Performance Supplement 2014/14TRANSCRIPT
Working for You, Working with You
Stirling Council Annual ReportPerformance Supplement 2013/14
stirling.gov.uk phone 0845 277 7000 or 01786 404040 text 07717 990 001
Working for You, Working with You
Working for You, Working with You
Target The Target is the level of performance we are aiming to reach.
Red Threshold If performance falls below the Red Threshold it would it indicate underperformance on this
indicator
Status
Green Tick - Performance is on or above target
Amber Triangle - Performance is below target but is not below the red threshold
Red Hexagon - Performance is below the red threshold
Graph - This indicator is for information only and does not have a target set.
Important words, phrases and symbols
Stirling Council Performance Report 2013/14
This report presents performance information used to monitor progress made by the council in relation to its Key Priorities and other performance targets during the financial year 2013-14 (April 2013 – March 2014). The report is structured around the following themes, which relate to Stirling Council’s Committees. These committees have responsibility for monitoring the Council’s performance in different areas of council activity as well as monitoring progress towards the achievement of the Council’s Key Priorities. Further details are provided under each section.
1. Finance and Economy
2. Social Care and Health
3. Environment and Housing
4. Community Planning and Regeneration
5. Education
Further performance-related information, including additional performance indicators, an overview of our performance management framework, background information on the performance indicators used and further information on how our performance compares with other local authorities, can be accessed on the Stirling Council website:
http://www.stirling.gov.uk/services/council-and-government/council-information-performance-and-statistics/council-performance-indicators
For any further information please contact:
Performance Team, Corporate Operations, Stirling Council
email: [email protected]
Introduction
1
This is an important indicator in relation to the Council’s Key Priority O - deliver and improve upon access to and
speed of internet access across the Council area. High-speed internet connectivity is essential to the development
of local economies and the future provision of services to communities. The indicator provides details of progress in
relation to increasing high speed broadband availability.
The Council’s Executive on 27 September 2012 agreed to fund the expansion of Next Generation Broadband,
beyond the minimum 75% of premises covered by the Scottish Government’s Step Change core programme, by
providing an additional £0.6m. Estimates provided by the Scottish Government predicted that this extra funding
Internet access - Delivering and improving upon access to and speed of internet access cross the Stirling area
Key Indicators Finance and Economy
O
100%
59.5%
46.2%
0%
Current Target 90%
Status
Red Threshold
Target
Achieved
Superfast broadband availability
2013/14
2012/13
2011/12
The Council’s Key Priorities in relation to Finance and Economy include the following:
Internet access • Delivering and improving upon access to and speed of internet access across the Stirling area
Business support • Streamlining business support under leadership of the business community
High wage economy • Pursuing a diverse high wage economy that delivers local jobs for people across Stirling area and a
procurement policy that supports this
Financial strategy
• Implementing a financial strategy that reflects the current economic challenges by saving £24m whilst ensuring the delivery of quality services
Finance and EconomyFinance and Economy
2
Working for You, Working with You
Business support - Streamlining business support under leadership of the business community
Number of Start-Up Businesses assisted through Business Gateway by STEP
This is an important indicator in relation to the impact of the Council’s key priority P - streamline business support
under the leadership of the business community.
During 2013/14 business support services have been integrated within Stirling Enterprise (STEP) - the local
economic development agency responsible for local delivery of Business Gateway the national business support
and development programme. This has included transfer of the Council’s Economic Support function to STEP and
the establishment of a Service Level Agreement between the Council and STEP. This has been fully implemented
from 16 October 2013.
The indicator measures the number of start-up businesses assisted by STEP. It gives an indication of support for local
business start-up activity.
The number of Business Gateway start-up businesses supported was higher in 2012/13 due to a delay in reporting
performance in March 2012. The figure for 2012/13 is therefore higher than it would normally be. Business Gateway
performance in 2013/14 is in line with the Business Gateway contract. An annual target of 233 will be set for
2014/15 for this indicator.
Current Target no target set
Status
2013/14
2012/13
P
280 226
would increase the scope of the programme and provide 80% of premises in the Council area with access to
Superfast Broadband, with download speeds of up to 80 Mbps, by prioritising main communities and business sites
ahead of individual locations.
