2001

KILKENNY COUNTY COUNCIL

WASTEWATER TREATMENT PLANT AT SMITHSTOWN, CASTLECOMER, CO.

KILKENNY

PLANNING REPORT

Kilkenny County Council County Hall John Street Kilkenny

SEPTEMBER 2007

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 25: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

PLANNING REPORT

Wastewater Treatment Plant at Smithstown, Castlecomer, Co. Kilkenny

1. INTRODUCTION

1.1 This report has been prepared for submission to Kilkenny County Council in order to comply with Local Government (Planning and Development) Acts 2000 – 2004, and deals with the proposed upgrading of Wastewater Treatment Plant at Smithstown, Castlecomer, Co. Kilkenny

1.2 The development will include:

A 15:25 BOD:SS Treatment Plant to cater for a population equivalent of 6,000 with facilities for further upgrading and incorporating:

Automatic Inlet Screen Ferric Dosing Automated Pumping Equipment Balancing and Mixing Tanks Sequencing Batch Reactors Sludge Holding Tanks New Control Building New Access

1.3 The scheme was advertised in the “Kilkenny People” and was available for inspection at the County Hall, Kilkenny and Castlecomer Area Engineering offices from the 15th June 2007 until 13th July 2007. Submissions were invited to be submitted not later than 27th July 2007

For in

spec

tion p

urpo

ses o

nly.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 26: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

2. KILKENNY COUNTY DEVELOPMENT PLAN

In Volume 1, Section 4.4 of the Kilkenny County Development Plan, it states that

“The provision of wastewater treatment infrastructure is imperative to facilitate the economic, social and physical development of the County

It is essential to facilitate the planned phased expansion of the towns and villages throughout the county”

In Section 4.5 it is the policy of the Council to:

a) extend waste water treatment to meet the expanding domestic, commercial and industrial of the county and

b) improve the provision of treatment services in those areas where deficiencies exist at present

In Volume 2 in the Castlecomer Plan section 12.1 it is an objective “to investigate the adequacy of the town’s sewage treatment facility, with a view to assessing future need for improvement”.

3. SUBMISSION AND OBSERVATIONS RECEIVED AND RESPONSES THERETO

One submission was received from the Southern Regional Fisheries Board. Their observations and comments have been taken into account in establishing the discharge standards of the proposed upgraded treatment plant and in determining the assimilative capacity of the receiving waters.

Two further submissions were received from local landowners. Their comments generally deal with issues related to the pipeline. An issue in the submissions in relation to the screening of the site. These issues will be addressed at the detailed design stage of the project.

4. RECOMMENDATION

I consider therefore the proposed scheme to be in compliance with the provisions of the County Development Plan and to be in accordance with the proper planning and sustainable development of the area.

Denis Malone, Senior Planner

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 27: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CALLAN WASTEWATER TREATMENT PLANT UPGRADING

(2003)

PLANNING & APPROVAL FOR SCHEME

PUBLIC DISPLAY DOCUMENTS

For in

spec

tion p

urpo

ses o

nly.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 28: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

KILKENNY COUNTY COUNCIL

SANITARY SERVICES SECTION

LOCAL GOVERNMENT (PLANNING AND DEVELOPMENT) ACT 2000 PLANNING AND DEVELOPMENTS REGULATIONS 2001

NOTICE OF PROPOSED DEVELOPMENT BY A LOCAL AUTHORITY

In accordance with Article 179 of the Local Government (Planning and Development) Act 2000 and Part V111 of the Planning and Development Regulations 2001 and any amendments thereof, Kilkenny County Council hereby gives notice of its intention to carry out the following development,

CASTLECOMER WASTEWATER TREATMENT PLANT UPGRADING 2007

AT

SMITHSTOWN, CASTLECOMER, COUNTY KILKENNY

It is proposed to upgrade the existing Wastewater Treatment Plant at Castlecomer to cater for a population-equivalent loading of 6000 PE, with facilities for further upgrading thereafter if required.

The development will include: (a) Screening and Grit Removal (b) Phosphate Reduction (c) Automated Pumping Equipment (d) Balancing and Mixing Tank (e) Sequencing Batch Reactor Tanks (f) Sludge Holding Tank (g) Final Settlement

Plans and Particulars of the proposed Development will be available for inspection in the Water Services Office of Kilkenny County Council, County Hall, John St, Kilkenny and the Castlecomer Area Engineering Office, Castlecomer from 15th June 2007 until 13th July 2007 between the hours of 9.00am to 5.00pm, Monday to Friday (excluding Bank Holidays).

Submissions or observations with respect to the proposed Development may be made in writing to: Philip O’Neill, Director of Services Kilkenny County Council County Hall John St, Kilkenny

not later than 27th July 2007.

Philip O’Neill Director of Services Kilkenny County Council

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 29: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

1

TERRY BRENNAN B.E. ---------------------------------------

CONSULTING STRUCTURAL AND CIVIL ENGINEER

Wastewater Treatment System,

at

Castlecomer, Co. Kilkenny

Existing Plant and System Assessment Preliminary Report

A) Recommendations associated with existing 2500PE WWTP Improvements.

B) Recommendations associated with 6000PE WWTP Improvements.

June 2007

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 30: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

2

SITE & LOCATION The Wastewater Treatment Plant (WWTP) is located on the southern edge of the town, adjacent to the River Deen (also known as the Dinin), and is accessed from the N78 by a roadway, which Kilkenny County Council shares with the Carter family farm and Castlecomer Golf Club. The WWTP is a traditional design Percolating or Trickling Filter plant. The site comprises an overall plot of c.0.38ha, which is securely fenced and accessed via a 3m wide double leaf entrance gate.

Plant Layout

The existing WWTP and process is briefly summarized hereunder:

Inlet works: The incoming pipeline to the plant is 150mm diameter and discharges into an Inlet Channel, constructed in 2000, which incorporates a Stormwater Overflow to the adjacent river. The inlet channel also incorporates an automatic fine screen and a by-pass with a coarse screen for emergency use\maintenance down time alternative.

Imhoff Tank: The screened wastewater is discharged by gravity to an Imhoff tank, comprising a horizontal flow settlement tank 4.88m wide x 13.71m long x 4.8m deep. Primary treatment is achieved in the Imhoff tank. Settled sludge is pumped to drying beds.

Percolating Filters: A dosing siphon and rotating distributors introduce the settled liquor to the 2 no Percolating Filters, which are 14m diameter and c 1.5m deep and operate in parallel. The filter media is “Marpak” plastic, which replaced the original stone media when the Plant was upgraded in 2000.

Clarifier: The Clarifier comprises a 10m diameter x 2.5m high precast concrete tank, with a sloping floor and central hopper bottom, and a rotating half-bridge scraper system. The treated liquor from the Trickling Filters is pumped to the Clarifier for final settlement and discharge to the River Deen. The settled sludge is pumped to Drying Beds.

