final pla presentation
DESCRIPTION
TRANSCRIPT
![Page 1: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/1.jpg)
![Page 2: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/2.jpg)
![Page 3: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/3.jpg)
INTRODUCTION
Power Link Arabian Co. Ltd. is a leading contracting company involved mainly with civil, electrical and instrumentation projects. The company is dedicated to operate with high safety measure and complies with local and international standards. Power Link Arabian Co. Ltd. is determined to provide supreme engineering design, supply, erection, testing and commissioning of substation.
![Page 4: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/4.jpg)
INTRODUCTION
Power Link Arabian Co. Ltd. offers services with compliments growing range of integrated services that enable us to take any industrial or public works project from concept through planning, financing, design, construction, operations and maintenance. Every element of the firm is structured to ensure that we can leverage our global resources and know-how to satisfy each client’s particular needs.
![Page 5: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/5.jpg)
VENDOR REGISTRATIONS
• SEC V. ID 6235953274 • SAUDI ARAMCO V.ID 10041734
• SABIC VENDOR V.ID 505786 • MARAFIQ
• TASNEE V.ID. 101991 • AL ROWAD
![Page 6: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/6.jpg)
SCOP OF ACTIVITIES
• Layout of Sub-stations • All associated Civil works• Installation of Cable Ladders and trays• Erection of Gantries• Installation of Power transformers• Installation of Switchgear, Control and Protection system,• Installation of GIS type switchgear and Protection system.• Testing & Commissioning. • Laying of XLPE Power Cables for all voltages 11KV, 33KV, and 132KV.• Cable jointing, Indoor & Outdoor terminations.• HV DC Testing of Cables.• Testing & Commissioning.• Installations of Overhead lines, Conductors and Underground Cables.• Installation of Cables for internal Electrification in trenches, ducts, etc.• Installation of MCB , MCCB protection system• DBS & Panels
Main Activities Of The Electrical Contracting Include
![Page 7: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/7.jpg)
SCOP OF ACTIVITIES
• Design survey & Profiling • Networking Solutions• Supply, Installation& configuration of CISCO switches• Supply & Installation of patch panels, media converters etc.• Design, Supply & installation of Fibre Optical Cables• Splicing of Fibre optic cables• Connectorization• Power Meter Testing• OTDR testing• Complete Installation of Automation Equipment• Complete Installation of Field devices
![Page 8: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/8.jpg)
Power Link Hierarchy GENERAL MANAGER
HR & Admin Dept.Sales &
Marketing Dept.Operation Dept
Estimation QA/QC Dept.
Safety Dept.Civil Dept.
Electrical Dept.
Project Eng.Planning
Eng.Protection
Eng.
Site Eng.
Site Supervisor
Technician
Helper
Project Eng.Planning
Eng.
Site Eng.
Site Supervisor
Technician
Helper
Site Manager
Site Eng.
Site Supervisor
Forman
Load man
Project Eng.
DocumentController
Carpenter
SteelFixer
Scaffolder
Painter
Masons
Instrumentation Dept
![Page 9: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/9.jpg)
CIVIL CONSTRUCTION
A combination of flexibility, quality, special skills and adherence to budgets have ensured a pre-eminent position when clients require a single source contractor with capabilities in project development, management, construction services, installation and commissioning.
Power Link Arabian Co. Ltd. is fully capable to perform of handling all kinds of Civil Construction
• Earthwork• Roads• Sidewalks• Curbs • Gutters• Industrial Constructions• Commercial Buildings Constructions
![Page 10: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/10.jpg)
Hierarchy for Civil work
Planning Engineer
Safety Officer Document Control Permit ReceiverBackhoe Project Engineer
Project Manager
Project Supervisor
Foreman
Carpenter
Steel Fixer
Painter
Mason
Tile Fixer
Labor
Dump Truck
Loader
Crane
Bobcat
Boom Truck
Operator & Driver
![Page 11: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/11.jpg)
CLINT: SAUDI ARAMCO (AL-WASEA BULK PLANT)
CUSTOMER : GBN (GULF BUSINESS NETWORK)
INSTALLATION OF EMISSION MONITORING SYSTEMCIVIL/ ELECTRICAL/ INSTRUMENTATION/ FEBRICATION
![Page 12: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/12.jpg)
CLINT: SECCUSTOMER : GBN (GULF BUSINESS NETWORK)
INSTALLATION OF EMISSION MONITORING SYSTEMCIVIL/ELECTRICAL/ INSTRUMENTATION/ FEBRICATION
![Page 13: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/13.jpg)
PICTURES OF CIVIL JOBPICTURES OF CIVIL JOB
![Page 14: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/14.jpg)
CLINT: TASNEE (AL-ROWAD)
![Page 15: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/15.jpg)
Rowad Under Ground Tank
![Page 16: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/16.jpg)
Rowad Under Ground Tank
![Page 17: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/17.jpg)
Rowad Under Ground Tank
![Page 18: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/18.jpg)
Rowad Under Ground Tank
![Page 19: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/19.jpg)
Rowad Under Ground Tank
![Page 20: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/20.jpg)
Rowad Under Ground Tank
![Page 21: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/21.jpg)
CLINT: SABIC (YANBU)
![Page 22: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/22.jpg)
Yansib Yanbu BMS Project
![Page 23: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/23.jpg)
Yansib Yanbu BMS Project
![Page 24: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/24.jpg)
Yansib Yanbu BMS Project
![Page 25: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/25.jpg)
Yansab Yambu BMS Project
![Page 26: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/26.jpg)
CLINT: MARAFIQ SWTP-9SUB-STATION
CUSTOMER : SAUDI E-PHASE
![Page 27: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/27.jpg)
Marafiq SWTP 9 (substation) Project
![Page 28: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/28.jpg)
Marafiq SWTP 9 (substation) Project
![Page 29: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/29.jpg)
Marafiq SWTP 9 (substation) Project
![Page 30: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/30.jpg)
Marafiq SWTP 9 (substation) Project
![Page 31: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/31.jpg)
Marafiq SWTP 9 (substation) Project
![Page 32: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/32.jpg)
Marafiq SWTP 9 (substation) Project
![Page 33: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/33.jpg)
ELECTRICAL & COMMISSIONING - Installation, Testing, Commissioning and Maintenance
We will continue to meet the challenging needs of our clients with our quality services delivered by the most qualified people.
