flyer handout color · title: flyer handout color.cdr author: bankardh created date: 2/25/2009...

2
CANAL C&D WILD AREA LIFE LUMS POND STATE PARK MIDDLETOWN ODESSA TOWNSEND 1 299 299 1 71 15 15 15 71 896 301 13 13 301 301 301 MARYLAND DELAW A RE CHESAPEAKE AND DEL CANAL MOUNT PLEASANT TOLL PLAZA A WARE SUMMIT ST. GEORGES 896 Green North + Spur - Selected Alternative Green North + Spur - Selected Alternative Spur Green North + Spur - Selected Alternative Green North + Spur - Selected Alternative Spur Spur DelDOT The purpose and primary focus of the Public Workshop is to present the following information to the public regarding the Spur Road: Potential alternatives to the Spur Road, including the upgrading of existing US 301 Identification of an early contract to improve the sharp curve on SR 896, south of Summit Bridge The results of additional Spur Road studies that were commitments in FHWA's approved Record of Decision (ROD) for the project, including: Alignment refinements to minimize impacts Spur Road median width Spur Road design speed The most current traffic data for the project will also be presented. In addition, DelDOT will use the Public Workshop as an opportunity to provide the public with information regarding a number of potential refinements to the selected US 301 Mainline Alternative, including: US 301 Mainline at the MD/DE line: minor shift of the alignment to minimize environmental impacts, avoid electric transmission towers and reduce costs Levels Road Diamond Interchange: minor shift to reduce environmental impacts to Sandy Branch Northbound US 301 exit to Northbound Spur Road: modify from a left side to a right side exit, to improve traffic operations and safety and reduce costs The New US 301 Interchange with existing US 301, just north of Armstrong Corner Road: where a diamond interchange with roundabouts at the ramp termini is being considered, in lieu of the selected partial cloverleaf interchange, to reduce environmental impacts and improve traffic operations and safety Jamison Corner Road Diamond Interchange: consideration of roundabouts at ramp termini, to improve traffic operations and safety and to reduce costs Toll Free Ramp from US13 to Northbound SR1 (Roth Bridge): shift farther South and relocate a section of Port Penn Road at US13 Any person having special needs or requiring special aid, such as an interpreter, is requested to contact DelDOT by phone or mail a week in advance. Si necesitas algún asistencia especial, o un traductor, por favor llame a DelDOT con una semana por adelantado. Write DelDOT’s Office of Public Relations, P.O. Box 778, Dover, DE 19903, or call 1-800-652-5600 (in DE) or 302-760-2080, or visit www.deldot.gov. This US 301 Project is a cooperative effort of the Delaware Department of Transportation and the Federal Highway Administration. Come Review & Comment on Potential Alternatives to the Spur Road Spur Road Study Results Potential Refinements to New US 301 Come Review & Comment on Potential Alternatives to the Spur Road Spur Road Study Results Potential Refinements to New US 301 Come Review & Comment on Potential Alternatives to the Spur Road Spur Road Study Results Potential Refinements to New US 301 Plan to attend the March 23rd Workshop Tell us what you think! For more information: For more information: Delaware Department of Transportation D E P A R T M E N T O F T R A N S P O R T A T I O N U N I T E D S T A T E S O F A M E R I C A project development U.S. PUBLIC WORKSHOP PUBLIC WORKSHOP March 23rd 2009 3:00 - 8:00 p.m. Middletown Fire Hall W. Green & S. Scott Streets A brief presentation is scheduled for 3:15, to be repeated at 4:15, 5:15, 6:15 and 7:15 Monday Snow Date: Tuesday, March 24, 2009 Middletown Fire Hall 3:00 pm - 8:00 pm

Upload: others

Post on 27-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Flyer Handout Color · Title: Flyer Handout Color.cdr Author: bankardh Created Date: 2/25/2009 12:50:38 PM

CANALC & D

WILD AREALIFE

LUMS POND

STATE PARK

MIDDLETOWN

ODESSA

TOWNSEND

9

1

299

2991

71

15

15

15

71

896

30113

13

13

301

301

301

MA

RY

LA

ND

DE

LA

WA

RE

CHESAPEAKE AND

DEL CANAL

MOUNT

PLEASANT

TOLL PLAZA

AWARE

SUMMIT

BOYDS

CORNER

ST. GEORGES

896

Green North + Spur -Selected AlternativeGreen North + Spur -Selected Alternative

SpurGreen North + Spur -Selected AlternativeGreen North + Spur -Selected Alternative

