  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    1/12

    Foam Bitumen Mixes for Base Layers-Laboratory and Field Study

    Dr. Sunil Bose, Head Flexible Pavements Division, CRRI-New DelhiShri Arun Gaur, Lecturer Civil Engineering Deportment, MNIT-Jaipur

    G Narendra Goud, Student M.Tech Transportation Engineering MNIT-Jaipur

    AbstractIn the dense populated cities like Delhi, where environmental pollution and Land fill

    problems are of prime concerns in the recent years. In rapid developing countries like India,

    where conservation and optimum utilization of the road building materials specially petroleumand mineral products are an important issue. There is an immediate attention requirement

    towards the development and implementation of Eco-friendly and cost effective pavementconstruction technologies. Through application of these technologies the efficient use of existing

    and waste materials can be made with out creating problems to the environment and at the sametime meeting the quality requirements of the pavements.

    Advances in technology and techniques in the in recent years have made cold recycling anincreasingly popular and cost-effective pavement construction and maintenance technique. In thepresent study an effort is made to study the laboratory and field behavior of recycled cold mixes

    with binder as foamed bitumen. The Marshall specimens were cast using foamed bitumen incombination with cement. The specimens were tested for Density, Indirect Tensile Strength,

    Resilient modulus and dynamic creep. Benkelman Beam deflection study was carried out on thepavement constructed with recycled foamed bituminous mix after a period of three months from

    construction and field cores were cut from the pavement and were investigated in the Laboratory.It was found that the pavement constructed with foamed bitumen treated RAP was structurally

    sound and cores cut from that pavement have shown higher ITS and MR values when comparedwith Laboratory cast cores but they shown less creep stiffness and densities.

    1.0 IntroductionIn the dense populated cities like Delhi, where environmental pollution and Land fill

    problems are of prime concerns in the recent years. In rapid developing countries like India,

    where conservation and optimum utilization of the road building materials specially petroleumand mineral products and energy are an important issues. The rehabilitation and up gradation of

    existing badly distressed Pavements due to rapidly growing heavy vehicular traffic are attractingthe concentration. There is an immediate attention requirement towards the development and

    implementation of Eco-friendly pavement construction technologies. Through application ofthese technologies the efficient use of existing and waste materials can be made with out creating

    problems to the environment and at the same time meeting the quality requirements of thepavements.

    Advances in technology and techniques in the in recent years have made cold recycling anincreasingly popular and cost-effective pavement construction and maintenance technique. It has

    been proved in abroad that cold recycling with foamed bitumen is one of the best alternatives tobe considered as a rehabilitation option. Cold recycling technology can be an option which has

    the potential to address the above mentioned issues.In the present study an effort is made to study the laboratory and field behaviour of

    recycled cold mixes with binder as foamed bitumen. The Marshall specimens were cast usingfoamed bitumen in combination with cement. The specimens were tested for density, Indirect

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    2/12

    Tensile Strength, Resilient modulus and dynamic creep. Benkelman Beam deflection study was

    carried out on the pavement constructed with recycled foamed bituminous mix after a period ofthree months from construction and field cores were cut from the pavement and were investigated

    in the Laboratory.

    2.0 Literature review

    2.1 Foam bitumenIn order to mix bitumen with road-building aggregates, you first need to considerably

    reduce the viscosity of the cold hard binder. Traditionally, this was done by heating the bitumenand mixing it with heated aggregates to produce hot mix asphalt. Other methods of reducing the

    bitumen viscosity include dissolving the bitumen in solvents and emulsification. Prof. Csanyicame up with the idea of introducing moisture into a stream of hot bitumen, which effects a

    spontaneous foaming of the bitumen (similar to spilling water into hot oil). The potential offoamed bitumen for use as a binder was first realised in 1956 by Dr. Ladis H. Csanyi, at the

    Engineering Experiment Station in Iowa State University. Since then, foamed asphalt technologyhas been used successfully in many countries, with corresponding evolution of the original

    bitumen foaming process as experience was gained in its use.

