fmp event - using property rationalisation to achieve flexible working and business savings - sandra...
TRANSCRIPT
![Page 1: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/1.jpg)
Delivering Transformation. Together.
USING PROPERTY RATIONALISATION TOACHIEVE FLEXIBLE WORKING ANDBUSINESS SAVINGSOctober 2015
![Page 2: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/2.jpg)
Title presentation2
THE CHALLENGE
Where we were: A property portfolio that no longer matched the needs of the business Too many buildings Under utilisation Heavy property costs
The Challenge: To reduce the size of the property portfolio To cut costs To improve the working environment
![Page 3: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/3.jpg)
Title presentation3
WHY DID WE CHOOSE TO IMPLEMENT FLEXIBLE WORKING?
2 floors in London
Low utilisation rates
Staff ‘owning’ desks, even empty ones
Work styles out of date for our business
Dated image
Expensive accommodation costs‐ Opportunity to break a lease
![Page 4: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/4.jpg)
Title presentation4
UTILISATION DESKING
![Page 5: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/5.jpg)
Title presentation5
UTILISATION ROOMS
![Page 6: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/6.jpg)
Title presentation6
APPROACH TO IMPLEMENTATION, BENEFITS?
Analysis of occupations Internal External (Steelcase workscan project)
‐ General staff‐ Leadership workshop
Identify ‘art of the possible’
Business case
Staff consultation
Fit out
Survey
![Page 7: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/7.jpg)
Title presentation7
WORK SETTINGS
Fixed desks; Reduced allocation i.e. Account 1: 59 to 30
Flexible desks
Meeting rooms; Large, Small, Focus
No offices
Drop down areas
Technology areas
Break out areas
Print hubs
![Page 8: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/8.jpg)
Title presentation8
EQUIPMENT
Video conferencing
Room wizards
Kiosks
Smart boards
Eno boards
Interactive technology areas Multi user
IPT telephony
![Page 9: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/9.jpg)
Title presentation9
TOOLS
Resource Scheduler Set up
‐ Rules or work settings‐ Security groups‐ Administrations
Using‐ Linked to Lotus‐ Linked to Notes‐ Intranet‐ Kiosk‐ Room wizards
![Page 10: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/10.jpg)
Title presentation10
THE RESULTS
A modern new work space with great flexibility
Reduction in the London footprint
Reduction in overhead costs
A template to roll out elsewhere
![Page 11: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/11.jpg)
Title presentation11
QUESTIONS
![Page 12: FMP Event - Using property rationalisation to achieve flexible working and business savings - Sandra Flannery](https://reader036.vdocuments.site/reader036/viewer/2022070519/58f03d531a28abd7708b45c1/html5/thumbnails/12.jpg)
Title presentation12
Delivering Transformation. Together.