florida product approval system validator training december 11, 2012

48
Florida Product Approval System Validator Training December 11, 2012 Florida Building Commission Florida Department of Business and Professional Regulations 1940 North Monroe Street | Tallahassee, FL 32399 | (850) 487-1824

Upload: mead

Post on 25-Feb-2016

65 views

Category:

Documents


1 download

DESCRIPTION

Florida Product Approval System Validator Training December 11, 2012 . Florida Building Commission Florida Department of Business and Professional Regulations 1940 North Monroe Street | Tallahassee, FL 32399 | (850) 487-1824 www.floridabuilding.org. Florida Product Approval System. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Florida Product Approval System Validator Training December 11, 2012

Florida Product Approval System

Validator TrainingDecember 11, 2012

Florida Building Commission Florida Department of Business and Professional

Regulations1940 North Monroe Street | Tallahassee, FL 32399 | (850) 487-

1824www.floridabuilding.org

Page 2: Florida Product Approval System Validator Training December 11, 2012

Florida Product Approval System

DEPARTMENT OF BUSINESS & PROFESSIONAL REGULATIONS

MO MADANI Senior Technical Manager

JOE BIGELOW Codes & Standards

Page 3: Florida Product Approval System Validator Training December 11, 2012

Ted Berman and Associates, LLC

THEODORE BERMAN, P.E.Product Approval System Administrator

SIMON SEGAL, P.E.Senior Engineer, Product Approval Application Reviewer

RANA RADMANESH, E.I.Product Approval Specialist

Page 4: Florida Product Approval System Validator Training December 11, 2012

Objectives of Training

• UPDATES OF VALIDATION REQUIREMENTS

• DISCUSSION OF VALIDATION CHECKLISTS

• MOST COMMON MISTAKES

Page 5: Florida Product Approval System Validator Training December 11, 2012

Product Approval Application

There are four ways to apply for a Florida Product Approval

• New Application• Full Revision of an existing

application • Editorial Change• Self-Affirmation of existing

application

Page 6: Florida Product Approval System Validator Training December 11, 2012

Self–Affirmation FBC 2010

Application Using Self Affirmation

• Self Affirmation indicating that the change in building code does not affect the performance of product.

• Does not require validation

• Self Affirmations cost $100.

Page 7: Florida Product Approval System Validator Training December 11, 2012

Editorial Change FBC 2010

Editorial Change

• Used for editorial corrections with no new performance evidence provided.

• Used to change quality assurance entity

• Requires validation (ensure that application is limited to the above restrictions).

• Editorial Change cost $150.

Page 8: Florida Product Approval System Validator Training December 11, 2012

Revised Applications FBC 2010

Revised Application:

• If the standards or restrictions pertaining to your product in the 2010 Code have changed, then a full revision application must be submitted.

• New evidence such as a certification, test report or an evaluation report demonstrating compliance must also be submitted.

• New products may be added to application.

• Full Revisions cost $500.

Page 9: Florida Product Approval System Validator Training December 11, 2012

New Application FBC 2010

New Application:

• Evidence such as a certification, test report or an evaluation report demonstrating compliance must be submitted.

• New Application cost $500.

Page 10: Florida Product Approval System Validator Training December 11, 2012

Revision FBC 2010

IMPORTANTIF THERE ARE MULTIPLE PRODUCTS WITHIN THE SAME APPLICATION (FL#), THEN EVIDENCE FOR ALL THE PRODUCTS MUST BE SUBMITTED. THE ENTIRE PRODUCT LINE MUST ALSO COMPLY WITH THE NEW STATE PRODUCT APPROVAL RULE AND ALL THE REQUIREMENTS THEREIN

Page 11: Florida Product Approval System Validator Training December 11, 2012

New Application Process

Changes made to the new application process include:

Applications must be validated by COMPLETION DEADLINE

Applicants work at their own pace to complete applications by the posted deadline date.

Early submittals will have more correction time if needed.

