FLOOD MANAGEMENT IN THE PHILIPPINES:
THE METRO MANILA CASE
- December 5, 2012 -
Republic of the Philippines
Department of Public Works and Highways
Manila
1
The views expressed in this paper are the views of the authors and do not necessarily reflect the views or policies of theAsian Development Bank (ADB), or its Board of Directors, or the governments they represent. ADB does not guarantee theaccuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology
used may not necessarily be consistent with ADB official terms.
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 2/32
2
The PhilippinesFlood Disaster Data
7,107 islands
Land Area : 298,170 km2
Population : 85 Million
Annual rainfall : 2,400 mm
92.5% of disasters caused by
typhoons
Intense Rainfall Strong Winds
Overflowing of Waterways
Disrupt Normal Living
Conditions
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 3/32
3
18 Major River Basins
Catchment Area > 1,400 km2
421 Principal River Basins
Catchment Area > 40 km2
With intense rainfall:
overflowing of waterways
inundation and deposition of sediment in flood plains
extensive flood damages
often result.
River Basins in the Phil
ippines
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 4/32
4
Causes of Flooding
Denuded watersheds
Illegal loggingInformal Settlements
Inaccessible waterways
Limited channel capacity
Indiscriminate dumping of wastes
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 5/32
5
Marikina River water level rapidly rose 4.6 m in 6 hours at
Marikina Bridge on September 26, 2009 due to
approximately 400 mm rainfall in 6 hours.Also, Laguna Lake water level rose from Elev. 12.90 m at
9:00 AM on September 26, 2009 to Elev. 13.84 m in 24
hours.
5,000
4,150
3,500
3,000
500
1,200
Inflow:
7,000m3 /s
Sierra Madre Mountains
Flood in Pasig-Marikina-Laguna Lake Basin by “Ondoy” (Unit: m3/s)
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 6/32
6
Flood Condition by
“Ondoy” in Pasig-
Marikina River Area
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 7/327
DPWH History of Flood Control
Mitigation Efforts in Metro ManilaCompleted and On-Going Studies and Projects :
1. The first Study was undertaken after the flood in November 1942
2. The Study resumed after the Battle of Manila and covered North Manila Watershed (2,176 has) and South ManilaWatershed (2,908 has)
3. Study on the Drainage of Metro Manila and Suburbs (1954)
4. Construction of first seven (7) Pumping Stations (Completed in 1978)
5. Napindan Hydraulic Control Structure (Completed in 1983)
6. Study on Metro Manila Integrated Urban Drainage and Flood Control Master Plan (1984)
7. Mangahan Floodway Project (Completed in 1988)
8. Construction of additional five (5) Pumping Stations (Completed in 1990)
9. Study on Flood Control and Drainage Project in Metro Manila (1990)
10. Metro Manila Flood Control Project II (Completed in 1998)
11. The Study on the Existing Drainage Laterals in Metro Manila (2000)
12. Effective Flood Control Operation & Warning System (EFCOS) Project (Completed in 1993 & Rehabilitated in 2002)
13. The Study on Drainage Improvement in the Core Area of Metro Manila (2005)
14. Metro Manila Flood Control Project - West of Mangahan Floodway (Completed in 2008)15. KAMANAVA Area Flood Control and Drainage System Improvement Project, Phase I (Completed in 2012)
16. Pasig-Marikina River Channel Improvement Project, Phase II (To be Completed)
Proposed Projects:
1. Pasig-Marikina River Channel Improvement Project, Phase III (To be Started)
2. Projects under the Master Plan Study on Flood Risk Management in Metro Manila and Surrounding Areas (until 2035)
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 8/32
8
Boundary of
Study Area and
the River Basins
Based on river basins:
Pasig-Marikina River
Basin and Laguna Lake
Basin.