    Figure 1: schematic diagram of foamed bitumen production

    The foamed bitumen, or expanded bitumen, is produced by a process in which pressurized waterand compressed air is injected into the hot bitumen (155-180

    0c), resulting in spontaneous

    foaming. The physical properties of the bitumen are temporarily altered when the injected water,on contact with the hot bitumen, is turned into vapour which is trapped in thousands of tiny

    bitumen bubbles. In the foam state the bitumen has a very large surface area and extremely lowviscosity making it ideal for mixing with aggregates however the foam dissipates in less than a

    minute and the bitumen resumes its original properties. In order to produce foamed asphalt mix,the bitumen has to be incorporated into the aggregates while still in its foamed state. A distinct

    difference between foamed asphalt mixes and conventional asphalt stabilised mixes is the way inwhich the bitumen is dispersed through the aggregate. In the later case the bitumen tends to coat

    all particles whilst in the foamed mixes the larger particles are not fully coated. The foamedbitumen disperses itself among the finer particles forming a mortar which binds the mix together.

    2.2 Characterization of Foam bitumenFoamed bitumen is characterized by two primary properties:

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    3/12

    1. Expansion Ratio that is a measure of the viscosity of the foam and will determine howwell it will disperse in the mix. It is calculated as the ratio of the maximum volume offoam relative to its original volume

    2. Half-Life is a measure of the stability of the foam and provides an indication of the rateof collapse of the foam. It is calculated as the time taken in seconds for the foam to

    collapse to half of its maximum volume.The best foam is generally considered to be the one that optimizes both expansion and half-life.

    Figure 2: Bitumen Foam characterization

    2.3 Action of FoamixUnlike hot-mix asphalt, material stabilised with foamed bitumen does not appear black.

    This result from the coarser particles of aggregate not was being coated with bitumen. When

    foamed bitumen comes into contact with aggregate, the bitumen bubbles burst into millions oftiny bitumen droplets that seek out and adhere to the fine particles, specifically the fraction

    smaller than 0.075 mm. The bitumen droplets can exchange heat only with the filler fraction andstill have sufficiently low viscosity to coat the particles. The foamed mix results in a bitumen-

    bound filler that acts as a mortar between the coarse particles, as shown in Figure 3. There istherefore only a slight darkening in the color of the material after treatment. The addition of

    cement, lime or other such fine cementitious material (100 % passing the 0.075 mm sieve) assiststhe bitumen to disperse, in particular where the recycled material is deficient in fines.

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    4/12

    Figure 3: Foamed bitumen dispersion and binding in the treated mix

    2.4 Material suitability for foamed bitumen treatment

    The foamed bitumen process is suitable for treating a wide range of materials, rangingfrom sands, through weathered gravels to crushed stone and RAP. Aggregates of sound and

    marginal quality, from both virgin and recycled sources have been successfully utilized in theprocess in the past. As depicted in Figure 4, the minimum requirement is 5% passing the 0.075

    mm (No. 200) sieve. When a material has insufficient fines, the foamed bitumen does notdisperse properly and tends to form what are known as stringers (bitumen rich agglomerations

    of fine material) throughout the recycled material. These stringers vary in size according to thefines deficiency, a large deficiency will result in many large stringers which will tend to act as a

    lubricant in the mix and lead to a reduction in strength and stability.

    Figure 4: Material gradation envelops

    Material that is deficient in fines can be improved by the addition of cement, lime or other suchmaterial with 100 % passing the 0.075 mm sieve. However, the use of cement in excess of 1.5 %

    by mass should be avoided due to the negative effect on the flexibility of the stabilised layer. Theenvelopes provided in Figure 4 are broad and can be refined by targeting a grading that provides

    the lowest voids in the mineral aggregate. This produces foamed bitumen mixes with the mostdesirable mix properties. A unique relationship for achieving the minimum voids, with an

    allowance for variation in the filler content, is shown in equation. This relationship is useful as itprovides flexibility with the filler content of a mixture. A value of n = 0.45 is utilised to achieve

    the minimum voids.