Only those applications that are complete by the Completion Deadline are recommended to the Product Oversight Committee (POC) and listed on the meeting agenda

Page 12: Florida Product Approval System Validator Training December 11, 2012

New Application Process

Page 13: Florida Product Approval System Validator Training December 11, 2012

Product Approval Methods

Four Methods for State Approval

Certification Mark or Listing Test Report Evaluation Report from an Evaluation Entity Evaluation Report from a Florida licensed

Architect or a Florida Professional Engineer

Page 14: Florida Product Approval System Validator Training December 11, 2012

Validations

Rule 61G20-3.006 Product Validation

Two Types of Validation Administrative Validation Technical ValidationNOTE:All applications, except Self-Affirmation, require validation. Applications requiring corrections have to be Re-Validated.

Page 15: Florida Product Approval System Validator Training December 11, 2012

Administrative ValidationOverview1a.

Certification: Certificate, Mark

Or Listing

1c.Evaluation report from evaluation

entity ie. ICC

1d.Evaluation

report from an architect or

engineer

EVALUATIONREPORT

3rd PARTY

ADMINVALIDATION

Page 16: Florida Product Approval System Validator Training December 11, 2012

Administrative Validation

Applicable to:

A certification mark or listing from an approved certification agency

An evaluation report from a Florida Registered Architect or Licensed Engineer independent from the manufacturer

An evaluation report from an approved evaluation entity.

Page 17: Florida Product Approval System Validator Training December 11, 2012

Administrative Validation Criteria

Criteria consists of: Verification of certification or evaluation report,

product description, testing standards per Florida Building Code and compliance documentation are compliant with the current code.

Verification of installation instructions, anchorage requirements and product performance are as per certification or evaluation report.

Verification of any limits are within the scope of certification or evaluation.

Verify that certification is not based on rational analysis.

Verify that if rational analysis was used for installation instructions that an evaluation report is included.

Page 18: Florida Product Approval System Validator Training December 11, 2012

Certification ValidationChecklist

Page 19: Florida Product Approval System Validator Training December 11, 2012

Administrative ValidationChecklist

Page 20: Florida Product Approval System Validator Training December 11, 2012

Certification Validation Common Errors (1)

• Testing Standards on Certification Agency Certificate (CAC) are not the same as on face of application.

• Testing standards are not as adopted and an equivalency of standards has not been provided.

• Design Pressure on application exceeds design pressure on CAC or load test has not been certified.

• Limits of use indicate impact resistance and testing standards for impact were not performed.

• Certification cannot be based on rational analysis.• Description of product on application is not the same as

on CAC.

Page 21: Florida Product Approval System Validator Training December 11, 2012

Certification Validation Common Errors (2)

• Installation Instructions are not in accordance with Rule 61G20-3.005(4)(e) or as on the CAC.

• Certification Agency Certificate is expired.• Installation Instructions are based on rational analysis

and an Evaluation Report was not provided.• Certification of plastic structural components was not

provided or is expired (glass laminates, plastic extrusions).

• Validation checklist is for the correct method and signed and sealed after validation on-line.

Page 22: Florida Product Approval System Validator Training December 11, 2012

Evaluation Report by Florida PE/RA Administrative Validation Checklist

Page 23: Florida Product Approval System Validator Training December 11, 2012

Evaluation Report by Florida PE/RA Validation Common Errors (1)

• Testing Standards on Evaluation Report (ER) are not the same as on face of application.

• Testing standards are not as adopted and an equivalency of standards has not been provided.

• Design Pressure on application exceeds design pressure on ER.

• Limits of use indicate impact resistance and testing standards for impact were not performed.

• Certificate of Independence was not provided or is not from the evaluation engineer/architect.

• Description of product on application is not the same as on ER.

Page 24: Florida Product Approval System Validator Training December 11, 2012

Evaluation Report by Florida PE/RA Validation Common Errors (2)

• Installation Instructions are not in accordance with Rule 61G20-3.005(4)(e) or as described on ER.

• Testing was not conducted at an accredited, by an approved accreditation agency, testing laboratory.

• Testing was not performed on the product as described on ER and the data cannot be verified.

• Certification of plastic structural components was not provided or is expired (glass laminates, plastic extrusions).

• Validation checklist is for the correct method and signed and sealed after validation on-line.

• Verify that rational analysis was not performed in-lieu of testing standards required by the building code.