A contract for the delivery of broadband infrastructure was entered into by the Scottish Government and British
Telecom in July 2013. Included in British Telecom’s contractual offer to the Scottish Government is that the Stirling
Council area will receive 93.4% Superfast Broadband coverage to premises, an increase of 18.4% on the Scottish
Government’s base requirement of 75%, as a direct result of the Council’s £0.6M of additional funding.
The Scottish Government had originally intended that all phases of the Step Change programme would be
completed by 2015, but it has become evident that 2017 is a more realistic date, and details will become clearer as
the surveys continue and announcements are made.
3
High wage economy - Pursuing a diverse high wage economy that delivers local jobs for people across the Stirling area and a procurement policy that supports this
This indicator provides details on the level of general fund capital spend as a proportion of the allocated budget.
For the total General Services capital programme overall expenditure was £25.681m, representing an expenditure
rate of 94%, and an underspend of £1.656m against a full-year adjusted and reprofiled programme of £27.337m.
The most significant capital projects undertaken during the year included roads improvements, the completion
of significant projects under the headquarters office rationalisation, the completion of Riverside Primary school,
the acquisition of an investment property portfolio from Stirling Development Agency and the purchase of the
Wolfcraig building.
Financial strategy - Implementing a financial strategy that reflects the current economic challenges by saving £24m whilst ensuring the delivery of quality services
General Fund Capital Programme 2013/14 performance
R
Current Target 100%
Status
Red Threshold
Target
Achieved
2012/13 2013/14
94%92%
Q
The Council's Key Priority Q is to pursue a diverse high wage economy that delivers local jobs for people across
Stirling and a procurement policy that supports this. In relation to this priority, this indicator consider the Council's
role in directly supporting local economic development. The indicator measures the proportion of the Council's
spend that has taken place through local companies/ employers. The indicator takes some time to calculate and is
reported a year in arrears.
The definition of ‘spend with local employers’ used prior to 2012/13 was ‘spend with companies registered within
council boundaries’. This was updated in 2012/13 to reflect the true position when it comes to the Council’s
contribution to the local economy through procurement. Spend with Local Employers is now defined as spend with
a supplier who has a base/branch within the Stirling Council area, employs local people and generally contributes to
the local economy. Such suppliers could be locally registered SME's or global companies.
Council Spend with Local Employers
2010/11 2011/12 2012/13
17% 33% 47% Current Target 30%
Status
Red Threshold
Target
Achieved
4
Working for You, Working with You
This indicator shows the projected end of year balances as a percentage of General Fund budget.
General Fund revenue balances at the end of 2013/14 were £5.887m. This is 2.9% of the total General Fund for
2013/14 and exceeds the target level of balances of between 2% and 2.5%.
Despite a difficult financial climate, the Council Tax collection rate for 2013/14 was 97.3% of total billings, in line
with the 2012/13 level, and still continues to represent one of the highest in-year collection rates across mainland
authorities.
During 2013/14 work began on the development of Priority Based Budgeting Options to contribute to the spending
reductions necessary to meet available resources. The General Fund Revenue Budget for 2014/15 was approved
with a large number of PBB options contributing to the 2014/15 savings target of £3.612million.
Further details on the Council’s financial strategy and performance can be found in the Annual Accounts 2013/14
available on the Council Website.
End of year 2013/14 balances as a percentage of General Fund budget
Current Target 2.5%
Status
Red Threshold
Target
Achieved
0.50 1 1.50 2.502 %
2013/14
5
Key Indicators Social Care and Health
Corporate Parenting Being a good corporate parent
% of Looked After Children with more than 3 changes of placements
This indicator measures the % of Looked After Children away from home with more than 3 changes of placement
within a year.
Being a good corporate parent is one of Council's 18 Key Priorities and this indicator is an important measure
in relation to this. The indicator shows the number of changes of placement for children looked after away from
home. Creating stable and appropriate living arrangements for looked after children is an important aspect of the
Council's responsibilities as a Corporate Parent.
