fispace review meeting 1 t280

8
FIspace Review Meeting 1 T280 Francisco Pérez Atos

Upload: alden-barrera

Post on 31-Dec-2015

34 views

Category:

Documents


0 download

DESCRIPTION

FIspace Review Meeting 1 T280. Francisco Pérez Atos. Agenda. FIspace Platform Architecture Operational Model and Stakeholders WP Status and Roadmap. Pending:Integrate with rest of the modules. T280: FIspace Studio SDK. BCM. EPM. T280: FIspace Studio SDK. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FIspace Review Meeting 1 T280

FIspace Review Meeting 1

T280

Francisco PérezAtos

Page 2: FIspace Review Meeting 1 T280

2

• FIspace Platform Architecture

• Operational Model and Stakeholders

• WP Status and Roadmap

19.11.2013 - perezdf

Agenda

Pending:Integrate with rest of the modules

Page 3: FIspace Review Meeting 1 T280

319.11.2013

T280: FIspace Studio SDK

BCM EPM

Page 4: FIspace Review Meeting 1 T280

19.11.2013 - perezdf

T280: FIspace Studio SDK

Objecties•Make ease their work during the implementation of the apps, providing some specific tools and hiding the complexity of the platformStrategic• Reuse a wirely well known SDK based on Eclipse platform

Road blocked issues• Autogeneration of artifacts applying the constraints of Eclipse plugin•Fully integration with Maven built engine

•Aligned approach to the similar Eclipse distribution hosting in Eclipse.org

Fixed

In

Progress

Fixed

Tools are not silver bullets but make life easier

Page 5: FIspace Review Meeting 1 T280

519.11.2013 - perezdf

T280: FIspace Studio SDK

Community Open SourcePromotes the idea of universal access and redistribution Make easy the “howto” in order to get focus on “what” developToolingEclipse JDT (for example, classpath container) Fully integration of specific models and APIsSpecific facilities to deploy and app storage

RuntimePreconfigure framework provide standard and specific libraries

++

++

+

+

What behind the shell egg is…

+

Backend

Widget

FISpacelibrary

JDT

FIspace Community

FIspace Deployment

+

Page 6: FIspace Review Meeting 1 T280

6

• Achievements

Integration with Maven runtime built engine in order to reuse preimplemented plugins and archetypes

Implementation of Wizard plugin in order to start spreading out FIspace Studio distribution as first starting point in the Fispace app development

Adaptation and Using Scrum methodology.

• Next steps (What’s the next?)– Enrich set of plugins including some related to specific FIspace vocabulary as

I/O channels and API message handling

– Integration with FIspace components for development activities as auto deployment of apps in FIspace

– FIspace Studio Release 1.0. and New features.

19.11.2013

Task 280 Work Status So far

Page 7: FIspace Review Meeting 1 T280

7

• Known issues

Typical time overhead in using an open source frameworks.

Improve understanding and cooperation among people from different cultures.

• TEAM T 280

• Dimitris (Greece)

• Paco (Spain)

• Augusto (Panama)

• Pablo (Spain)

• Hector (Peru)

• Castulo (Colombia)

19.11.2013

Page 8: FIspace Review Meeting 1 T280

Questions?