finish schedule - basement floor · teamwork://g5server/snhmc-nashua-rev high gym-111107 monday,...

12
teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 Sept. 7, 2011 date: proj. no.: Interior Finish Schedule - Basement and 1st Floor South The material contained in these drawings and the design they are intended to convey are the exclusive property of Dennis B. Mires. Possession and use hereof is granted only confidentially in connection with construction and / or sale of the structure depicted herein as authorized by him, and the recipient agrees to abide by these restrictions. Any use, reproduction or desclosure of any information, in whole or in part, contained herein, without written permission of Dennis B. Mires, is expressly prohibited. 11-11-11 PERMIT SET Southern New Hampshire Medical Center Foundation Medical Partners, Inc. 17 Prospect Street Nashua New Hampshire FINISH SCHEDULE - FIRST FLOOR - SOUTH WING ROOM # S-101 S-102 S-103 S-104 S-104a S-105 S-106 S-107 S-108 S-109 S-110 S-110a S-111 S-112 S-112a S-113 S-113a S-114 S-115 S-118 Name Vestibule Main Lobby Cafe Kitchen Kitch Jan M Toilet W Toilet West Foyer Storage Storage Mechanical Elec Waiting Corridor Janitor Tenant Space - 2 Tel/Data Tenant Space - 3 Corridor Tenant Space - 4 Area 124.95 1,431.35 336.00 409.03 21.64 126.22 126.22 374.08 56.28 379.20 463.05 41.12 326.78 212.49 99.20 600.44 122.98 459.81 303.86 817.68 Floor PORC TILE PORC TILE/CPT 1 PORC TILE VCT VCT TILE TILE VCT VCT SEALED CONC. SEALED CONC. SEALED CONC. CPT 1/2 CPT 1/2 VCT UNFINISHED SEALED CONC. UNFINISHED VCT/MAT UNFINISHED WALLS North --- PTD GWB PTD GWB PTD GWB PTD GWB PTD CMU PTD CMU PTD CMU PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB --- PTD GWB --- PTD GWB --- South --- PTD GWB PTD GWB PTD GWB PTD GWB PTD CMU PTD CMU PTD GWB PTD CMU PTD CMU PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB --- PTD GWB --- PTD GWB --- East --- PTD GWB --- PTD GWB PTD GWB PTD CMU PTD CMU PTD CMU PTD CMU PTD CMU PTD CMU PTD CMU PTD GWB PTD GWB PTD GWB --- PTD GWB --- PTD GWB --- West --- --- PTD GWB PTD GWB PTD GWB PTD CMU PTD CMU PTD CMU PTD CMU PTD CMU PTD CMU PTD GWB --- PTD GWB PTD GWB --- PTD GWB --- PTD GWB --- Base --- PORC/VINYL PORC VINYL VINYL TILE TILE VINYL VINYL VINYL@GWB VINYL@GWB VINYL VINYL VINYL VINYL --- VINYL --- VINYL --- CEILING FINISH ACT ACT ACT ACT ACT ACT ACT ACT ACT EXPSD STRUC. EXPSD STRUC. EXPSD STRUC. ACT ACT EXPSD STRUC. --- EXPSD STRUC. --- ACT --- HEIGHT SEE RCP SEE RCP SEE RCP # S-101 S-102 S-103 S-104 S-104a S-105 S-106 S-107 S-108 S-109 S-110 S-110a S-111 S-112 S-112a S-113 S-113a S-114 S-115 S-118 NOTES PTD GWB ABOVE ALUM STOREFRONT. ALUM FRAME BASE, RECESSED SLAB AT WALK OFF GRATE SEE INTERIOR ELEV. FOR CHAIR RAIL AND WAINSCOTING SEE INTERIOR ELEV. FOR CHAIR RAIL AND WAINSCOTING FINISH SCHEDULE - BASEMENT FLOOR ROOM # B-001 B-002 B-002a B-002b B-003 B-004 B-005 B-006 B-007 B-008 B-009 B-010 B-011 B-012 B-013 B-014 B-015 B-016 Name Basement - Mech. Space-1 Bsmt-Mech. Space-2 Electric-1 Electric-2 Bsmt-Maint. Pool-Low Headroom Mech. Low Headroom Basement North Stair Freight Elevator Freight Elev. Mach.Room Office Laundry Area W. Bath M. Bath Work Area Mech. Space-3 Elevator M. Room Basement S-East Stair Area 2,144.07 941.17 89.35 57.97 778.49 1,085.22 730.35 80.67 85.33 64.00 105.04 95.10 93.13 93.13 551.67 623.73 124.03 128.91 Floor Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc Sealed Conc VCT VCT Sealed Conc Sealed Conc Sealed Conc Sealed Conc WALLS North Extg Conc. Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Ptd GWB Ptd GWB --- Extg Conc. Ptd GWB Extg Conc. South Extg Conc. Extg Conc. Ptd GWB Ptd GWB Extg Conc. Extg Conc. Extg Conc. Extg Conc. Extg Conc. Ptd GWB Ptd GWB ------ Ptd GWB Ptd GWB --- Extg Conc. Extg Conc. Ptd GWB East Extg Conc. Extg Conc. Ptd GWB Ptd GWB Extg Conc. Extg Conc. Extg Conc. Extg Conc. Extg Conc. Extg Conc. Ptd GWB ------ Ptd GWB Ptd GWB --- Extg Conc. Ptd GWB Extg Conc. West Extg Conc. Extg Conc. Ptd GWB Ptd GWB Extg Conc. Extg Conc. Extg Conc. Extg Conc. Extg Conc. Ptd GWB Ptd GWB Ptd GWB Ptd GWB Ptd GWB --- Extg Conc. Extg Conc. Ptd GWB Base --- --- Vinyl Vinyl --- --- --- Vinyl@GWB --- Vinyl@GWB Vinyl Vinyl Vinyl Vinyl --- --- Vinyl Vinyl@GWB CEILING FINISH Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. ACT Expd. Struct. ACT ACT Expd. Struct. Expd. Struct. Expd. Struct. Expd. Struct. HEIGHT 8'-0" 8'-0" 8'-0" # B-001 B-002 B-002a B-002b B-003 B-004 B-005 B-006 B-007 B-008 B-009 B-010 B-011 B-012 B-013 B-014 B-015 B-016 NOTES 9-30-11

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A601

Sept. 7, 2011date:proj. no.:

Interior FinishSchedule -Basement and1st Floor South

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

FINISH SCHEDULE - FIRST FLOOR - SOUTH WING

ROOM

#

S-101S-102S-103S-104S-104aS-105S-106S-107S-108S-109S-110S-110aS-111S-112S-112aS-113S-113aS-114S-115S-118

Name

VestibuleMain LobbyCafeKitchenKitch JanM ToiletW ToiletWest FoyerStorageStorageMechanicalElecWaitingCorridorJanitorTenant Space - 2Tel/DataTenant Space - 3CorridorTenant Space - 4

Area

124.951,431.35336.00409.0321.64126.22126.22374.0856.28379.20463.0541.12326.78212.4999.20600.44122.98459.81303.86817.68

Floor

PORC TILEPORC TILE/CPT 1PORC TILEVCTVCTTILETILEVCTVCTSEALED CONC.SEALED CONC.SEALED CONC.CPT 1/2CPT 1/2VCTUNFINISHEDSEALED CONC.UNFINISHEDVCT/MATUNFINISHED

WALLS

North

---PTD GWBPTD GWBPTD GWBPTD GWBPTD CMUPTD CMUPTD CMUPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB---PTD GWB---PTD GWB---

South

---PTD GWBPTD GWBPTD GWBPTD GWBPTD CMUPTD CMUPTD GWBPTD CMUPTD CMUPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB---PTD GWB---PTD GWB---

East

---PTD GWB---PTD GWBPTD GWBPTD CMUPTD CMUPTD CMUPTD CMUPTD CMUPTD CMUPTD CMUPTD GWBPTD GWBPTD GWB---PTD GWB---PTD GWB---

West

------PTD GWBPTD GWBPTD GWBPTD CMUPTD CMUPTD CMUPTD CMUPTD CMUPTD CMUPTD GWB---PTD GWBPTD GWB---PTD GWB---PTD GWB---

Base

---PORC/VINYLPORCVINYLVINYLTILETILEVINYLVINYLVINYL@GWBVINYL@GWBVINYLVINYLVINYLVINYL---VINYL---VINYL---

CEILING

FINISH

ACTACTACTACTACTACTACTACTACTEXPSD STRUC.EXPSD STRUC.EXPSD STRUC.ACTACTEXPSD STRUC.---EXPSD STRUC.---ACT---

HEIGHT

SEE RCP

SEE RCP

SEE RCP

#

S-101S-102S-103S-104S-104aS-105S-106S-107S-108S-109S-110S-110aS-111S-112S-112aS-113S-113aS-114S-115S-118

NOTES

PTD GWB ABOVE ALUM STOREFRONT. ALUM FRAME BASE, RECESSED SLAB AT WALK OFF GRATESEE INTERIOR ELEV. FOR CHAIR RAIL AND WAINSCOTING

SEE INTERIOR ELEV. FOR CHAIR RAIL AND WAINSCOTING

FINISH SCHEDULE - BASEMENT FLOOR

ROOM

#

B-001B-002B-002aB-002bB-003B-004B-005B-006B-007B-008B-009B-010B-011B-012B-013B-014B-015B-016

Name

Basement - Mech. Space-1Bsmt-Mech. Space-2Electric-1Electric-2Bsmt-Maint.Pool-Low HeadroomMech. Low HeadroomBasement North StairFreight ElevatorFreight Elev. Mach.RoomOfficeLaundry AreaW. BathM. BathWork AreaMech. Space-3Elevator M. RoomBasement S-East Stair

Area

2,144.07941.1789.3557.97778.491,085.22730.3580.6785.3364.00105.0495.1093.1393.13551.67623.73124.03128.91

Floor

Sealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcSealed ConcVCTVCTSealed ConcSealed ConcSealed ConcSealed Conc

WALLS

North

Extg Conc.ConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcretePtd GWBPtd GWB---Extg Conc.Ptd GWBExtg Conc.

South

Extg Conc.Extg Conc.Ptd GWBPtd GWBExtg Conc.Extg Conc.Extg Conc.Extg Conc.Extg Conc.Ptd GWBPtd GWB------Ptd GWBPtd GWB---Extg Conc.Extg Conc.Ptd GWB

East

Extg Conc.Extg Conc.Ptd GWBPtd GWBExtg Conc.Extg Conc.Extg Conc.Extg Conc.Extg Conc.Extg Conc.Ptd GWB------Ptd GWBPtd GWB---Extg Conc.Ptd GWBExtg Conc.