Power Link Arabian Co. Ltd. has successfully accomplished the job of all kinds of Electrical work with the appreciation letter of from our client TASNEE
• Installation, Testing, Commissioning and Maintenance• Underground and overhead distribution network. • Electrification of Buildings and Plant facilities. • Telecommunication works and security alarm system. • Power system, Substation, Switchgears and MCC. • Plant equipment, facilities and controls. • Calibration of System protection and monitoring devices.
![Page 34: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/34.jpg)
Hierarchy for Electrical work
Planning Engineer
Safety Officer Document Control Permit ReceiverProject Engineer
Project Manager
Project Supervisor
Foreman
Electrical Technician
InstrumentTechnician
Helper
Labor
![Page 35: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/35.jpg)
PICTURES OF PICTURES OF ELECTRICAL JOBELECTRICAL JOB
![Page 36: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/36.jpg)
CLINT: TASNEE AL-ROWAD
![Page 37: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/37.jpg)
TASNEE Group Rowad Power Station Project
![Page 38: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/38.jpg)
TASNEE Group Rowad Power Station Project
![Page 39: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/39.jpg)
TASNEE Group Rowad Power Station Project
![Page 40: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/40.jpg)
TASNEE Group Rowad Power Station Project
![Page 41: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/41.jpg)
TASNEE Group Rowad Power Station Project
![Page 42: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/42.jpg)
TASNEE Group Rowad Power Station Project
![Page 43: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/43.jpg)
LETTER OF APPRECATION
![Page 44: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/44.jpg)
CLINT: SAUDI ARAMCOCUSTOMER : ABHASAIN
SYNCHRONIZATION OF THREE EXISTING GENERATORS WITH AUTOMATIC SHIFTING (SUPPLY & INSTALLATION)
![Page 45: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/45.jpg)
Petro Rabic Project
![Page 46: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/46.jpg)
Petro Rabic Project
![Page 47: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/47.jpg)
Petro Rabic Project
![Page 48: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/48.jpg)
MECHANICAL, STEEL STRUCTURE & FEBRICATION
We hope that you will find the enclosed information of benefit in assessing our organization and we look forward to having the opportunity of putting our Mechanical & Fabrication skill to work for you.
Mechanical Works, Steel Structure & Fabrication
• HVAC Design and installations. • Steel Fabrication and Installation. • Fabrication, Installation and Erection of Steel Structure, GSM Towers.
![Page 49: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/49.jpg)
Hierarchy for Civil work
Planning Engineer
Safety Officer Document Control Permit ReceiverBackhoe Project Engineer
Project Manager
Project Supervisor
Foreman
Steel & PipeFabricator
Ducting Fabricator
Welder
Plumber
Pipe Fitter
Erector
Dump Truck
Loader
Crane
Bobcat
Boom Truck
Operator & Driver
![Page 50: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/50.jpg)
TASNEE Group Rowad Power Station Project
![Page 51: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/51.jpg)
TASNEE Group Rowad Power Station Project
![Page 52: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/52.jpg)
PICTURES OF PICTURES OF MECHANICAL, STEEL MECHANICAL, STEEL STRUCTURE STRUCTURE & & FEBRICATION JOBFEBRICATION JOB
![Page 53: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/53.jpg)
CLINT: SAUDI ARAMCOCUSTOMER : JOHNSONS CONTROL
![Page 54: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/54.jpg)
NPOC Project Saudi Aramco
![Page 55: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/55.jpg)
NPOC Project Saudi Aramco
![Page 56: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/56.jpg)
NPOC Project Saudi Aramco
![Page 57: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/57.jpg)
NPOC Project Saudi Aramco
![Page 58: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/58.jpg)
NPOC Project Saudi Aramco
![Page 59: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/59.jpg)
NPOC Project Saudi Aramco
![Page 60: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/60.jpg)
NPOC Project Saudi Aramco
![Page 61: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/61.jpg)
NPOC Project
![Page 62: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/62.jpg)
NPOC Project
![Page 63: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/63.jpg)
INSTRUMENTATION & AUTOMATION
It is the underlying policy of Power Link Arabian Co. Ltd. to develop and train the indigenous labor force and retain this staff within the subsidiary operation, providing Technology Transfer in the specialist areas of Instrumentation & Automation. In this regard we believe that we have been very successful
Instrumentation & Automation Works: • Installation, process equipment / facilities, piping controls, testing &
commissioning Instrumentation devices. • Calibration of Flow control system and supervisory instruments, Tanks /
pipe probers, storage tanks, and gauging devices. • Plant automation for process operation enhancement. • In-house testing commissioning of Plant / refinery instruments.
