Flange disassembly - An underrated source of safety incidents While much has been written about tire importance of correctly assemblingflunged joints to ensure the reliability and safety o/tlre joint, there has been relatively little published about the potentialfor incidents during disassembly o/these joints. Despite ASME PCC-l offering a warning and guidance on the disassembly of thick flanges and ge n- era/ good practices in various training documents avoidable incidents still occur. This paper presents jormal studies and case hi stories that can be used to formalize and strength en procedures and technician training. The paper will include scenarios o/flange disassembly both with and without intemal pressure and wil/highlight Ihe potential for incidents that could arise from them. Finite element analysis and case hi stories will be used where applicable to support or illustrate the results. Sa muel Ta it Methanex NZ Ltd. Introduction F langed joints are widely used in pressure piping, pressure vessels, and heat ex- changers in petro-chemical industries. The ne ed for joint integrity while a plant is running ha s resulted in lots of research and many papers being written about th e importance of correct1y assembl ing a fl anged joint. Howev- er when it comes to di sassembly of the se joints there is relatively little information available about the potential for safety incidents. In thi s paper th e current perceived received wis- dom will be reviewed and compared with resu lts from finite element modelling. The effects of flange thickne ss will be considered as well as the bolt removal sequence, th e bolt removal se - quences compared are the cross pattern from ASME PCC-I 20 IY and rotational order. The 2015 127 potential for safety incidents will be highlighted using case hi stories. The resul ts appear to contradict the current per- ceived wisdom and highlight the need for more focu s to be placed on flange disassembly. Current Information Currently th ere is very little infonnation availa- ble about the di sassembly of flanged joints. Paragraph 15 in ASME PCC- I 2013 provides some advice on flange disassembly. First it highlights the importance of ensuring the system is completely pressure free prior to the joint be- ing opened. While thi s is written in most proce- dures, incidents still occur due to joints being disassembled with pressure behind th em. AMMONIA TECHNICAL MANUAL

Upload: others

Post on 28-Jan-2021

19 views

Category:

Documents


0 download

TRANSCRIPT

  • Flange disassembly - An underrated source of safety incidents

    While much has been written about tire importance of correctly assemblingflunged joints to ensure the reliability and safety o/tlre joint, there has been relatively little published about the potentialfor

    incidents during disassembly o/these joints.

    Despite ASME PCC-l offering a warning and guidance on the disassembly of thick flanges and gen-era/ good practices in various training documents avoidable incidents still occur.

    This paper presents jormal studies and case histories that can be used to formalize and strengthen procedures and technician training. The paper will include scenarios o/flange disassembly both with

    and without intemal pressure and wil/highlight Ihe potential for incidents that could arise from them. Finite element analysis and case histories will be used where applicable to support or illustrate

    the results.

    Samuel Tait Methanex NZ Ltd.

    Introduction

    F langed joints are widely used in pressure piping, pressure vessels, and heat ex-changers in petro-chemical industries. The need for joint integrity while a plant

    is running has resulted in lots of research and many papers being written about the importance of correct1y assembl ing a flanged joint. Howev-er when it comes to disassembly of these joints there is relatively little information available about the potential for safety incidents.

    In this paper the current perceived received wis-dom will be reviewed and compared with results from finite element modelling. The effects of flange thickness will be considered as well as the bolt removal sequence, the bolt removal se-quences compared are the cross pattern from ASME PCC-I 20 I Y and rotational order. The

    2015 127

    potential for safety incidents will be highlighted using case histories.

    The results appear to contradict the current per-ceived wisdom and highlight the need for more focus to be placed on flange disassembly.

    Current Information

    Currently there is very little infonnation avai la-ble about the disassembly of flanged joints.

    Paragraph 15 in ASME PCC- I 2013 provides some advice on flange disassembly. First it highlights the importance of ensuring the system is completely pressure free prior to the joint be-ing opened. While this is written in most proce-dures, incidents still occur due to joints being disassembled with pressure behind them.

    AMMONIA TECHNICAL MANUAL

  • Elastic recovery of the clamped components is considered particularly when loosening bolts in a rotational order, stating that this "can result in excessive loads on the relatively few remaining bolts". It points out the potential for galling be-tween the nut and potential and subsequent po-tential for torsional overload. To mitigate this ASME PCC-I 2013 recommends loosening the bolts in a cross pattern. According to ASME PCC-I 20 13 the reported incidents of disassem-bly difficulties have typically involved

    a) Flanges larger than DN 600 (NPS24) b) Flange thicknesses greater than 125mm

    (Sin.) c) Bolt diameters M45 (1 %in.) and larger.