West

Extg Conc.Extg Conc.Ptd GWBPtd GWBExtg Conc.Extg Conc.Extg Conc.Extg Conc.Extg Conc.Ptd GWBPtd GWBPtd GWBPtd GWBPtd GWB---Extg Conc.Extg Conc.Ptd GWB

Base

------VinylVinyl---------Vinyl@GWB---Vinyl@GWBVinylVinylVinylVinyl------VinylVinyl@GWB

CEILING

FINISH

Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.ACTExpd. Struct.ACTACTExpd. Struct.Expd. Struct.Expd. Struct.Expd. Struct.

HEIGHT

8'-0"

8'-0"8'-0"

#

B-001B-002B-002aB-002bB-003B-004B-005B-006B-007B-008B-009B-010B-011B-012B-013B-014B-015B-016

NOTES

9-30-11

Page 2: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A602

Sept. 7, 2011date:proj. no.:

Interior FinishSchedule - 1stFloor North

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

FINISH SCHEDULE - FIRST FLOOR - NORTH WING

ROOM

#

N-101N-101aN-101bN-102N-103N-104N-105N-106N-107N-108N-109N-110N-111N-112N-113N-114N-115N-116N-116aN-116bN-117N-118N-119N-120N-121N-122N-123N-124N-125N-126N-127N-127aN-128N-129N-130N-131N-131aN-131bN-131cN-132N-133N-134N-135N-136N-137N-138N-139N-140N-141N-141aN-141bN-142N-143N-144N-145N-146N-147N-148N-149N-150N-151N-151aN-151bN-152N-153N-154N-155N-156

Name

Elevator LobbyElevatorElevatorShared WaitingNorth StairToilet AlcoveW. ToiletM. ToiletSE StairBasement-SE StairEast VestibuleFreight Elev.WaitingPhlebotomyLaboratoryToiletFilesPhysical TherapyStor.ToiletStaffOfficeOfficeJan.ToiletExam 1Exam 2Exam 3Exam 4Exam 5CorridorSoiledBreak RoomStor.Basement - North StairCorridorStor.Stor.Cl.ExamExamConsultExamConsultToiletConsultExamConsultCorridorCleanSoiledNurseExamExamExamProcedureExamToiletStaffToiletCorr.Stor.Jan.IT.Lobby In/OutReceptionAdmin.Conference

Area

337.0785.4685.461,054.20145.8053.87241.91238.7855.5580.87189.2378.001,227.22265.2393.0745.21340.781,913.7327.2755.89382.93109.00107.4423.5140.25120.81120.58139.11148.18123.16317.4111.97253.10131.1999.81398.4017.3521.1216.3998.7598.8090.2597.6692.3738.0992.5197.6694.20318.6158.4238.58199.95103.04100.1497.46144.09102.5540.68258.5648.21198.9421.9431.9764.41241.51295.40137.06224.94

Floor

CPT 1CPT 1CPT 1CPT 1/2RUBBERCPT 1TILETILERUBBERCONC.MATVCTCPT 1VCTVCTVCTCPT 3VCTVCTVCTCPT 3CPT 3CPT 3VCTVCTCPT3CPT3CPT3CPT3CPT3CPT 3VCTVCT/CPT 3VCTCONC.CPT 3VCTVCTVCTVCTVCTCPT 3VCTCPT 3VCTCPT 3VCTCPT 3CPT 3VCTVCTCPT 3VCTVCTVCTVCTVCTVCTVCT/CPT 3VCTCPT 3VCTVCTVCTCPT 3CPT 3CPT 3CPT 3

WALLS

North

---------PTD GWBPTD GWBPTD GWBPTD GWB/TILEPTD GWB/TILEPTD CMUPTD CMUPTD GWB---PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

South

------------PTD CMUPTD GWBPTD GWB/TILEPTD GWB/TILEPTD CMU/GWBPTD CMUPTD GWB---PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

East

----------PTD GWBPTD CMUPTD GWBPTD GWB/TILEPTD GWB/TILEPTD CMUPTD CMUPTD GWB---PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

West

PTD GWB------PTD GWBPTD CMU---PTD GWB/TILEPTD GWB/TILEPTD CMUPTD CMUPTD GWB------PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

Base

VINYL------VINYLVINYL@GWBVINYLTILETILEVINYL---VINYL---VINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYL

CEILING

FINISH

ACT------ACT/GWBACTACTACTACTPTD STRUCT.PTD STRUCT.ACT---ACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACT

HEIGHT

SEE RCP------SEE RCP

VARIESVARIESSEE RCP---SEE RCP

#

N-101N-101aN-101bN-102N-103N-104N-105N-106N-107N-108N-109N-110N-111N-112N-113N-114N-115N-116N-116aN-116bN-117N-118N-119N-120N-121N-122N-123N-124N-125N-126N-127N-127aN-128N-129N-130N-131N-131aN-131bN-131cN-132N-133N-134N-135N-136N-137N-138N-139N-140N-141N-141aN-141bN-142N-143N-144N-145N-146N-147N-148N-149N-150N-151N-151aN-151bN-152N-153N-154N-155N-156

NOTES

CHAIR RAIL AND WAINSCOTING, SEE INT. ELEV.

CHAIR RAIL AND WAINSCOTING, SEE INT. ELEV.

Page 3: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A603

Sept. 7, 2011date:proj. no.:

Interior FinishSchedule - 2ndFloor North

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

FINISH SCHEDULE - SECOND FLOOR - NORTH WING

ROOM

#N-201

N-201a

N-201b

N-202

N-202b

N-203

N-204

N-205

N-206

N-207

N-207a

N-208

N-208a

N-208b

N-209

N-209a

N-210

N-211

N-212

N-213

N-214

N-215

N-216

N-217

N-218

N-219

N-220

N-221

N-222

N-223

N-224

N-225

N-226

N-227

N-228a

N-228b

N-228c

N-228d

N-229

N-230

N-231

N-232

N-233

N-234

N-235

N-236

N-237

N-237a

N-238a

N-238b

N-239

N-240

N-241

N-242

N-243

N-244

N-244a

N-245

N-246

N-247

N-248

N-248a

N-249

N-250

N-251

N-252

N-253

N-254

N-255

N-256

N-257

N-258

N-258a

N-258b

N-259

N-260

N-261

N-262

N-263

N-264

N-265

N-266

N-267

N-268

N-269

N-270

N-271

NameElevator Lobby

Elevator

Elevator

Waiting A

Waiting B

North Stair

Toilets Alcove

M. Toilet

W. Toilet

New SE Stair-Up

Extg SE Stair-Down

Workman's. Comp.

Conf. A

Conf. B

Spine & Brain Corridor

Mech.

Receptn.

Conference

Admin.

Research

Exam

Exam

Exit Corr.

Exam

Stor.

Toilet

Exam

Exam

Exam

Exam

Loop Corridor

Exam

Nurse

Toilet

P.A.1

P.A.2

P.A.3

P.A.4

Consult

Consult

Consult

Consult

Staff

D.M.E.

Conn. Corr.

Toilet

X-Ray Wait

Change

X-RAY A

X-RAY B

Technician

Ortho-In/Out

Reception

Admin.

Toilet

Corridor

IT.

Utility

Nurse

Exam

Corridor

Stor.

Consult

Exam

Exam

Toilet

Exam

Consult

Consult

Exam

Exam

Loop Corridor

Closet

Wkstatn

Cast

Nurse

Exam

Toilet

Exam

Consult

Consult

Exam

Exam

Consult

Exam

Toilet

Exam

Area

319.84

85.46

85.46

556.48

874.16

162.64

49.44

153.78

152.10

143.10

111.27

108.95

100.12

136.30

368.80

28.53

180.40

151.89

89.07

96.37

86.85

82.95

109.89

97.87

46.60

37.28

101.86

99.22

79.84

94.20

478.56

98.83

117.34

50.56

75.83

58.98

62.58

56.82

98.38

97.67

97.67

111.27

278.77

96.32

123.77

39.13

228.75

62.96

199.02

200.28

146.75

118.59

194.25

84.04

43.40

418.45

37.92

63.62

179.85

97.57

325.96

18.60

90.43

97.66

92.37

38.09

92.51

90.77

102.77

87.24

93.98

628.67

13.25

115.19

222.98

167.83

95.16

38.09

95.61

108.20

103.04

111.15

104.34

114.54

131.84

41.21

100.88

Floor

CPT 1

CPT 1

CPT 1

CPT 1

RUBBER

CPT 1

CT

CT

RUBBER

RUBBER

CPT 3

CPT 3

CPT 3

CPT 3

VCT

CPT 3

CPT 3

CPT 3

CPT 3

VCT

VCT

CPT 3

VCT

VCT

VCT

VCT

VCT

VCT

VCT

CPT 3

VCT

CPT

VCT

CPT 3

CPT 3

CPT 3

CPT 3

CPT 3

CPT 3

CPT 3

CPT 3

VCT/CPT 3

VCT

CPT 3

VCT

CPT 3

CPT 3

VCT

VCT

VCT

CPT 3

CPT 3

CPT 3

VCT

CPT 3

VCT

VCT

CPT 3

VCT

CPT 3

VCT

CPT 3

VCT

VCT

VCT

VCT

CPT 3

CPT 3

VCT

VCT

CPT 3

VCT

CPT 3

VCT

CPT 3

VCT

VCT

VCT

CPT 3

CPT 3

VCT

CPT 3

CPT 3

VCT

VCT

CPT 3

WALLS

NorthPTD GWB

---

---

PTD GWB

PTD GWB

PTD CMU

PTD GWB

CT

CT

PTD CMU

PTD CMU

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

SouthPTD GWB

---

---

PTD GWB

PTD GWB

PTD CMU

---

CT

CT

PTD CMU

PTD CMU

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

EastPTD GWB

---

---

PTD GWB

PTD GWB

PTD CMU

PTD GWB

CT

CT

PTD CMU

PTD CMU

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

WestPTD GWB

---

---

PTD GWB

PTD GWB

PTD CMU

PTD GWB

CT

CT

PTD CMU

PTD CMU

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

PTD GWB

BaseVINYL

---

---

VINYL

VINYL

VINYL

VINYL

CT

CT

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

VINYL

CEILING

FINISHACT

---

---

ACT

ACT

ACT/GWB

ACT

ACT

ACT

ACT/GWB

ACT/GWB

ACT

ACT

ACT

ACT

EXPD STRUCT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

ACT

HEIGHTSEE RCP

---

---

SEE RCP

SEE RCP

VARIES

SEE RCP

SEE RCP

SEE RCP

VARIES

VARIES

SEE RCP

SEE RCP

SEE RCP

SEE RCP

---

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RECP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