Page 25: Florida Product Approval System Validator Training December 11, 2012

Evaluation Report by Evaluation Entity Administrative Validation

Checklist

Page 26: Florida Product Approval System Validator Training December 11, 2012

Evaluation Report by Evaluation Entity Validation Common Errors (1)

• Testing Standards on Evaluation Report (ER) are not the same as on face of application.

• Testing standards are not as adopted and an equivalency of standards has not been provided.

• Design Pressure on application exceeds design pressure on ER.

• Limits of use indicate impact resistance and testing standards for impact were not performed.

Page 27: Florida Product Approval System Validator Training December 11, 2012

Evaluation Report by Evaluation Entity Validation Common Errors (2)

• Description of product on application is not the same as on ER.• Installation Instructions are not in accordance with Rule

61G20-3.005(4)(e) or as described on ER.• Evaluation Report is not based on the model code for the

Florida Building Code.• Validation checklist is for the correct method and signed and

sealed after validation on-line.• Evaluation Report based on alternate materials. (Not

allowed for statewide product approval).

Page 28: Florida Product Approval System Validator Training December 11, 2012

Technical ValidationOverview

1d.Evaluation

report from an architect or

engineer

EVALUATIONREPORT

IN HOUSE

TECHNICALVALIDATION

1b.Test

report

Page 29: Florida Product Approval System Validator Training December 11, 2012

Technical Validation

Applicable to: A test report from an approved testing

laboratory

An evaluation report from an approved evaluation entity that is not an independent third party from the manufacturer

Installation instructions designed by in-house to the manufacturer, non independent third-party professional.

Page 30: Florida Product Approval System Validator Training December 11, 2012

Technical Validation Criteria

In addition to criteria for Administrative Validation, Technical

validation includes:• Determination that the evaluator has

complied with acceptable standards of engineering principles.

• Engineering verification that the evaluation complies with the Code.

• Copy of the application complying with all aspects of rule 61G15-36 F.A.C. must be filed with the Commission.

Page 31: Florida Product Approval System Validator Training December 11, 2012

For the technical validation when using the Certification, EvaluationReport by Florida PE/RA and Evaluation Report by Evaluation Entity methods,the validator needs to complete the corresponding Administrative Validation checklist plus the following Technical Validation checklist.

Technical ValidationChecklist

Page 32: Florida Product Approval System Validator Training December 11, 2012

For the technical validation when using the Test Report method,the validator needs to complete the following Validation checklist.

Technical ValidationTest Report Method Checklist

Page 33: Florida Product Approval System Validator Training December 11, 2012

Test Report Method Validation Common Errors (1)

• Testing Standards on test report are not the same as on face of application.

• Testing standards are not as adopted and an equivalency of standards has not been provided.

• Design pressure on application exceeds design pressure on test report.

• Limits of use indicate impact resistance and testing standards for impact were not performed.

• Certificate of Independence was not provided or is not from the testing laboratory.

• Description of product on application is not the same as on test report.

Page 34: Florida Product Approval System Validator Training December 11, 2012

Test Report Method Validation Common Errors (2)

• Installation Instructions are not in accordance with Rule 61G20-3.005(4)(e) or as on the test report.

• Testing was not conducted at an approved testing laboratory or the laboratory was not accredited for the test performed.

• Testing was not performed on the product as described on the application.

• Certification of plastic structural components was not provided or is expired (glass laminates, plastic extrusions).

• Validation checklist is for the correct method and signed and sealed after validation on-line.

• Verify that rational analysis was not performed and the product performance is as tested.

Page 35: Florida Product Approval System Validator Training December 11, 2012

Installation Instructions

Installation instructions also require verification:

If prepared by company engineers then technical validation is required

If prepared by independent engineers then administration validation is required, unless using the Test Report Method (which always requires a technical validation)

Page 36: Florida Product Approval System Validator Training December 11, 2012

Installation Instructions

Installation instructions criteria: Determination that the evaluator has complied with acceptable standards of engineering principles. Engineering verification that the evaluation complies with the Code. Copy of the application complying with all aspects of rule 61G15-36 F.A.C. must be filed with the Commission.Exception:

Technical Validation is not required if the installation instructions including attachments are verified by the product certification agency or the product evaluation agency.