    Where: d = selected sieve size (mm)

    P = percentage by mass passing a sieve of size d (mm)D = maximum aggregate size (mm)

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    5/12

    F = percentage filler content (inert and active)

    n = variable dependent on aggregate packing characteristics (0.45)Achieving a continuous grading on the fraction less than 2 mm is important for the proper

    dispersion of the foamed bitumen and easier compaction, thereby reducing voids and thematerials susceptibility to water ingress. Where necessary, therefore, consideration should be

    given to blending two materials to improve the critical grading characteristics.Moisture Conditions: The moisture content during mixing and compaction is considered by many

    researchers to be the most important mix design criteria for foamed asphalt mixes. Moisture isrequired to soften and breakdown agglomerations in the aggregates, to aid in bitumen dispersion

    during mixing and for field compaction. Insufficient water reduces the workability of the mix andresults in inadequate dispersion of the binder, while too much water lengthens the curing time,

    reduces the strength and density of the compacted mix and may reduce the coating of theaggregates. The optimum moisture content (OMC) varies, depending on the mix property that is

    being optimized (strength, density, water absorption, swelling). However, since moisture iscritical for mixing and compaction, these operations should be considered when optimizing the

    moisture content. The optimum mixing moisture content occurs in the range of 65 - 85 per cent ofthe modified AASHTO OMC for the aggregates.

    Curing Conditions: Studies have shown that foamed asphalt mixes do not develop their fullstrength after compaction until a large percentage of the mixing moisture is lost. This process is

    termed curing. Curing is the process whereby the foamed asphalt gradually gains strength overtime accompanied by a reduction in the moisture content. A laboratory mix design procedure

    would need to simulate the field curing process in order to correlate the properties of laboratory-prepared mixes with those of field mixes. Since the curing of foamed asphalt mixes in the field

    occurs over several months, it is impractical to reproduce actual field curing conditions in thelaboratory. Most of the previous investigations have adopted the laboratory curing procedure

    proposed by Bowering (1970), i.e. 3 days oven curing at a temperature of 60 C. This procedureresults in the moisture content stabilizing at about 0 to 4 per cent, which represents the driest state

    achievable in the field. In the present study the specimen are cured for 72 hours at 400C

    temperature only.

    3.0 Laboratory and Field studies3.1 Material evaluation

    Representative sample of pulverized and air dried Reclaimed Asphalt Product (RAP)and Crusher stone dust were collected from stock piles and then sieved through a set of sieves for

    gradation. The details of sieve analysis are presented in tables 1 and 2. Bitumen content andmoisture content of air dried RAP found to be 5.2% and 0.12% respectively. Moisture content

    and specific gravity of air dried Stone Dust found to be 0.40% and 2.68 respectively. Based onpulverized RAP and stone dust gradation their proportions were fixed (RAP:Stone

    dust::55%:45%) to meet the gradation requirements for Foamed bitumen treatment. Figure 5

    shows the gradation envelops.

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    6/12

    0

    20

    40

    60

    80

    100

    0.01 0.1 1 10 100sieve size, mm (log scale)

    Percenta

    gepassing

    lowerlimit

    upperlimit

    combined achieved

    RAP

    stone dust

    Figure 5: Gradation envelops

    Table 1: Sieve analysis of pulverized and air-dried RAPsieve size, mm 37.5 26.5 19 13.2 9.5 6.7 4.75 2.36 1.18 0.6 0.425 0.3 0.075 pan

    cumulative % passing 100.0 99.2 95.0 74.7 52.1 39.1 29.1 16.6 7.5 5.3 3.4 2.0 0.2 0.0

    Table 2: Sieve analysis of Stone Dustsieve size, mm 6.7 4.75 2.36 1.18 0.6 0.425 0.3 0.075 pan

    cumulative % passing 100.00 93.40 72.00 50.60 43.60 35.80 26.20 9.00 0.00

    OMC Determination for Foamed Bitumen Treatment: The pulverized and air dried RAP is

    separated in to three different fractions (i.e. P-19mm & R-13.2mm, P-13.2mm & R4.75mm andP-4.75). The proportioned and un-treated material was used to find Optimum Moisture Content

    with modified Proctor compaction effort for foamed bitumen treatment. The Optimum MoistureContent found to be 8.75% with a Maximum Dry Density of 2.09 g/cc. The mixing moisture

    content of proportioned material was decided based on optimum moisture content and air driedfield sample moisture content to prepare foamix.