SEE RCP

#

N-201

N-201a

N-201b

N-202

N-202b

N-203

N-204

N-205

N-206

N-207

N-207a

N-208

N-208a

N-208b

N-209

N-209a

N-210

N-211

N-212

N-213

N-214

N-215

N-216

N-217

N-218

N-219

N-220

N-221

N-222

N-223

N-224

N-225

N-226

N-227

N-228a

N-228b

N-228c

N-228d

N-229

N-230

N-231

N-232

N-233

N-234

N-235

N-236

N-237

N-237a

N-238a

N-238b

N-239

N-240

N-241

N-242

N-243

N-244

N-244a

N-245

N-246

N-247

N-248

N-248a

N-249

N-250

N-251

N-252

N-253

N-254

N-255

N-256

N-257

N-258

N-258a

N-258b

N-259

N-260

N-261

N-262

N-263

N-264

N-265

N-266

N-267

N-268

N-269

N-270

N-271

NOTES

FINISHES BY ELEVATOR MFTR

FINISHES BY ELEVATOR MFTR

EXISTING CMU TO BE PATCHED AND PREP'D FOR PT

CT TO 5'-6" +/- SEE INTERIOR ELEVATONS

CT TO 5'-6" +/- SEE INTERIOR ELEVATONS

EXISTING CMU TO BE PATCHED AND PREP'D FOR PT

EXISTING CMU TO BE PATCHED AND PREP'D FOR PT

5-12" DEEP SHELVES ON ADJUSTABLE BRACKETS

5-12" DEEP SHELVES ON ADJUSTABLE BRACKETS

5-12" DEEP SHELVES ON ADJUSTABLE BRACKETS

Page 4: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A604

Sept. 7, 2011date:proj. no.:

Interior FinishSchedule - 2ndFloor South and3rd Floor North

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

FINISH SCHEDULE - SECOND FLOOR - SOUTH WING

ROOM

#

S-201S-202S-202aS-202bS-205bS-206S-207S-208S-209S-210S-211S-212S-213S-213aS-213bS-213cS-214S-215S-216S-217S-218S-219S-220S-221S-222S-223S-224S-225S-226S-227S-228S-229S-230S-231S-232S-233S-234S-235S-236S-237S-238S-239S-240S-241S-241aS-242S-243S-244S-245S-246S-247S-248S-249S-250S-251S-252S-253S-255

Name

Main LobbyCorr.Jan.I. T.Waiting-BCorridorClinical TrialsAdminFilesNurseToiletStaffCorridorCleanSoiledStor.ExamExamConsultExamExamConsultToiletInfusePain Mgmt. - in/outCommon FilingFilesToiletCorridorNurseStorageConsultConsultExamExamExamPodiatry - in/outCorridorWest Corr.ProcedureStaffToiletLabEast Corr.CleanNurseConsultExamExamExamConsultExamExamExamConsultFilesFluoroscopyStor.

Area

1,423.59158.8043.4973.92219.78272.06152.68106.2265.90154.5038.55227.93240.8332.6733.0132.94101.1590.29101.6390.1895.9996.2544.97782.18164.03340.6159.5357.60173.0274.9163.8196.7788.88102.9090.2198.9494.9493.68320.9399.36102.7838.0988.96202.5639.45167.67103.5884.9295.9984.92103.0193.7298.4999.3299.3284.75120.1130.83

Floor

CPT 1CPT 1VCTVCTCPT 3CPT 1CPT 1CPT 1CPT 1CPT 1VCTCPT 1/VCTCPT 1VCTVCTVCTVCTVCTCPT 1VCTVCTCPT 1VCTVINYLCPT 1CPT 1CPT 1VCTCPT 1CPT 1VCTCPT 1CPT 1VCTVCTVCTCPT 1CPT 1CPT 1VCTVCTVCTVCTCPT 1VCTCPT 1CPT 1VCTVCTVCTCPT 1VCTVCTVCTCPT 1CPT 1VCTVCT

WALLS

North

PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

South

PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

East

PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

West

PTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWBPTD GWB

Base

VINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYL

CEILING

FINISH

ACTACTACTACTACT/GWBACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACTACT

HEIGHT

SEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCPSEE RCP

#

S-201S-202S-202aS-202bS-205bS-206S-207S-208S-209S-210S-211S-212S-213S-213aS-213bS-213cS-214S-215S-216S-217S-218S-219S-220S-221S-222S-223S-224S-225S-226S-227S-228S-229S-230S-231S-232S-233S-234S-235S-236S-237S-238S-239S-240S-241S-241aS-242S-243S-244S-245S-246S-247S-248S-249S-250S-251S-252S-253S-255

NOTES

CHAIR RAIL & WAINSCOTING. SEE INTERIOR ELEVATIONS

5-12" DEEP SHELVES ON ADJUSTABLE BRACKETS

5-12" DEEP SHELVES ON ADJUSTABLE BRACKETS

5-12" DEEP SHELVES ON ADJUSTABLE BRACKETS

FINISH SCHEDULE - THIRD FLOOR - NORTH WING

ROOM

#

N-301N-301aN-301bN-302N-303N-304N-305N-306

Name

Elevator LobbyElevatorElevatorN. Stair LandingNorth StairStorageS-East StairExpansion Area

Area

272.7785.4685.4678.57244.0879.57108.995,931.46

Floor

CPT 3CPT 3CPT 3RUBBERRUBBERVCTRUBBERUNFINISHED

WALLS

North

---------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

South

---------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

East

PTD GWB------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

West

PTD GWB------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

Base

VINYL------VINYLVINYLVINYLVINYL---

CEILING

FINISH

ACT------EXPSD STRUCTSKYLIGHTACTACTEXPSD STRUCT

HEIGHT

SEE RCP---------SEE SECT.SEE RCPSEE RCP---

#

N-301N-301aN-301bN-302N-303N-304N-305N-306

NOTES

FINISHES BY ELEVATOR MFTRFINISHES BY ELEVATOR MFTR

PRIMED GWB AT FURRED EXTERIOR WALLS

Page 5: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A605

Sept. 7, 2011date:proj. no.:

Door and FrameSchedule -Basement and1st Floor South

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

DOOR AND FRAME SCHEDULE - BASEMENT FLOOR

Door No.

B-002AB-002BB-003B-006B-008B-009B-011B-012B-015B-016

From

Electric-1Electric-2Bsmt-Mech. Space-2Basement - Mech. Space-1Freight Elev. Mach.RoomBasement - Mech. Space-1Work AreaWork AreaElevator M. RoomWork Area

To Room

Bsmt-Mech. Space-2Bsmt-Mech. Space-2Bsmt-Maint.Basement North StairBasement - Mech. Space-1OfficeW. BathM. BathMech. Space-3

W x H Size

3'-0"x7'-0"3'-0"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"

SwingDoor

Core Fin Elev

MFMFMFMNMFMGMFMFMFMN

Glazing

---------

TEMPERED---

TEMPERED---------

TEMPERED

Frame

Mat

HMHMHMHMHMHMHMHMHMHM

Fr Type

FF

F2FFFFFFF

Fire Rating

Label

45MIN45 MIN

---60 MIN45 MIN

---------

45 MIN90 MIN

Closer

YESYES---

YESYES---

YESYESYESYES

Panic

---------

YES---------------

YES

Lockset

YESYESYES---YESYESYESYESYES---

Notes / Remarks

FLUSH BOLTS

DOOR AND FRAME SCHEDULE - FIRST FLOOR - SOUTH WING

Door No.

S-101AS-101BS-102AS-102BS-102CS-104

S-104AS-104BS-104CS-104aS-105S-106S-107

S-107BS-108

S-108AS-108BS-109

S-110AS-110BS-110CS-112AS-113AS-113BS-114S-115S-118

From

VestibuleMain LobbyTenant Space - 1Meeting - BMeeting - CKitchenWest FoyerMeeting - BCafeKitch JanWest FoyerWest FoyerWest FoyerTenant Space - 1StorageMeeting - ATenant Space - 1StorageElecCorridorCorridorCorridorCorridorCorridorWaitingCorridorCorridor

To Room

Main Entry Drop-OffVestibuleMain LobbyMain LobbyMain LobbyKitchen EntryKitchenTenant Space - 1KitchenKitchenM ToiletW ToiletWest Side EntryWest FoyerWest FoyerSouth EgressSouth EgressTenant Space - 1MechanicalMechanicalMechanicalJanitorTel/DataTenant Space - 2Tenant Space - 3South-East EntryTenant Space - 4

W x H Size

6'-0"x8'-6"6'-0"x8'-6"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-8"x10'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"14'-2"x10'-0"6'-0"x7'-0"6'-0"x7'-0"6'-0"x7'-0"6'-0"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"6'-0"x7'-0"4'-8"x7'-2"6'-0"x7'-0"

SwingDoor

Core Fin Elev

CW01SF01FFFIMFFFFFFFCW17F2FIMF2IMF2F2MFFFFFFF2CW16F2

Glazing

INSULATEDTEMPERED

------------------------------

INSULATED------------------------------------

INSULATED---

Frame

Mat

ALUMALUM

HMHMHM

GALV HMHMHMHMHMHMHM

ALUMHMHM

GALV HMGALV HM

HMHMHMHMHMHMHMHM

ALUMHM

Fr Type

CW01SF01

F2FF

IMFFFFFFF

CW17F2F

IMF2IMF2F2MFFFFFF

F2CW16

F2

Fire Rating

Label

---------------------------------------------------

45 MIN45 MIN45 MIN45 MIN

---45 MIN

------------

Closer

YESYESYESYESYESYES-ES--

---------

YESYESYESYES---

YESYESYESYESYESYES---

YES------

YES---

Panic

YESYESYESYESYES---------------------

YESYES---

YESYES---

YES------------------

YES---

Lockset

YESYESYESYESYESYESYESYESYESYES------YESYESYESYESYESYESYESYESYESYESYESYESYESYESYES

Notes / Remarks

ALUM THRESHOLD, WEATHERSTRIPPING,AUTO DOOR OPERATORSQUARE EDGE ALUM THRESHOLD, AUTOMATIC DOOR OPERATOR

ALUM THRESHOLD, WEATHERSTRIPPING8" FRAME8" FRAME8" FRAMEFLUSHBOLTS AT INACTIVE PANELPUSH/PULL, SERVICE DEADBOLTPUSH/PULL, SERVICE DEADBOLTALUM THRESHOLD, WEATHERSTRIPPING

FLUSHBOLTS AT INACTIVE PANEL12" FRAME, 12" ALUM THRESHOLD, WEATHERSTRIPPING12" FRAME, 12" ALUM THRESHOLD, WEATHERSTRIPPING

FLUSHBOLTS AT INACTIVE PANELTHRESHOLD, WEATHERSTRIPPING

PER PLAN/SCHEDULE

4'-0"

TYPICAL EXTERIOR & INTERIOR STEEL DOOR & FRAME:

IMF IMG

TYPICAL INTERIOR DOORS & FRAMES:1 3/4" 7-PLY SOLID CORE FLUSH DOOR W/ HARDWOOD VENEER.PREFINISHED PARTICLE CORE W/ 30 PCF DENSITY.MINERAL CORE AT RATED DOORS, MATCHING LAMINATED STILES.ADHESIVES SHALL CONTAIN NO FORMALDEHYDE.1/4" TEMPERED GLASS AT VISION PANELS.1/4" WIRED GLASS, SQUARE PATTERN, AT FIRE RATED OPENINGS.