Sewerage Network: The Sewerage Network in Castlecomer is a combined system. The pipe network serves the Castlecomer town area and extends from the plant northwards through the main Kilkenny Street, with individual branch networks serving Oakhill development, the Hospital and Hillside View area, Maryville houses, and a branch extending westwards from central town junction at High Street serves Barrack Street-Marymount-Donaguile. A pumped main also discharges into manhole (MH E4) located at this central town junction, the Pumping Station being located at the bottom of High St. on the western bank of the River Deen. This Pumping Station is gravity fed by a pipeline from Love Lane via Ballinakill Road, Chatsworth Street, via the rear gardens of houses on the northern side of High Street and crossing High Street to the Pumping Station. Branch pipework is generally 150mm, increasing to

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 31: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

3

225mm before connecting to the main 300mm sewer which runs through Kilkenny Street.

The main pipeline from High Street main junction is a 300mm spigot and socket concrete pipe, increasing to 375mm adjacent to the Oakhill branch connection. The 375mm pipeline extends to the end of the Kilkenny Road main run and to the River Deen crossing, where a 150mm cast iron siphon under the river bed discharges to a manhole from which a 225mm pipeline extends to the Inlet Works at the plant. There is a storm overflow connection to the river at the river crossing siphon location, another mid-way along Kilkenny Road and a third at the Pumping Station at the bottom of High Street.

Plant Capacity

The WWTP was originally constructed as a traditional design Percolating Filter plant, with stone as the filter media. This WWTP in its original stone media filter form had a design capacity of c. 1300 PE.

In 2000 the plant was upgraded to a design capacity of 2500 PE, the upgrade including the provision of:

Automatic inlet screen with bagging unit Upgrade of Imhoff tank, baffles etc. Provision of new dosing and distributor system to 2 no Percolating Filters Replacement of stone filter-media with plastic media system Provision of new 10m dia x 2.5m deep Clarifier\Settling Tank Provision of recirculation system and associated pumping Provision of new sludge pumps

For in

spec

tion p

urpo

ses o

nly.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 32: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

4

CURRENT POPULATION & DESIGN LOADINGS In accordance with Table 3 of the EPA Wastewater Treatment Manuals (Small Communities), the existing plant loading is assessed hereunder:

Table 1 SOURCE LOADING TOTAL FLOW

Litres\day BOD5

Grams\day 2002 Census: 1482 persons (PE)

Flow @ 180L/PE BOD @ 60 g/PE 266,760 88,920

Population

Developments since 2002: Oakhill 1 = 85 houses Oakhill 2 = 58 houses Oakhill 3 = 17 houses Total: 160 houses @ 2.88 PE = 461 PE 82,980 27,660 5 no. public houses Day staff @ 10 persons

Flow @ 60L/person BOD @ 30 g/person

600

300

Public houses

Bar drinkers @ 150 persons Flow @ 10L/person BOD @ 10 g/person 1,500 1,500

Schools

Boys’ National = 90 pupils Girls National = 200 pupils Wandesforde NS = 50 pupils Secondary = 660 pupils Total pupils = 1000 Teachers = 50

Flow @ 40 L/person BOD @ 20 g/person 42,000 21,000

Offices & Shops

EuroSpar = 25 persons Steen = 6 persons Hardware = 12 persons Service Station = 10 persons Bank = 10 persons Credit Union = 5 persons Solicitor = 8 persons Doctor = 3 persons CDCD/Fás = 6 persons Others = 40 persons Total = 125 persons

Flow @ 40L/person BOD @ 20 g/person 5,000 2,500

Industrial IJM = 20 persons Rockfoyle = 20 persons

Flow @ 60L/person BOD @ 30 g/person 2,400 1,200

TOTAL 401,240 L/day 143,080 g/day 2,229 PE 2,385 PE

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 33: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

5

SURVEY AND RECOMMENDATIONS Survey & Findings

It has been established that there are problem areas adversely affecting the operation of the WWTP and associated pipe network as follows:

Blockages periodically occur in the pipe network at the river crossing adjacent to the inlet works of the plant. This results in backing up of the pipework system and consequent flooding and sewer blockage of service connections to houses adjacent to the WWTP.

The Humus Tank/Pump Chamber, which is the lowest level chamber at the WWTP, is prone to incursion of river water during high flood level occurrence, unnecessarily adding to the pumping demands of returning liquor to the clarifier.

Video camera surveying confirmed that the pipelines adjacent to the River Deen and immediately upstream of the river/siphon crossing contain very considerable deposits of silt and debris; however it also confirmed that the pipelines are in good repair. Camera surveys also highlighted the connection of 8 no. road gullies to the sewer system.

Survey and inspection of working WWTP confirms that the plant is operating satisfactorily and identifies that there is evidence of river water incursion into the humus tank, as identified above.

Pipeline blockages: It is apparent from observation of pipe flows and particularly storm flows that the method of flow via siphon across the River Deen adjacent to the plant inlet is incapable of catering with design flows.

The assessment of this section of pipe network with the substantial flow of a combined system running in a 300mm pipe along Kilkenny Road, increasing to 375mm (flat gradient 1:300) along the run approaching the river crossing gives a clear explanation for the problems identified on site.

In particular the cumulative effect of this considerable flow in a 375mm pipe being carried to the inlet of the 150mm Siphon gives explanation for the consequential backing up – the large reduction of pipe diameter; the reduction in flow velocity; the deposition of silt and grit in backed-up pipework; the absence of screening to remove solids and debris; all as observed in camera surveys. The 375mm incoming pipe is serviced by a 150mm siphon under the river bed and also a 225mm storm overflow to the river. Lack of screening and a turbulent flow regime in the environment of this storm overflow results in solid matter and debris, not alone blocking the siphon entry, but also discharging directly to the river via the storm overflow.

A) Recommendations for Improvements to the existing WWTP:

The matter of river backflow to the Humus Tank/Pump Chamber is relatively easy to solve and involves the fitting of a non-return or flap valve on the discharge to the river. This modification can be carried out without any major disruption to plant operation.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 34: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

6

In relation to the problems associated with the river crossing the proposed solution is to provide a replacement 375mm inlet gravity pipeline extending directly into the WWTP Inlet Works from the manhole adjacent to the N78.