Position at 31st July 2013 - Number of looked after children 246;
Number with 3+ placements during the past year= 10 (4%)
Comparators - Scotland 5%
Aberdeenshire - 6% Perth and Kinross - 7% East Lothian - 4% South Ayrshire - 5% Fife - 7%
Performance in Stirling is better than the Scottish average, and this reflects the work of the Council to provide stable
placements for the young people in our care.
F
4%Current Target no target set
Status
Achieved6%
2012/13 2013/14
The Council has responsibility for a range of service areas that provide care, advice and support to vulnerable or ‘at risk’ adults, children and families, young people and carers. Key Priorities include the following:
Corporate parenting • Being a good corporate parent
Improving care • Improving care for our vulnerable people at home
Indicators of performance on these key priorities and other important indicators of the Council’s performance in relation to social care and health are outlined below.
Finance and EconomySocial Care and Health
6
Working for You, Working with You
69%
74%
Improving care Improving care for our vulnerable people at home
Adult service users reporting satisfaction that Social Services have helped them to lead a more independent life.
This indicator is an important outcome indicator in relation to the Council's Key Priority G "Improving care for our
vulnerable people at home". It measures the percentage of Stirling service users surveyed who report satisfaction
that social services have helped them to lead a more independent life.
Over the last few years Stirling Council has focused on the development of Reablement Services to ensure that
older people regain and retain as many skills as possible to enable them to stay in their own homes, wherever
possible without the need for long term care at home provision. This means that the Service are working both to
reduce the proportion of older people cared for in residential settings and to ensure that people do not receive care
at home services that they do not require.
This measure indicates the increasing success of this approach from the perspective of service users.
G
2012/13
2013/14
Current Target 75%
Status
Red Threshold
Target
Achieved
Shifting the balance of care
Percentage of Stirling service users aged 65 and over with intensive care needs who receive 10 hours or more of
home care per week.
Reablement Services are fully implemented across Stirling Council area and work to ensure that older people regain
and retain as many skills as possible to enable them to stay in their own homes, wherever possible without the need
for long term care at home provision. This means that the Service is working both to reduce the proportion of older
people cared for in residential settings and to ensure that people do not receive care at home services that they do
not require.
2008/9 2009/10 2010/11 2011/12 2012/13 2013/14
21% 26.1% 28.6% 33.2% 33.8% 33.7%Red Threshold
Target
Achieved
Current Target 35%
Status
7
This indicator reports the number of delayed hospital discharges and sets a target of zero for those delayed over the
standard four-week planning period.
The figures are collated during a monthly census and are provided by NHS Forth Valley. The figure for each month
is a snapshot of the discharges at that point in time, rather than the total across the month. The annual figure is the
average monthly figure.
The increased pressure regarding delayed discharges in Clackmannanshire and Stirling continues with a small
increase in referrals as we move towards a 2 week target. In order to prepare for this the service is currently
reviewing and further developing intermediate care services. This includes further development of short term beds
with health colleagues taking into account delivery of services in the community hospital and review of reablement
services to incorporate rehab at home. The service is also working with health colleagues to commission an
overnight care at home service to avoid hospital admission in crisis and facilitate early discharge. The introduction
of the Discharge Hub based at Falkirk will continue to provide early information regarding patients in hospital
and support and coordinate priority discharge. The establishment of a health and social care weekly action group
continues to support prioritisation and is now focussing on those patients who are just ready for discharge who can
have assessment out with acute hospital while the specialist hospital team will fast track those patients heading
towards a delay by providing rapid access to social work services.
Delayed hospital discharges over 4 weeks (Annual)
0
1
2
3
4
5
2008/92009/10
2010/112011/12
2012/132013/14
Current Target 0
Status
Red Threshold
Target
Achieved
4
1.08
2.92
0.920.42
1.33
8
Working for You, Working with You
Key Indicators Environment and Housing
Stirling Council Carbon Management Plan adopted October 2011 set out a five year plan for the reduction of carbon
emissions from within the Council’s own activities.
The overall target for carbon reduction is 20% by the end of financial year 2015/16 from a baseline year of 2006/07.
Figures are reported one year in arrears.
The 20% carbon emissions reduction target has been achieved 3 years early. A new target has been adopted in the
Open Space Strategy of a 40% reduction in emissions by 2021, with a longer-term target of 80% by 2050.