HOLLOW METAL FRAMES. 2" DRYWALL KD 18 GA.,1/2" BACKBEND,16 GA. AT FIRE RATED OPENINGS.PRIMED. COMPRESSION ANCHORS & 7 GA. HARDWARE REINFORCEMENTS.

F2

GHG N

FSF

GS

ALUM/FULL

TYPICAL EXTERIOR & INTERIOR ALUMINUM DOOR & FRAME:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.INSULATED TO U.23 W/ EXPANDED POLYSTYRENE.INSULATED & TEMPERED GLAZING AT VISION PANELS.

2 1/2" X 6" ANODIZED ALUMINUM W/ EXTERIOR SET 1" INSULATED LOW-ETEMPERED GLAZING. THERMALLY BROKEN FRAME. 5" WIDE STILE & RAIL W/10" BOTTOM RAIL & 10" INTERMEDIATE RAIL DOORS. PROVIDE FINISH PERSPECIFICATION.

INTERIOR:

2"X4 1/2" ANODIZED ALUMINUM W/ CENTER SET 1/4" TEMPERED GLAZING. 31/2" MEDIUM STILE & RAIL W/ 6 1/2" BOTTOM RAIL & 8 1/4" INTERMEDIATE RAILDOORS. PROVIDE FINISH PER SPECIFICATION.

EXTERIOR:

MG/FULLMF MG

EXTERIOR:

INTERIOR:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.TEMPERED GLAZING AT VISION PANELS.

MN

IMF2

F4 (XRAY)INACTIVE/ACTIVE

FS

10/6/201110/6/2011

Page 6: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A606

Sept. 7, 2011date:proj. no.:

Door and FrameSchedule - 1stFloor North

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

DOOR AND FRAME SCHEDULE - FIRST FLOOR - NORTH WING

Door No.

N-101AN-101BN-103

N-103AN-105N-106N-107N-108N-109

N-109AN-109BN-110N-111

N-112AN-112BN-113N-114N-115N-116

N-116AN-116AN-116BN-117AN-117BN-118N-119N-120N-121N-122N-123N-124N-125N-126

N-127AN-128N-129N-130

N-131AN-131BN-131CN-132N-133N-134N-135N-136N-137N-138N-139N-140

N-141AN-141BN-143N-145N-146N-147N-148N-149N-150N-151

N-151AN-151BN-152N-153N-154N-155N-156

From

ElevatorElevatorShared WaitingNorth StairToilet AlcoveToilet AlcoveSE StairBasement-SE StairEast VestibuleCorridorWaitingFreight Elev.WaitingWaitingFilesPhlebotomyPhlebotomyStaff

Physical TherapyStor.CorridorPhysical TherapyCorridorStaffStaffJan.ToiletCorridorCorridorCorridorCorridorCorridorSoiledCorridorStor.Basement - North StairStor.Stor.Cl.CorridorCorridorCorridorCorridorCorridorToiletCorridorCorridorCorridorCorridorCorridorCorridorCorridorCorridorCorridorToiletCorr.Corr.Corr.Stor.Jan.IT.Lobby In/OutLobby In/OutReceptionCorr.

To Room

Elevator LobbyElevator LobbyNorth StairNorth EgressW. ToiletM. ToiletEast VestibuleEast VestibuleEast Side Egress - EntryEast VestibuleEast VestibuleEast VestibuleElevator LobbyPhlebotomyPhlebotomyLaboratoryToiletFilesWaitingPT SE EgressPhysical TherapyToiletStaffStaffOfficeOfficeCorridorCorridorExam 1Exam 2Exam 3Exam 4Exam 5CorridorBreak RoomCorridorBasement - North EgressCorridorCorridorCorridorExamExamConsultExamConsultCorridorConsultExamConsultCleanSoiledExamExamProcedureExamCorridorStaffToiletWaitingCorr.Corr.Corr.Shared WaitingReceptionAdmin.Conference

W x H Size

4'-6"x7'-0"4'-6"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"5'-6"x9'-10"6'-0"x7'-0"3'-0"x7'-0"4'-6"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-6"x7'-0"3'-4"x8'-0"5'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"2'-6"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"

SwingDoor

Core Fin

------

---

---------------

Elev

------N

IMFFFNN

CW14NN---FF

HGFF

HGF

CW16F2F

HGHGHGHGFFFFFFFFFF

IMFFFFFFFFFFFFFFFFFFFFFFNFFFGFFN

Glazing

------

WIRED---------

WIREDWIRED

INSULATEDWIREDWIRED

---------

TEMPERED------

TEMPERED---

INSULATED------

TEMPEREDTEMPEREDTEMPEREDTEMPERED

------------------------------------------------------------------------------------------------

TEMPERED---------

TEMPERED------

TEMPERED

Frame

Mat

------

HMGALV HM

HMHMHMHM

ALUMHMHM---

HMHMHMHMHMHMHM

ALUMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHM

GALV HMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHM

Fr Type

------N

IMFFFNN

CW14F2N---F2F

HGFF

HGF

CW16F2 SIM

FHGHGHGHGFFFFFFFFFF

IMFFF

F2FFFFFFFFFFFFFFFFFFNFFFGFFN

Fire Rating

Label

------

60 MIN---------

90 MIN90 MIN

---60 MIN60 MIN

---------------------------------------------------------------------------------------------------------------------------------------------------------------------

Closer

------

YESYESYESYESYESYESYESYESYES---

YES---------

YES------

YES---

YES---------------

YES------------------------

YES---------------------------------------------------------------------------------------

Panic

------

YESYES------

YESYESYESYESYES---

YES------------------

YES-----------------------------------------------

YES---------------------------------------------------------------------------------------

Lockset

---------

YES---------

YESYESYESYES---

YESYESYESYES

PRIVACYYESYESYESYES

PRIVACYYESYESYESYESYES

PRIVACY---------------

YESYESYESYESYESYESYES------

YES---

YESPRIVACY

YES---

YESYESYES------------

PRIVACYYES

PRIVACYYESYESYES

PRIVACYYESYESYESYES

Notes / Remarks

BY ELEVATOR MANUFACTURERBY ELEVATOR MANUFACTURER

8" FRAME, FULL WIDTH ALUM THRESHOLD, WEATHERSTRIPPINGPUSH/PULL,SERVICE DEADBOLTPUSH/PULL,SERVICE DEADBOLT

FLUSHBOLTS AT INACTIVE PANEL, THRESHOLD, WTHERSTRPPG

BY ELEVATOR MANUFACTURER

THRESHOLD, WEATHERSTRIPPINGFLUSHBOLTS AT INACTIVE PANEL

MIRROR AND HOOK AT EXAM SIDE OF EACH DOORMIRROR AND HOOK AT EXAM SIDE OF EACH DOORMIRROR AND HOOK AT EXAM SIDE OF EACH DOORMIRROR AND HOOK AT EXAM SIDE OF EACH DOORMIRROR AND HOOK AT EXAM SIDE OF EACH DOOR

8" FRAME, FULL WIDTH ALUM THRESHOLD, WEATHERSTRIPPING

PER PLAN/SCHEDULE

4'-0"

TYPICAL EXTERIOR & INTERIOR STEEL DOOR & FRAME:

IMF IMG

TYPICAL INTERIOR DOORS & FRAMES:1 3/4" 7-PLY SOLID CORE FLUSH DOOR W/ HARDWOOD VENEER.PREFINISHED PARTICLE CORE W/ 30 PCF DENSITY.MINERAL CORE AT RATED DOORS, MATCHING LAMINATED STILES.ADHESIVES SHALL CONTAIN NO FORMALDEHYDE.1/4" TEMPERED GLASS AT VISION PANELS.1/4" WIRED GLASS, SQUARE PATTERN, AT FIRE RATED OPENINGS.

HOLLOW METAL FRAMES. 2" DRYWALL KD 18 GA.,1/2" BACKBEND,16 GA. AT FIRE RATED OPENINGS.PRIMED. COMPRESSION ANCHORS & 7 GA. HARDWARE REINFORCEMENTS.

F2

GHG N

FSF

GS

ALUM/FULL

TYPICAL EXTERIOR & INTERIOR ALUMINUM DOOR & FRAME:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.INSULATED TO U.23 W/ EXPANDED POLYSTYRENE.INSULATED & TEMPERED GLAZING AT VISION PANELS.

2 1/2" X 6" ANODIZED ALUMINUM W/ EXTERIOR SET 1" INSULATED LOW-ETEMPERED GLAZING. THERMALLY BROKEN FRAME. 5" WIDE STILE & RAIL W/10" BOTTOM RAIL & 10" INTERMEDIATE RAIL DOORS. PROVIDE FINISH PERSPECIFICATION.

INTERIOR:

2"X4 1/2" ANODIZED ALUMINUM W/ CENTER SET 1/4" TEMPERED GLAZING. 31/2" MEDIUM STILE & RAIL W/ 6 1/2" BOTTOM RAIL & 8 1/4" INTERMEDIATE RAILDOORS. PROVIDE FINISH PER SPECIFICATION.

EXTERIOR:

MG/FULLMF MG

EXTERIOR:

INTERIOR:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.TEMPERED GLAZING AT VISION PANELS.

MN

IMF2

F4 (XRAY)INACTIVE/ACTIVE

FS

10-3-2011

Physical Therapy

Page 7: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A607

Sept. 7, 2011date:proj. no.:

Door and FrameSchedule - 2ndFloor North

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

DOOR AND FRAME SCHEDULE - SECOND FLOOR - NORTH WING

Door No.

