for hudson city schools, the master facility and …...for hudson city schools, the master facility...

30

Upload: others

Post on 16-Jul-2020

2 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 2: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

For Hudson City Schools, the master facility plan is a holistic and strategic plan to address the long range needs and vision of the district.

What is a Master Facility Plan?

Page 3: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

The process to develop the master plan includes the following steps: • Comprehensive building condition analysis • Analysis student capacity for current and projected

enrollment • Visioning Workshop to understand how facilities can best

support 21st Century learning • Development of various options for a facility master plan • Develop cost modeling and analysis of the various options • Develop a strategy and steps to implement the facility

master plan

Page 4: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

Why?

Aging Facilities Hudson Middle School was built in 1927.

Other than Ellsworth Hill, our elementary schools were all built in the 50’s and 60’s.

Rapid Development and Changes In Education and Technology Today, we know learning can be enhanced

through interactivity and increased social engagement Flexible spaces that allow instruction to

adjust and evolve with technology are needed.

Page 5: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

Why?

Fiscally Responsible When school districts wait until there is a

facility emergency (i.e. leaking roof, HVAC system failure, etc.), options for addressing the needs become limited, less efficient and more expensive.

Pay it forward It is essential that we continue to carefully

plan for and create educational spaces that will meet our students’ learning needs today, and for many years to come.

Page 6: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

Why Now?

Stretching the Life of Facilities to the Point of Diminishing Returns Life Cycles of Existing Facilities Facility Plans Will Take Years to

Implement Period of Operational Financial

Stability Period of Low Interest Rates

Page 7: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

SILVER PLAN • Refresh and renovations will be completed for each

building, with limited renovations completed at the high school and Ellsworth Hill.

• Middle School renovations will expand the lifespan of the building approximately 10 to 15 years.

• Air Conditioning will be installed for Evamere and McDowell.

• Grade level configurations will remain the same. • District identified maintenance priorities that include

electrical and network systems, building envelope, plumbing systems, HVAC, and some site improvements which include central campus parking, traffic flow solutions, utilities and playground updates.

• Central offices will be moved to McDowell.

Page 8: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

Renovate Middle School (6, 7, 8) $34,500,000 Maintenance and District Identified Needs Plus Required Maintenance Renovate East Woods, McDowell, $13,400,000 Ellsworth Hill and Evamere (Keep Existing Grade Configurations) Add Central Office to McDowell $1,600,000 Maintenance and District Identified Needs $21,500,000 High School Improvements $350,000

Total: $71,350,000

SILVER PLAN

Page 9: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 10: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 11: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 12: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 13: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 14: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 15: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

WHITE PLAN • A new Middle School for grades 6, 7 and 8, which

allows the lifespan of the building to be 75+ years. • Refresh and renovations will be completed for

Evamere, McDowell and East Woods, with limited renovations completed at the High School and Ellsworth Hill.

• Air Conditioning will be installed for Evamere and McDowell.

• Grade level alignments will remain the same. • District identified maintenance priorities that include

electrical and network systems, building envelope, plumbing systems, HVAC, and some site improvements which include central campus parking, traffic flow solutions, utilities and playground updates.

• Central Offices will move to McDowell.

Page 16: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

New Middle School (6, 7, 8) $46,000,000 Renovate East Woods, McDowell, $13,400,000 Ellsworth Hill and Evamere (Keep Existing Grade Configurations) Add Central Office to McDowell $1,600,000 Maintenance and District Identified Needs $20,200,000 High School Improvements $350,000

Total $81,550,000

WHITE PLAN

Page 17: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 18: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 19: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 20: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 21: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 22: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

BLUE PLAN • A new Middle School for grades 5, 6, 7 and 8, which allows

the lifespan of the building to be 75+ years. • A vast majority of students will be in new or newer facilities. • Grade levels will be realigned to reduce the number of

transitions among the buildings which has students in the same school for two years.

• Air conditioning will be installed for McDowell. • Central office will be located at Evamere with selective

deconstruction to the older parts of Evamere. • Modified district maintenance priorities will be restructured

due to the overall plan and the scope of the Middle School with smaller scale site improvements.

• Enables a strategic approach to long term staggering investments in our facility.

Page 23: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

New Middle School (5, 6, 7, 8) $57,500,000 New Grade Configuration with Minor Renovations (7 New CR at Ellsworth Hill) $13,600,000 Move Central Office to Evamere $1,600,000 (Selected Deconstruction Costs Not Included) Reduced Scope of Maintenance and $8,500,000 District Identified Needs High School Improvements $350,000 Total: $81,550,000

BLUE PLAN

Page 24: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 25: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 26: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 27: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 28: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision
Page 29: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

COMMUNITY ENGAGEMENT View the entire Facilities Plan

at www.hudson.k12.oh.us

Page 30: For Hudson City Schools, the master facility and …...For Hudson City Schools, the master facility plan is a holistic and strategic planto address the long range needs and vision

Thank you for attending