Page 1: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

Floater Product LineWhy a Spar

29 September, 2004

Owner
Text Box
Return to session directory
Page 2: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

2Why a Spar?

WHY A Spar?

Mature Concept

On Time Delivery

Safest Platform

Best Riser Support Platform

Make Operator More Profit

Page 3: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

3TECHNIP SPARS TO DATE

Page 4: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

4Truss Spar

Wet TowWet Tow

Dry TransportDry Transport

UpendingUpending

Page 5: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

5Truss Spar

Proven Design

Proven Hull Delivery History On-Time and On-Cost

Large Payload Capacity

Dry or Wet Tree Solution

Page 6: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

6Why a Spar?

WHY A Spar?

Mature Concept

On Time Delivery

Safest Platform

Best Riser Support Platform

Make Operator More Profit

Page 7: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

7

CONSTRUCTION SEQUENCE

Decision Economics

Delay Expensive• For 6 month delay in first oil

180 days at $6 M/day = $1080 M

10 % Interest on CAPEX = $90 M

On Time Spar Deliveries

Make You Money

Page 8: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

8Mad Dog Holstein Gunnison

17 months

16 months

17 months

Fabrication Time

9-03

12-03

5-03

Sail Away

24,000 tons

22,000 tons

13,000 tons

Tonnage

14104-02Holstein

13758-02Mad Dog

76012-01Gunnison

Tons / MonthStart Steel Cutting

Page 9: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

9Spar Delivery Reliability

Spar Fabrication at TOF

0,0 5,0 10,0 15,0 20,0 25,0

NEPTUNE

GENESIS

DIANA

NANSEN

BOOMVANG

HORN MOUNTAIN

GUNNISON

HOLSTEIN

MAD DOG

Proj

ect

Fabrication - Months

Contract Actual Contract at GOM Actual at GOM

Page 10: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

10Why a Spar?

WHY A Spar?

Mature Concept

On Time Delivery

Safest Platform

Best Riser Support Platform

Make Operator More Profit

Page 11: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

11Spar Safety

WHY IS A SPAR SAFER?Unconditionally Stable

Failsafe ballast system: intact stability is not endangered by variable ballasting errors

Simple ballast system: Licensed marine crew not required on board

Mooring Line Failure not CatastrophicRedundancy: spread mooring is designed for one line missing

Spar continues to float

Down flooding difficult

Page 12: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

12Why a Spar?

WHY A Spar?

Mature Concept

On Time Delivery

Safest Platform

Best Riser Support Platform

Make Operator More Profit

Page 13: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

13

Wave Frequency SCR Hang-off Response

0

1

2

3

4

5

6

7

8

Cell Truss TLP Semi

Std

Dev

Mot

ion

- ft

Lateral

Vertical

Spars Better SCR Support Vessel

Page 14: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

14RISER SYSTEM ADVANTAGES

Low Motions at keelLower riser stressesAllows less expensive riser

Risers are protected from surface wave and current actionLateral mooring system allows running risers in high currentsAll types of risers and hang-off systems

Page 15: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

15PRE-INSTALLED PULL TUBES

Page 16: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

16Porches and Piping at Keel

Page 17: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

17Fixtures at Keel for Future Flexibles

Page 18: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

18Why a Spar?

WHY A Spar?

Mature Concept

On Time Delivery

Safest Platform

Best Riser Support Platform

Make Operator More Profit

Page 19: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

19

CONSTRUCTION SEQUENCE

Platform Costs

Finn’s Theorems1. All Platforms Cost the Same

$20 M delta in the noise level

2. Design Competition a Flawed Approach

Winner often low balls estimates to win

Cost increases often much greater than delta

Spar Saves in Other AreasRisers, Completion, Drilling, Workover

Page 20: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

20

Typical Field Development CostsGOM Deepwater 300 MB 150 KBD 20 Wells

Subsea Case Millions

• Transportation by Pipeline $100

• Drilling by MODU $1000

• SURF $300

• Topsides $250

• Platform $150

• Total $1800

Field Development Costs

55 %

8 %

Page 21: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

21

CONSTRUCTION SEQUENCE

Macro Economics

Is This a Profitable Venture?