Sustainability Adopt a pragmatic approach to sustainability that protects and enhances the local environment
Carbon emissions reduction
L
Red Threshold
Target
Achieved
Current Target -20%
Status
Last Update 2013/14
2007/8 2008/9 2009/10 2010/11 2011/12 2012/13
0.3% -4% -3% -8.6% -15.6% -19.9%
Environment and Housing
The Council has responsibility for planning policy and the build environment, roads, parks and open space, waste, housing and the enforcement and sustainability agendas. Key Priorities include the following:
Sustainability • Adopting a pragmatic approach to sustainability that protects and enhances the local environment
Roads • Making resurfacing roads, paths and pavements the service priority across the whole Stirling area
Socially rented housing • Building more socially rented housing
Indicators of performance on these key priorities and other important indicators of the Council’s performance in relation to environment and housing are outlined below.
9
This is an important indicator in relation to Key Priority M -
make resurfacing roads, paths and pavements the service priority across the whole Stirling area.
The Scottish Road Maintenance Condition Survey is undertaken throughout Scotland, using machine-based survey
equipment, which measures carriageway rutting, texture, profile and cracking. These surveys include 100% of the ‘A’
class road network over a 2-year period and a percentage of all other roads.
The annual survey indicates a decrease in carriageway condition. This may be due to statistical variations related to
the survey methodology. The trend is still an improving condition. However, based on the last few years data, this
level of investment will need to be maintained for several years if the Council is to realise its target of achieving
Scottish average carriageway condition.
During 2013/14, the level of investment in planned carriageway works was below what was required to meet steady
state. 3.1% of carriageways were treated ; target is >4%
Roads Make resurfacing roads, paths and pavements the service priority across the whole Stirling area
Overall percentage of the road network that should be considered for maintenance treatment
Socially rented housing Building more socially rented housing
This indicator monitors completions or acquisitions of all types achieved by the Council and any other Registered
Social Landlord in the Stirling Council area. It is an important indicator for monitoring progress in relation to
Stirling Council’s Key Priority N: Build more socially rented housing.
This indicator monitors new-build properties and those acquired or bought and which will be used for socially
rented housing (including that for homeless/ temporary accommodation) by the Council, Rural Stirling Housing
Association and Forth Housing Association.
It includes;
• properties built or acquired for homeless temporary / hostel accommodation.
• properties acquired either through the Scottish Government’s ‘Mortgage to Rent’ scheme, Shared ownership ‘buy back’s or second homes acquisitions bought from the private market for social rent.
• properties converted for mainstream social housing or homeless temporary / hostel accommodation.
M
N
138 Completions and acquisitions of Socially Rented Housing 2013/14
This is a new indicator and trend data is not yet available.
2007/8 2008/9 2009/10 2010/11 2011/12 2012/13 2013/14
47.5% 44.8% 44.5% 43.8% 42.3% 40.8% 42.1%
Current Target 36.7%
Status
Red Threshold
Target
Achieved
10
Working for You, Working with You
Recycling & waste collection routes completed on the correct day
This indicator shows the percentage of waste and recycling collection routes completed on the correct day. Further
information on the Council’s waste strategy and additional performance information can be found on the Waste
Strategy pages of the Council website.
The dip in the percentage of household waste composted/ recycled in 2013/14 as well as the related dip in % of
recycling and waste collection routes completed on the correct days in 2013/14 can both be attributed to the
industrial action that took place in Sep, Oct, and Nov 2013. The target is being reviewed for 2014/15.
80
%
2008/92009/10
2010/112011/12
2012/132013/14
90
Current Target 90%
Status
Red Threshold
Target
Achieved
96%
93.4%91.4%
96.8%
92.7%89.9%
Percentage of household waste composted/recycled
This indicator shows the percentage household waste composted/recycled as a percentage of the total household
waste collected.
Further information on the Council’s waste strategy and additional performance information can be found on the
Waste Strategy pages of the Council website.
The dip in the percentage of household waste composted/ recycled in 2013/14 as well as the related dip in % of
recycling and waste collection routes completed on the correct days in 2013/14 can both be attributed to the
industrial action that took place in Sep, Oct, and Nov 2013.