Total area: 4,354 km2
Total Population: 17.1 M
635 km2
72 km2
69 km2
169 km2
3280 km2
95 km2
15 km2
19 km2
8
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 9/32
9
Level-1
Low
Level-2
Medium
Level-3
High
Level-4
Very High
Total
1-4
Overflow from
Major rivers1,210 929 696 175 3,010
Around Laguna Lake 140 7 294 0 441
Flood Risk Map on Danger of Casualty-Risk Level(100-year Flood for the Rivers, and 2009 water level for Laguna Lake)
Population exposed to Flood Risk (unit:1000)
Note:
Estimated population in Flood
Risk Level-3 & 4.:773,940 in NCR
294,000 in Laguna Lake
9
- Low Risk of Casualty- Medium Risk of Casualty
- High Risk of Casualty
- Very High Risk of Casualty
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 10/32
1010
Three Major Flooding
Occurrence:
(1) Huge volumeof watercoming fromSierra Madre
(2) Drainagecapacityconstraints incore area of Metro Manila
(3) Low lyingcommunitiesaround
Manila Bay &Laguna Lake
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 11/32
11
1,000
850(750**)
600
Dredging
Heightening of Wall
Small Marikina Dam
Retarding Basin
Flood Wall
Dike and Excavation
RAM & Small Wall
RAM & FPM
FPM
Flood Wall
900
2,000
1,000
Rehabiritation of
Floodway
3,600
RAM & Small Wall
Retarding Basin
1,750
2,900
3,000
1,200
800 (600*)
1,800
2,400
Dam
11
RAM – River Area Management
FPM – Flood Plain Management
Rehabilitation of
Floodway
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 12/32
12
Flood Condition without Project
Existing Condition
(100-year Return Period)
Flood Condition with Project
River Improvement and
Large Flood Control Dam
(100-year Return Period)
Pasig-Marikina RiverPasig-Marikina River
12
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 13/32
1313
Proposed Components
and Measures in
DICAMM
Rehabilitation of 15 MajorPumping Stations
Rehab. of Drainage Channel
• Removal of Obstructions
within drainage channels
with settlements• Dredging and Declogging
• Rehab. of Drainage Mains
Additional Drainage Mains /
Box Culverts
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 14/32
14
Laguna Lakeshore: Long-list of AlternativesPasig
Mangahan
Tanay
Sta. MariaParañaque
Zapote
P'que Spillway
Sta. RosaSta. Cruz
Pagsanjan
San Cristobal
San Juan
Im provem ent of St.
M aria River
Im provem ent of
Pagsanhan River
Spillway to P acific
O cean by Tunnel
Im provem ent of Sta.
C ruz R iver
Im provem ent of Sta.
Rosa River
Parañaque River
Im provem ent
Im provem ent of Sta.
Rosa River
Parañaque River
Im provem ent
Im provem ent of San
Fuan
Ring R oad D ike
Parañaque Spillway
:Partial Land Reclamation
Dredging
Partial Lake S hore D ike &Land Rising
Im provem ent of Tanay
River
14
Improvement of San
Juan River
Improvement of Sta.
Maria River
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 15/32
15
Options for the Lakeshore Area from Taguig to Muntinlupa
Option-1: Image of Lakeshore Dikewith Road
Option-2: Image of Raising Lakeshore Landwith Road and Future Developments
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 16/32
16
Short-listed Structural Mitigation Measures (1/3)No. Item High-
est
Flood
Risk
Level
Target
Flood
Safety
(R.P.)
Total
Cost
(Mil.
Pesos)
EIRR Resettle
ment
(1000
person)
Benefici
ary
(1000
person)
Preliminary
Environmental
Assess. (except
negative impact
of resettlement)
1(VH)
Pasig-Marikina
River
Improvement (RI)
+ Dam
4 100-y 198,435 16.4% 331 1,593 Moderate due
to some
negative social
impact by dam
(possible)
2(H)
Meycauayan RI 3 50-y 14,040 22.9% 35 199 Positive due to
improve. envir.
(recommended)
3(H)
Malabon-Tullahan
RI
3 50-y 21,635 22.3% 39 298 Positive due to
improve. envir.
(recommended)
4(M)
South Parañaque –
Las Piñas RI
3 30-y 17,335 12.2% 30 104 Positive due to
improve. envir.
