Page 1: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

FIRST TRACECA INVESTMENT FORUMBrussels 12th October 2010Brussels, 12th October 2010

FOCSANI – ALBITA MOTORWAY SECTIONROMANIA

Page 2: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

FOCSANI – ALBITA MOTORWAY SECTION

Brussels, 12th October 2010 First TRACECA Investment Forum 2

Page 3: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

GOALS and Technical Parameters

TRACECA route- TRACECA route- Public Private Partnership- Quick access to neighboring countries and water waysQuick access to neighboring countries and water ways- Cost and Time savings- Environmentally friendly (reduced pollution)

- Technical DescriptionDesign speed: 130 km/hDesign speed: 130 km/hLength: aprox. 155kmConstruction period: 3 years

Brussels, 12th October 2010 First TRACECA Investment Forum 3

Page 4: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

SOCIO-ECONOMIC DESCRIPTION

• Value for Money – is the main key used to establish the concession oportunity especially the value given by project implementation oportunity, especially the value given by project implementation

• Better Safety Parameters – the technical requirements, will impose the safety geometrical elements, in line with best design & technologies;technologies;

• New Employment opportunities - During the construction phase, the employment (in the construction field) in the area will be increased covering the job needs in the area for at least 3 years of increased, covering the job needs in the area for at least 3 years of construction and then, for the operation.

Brussels, 12th October 2010 First TRACECA Investment Forum 4

Page 5: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

INVESTMENT AMOUNT AND REPAYMENT

• Estimated budget for construction • Estimated budget for construction 855 Million Euro

(without land acquisition , juridical services contract and design stage)( q , j g g )

• after finalising the Feasibility Study, it will be done an economic analysis to establish the needed revenues to cover the investment amout10 t th i iti l t• 10 years to recover the initial costs

Brussels, 12th October 2010 First TRACECA Investment Forum 5

Page 6: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

OTHER SOCIO-ECONOMIC DESCRIPTIONS

Brussels, 12th October 2010 First TRACECA Investment Forum 6

Page 7: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

SUMMARY

855 Mil Euro855 Mil. Euro

155 km Motorway155 km Motorway

HIGH GOVERNMENT SUPPORTThe project is included into Romanian transport strategyPart of the Romanian Master Plan NO DEPENDENCYNO DEPENDENCY on other projectsREADY FOR IMPLEMENTATIONAfter signing the concession/PPP, the contract frame will permit the immediateimplementation of the project

Brussels, 12th October 2010 First TRACECA Investment Forum 7

implementation of the project

Page 8: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

Brussels, 12th October 2010 First TRACECA Investment Forum 8

Page 9: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

FIRST TRACECA INVESTMENT FORUMBrussels, 12th October 2010

Chisinau-Gurgiulesti Motorway, Porumbrey-Cimislia S ti MLD2Section MLD2

Chisinau-Gurgiulesti Motorway, Comrat Bypass MLD3MLD3

Rep blic of Moldo aRepublic of Moldova

Page 10: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

Chisinau-Gurgiulesti Motorway, Porumbrey-Cimislia Section MLD2

Brussels, 12th October 2010 First TRACECA Investment Forum 10

Page 11: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

Chisinau-Gurgiulesti Motorway, Comrat Bypass MLD3

Brussels, 12th October 2010 First TRACECA Investment Forum 11

Page 12: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

GEOGRAPHICAL DESCRIPTION

• South of Republic of Chisinau-Giurgiulesti South of Republic of Moldova, connecting the Capital city, Romanian and Ukrainian borders

gMotorway

and Ukrainian borders, and the Giurgiulesti International Free Port (GIFP).

• GIFP - the only country access to the fluvial and maritime navigable ways.

Brussels, 12th October 2010 First TRACECA Investment Forum 12

maritime navigable ways.