N-201AN-201BN-205N-206N-207

N-207AN-208

N-208AN-208BN-209

N-209AN-210N-211N-212N-213N-214N-217N-218N-219N-220N-221N-222N-223N-225N-227

N-228AN-228BN-228CN-228DN-229N-230N-231N-232

N-233AN-233BN-234N-236N-237

N-237AN-237BN-238AN-238BN-239N-240N-241N-242N-243

N-244AN-244BN-245N-247

N-248AN-249N-250N-251N-252N-253N-254N-255N-256N-257

N-258AN-259AN-259BN-261N-262N-263N-264N-265N-266N-267N-268N-269N-270N-271

From

ElevatorElevatorToilets AlcoveToilets AlcoveCorr.Exit Corr.Workman's. Comp.Workman's. Comp.Workman's. Comp.Waiting AMech.Spine & Brain CorridorReceptn.Receptn.Receptn.Spine & Brain CorridorExit Corr.Exit Corr.ToiletSpine & Brain CorridorSpine & Brain CorridorSpine & Brain CorridorSpine & Brain CorridorLoop CorridorToiletLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorConn. Corr.ToiletWaiting AX-Ray WaitCorridorX-Ray WaitX-Ray WaitConn. Corr.

Reception

CorridorIT.IT.UtilityCorridorStor.CorridorCorridorCorridorToiletCorridorCorridorCorridorCorridorCorridorClosetLoop CorridorLoop CorridorLoop CorridorToiletLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorLoop CorridorToiletLoop Corridor

To Room

Elevator LobbyElevator LobbyM. ToiletW. ToiletNew SE Stair-UpExtg SE Stair-DownMain LobbyConf. AConf. BSpine & Brain CorridorSpine & Brain CorridorReceptn.ConferenceAdmin.ResearchExamExamStor.Exit Corr.ExamExamExamExamExamLoop CorridorP.A.1P.A.2P.A.3P.A.4ConsultConsultConsultConsultStaffStaffD.M.E.CorridorX-Ray WaitChangeX-Ray WaitX-RAY AX-RAY BTechnicianWaiting BCorridorAdmin.ToiletCorridorCorridorCorridorExamCorridorConsultExamExamCorridorExamConsultConsultExamExamLoop CorridorCastCastExamLoop CorridorExamConsultConsultExamExamConsultExamLoop CorridorExam

W x H Size

4'-6"x7'-0"4'-6"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"4'-9"x7'-2"3'-0"x7'-0"3'-0"x7'-0"5'-1"x7'-2"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"4'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"4'-0"x7'-0"4'-0"x7'-0"3'-0"x7'-0"3'-6"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-6"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"

SwingDoor

Core Fin Elev

FFNNHM06HGHGHM05-FFHGHGHGHGFFFFFFFFFFFFFFFFFFFFFFHGFNF4F4FGNFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF

Glazing

------

WIREDWIRED

TEMPEREDTEMPEREDTEMPEREDTEMPERED

---TEMPEREDTEMPEREDTEMPEREDTEMPERED

------------------------------------------------------------------

TEMPERED---

TEMPERED---------

TEMPEREDTEMPERED

------------------------------------------------------------------------------------------

Frame

Mat

HMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHM

Fr Type

FFNN

HM06HGHG

HM05F

HGHGHGHGFFFFFFFFFFFFFFFFFFFFFF

HGFNF4F4FGNFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF

Fire Rating

Label

------

90 MIN90 MIN

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Closer

YESYESYESYES---------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------------------------------

Panic

------

YESYES--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Lockset

------YESYESYESYESYESYESYESYESYESYESYES------YESPRIVACY---------------PRIVACYYESYESYESYESYESYESYESYESYESYESYESPRIVACYYESYESYESYESYESYESYESYESYESPRIVACYYESYESYES---YESYES------PRIVACY---YESYES------YESYESYES---PRIVACY---YESYES------YES---PRIVACY---

Notes / Remarks

BY ELEVATOR MANUFACTURERBY ELEVATOR MANUFACTURER

3'-6" X 7' DOOR WITH POWER OPERATOR, FULL SIDELIGHT

LEAD LINING TBDLEAD LINING TBD

POWER DOOR OPERATOR

PER PLAN/SCHEDULE

4'-0"

TYPICAL EXTERIOR & INTERIOR STEEL DOOR & FRAME:

IMF IMG

TYPICAL INTERIOR DOORS & FRAMES:1 3/4" 7-PLY SOLID CORE FLUSH DOOR W/ HARDWOOD VENEER.PREFINISHED PARTICLE CORE W/ 30 PCF DENSITY.MINERAL CORE AT RATED DOORS, MATCHING LAMINATED STILES.ADHESIVES SHALL CONTAIN NO FORMALDEHYDE.1/4" TEMPERED GLASS AT VISION PANELS.1/4" WIRED GLASS, SQUARE PATTERN, AT FIRE RATED OPENINGS.

HOLLOW METAL FRAMES. 2" DRYWALL KD 18 GA.,1/2" BACKBEND,16 GA. AT FIRE RATED OPENINGS.PRIMED. COMPRESSION ANCHORS & 7 GA. HARDWARE REINFORCEMENTS.

F2

GHG N

FSF

GS

ALUM/FULL

TYPICAL EXTERIOR & INTERIOR ALUMINUM DOOR & FRAME:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.INSULATED TO U.23 W/ EXPANDED POLYSTYRENE.INSULATED & TEMPERED GLAZING AT VISION PANELS.

2 1/2" X 6" ANODIZED ALUMINUM W/ EXTERIOR SET 1" INSULATED LOW-ETEMPERED GLAZING. THERMALLY BROKEN FRAME. 5" WIDE STILE & RAIL W/10" BOTTOM RAIL & 10" INTERMEDIATE RAIL DOORS. PROVIDE FINISH PERSPECIFICATION.

INTERIOR:

2"X4 1/2" ANODIZED ALUMINUM W/ CENTER SET 1/4" TEMPERED GLAZING. 31/2" MEDIUM STILE & RAIL W/ 6 1/2" BOTTOM RAIL & 8 1/4" INTERMEDIATE RAILDOORS. PROVIDE FINISH PER SPECIFICATION.

EXTERIOR:

MG/FULLMF MG

EXTERIOR:

INTERIOR:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.TEMPERED GLAZING AT VISION PANELS.

MN

IMF2

F4 (XRAY)INACTIVE/ACTIVE

FS

10/6/2011

Ortho In/Out

Ortho In/Out

Page 8: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A608

Sept. 7, 2011date:proj. no.:

Door and FrameSchedule - 2ndFloor South and3rd Floor North

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

DOOR AND FRAME SCHEDULE - SECOND FLOOR - SOUTH WING

Door No.

S-202AS-202BS-205AS-205BS-207S-208S-211S-212

S-213AS-213BS-213CS-214S-215S-216S-217S-218S-219S-220S-221

S-223AS-223BS-225S-228S-229S-230S-231S-232S-233S-236S-237S-238S-239S-240

S-241AS-243S-244S-245S-246S-247S-248S-249S-250S-251S-253S-255

From

Corr.Corr.Podiatry - in/outPain Mgmt. - in/outCorridorCorridorToiletCorridorCorridorCorridorStor.CorridorCorridorCorridorCorridorCorridorCorridorToiletCorr.CorridorPodiatry - in/outPain Mgmt. - in/outStorageCorridorCorridorCorridorCorridorCorridorWest Corr.West Corr.East Corr.ToiletEast Corr.CleanEast Corr.East Corr.East Corr.West Corr.West Corr.West Corr.West Corr.West Corr.West Corr.West Corr.Stor.

To Room

Jan.I. T.Common WaitingCommon WaitingClinical TrialsAdminCorridorStaffCleanSoiledCorridorExamExamConsultExamExamConsultCorridorInfuseCommon FilingCommon FilingToiletCorridorConsultConsultExamExamExamMain LobbyProcedureStaffEast Corr.LabEast Corr.ConsultExamExamExamConsultExamExamExamConsultFluoroscopyWest Corr.

W x H Size

3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"6'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"3'-0"x7'-0"

SwingDoor

Core Fin Elev

FFFSFSFFFFFFFFFFFFFFFFFFFFFFFFNFNFFFFFFFFFFFFFF

Glazing

------

TEMPEREDTEMPERED

------------------------------------------------------------------------

TEMPERED---

TEMPERED---------------

------------------------

Frame

Mat

HMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHMHM

Fr Type

FF

FSFSFFFFFFFFFFFFFFFFFFFFFFFFNFNFFFFFFFFFFFFFF

Fire Rating

Label

--------------------------------------------------------------------------------------------------------------------------------------

Closer

------

YESYES------------------------------------------------------------------------

------------------------------------------------

Panic

---------------------------------------------------------------------------------------------------------------------------------------

Lockset

YESYESYESYESYESYESPRIVACYYESYESYESYES------YES------YESPRIVACYYESYESYESPRIVACYYESYESYES---------YES---YESPRIVACYYESYESYES---------YES---------YESYESYES

Notes / Remarks

FLUSH BOLTS AT INACTIVE PANEL

FINISH SCHEDULE - THIRD FLOOR - NORTH WING

ROOM

#

N-301N-301aN-301bN-302N-303N-304N-305N-306

Name

Elevator LobbyElevatorElevatorN. Stair LandingNorth StairStorageS-East StairExpansion Area

Area

272.7785.4685.4678.57244.0879.57108.995,931.46

Floor

CPT 3CPT 3CPT 3RUBBERRUBBERVCTRUBBERUNFINISHED

WALLS

North

---------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

South

---------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

East

PTD GWB------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

West

PTD GWB------PTD GWBPTD CMUPTD GWBPTD CMUPTD GWB

Base

VINYL------VINYLVINYLVINYLVINYL---

CEILING

FINISH

ACT------EXPSD STRUCTSKYLIGHTACTACTEXPSD STRUCT

HEIGHT

SEE RCP---------SEE SECT.SEE RCPSEE RCP---

#

N-301N-301aN-301bN-302N-303N-304N-305N-306

NOTES

FINISHES BY ELEVATOR MFTRFINISHES BY ELEVATOR MFTR

PRIMED GWB AT FURRED EXTERIOR WALLS

PER PLAN/SCHEDULE

4'-0"

TYPICAL EXTERIOR & INTERIOR STEEL DOOR & FRAME:

IMF IMG

TYPICAL INTERIOR DOORS & FRAMES:1 3/4" 7-PLY SOLID CORE FLUSH DOOR W/ HARDWOOD VENEER.PREFINISHED PARTICLE CORE W/ 30 PCF DENSITY.MINERAL CORE AT RATED DOORS, MATCHING LAMINATED STILES.ADHESIVES SHALL CONTAIN NO FORMALDEHYDE.1/4" TEMPERED GLASS AT VISION PANELS.1/4" WIRED GLASS, SQUARE PATTERN, AT FIRE RATED OPENINGS.