It is also recommended, and important, that the 8 road gullies, which have been identified by camera as being connected to the sewer, should instead be connected to existing surface water systems and adjacent culverts. These are located along the Kilkenny Road in the surveyed c 600m section extending from Maryville towards the WWTP.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 35: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

7

B) Recommendations for with 6000PE WWTP Improvements. Projected Population & Design Loadings

In accordance with Table 3 of EPA Wastewater Treatment Manuals for Small Communities the anticipated maximum design loading for the proposed plant is set out hereunder:

Table 2

SOURCE LOADING TOTAL FLOW

Litres\day

BOD5

Grams\day

2002 Census: 1482 persons (PE) Flow @ 180L/PE BOD @ 60 g/PE 266,760 88,920

Population

Developments since 2002: Oakhill 1 = 85 houses Oakhill 2 = 58 houses Oakhill 3 = 17 houses Total: 160 houses @ 3.2 PE = 512 PE 92,160 30,720 5 no. public houses Day staff @ 10 persons

Flow @ 60L/person BOD @ 30 g/person

600

300

Public houses

Bar drinkers @ 150 persons Flow @ 10L/person BOD @ 10 g/person 1,500 1,500

Schools

Boys’ National = 90 pupils Girls National = 200 pupils Wandesforde NS = 50 pupils Secondary = 660 pupils Total pupils = 1000 Teachers = 50

Flow @ 40 L/person BOD @ 20 g/person 42,000 21,000

Offices & Shops

EuroSpar = 25 persons Steen = 6 persons Hardware = 12 persons Service Station = 10 persons Bank = 10 persons Credit Union = 5 persons Solicitor = 8 persons Doctor = 3 persons CDCD/Fás = 6 persons Others = 40 persons Total = 125 persons

Flow @ 40L/person BOD @ 20 g/person 5,000 2,500

Childcare & Crèche- 3 no.

Allow 100 children &15 staff Total flow@ 40 L\pupil BOD @ 20 g/pupil 4,600 2,300

TOTAL C/F 412,620 147,240

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 36: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

8

SOURCE LOADING TOTAL FLOW

Litres\day

BOD5

Grams\day

TOTAL C/F 412,620 147,240

Industrial IJM = 30 persons Rockfoyle = 100 persons

Flow @ 60L/person BOD @ 30 g/person 7,800 3,900

Planning Survey (based on applications in progress)

CDCD/Fás = 6 persons Others = 40 persons Total = 125 person Caisleán = 60 houses Mealy = 32 houses Respond = 28 houses Total 120 houses x 3.2 = 384PE 69,120 23,040

McDermott = 6 apts (x2) Brooks = 4apts (x2) Total 20 PE 3,600 1,200

Applications due From developers, who have been consulted RESIDENTIAL

E. Nolan at Clogh Road: 100 houses Cordill at Castlecomer: 50 houses Caisleán at Convent: 30 apts. Total 150 houses x 3.2=480 Plus 30 apts. x 2.0= 60 Total = 540 PE

Flow @ 180L\person BOD @ 60 grams\person 97,200 32,400

Applications due From developers, who have been consulted Industrial & Commercial

Cordill at Castlecomer Commercial Dev Supermarket + shops Max. 100 persons flow @ 60L\person BOD @ 30 grams\person 6,000 3,000

Residential zoned lands currently on market

Castlecomer Parish Lands. 8acres\80 dwellings\ 256PE

46,080 15,360 Existing Residential zoned lands \2002Dev

See Zoning Map, ref: RES 1-3 8acres\80 dwellings\ 256PE

46,080 15,360 688,500L/day 241,500g/day TOTAL LOADINGS\SHORT- MEDIUM

TERM 3825 PE 4025 PE Future Development. Plots A- F, within 2002 Development Boundary C 117 acres

At c. 50% =C.50 ACRES Residential @. 10 NO HOUSES\ACRE 50 X 10 X 3.2 = 1600PE

1600 PE 1600 PE TOTAL LOADINGS, MEDIUM TO

LONG TERM 976,500 L/day

= 5425 PE 337,500 g/day

= 5625 PE.

Basis of Assessment

From the above, Table 2, it is evident that there is an short\medium-term requirement for a treatment plant of 6000 PE, and it is important to note that the above assessment, as set out in Table 2, is based on the following:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 37: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

9

Central Statistics Office (CSO) data from 2002 census is used as a population datum, and new homes, constructed since 2002, are factored into current PE estimates.

Proposed developments which account for 540PE contribution have been confirmed for immediate planning applications by developers E. Nolan at Clogh Rd (100 houses), by Cordill at Castlecomer (50 houses) and by Caisleán Homes at Convent (30 apts.)

The further existing lands, zoned residential in 2002 County Kilkenny Development Plan, which are not at planning application stage are factored into estimates.

The further existing c 117 acres of lands, not zoned residential in 2002 County Kilkenny Development Plan but within the development boundary, which are not at planning application stage are provided for in Table 2 as a 1600PE allowance, which is the equivalent of 50acres of residential development. This increase in PE capacity allowance will provide for the opening up of these lands for future development.

The Kilkenny County Development plan is subject to revision and update in 2008, and is not taken into account at this stage.

Revised 2006 Census figures are not available until mid 2007, and PE figures will be reviewed when these become available.

Summary

The existing percolating filter WWTP has a capacity of 2500PE. The future population demand assessment indicates that a 6000PE plant is required in order to provide a satisfactory and compliant effluent treatment system.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 38: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

10

Recommendations for Proposed Upgrade of Scheme 1) Pipe Network and Pumping Station at High Street It is apparent from site inspections and from an examination of pump

chamber dimensions that the present arrangement is inadequate to cater for present flows and that overflows to the river Dinin are constant and that pipelines feeding directly to the pump chamber constantly back-up. This pump chamber, which was constructed on the floor of the filter bed of original WWTP, has an effective depth of 1m under incoming pipe and the chamber is c 1.8m x 3.6m in plan. The sump, with a capacity of c 6.5cu m., is gravity fed by a 225mm which reduces to 150mm immediately before sump entry. Surplus flows are diverted to river Dinin via 375mm storm overflow pipework. The pipework feeding into this pump station extends from Love Lane northwards to the Ballinakill road, along part of Chatsworth St, onwards behind and in the private back gardens of buildings on northern side of High St., and crosses High St. to enter the pumping station. Furthermore this line also affords the only possibility of serving Respond, Cordill & E Nolan lands (178houses + commercial) and particularly in this context the adequate capacity of pumping station is a priority.

In regard to and in response to the above network and pumping difficulties the following is recommended:

a) Provide new pump sump, pumps, controls, holding tank with screened overflow, and necessary adjustments to incoming pipework at the existing pump station location.

b) Provide system capacity to cater for the future developments identified and also for future lands\North of town centre.

c) It is evident that the existing pipelines carry very large volumes of surface and rain water and this compromises the proper functioning and efficiency of WWTP and also of pumping station. Whilst some sections of the network have been surveyed and surface water gullies and ingress have been identified, further camera surveying is recommended to identify ingress of surface water. Remedial action can then be detailed and this will bring benefits to functioning and efficiency of pipelines and also the WWTP

2) 6000PE WWTP Upgrade-Preliminary Proposals. It has been established that the existing WWTP has a capacity of 2500PE and will require upgrading to min. 6000PE. This upgrade may be acceptable and advisable in phases, but this will be subject to confirmation following detailed design.

