    INDEX

    1.0 INTENT OF DESIGN PHILOSOPHY -03

    2.0 GENERAL DESIGN & ENGINEERING -03

    3.0 SUB STATION DESIGN DETAILS -05

    4.0 SWITCHYARD EUIP!ENTS -0"

    4.1 CIRCUIT BREA#ER -0"

    4.2 ISOLATOR -10

    4.3 CURRENT TRANSFOR!ER -14

    DESIGN PHILOSOPHY

  • 8/13/2019 for Ferke-11.4.11

    2/13

    4.4 POTENTIAL TRANSFOR!ER -20

    4.5 LIGHTNING ARRESTER -21

    4." INSULATORS & HARDWARE -24

    4.$ SWITCHYARD PROTECTION CONTROL & RELAY PANEL -2%

    4. EARTHING & LIGHTNING PROTECTION -2$

    4.10 HT CABLES -2

    4.11 LIGHTING SYSTE! FOR SWITCHYARD -30

    4.12 25 !'A() 225*' SHUNT REACTOR -31

    4.14 DRAWINGS) DATA AND !ANUAL -3%

    5.0 ANNEXURE -3%

    1. PRO+ECT DESCRIPTION ,

    Project for interconnection of electrical networks of Mali and Ivory Coast envisages in

    its initial phase of realization of a 225kV line connecting the existing station of Ferkessedogo in

    Ivory Coast to the existing !5"kV station of #ego$

    %his design philosophy is intended to cover the re&ire'ents of D/ E/(/ for

    the extension of one 225kV (ine )ay with 2"MV*r +eactor in 225kV F,+-,##./01/0 s)

    station as per I,C standards and %echnical #pecification$

  • 8/13/2019 for Ferke-11.4.11

    3/13

    2. SUB STATION DESIGN DETAILS

    2.1 225*' FER#ESSDOUGOU EXISTING SS

    .esign criteria for 225kV syste' details are as per %echnical specification and I,CI#

    standard$

    %he 'ajor activities for the proposed extension of Ferkessdogo #)station

    ,xtension of existing 225kV *l'ini' IP# t)e and installation of new 225kV (ine )ay

    with 2"MV*r #hnt +eactor as per (ayot drawing$

    ,arth 'at3 (ighting and (ightning will )e covered for the proposed extension )ays and %wo

    n')ers of !4' height (C(P is provided for (ighting ill'ination and (ightning protection$

    %wo n')ers of M- 6ay Marshalling -iosk7 for (% *C power spply will )e provided in

    the switchyard for axiliary spply to +eactor and other e&ip'ents 6C3 1/#3 C%8 9 V%873

    one is for #ikasso (ine ay and another one is for +eactor ay$

    ,xtension of existing control roo' to locate the new control and protection panel for theproposed extension )ay$

    Ca)le trench to acco''odate control and power ca)les for the proposed extension line )ay$

    %he #ingle line diagra'3 Plan (ayot3 and section layot are prepared )ased on %echnical

    specification3 I,C I# standard and existing data collected fro' site$

    C/67/8 89/7/9,

    Mini'' te'peratre : !2;C

    Maxi'' te'peratre: 5" ;C

    *ltitde is less than !"""'

    .aily 'axi'' average te'peratre : o'inal syste' voltage 225 kV as per (ayot dwg$ no$!?@"AA?,?(*B?""A?"4$2 ighest syste' voltage 2

  • 8/13/2019 for Ferke-11.4.11

    4/13

    < Main s#ingle s6*($ +igid s7

    5Fll wave i'plse withstandvoltage 6!$25" 'icrosec$7 !"5" kVp

    4

    /ne 'inte power fre&ency

    withstand voltage

  • 8/13/2019 for Ferke-11.4.11

    5/13

    +ated #hort %i'e Crrent

  • 8/13/2019 for Ferke-11.4.11

    6/13

    >o'inal syste' Voltage 225kV

    Fre&ency 5"z

    +ated #hort %i'e Crrent

  • 8/13/2019 for Ferke-11.4.11

    7/13

    Metering 9 C0 =5!* Cl:"$53 I#FG5 ? =$5V*?

    +eactor .iff$ Protn$ =5!* Cl:5P2" ? =$5V*?