HOLLOW METAL FRAMES. 2" DRYWALL KD 18 GA.,1/2" BACKBEND,16 GA. AT FIRE RATED OPENINGS.PRIMED. COMPRESSION ANCHORS & 7 GA. HARDWARE REINFORCEMENTS.

F2

GHG N

FSF

GS

ALUM/FULL

TYPICAL EXTERIOR & INTERIOR ALUMINUM DOOR & FRAME:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.INSULATED TO U.23 W/ EXPANDED POLYSTYRENE.INSULATED & TEMPERED GLAZING AT VISION PANELS.

2 1/2" X 6" ANODIZED ALUMINUM W/ EXTERIOR SET 1" INSULATED LOW-ETEMPERED GLAZING. THERMALLY BROKEN FRAME. 5" WIDE STILE & RAIL W/10" BOTTOM RAIL & 10" INTERMEDIATE RAIL DOORS. PROVIDE FINISH PERSPECIFICATION.

INTERIOR:

2"X4 1/2" ANODIZED ALUMINUM W/ CENTER SET 1/4" TEMPERED GLAZING. 31/2" MEDIUM STILE & RAIL W/ 6 1/2" BOTTOM RAIL & 8 1/4" INTERMEDIATE RAILDOORS. PROVIDE FINISH PER SPECIFICATION.

EXTERIOR:

MG/FULLMF MG

EXTERIOR:

INTERIOR:

16 GA. FULL FLUSH PRIMED & PTD. G60 GALVANIZED.TEMPERED GLAZING AT VISION PANELS.

MN

IMF2

F4 (XRAY)INACTIVE/ACTIVE

FS

10/6/2011

Page 9: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A609

Sept. 7, 2011date:proj. no.:

Elevations -Windows-CurtainWalls

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

7'-0

"3'

-6"

10'-6

"

3'-1

"

2'-7

"10

"

T.

T.

T.

T.

T.

T.

T.

T.

T.T.

2 1/4" x 8" ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

WIDE STILE DOORAUTOMATIC DOOR OPERATORON BOTH LEAVES

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

1st Floor Top of Slab±0"

9'-0

"

3'-0" 5" 12'-0" 5" 3'-0"

2'-11 1/2" 2'-11 1/2" 2'-11 1/2" 2'-11 1/2"

3'-0

"

11'-0"

9'-0

"R. O.

R. O

.

R. O. R. O.

+Second Floor - T. o. Slab

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

N

7'-0

"3'

-6"

6"3'

-0"

6'-0

"

3'-0

"3'

-0"

10'-6

"6"

9'-0

"

11'-7 3/4"

10'-6

"6"

9'-0

"

EQ. EQ. EQ. EQ.

2"2'

-9"

2"3'

-11"

R. O.

R. O

.

T. T.

T. T.

T.

T.

T.

R. O

.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

7'-0

"4'

-0"

3'-0

"6'

-0"

11'-0

"9'

-0"

3'-0

"3'

-0"

11'-0

"9'

-0"

6'-6"

3'-2 3/4" 3'-3 1/4"

3'-1

"

R. O.

R. O

.

T. T.

R. O

.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

10'-6

"

6'-6"

3'-1 5/8" 3'-1 5/8"

7'-0

"3'

-6"

3'-1

"

R. O.

T. T.

R. O

.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

1st Floor Top of Slab±0"

3'-0

"6'

-4"

3'-8"

R.O

. & M

.O.

R.O. & M.O.

TYPICAL ALUMINUM SUB-SILLOVER ROWLOCK BRICK SILLSEE SECTION W-4b / A309

SOLDIER COURSE ONGALVANIZED STEEL ANGLELINTEL SEE STRUCTURALDRAWINGS

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1st Floor Top of Slab±0"

1'-0

"9'

-6"

6"10

'-6"

6"3'

-11"

6'-0

"3'

-6"

6"3'

-0"

4'-5

"3'

-1"

6"

2'-2"

7'-0

"

R.O.

R.O

.R

.O.

R.O

.

T.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

SPANDREL GLASS PANELWITH BACKER AND FLASHINGTO SKYLIGHT BEYOND

ALUMINUM CAP AND FLASHINGTO SKYLIGHT BEYOND

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

3rd Floor T.o. Slab & 1970 Roof+22'-0"

2'-0

"8'

-6"

6"10

'-6"

6"3'

-11"

5'-0

"3'

-6"

3'-0

"4'

-5"

3'-1

"

2'-2"

7'-0

"

R.O.

R.O

.R

.O.

R.O

.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

SPANDREL GLASS PANELWITH BACKER AND FLASHINGTO SKYLIGHT BEYOND

ALUMINUM CAP AND FLASHINGTO SKYLIGHT BEYOND

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

ALUMINUM INFILL PANELSTO MATCH WINDOW FRAMES

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

3rd Floor T.o. Slab & 1970 Roof+22'-0"

2'-0

"8'

-6"

6"10

'-6"

6"3'

-11"

5'-0

"3'

-6"

1'-9"

3'-0

"4'

-5"

3'-1

"

7'-0

"

R.O.

R.O

.R

.O.

R.O

.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

SPANDREL GLASS PANELWITH BACKER AND FLASHINGTO SKYLIGHT BEYOND

ALUMINUM CAP AND FLASHINGTO SKYLIGHT BEYOND

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

ALUMINUM INFILL PANELTO MATCH WINDOW FRAMES

ALUMINUM INFILL PANELTO MATCH WINDOW FRAMES

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

3rd Floor T.o. Slab & 1970 Roof+22'-0"

3'-0

"6'

-4"

4'-2

"2'

-2"

3'-4"

R.O

. & M

.O.

R.O. & M.O.

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

ALUMINUM SILL WITH DRIPEDGE OVER CUT AS REQUIREDBRICK COURSE(TYP. AT 1ST FLR. GALLERY& 1963 GYM NORTH WALL)

8" BRICK SOLDIER COURSE(SEE WEST ELEVATION- GALLERY WINDOW)

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1st Floor Top of Slab±0"

2'-0

"1'

-0"

4'-2

"2'

-2"

3'-0

"6'

-4"

6'-4"

3'-2" 3'-2"

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

ALUMINUM SILL WITH DRIP EDGE(TYP. AT 1ST FLR. 1963 GYM NORTH WALL)

CUT TO FIT BRICK SOLDIER COURSE(SEE NORTH ELEVATION1963 GYM NORTH WALL)

**ALUMINUM SILL SET OVER ROWLOCK BRICK SILLTYPICAL AT ALL OTHER LOCATIONS (1963 POOLEAST & NORTH WALL)

R.O. & M.O.

R.O

. & M

.O.

BRICK SOLDIER COURSE(SEE NORTH ELEVATION 1963 GYM NORTH WALL)

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1st Floor Top of Slab±0"

SCALE: 1/4" = 1'-0"CW01 Main Entry Curtain Wall

SCALE: 1/4" = 1'-0"CW02 Main Lobby 2nd Floor Window

SCALE: 1/4" = 1'-0"CW03 Main Lobby-Stair Curtain WallSCALE: 1/4" = 1'-0"CW04 Cafe-Lobby Curtain Wall

SCALE: 1/4" = 1'-0"CW05 Cafe WindowSCALE: 1/4" = 1'-0"CW06 Cafe Window

SCALE: 1/4" = 1'-0"CW07 Gallery Curtain WallSCALE: 1/4" = 1'-0"CW08 Gallery Curtain Wall

SCALE: 1/4" = 1'-0"CW09 Gallery Curtain WallSCALE: 1/4" = 1'-0"CW10 63s-Gallery & Medical Office Window

SCALE: 1/4" = 1'-0"CW11 63s-Medical Office Window10/6/2011

Page 10: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A610

Sept. 7, 2011date:proj. no.:

Elevations -Windows-CurtainWalls

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

3'-0

"6'

-10"

2"1'

-0"

8"2'

-4"

7'-2

"

2" 3'-0" 2"

ALUMINUM SOLAR SHADE

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

T.

T.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS3070 ALUMINUM DOORMEDIUM STILECLOSER, PANIC.FULL WIDTH THRESHOLD

1" INSULATED, TEMPEREDSAFETY GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

CW12 WINDOWUSED AT TWO LOCATIONS

T.

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

3'-0

"

8"2'

-4"

5'-0

"

8"7'

-4"

8"2'

-4"

7'-2

1/2

"

3'-0

"4'

-2 1

/2"

6"

18'-5 3/4"

2'-7 3/8" 2'-7 3/8" 2'-7 3/8" 2'-7 3/8" 2'-7 3/8" 2'-7 3/8" 2'-7 3/8"

ALUMINUM SOLAR SHADE

R.O

.R

.O.

R.O

.

T. T. T. T. T. T. T.

T. T. T. T. T. T. T.

R.O.

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

9'-1

0"

7'-0

"2'

-10"

6" 5'-6"

3'-0

"

2'-2" +/- 3'-0"

R.O

.

R.O.

2" X 6" ALUMINUM FRAMES WITH1" INSULATED GLASS

T.

T.

T.

T.

1" INSULATED, TEMPEREDSAFETY GLASSSEE SCHEDULE DOOR N-109

ALUMINUM CORNER CLOSURE

WIDE STILE DOORS

1st Floor Top of Slab±0"

2'-2" 6"

9'-1

0"

7'-0

"2'

-10"

6"2'

-2"

8"

R.O

.

R.O.

2" X 6" THERMALLY BROKENALUMINUM FRAMES WITH1" INSULATED GLASS

ALUMINUM CORNER CLOSURE

T.

T.

1" INSULATED, TEMPEREDSAFETY GLASS

1st Floor Top of Slab±0"

7'-2

" +/-

7'-0

"2"

1'-4"+/- 3'-0"

4'-8"

R.O

.

R.O. & M.O.

T.

T.

1" INSULATED, TEMPEREDSAFETY GLASS

T.

T.

THERMAL BRAKE -ALUMINUM FRAMES

WIDE STILE DOOR

ALUMINUMCOMPOSITE PANELS

1st Floor Top of Slab±0"

10'-0

"

4'-1" 3'-0" 3'-0" 4'-1"

3'-8" 1'-4" 18'-0" 14'-2"

EQ. EQ. EQ. EQ.6'-0"

3'-4" +/-

6"2'

-2"

8"

8'-0

"2'

-0"

10'-0

"

8'-0

"

6"2'

-2"

8"

ALUMINUM COIL INFILLFLUSH WITH FRAMES

M.O

.

