WELCOMETO

PRESENTATION OF

FINAL PROJECT ANTIM KNITTING DYEING & FINISHING LTD.& ANTIM KNIT COMPOSITE LTD.100% EXPORT ORIENTED KNIT COMPOSITE FACTORY

05/01/2023 1

Page 2: Final Project Presentation 2015 (111-065-0-45)

Submitted to..Md. Obaidullah Sr. Asst. Professor (BUFT)

Submitted by…Md. Sayeed HossainID No: 111-065-0-45Dept.: AMTSec: AMT-2

05/01/2023 2

Page 3: Final Project Presentation 2015 (111-065-0-45)

SPECIAL TOPIC:

PRODUCTION PLANNING AND INDUSTRIAL SAFETY MEASURE OF THE INDUSTRY.

05/01/2023 3

Page 4: Final Project Presentation 2015 (111-065-0-45)

ANTIM KNITTING DYEING & FINISHING LTD. is a 100% Export Oriented Knit Composite Textile Factory. It is the pioneer in manufacturing and exporting finest quality knitted garments items. It has maintaining state of the art in its production process.

Total number of employee 6230 SKILL & UN-SKILL

55% FEMALE WORKERS

05/01/2023 4

ANTIM KNITTING DYEING & FINISHING LTD was established in 1997 .

Page 5: Final Project Presentation 2015 (111-065-0-45)

VISION: Building a true marketing led enterprise with motivated workforce, innovative vision, and strong revenue based product portfolio, customer satisfaction & understand of global market.

MISSION: To maintain strong position as one of the market leader in garments manufacturing and to meet the demands of our buyers.

A standard excellence in every aspect of business. Ethical and responsible conduct in all operations. Respects for rights of all individual. Respects for the environments. Respect for the social activities with participation.

MISSION & VISION OF ANTIM GROUP LTD:

05/01/2023 5

Page 6: Final Project Presentation 2015 (111-065-0-45)

Main products:

All Kinds of Knit garment products (Men’s, Women’s, Children’s & Infants) such as: 1. T-Shirt 2. Tank Top 3. Polo Shirt 4. Ladies Dress 5. Nightwear 6. Jacket 7. Under Garments etc.

05/01/2023 6

Page 7: Final Project Presentation 2015 (111-065-0-45)

Production Steps:- Yarn Storage - Knitting- Dyeing- Printing - Embroidery- Cutting- Sewing- Finishing- Delevery

05/01/2023 7

Page 8: Final Project Presentation 2015 (111-065-0-45)

PRODUCTS & Production Capacity Capacity 5 million pcs/month

05/01/2023 8

No. Details Products

4.1 Production Capacity

GarmentsTotal Production

160 Thousands Pcs / Day

Total Line 90Dyeing Cotton/Synthetic – 45 Ton/DayKnitting 25 Ton / DayPrinting Rotary 5 Ton /day

Screen 45,000pcs/Day  ( Automatic& Manual)Embroidery 25,000 Stitches / Head / HourCollar 30,000 Pcs/DayWash / Piece Dyeing 20,000 Pcs/Day

4.2  

Range of Products

1. BASIC T-SHIRT, TANK TOP, BASE BALL,HANDLY        SHIRT, POLO SHIRT, LADIES DRESS,UNDER GARMENTS ETC. WITH KNIT FABRICS2. ALL KINDS OF COTTON KNIT FABRICS.

4.3  

Markets

USA. U.K. GERMANY, FRANCE, DENMARK,SPAIN,ITALY,AUSTRIA & CANDA

4.4 Existing Buyers LIDL,WalMart, Elmau Associates, C&A , Terre nova, Aldi, Target, K-Mart, Sears, Footlocker, Habestreit Zara, Anvil, Dollar General, Bonton , Handcraft, NKD, Fruit of the Loom, ETAM etc

4.5 Main Markets. Europe USA4.6 In % of total Annual Production 65% 35%4.7 Production Lead Time 90/60/30 days after receiving L/C or confirm the order.

Page 9: Final Project Presentation 2015 (111-065-0-45)

05/01/2023 9

Annual Turnover and Workers

Page 10: Final Project Presentation 2015 (111-065-0-45)

Annual Turnover

05/01/2023 10

Annual Turnover in USD

: i) 17 Million USD in the year of 2007ii) 30 Million USD in the year of 2008 iii) 36 Million USD in the year of 2009iv) 40 Million USD in the year of 2010v) 42 Million USD in the year of 2011

Legal Status : Public Limited Company

Capital  : 45 Million USD

Page 11: Final Project Presentation 2015 (111-065-0-45)

05/01/2023 11

Production Planning

No. Function ManpowerTotal Manpower 6500

3.1 General Administration

Management 40Merchandising 30General Admin 110Other 35

3.2 ProductionFabric Production 800Garments Production 4670Printing 250Quality Department 565

MANPOWER

REMARKS: The manpower management system ANTIM GROUP LTD is well arranged. Every officers & stuffs are responsible for their duty. It is sufficient for fluent production. The efficiency of the worker should be increased for more quality production.

