  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    1/21

    Wireless Curriculum Development Section

    ISSUE

    Five Core Flow Rules (2)

    1.0

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    2/21

    Contents

    Chapter I RNP workflows

    Chapter II Data modification flow

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    3/21

    Radio network planning workflows

    Pro Master Plan

    Network planning

    Pre-planning process Cutover /Launch

    Network optimization

    Acceptance

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    4/21

    Overall process

    RNE-RPO000 RPO Master Plan

    Document Name: RPO Master Plan Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO000 Approved by: RNP, Huawei Version: Version 2.0

    Reference: \RPO000

    R N P & R N O

    D o c u m e n t s

    RPO Master Plan Report RPO Documents Checklist

    TechnicalSupport

    404

    Network Acceptance

    500

    RF Survey

    201Cut-Over/

    Launch

    300

    KPIOptimization

    402

    NetworkMonitoring

    403

    Pre-Planning

    100

    PlanningConcept

    202

    PracticalPlanning

    203

    DTOptimization

    401

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    5/21

    Pre-Planning

    RNE-RPO100 Pre-Planning Process

    Document Name: Pre-Planning Process Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO100 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO100

    `

    R F E n g

    i n e e r

    D o c u m e n

    t

    sElectromagneticBackground TestReport

    Pre-PlanningProposal

    Network EvaluationReport

    RequirementAnalysis

    001

    Current Network Analysis/Site Survey

    002

    Simulation

    006

    Pre-planningReport

    009

    Site List fromCustomer

    003

    DP

    DP

    DP

    Electromag.Background Test

    008

    Plan Based on Map

    004DP

    Network Evaluation

    007

    DP

    DP

    Need SiteSurvey?

    Customer ProvideSite List ?

    Plan based onmap?

    Need Simulation?

    Need Current Network Evaluation?

    Test Electromag.Background ?

    Model Tuning

    005DP

    Need Model Tuning?

    Network Dimensioning

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    6/21

    RF Survey

    RNE-RPO201 RF Survey

    Document Name: RF Survey Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO201 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO200\RPO201

    C u s t o m e r

    T e a m

    L e a

    d e r

    R F E n g

    i n e e r

    D o c u m e n

    t s

    RF SurveyDiscussion

    001

    RF SurveyDiscussion

    001

    RF Survey

    Preparation

    002

    RF Survey

    003

    RF Survey

    003

    RF Survey

    Report

    004

    RF SurveyReport Approval

    005

    RF SurveyReport Approval

    005

    RF Survey PreparationChecklist

    On-Site RF SurveyReport (XXX Site)

    RF Survey Report (XXX Site)RF Survey Summary

    Engineering

    Parameter

    006

    Site Database

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    7/21

    Network Planning Concept

    RNE-RPO202 Network Planning Concept

    T e a m

    L e a

    d e r /

    C u s

    t o m

    e r

    Document Name: Network Planning Concept Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO202 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO200\RPO202

    D o c u m e n

    t s

    Network Planning ConceptRNP Default Parameter SettingDual-band Parameter Setting

    RNO Acceptance Criteria

    RNO AcceptanceCriteria and Method

    005

    Cell Name Cell ID

    001

    Coverage / CapacityHighlights

    003

    Freq./PN Planning

    002

    Parameter PlanningConsideration

    004

    Practical Planning

    006

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    8/21

    Practical Planning

    RNE-RPO203 Practical Planning

    Document Name: Practical Planning Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO203 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO200\RPO203

    D u c u m e n

    t

    s

    B S S

    E n g

    i n e e r

    C u s t o m e r

    R N O

    E n g

    i n e e r

    RNP Default Parameter SettingDual-band Parameter Setting

    Freq./PNPlanning

    002

    Neighbor Planning

    003PlanningConcept

    001RNP Data

    Config. Table

    005

    BSC Data

    006

    On-site Check

    007

    On-site Check

    007

    RNP Data Configuration Table

    Data Config.Center

    Network Planning Concept

    Proposal Approval

    004

    Network Planning ProposalRNP Proposal Approval Report

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    9/21

    Cutover/Launch Process

    RNE-RPO300 Cut-Over/Launch Process

    Document Name: Cut-Over/Launch Process Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO300 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO300

    D o c u m e n

    t s

    P r o

    j e c t

    T e a m

    Site

    Commsioning

    002Site

    Installation

    001

    DP DP DP

    Hardware Adjustment

    004 Antenna

    Adjustment

    005Installation

    Adjustment

    003

    Hardware? Feeder/ Antenna?

    Installation?

    Cutover/

    Launch

    006DP

    OK?Y

    NMonitoring

    007

    BTS Commissioning TestChecklist (for RNO) Cut-Over Process (for RNO) Daily Performance Monitoring

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    10/21

    Network Optimization Process

    RNE-RPO400 Network Optimization Process

    Document Name: Network Optimization Process Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO400 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO400

    Y

    N

    NYes

    Cutover/Launch

    001

    DTOptimization

    002

    KPIOptimization

    003

    NetworkMonitoring

    004

    TechnicalSupport

    005

    Network Acceptance

    006

    Y

    90% BTSLaunch? (around)

    DP

    Meet AcceptanceCriteria in X weeks

    Keep on RFOptimization

    DP

    DP

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    11/21

    DT Optimization

    RNE-RPO401 DT Optimization

    R F E n g

    i n e e r

    D o c u m e

    n t s

    T e a m

    L e a

    d e r

    Document Name: DT Optimization Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO401 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO400\RPO401

    DTPreparation

    001DriveTest

    002DT Data

    Analysis

    003DP

    Y

    ResultConfirmation

    004

    DP

    DP

    DP

    Antenna Adjustment

    005

    Parameter Adjustment

    006

    Configuration Adjustment

    007

    DP

    OK?

