fm-ia (rev. 00)
TRANSCRIPT
-
8/13/2019 FM-IA (Rev. 00)
1/2
M.N. Dastur & Company (P) Ltd, Kolkata,
Project : Contract/P.O. No.:
Contractors Name : Specn. No.:
Package Description:
Approved/
Cleared Test to be Witnessed
Category Documents
Sl. Contract Equipment/Item No. of of Item (Select from Inspection
No. Item No. Description Quantity Lot A / B List-A) Witness Review Contractor Agency
Inspection Category:
A = To be physically inspected by Client/Inspection Agency.
B = To be released on the basis of review of documents.
Code Approved/Cleared Documents Code Inspection Tests Code Inspection Tests
A1 G.A. Drawing B1 Visual & Dimensional Check B8 Friction factor test
A2 Data Sheet B2 Raw material Inspection B9 Dust/ water Ingression test
A3 P & ID (physical & chemical) B10 Performance test / Characteristic Curve
A4 BOM B3 Weld Quality Inspection as B11 No Load / Free runing test
A5 BOQ per applicable standard B12 Load / Overload test
A6 Manufacturer Catalogue B4 Control assembly check B13 Vibration test / Acoustic test
A7 Approved BS B5 Heat treatment test B14 Pressure / Leakage test
B6 Hardness Test B15
B7 Spark test for Linning B16 Static Balancing Test
NOTE: Use Numerical codes as indicated for extent of Inspection & tests. Additional codes & Description for extent of Inspect
GENERAL NOTES:
(1) Inspection Procedure shall be submitted for each equipment separately with break up of assembly/sub-assembly & part/component or for grou
(2) Painting to be done after inspection as per approved procedure
(3) Valid calibration certificate for inspection, measuring and test equipment used during inspection shall be submitted.
(4) Two sets of test certificates( 1 Set Hard & 1 Set Soft) duly verified and signed by the main Contractor shall be furnished prior to/ during/after ins
(5) Random sampling for mass produced items, whenever so identified, shall be as per relevant National / International Standard.
(6) Detail Drawing shall be made availaible during Inspection as required.
Signature of Contractor Signature of Client
Name: Name:
by Inspn. Agency
Dynamic Balancing test
(Select from List-B)(Select from List-B)
INSPECTION/TEST PROCEDURE FOR MECHANICAL EQUIPMENT & STRUC
List-A List-B
Stage Inspection
f:skn\General Formats (Nov'11)\FM-IA
-
8/13/2019 FM-IA (Rev. 00)
2/2
INSPECTION/TEST PROCEDURE FOR MECHANICAL EQUIPME
& STRUCTURES AT MANUFACTURERS WORKS
Project :
Contractors Name : Specn. No.: N.A.
Package Description:
Approved
Cleared Test to be Witnessed
Category Documents
Sl. Contract Equipment/Item No. of of Item (Select from Inspect
No. Item No. Description Quantity Lot A / B List-A) Witness Review Contractor Agenc
1 10 - Fix Rake # 1 10 pc 1 B A8 - - B1 -
2 20 - Fix Rake # 2 10 pc 1 B A8 - - B1 -
3 30 - Movable Rake # 1 6 pc 1 B A8 - - B1 -
4 40 - Movable Rake # 1 (Short) 4 pc 1 B A8 - - B1 -
5 50 - Movable Rake # 3 10 pc 1 B A8 - - B1 -Inspection Category:
A = To be physically inspected by Client/Inspection Agency.
B = To be released on the basis of review of documents.
Code Approved/Cleared Documents Code Inspection Tests Code Inspection Tests
A1 G.A. Drawing B1 Visual & Dimensional Check B8 Friction factor test
A2 Data Sheets B2 Raw material Inspection B9 Dust/ water Ingression test
A3 P & ID (physical & chemical) B10 Performance test / Characteristic Cu
A4 BOM B3 Weld Quali ty Inspection as B11 No Load / Free runing test
A5 BOQ per applicable standard B12 Load / Overload test
A6 Manufacturer Catalogue B4 Control assembly check B13 Vibration test / Acoustic test
A7 Approved BS B5 Heat treatment test B14 Pressure / Leakage test
A8 Detail manufacturing drawing B6 Hardness Test B15
B7 Spark test for Linning B16 Static Balancing Test
NOTE: Use Numericals code as indicated for extent of Inspection & tests. Additional codes & Description for extent of Inspection & Test
GENERAL NOTES:
(1) Inspection Procedure shall be submitted for each equipment separately with break up of assembly/sub-assembly & part/component or for group of equipme
(2) Painting to be done after inspection as per approved procedure
(3) Valid calibration certificate for inspection, measuring and test equipment used during inspection shall be submitted.
(4) Two sets of test certificates duly verified and signed by the main Contractor shall be furnished prior to/ during/after inspection.
(5) Random sampling for mass produced items, whenever so identified, shall be as per relevant National / International Standard.
(6) Detail Drawing shall be made availaible during Inspection as required.
Signature of Contractor Signature of Client
Name:
List-A List-B
Stage Inspection
Dynamic Balancing test
(Select from List-B(Select from List-B)
Page 2 of 2