It is evident that the WWTP site is relatively small and also restricted by cross-falls and also low areas are subject to flooding. This will impact on design approach and final assessment.

The proposed WWTP will have minimum design criteria to produce final effluent as follows:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 39: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

11

Final Effluent Quality - BOD not greater than 15 mg\l

- COD not greater than 125mg\l - Suspended Solids not greater than 20mg\l

- Total Phosphorous not greater than 1mg\l - Total Nitrogen not greater than 15 mg\l

The establishment of the appropriate effluent standards is based on river Dinin assessment, assimilative capacity of the river and also compliance with the various regulations as set out later in this report.

Assessment of type of plant to be provided will be undertaken in greater detail and will take into account construction costs, flexibility in relation to further increases in capacity, advantages and disadvantages relating to space requirements, running costs, efficiency and reliability in meeting the required effluent quality standards.

Preliminary assessment of the option of maintaining percolating filter design would lead to some concerns about site size, but in particular the difficulties associated with nitrification, which can only occur in slow rate filtration plants, which are not efficient in BOD removal. Thus stone filtration plants remove ammonia efficiently but efficient BOD removal is achieved in rapid plastic media percolation plants. However a plant design for combined BOD removal and nitrification will be undertaken in order to assess options.

It is evident from the site size considerations and effluent discharge standards required that a satisfactory effluent treatment method is batch treatment in Sequencing Batch Reactors. This method easily lends the approach to phasing the work and a typical plant upgrade to SBR system is summarised hereunder.

Brief outline of Process & Works proposed: Phase 1 - Inlet works: The existing inlet channel has an automatic fine screen and a by-

pass with a coarse screen for emergency use\maintenance down time alternative. The automatic screen will require replacement and upgrading to accommodate the increased flows. Grit separation and removal will also be incorporated. Inlet flow will be automatically measured and monitored.

- Existing Imhoff Tank will be maintained as a primary settlement tank, with sludge removal pumping system to Sludge Holding tank.

- A new pump chamber will be constructed adjacent to and immediately downstream of the Imhoff tank. A submersible pump set, c/w mixer and level and ultrasonic control will feed the SBR tanks.

- SBR tanks: The submersible pump set will feed the SBRs via actuated valve sets. The SBRs will have fully automatic & programmable sequences- filling, mixing, aeration, settling and drainage stages. Decanters are automatically actuated to drain off supernatant liquor to discharge to existing outfall. Likewise the settled sludge is pumped to the sludge holding tank, SBRs and associated equipment and design also incorporate phosphate & nitrates removal. Ferric sulphate or phosclear dosing plant, mixers, pumps, actuated valves, measuring and monitoring of dissolved oxygen levels, flow and level

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 40: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

12

controllers and measurement, composite sampler, recorder etc. Optional satellite or equal telemetry system to incorporate call out\message\dial out facility, with all site equipment\controls etc to accommodate such a facility.

- Sludge Storage and removal: Existing clarifier will be used as a sludge holding tank, fed from SBRs by means of a valve actuated submersible `positive displacement\pd\mono` type pump set. The tank will incorporate supernatant draw-off valves, discharging to the inlet channel, also submersible aerator\mixer and sludge draw-off by means of low level valved connection pipe with tanker coupling.

- Tertiary treatment is required in order to achieve the recommended discharged effluent standards and this will be achieved by providing final holding tank and filtration system.

- Construct new control building, all interconnecting pipework and cables. Provide access platforms, stairs and ladders to tanks and equipment. Provide hard cored roadway to plant from public road, hardcore to entire site area, site lighting and necessary adjustment to fencing and gates.

- The various items\processes\equipment etc as mentioned above will be further specified in a Scope of Work & Project Specification document. They will form the basic guidelines for specialist design, supply, fit\construct contract, to be further clarified in contract documents.

Brief outline of Process & Works proposed: Phase 2 - Construct additional SBRs complete as per Phase 1 general arrangement.

- Construct sludge thickening plant to later detail.

Effluent Discharge Standards The standards appropriate to the effluent discharge from Castlecomer WWTP are established by reference to the following Statutory Instruments (S.I.), as follows:

S.I. 254\2001-Urban Waste Water Treatment Regulations, 2001 This regulation specifies that in all instances a discharged effluent shall contain a BOD maximum concentration of 25mg\l, a COD maximum concentration of 125mg\l, and a Total Suspended Solids maximum concentration of 35mg\l.

Furthermore in listed sensitive areas (rivers and lakes listed by name in schedule 3) Total phosphorous, P, maximum concentration of 2mg\l, Total nitrogen, N, maximum concentration of 15mg\l.

The river Dinin is not listed as a river in a `Sensitive Area`.

Water Quality Standards for Phosphorous Regulations, 1998 This regulation sets a minimum target water quality standard for rivers and lakes based on their Biological Water Quality Rating, Q. Q is the rating assigned by the EPA, resulting from monitoring by EPA. The river Dinin is designated Q3-4, slightly polluted. For a Q4 rated river a 30 mg\l P target water quality standard is recommended and 50 mg\l P for Q3 rivers.

S.I. 293:1988: - European Communities (Quality of Salmonid Waters) Regulations 1988

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 41: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

13

Whilst the river Dinin is not listed as `Salmonid Waters` and as such these regulations are not mandatory in respect of the river Dinin, due regard is given to the Salmonid Water Quality standards, listed in Second Schedule of S.I.293:1988, particularly as follows for the river waters maximum (average 12month samples)concentrations :

- Total Suspended Solids maximum concentration of 25mg\l. - BOD maximum concentration of 5mg\l

- Nitrites 0.05 mg\l NO2 - Non-ionized Ammonia 0.02 mg\l NH3

- Total Ammonia 1.0 mg\l NH4 N, subject to conforming to non-ionized Ammonia 0.02 mg\l NH3

Receiving Water Assimilative Capacity Quality of Receiving Water\Dinin River The river Dinin water quality is determined by reference to Environmental Protection Agency(EPA), Regional Water Laboratory, Kilkenny-River Quality Report-2005, the relevant river reference Code 15D02, and Station No. 0300 is located in Castlecomer North and upstream of the WWTP and Station No. 0400 is located at Dysart Bridge just South and downstream of the WWTP.

The latest Biological Quality Rating (2005) is Q3-4 slightly polluted at Station No. 0400 and Q4\unpolluted at Station 0300, which indicates slight deterioration downstream of WWTP. Biological components and concentrations are tabulated in latest EPA report for the Dinin River and these results are used in assessing the assimilative capacity of the river.