Page 13: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

TECHNICAL DESCRIPTIONType of Improvement New alignmentL th f d 19 1 kLength of new road 19.1 kmEstimated travel speed 80 km/hTravel time in minutes 20 minTravel time in minutes 20 minTraffic in 2011 in (000) 3,600Improving Access Access provided to 3

villagesCongestion 2 lanes on 4 Lane

Right of WayRight-of WayLand ownership 64 ha of land need to

be acquired

Brussels, 12th October 2010 First TRACECA Investment Forum 13

be acquired

Page 14: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

TECHNICAL DESCRIPTIONType of Improvement New alignmentLength of new road 17.9 kmEstimated travel speed 80 km/hTravel time in minutes 18 minTravel time in minutes 18 minTraffic in 2011 in (000) 3,400Improving Access Access provided to Improving Access Access provided to

Comrat townCongestion 2 lanes on 4 Lane

Right-of WayLand ownership land needs to be

acquired

Brussels, 12th October 2010 First TRACECA Investment Forum 14

acquired

Page 15: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

SOCIO-ECONOMIC DESCRIPTION

Construction of the road will facilitate:Construction of the road will facilitate:• Trade• Transport• Industry and tourism development and • Strengthen access to agricultural markets • Securing transportation connections between the country's • Securing transportation connections between the country's

centre and its southern regions; • Will also provide for the employment of significant number of

population and• Stimulate the local economies.

Brussels, 12th October 2010 First TRACECA Investment Forum 15

Page 16: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

INVESTMENT AMOUNT AND REPAYMENT

• Investment Amount Euro 24 million MLD2Euro 16 million MLD3

• Repayment Period 15-20 years

• Source of Repayment State Budgetp y g

Brussels, 12th October 2010 First TRACECA Investment Forum 16

Page 17: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

OTHER SOCIO-ECONOMIC DESCRIPTIONS

• Feasibility Study completed in June 2009• Feasibility Study completed in June, 2009• Economic internal rate of return (30 years): 15.0%

The benefits of the project implementation:• Cost savings to transport operators 0.3 eur/vehicle • Cost savings to passengers 0.24 g p g

Eur/passenger• Time savings 15% less • Enhance environmental sustainability• Enhance environmental sustainability• Reduce air pollution, noise, accident rates.• The discount rate applied in the project is 12%.

Brussels, 12th October 2010 First TRACECA Investment Forum 17

Page 18: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

OTHER SOCIO-ECONOMIC DESCRIPTIONS

• The Feasibility Study completed in June, 2009y y p ,• Economic internal rate of return (30 years): 12.2%

The benefits of the project implementation:The benefits of the project implementation:• Cost savings to transport operators 0.28

eur/vehicle • Cost savings to passengers 0.22

eur/passenger• Time savings 20% less • Enhance environmental sustainability• Reduce air pollution, noise, accident rates.• The discount rate applied in the project is 12%• The discount rate applied in the project is 12%.

Brussels, 12th October 2010 First TRACECA Investment Forum 18

Page 19: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

SUMMARY• Investment Amount

24 Million Euro

The presented project Porumbrei to Cimislia isThe presented project Porumbrei to Cimislia is a shorter and more used route between Porumbrei and Cimislia and more attractive route compared to its alternativesroute compared to its alternatives.

It attracts more traffic and provides shorter travel time.

I i i fIt opens new opportunities for transport operators from the perspectives of Port development.

Brussels, 12th October 2010 First TRACECA Investment Forum 19

Page 20: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

SUMMARY• Investment Amount

16 Million EuroThe Comrat bypass alignment:

i h h h i i• is shorter than the existing• will allow long-distance trips to bypass the urban

section of Comrat. id t f C t li d ff th t ffi• residents of Comrat relieved off the traffic.

Since the bypass alignment is partially build and• limited negative social and environmental effects

of the construction (bypass alignment is partiallyof the construction (bypass alignment is partially build)

• new opportunities for transport operators from the perspectives of Port development

Brussels, 12th October 2010 First TRACECA Investment Forum 20

from the perspectives of Port development.

Page 21: FOCSANI – ALBITA MOTORWAY SECTION ROMANIA

Brussels, 12th October 2010 First TRACECA Investment Forum 21