final semester mba banking project headlines
TRANSCRIPT
-
7/31/2019 Final Semester Mba Banking Project Headlines
1/11
A STUDY
ON
NON-PERFORMING ASSET AT
THE BANGALORE CITY CO-OPERATIVE BANK
LTD. BANGALORE
A project report submitted in partial fulfillment of the requirements for
Masters of Business Administration
Of Sikkim Manipal University, INDIA
Submitted By
NAGARATHNA . S
Guided By
Mr. Lokesh T.C
Sikkim Manipal University
Health Medical & Technological SciencesDistance Education Wing
MANIPAL - 576104
-
7/31/2019 Final Semester Mba Banking Project Headlines
2/11
HEALTH, MEDICAL & TECHNOLOGICAL SCIENCESMANIPAL
CERTIFICATE
This is to certify that the project work entitled
STUDY ON NON-PERFORMING ASSET ATTHE BANGALORE CITY CO-OPERATIVE BANK
LTD.
BANGALORE
is the bonafide record of work done by
NAGARATHNA . S
in partial fulfillment of the requirements for the award of the degree of
Master OF Business Administration
during the academic year
2012
Name of the candidate:Nagarathna.SRegister Number: 521023258
Study Center: 02772
Signature of the Co-ordinator
-
7/31/2019 Final Semester Mba Banking Project Headlines
3/11
DECLARATION
I hereby declare that the project report entitled
STUDY ON NON-PERFORMING ASSET AT
THE BANGALORE CITY CO-OPERATIVE BANK
LTD. BANGALORE
Submitted in partial fulfillment of the requirements for
the degree of
Masters of Business Administration
To Sikkim Manipal University, India, is my original work
and not submitted for the award of any other degree, diploma,
fellowship, or any other similar title or prizes.
Place:Bangalore Nagarathna.SDate: 5th June 2012 Reg.No. ; 521023258
-
7/31/2019 Final Semester Mba Banking Project Headlines
4/11
Learning Centre Certificate
This is to certify that the project report entitled
STUDY ON NON-PERFORMING ASSET AT
THE BANGALORE CITY CO-OPERATIVE BANK
LTD. BANGALORE
Submitted in partial fulfillment of the requirements for thedegree of
Masters of Business Administration
Sikkim Manipal university of Health, Medical andTechnological Sciences
Nagarathna .S
Has worked under my supervision and guidance and that of this
report has been submitted for the award of any other degree,
diploma, fellowship, or any other similar title or prizes and that the
work has not been published in any journal or Magazine.
(Reg. No ) Certified
521023258
-
7/31/2019 Final Semester Mba Banking Project Headlines
5/11
ACKNOWLEDGEMENT
I express my deep sense of gratitude to N.MANJUNATHA General
Manger, Bangalore, for permitting me to carry out this project work in
their esteemed organization.
I take great pleasure in thanking my Internal Project guide, Mr. Lokesh
T.C, for his valuable guidance, advice, encouragement and constructive
suggestions thought this project.
I take this opportunity to thank my beloved parents and my entire family
who have given me all the necessary financial and moral support during
the course of this project.
I would want to extend my profound sense of gratitude to everyone who
has helped me during the course of this project. I especially grateful to
my respondents who have provided me the essential and valuable
information needed for the successful completion of this project.
NAGARATHNA .S
-
7/31/2019 Final Semester Mba Banking Project Headlines
6/11
CONTENTS
CHAPTER 1: INTRODUCTION OF THE TOPIC
Chapter Scheme 1
Introduction about banking industry 5
Co-operative Banks 13
Evolution of Co-operative Banks 17
Definition and Features of Co-operative
Bank19
Structure of Co-operative Bank 20
Introduction to Non-Performing Assets 25
RBI Prudential Norms on the
recommendations of the Narasimham
Committee in the year 1992-9332
Impact of Non-Performing Assets 34
General causes of Non- Performing Assets 35
Measures to tackle Non-Performing Assets 36
Introduction to Securitization Act 2002 40
-
7/31/2019 Final Semester Mba Banking Project Headlines
7/11
CHAPTER 2: DESIGN OF THE STUDY
Title of the Study 43
Statement of the Problem 44
Needs & Importance of the study 44
Objectives of the study 45
Scope of the Study 45
Methodology of the study 46
Tools for the collection of data 46
Limitations of the study 47
Reference Period 47
CHAPTER 3: BANK PROFILE
History of The BCCBL 48
-
7/31/2019 Final Semester Mba Banking Project Headlines
8/11
Trade mark of the Bank 49
Goals & Objectives 50
Vision Statement 52
Organization chart of the Bank 53
Branches 54
Awards and Competitors Information 55
Bank Administrative Committee 56
CHAPTER 4: ANALYSIS & INTERPRETATION
Reasons for NPAs in the bank 62
Measures for the recovery of NPAs adopted
by the bank63
Analysis and interpretation of the Study 63 - 101
LIST OF TABLESSL.No Table Title Page
No.
4.1 Classification of NPA 65
-
7/31/2019 Final Semester Mba Banking Project Headlines
9/11
4.2 Gross NPA Ratio 68
4.3 Net NPA Ratio 70
4.4 Problem Asset Ratio 72
4.5 Provision Ratio 74
4.6 Sub- Standard Assets Ratio 76
4.7 Doubtful Assets Ratio 78
4.8 Percentage of total NPA to total Advances 81
4.9
Percentage of Total NPA in Long term loans to
totaladvances given in Long Term Loan
83
4.10 Percentage of Total NPA in Short term loans toadvances given in Short Term Loans
85
4.11 Percentage of NPA in other loans to totaladvances given in other loans
87
4.12 Percentage change in NPA to total advances 89
4.13 Percentage change in NPA in Long term loans 91
4.14 Percentage change in NPA in short term loans 93
4.15 Percentage change in NPA in other loans 94
4.16 Comparison of NPA to advances in Short termloans and total advances
97
4.17 Comparison of NPA to advances in Short termloans and Total advances
99
4.18 Comparison of NPA to advances in other loansand total advances
101
LIST OF GRAPHS
SL.No Table Title Page
No.4.10 Classification of NPA 66
4.11 Gross NPA Ratio 67
4.12 Net NPA Ratio 71
-
7/31/2019 Final Semester Mba Banking Project Headlines
10/11
4.13 Problem Asset Ratio 73
4.14 Provision Ratio 75
4.15 Sub- Standard Assets Ratio 76
4.16 Doubtful Assets Ratio 77
4.17 Percentage of total NPA to total Advances 82
4.18Percentage of Total NPA in Long term loans tototaladvances given in Long Term Loan
84
4.10 Percentage of Total NPA in Short term loans toadvances given in Short Term Loans
86
4.11 Percentage of NPA in other loans to totaladvances given in other loans
88
4.12 Percentage change in NPA to total advances 90
4.13 Percentage change in NPA in Long term loans 92
4.14 Percentage change in NPA in short term loans 94
4.15 Percentage change in NPA in other loans 95
4.16 Comparison of NPA to advances in Short termloans and total advances
98
4.17 Comparison of NPA to advances in Short termloans and Total advances
100
4.18 Comparison of NPA to advances in other loansand total advances
102
CHAPTER 6: SUMMARY OF FINDINGS
Summary of findings 104
CHAPTER 7: SUGGESTIONS
Suggestions 107
-
7/31/2019 Final Semester Mba Banking Project Headlines
11/11
CHAPTER 7: CONCLUSION
Conclusions 110
CHAPTER 8: ANEXURE
Annexure 112
CHAPTER 9: BIBLIOGRAPHY
Bibliography 115