    N

    Feeder/ Antenna?

    NetworkParameter?

    NetworkConfiguration?

    Complete?

    DT Preparation Checklist DT Data Analysis TableDT Optimization Bi-weekly Report

    Site Database

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    12/21

    KPI Optimization

    RNE-RPO402 KPI Optimization

    Document Name: KPI Optimization Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO402 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO400\RPO402

    R F E n g

    i n e e r

    D o c u m e n

    t s

    T e a m

    L e a

    d e r

    C u s t o m e r

    TrafficStatistic Data

    001Network

    Monitoring

    002Problem

    Analysis

    003Terms of Solution

    004Discussion/ Approval

    005

    Discussion/ Approval

    005

    Daily Performance Monitoring Problem Feedback FormRPO Project ReportN/W Optimization Bi-weekly Report

    SolutionImplement

    006

    Change RequestParameter Adjustment RecordProblem Investigation Report

    Discussion/ Approval

    005

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    13/21

    Network monitoring

    RNE-RPO403 Network Monitoring

    Document Name: Network Monitoring Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO403 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO400\RPO403

    R F o r

    M a i n t e n a n c e

    E n g

    i n e e r

    D o c u m e n

    t s

    R F o r

    T S

    E n g

    i n e e r

    C u s t o m e r

    Customer Complaint

    001

    Traffic

    Statistic Data

    002DPDaily

    Monitoring

    003

    ProblemSolving

    004

    Report

    005

    Need Supported

    Approval

    006

    Problem

    Solving

    004

    Daily Performance Monitoring Problem Feedback FormChange RequestParameter Adjustment Record

    Problem Investigation Report

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    14/21

    Technical Support

    RNE-RPO404 Technical Support

    Document Name: Technical Support Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO404 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO400\RPO404

    R F /

    M a i n t e n a n c e

    E n g

    i n e e r

    D o c u m e n

    t s

    R e g

    i o n a

    l

    T e c h n

    i c a

    l

    S u p p o r t

    T e c h n

    i c a

    l

    S u p p o r t o

    f

    H Q

    Problem Identification

    & Description

    001

    Technical Supportof HQ

    003

    DPRegional TechnicalSupport

    002

    Solution Implement

    004

    Result Confirming

    005

    Result Confirming

    005

    Result Confirming

    005

    OK

    CRMS (800/Problem Feedback Form) Change RequestParameter Adjustment Record

    Problem Investigation Report

    N

    Y

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    15/21

    Network Acceptance Process

    T e a m

    L e a

    d e r

    RNE-RPO500 Network Acceptance Process

    Document Name: Network Acceptance Process Prepared by: RNP, Huawei Effective Date: Dec. 2003Document No: RNE-RPO500 Approved by: RNP, Huawei Version: Version 2.0Reference: \RPO000\RPO500

    C u s t o m e r

    R F E n g

    i n e e r

    D o c u m e n

    t s

    TrafficStatistic Data

    001

    DT Data

    002

    AcceptanceDiscussion

    003

    AcceptanceDiscussion

    003

    AcceptanceReport

    004

    Approval

    005

    Network Optimization ReportProposal for Expansion

    CompleteOptimization

    006

    CompleteOptimization

    006

    Data backupRPO Document Checklist

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    16/21

    Contents

    Chapter I RNP workflows

    Chapter II Data modification flow

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    17/21

    Purpose

    Modify the network planning data based on a unified systemEnsure network security and reducethe man-made incidents.Improve network optimization efficiency.Ensure the feasibility andrationality of data modification.

    Standardize data modification .

    Data modification flow

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    18/21

    Data modification flow

    Check data Submit Network OperationAppli cation F orm to Customer

    Prepare Data Modification Plan

    Call tests

    Drive testsSuggestions

    Backup data

    Modify data Check trafficstatistics

    Archivemodificationinformation

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    19/21

    GSM RNO parameters level definition

    Equipment Effect Level

    Level 0 : No effect on equipment running, that is, the equipment running is not

    affected during the parameter setting.

    Level 1 : Minor effect on equipment running, and temporarily block the object to

    be adjusted. For example, block the channel and carrier during the parameter

    adjustment but it is not required to re-load the equipment program.

    Level 2 : Larger effect on equipment running, and reset the object to be adjusted

    during the adjustment. The equipment requires resetting base station or board

    and re-loading the program and data of base station or board during the

    parameter adjustment.

    Level 3 : Major effect on equipment running, and BSC service will be interrupted

    during the adjustment and the adjustment is performed in the morning after the

    approval. The parameter adjustment requires resetting BSC and re-loading the

    data and program of BSC.

  • 8/13/2019 Five Core Flow Rules (Part2) ISSUE1.0

    20/21

    GSM RNO parameters level definition

    Network Effect Level

    Level 0: No effect on network service. The usage and status of all the users are

    not affected during the parameter modification, that is, the user cannot feel

    network change.

    Level 1: Minor effect on network service. This does not affect the operation of

    user being called or connecting with a network but affects the user behaviors in

    idle state.

    Level 2: Larger effect on network service, and the network service will be

    interrupted for a short time. The parameter modification will result in the

    disconnection of user but the call is resumed after a short time.

    Level 3: Major effect on network service and network service will be interrupted.

    The parameter modification will enable network to interrupt the service and the

    network service is resumed after a short time.