300 MB at $40/B = $12 B

150 KBP at $40/B $6 M/day

300 days = CAPEX ($1.8 B)

YES!!

Page 22: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

22

CC

PI

EB

AC

GB

KC

MioceneBasins

PlioceneBasins

Pleistocene Basins

Port

Isab

el F

oldb

elt

Perdid

o Fold

belt

Sigsbee PlainSigsbee Escarpment

EB

{

Mississ

ippi Fan

Fold Belt

Gemini

Salt Canopy

Auger

Mars Ursa

Genesis

Hoover

Great White

MC

Mensa

Thunder Horse

GC

WR

AV

LD

Pliocene Basins

AtlantisAtlantisMad Dog

Tahiti

Neptune

The Salt Canopy

Page 23: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

23

Spar Can Reduce Drilling CostsCompleting Wells from Spar Saves

Less expensive completion rig

Workover costs also reduced

Drilling wells from Spar SavesLess expensive than MODU

More drilling uptime

Spar Mooring good for 100 hurricane

Reduce Drilling Costs

Page 24: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

24Offset Drilling with MODU / Spar Completion

Kerr McGee Neptune (1000 HP WO)BP Horn Mountain (DP Rig) (1500 HP WO)Kerr McGee Boomvang (1000 HP WO)Kerr McGee Nansen (1000 HP WO)Kerr McGee Gunnison (1500 HP WO)

Applications

Page 25: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

25Drilling and Completing from Spar

Chevron Genesis (3000 HP Drill)ExxonMobil Diana (3000 HP Drill)BP HolsteinBP/ UNOCAL Mad Dog

Page 26: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

26

Drill From Spar to Reduce CostsGOM Deepwater 300 MB 150 KBD 20 Wells

Subsea Complete Drill & Comp

• Transportation $100 $100 $100

• Drilling $600 $600 $240

• Complete $400 $160 $160

• SURF $300 $100 $100

• Topsides $250 $250 $250

• Platform $150 $180 $220

Total $1800 $1400 $1070

MODU vs. Spar Drilling Comparison

Page 27: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

27

Drill From 2 SparsGOM Deepwater 300 MB 75 KBD 10 Wells each

One Spar Spar 1 Spar 2

• Transportation $100 $100 $10 M

• Drilling $240 $150 $150

• Complete $160 $80 $80

• Risers $100 $50 $50

• Topsides $250 $140 $140

• Platform $220 $120 $120

Total $1070 $640 $550 $1190

Two Drill Centers Comparison

Page 28: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

28Conclusions

Conclusions• Drilling From Spar Saves Money

• Completing from Spar Also Saves

• Two Smaller Spars Very Attractive• Better Reservoir Coverage

• Efficiencies in Building 2

• Staged Development Lowers Reservoir Risk

Page 29: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

29The Cell Spar

WHY A Cell Spar?Cost Effective Small Field Platform

Low Cost Automated Fabrication

Quick DeliveryLow cost Installation

Same Good Motion CharacteristicsSCRsTTRsFlexibles

Page 30: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

30Cell Spar Tube Fabrication, Outfitting & Assembly

Page 31: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

31Cell Spar Tube Assembly – November 14th to December 14th

Page 32: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

32Red Hawk Cell Spar Installation

Page 33: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

33Red Hawk Cell Spar Installation

Contract Award to Delivery in 22 months

Page 34: Floater Product Line Why a Spar - Dynamic positioningdynamic-positioning.com/proceedings/dp2004/dfd_spars_technip.pdfFloater Product Line Why a Spar 29 September, 2004. Return to session

Spar at MTS Workshop

34

Cell Spar Has Good Motion CharacteristicsSCRsTTRs

A Low Cost HullLess steelFast fabrication – automated process

Suited for Marginal FieldsSmaller deck loadsDeep waterHigh currents

Conclusions