    A$A$!$< +ating of +eactor ay %ank #ide ! CoreCore +atio Class Vk rden +ct

    Metering 9 C0 =5!* Cl:"$53 I#FG5 ? =$5V*?

    3.3.2 C=((7 '97 T(>9(6(

    A$A$2$! +ating of (ine ay A CoreCore +atio Class

    Core?! 6Protection7 225kVHA!!"VHA !""V*

    Core?2 6Protection7 225kVHA!!"VHA !""V*

    Core?A 6Metering7 225kVHA!!"VHA =5V*

    3.4 L/?7/ A((7(

    %ype Metal /xide3 /tdoor

    >o'inal syste' Voltage 225kV

    ighest syste' Voltage 2

  • 8/13/2019 for Ferke-11.4.11

    8/13

    4. E(7?/ S:76

    %he Calclations of the earthing network are designed according to the 'ethod

    reco''ended in I,,, #tandard D" 6I,,, gide for safety in *C s)stations grondings7$

    ,arth 'at is covered for the proposed extension )ay and ! 'eter )eyond fencing$ %he ,arth

    'at designed for

  • 8/13/2019 for Ferke-11.4.11

    9/13

    (ightning Protection for the proposed extension )ay is done sing 1#E@5 shield wire

    )ased on +azevig 'ethod calclation and (C(P 6(ightning c' lighting pole7 is sed to protect the

    area which is not covered )y shield wire$

    Control roo' )ilding is protected )y sing 25xA'' or A5'' Copper condctor )ased on

    I#: 2A"@?!@D@ 6Indian #tandard Code of Practice for Protection against (ightning7$

    1rond electrodes of earthing syste' are !@'' .ia3 A' Copper clad steel rod electrode$

    For the yard protection3 /tside and inside zone is protected with shield wire at each

    e&ip'ent and condctor level$ %he control roo' )ilding is protected )y horizontal 'esh

    condctor fixed on the roof of the )ilding will not )e 'ore than 2"' x !"' in general$ orizontal

    'esh shold )e cla'ped on the roof )y sing 1I cla'ps at spacing of not 'ore than two 'eters$

    %he prpose of the control roo' )ilding protection is to esti'ate the n')er of (ightning

    electrodes and down condctors re&ired$ %he n')er of down condctor is o)tained )y thefollowing two criteria$

    i7 /ne pls an additional one for each A""'2or a part thereof3 in excess of the first !""'2

    ii7 /ne for each A"' of peri'eter of the strctre protected$

    %. I=6/7/9 S:76,

    Outdoor lighting ill'ination design is done sing C1 lx and Indoor (ighting is sing ajaj)ased on CIP 'anal$

    %he s) station and control roo' ill'ination syste' shall consist of the following:

    A( A@( I=6/7/9 L@ T:; 9> >/7=(

    In #)station/n e&ip'ent 5" lx !x

  • 8/13/2019 for Ferke-11.4.11

    10/13

    %he lighting syste' of a particlar area whether otdoor or indoor shold )e designed in sch a

    way that nifor' ill'ination is achieved$ *s far as possi)le any dark spots shold )e avoided$ %his

    re&ired carefl placing of the l'inaries3 selection of proper 'onting heights$

    ". AC D/7(/=7/9 9( & DC D/7(/=7/9 9(,

    ".1 AC D/7(/=7/9 9(,

    Inco'er spply for ,xtended *C. is taken fro' existing

    will )e provided with the following ratings

    for ! sec$ #ingle and three?phase *C #pply are needed in a s)station for Motor3 eating 9

    lighting spply$

    %he *C. with following /tgoing feeder ratings:

    a7 (ine ay M- 6

  • 8/13/2019 for Ferke-11.4.11

    11/13

    e7 +eactor ay C+P #pply?2 6!4*7 f7 (ine ay C+P #pply?2 6!4*7 g7 #C*.* Panel 6!4*7 h7 Fi)er optic panel 6!4*7 i7 #tation MI #erve 6!4*7

    j7 ,'ergency (ighting 6!4*7

    4$' DC D/7(/=7/9 9(,

  • 8/13/2019 for Ferke-11.4.11