(recommended)
5(H)
East Mangahan
Floodway (Cainta
& Taytay RIs)
3 30-y 25,901 26.8% 25 227 Positive due to
improve. envir.
(recommended)
Priority (Tentative) VH: Very High, H: High, M: Marginal
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 17/32
17
Short-listed Structural Mitigation Measures (2/3)
No. Item High-
est
Flood
Risk Level
Target
Flood
Safety
(R.P.)
Total
Cost
(Mil.
Pesos)
EIRR Resettle
ment
(1000
person)
Benefici
ary
(1000
person)
Preliminary
Environmental
Assess. (except
negative impactof resettlement)
6(VH)
West Laguna
Lakeshore Land
Raising
3 60-y 25,185 17.2% 114 114 Positive due to
improvement of
environment
and potential
of development
(recommended)
7(H)
Land Raising for
Small Cities around
Laguna Lakeshore
3 60-y 7,158 17.2% 8.8 8.8 Positive (same
as 6)
(recommended
and to be
studied more)
8(H)
Improvement of the
Inflow Rivers to
Laguna Lake
3 30-y 637 N.A. N.A. N.A. Positive due to
improve. of
environment
(recommended
and to be
studied more)
Priority (Tentative) VH: Very High, H: High, M: Marginal
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 18/32
18
Short-listed Structural Mitigation Measures (3/3)
No. Item High-
est
Flood
Risk Level
Target
Flood
Safety
(R.P.)
Total
Cost
(Mil.
Pesos)
EIRR Resettle
ment
(1000
person)
Benefici
ary
(1000
person)
Preliminary
Environmental
Assess. (except
negative impactof resettlement)
9(H)
Manila Core Area
Drainage
Improvement
2 10-y 27,257 19.1% 24 270 Positive due to
improvement of
environment
(recommended)
10(M) West MangahanArea Drainage
Improvement
2 5-y 5,522 11.1% 3.2 25.6 Positive due toimprovement of
environment
(recommended)
11 Valenzuela,
Obando and
Meycauayan
(VOM) Improve.(to
be studied further)
8,613
(Est.
only)
TOTAL 351,718
(1) Priority (Tentative) VH: Very High, H: High, M: Marginal
(2) Priority is set by considering 1) severity of floods or flood risk level, 2) cost and economic efficiency
(EIRR≧15%), and 3) social and natural impacts and preliminary environmental assessment.
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 19/32
19
Proposed Non-Structural Measures
1. Strengthening of the Flood Information and Warning System (FIWS)
• Effective Flood Control Operation and Warning System (EFCOS)
improvement
• New telemetric rainfall and water level gauging stations
2. Capacity Building for Strengthening Community-based FRM
• Update and implement Information and Education Campaign (IEC)
programs• Rainfall and water level monitoring by Barangay Disaster Risk Reduction
and Management Councils (BDRRMCs)
• Construction of evacuation routes and temporary evacuation centers
3. Improvement of Management Information System (MIS) for Disaster Risk
Management
• Improvement and development of MIS
• Capacity building
4. Reforestation and Watershed Management
19
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 20/32
20
MarikinaDam
LagunaLakeshore
Raising/Road Dike
Inflow:
7,000m3 /s
5,000
Sierra Madre Mountains
L A G U N A L A K E
Flood in Pasig-Marikina-Laguna Lake Basin w/ Interventions in-placed
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 21/32
21
End of Presentation
21
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 22/32
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 23/32
23
Linked Slides
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 24/32
Pandacan, Aviles, Quiapo, Valencia, Tripa de Gallina, Sta.
Clara and Paco
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 25/32
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 26/32
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 27/32
Libertad, Makati, Binondo, Balete and Escolta
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 28/32
Vitas, Balut and San Andres
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 29/32
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 30/32
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 31/32
7/30/2019 FM S102 Flood Managament in the Philippines by Patrick B. Gatan
http://slidepdf.com/reader/full/fm-s102-flood-managament-in-the-philippines-by-patrick-b-gatan 32/32