M.O.M.O.M.O.M.O.

T.

T.

1" INSULATED, TEMPEREDSAFETY GLASS

THERMAL BRAKE -ALUMINUM FRAMESSEE SCHEDULE DOOR S-107

M.O

.

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

T.

T.

T.

T.

T.

T.

FLUSH PTD GALV STEEL DOORAND FRAME

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

1st Floor Top of Slab±0"

3'-0

"4'

-2"

3'-4"

7'-2

"

ALUMINUM SILL SET OVERTYPICAL ROWLOCK BRICK SILL

ALUMINUM COMPOSITE PANELS- TYPICAL 2ND FLOOR POOL WING

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

R.O

.

R.O.1"+/- ALUMINUM TRIMABOVE WINDOW FRAMESEE WALL SECTIONW-1a/A301

2nd Floor Top of Slab+11'-0"

6'-4"

R.O. 3'-2"

3'-0

"4'

-2"

7'-2

"

ALUMINUM SILL SET OVERTYPICAL ROWLOCK BRICK SILL

ALUMINUM COMPOSITE PANELS- TYPICAL 2ND FLOOR POOL WING

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

R.O

.

R.O.1"+/- ALUMINUM TRIMABOVE WINDOW FRAMESEE WALL SECTIONW-1a/A301

2nd Floor Top of Slab+11'-0"

2'-4

3/8

"7'

-3"

1"

8"1'

-8 3

/8"

4'-7

5/8

"2'

-7 3

/8"

1"

7'-0

"

3'-3"

M.O

. & R

.O.

M.O.

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

1" ALUMINUM TRIMABOVE WINDOW FRAMESEE SECTION C5/A410

ALUMINUM FLASHING WITH DRIPEDGE (CONTINUED AT ADJACENTEXISTING CONCRETE CURB FLASHING)WITH CONTINUOUS CLEAT OVERTURNED UP ROOF FLASHINGSEE SECTION C5/A410

2nd Floor Top of Slab+11'-0"

3rd Floor T.o. Slab & 1970 Roof+22'-0"

3'-0

"6'

-8"

4'-2

"2'

-6"

3'-0

"6'

-8"

6'-4"

3'-2" 3'-2"ALUMINUM COMPOSITE PANELS

ALUMINUM FLASHINGAT TOP OF BRICK & WINDOWSSEE SECTION W-4b / A309

TYPICAL ALUMINUM SUB-SILLOVER ROWLOCK BRICK SILLSEE SECTION W-4b / A309

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

ALUMINUM SOLAR SHADES

R.O

. & M

.O.

R.O. & M.O.

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

2nd Floor Top of Slab+11'-0"

3'-0

"6'

-8"

3'-4"

3'-0

"6'

-8"

4'-2

"2'

-6"

ALUMINUM COMPOSITE PANELS

ALUMINUM FLASHINGAT TOP OF BRICK & WINDOWSSEE WALL SECTIONSW-3a W-4a & W-4b / A309

TYPICAL ALUMINUM SUB-SILLOVER ROWLOCK BRICK SILLSEE WALL SECTION W-4b / A309

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

ALUMINUM SOLAR SHADES

R.O

. & M

.O.

R.O. & M.O.

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

2nd Floor Top of Slab+57'-0"

3'-0

"5'

-10

1/2"

3'-4"

4'-2

"1'

-8 1

/2"

3'-0

"5'

-10

1/2"

ALUMINUM COMPOSITE PANELS

TYPICAL ALUMINUM SUB-SILLOVER ROWLOCK BRICK SILLSEE WALL SECTION W-2a / A305

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

R.O

. & M

.O.

R.O. & M.O.

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

3rd Floor T.o. Slab & 1970 Roof+22'-0"

3'-2" 3'-2"

6'-4"

3'-0

"5'

-10

1/2"

4'-2

"1'

-8 1

/2" ALUMINUM COMPOSITE PANELS

TYPICAL ALUMINUM SUB-SILLOVER ROWLOCK BRICK SILLSEE WALL SECTION W-2a / A305

R.O

. & M

.O.

R.O. & M.O.

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

3rd Floor T.o. Slab & 1970 Roof+22'-0"

8"7'

-4"

7"2'

-5"

7'-2

"2" 3'-0" 2"

2'-4

"2"

ALUMINUM SOLAR SHADE

ALUMINUM LOUVER WITH3" INSULATED BACKER PANEL

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

THERMAL BRAKE -ALUMINUM FRAMES WITH1" INSULATED GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

1" INSULATED, TEMPEREDSAFETY GLASS

CW12 WINDOWUSED AT TWO LOCATIONS

1st Floor Top of Slab±0"

2nd Floor Top of Slab+11'-0"

SCALE: 1/4" = 1'-0"CW12A Physical TherapySCALE: 1/4" = 1'-0"CW13 Physical Therapy-P.A. Curtain Wall

SCALE: 1/4" = 1'-0"CW14 East Vestibule-FreightSCALE: 1/4" = 1'-0"CW15 East Vestibule-Freight

SCALE: 1/4" = 1'-0"CW16 Data-Staff-East Egress

SCALE: 1/4" = 1'-0"CW17 Meeting Area Curtain WallSCALE: 1/4" = 1'-0"CW18 East 2nd Floor-Medical Office Window

SCALE: 1/4" = 1'-0"CW19 East 2nd Floor-Medical Office Window

SCALE: 1/4" = 1'-0"CW20 S-East Stair WindowSCALE: 1/4" = 1'-0"CW21 South 2nd Floor-Medical Office Window

SCALE: 1/4" = 1'-0"CW22 South 2nd Floor-Medical Office WindowSCALE: 1/4" = 1'-0"CW23 3rd Floor Window

SCALE: 1/4" = 1'-0"CW24 3rd Floor Window

SCALE: 1/4" = 1'-0"CW12 Physical Therapy

10/6/2011

10/20/2011

Page 11: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A611

Sept. 7, 2011date:proj. no.:

Elevations -Windows-CurtainWalls-Skylights

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

+30'-10 5/8

8'-1

0 5/

8"3

1/8"

1" EQ. EQ. EQ. EQ. 1" 6"

4'-1

0 5/

8"

1'-1/8" 14'-7 7/8"

15'-8" 6"

3'-3

/8"

1 3/

8"5'

-2"

1/2"

16'-4"

4 3/8"

6"

124

FOR SKYLIGHTSEE DETAIL SECTIONS :A2 / A402 & A3 / A403

SKYLIGHT - SKY2

INFILLTO MATCH

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

ALUMINUMCOMPOSITEPANELS +/-

T.

1" INSULATEDTEMPERED SAFETYGLASS(THESE TWO PANELSAT CW25-MIRROREDONLY)

T.

USE CW25 - MIRROREDCURTAIN WALL AT OTHERSIDE OF NORTH STAIR

3rd Floor T.o. Slab & 1970 Roof+22'-0"

1'-4

"7'

-2"

4 5/

8"9

3/8"

10 3

/4"

1'-1

0"5'

-4"

4 1/

2"1/

8"

16'-1"

1" 3'-2 1/4" EQ. EQ. EQ. 3'-2 1/8" 1"

3'-0"

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

ALUMINUM COMPOSITE PANELS

1" INSULATED, TEMPEREDSAFETY GLASS

T.T. T. T.

R.O

.

R.O.

ALUMINUM COPING ROOF EDGESEE SECTION 4/A205 ANDC5/A410 - FOR SIMILAR

ALUMINUM INFILL PANELSTO MATCH FRAMES

USE CW27 AT TWO LOCATIONS:EACH SIDE OF ELEVATOR LOBBY@ THIRD FLOOR (ONE-MIRRORED)

ROOFFLASHING

ALUMINUM SILL FLASHING SETOVER ROOFING MEMBRANE- ROOF FLASHING RETURN

TYPICALCOPPERCOUNTERFLASHING

T.

T.

ROOF ACCESS- NARROW STILEDOOR WITH 1" INS.TEMPERED GLASS

3rd Floor T.o. Slab & 1970 Roof+22'-0"

M

1'-4

"3'-2

"1'

-8"

3'-8

"4

1/2"

1/8" 11

3/8

"8

3/4"

3'-2

"5'

-4"

4 5/

8"1'

-8 1

/8"

2'-5 1/2"1"

2'-5 1/2"5"

4'-2" 6"

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

ALUMINUM COMPOSITE PANELS

R.O

.

R.O.

ALUMINUM COPING ROOF EDGESEE SECTION DETAIL C5/A410

ALUMINUM INFILL PANELSTO MATCH FRAMES

R.O. R.O.

ROOFFLASHING

ALUMINUM SILL FLASHING SETOVER ROOFING MEMBRANEFLASHING RETURN

ALUMINUM LOUVER WITH3" INSULATED BACKINGPANEL

TYPICALCOPPERCOUNTERFLASHING

CW30-aCW30-b CW30-c

CW30-b CW30-c CW30-a

3rd Floor T.o. Slab & 1970 Roof+22'-0"

M

3'-2

"5'

-4"

4 5/

8"1'

-8 1

/8"

5'-4

"4

1/2"1/

8"11

3/8

"8

3/4"

1'-8

"

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

ALUMINUM COMPOSITE PANELS

ALUMINUM COPING ROOF EDGESEE SECTION DETAIL C5/A410

ALUMINUM INFILL PANELS ANDCORNER TRIMSTO MATCH WINDOW FRAMES

ALUMINUM SILL FLASHING SETOVER ROOFING MEMBRANEFLASHING RETURN

ALUMINUM COMPOSITE PANELS

FACE OF COLUMN(BEYOND & FOREGROUND)

ALUMINUMCOMPOSITEPANELS

3rd Floor T.o. Slab & 1970 Roof+22'-0"

4

5'-4

"4

5/8"

1'-8

1/4

"

5'-4

"4

1/2"

1/8" 11 3

/8"

8 7/

8"

1'-8

"

6" 19'-10" 6"

1"+/- EQ. EQ. EQ. EQ. EQ. 1"

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

ALUMINUM COMPOSITE PANELS

ALUMINUM COPING ROOF EDGESEE SECTION DETAIL C5/A410

ALUMINUM INFILL PANELS ANDCORNER TRIMSTO MATCH WINDOW FRAMES

ALUMINUM SILL FLASHING SETOVER ROOFING MEMBRANE- ROOF FLASHING RETURN

ROOFFLASHING

ALUMINUMCORNERTRIM

3rd Floor T.o. Slab & 1970 Roof+22'-0"

10'-0"

EQ. EQ. EQ. 1"

4 3/

8"1

3/8"

5'-2

"

FOR SKYLIGHTSEE DETAIL SECTIONS :A2 / A402 & A3 / A403

ALUMINUM COMPOSITE PANELS

ALUMINUM FLASHINGAT TOP OF SKYLIGHT

THERMAL BRAKE -ALUMINUM FRAMESWITH 1" INSULATED GLASS

3rd Floor T.o. Slab & 1970 Roof+22'-0"

13'-3

"

4 1/

2"12

'-6"

4 1/

2"

1"4'

-1 3

/8"

EQ

.E

Q.