38.7% 41.5%43.5%
48.2%
53.8%55.7%
53.4%
Red Threshold
Target
Achieved
Current Target 54%
Status
2007/8 2012/13 2013/142008/9 2009/10 2010/11 2011/12
11
Overall cleanliness index achieved
Cleanliness is a measure based on the amount of litter (eg smoking related, sweet wrappers, drinks related, fast food
packaging and animal faeces). Weeds and detritus (eg sand, silt and other debris) do not form part of the cleanliness
index. Keep Scotland Beautiful (KSB) has developed criteria against which cleanliness is to be measured. The process
is known as the ‘local environmental audit and management system’ (LEAMS). Until 2013/14 all councils received
seven inspections each year. Four inspections undertaken by the council’s own staff who have been trained in the
LEAMS process, a further two inspections undertaken by the staff of a partner council and KSB undertake an annual
validation survey. From 2014/15 some changes will be made to the inspection and validation process.
At the end of each financial year the overall marks from each survey are totalled and a final cleanliness index figure
between 0 and 100 is calculated for the year. An area with a cleanliness index of 0 would consist of heavily littered
sites, whereas a cleanliness index of 100 would represent an area completely free of litter or refuse.
Stirling’s scoring on LEAMS has remained consistent over the last few years and is line with the Scottish average.
LEAM
S Sc
ore
67 75 74 76 74 75 75
Red Threshold
Target
Achieved
Current Target 70
Status
2007/8 2012/13 2013/142008/9 2009/10 2010/11 2011/12
This indicator measures the percentage of Housing emergency repairs (4 hour & 24 hour) which were completed on
time.
Performance on emergency repairs (4-hour and 24-hour) declined in 2013/14 due to recording inconsistencies. The
service experienced system issues with Northgate and Kirona throughout June and July which had an impact on
the accurate recording of performance. The Housing Service also upgraded our mobile technology due to many
of the notebooks coming to end of life, with delays due to the procurement process impacting on the accurate
recording of completion dates.
The current scheduling software has been causing difficulties in organising and managing works orders, a new
scheduling platform and works order management system is currently being developed which will be implemented
by the end of 2014. The new software will give us greater control of works orders and should have a significant
beneficial impact on performance in all areas of the repairs service.
Housing emergency repairs completed within target
2009/10
89.0%
2010/11
93.4%
2011/12
91.9%
2012/13
93.7%
2013/14
90.6%
Red Threshold
Target
Achieved
Current Target 95%
Status
12
Working for You, Working with You
2012/13
2013/14
When considering the outcomes from the Council’s efforts to address homelessness it is important that the Council
not only assists those who have been homeless into permanent accommodation but also monitors the extent to
which such a move is sustained. This indicator measures the percentage of homeless households provided with
permanent accommodation in Council stock who have successfully sustained their tenancy for 12 months.
The tenancy sustainment rate for those housed through the Homeless List has remained above target and
improved slightly from 91.5% in 2012/13 to 91.9% in 2013/14. Our target is a tenancy sustainment rate of 90% for
both Homeless and Waiting and Transfer lists. Tenancy sustainment rates for those housed from the Transfer and
Waiting lists show similar results with a 90.3% sustainment rate for 2013/14.
Where a tenancy ends within the first 12 months, the reason given by the tenant is noted. Some tenancies come
to an end for unavoidable reasons such as, relationship breakdown which requires a transfer of tenancy, death or
having to move into a Care home. Other tenancies end for more positive reasons such as a mutual exchange or
moving to a new property through choice and a change in circumstances. In our calculations the definition we
use for measuring tenancy sustainment takes into account these differences and tenancies ending due to mutual
exchanges, a transfer of tenancy and due to death are not included in the calculations.
Of the 123 Homeless tenancies created in 2012/13, 20 tenancies ended within 12 months, 10 for positive reasons.
There have been 5 mutual exchanges, 3 transfer of tenancies and 2 deaths, and these figures have not been
included in the calculations.
Figures for transfer and waiting list applicants show a similar pattern with 194 tenancies created, and 34 ending
within 12 months, including 10 mutual exchanges, 8 transfers of tenancy and 1 death.