    Foamed Bitumen Characterization: The Study of foamed bitumen and its characterization waiscarried out using Wirtgen Foam bitumen Laboratory plant, WLB-10. The Foamability and the

    variation of foam characteristics viz. expansion ratio and half life time were observed at differentair pressures, temperatures and Bitumen water contents. The bitumen used was of 80/100

    penetration grade. The figure xx shows variation of Half life time and Expansion ratio withBitumen water at 4.5 bars air pressure and 165

    oC bitumen temperature. Optimum foam

    producing bitumen water found to be 3.3% by weight of bitumen.

    3

    4

    5

    67

    8

    9

    10

    11

    12

    2.0 2.5 3.0 3.5 4.0 4.5Bitumen water content, %

    Expansion

    ratio

    0

    1

    2

    34

    5

    6

    7

    8

    9

    Halflife

    ,seconds

    exp ratio

    half life

    Figure 5: Bitumen water content Influence on expansion ratio and half life time of Foamed

    bitumen

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    7/12

    3.2 Foamix preparation and specimens castingThe graded material and filler cement was mixed using pug-mill type mixer Initially dry mixing of

    proportioned material was carried out for 10 to 15 seconds then additional water was added and then in to

    that mix foamed bitumen was sprayed using WLB-10, after setting the calculated and determined

    parameters on the laboratory plant. Foam bitumen quantity varied from 2 to 5% with 1% interval and

    cement varied from 0 to 3% with 1% interval. The Marshall Specimens were cast with the mixture,

    the number of blows applied were 75 on each side.

    3.3 Specimens conditioning and testingThe Marshall specimen prepared with formulated material have been tested for Bulk

    Density, Resilient modulus (MR) and Indirect Tensile Strength (ITS) after a curing period of 24hours at room temperature in mold and 72 hours at 40

    0C after taken out of mold. And testing was

    carried out at room temperature only. Duplicate samples were tested for soaked Indirect TensileStrength after a soaking period of 24 hours in water bath at ambient temperature. Indirect Tension

    Test for Resilient Modulus was carried out at a repetitive load 100 N, frequency 0.1 Hertz and ata temperature of 25

    0C. The test results of bulk density, indirect tensile strength and Indirect

    Tension test for Resilient Modulus are presented in table 3. Field cores cut from the Foamedbitumen treated recycled pavement layer were tested for Bulk Density, Resilient modulus (MR),

    Indirect Tensile Strength (soaked and un-soaked) and dynamic creep resistance. Some Laboratorycast specimens were also tested for dynamic creep resistance since the uniaxial unconfined creep

    test is effective in identifying the sensitivity of asphalt mixtures to permanent deformation orrutting. Dynamic creep test was conducted under unconfined conditions at a temperature of 400C. The Specimens were placed in the temperature control cabinet for a minimum period of two

    hours for conditioning the specimen to achieve test temperature before testing. The contact stress

    of 3 kPa was applied for 0.1 second and rest period of 0.9 second at a frequency of 1 Hz. Theload was applied for a maximum of 3600 cycles. The results of Dynamic creep test on lab and

    field cores presented below in table 4.The values of Resilient modulus were plotted in graphs (Figure 6) and then linear trend

    lines were drawn to observe the variation in MR with foam bitumen and active filler. It wasobserved from the graphs that the increase in foam bitumen and increase in cement increased the

    MR but at higher cement contents and at higher foam bitumen contents increase in MR was notmuch significant. The optimum cement content ranges from 1 to 2% and optimum foam bitumen

    content ranges from 3 to 4%. The maximum MR values observed was 2372 MPa at 1% cementand 5% foam bitumen and 2350 MPa at 3% cement and 3% foam bitumen.

    The ITS values were increased and then decreased with increase in foam bitumen. Theaddition of cement increased the ITS values significantly. Maximum ITS observed was 510 kPa

    at 3% cement and 4% foam bitumen (Figure 7). The specimens with cement were observed to bevery less susceptible to moisture as it was observed from soaked ITS of the specimens.