Dinin River flow rate The river Dinin flow is determined by reference to Office of Public Works(OPW) data from adjacent river gauging station, which confirms a 95th percentile flow of 0.21 m3/s. From catchment data and site assessment it is estimated that average flow is c. 2 m3/s and typically low summer flows are c 0.5 m3/s.

Assimilative Capacity of River Dinin Assimilative capacity calculation for BOD, phosphorous, suspended solids, Ammonia and non-toxic substances is based on the recommended (EPA) methodology set out in the following equation:

Waste Assimilation Capacity (WAC) = (Cmax - Cback) x F95 x 86.4 kg \day

Where: Cmax = max permissible (mg\l) , in accordance with S.I. standards

Cback = background upstream (mg\l), determined from EPA River Quality records

BOD Assimilative capacity Final Effluent Quality Proposed BOD not greater than 15 mg\l

River median BOD 1.30 mg\l

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 42: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Terry Brennan BE., Consulting Engineer, The Square, Castlecomer, Co. Kilkenny

Tel. 056 – 4441272 E-Mail: [email protected]

14

Permissible BOD=Median + 1mg\l as per EPA advisory\S.I. 293:1988 Quality of Salmonid Water Directive

Waste Assimilation Capacity (WAC) = (Cmax - Cback) x F95 x 86.4 kg BOD \day

Where Cmax = max permissible BOD (mg\l)

Cback= background upstream BOD (mg\l) WAC = (2.30-1.30) x 0.21 x 86.4 kg BOD \day = 18.144 Kg.

6000PE gives rise to additional 1,080,000 L @15MG\L BOD, which equates to 16.2 Kg\day i.e. 89% WAC.

Effluent BOD @ 15 mg\l is recommended. Assimilative Capacity Ammonia and Orthophosphate Ammonia Applying the above methodology, the River Ammonia median is 0.026 mg\l N and the Permissible N =1.0 mg\l N, there is adequate assimilative capacity to receive a final discharge with Ammonia concentration of N not greater than 15 mg\l.

Orthophosphate River o-Phos median 0.02 mg\l

Permissible o-Phos = 0.03mg\l as per EPA advisory\River Quality Q4 Effluent o-Phos @ 1 mg\l is recommended.

There is only minimal assimilative capacity available for Orthophosphate, as the median o-Phos concentration of 0.02 mg\l is close to permissible 0.03 mg\l. Best practice indicates that a recommendation for higher quality treated effluent with 1 mg\l concentration is appropriate and this will have minimal impact on the Dinin, with average flows estimated to exceed 2.0 m3/s.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 43: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

1{

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 44: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

1:2500O-C

653350.672120I"a·.,:" ii 1i 3·:·j·.1,

;;:

11:1000• 10-22

7 •

F

marked: T.Brennan B.E. Apr 07OS. Ucence AR.0082007

SITE LOCATION MAP 1:2500

CASTLECOMER WASTEWATERTREATMENT PLANT

300

o

. - l

Inlet Pipe ork

I

~

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 45: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Ia. ... .....~n.. shw r ~

l;I!l C':'4IIl'ICTl':O ni ac _ u(oJ.F:.~I-" i"'}~

tt..... t.. l·~te::tx..eY.-n:J IPr'1':"J~.l'JTF ~

: n .11 iUco"".. ~ /

~E "'H'li , j:) <:l:-T'"* 1'<;.fET ~lli cr ':CN-~~ SlIllDIN.'

- _.._~

CASTLECOMER SEWERAGE UPGRADING 200TREATMENT PLA T SiTE LAYOUT

..........

!I .1'

,t:'o:: J, .· " _1~

\,,{ \.... 'I

\' IlJ.~ \-------A-\r=-~...;',~-==--- - t-

1

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 46: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

En.H-o........tal Pn>44o<IIoD ,,-, IIq\aMI W..., Lo-"'''"l', KilIouny _ R;_ w• ..,.QuIll:1 MOIIIlkr<1llll Do,.

.... "in 1a-l1l1ll} C.... I500Z ~o"N_

"". .......ooer. 15007_'on No.0300 -- u tes,BkJIogicaJ 0u21iiy FWing ( 2005 ) ,0< ~""",,, "",""--_ .._- -_. _- _ ..- 0- o~ 00 W ' 00 - • ~ Sol''''''' __ _. u.-;,. ...... ...... .,~ COl_ T-ceo' ~ '-,- ~ """ "" -.~ .

~. .--""'. ~" ~". - " ~" ~o - ••• ~-"""" 1200' ,~~ " • 12.• " 0.' ., 0.05 .~ 0-0005 0.007

" "'''"0'''200' '2 ~0 " ". , 3,3 .. • " @ 0.0, 0.0' 0.0005 0.005 .. ..~, 14 00 ' U '" ,"" " ~ .. ~ ,. ." 0.0087 .~ ••• "~, '2~5 I '," •• , 0.' •• ~ " ee ,. 0,13 0,008. 0.018 .. .. -,. ~5' 0

05/'2/2001 12:5' •• .. 11 ,1l ,., .~ ,. ~ •• •• 0.000' 0.01' U .. ••• m,251011.2002 10:50 ,.. • "., U ,. rra 0.10 ••• 0,0010 .- .. ee.~. "020 '" • 10.' ee .~ ., m 0.0' C.O' 0.00'" C.C12 c.s ..21fOOt.1oo. 13,10 ' 0-4 •• 1 1.1 •• " 0> •• 0-0, .~ ,.. O,Cll ., ..-_. '3:57 ... ." 1c,6 ••• .. .. ," 0.07 ... ..- 0.03< ,. "1111112002 ""5 " • 11.2 ,.. '" " ~ ••• <om 0.00' '. .....- '2:'0 ,. .. 11.' " '" " ", •• •• 0.000, 0.010

"..

1510""""" '""'0 ,. •• 13.0 .. .. •• - 0,0' •• .- 0-012"

....- '2:0' " ,2 • 10.1 ••• • •• .oo ,. 0,0' ,- 0-010 r.e "11/07r>00:3 11 ,'" 16.' ".,

••• ~ ••• '" •• , OO 0.0031 C,O" ,. "c$"cr>00:3 , " "5 12,' ". 12.' .. • ., '" ~.. <0-01 0,007 ,. ..1$'"r>00:3 ' <:15 .. • ,1.5 .. • ,., .. •.OO .OO C.OO12 ,~ ., ".OOOO- ",'" " ... , l.? .. ... '.- ••• ••• C.COO, C.007 .., " •,-- 11:25 .. ~ 1O,' •• .~ " ~ ... •.eo .- 0,D.1' as "

,,_oo ,."" '" ,OO 10,2 U • •• ", , oo •• 0,0002 e.~ .. .. .,.- ' 3" 0 ' "-0 ,. 11.1 U " " .., <0,01 <0.01 ..- .., "1111 11200< 12:55 1M • ll. , ., .. ae • e.OO ,OO 0.0013 ". .. 0.33121011:1005 12::a ., .. 12,2 " " e.e ., 0.0' ,.. .=, 0.011 .. " ..00I0OI2005 13:'0 •• "'

11 ,. " " " '" •• 0.0' 0.000' 0.007 <0,' " ."'2IOM!00' ..~ '" ,. " " " • ., - .. 0.0' O.OOOS 0.011 r.e " 0;_.