Page 12: Final Project Presentation 2015 (111-065-0-45)

To give dyeing program slip. To match production sample with target shade. To collect production sample for sample matching next production. To observe dyed fabric during finishing running & also after finishing. To identify disputed fabrics & report to P.M/G.M for necessary actions. To discuss with P.M. about overall production if necessary. To sign the store requisition & delivery challan in the absence of P.M. Also to execute overall floor works. To maintain loading/unloading register book. Any other assignment given by higher authority.

RESPONSIBILITIES OF PRODUCTION OFFICER:

05/01/2023 12

Page 13: Final Project Presentation 2015 (111-065-0-45)

Report To: Sr. production officer Job Summary: To plan, execute & follows up the production activities & control the

quality production with related activities. 

Duties & Responsibilities: Overall supervision of dyeing, finishing production. Batch preparation & PH check. Dyes & chemical requisition issue & check. Write fabrics loading & loading time from m/c. Program making, sample checking, color management. Control the supervisors, operator, asst. operator & helpers of dyeing m/c. And also any other work as & when required by the management.

Job Description of Production Officer:

05/01/2023 13

Page 14: Final Project Presentation 2015 (111-065-0-45)

Report To: P.M (production) Job Summary: To plan, execute & follows up the production activities & control the

quality production with related activities.

DUTIES & RESPONSIBILITIES: Overall supervision of dyeing, finishing production. Checks the different log books of different areas & report to management. Checks the sensitive parameters of different machine for smooth dyeing. Checks out the plan to control the best output from supervisor & workers. To trained up & motive the subordinates how to improve the quality

production. Maintenance of machine & equipment. Any other works & when required

by the management. Control the supervisors, operator, asst. operator & helpers of dyeing m/c.  

JOB DESCRIPTION OF SR. PRODUCTION OFFICER:

05/01/2023 14

Page 15: Final Project Presentation 2015 (111-065-0-45)

Corresponding Officer Forward a requisition form to the Planning Department

Showing the token collect fabric from Cutting & Accessories from Store

Planning Department Gives a token Containing new style No

Quality Check

Ready for Sewing

Input Process Flow Chart:

05/01/2023 15

Page 16: Final Project Presentation 2015 (111-065-0-45)

Sewing process flow Chart:

05/01/2023 16

Input

Print & Embroidery Check

Measurement Check

Sewing StartedGet Full garments as

outputGarments Inspection

Forward it to the Finishing Section

Page 17: Final Project Presentation 2015 (111-065-0-45)

Antim Knitting Dyeing & Finishing Ltd.Antim Knit Composite Ltd.

Machine Layout & Production Planning

05/01/2023 17

Antim Knitting Dyeing & Finishing Ltd.Antim Knit Composite Ltd.Machine Layout & Production Planning

Buyer Style Item SMV TARGET // DAYLine No.

   ST - 05 Shorts 12.1 65%   70% 75% 80% 90% 100%

LINE BALANCING SYSTEM 1902   2048 2194 2340 2633 2926Floor  

SERIAL OPERATION BREAKDOWN TYPE OF MACHINE SMV # OF MACHINE TARGET/ OPERATION TARGET/HOUR TARGET/10 HR HELPER Quality

Machine Layout

Plan

INPUT     

Line Layout Plan

          

1 Front inside mase attach run stitch P/M 0.22 3 273 818 8182 0        2 Front inside mase attach zig zag stitch F/L 0.42 2 143 286 2857 0        3 Trimming & check 0 0.22 0 273 273 2727 1        4 Front waist psn face attach P/M 0.42 2 143 286 2857 0        5 Front waist psn face attach top stitch F/L 0.22 1 273 273 2727 0        6 Front lace join middle & cut O/L 0.23 1 261 261 2609 0        7 Front lace attach at front part run stitch P/M 0.44 2 136 273 2727 0        8 Front lace attach at front part Zig Zag stitch F/L 0.42 2 143 286 2857 0        9 Trimming & check 0 0.22 0 273 273 2727 1        10 Both leg lace & body attach O/L 0.46 2 130 261 2609 0        11 Cuset join at front part & cut O/L 0.44 2 136 273 2727 0        12 Bk & front part guset match 0 0.22 0 273 273 2727 1        13 Cuset join at bk part & cut O/L 0.42 2 143 286 2857 0        14 Bk part inside mase attach run stitch P/M 0.65 3 92 277 2769 0        15 Bk part inside mase attach zig zag stitch F/L 0.42 2 143 286 2857 0        16 Bk rise P/M 0.65 3 92 277 2769 0        17 Bk rise zig zag stitch F/L 0.42 2 143 286 2857 0        18 Side seam & cut size O/L 0.65 3 92 277 2769 0        19 Side seam top stitch& cut size F/L 0.6 3 100 300 3000 0        20 Trimming & check 0 0.22 0 273 273 2727 1 1      21 Elastic accu. Measure cut size 0 0.23 0 261 522 5217 2        22 Elastic attach at leg F/L 0.42 2 143 286 2857 0        23 Trimming & check 0 0.22 0 273 273 2727 1        24 Waist mark for lbl attach 0 0.23 0 261 261 2609 1        25 Waist lbl attach P/M 0.42 2 143 286 2857 0        26 Elastic accu. Measure cut size 0 0.4 0 150 300 3000 2        27 Waist elastic join F/L 0.44 2 136 273 2727 0        28 Waist elastic join safty tack P/M 0.42 2 143 286 2857 0        29 Trimming & check 0 0.22 0 273 273 2727 1        30 Side seam safty tack & cut size P/M 0.42 2 143 286 2857 0        31 Stricker remove 0 0.22 0 273 273 2727 1        32 Thread Trimmer TM 0.5 2 120 240 2400 0                                   PRODUCTIVE MACHINE   12.1 47       12 1        MACHINE REQUIRED      