Page 37: Florida Product Approval System Validator Training December 11, 2012

Windows

Installation instructions requirements for windows must contain the following:

Type, and grade of anchor, and/or manufacturer’s anchor specifications, including minimal nominal size, minimum penetration into substrate and minimum edge distances.

Type, physical dimensions, material and grade of any accessory item or strap, if applicable.

Spacing of anchors, shims, accessory items and straps. Illustrated diagrams of the attachment of the product

structure.

Page 38: Florida Product Approval System Validator Training December 11, 2012

RULE 61G20-3Optional State Approval with updates

INSTALLATION INSTRUCTIONS

3rd PARTY

IN HOUSE

TECHNICALVALIDATION

ADMINVALIDATION

REVIEW BY CERT AGENCY

Page 39: Florida Product Approval System Validator Training December 11, 2012

Validation Entities

All approved Validation Entities must retain documentation of the product application

Approved Certification and Evaluation agencies can validate their own certifications/evaluations

Testing Labs are not allowed to conduct validations

Page 40: Florida Product Approval System Validator Training December 11, 2012

Validation Entities

61G20-3.006(4) Violations and Penalties for Validation Entities.

Disciplinary penalties may be imposed upon an approved Validation entity for Rule 61G20-3 violations.

Disciplinary penalties could be fines up to $10,000 per occurrence, suspensions and revocations

Page 41: Florida Product Approval System Validator Training December 11, 2012

Recent POC Issues

61G20-3.005 (2) Product Evaluation:

Method 2. Products for which there are no specific standardized tests or comparative or rational analysis methods of evaluation established as required by the Code shall demonstrate compliance with the intent of the Code through one of the following:

Page 42: Florida Product Approval System Validator Training December 11, 2012

Recent POC Issues

(1) An evaluation report from an approved product evaluation entity; (2) an evaluation report from a Florida Registered Architect or a licensed Florida Professional Engineer based on testing or comparative or rational analysis or combination thereof, which provides verifiable documentation indicating the product complies with the intent of the Code. (3) A legacy report from a nationally recognized model Code organization may be used if the report demonstrates compliance with the code.

Rational engineering analysis cannot be used in lieu of a standard test required by the Code for approval of products within the scope of the standard.

Page 43: Florida Product Approval System Validator Training December 11, 2012

Recent POC Issues

Examples of applications requiring Method 2:

1. Roof panels using plastic materials.2. Non-organic roofing products (not all).3. Wall panels outside HVHZ.

There are many other examples.

Page 44: Florida Product Approval System Validator Training December 11, 2012

Recent POC Issues

Applications with Alternate Materials are not allowed for statewide product approval.

Alternate materials is a claim that a product compliance is equivalent to the provisions of the code, but is not evaluated as required by the code.

Example: Evaluation report with this language: “The system is an alternative exterior wall covering to those specified in Chapter 25”.

Page 45: Florida Product Approval System Validator Training December 11, 2012

Recent POC Issues

Underwriters Laboratories, Inc. is now UL LLC and approved as:

Certification Agency Quality Assurance Entity Testing Laboratory Validation EntityProduct Approval Applications still containing the

old name will need to submit an Editorial Change to revise the application and select the appropriate approved entity.

Page 46: Florida Product Approval System Validator Training December 11, 2012

Recent POC Issues

PSI/Pittsburgh Testing Laboratory has been succeeded by Benchmark Holdings, L.L.C. and approved as:

Quality Assurance Entity

Product Approval Applications still containing the old name will need to submit an Editorial Change to revise the application and select the appropriate approved entity.

Page 47: Florida Product Approval System Validator Training December 11, 2012

Role of Validator

   Validation means determination of compliance pursuant to

Rule 61G20-3, F.A.C., for state approval.

The validator certifies to the Commission the product’s compliance with the standards specified in the Code or intent of the Code for use in state approval.

All product approval applications, except self-affirmation, require that the validator reviews the documentation and executes the proper validation checklist that includes the determination of compliance.

Page 48: Florida Product Approval System Validator Training December 11, 2012