SpurSpur

DelDOT

The purpose and primary focus of the Public Workshop is topresent the following information to the public regarding theSpur Road:

Potential alternatives to the Spur Road, including theupgrading of existing US 301

Identification of an early contract to improve the sharpcurve on SR 896, south of Summit Bridge

The results of additional Spur Road studies that werecommitments in FHWA's approved Record of Decision(ROD) for the project, including:

Alignment refinements to minimize impacts

Spur Road median width

Spur Road design speed

The most current traffic data for the project will also bepresented.

In addition, DelDOT will use the Public Workshop as anopportunity to provide the public with information regardinga number of potential refinements to the selected US 301Mainline Alternative, including:

US 301 Mainline at the MD/DE line: minor shift of thealignment to minimize environmental impacts, avoidelectric transmission towers and reduce costs

Levels Road Diamond Interchange: minor shift to reduceenvironmental impacts to Sandy Branch

Northbound US 301 exit to Northbound Spur Road:modify from a left side to a right side exit, to improvetraffic operations and safety and reduce costs

The New US 301 Interchange with existing US 301, justnorth of Armstrong Corner Road: where a diamondinterchange with roundabouts at the ramp termini isbeing considered, in lieu of the selected partial cloverleafinterchange, to reduce environmental impacts andimprove traffic operations and safety

Jamison Corner Road Diamond Interchange:consideration of roundabouts at ramp termini, to improvetraffic operations and safety and to reduce costs

Toll Free Ramp from US13 to Northbound SR1 (RothBridge): shift farther South and relocate a section ofPort Penn Road at US13

Any person having special

needs or requiring special aid,

such as an interpreter, is requested

to contact DelDOT by phone or

mail a week in advance.

Si necesitas algún asistencia

especial, o un traductor, por favor

llame a DelDOT con una semana

por adelantado.

Write DelDOT’s Office of Public Relations, P.O. Box 778, Dover, DE 19903, or call 1-800-652-5600 (in DE) or

302-760-2080, or visit www.deldot.gov. This US 301 Project is a cooperative effort of the Delaware Department of

Transportation and the Federal Highway Administration.

Come Review & Comment onPotential Alternatives to the Spur Road

Spur Road Study Results

Potential Refinements to New US 301

Come Review & Comment onPotential Alternatives to the Spur Road

Spur Road Study Results

Potential Refinements to New US 301

Come Review & Comment onPotential Alternatives to the Spur Road

Spur Road Study Results

Potential Refinements to New US 301

Plan to attend the March 23rd WorkshopTell us what you think!

For more information:For more information:

Delaware Department

of Transportation

DE

PA

RTM

ENT OF TRANSP

OR

TA

TIO

N

UN

I TE

DS T AT E S O F A M

E

RI C

A

project development

U.S.

PUBLIC WORKSHOP

PUBLIC WORKSHOPMarch 23rd20093:00 - 8:00 p.m.Middletown Fire Hall

W. Green & S. Scott Streets

A brief presentation is scheduled for

3:15, to be repeated at 4:15, 5:15,

6:15 and 7:15

Monday

Snow Date: Tuesday, March 24, 2009

Middletown Fire Hall 3:00 pm - 8:00 pm

Page 2: Flyer Handout Color · Title: Flyer Handout Color.cdr Author: bankardh Created Date: 2/25/2009 12:50:38 PM

project development

U.S.

project development

U.S.

DelDOT Public Relations

PO Box 778

Dover, DE 19903

DelDOT Announces a Public Workshop to present:Potential Alternatives to the Spur Road

Spur Road Study Results

Potential Refinements to New US 301

See you there!

project development

U.S.

PUBLIC WORKSHOP

PUBLIC WORKSHOPMarch 23rd20093:00 - 8:00 p.m.Middletown Fire Hall

W. Green & S. Scott Streets

A brief presentation is scheduled

for 3:15, to be repeated at 4:15,

5:15, 6:15 and 7:15

Monday

Snow Date: Tuesday, March 24, 2009

Middletown Fire Hall 3:00 pm - 8:00 pm

Tell us what you think!Plan to attend the March 23rd Workshop.