, 1:45 15,~ ," '0.0 " .. " "' •. OO •• ,- 0-0'" t.a " "29/0""'005 12,1~ 10.6 • '0.7 " '00 ,. m 0-07 ,. 0,0012 C.02B ,. ..'''''212005 1255 .. " " .7 0.' • " ... ", ,. .- 0.012

"..

31/0112OC1l 12,,,-, " • ,'-' ,.. .. " ,. 0.02 ,. O.COO~ .= ., "1'/0412006 11,5Ii " ... 11.5 " ., •• '" O.OS 0-0007 0-012 ••• ..._.1"'"

15.~ ., .' ,. .. ,. ~ 0-0' O.OS 0-00'0 0.017 " "- "'00 16,g • e.s '" <0-01 0.01 0.0008 .~ ,.. "l;nOI2OOO 12:15 13.0 • '" '. rc ,. ,. •• •• 0.000' 0.0" " "04 "Utation 4liD (2DOI5) - Aka ri••r cod" 15D073..ti"" No. DOOO ",...., . , (N ~hO"",,~· <I'a 01~_o.....~ La'w BioJo<;icaJ """lily Ra,irtj} ( 2005 J • 00' 0"" ROO S .,1701l

..~- .. ._ ---~---

•• - '- 00 00 .0. - " ~$00"'" _00 - -- - -- ,- ~ -'(l """' .... 01 "'" 0' •• • - - ~. ~" ~-

~. ~. ~o .- 0- -._- - - _. _- - - _. -------...._"

2Ml l r=1 ,",40 .. • 12,~ ,.. '" " ". ••• ••• 0.0006 .~ " rs

'''''''''>00' '417 " '" 13,8 .. " " ,. ••• 0.0' .=, ecce , e ..~-, ,.,to ' U ... ,1-7 " • " "' ,. •• 0,0015 0.000 " rs~./200' 13:40 ,... ,. 10.' .. sc •• m '. 0.01 ,.. 0,D.1'

".. .. -0511212001 '4:'" ., • 11 .' •• .~ " •• •• •.ce ,.- 0,0'2 " .. ~'" ..

ZIIO' ",002 '0'35 .. ss 11.3 ••• ,. m 0.11 0,10 0.001• .~ •• "22i\l<12oo2 IMO 11,0 ,. ". ., '00 .. m ••• 0,0' .... 0.0l5 " ..27,\)6/200' 13:50 1',0 •• 11.2 .. • '" '" '. ' oo O.co:" ecea .. "._= ' 4:515 12.' '" ' 2.0 a,, .. •• .., , .OO <0.01 0.010 ,. "1111''''1)02 13,'~ ,. " 11.S ••• '" " ,. ues •• 0,0003 ~,007

" ..O~/O ' 12OOO ,,~ " es 11'< " '" ,. ~ ••• ..OO ... .~ ,.. ",~- 13"5 . ••• •• "'., .. .. ., .. •.OO 0.0' .- 0.0"" " ..e-

,,~ .., ,,, ... .. ~ .. •• 0.0' 0.0' 0.00'0 0.012 ., "rl107l2OO1l 12:56 ".' " •• ' ; ee " ~ •• 0.05 .- 0.029 " "(IB/'OI2003 1 ~,"' 12.• •• ' 0.5 .. e .. oo. ,. 0.0' 0.1XI04 0 .0' 9 " "'8/1212Oll3 ..~ .. •• 11.7" .. " •• ..OO 0-07 O.co:'~ 0,0 " ., ..

""",,,Il'Oll ' 12,1' .. ." 1l.! u 00 ., ~ e.es o.es 0.000' 0.008 " "'510</200. 11 'I' " "' 11,' ., • 00 ,. •• ... 1.10 0.0221 0.0~3 .. •'~"'OO4 " '" 11.5 ." ' 0.' ,.. " ,. ", 0,10 0.0' ... .~ .. ..oa,,- Il :20 l1.~ ", " s.s • •• ~ D.U 0.02 C.OO 1< 0.050 " "17i1l1roo< 13:4.1 10.' • 11.1 r.e " .. , C.O' 0." 0.005<- 0,0' 6

"10011= 1,,<7 ,.. • ,2,6 0' " ., ~ .~ ,. 0.0007 0,012 ., "001031= 14,' 0 ", .., ,t.7 .., .. " - ••• .. 0.0017 ,~ ••• "

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 47: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

~""'I<., F, ,.~.. ", $_~..,U_, . m-W.... QMIIt»M . ..-- 11I11 [a-lorthl C..... 15DOZ ~"',-.

,~ ,,~ ,,. ,~ 12,' .. , U ., ,~ ..~ .- .- ., ..- n~ 1_,0 M 10.0 ,, • ,. • .~ .m .= ..- ,. ..- "00 10,' ,~ ,U ,. ,. u a ..~ ... eceee <0,001 '" ",~- "00 ., ,~ 12,2 ,. • ., • .~ .00 0,0012 0,01' " ..!I.o:11f2OO& "00 " '" 13,! u .. U - .~ •• .W, 0,012 U ..n~ W'lII" 9.e ," 12,4 .. U - .m •• .w, 0.017 U "- ,,~ u,a '" 10_~ .. eo .. ~ .00 •• .- .= .. ..- ..:15 15.4 • U W '00 •• .- 0,015 ,. ..19110.2005 "00 12,8 .. '0,- •• ~ .. m a,11 •• .~, .m, ,. ..,- "00 •• ,. 13.2 ,. ~ .., ... 'M ••• 0.0012 om. ., "

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 48: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008

SUBMISSIONS ON PROPOSALS

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 49: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

~~,

:11 . ) Sout ern R.eg.ional Fisheries Board~!I!!/!!f/ Bord Iasca igh ReWlunach an [ erscirr

Fisheries Ire lan d

OJ " Nat ural Heri ageKILKENNY CDE V UN YCOUNCIL

I amilE - s (;1 f!J

3 JUt liB!

\CASTLECOMER WASTEWATER TRE~M

"PROPOSED UPGRADING TO SERVE A POPULATIO

26 J dy 2007

Mr. Philip O'Neill,ir ect or of Services ,

Wat er Services and Environment ,Kilkenny County Council,County Hail,J ohns , St reet ,Kilkenny.

