    Northgate Pedestrian and

    Bicycle Bridge

    Open House

    June 3, 2014

  • 8/12/2019 Final_open House Presentation

    2/63

    SDOTs mission & vision

    Mission: delivering a first-rate transportation system for Seattle.

    Vision: a vibrant Seattle with connected people, places, and products.

  • 8/12/2019 Final_open House Presentation

    3/63

    SDOTs values

    Keep it safe

    Focus on thebasics

    Build healthycommunities

    Support athriving

    economy

    Provide greatservice

  • 8/12/2019 Final_open House Presentation

    4/63

    Maple Leaf

    Licton Springs

    Site and Context

    Bridge Area

    Northgate Mall

    Future SoundTransit Station

    North SeattleCommunity College

    North PublicHealth Center Interstate

  • 8/12/2019 Final_open House Presentation

    5/63

    Project Need

    I-5 is a barrier separating the communities onthe east and west sides.

    The project will create improved connections

    to major transit investments, educationfacilities, retail centers and reconnect thecommunity.

  • 8/12/2019 Final_open House Presentation

    6/63

    Project Benefits

    The project benefits Northgateneighborhoods, businesses and schools by: Increasing ridership at the Transit Center and

    future Light Rail Station.

    Creating an easier connection for students to andfrom North Seattle College by shortening the walkdistance from the Transit Center by almost a mile.

    Providing important access for bicyclists andpedestrians to other improvements coming to theNorthgate area.

  • 8/12/2019 Final_open House Presentation

    7/63

    Northgate Pedestrian and BicycleBridge Project Overview

    Currently in early design and environmentalreview

    Overall length is estimated at 1800 to 2200feet depending on the chosen alternative

    Exact location and access points to thebridge are being developed

  • 8/12/2019 Final_open House Presentation

    8/63

    Project Timeline

  • 8/12/2019 Final_open House Presentation

    9/63

    Screening Criteria:Alignment Options

  • 8/12/2019 Final_open House Presentation

    10/63

    Design Feeback from YOU today:

    ALIGNMENT SPANDESIGN+

  • 8/12/2019 Final_open House Presentation

    11/63

    North Seattle College

    14,000 STUDENTSAND OVER 400 STAFF

  • 8/12/2019 Final_open House Presentation

    12/63

    Existing Northgate Transit Center

    CURRENTLY6,000 RIDERS / DAY

  • 8/12/2019 Final_open House Presentation

    13/63

    Future Northgate Sound Transit Station

    15,000 PASSENGERS

    PER DAY PROJECTED

  • 8/12/2019 Final_open House Presentation

    14/63

    Existing Connections

    1.2 MILES

  • 8/12/2019 Final_open House Presentation

    15/63

    Existing Connections

    1.2 MILES

  • 8/12/2019 Final_open House Presentation

    16/63

    Existing East Walking Connections

    Northgate Way at I-5 overpass Northgate Way at 1stAve NE

  • 8/12/2019 Final_open House Presentation

    17/63

    Existing West Walking Connections

    92ndStreet Overpass Northgate Way at I-5 Overpass

    id i

  • 8/12/2019 Final_open House Presentation

    18/63

    Bridge Access Points

  • 8/12/2019 Final_open House Presentation

    19/63

    Existing Conditions

    1.2 MILES

    B id Ali O i

  • 8/12/2019 Final_open House Presentation

    20/63

    Bridge Alignment Options

    MILE!