    Table 3: Test results of Marshall Specimens of Foamix

    ITS, kPaMold

    ID

    Filler

    type

    Filler,

    %

    Foamed

    Bitumen, %

    Bulk

    Density,

    g/cc

    Average

    Bulk

    Density, g/cc

    Resilient

    Modulus,

    MPa

    Mean Resilient

    Modulus, MPaDry Soaked

    TSR,

    %

    0/2/1 2.107 1211 316.74

    0/2/22

    2.0632.085

    14251318

    183.4158

    0/3/1 2.114 2090 353.89

    0/3/2

    0%

    32.182

    2.148800

    1445259.87

    73

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    8/12

    0/4/1 2.134 1845 372.66

    0/4/24

    2.1322.133

    15281687

    322.4187

    0/5/1 2.129 2544 402.01

    0/5/25

    2.1312.130

    17652155

    318.3179

    1c/2/1 Cement 2.340 2519 329.83

    1c/2/2 Cement2

    1.9642.152

    15172018

    292.9489

    1c/3/1 Cement 2.188 2585 390.23

    1c/3/2 Cement3

    2.1272.158

    22502417

    405.37104

    1c/4/1 Cement 2.126 2132 437.23

    1c/4/2 Cement4

    2.1252.125

    23622247

    387.0489

    1c/5/1 Cement 2.148 2335 450.46

    1c/5/2 Cement

    1%

    52.074

    2.1112464

    2399343.44

    76

    2c/2/1 Cement 2.144 2094 435.79

    2c/2/2 Cement2

    2.1402.142

    22442169

    305.2370

    2c/3/1 Cement 2.161 2188 448.34

    2c/3/2 Cement3

    2.1392.150

    22012195

    403.7690

    2c/4/1 Cement 2.152 2278 519.35

    2c/4/2 Cement

    4

    2.155

    2.153

    2286

    2282

    376.00

    72

    2c/5/1 Cement 2.126 2300 359.33

    2c/5/2 Cement

    2%

    52.077

    2.1012253

    2277301.16

    84

    3c/2/1 Cement 2.163 1957 484.19

    3c/2/2 Cement2

    2.1202.141

    20281993

    433.8390

    3c/3/1 Cement 2.117 2494 494.21

    3c/3/2 Cement3

    2.1212.119

    18022148

    426.5786

    3c/4/1 Cement 2.114 2058 512.92

    3c/4/2 Cement4

    2.1182.116

    22872173

    402.8279

    3c/5/1 Cement 2.110 2258 500.38

    3c/5/2 Cement

    3%

    52.095

    2.1022390

    2324382.34

    76

    Field cores

    1 Cement 1.5% 3.5% 2.110 3350 525.8072

    2 Cement 1.5% 3.5% 2.090 2374 403.3839

    3 Cement 1.5% 3.5% 2.108 3416 342.1538

    4 Cement 1.5% 3.5% 2.035

    2.090

    2302

    2861

    258.0461

    155

    Table 4: Dynamic creep Test results of Foamix

    S.NO Mold description

    Creep

    stiffness,

    MPa

    Total accumulated axial

    strain at 1 hour of

    loading, %

    Remarks

    1 1.5% Cement, 3.5% Foamed bitumen 464.7 0.015 No failure

    2Field core of 1.5% cement, 3.5% Foamed

    bitumen30.5 0.222

    No failure

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    9/12

    Variation of MR with Foamed Bitumen and Cement

    500

    750

    1000

    1250

    1500

    1750

    2000

    2250

    2500

    2750

    3000

    3250

    3500

    1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5

    Foamed bitumen, %

    Resilientmodulus,MPa

    0% Filler

    1% Cement

    2% Cement

    3% Cement

    Figure 6: variation of Resilient modulus with foamed bitumen and cement

    Variation of Dry ITS with Foamed bitumen and cement

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    550

    1.5 2 2.5 3 3.5 4 4.5 5 5.5Foamed bitumen, %

    DryITS,KPa

    0% Filler

    1% Cement

    2% Cement

    3% Cement

    Figure 7: variation of ITS with foamed bitumen and cement

    3.4 BBD study on RAP Foamix pavementBenkelman beam deflection study has been carried out on the pavement constructed with

    Recycled mix of Foamed bitumen in Kumbalgodu industrial area, Bangalore after three monthsof construction i.e. in the month of March 2006. The interval of deflection measurement points

    was selected as 30 meters and initial point was marked at a distance of 10 meters from the zeroChainage of the Road (i.e. SH-17 Junction). The pavement temperature observed was 37

    0C, The

    PI value and moisture content of sub-grade soil found to be 14% and 17% respectively. Thetemperature correction factor and moisture correction factor applied were -0.02 and 1.1

    respectively. The average characteristic rebound deflection of the pavement found to be 1.17mm.