By email and fax

Dear Sir ,

Thank you f or your Councils' lett er dated 22nd ult, and enclosu es , invit ing the su bmission ofobser va ions in relation to t he above proposed developme t.

At t he outset , on behalf of the Board, I welcome t he pro posed ups izing and upgrad ing of thet r eat men plant , and t he propos ed changes to t he sewer and assoc iated pumping networ k.

However . I am bound r es pec I ive ly to note that your Co uncfl's consultants appear to have madea number of errors in t heir estimation of ups t r eam median contaminant values and associatedassimilat ive capacity. I refer in particular to t he ir usage of a med ian orthophosphat e value- 'of 0.03 mg/ I as P for t he per iod 2001-2006 i d . The use of this lat 't'er figure ser ious lyoverstat es ass imilat ive capacity in t he case of or thophosphate , a d the Board is boundrespectively t o advise t hat the re levant da ta be re-exa mined. I n th is r egard, you may wisht o seek independent conf irmat ion of t he upstream med ian value, and we refer yo to t heEPA's Ki lkenny Regional Laboratory who we are sat isf ied will provide conf irmat ion t hat t hevalue of 0.03 mg/l as P is t he appropr iate median figure to use f or the per iod 2001-2006 incl.

It f ollows from t he f oregoing, particular ly in e case of orthophos phate, that yourconsultants have s ignif icantly overestimated ass i ila ive capaci ty , and the guidance providedby t hem cannot we submit be accepted . It would appear f om t heir docu ent , t hat they

The Sou the n Reqion,,1

rI:~berje5 Board

AnglllsO"Q Slrec'Clenme]

Ce T,pp rOIl'T: (W,1 8 00 5

F: I '?f 2:19-71

f: . n Ulft~ 5-::'jI sT b eo

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 50: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Q 'Southern Regional Fisheries Board,~#' Bard lascaigh Reigiun ach an Deiscirr

_ _ . Fisherie !ii Irelandestimate that Q total P level of Img/l may be discharged. without exceedinl wnat tlitlcorrectly interpret as the relevant dowlIStream canditiollS te. 0.03 mgtl o~up ~n 1f/,'~l r~~tg eor-thcphcsphcte. In fact . based on usage of what we believe: to be the correct medianor thophosphate: value for the period 2002-2006 incl, l.e. 0.04 mg/ l as th e pre-existingupstream rece:ivif\9 weter value, there is no copacity for further orthophosphate: discharge.

A discharge of such concentrQtion as recommended by your consultants (1 mg/l P tot al,phosphate) at the flow rate proposed would r esult in the River Dinin being classified es beingmoderately to seriously polluted based an orthophosphate concelltrat ion (depend ing 011 tilefr act ion of total? present as cr-thcphosphcte ) ill the final discl1arge.

Having regard to t he foregoing , your Coullcil ore requested to re-examine the position, takingaccount of the need to use the appropriate value for orthophosphate.

In the crrcuestcnce, in ccccrdcnce with the precautionary principle, t he Board is bound toobject to the development proceeding in the form prepcsed.

I would be obliged for your Councils response, QI'ld ill this regard, may I suggest that ameeting between representcnves of your Coullcil and th iS Board to address the matters atissue might well allow our progressing this to a positive conclusion, as the Board is, cs statedat the outset, supportive of your Coullci l's plans for upsizing OIld upgrading of theCcstlecomer- plQl'lt,

Yours faithf ully,

Patrick Kilf eat herSenior Fisheries Environmental Officer

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 51: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

Kilkenny Co. Council

2 0 JUL Z007

imithsrown-H 'e.Ca tie .omer,

0, Kilkenny.

25 1 July. 2007,

, r. J hilip OlN ill.Di rector of e ice,( i lkcn : -'-ounty cunei ICounty I ra l l ~

Joh n' "'t ..K ilkennv

Re: Proposed upgrade of treatment plant at C as tlecome r,

D ar 'tr,

no e . our iJ tention to u grad the treatment plant at Smithstown. Castlecom r.appre .late that th i: is urgently needed bee W of the increased population of th [Own.

hov.... .ver, [ \ au ld wish to note a few points.

se from y JU r plans tha you want t move the xistinc en trance and add a new onen ar r .o th ... corn 'r - w ] j -h could l ... a potcruii I danger to one ruing traffi c '1 ' it rand atpr ent,

The cur.r n f n ing i adequat for ecurity but it i not uffi cicnt fo r .creening purposes- you will understand that this i our only entrance and the iew of a v a. te treatmentplan is un i sirable (not to ' 't. actually re ul iv ) on . nyone entrance. The e ergreenh ag is uII, .ient n part, but from where the proposed new entrance will be back to theroad h b ech tr es \. hil provi ling excellent ) ight. character and isg lse from th10 vn a d iolf are inadequate as sere ning at eye-level. If the gr en f nee was replacedb r a L metre wal l it \. auld pro ide instant an permanent screenit ~.

.Sinceth last upgrad the amount of heav traffic into th - treatment plant has increasedand the road conditions on your dahl of way h ve de riorated badly. It need,' to heresurfa ' ed at this s ag compl lei. ~ not ju 1 patched.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 52: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

l also not ~ you plan to change til inlet and outl t pipes. I would apprec iate bcinuconsulted about the route of the new pipes and the future of the existing ones when theyare disused.

I \ ould also appreciate a meeting on . ite with your Chief Engineer or some equiva lentperson in aut ority. There ha always been excellent relation between us which I trustwill continue and hope I,.V . can reach a mu ally ati factory agr ment,

Yours incerely,

Dorcas Carter

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 53: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

BROOKSIC'E '

BALLYHDfMON,

CASTl.ECOMER,

C O KIl.J(E'lNY

M, Philip O NedlDirector of Se",,,,,,sI(j lkenny County CouncilCounty HallJohn StreetKolkenny

2" July2007

Kilkennv Co t u tnv.

