flyer handout color · title: flyer handout color.cdr author: bankardh created date: 2/25/2009...
TRANSCRIPT
CANALC & D
WILD AREALIFE
LUMS POND
STATE PARK
MIDDLETOWN
ODESSA
TOWNSEND
9
1
299
2991
71
15
15
15
71
896
30113
13
13
301
301
301
MA
RY
LA
ND
DE
LA
WA
RE
CHESAPEAKE AND
DEL CANAL
MOUNT
PLEASANT
TOLL PLAZA
AWARE
SUMMIT
BOYDS
CORNER
ST. GEORGES
896
Green North + Spur -Selected AlternativeGreen North + Spur -Selected Alternative
SpurGreen North + Spur -Selected AlternativeGreen North + Spur -Selected Alternative
SpurSpur
DelDOT
The purpose and primary focus of the Public Workshop is topresent the following information to the public regarding theSpur Road:
Potential alternatives to the Spur Road, including theupgrading of existing US 301
Identification of an early contract to improve the sharpcurve on SR 896, south of Summit Bridge
The results of additional Spur Road studies that werecommitments in FHWA's approved Record of Decision(ROD) for the project, including:
Alignment refinements to minimize impacts
Spur Road median width
Spur Road design speed
The most current traffic data for the project will also bepresented.
In addition, DelDOT will use the Public Workshop as anopportunity to provide the public with information regardinga number of potential refinements to the selected US 301Mainline Alternative, including:
US 301 Mainline at the MD/DE line: minor shift of thealignment to minimize environmental impacts, avoidelectric transmission towers and reduce costs
Levels Road Diamond Interchange: minor shift to reduceenvironmental impacts to Sandy Branch
Northbound US 301 exit to Northbound Spur Road:modify from a left side to a right side exit, to improvetraffic operations and safety and reduce costs
The New US 301 Interchange with existing US 301, justnorth of Armstrong Corner Road: where a diamondinterchange with roundabouts at the ramp termini isbeing considered, in lieu of the selected partial cloverleafinterchange, to reduce environmental impacts andimprove traffic operations and safety
Jamison Corner Road Diamond Interchange:consideration of roundabouts at ramp termini, to improvetraffic operations and safety and to reduce costs
Toll Free Ramp from US13 to Northbound SR1 (RothBridge): shift farther South and relocate a section ofPort Penn Road at US13
Any person having special
needs or requiring special aid,
such as an interpreter, is requested
to contact DelDOT by phone or
mail a week in advance.
Si necesitas algún asistencia
especial, o un traductor, por favor
llame a DelDOT con una semana
por adelantado.
Write DelDOT’s Office of Public Relations, P.O. Box 778, Dover, DE 19903, or call 1-800-652-5600 (in DE) or
302-760-2080, or visit www.deldot.gov. This US 301 Project is a cooperative effort of the Delaware Department of
Transportation and the Federal Highway Administration.
Come Review & Comment onPotential Alternatives to the Spur Road
Spur Road Study Results
Potential Refinements to New US 301
Come Review & Comment onPotential Alternatives to the Spur Road
Spur Road Study Results
Potential Refinements to New US 301
Come Review & Comment onPotential Alternatives to the Spur Road
Spur Road Study Results
Potential Refinements to New US 301
Plan to attend the March 23rd WorkshopTell us what you think!
For more information:For more information:
Delaware Department
of Transportation
DE
PA
RTM
ENT OF TRANSP
OR
TA
TIO
N
UN
I TE
DS T AT E S O F A M
E
RI C
A
project development
U.S.
PUBLIC WORKSHOP
PUBLIC WORKSHOPMarch 23rd20093:00 - 8:00 p.m.Middletown Fire Hall
W. Green & S. Scott Streets
A brief presentation is scheduled for
3:15, to be repeated at 4:15, 5:15,
6:15 and 7:15
Monday
Snow Date: Tuesday, March 24, 2009
Middletown Fire Hall 3:00 pm - 8:00 pm
project development
U.S.
project development
U.S.
DelDOT Public Relations
PO Box 778
Dover, DE 19903
DelDOT Announces a Public Workshop to present:Potential Alternatives to the Spur Road
Spur Road Study Results
Potential Refinements to New US 301
See you there!
project development
U.S.
PUBLIC WORKSHOP
PUBLIC WORKSHOPMarch 23rd20093:00 - 8:00 p.m.Middletown Fire Hall
W. Green & S. Scott Streets
A brief presentation is scheduled
for 3:15, to be repeated at 4:15,
5:15, 6:15 and 7:15
Monday
Snow Date: Tuesday, March 24, 2009
Middletown Fire Hall 3:00 pm - 8:00 pm
Tell us what you think!Plan to attend the March 23rd Workshop.