FIRST ADDENDUM TO WATER SUPPLY AND WASTEWATER TREATMENT
SERVICE AGREEMENT FOR THE GROVE AT WESLEY CHAPEL
COMPOSITE EXHIBIT A
Item Descri~tion - Panes
1. Sketches showing project boundary, project improvements, and easements to be dedicated 1-5 and transferred to the County.
Competitive Cost Analysis Data and Information
a) Project Engineer for County
b) Independent Engineer for developer
Summary - Competitive cost analysis and basis of negotiated reimbursement.
DEVELOPMENT BY
GROVE AT WESLEY CHAPEL PCU 06-256.M)
PARCEL BOUNDARIES OCTOBER, zoos
DEVELOPMENT
AREA APPROVED IN THE USA
R = 140LF
OFF SITE ( O A K W BLVD.):
NOTE: ACQUISITION ITEMS SHALL INCLUDE ALL APPURTENANCES (FlllINGS, VALVES, TEES, BENDS,RPZS, ETC.) FOR A COMPLETE SYSTEM.
OFF SITE WATER I I I IMPROVEMENT
EXISTING WATER
- - I..
111.
8" W C GRAVITY = 160 LF 12" PVCGRAVITY = 40LF SEWERMANHOLES = 2 TRIPLEX PUMPSTA ;. 1
NOTE: ACQUISITION ITEMS SHALL INCLUDE ALL APPURTENANCES (FIllNGS,VALVES, TEES, BENDS, ETC.) FOR A COMPLETE SYSTEM.
ROVE AT WESLEY CHAPEL PCU 06-256.00
PROJECT IMPROVEMENTS WASTEWATER
OCTOBER, 2009
- GRAVITYSEWER& MANHOLES TO PCU
MASTER WASTE WATER
EASEMENTS TO PCU
EXISTING EASEMENTS
ADDITIONAL EASEMEN NEEDED FROM KAZWE