1R ,1111'

Rl:L i:. I \i U J

re: Cas! leeomer W~"te",aler T..n _ n! PI.nt Upgrading z007.1 Smllh" Iown, Cl&t lecomer.Co Kil kenny

Dear Sirs,

I am the owner of the land hat<::hed in red on the attached sketch . Tne land , 9S snown. IS bounded to the

west by the main road N78, to the north by the minor road giving access to my land. to an adjacent

dwel ling, to Cast~er Golf Club, to Carlllr's house and larm and to CaStOloomer Wastewater

Trea:ment Plant. to the east tly ee nvel Dinin and to a solJll1 by a sma ll watercourse The land has tleen

In ns current use as farmyard since atlesst the early 20" cenwl)'

As is evident from the sketch the CUrreflt access pipeline to the wastewarer treatment plant and the

associated river crossing a re located on my lands and having reviewed the publicly available repnrt I

wish to make tha following "utmi"s",ns and observations on tha above development

The proposed upgrading IS very welcome as the current s~uation 01 untreated sewerage bejng

released to the merat me river crossing is unacceptatle

h the report the wastewater treatment ~ant is oeSCfitled as tleing "fI(;Cl!SStJd /rom rite /fi8 by

8CC$SS roadway shared by Carler larm 8. family. parTiy by Castlecomer GaY club and by Kilkenny

Co. Co " This~ss road 'Nay is also ,..~ared by my farmyard , as its so.. vehicular access end in use

since at least the early 20" century , and by ar adjacent dwelling reeseIn the section of the above report dea ling w;th Recommendations and Improvements to Existing

WWTP rt states "In rolatlOn to tha problems associated with t!le river crossing l/1e proposedsolution

is to provide a rep/acemanl 37.5mm inlet oramy pipeline extending from a manhole adjacent 10 It18

N7B roadway in/{) tI1e OINflP, " No further informatiOfl is given regard ing proposed rout9s or how the

river cross;ng is to be carrie<;.l out.

Given that the eXlst"g pIpelIne runs across my farmya'll this IS a matter 01consu1e'atli e Importance

to me. If it is proposed to run the new pipe line along the lirll! 01 the existing across my Iaocl l!1j!n

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 54: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

con5<lembr; more <Seta l and oonsLJItattOtl ""ill be required priot to a~~ proposal being agreed by me

While I have ",ada access availal>" to I< ilkann~ COlInI)' COLll1C11and Its a9"n'$ In I/Ie pa<l lor lhe

carrying out 01 maintenarooe and Imormemerns to the river cro:ssing ,he !lCaIe of wort reqUired 10

rela~ the entire Dipeine i$ sig'lifica"l~ greater. In additoo Ie the OO"3deratoe diSruptIOn an<l

InCOl'v" noence Invotvec ther" WOIJId be slgnll'lclln,~~h and saleI)' ImpilcatJons lor my I".." tock. for

_mysej l and lor "Il)' otNor pe,,,,,os " "9"ged In "g,icu~E11 woriI on my t>e/1,,~ , This is of ccu rst! in

add~ion to the risl<s poood to persons engaged in corry"g out such worts WIthin the conhroes of a

wor k ng f",myard

Thomas Rothwell

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 55: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

"z

..i-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 56: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

CASTLECOMER SEWERAGE SCHEME UPGRADING 2008

RESPONSES TO SUBMISSIONS

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:00

Page 57: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

4th September 2007 Mr. Pat Kilfeather Senior Fisheries Environmental Officer Southern Regional Fisheries Board Anglesea Street Clonmel Co. Tipperary Re: Upgrade to Wastewater Treatment Plant at Castlecomer Dear Sir I refer to your letter of 26th July 2007 regarding the proposed upgrade of Castlecomer Waste Water Treatment Plant and your comments in relation to orthophosphate levels. I have been in contact with the Consultant who has informed me that the median orthophosphate level of 0.02mg/l used in calculations was derived from the last ten results received from the EPA. It would appear from an anlaysis of the results that there has been an improvement in the orthophosphate levels with a median orthophosphates level of 0.02mg/l from the last ten results, 0.03mg/l from the last 20 results and a median level of 0.04mg/l over the period 2001-2006 as pointed out in your correspondence. Having reviewed the figures and taking your comments on board, Kilkenny County Council proposes that the final effluent standard for orthophosphates be improved to a level of 0.5mg/l as opposed to the original proposed standard of 1mg/l. An increase of 0.004mg/l in the orthophosphate levels in the receiving waters would give an assimilative capacity of (Cmax –Cback) x Fmed*86.4 which equals 0.004*2*86.4 Kg = 0.69 Kg Where Fmed is the median flow in M3/S A 6,000 PE Treatment Plant with a 0.5mg/l effluent standard for orthophosphate would give a loading of 6,000*180*0.5mg = 0.54 Kg. This means that there would be an increase in orthophosphate levels in the receiving waters of 0.004*0.54/0.69 or 0.0031mg/l. This would give a median orthophosphate level of 0.0231mg/l based on the last ten results from the EPA or 0.0331mg/l based on the last twenty results. Kilkenny County Council would welcome a meeting with the Fisheries Board to discuss issues of mutual interest. Our Senior Engineer, Mr. Billy Mernagh, is on leave/courses until 13th September 2007. Perhaps you could telephone him at 056/7794258 to arrange a meeting. Yours faithfully ______________ Eamon Mahon Executive Engineer Sanitary Services

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:02:38:01

Page 58: For inspection purposes only. Consent of copyright owner ... · Trickling Filters upgraded with High-rate Media; Final Settling Tank added. Outfall: Treated effluent discharges to

7th September 2007 Dorcas Carter Smithstown House Castlecomer Co. Kilkenny Re: Castlecomer Wastewater Treatment Plant Upgrading 2007 at

Smithstown, Castlecomer Dear Dorcas Further to your letter of 25th July 2007 and a meeting of Ronald Carter, Terry Brennan and myself, I wish to confirm the following: Subject to the proposed upgrade taking place, the following alterations and accommodation works will take place.

• The route of the pipeline will be altered as shown in red on the attached drawing and a 10 metre long concrete culvert will be installed over the new sewer pipe to facilitate access to your field from the existing gate . The existing pipes and concrete plinths are to be removed.

• The amount of trees to be felled at entrance no. 1 is to be minimised with the most southerly tree being maintained and four adjacent trees being felled. New beech and Leylandii trees to be planted at existing entrance and 3-4 foot beech hedging to be sown in Carter’s field opposite the entrance.

• Hard core to be place in the verge opposite entrance no. 1 to facilitate vehicular access to the treatment plant.

• Entrance no. 2 to be relocated as per attached drawing. This entrance to be 12 foot wide.

• The new entrance gates are to be of timber construction. • A new eight foot block wall is to be installed to the west of entrance no. 2 as

shown on the attached drawing. This wall is to pointed and capped with ivy creepers to be sown. In as far as is possible, the width between this new wall and the existing wall at the other side of the access road is to be eight metres.

• An existing manhole in Carter’s field is to be removed. Hole shall be backfilled up to existing ground level

• The access road to the treatment plant is to be tarred and chipped. I trust that this is an accurate reflection of our discussion. Should you have any queries in relation to the above, please contact the undersigned. Kilkenny County Council would like to acknowledge you co-operation over a number of years Yours faithfully ______________ Eamon Mahon Executive Engineer Water Services