Tenancy sustainment of homeless households
91.9%
91.5%
Current Target 90%
Status
Red Threshold
Target
Achieved
13
Community Planning and Regeneration
Physical activity and sport Promoting opportunities and supporting access to physical activity and sport for all
Number of attendances at Active Stirling indoor sport and leisure activities expressed per 1000 population
This indicator measures the number of attendances at Active Stirling indoor sport and leisure activities and is
expressed per 1000 population.
In 2008-09 Stirling was ranked second lowest out of all 32 local authorities in Scotland for indoor sport
attendances due to a lack of sports facilities in the area. Since the opening of The Peak in April 2009 performance
has significantly improved. Attendances at Active Stirling indoor sport and leisure activities decreased slightly in
2013/14 but remain above target. Overall the number of participants in Active Stirling sports activities has increased
by 6% in 2013-14 to 1.2 million.
H
7766
7486
7143
Current Target 7000
Status
Red Threshold
Target
Achieved 2011/12
Achieved 2012/13
Achieved 2013/14
The Council has responsibility for facilitating local community planning and regeneration processes and for ensuring the delivery of advice services, sport and recreation, culture, libraries and archives. Key Priorities include the following:
Advice Services • Developing advice services that are fit to support people through the current round of welfare changes by
establishing an integrated service with voluntary sector leadership
Physical activity and sport • Promoting opportunities and supporting access to physical activity and sport for all
Indicators of performance on these key priorities and other important indicators of the Council’s performance in relation to these areas are outlined below.
14
Working for You, Working with You
6000
7000
8000
9000
2007/8
6104
2008/9
8292 7528
2009/10
7880
2010/11
8459
2011/12
8052
2012/13
7231
2013/14
This indicators measures the number of visits to libraries and is expressed per 1000 population.
Visitor figures were down in 2013/2014. Bridge of Allan Library and Bannockburn Library had major heating and
ventilation maintenance. Both large libraries were closed 6-7 weeks. All libraries were closed between Christmas
and New Year for the first time.
Key Indicators Community Planning and Regeneration
Numbers of visits to libraries expressed per 1000 population
Current Target 7500
Status
Red Threshold
Target
Achieved
Advice Services Developing advice services that are fit to support people through the current round of welfare changes by establishing an integrated service with voluntary sector leadership
Customer Satisfaction with Advice Services (%)
This indicator measure the % of people using Advice Services who have expressed satisfaction with the service they
have received. All service users are given the opportunity to complete a questionnaire about their experience of the
service and the figure is based on the returned questionnaires.
Client feedback was excellent in 2013/14.
J
0
20
40
60
80
Q3 2013/14
%
Q4 2013/14
100% 100%
Current Target 100%
Status
Red Threshold
Target
Achieved
15
Key Indicator Education
Percentage of school leavers in a positive destination (initial; approx 3 months after leaving school)
89.8% of school leavers are entering positive destinations. This is the highest figure recorded for Stirling but it
remains below the national figure of 91.4%
Breakdown
- Higher Education = 45.2%
- Further Education = 17.8%
- Training = 3.7%
- Employment = 22.3%
- Other/Unknown = 0.9%
- Not in Employment, Education or Training = 10.1%
An increasing number of Stirling young people are leaving school and entering Higher Education. Additionally,
numbers entering Employment have increased by 2% this year.
Lowest performing 20% Improving outcomes for the lowest performing 20% of children
Initial Positive Leaver Destination Stirling
D
80
2008/92009/10
2010/112011/12
2012/132007/8
90
%
Current Target 89%
Status
Red Threshold
Target
Achieved
89.8%
Education
The Council has a range of responsibilities in relation to Education at all levels from nursery through to adult. Key Priorities include the following:
Lowest performing 20% • Improving the outcomes for the lowest performing 20% of children in nurseries and schools
• This section of the report provides details of a key performance indicator used to oversee performance.
Further details on Education performance are provided in the Standards and Quality report which is published annually given detailed information on the performance of the Education Service. The Standards and Quality report for the academic year 2013-14 will be published in December 2014.
16
Working for You, Working with You
Formats
Copies of our leaflets are available by request in arange of other languages, large print and on audiotape. To request articles in any of these formatsplease email or call 0845 277 7000.