    Table 5: Deflection data (LHS, towards Karnataka cold Storage Pvt. ltd)Chainage, km & m 00+010 00+040 00+070 00+100 00+130 00+160 00+190 00+220 00+250 00+280 00+310

    Distance, m 10 40 70 100 130 160 190 220 250 280 310

    Corrected Rebound

    Deflection, mm0.89 0.66 1.18 0.37 0.62 0.65 0.31 0.62 0.37 1.03 1.31

    Table 6: Deflection data (RHS, towards Karnataka cold Storage Pvt. ltd)Chainage, km & m 00+010 00+040 00+070 00+100 00+130 00+160 00+190 00+220 00+250 00+280 00+310

    Distance, m 10 40 70 100 130 160 190 220 250 280 310

    Corrected Rebound

    Deflection, mm1.2 0.99 1.01 1.16 0.33 0.62 1.06 1.32 1.23 1.14 0.57

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    10/12

    4.0 ConclusionsThe following conclusions were drawn based on the studies performed on foamed

    bitumen treated RAP in laboratory and Field.

    When recycling with foam bitumen mixing moisture content should be around

    60% of OMC as per Wirtgen Cold Recycling Manual, however observing the material

    it can be varied from 50 to 65% to reduce problems in compacting the mixLoss of strength on soaking is very less with foamed bitumen and cement treated

    material, in most of the cases the tensile strength ratio ranges from 70 to 100% and it

    is 155% in case of field cores

    Cores cut from the foamed bitumen treated pavement have shown higher ITS and MR

    values in comparison with laboratory cast cores

    Dynamic creep stiffness of Cores from the field was very less in comparison with

    laboratory cast cores but they were comparable to HMA cores, which needs to be

    further examined before any conclusions are drawn.

    Benkelman beam deflection study on foamed bitumen treated pavement shows that it

    was structurally sound with an average characteristic rebound deflection of 1.17mm

    and no functional failure was observed even in the absence of surface course

    Foam bitumen treated mixes can be one of the considerable options for base courses

    in a flexible pavement structure since it requires a surface course

    AcknowledgementsThe authors are grateful to the director for granting permission to publish this paper. Thanks are

    also due to M/S Wirtgen India Pvt. Ltd. For supporting during foamix study and NagarjunaConstruction Company for the help rendered during field study.

    ReferencesWebsites

    www.asphalt.csir.co.za www.arra.org www.infratech.com www.wirtgen.com www.betterroads.com www.asphaltwa.com/wapa www.trb.orgReports and papers

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    11/12

    1. Wirtgen cold recycling manual-2004

    2. Wirtgen job reports3. CAPSA'99 - Muthen et al: Foamed Asphalt Mixes Mix Design Procedure

    4. Ramanujam, J.M. & Fernando, D.P. 1997. Foamed Bitumen Trial at Gladfield-CunninghamHighway. In: Proceedings of the Southern Region Symposium, Australia, 1997.

    5. CAPSA'99 - Jenkins et al: Characterisation Of Foamed Bitumen6. Acott, S.M. & Myburgh, P.A. 1983. Design and performance study of sand bases treated with

    foamed asphalt. In: Low-volume roads: third international conference. Washington, DC:(Transportation Research Record; 898), pp 290-296.

    7. Acott, S.M.1979. Sand stabilisation using foamed bitumen. In: 3rd Conference on AsphaltPavements for Southern Africa, 3rd, 1979, Durban, pp.155-172.

    8. Akeroyd, F.M.L. & Hicks, B.J. 1988. Foamed Bitumen Road Recycling. Highways, Volume56, Number 1933, pp 42, 43, 45.

    9. Akeroyd, F.M.M. 1989. Advances in foamed bitumen technology. In: Fifth conference onasphalt pavements for Southern Africa; CAPSA 89, held in Swaziland, 5-9 June 1989, Section 8,

    pp 1-410. Bissada, A.F. 1987. Structural response of foamed-asphalt-sand mixtures in hot

    environments. In: Asphalt materials and mixtures. Washington, DC: Transportation ResearchBoard. (Transportation Research Record, 1115), pp 134-149.