    It suggests that a disassembly procedure meet-ing the criteria of ASME PCC-I 20 13 paragraph 15.1 may be desirable for such joints.

    A paper presented at the 2002 ASME Pressure Vessels and Piping Conference titled Finite El-ement Simulation of the Disassembly Process of Pipe Flange Connections2 provides infonnation about the mechanical behavior of flanged con-nections during disassembly. The key parame-ters assessed in the paper are flange size, flange rating and bolt removal sequence.

    The analysis found that the maximum bolt load seen during flange disassembly increases with increasing flange size and rating class. This is consistent with the infonnation provided in ASME PCC-l 2013.

    Both the cross pattern recommended in ASME PCC-I 2013 and rotational order were modelled as bolt removal sequences in the paper. It was found that the bolt loads generated by the star pattern are significant ly higher than the bolt loads generated by removing the bolts in rota-tional order. This was validated with experi-mental results. This result is inconsistent with the information presented in ASME PCC-I 2013. Another important finding of the analysis was that maximum bolt loads are significantly

    AMMONIA TECHNICAL MANUAL 128

    reduced when the bolts are removed in two or more passes.

    Finite Element Analysis

    After a near miss at Methanex New Zealand Ltd. where a nut rapidly dislodged while disas-sembling a 42" blind flange, Matrix Applied Computing Ltd. were contracted to model the flange to provide greater understanding of the bolt loads in the flange during disassembly. This initial investigation included two flange thick-ness dimensions, the bolt removal sequence was the cross pattern recommended by ASME PCC-I 2013. It confirmed that the load on the remain-ing bolts increases as bolts are removed, as found in the 2002 finite element simulation. The increase in bolt loads is caused by elastic recov-ery of the flange, there was no internal pressure or pipe stresses included in the model. The magnitude of the bolt loads seen in the simula-tion also reinforced the need for care and con-sideration when disassembling large diameter flanges.

    Figure 1. Screenshot from thick flange unbolt-ing animation

    2015

  • • ..

    ..... -Figure 2. Screenshot from thin flange unbolting animation

    Unexpectedly, the bolt loads in the thin flange were significantly higber than the bolt loads seen in the thick flange . As can be seen on the stud highlighted with a red circle in Figure I, the thick flange, the stresses are mostly in the yellow and orange areas of the scale (400MPa-500MPa). While in Figure 2, the thin flange, the stresses are mostly in the red region of the scale (600MPa) and the maximum stress is in the grey area (739MPa+), this is above the yie ld strength of a standard B7 or B 16 stud. This result was counter-intuitive and is anomalous to the current infonnation from ASME PCC- I 20 13 that bolt loads during disassembly increase with increas-ing flange thickness.

    The investigation was expanded to try and un-derstand the anomaly from the original results where the bolt loads in the thin flange were higher than the bolt loads in the thick flange. The original 42in. pipe to blind flange model was expanded to include a pipe to p ipe joint, and a gasket. An 18in. class 300 flange was also modelled for comparison. As per the 2002 finite element simulation, the resul ts were plotted as a bolt load ratio against the bolt removal se-quence, the removal sequence modelled was the cross pattern from ASME PCC-I 20 13. The bolt load ratio is the force on the bolt during disas-

    2015 129

    sembly versus the in itial bo lt load prior to di sas-sembly .

    ••

    1.0

    12.5 • -2 2.0 • • ~ 1.5

    S 1.0

    0.5 +1--

    -+-42 in Blind filnl!. 100 MP, psk!t

    .-42in Pipe·Pipe,

    lOOMP,sasket

    -...42in Blind f1anse, no I,$let

    -18in el'lI 300 blind liallle, 100 MP,psket

    - 18 1n elus 300 blind flall8e, no s,$ltt

    0.0 .... 18in elm 300,

    o 2 4 6 8 10 12 14 16 18 20 22 24 100 MP, psk!l, Remov,1 Sequtnct low eloMl

    Figure 3. Bolt load ratio during disassembly of 42 in. and 18 in. flanges

    All of the scenarios saw the bolt load ratios in-crease in a similar pattern to that published in the 2002 paper with the loads increasing in steps to a maximum followed by a rapid drop in load for the last few bo lts. There were too many vari-ables to draw any valid compari sons between diameters and thicknesses.

    The models were adjusted so that one variable could be examined at a time. A 24in. flange which is the largest standard ASME B16.53

    flange was modelled instead of the 42in. flange which was not a standard size. To compare di-ameters a standard ASME 81 6.5 12in. flange was mode lled instead of the 18in. flange. The model includes a gasket of standard ASME 816.204 dimensions, the properties of the gasket are assumed to be the same as carbon steel based on the assumptions that the flange faces will pull up against the outer and inner ring of the gasket and that there is very little relaxation of the spira l wound part of the gasket during flange di sassembly. Class 300, 600, 900 and 1500 fl anges were modelled.