  • 8/12/2019 Final_open House Presentation

    21/63

    Proposed Bike Infrastructure

    1stAvenue

    Bike Lane

    100thSt Primary

    Bicycle Connection

    100th

    St PrimaryBicycle Connection

  • 8/12/2019 Final_open House Presentation

    22/63

    Expanded walk and bike sheds

    B id C

  • 8/12/2019 Final_open House Presentation

    23/63

    Bridge Components

    35 elevation gain 45 elevation gain

    @ ~20 above grade17.5 clear height beneath

    h l

  • 8/12/2019 Final_open House Presentation

    24/63

    BIKE LANES

    BIKE LANESWALKWAY WALKWAY

    WALKWAY

    Bridge Components: Pathway Elements

    15 20 WIDE

    W A h

  • 8/12/2019 Final_open House Presentation

    25/63

    Bridge Components: West Approach

    AT-GRADE APPROACH ELEVATED APPROACH

    WEST APPROACH

    E t A h

  • 8/12/2019 Final_open House Presentation

    26/63

    Bridge Components: East Approach

    AT-GRADE APPROACH ELEVATED APPROACH

    EAST APPROACH

    E t A h

  • 8/12/2019 Final_open House Presentation

    27/63

    Bridge Components: East Approach

    STAIRS ELEVATOR

    EAST APPROACH

    P i S

  • 8/12/2019 Final_open House Presentation

    28/63

    Bridge Components: Primary Span

    CABLE STAY

    TIED ARCH

    TUBE / TRUSS

    PRIMARY SPAN

    C bl St

  • 8/12/2019 Final_open House Presentation

    29/63

    Primary Span Types: Cable Stay

    C bl St

  • 8/12/2019 Final_open House Presentation

    30/63

    Primary Span Types: Cable Stay

    C bl St

  • 8/12/2019 Final_open House Presentation

    31/63

    Primary Span Types: Cable Stay

    C bl St

  • 8/12/2019 Final_open House Presentation

    32/63

    Primary Span Types: Cable Stay

    C bl St

  • 8/12/2019 Final_open House Presentation

    33/63

    Preliminary Design Concept: Cable Stay

    C bl St

  • 8/12/2019 Final_open House Presentation

    34/63

    Preliminary Design Concept: Cable Stay

    VIEW FROM NORTHEAST

    C bl St

  • 8/12/2019 Final_open House Presentation

    35/63

    Preliminary Design Concept: Cable Stay

    VIEW FROM NE 100THST AND 1STAVE N.

    C bl St

  • 8/12/2019 Final_open House Presentation

    36/63

    Preliminary Design Concept: Cable Stay

    VIEW FROM SPAN

    P i S T Tied Arch

  • 8/12/2019 Final_open House Presentation

    37/63

    Primary Span Types: Tied Arch

    P i S T Tied Arch

  • 8/12/2019 Final_open House Presentation

    38/63

    Primary Span Types: Tied Arch

    P i S T Tied Arch

  • 8/12/2019 Final_open House Presentation

    39/63

    Primary Span Types: Tied Arch

    P i S T Tied Arch

  • 8/12/2019 Final_open House Presentation

    40/63

    Primary Span Types: Tied Arch

    li i i C Tied Arch

  • 8/12/2019 Final_open House Presentation

    41/63

    Preliminary Design Concept: Tied Arch

    P li i D i C Tied Arch

  • 8/12/2019 Final_open House Presentation

    42/63

    Preliminary Design Concept: Tied Arch

    P li i D i C Tied Arch

  • 8/12/2019 Final_open House Presentation

    43/63

    Preliminary Design Concept: Tied Arch

    VIEW FROM NORTHEAST

    P li i D i C t Tied Arch

  • 8/12/2019 Final_open House Presentation

    44/63

    Preliminary Design Concept: Tied Arch

    VIEW FROM NE 100TH

    ST AND 1ST

    AVE N.

    P li i D i C t Tied Arch

  • 8/12/2019 Final_open House Presentation

    45/63

    Preliminary Design Concept: Tied Arch

    VIEW FROM SPAN

    Primary Span Types: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    46/63

    Primary Span Types: Tube / Truss

    Primary Span Types: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    47/63

    Primary Span Types: Tube / Truss

    Primary Span Types: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    48/63

    Primary Span Types: Tube / Truss

    Primary Span Types: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    49/63

    Primary Span Types: Tube / Truss

    Primary Span Types: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    50/63

    Primary Span Types: Tube / Truss

    Primary Span Types: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    51/63

    Primary Span Types: Tube / Truss

    Preliminary Design Concept: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    52/63

    Preliminary Design Concept: Tube / Truss

    Preliminary Design Concept: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    53/63

    Preliminary Design Concept: Tube / Truss

    Preliminary Design Concept: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    54/63

    Preliminary Design Concept: Tube / Truss

    VIEW FROM NORTHEAST

    Preliminary Design Concept: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    55/63

    Preliminary Design Concept: Tube / Truss

    VIEW FROM NE 100TH

    ST AND 1ST

    AVE N.

    Preliminary Design Concept: Tube / Truss

  • 8/12/2019 Final_open House Presentation

    56/63

    Preliminary Design Concept: Tube / Truss

    VIEW FROM WITHIN WEST APPROACH

  • 8/12/2019 Final_open House Presentation

    57/63

    Project Timeline

  • 8/12/2019 Final_open House Presentation

    58/63

    Project Funding & TIGER Grant

    Funding is provided by $5 million contributions fromSDOT and Sound Transit. An additional $15 million isrequired fully fund the project.

    SDOT is seeking additional funding through a FederalTIGER Grant application.

    The TIGER Grant application is available on our

    website.

    Outreach Activities

  • 8/12/2019 Final_open House Presentation

    59/63

    Outreach Activities

    Held community briefings throughout the spring

    Open Housetonight!

    Another round of briefings will be held once a finalrecommendation is made in the fall

  • 8/12/2019 Final_open House Presentation

    60/63

    Next Steps

    Keep in touch!

    Join our email list sign up at welcome table

    Check out our website:www.seattle.gov/transportation/northgatepedbridge.htm

    http://www.seattle.gov/transportation/northgatepedbridge.htmhttp://www.seattle.gov/transportation/northgatepedbridge.htmhttp://www.seattle.gov/transportation/northgatepedbridge.htmhttp://www.seattle.gov/transportation/northgatepedbridge.htm
  • 8/12/2019 Final_open House Presentation

    61/63

    Questions?

  • 8/12/2019 Final_open House Presentation

    62/63

    Thanks!

    http://www.seattle.gov/transportation

    Screening Criteria:

  • 8/12/2019 Final_open House Presentation

    63/63

    Screening Criteria:Alignment Options