finalise ppt

22
8/12/2019 Finalise Ppt http://slidepdf.com/reader/full/finalise-ppt 1/22 Group members Hong Yan Jia Joel Yong Yeo  jun seng Group members Hong Yan Jia Group members Hong Yan Jia Yeo Jun Seng

Upload: yeo-jun-seng

Post on 03-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 1/22

Group

members

Hong

Yan

Jia

Joel

Yong

Yeo

 jun

seng

Group

members

Hong

Yan

Jia

Group

members

Hong

Yan

Jia

Yeo

Jun

Seng

Page 2: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 2/22

Presentation

Question

The manager of the companyhave been convinced that theyneed a better costing system.

They have heard about ActivityBased Costing and they believethat it will improve the accuracyof the costing of their products.Prepare a presentation to themanagement on whether you

believe there is a case toimplement Activity Based

Costing.

Page 3: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 3/22

Company’s Products 

Mass produce:

• T-shirts

Special products:• Surf Pants

• Surf Boards

Page 4: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 4/22

POR : Budgeted Overhead 7140000 $170 per hourBudegeted direct-hour hours 42000 hours

Job-order system with direct labour hours

T-shirt urf Board Surf PantsAnnual Sales (units) 20000 1000 10000

Product Costs:

Direct Material 20 50 84

Direct Labour ($20/hr) 20 40 40Manufacturing Overhead ($170/hr) 170 340 340

Total Product Cost 210 430 464

Job-order system

Page 5: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 5/22

Current situation

• Surf pants- $220

- customers not buying

- competitors selling cheaper

• Surf boards

- $430

- too much customers buying

- product is too cheap

Page 6: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 6/22

Company’s Amendments 

• Mark down the surf pants – $220 to $212

•Mark up the surf boards – $430 to $473

Page 7: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 7/22

Drawbacks of Job-Costing

• Utilize a single, volume based cost driver.

• The assumption of cost incurred does notwork for activities.

• Distorts the cost of products.

• Often report inaccurate product costs.

Page 8: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 8/22

What is Activity-Based Costing(ABC)?

• An alternative to traditional way of

accounting.

• Identifies the cost pools, or activity centers in

an organization.

• Assigns costs to products (cost drivers) based

on the number of transactions.

• To maximize shareholder value and improve

corporate performance.

Page 9: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 9/22

Identify Activities and Cost DriversActivities Cost Drivers

Purchasing No. of material orders

Material Handling Machine Time

Packaging Labour Hours

Depreciation Factory Space

Page 10: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 10/22

Product Lines

Activity Cost Pool Cost Driver T-shirt Surf Boards Surf Pants1) Purchasing No. of Material orders 39% 13% 48%

2) Material Handling Machine Time 47% 6% 47%

3) Packaging Labour Hours 47% 8% 45%

4) Depreciation Factory Space 42% 15% 43%

Page 11: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 11/22

Page 12: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 12/22

Page 13: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 13/22

Surfing T-shirt Job-order ABC

Cost per unit $210.00 $192.02Selling Price $231.00 $211.22

•Competitors selling Surfing T-shirt at $212

•Company lowers price to $220, but still failed to compete

•Actual cost is only $192.02, company can sell at $211.22 with 10% mark

up

•Product was previously overpriced

•Company will be able to gain a competitive advantage with ABC

Page 14: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 14/22

Surf Boards Job-order ABC

Cost per unit $430.00 $875.50Selling Price $473.00 $963.05

•Previous selling price is even lower than its actual cost

•The product was previously underpriced (a lot)

•Company plans to mark up price to mark up to $500 per unit, still

short of $375.50 compared to its cost

•Loss of $375500 will be incurred when 1000 units are sold annually

even if it’s sold at $500 per unit 

Page 15: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 15/22

Surf Pants Job-order ABC

Cost per unit $464.00 $455.42Selling Price $510.40 $500.96

•Although only with slight deviation, this product is also overpriced

•The ABC can lower the cost of this product, hence lower the selling

price (competitive advantage)

Page 16: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 16/22

Result of Differences T-shirts?

• 210 and 192.02

 – Result in lost of customers

 – Price too expensive

 – Customers look for alternatives

• Recommendations

 – Reduce the price further to $200

Page 17: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 17/22

•430 and 875.5 – High Demand when sold at

500

 –

Producing at a lost

• Recommendations

 –

Increase the price to at least$900

Page 18: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 18/22

Page 19: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 19/22

Page 20: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 20/22

Conclusion

• ABC costing – Based on machine

hours

• Adept ABC costing

system

 –Profitable

 – Prevent unnecessary

losses

 – More accurate

Page 21: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 21/22

Page 22: Finalise Ppt

8/12/2019 Finalise Ppt

http://slidepdf.com/reader/full/finalise-ppt 22/22

References

• Answer.com. n.d. Activity based costing.http://www.answers.com/topic/activity-based-costing (accessed September 27, 2010).

• Peterson,S. n.d. Managerial Accounting.http://higheredbcs.wiley.com/legacy/college/jiambalvo/0471228761/ppt/ch06.ppt (accessedSeptember 27, 2010)

• Hilton, R. 2009. Managerial Accounting, 8th Ed.,International Ed.. New York: McGraw- Hill Irwin.