    AMMONIA TECHNICAL MANUAL

  • 2.5

    2.0

    i ..... 1.S o .~

    ~

    ~ 1.0 ~

    0 .5

    0.0

    ~12in Class 3 00

    ~12i n Class 600

    ~12in Class 900

    -11in Class 1500

    '-+-2 4in Class 300

    ___ 2 4in Class 600

    ~24in Class 900

    --2 4in Class 1 500

    o 2 4 6 8 10 1 2 14 1 6 1 8 20 22 2 4 Removal Sequence

    Figure 4. Bolt load ratio during disassembly of various classes of J 2in. and 24in.jlanges

    With the number of variables reduced the results became more consistent. Whi le there was remarkably little difference between the 12 inch and 24 inch flanges, the result that stands out is the 24 inch class 300 flange. This has significantly higher bolt loads than all of the other flanges as is particularly noticeable when compared with the 24 inch class 600 flange that also has 24 bolts. This backs up the findings from the original model of the 42 inch flange that a thinner flange produces higher bolt loads during disassembly. Notably, the peak load ratio is 2.24 times the original bolt load meaning there is a real possibility of yielding the stud.

    There are geometrical differences between the class 300 and class 600 flanges other than just the thickness. To focus purely on the thickness the 24 inch class 300 flange was modelled with varying thickness while keep all other dimen-sions constant. The thicknesses modelled were original thickness (I), 0.51, 1.5t, and 2.0t. The pipe to blind flange model demonstrated the ex-pected behaviour with the bolt load ratio de-creasing with increasing flange thickness.

    AMMONIA TECHNICAL MANUAL 130

    B

    , .r 1 J .S f ~ ," • -+-O.SI. cross. blind fl~nle S

    ..... I.Ot. cross. blind Ilan,e O.S _ 1.St. cross. blind flanae

    - 2.Ot. cross, blind Ilanae

    ~. 0 0 , • , 8 " " .. 16 18 " " Removal Sell"ence Figure 5. Boll load raflo durmg disassembly of 24in. class 300 pipe to blindjlange with varying thicknesses

    The same simulation was run for a pipe to pipe flange joint with similar results. The half thick-ness flange had unexpectedly low bolt ratios, but the remainder of the thicknesses fo llowed the expected pattern. It was noted during the model that the half thickness fl ange deflected to the point where the two flange faces contacted each other, reducing the energy stored by the flange and explaining the unexpectedly low bolt ratios.

    2015

  • 2.5

    2

    - O.St, cross, pipe-pipe

    _ LOt, cross, pipe-pipe

    0.5 __ 1.51, cross, plpe· plpe

    _ 2.0t, cross, pipe-pipe \ o o 2 , 6 8 10 12 14 16 18 20 22 24

    Removill Sequence

    Figure 6. Bolt load rallo durmg dlsassemhly of 24m. class 300 pipe 10 pipejlal/ge with varying thicknesses.

    In the 2002 finite element simulation it was identified that removing the studs in rotational order rather than a star pattern resulted in lower bolt load ratios. The 24 inch class 300 flange simulation seen in Figure 5 was run again re-moving the bolts in rotational order. The results confirmed those of the 2002 study with the max-imum bolt load ratio seen only 1.51 compared with 2.24 for the star pattern.

    1.6

    , .. 1.2

    E 0.8 • • ~ 0.6 S

    0.4

    O.st, clockwise, blind flange

    ...... 1.Ot, clockwise, blind flange

    - l .St, clockwise, blind flange

    - 2.Ot, clockwise, blind

    0.2 - '---"'n'!!l"",,' ___ ---' o

    o 2 4 6 8 10 12 14 16 W 20 22 M Removal Sequence

    Figure 7. Bolt load ratio during disassembly of 24in. class 300 pipe to blind flange, studs removed in rota-tiona/ order

    Case Histories

    There have been several incidents due to flanges being di sassembled when the system was not completely pressure free.

    2015 131

    in one such case at a petroleum refinery a spool piece on the discharge side of a pump was be ing removed. Unfortunately the pump discharge va lve had not seated correctly resulting in inad-equate isolation. As the last bolt was being re-moved the flange seal broke causing a process leak that escalated into a fire.

    Investigation into the incident identified fai ling to follow the flange un-bolting procedure as a contributing factor. The procedure requires the flange seal to be broken while there are four studs remaining in the joint. This helps mitigate any unexpected release of energy. In this in-stance it would not have prevented the leak, but it would have reduced the risk to the craftsmen disassembling the joint.