TYPE OF MACHINE TTL M/C SMV Summary        O/L 10 2.2 Order Qty          F/L 16 3.36 Per Day Avg.Prod. Plan 80% 1460        P/M 19 3.64 Per Day Avg.Prod. Plan 60% P/E          B/A 0 0 Required Day 0        BH 0 0 Required Line    KS 0 0 OUTPUT  TM 2 0.5 26% Quality Table  Total M/C 47 9.7

  Total HP 12 2.4CM

OP HP Staff & Others Overhead Total Cost CM TK CM $ CM $ /Dzn

  Total 59 12.1 12292 2446 30131 30131 75000 51 $0.66 $7.90

Four line one o/p for piping cutting 20 line 4 operator

Page 18: Final Project Presentation 2015 (111-065-0-45)

ANTIM’s major buyers is:

Business relationship since 2007

05/01/2023 18

Page 19: Final Project Presentation 2015 (111-065-0-45)

05/01/2023 19

Achievements

Page 20: Final Project Presentation 2015 (111-065-0-45)

Capacity building of mid-management and worker to improve working condition

05/01/2023 20

Industry Safety Measure Training Support from Lidl/GIZ

Page 21: Final Project Presentation 2015 (111-065-0-45)

Electrical installations

Previous picture Current picture

05/01/2023 21

Page 22: Final Project Presentation 2015 (111-065-0-45)

Fire safety training by SQP experts

05/01/2023 22

Support from Lidl/GIZ

Page 23: Final Project Presentation 2015 (111-065-0-45)

Warning sign and poster posted at work floor

Previous picture Current picture

05/01/2023 23

Page 24: Final Project Presentation 2015 (111-065-0-45)

Fire fighting system improved

Previous picture Current picture

05/01/2023 24

Page 25: Final Project Presentation 2015 (111-065-0-45)

Infrastructure improvement support

05/01/2023 25

Support from Lidl/GIZ

Page 26: Final Project Presentation 2015 (111-065-0-45)

Health support for the workers

05/01/2023 26

Support from Lidl/GIZ

Page 27: Final Project Presentation 2015 (111-065-0-45)

Bonus payment for all employees

05/01/2023 27

Support from Lidl/GIZ

Page 28: Final Project Presentation 2015 (111-065-0-45)

Improvements made with support of

05/01/2023 28

Supplier Qualification Project (SQP)implemented by

Page 29: Final Project Presentation 2015 (111-065-0-45)

Change Management Team (CMT) 6 members

◦ 2 from HR and Compliance◦ 1 welfare officer◦ 1 from production department◦ 2 worker representatives (both female)

05/01/2023 29

Formation of CMT

Page 30: Final Project Presentation 2015 (111-065-0-45)

CMT members are directly trained by SQP on ◦ Dialogue between worker-management◦ Labour law, worker rights◦ Health and Safety issues◦ Waste management◦ Productivity improvement

05/01/2023 30

Capacity building of CMT

Page 31: Final Project Presentation 2015 (111-065-0-45)

CMT conduct regular meeting Train other colleagues on relevant issues Develop action plan Take responsibility Implement and monitor

05/01/2023 31

CMT activities

Page 32: Final Project Presentation 2015 (111-065-0-45)

Selected improvements made by CMT with support of SQP

05/01/2023 32

Page 33: Final Project Presentation 2015 (111-065-0-45)

Working floor rearranged

Previous picture Current picture

05/01/2023 33

Page 34: Final Project Presentation 2015 (111-065-0-45)

Medical room

Previous picture Current picture

05/01/2023 34

Page 35: Final Project Presentation 2015 (111-065-0-45)

Dining facility

Previous picture Current picture

05/01/2023 35

Page 36: Final Project Presentation 2015 (111-065-0-45)

Toilets

Previous picture

Current picture

05/01/2023 36

Page 37: Final Project Presentation 2015 (111-065-0-45)

Seating area separated from chemical store

Previous picture Current picture

05/01/2023 37

Page 38: Final Project Presentation 2015 (111-065-0-45)

Extension of Finished Goods storage is in progress

Previous picture Current picture05/01/2023 38

Page 39: Final Project Presentation 2015 (111-065-0-45)

Competency of mid-management improved

Workers become more aware on Health Safety and Environment issues

Worker migration rate reduced from 15% to 5%

Worker absenteeism rate reduced from 15% to 7%

Work injury reduced Worker’s income increased

05/01/2023 39

Results so far

Page 40: Final Project Presentation 2015 (111-065-0-45)

THANK YOU