![Page 64: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/64.jpg)
Hierarchy for Instrumentation & Automation
Planning Engineer
Safety Officer Document Control Permit ReceiverProject Engineer
Project Manager
Project Supervisor
Foreman
Electrical Technician
InstrumentTechnician
Helper
Labor
![Page 65: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/65.jpg)
PICTURES OF PICTURES OF INSTRUMENTATION & INSTRUMENTATION & AUTOMATION JOBAUTOMATION JOB
![Page 66: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/66.jpg)
CLINT: TASNEE AL-ROWAD
POWER MANAGEMENT OF 18 x 1.6 MW POWER STATION WITH SCADA
![Page 67: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/67.jpg)
TASNEE Group Rowad Power Station Project
![Page 68: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/68.jpg)
TASNEE Group Rowad Power Station Project
![Page 69: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/69.jpg)
TASNEE Group Rowad Power Station Project
![Page 70: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/70.jpg)
TASNEE Group Rowad Power Station Project
![Page 71: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/71.jpg)
TASNEE Group Rowad Power Station Project
![Page 72: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/72.jpg)
TASNEE Group Rowad Power Station Project
![Page 73: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/73.jpg)
TASNEE Group Rowad Power Station Project
![Page 74: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/74.jpg)
CLINT: SAUDI ARAMCOCUSTOMER: AL ASWAD
SUPPLY INSTALLATION COMMISIONING OF FUEL MANAGEMENT SYSTEM WITH SCADA AT SAUDI ARAMCO CORPORATE DATA CENTER
![Page 75: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/75.jpg)
Master Control Pannel for Fuel Management at CDC
![Page 76: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/76.jpg)
Master Control Pannel for Fuel Management at CDC
![Page 77: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/77.jpg)
Master Control Pannel for Fuel Management at CDC
![Page 78: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/78.jpg)
CLINT: SABIC – ALBAYRONIEXPANSION PLANT
SUPPLY & INSTALLATION CIVIL MACHINCAL ELECTRICAL
![Page 79: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/79.jpg)
![Page 80: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/80.jpg)
![Page 81: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/81.jpg)
![Page 82: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/82.jpg)
![Page 83: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/83.jpg)
![Page 84: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/84.jpg)
![Page 85: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/85.jpg)
![Page 86: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/86.jpg)
![Page 87: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/87.jpg)
![Page 88: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/88.jpg)
![Page 89: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/89.jpg)
![Page 90: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/90.jpg)
![Page 91: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/91.jpg)
![Page 92: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/92.jpg)
![Page 93: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/93.jpg)
![Page 94: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/94.jpg)
![Page 95: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/95.jpg)
![Page 96: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/96.jpg)
![Page 97: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/97.jpg)
AL-HASA PROJECTSEC - OHTL
![Page 98: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/98.jpg)
![Page 99: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/99.jpg)
![Page 100: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/100.jpg)
![Page 101: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/101.jpg)
![Page 102: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/102.jpg)
![Page 103: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/103.jpg)
![Page 104: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/104.jpg)
![Page 105: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/105.jpg)
![Page 106: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/106.jpg)
![Page 107: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/107.jpg)
![Page 108: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/108.jpg)
![Page 109: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/109.jpg)
![Page 110: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/110.jpg)
![Page 111: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/111.jpg)
![Page 112: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/112.jpg)
![Page 113: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/113.jpg)
![Page 114: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/114.jpg)
![Page 115: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/115.jpg)
![Page 116: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/116.jpg)
![Page 117: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/117.jpg)
![Page 118: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/118.jpg)
![Page 119: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/119.jpg)
![Page 120: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/120.jpg)
![Page 121: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/121.jpg)
![Page 122: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/122.jpg)
![Page 123: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/123.jpg)
![Page 124: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/124.jpg)
![Page 125: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/125.jpg)
![Page 126: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/126.jpg)
![Page 127: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/127.jpg)
![Page 128: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/128.jpg)
![Page 129: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/129.jpg)
![Page 130: Final pla presentation](https://reader037.vdocuments.site/reader037/viewer/2022102716/5452cf2faf7959ce7f8b88a2/html5/thumbnails/130.jpg)
THE END