Optimum Design Return Period of EHV Lines Considering Reliability, Security and Availability
1
CIGRE-IEC Colloquium
Montreal, May 9-10, 2016
Optimum Design Return Period of EHV Lines Considering Reliability, Security and
Availability
Asim Haldar, Ph.D, P.Eng. CEATI International
Leon Kempner, Ph.D, P.Eng. Bonneville Power Administration
Alex MogilevskyCEATI International
Outline of the Presentation
Ø Introduction Ø ScopeØ Historical Background of Line Failures Ø Cost ModelØ Line Optimization ModelØ SensitivityØ Summary and Conclusions
A Typical Line Diagram of a 230 kV Power System (Network at High Level)
Typical System
• Structural System
• Electrical System
In all these systems, load must not exceed the capacity or demand must be less than the capacity in order for the system to survive
Electrical System
SystemReliability
SystemAdequacy
SystemSecurity
RESILIENCY
Structural System
Reliability
Security
Resiliency Of The Power GridSY
STEM
DES
IGN
LEV
EL
DAMAGE LEVEL
TIMENATURAL HAZARD
EVENT
PRE-HAZARD LEVEL
POST-HAZARD LEVEL
MITIGATIONEFFORT
ΔTIME
ΔDA
MA
GE
RECOVERY TIME
Resilience Index = Area of Triangle
Line Failures
Serviceability Limit State
Ultimate Limit State
Reliability and Security Integration
Ø It is well known that two lines designed with same reliability level can have very different availabilities should the failure modes and the extent of the failure zones be different.
Ø Haldar et al (2007,2008, 2009 and 2010) have used finite element models to estimate the extent of the cascade zone of overhead lines. The model included multiple tower failures. The purpose was to estimate the cascade failure zone and the expected number of tower losses to link the number of tower failures to repair time.
Ø Although numerical model for cascade requires some improvement, these models can be used to explore the extent of the line damage and its effect on the repair rate (μ) and line availability.
Canisius et al ICASP 2007
Scope
Cost
Reliability (Return Period)
Initial Cost Cost of Failures
Total Cost
Least Cost
Historical Information- Major Blackouts in the Past 35 Years (some examples)
80% of FranceBlackout
Sweden Voltage Collapse
FranceVoltage Collapse
SloveniaIce Storm
1978 1983 1987 1996 1998 2003 2005 2007 2008 2012 2014
IndiaBlackout
Northeast USABlackout
QuebecBlackout
FranceWind storm
ColumbiaBlackout
LondonBlackout
ItalyMalaysia…
….
MexicoBlackout
MoscowBlackout
ChinaIce Storm
JapanEarthquake
HurricaneSandy
Historical Line Failures
1998 Quebec Storm
http://theenergylibrary.com/node/13088
(Electrical)August 2003
(Structural)
Line Cost Model - Optimum Cost Versus Reliability
Cost
Reliability
Initial Cost(Cost of Maintenance)
Cost of Damage(Cost of Failures)
Total Cost
Least Cost
CT = CI + PV(CM + PfCf + Outage Cost)
Design Operation Planning (Line Security)
ConsequencesFailure Probabilities
(Ref: Robert Bea)
TCOST
LCOST DCOST
Initial-StructuralDesign System-Model
Line Cost Model – Flow Chart
Overlap RegionL R Probability
Density Functionof Strength of
Member
ProbabilityDensity Functionof Member Load
CT = CI + PV(CM + PfCf + Outage Cost)
µλµ+
Availability =
Unavailability = µλλ+
Line Optimization Model- Reliability & Availability Cost Components
DCOST Determination
ØStructural SystemPf = φ(-β)=1- φ(β)
where : Pf = failure probability
ØElectrical System
Where: SI = Severity Index
min60*(MW)LoadPeakhr)(MWEENSSI −
=
Energy and Peak
25%
35%
40%Industrial
Commercial
Residential
Example Problem -Optimum Return Period
Sensitivity Summary & Conclusions
A sensitivity analysis also shows that the optimum design return period is less influenced by discount rate and the cost of line replacement and more sensitive to the duration of outage and IEAR value used.
Haldar (2011) has extended the concept to parallel line configuration as well to study the integration of a HVDC line in an existing 230kV power network system by minimizing the total cost and hence, determining the optimum return period.
The study presents a basis for computing the optimum designreturn period of an overhead line considering the initial linecost and the present value of the future failure cost.
The optimization is performed considering the initial line costand the cost of losses due to line failures. The failure costconsists of two components; (1) expected cost of linereplacement and (2) expected cost of energy not supplied.
A mathematical model is developed for a radial lineconfiguration and it is shown clearly that the optimum designreturn period is significantly influenced by the duration of theline repair once it has failed and the cost of energy rate (IEARparameter).
The line should be designed for a higher return period if theduration of repair is expected to be long to ensure that the linecost is balanced against the present value of the failure costs.
The sensitivity analysis also shows that the optimum designreturn period is less influenced by discount rate and the costof line replacement and more sensitive to the duration ofoutage and IEAR value used.