    As was reported at the 2014 Ammonia Safety Symposium workshop, another incident in-vol ved a major girth flange sealed with a lip seal gasket that was being disassembled while inter-nal pressure remained. The nature of a lip seal gasket allowed significant unbolting to occur without loss of containment. However the lip seal gasket had distorted to the point where it required replacing which is not a tri vial task, making thi s a significant incident. While the flange was being disassembled the wamjng signs that internal pressure remained were pre-sent to the technicians, but were not recognized . The warning signs reported were the remaining studs becoming progressively harder to remove as the flange was disassembled.

    Case History - Near Miss, Methanex New Zea-land Ltd The bottom flange on a vertical heat exchanger was being di sassembled on a plant that had been shut down for four years. The nuts were being gas cut as they were seized, while cutting the fourth to last stud the nut rapidly and unexpect-edly di slodged and fell to the ground twenty feet below.

    AMMONIA TECHNICAL MANUAL

  • Figure 8. Vertical heat exchanger

    This was recorded as a potential major incident due to the dropped object and a Taproot® inves-tigation was carried out. One of the root causes identified in the investigation was the flange joint assembly procedure not specifically ad-dressing the disassembly of large flanges. The procedure states that " large flange sizes require a specific disassembly procedure to avoid over-loading studs" but does not include any further guidance o f the procedure to be followed.

    The finite element analysis presented in this pa-per was initiated as a corrective action from the incident investigation.

    Flange Disassembly Training

    Methanex New Zealand Ltd currently has in-house flanged joint assembly training that all staff and contract mechanical maintenance tech-nicians complete. This comprises of practical in-fonnation on the importance of assembling a flange correctly including:

    Flange and stud condition Gasket se lection Flange alignment

    AMMONIA TECHNICAL MANUAL 132

    Lubrication Bolt up sequence

    The theoretical training is followed by a practi-cal session on a purpose built flange joint test rig; this allows supervisors to confinn that the technician has understood the training and is ca-pable of applying it in practice.

    Figure 9. Flange training test rig

    As a result of this research flange disassembly has also been included in the training. This highlights the potential for incidents due to in-creasing bolt loads during the disassembly pro-cess and the need to be completely certain that the system is pressure free. Another important facet added to the training is the requirement to ensure the seal on the joint is broken with a min-imum of four studs remaining; this reduces the impact of any potential incidents due to pressure remaining in the system.

    The flange training test rig has been modified to mimic internal pressure using an internal spring and technicians are required to disassemble the flange during the training. This will help give the technician a feel for the telltale sign of inter-

    2015

  • nal pressure remaining in the joint, the increase in bolt loads and consequent increase in torque required to remove the nuts during disassembly.

    Conclusions

    Current information indicates the potential for safety incidents during disassembly and is backed up by case histories. The current per-ceived wisdom is that care needs to be taken when disassembling thick large diameter flanges and that a star pattern is the best order to remove the studs, however, recent work has called this recommendation into question.

    Further research using finite element modelling confirms the potential for incidents but is con-trary to some of the current information. It indi-cates care should be taken when disassembling all flanges that are large in diameter regardless of thickness and that the bolt loads seen during disassembly actually decrease with increasing flange thickness. The analysis shows that the bolt loads can be reduced by removing the studs in rotational order rather than in a cross pattern. Another method to reduce bolt loads demon-strated is removing the studs in two or more passes instead of in a single pass.

    Steps that can be taken to reduce the potential for safety incidents during disassembly of large diameter flanges include:

    2015

    Highlighting the risks associated with disassembly of large diameter fl anges in procedures and training Removing studs from large diameter flanges in rotational order rather than a star pattern, and with multiple passes. Use of a flange joint training test rig to mimic a flange being disassembled with pressure behind it Highlighting the "at ri sk" flanges that require care during disassembly on the bolt torque chart

    133

    References

    I. ASME, 2013, "Guidelines for Pressure Boundary Flange Joint Assembly", ASME PCC-I - 2013

    2. Takaki, T. and Fukuoka, T., 2002, "Fi-nite Element Simulation of the Disas-sembly Process of Pipe Flange Connec-tions", PVP2002-1091

    3. ASME, 2013, "Pipe Flanges and Flanged Fittings", ASME B 16.5 - 20 13

    4. AS ME, 2012, "Metallic Gaskets for Pipe Flanges", ASME B 16.20 - 2012

    AMMONIA TECHNICAL MANUAL

  • AMMONIA TECHNICAL MANUAL 134 2015