1"+/

-4

1/2"

12'-8"

4 1/2" 11'-11" 4 1/2"

1" EQ. EQ. 3'-11" 1"

THERMAL BRAKE -ALUMINUM FRAMES WITH1" TEMPERED SAFETYINSULATED GLASSFACE GLAZING

INSULATED ALUMINUMCURB AND FLASHINGCOLOR TO MATCHSKYLIGHT FRAMES

SEE SECTION W-8a/A308AND RELATED DETAILS

+/- O

VE

R A

LL

R.O

.

R.O.

+/- OVER ALL

10'-0"

16'-9

"

4 3/

8"16

'-4"

5/8"

1"4'

-1/2

"E

Q.

EQ

.4'

-1/2

"1"

6" 9'-0" 6"

1" EQ. EQ. EQ. 1"

+/- O

VE

R A

LL

R.O

.

R.O.

+/- OVER ALL

THERMAL BRAKE -ALUMINUM FRAMES WITH1" TEMPERED SAFETYINSULATED GLASSFACE GLAZING

INSULATED ALUMINUMCURB AND FLASHINGCOLOR TO MATCHSKYLIGHT FRAMES ANDCURTAIN WALS CW25,CW25 MIRRORED & CW26

SEE SECTIONS:A1 & A2/A402 - A3 & A4/A403AND RELATED DETAILS

2'-5 3/4"

5'-8 1/4"

36'-9

1/2

" R.O

.

5'-6"

3'-5"

8'-1

1"9'

-5 1

/4"

9'-1

1 3/

4" +

/-9'

-6"

9'-6

"7'

-9 3

/4" +

/-

EQ.

EQ.

EQ.

EQ.

EQ.

EQ.

8'-1

1"8'

-11"

9'-9

1/8

" +/-

8'-3

/8" +

/-

89.15º+/-

R.O.

THERMAL BRAKE -ALUMINUM FRAMES WITH1" TEMPERED SAFETYINSULATED GLASSFACE GLAZING

INSULATED ALUMINUMCURB AND FLASHINGCOLOR TO MATCHSKYLIGHT FRAMES SEESECTIONS AND DETAILS

SEE SECTIONS:E2 & E3/A422AND RELATED DETAILS

R.O.

VERIFY ANGLEIF SLOPECHANGES

SLOPE 4/12

SLOPE 3'-9 1/8"/12'-0"

ALUMINUM WALLFLASHING SEESECTIONS ANDDETAILS

FLASHING TOCURTAIN WALLSPANDREL

SCALE: 1/4" = 1'-0"CW25 North Stair-3rd Floor Curtain Wall

SCALE: 1/4" = 1'-0"CW27 Elevator Lobby-Roof Access-3rd Floor Curtain Wall

SCALE: 1/4" = 1'-0"CW30 S-East Stair & Storage-3rd Floor Curtain WallSCALE: 1/4" = 1'-0"CW28 S-East Stair-3rd Floor Curtain Wall

SCALE: 1/4" = 1'-0"CW29 S-East Stair-3rd Floor Curtain Wall

SCALE: 1/4" = 1'-0"CW26 North Stair-3rd Floor Curtain Wall

SCALE: 1/4" = 1'-0"SKY1 Skylight at Cafe - LobbySCALE: 1/4" = 1'-0"SKY2 Skylight at North Stair

SCALE: 1/4" = 1'-0"SKY3 Skylight at Gallery

10/6/2011

Page 12: FINISH SCHEDULE - BASEMENT FLOOR · teamwork://g5server/SNHMC-Nashua-Rev High Gym-111107 Monday, November 14, 2011 2010002 revisions: A601 date: Sept. 7, 2011 proj. no.: Interior

team

wor

k://g

5ser

ver/S

NH

MC

-Nas

hua-

Rev

Hig

h G

ym-1

1110

7 M

onda

y, N

ovem

ber 1

4, 2

011

2010002

revisions:

A612

Sept. 7, 2011date:proj. no.:

Elevations -InteriorWindows-StoreFront

The

mat

eria

l con

tain

ed in

thes

e dr

awin

gs a

nd th

ede

sign

they

are

inte

nded

to c

onve

y ar

e th

e ex

clus

ive

prop

erty

of D

enni

s B

. Mire

s. P

osse

ssio

n an

d us

ehe

reof

is g

rant

ed o

nly

conf

iden

tially

in c

onne

ctio

n w

ithco

nstru

ctio

n an

d / o

r sal

e of

the

stru

ctur

e de

pict

edhe

rein

as

auth

oriz

ed b

y hi

m, a

nd th

e re

cipi

ent a

gree

sto

abi

de b

y th

ese

rest

rictio

ns.

Any

use

, rep

rodu

ctio

nor

des

clos

ure

of a

ny in

form

atio

n, in

who

le o

r in

part,

cont

aine

d he

rein

, with

out w

ritte

n pe

rmis

sion

of D

enni

sB

. Mire

s, is

exp

ress

ly p

rohi

bite

d.

11-11-11 PERMIT SET

So

uthe

rn N

ew

Ha

mp

shi

re M

ed

ica

l Ce

nte

rF

oun

da

tio

n M

ed

ica

l Pa

rtne

rs, I

nc.

17

Pro

sp

ec

t S

tre

et

Na

shu

a N

ew

Ha

mp

shi

re

6"2'

-2"

8"3'

-8"

1'-6

"

8'-6

"

3'-5" 6'-0" 3'-5"

6'-0"

R. O.

R. O

.

T. T. T. T.

T. T. T. T.

2" x 4 1/2" ALUMINUM FRAMES1/4" CLEAR GLASS

1/4" CLEAR TEMPEREDSAFETY GLASS

WIDE STILE DOORSAUTOMATIC OPERATORSWITH MULLION LOCATED CONTROLS

ALUMINUM 90º CORNERCOVER FLUSH WITHSTOREFRONT

1st Floor Top of Slab+46'-0"

7'-0

"1'

-6"

5"

2"2'

-9"

2"3'

-11"

2"1'

-2"

2"

10'-0"

EQ 2" EQ 2" EQR. O.

R. O

.

T. T. T.

2" x 5" STOREFRONTALUMINUM FRAMES

1/4" CLEAR TEMPEREDSAFETY GLASS

ALUMINUM 90º CORNERCOVER FLUSH WITHSTOREFRONT

USE SF02 AT TWO LOCATIONS:EACH SIDE OF MAIN ENTRYVESTIBULE @ FIRST FLOOR

T. T. T.

1/4" CLEAR GLASS

1st Floor Top of Slab+46'-0"

7'-0

"1'

-6"

7'-2

" +/-

2'-1

1"2"

1'-4" 6'-4" 1'-4"

T.

T.

T.

T.

T.

T.

T.

T.2" FACEPAINTED HOLLOW METAL FRAMES1/4" CLEAR TEMPEREDSAFETY GLASS

CLEAR FINISH HARDWOOD VENEER DOORSAUTOMATIC DOOR CONTROLCOORDINATE CONTROL SWITCH LOCATION WITHARCHITECT

1st Floor Top of Slab±0" 2"

2'-9

"2"

3'-1

1"

7'-2

"

T.

T.

T.

T.

PAINTED HOLLOW METAL FRAMEHARDWOOD VENEER DOOR1/4" TEMPERED SAFETY GLASS LITES

1st Floor Top of Slab±0"

7'-0

"

7'-2

"

5'-1"

2" 3'-6" 2"1'-1"

2"

R. O.

R. O

.

+/-

+/-

T.

T. PAINTED HOLLOW METAL FRAMEFLUSH HARDWOOD DOOR1/4" CLEAR TEMPEREDSAFETY GLASSPOWER OPERATOR

2nd Floor Top of Slab+11'-0"

7'-0

"

4'-9"

7'-0

"2" PAINTED HOLLOW METAL

FLUSH HARDWOOD VENEER DOOR1/4" CLEAR TEMPEREDSAFETY GLASS

NEW GWB. PAINTED

EXISTING CONCRETE WITH FURRINGAND GWB

NEW GWB. PAINTED

R.O.

T.

2nd Floor Top of Slab+11'-0"

7'-0

"2"

+/-

2'-4

1/2

"4'

-9 1

/2"

1 1/

2"

5'-4"

EQ. 2'-8"

PAINTED HOLLOW METAL FRAME1/4" CLEAR GLASS

HARDWOOD SILL

EXISTING CONCRETEFURRING AND GWB

NEW GWB. PAINTED

R.O

.

R.O.

WINDOW USED AT TWO LOCATIONS

2nd Floor Top of Slab+11'-0"

3'-4

"3'

-10"

7'-2

"

4'-0"

2" FACEPAINTED HOLLOW METAL FRAME1/4" CLEAR GLASS

NEW GWB. PAINTED

1st Floor Top of Slab±0"

3'-4

"3'

-10"

7'-2

"

5'-0"

2" FACEPAINTED HOLLOW METAL FRAME1/4" CLEAR GLASS

NEW GWB. PAINTED

Existing Bsmt Gym Mech.-13'-0"

Existing Bsmt Pool-South Side-10'-0"

SCALE: 1/4" = 1'-0"SF01 Vestibule Entry Doors and SidelightsSCALE: 1/4" = 1'-0"SF02 Vestibule Side Walls

SCALE: 1/4" = 1'-0"HM01 PT Waiting EntrySCALE: 1/4" = 1'-0"HM02 PT Entry Door & Sidelight

SCALE: 1/4" = 1'-0"HM05 Spine Entry Door and SidelightSCALE: 1/4" = 1'-0"HM06Workmen's Comp. Entry Door & Sidelight

SCALE: 1/4" = 1'-0"HM07Workmen's Comp. Window

SCALE: 1/4" = 1'-0"HM03 PT WindowSCALE: 1/4" = 1'-0"HM04 Basement Office Window

10/6/2011