    11. Bowering, R.H. & Martin, C.L. 1976. Foamed bitumen production and application ofmixtures, evaluation and performance of pavements. in: Proceedings of the Association of

    Asphalt Paving Technologists, Vol. 45, pp. 453-477.12. Bowering, R.H. 1970. Properties and behaviour of foamed bitumen mixtures for road

    building. In: Proceedings of the 5th Australian Road Research Board Conference, held inCanberra, Australia, 1970, pp. 38-57.

    13. Bowering, R.H. & Martin, C.L. 1976. Performance of newly constructed full depth foamedbitumen pavements. In: Proceedings of the 8th Australian Road Research Board Conference, held

    in Perth, Australia, 1976.14. Brennen, M., Tia, M., Altschaeffl, A.G. & Wood, L.E. 1983. Laboratory investigation of the

    use of foamed asphalt for recycled bituminous pavements. In: Asphalt materials, mixtures,construction, moisture effects and sulfur. Washington, DC: Transportation Research Board.

    (Transportation Research Record; 911), pp 80-87.15. Castedo-Franco, L.H., Beaudoin, C.C., Wood, E.L. & Altschaeffl, A.G. 1984. Durability

    characteristics of foamed asphalt mixtures. In: Proceedings of the 29th Annual CanadianTechnical Asphalt Association Conference, held in Montreal, Canada, 1984.

    16. Collings, D. 1997. Through foaming it's possible to mix hot asphalt with cold, dampaggregate. Asphalt Contractor, June 1997 (Article based on the presentation at the 1997

    ARRA annual meeting, San Antonio, TX).17. Joubert, G., Poolman, S. & Strauss, P.J. 1989. Foam bitumen stabilised sand as an

    alternative to gravel bases for low volume roads. In: 5th Conference on AsphaltPavements for South Africa (CAPSA 89), Proceedings held in Swaziland, 5-9 June, 1989,

    Section 8, pp21-5.18. Lancaster. J., McArthur, L. & Warwick, R. 1994. VICROADS experience with foamed

    bitumen stabilisation. In: 17th ARRB Conference, Proceedings held in Gold Coast,Queensland, 15-19 August, 1994, Volume 17, Part 3, pp193-211.

    19. Lee, D.Y. 1981. Treating marginal aggregates and soil with foamed asphalt. In:Proceedings of the Association of Asphalt Paving Technologists, Vol. 50, pp 211-150.

  • 8/4/2019 Foam Bitumen Agra Seminar Paper

    12/12

    20. Little, D.N., Button, J.W. & Epps, J.A. 1983. Structural properties of laboratory mixtures

    containing foamed asphalt and marginal aggregates. In: Asphalt materials, mixtures, construction,moisture effects, and sulfur. Washington, DC: Transportation Research Board. (Transportation

    Research Record; 911), pp 104-113.21. Maccarrone, S., Holleran, G., Leonard. D.J. & Hey, S. 1994. Pavement Recycling using

    Foamed Bitumen. In: 17th ARRB Conference, Proceedings held in Gold Coast, Queensland, 15-19 August, 1994, Volume 17, Part 3, pp 349-365.

    22. Maccarrone, S., Holleran, G, & Leonard, D.J. 1993. Bitumen Stabilisation - A New ApproachTo Recycling Pavements. In: AAPA Members Conference, 1993.

    23. Maccarrone, S., Holleran, G. & Ky, A. 1995. Cold Asphalt Systems as an Alternative to HotMix. In: 9th AAPA International Asphalt Conference.

    24. Roberts, F.L., Engelbrecht, J.C. & Kennedy, T.W. 1984. Evaluation of recycled mixturesusing foamed asphalt. In: Asphalt mixtures and performance. Washington, DC: Transportation

    Research Board. (Transportation Research Record; 968), pp 78-85.25. Foamix asphalt advances by Ruckel, P.J. ... [et al]. In: Asphalt Pavement Construction: New

    Materials and Techniques. Philadelphia, PA: American Society for Testing and Materials (ASTMSTP; 724), pp. 93-109.