final lcp najeehah farahen pricilla
DESCRIPTION
Laporan Cadangan Kemajuan Skudai..TRANSCRIPT
-
REGENERATION OF SKUDAIREGENERATION OF SKUDAI
-
UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
1.01.0 INTRODUCTIONINTRODUCTION
This report is prepared for proposal development of regenerating the parcels of land
in Skudai Town. Skudai is part of the new growth corridor of Southwest Johor and it
will thrive through the recommendations of the proposed development part of BPK
1.1, BPK 1.2 and BPK 1.4 .
This development proposal will generate Skudai Town Centre as a sub-region
growth centre in enhancing the physical, economic, sosial and environmental sur-
rounding of Skudai.
1.11.1 Scope of Study Scope of Study
From the earlier study, we have discovered:
Regional framework and policies for the proposed site.
Area includes existing and surrounding elements in Skudai which include physical,
social and economy on site.
Future projects that might benefit the regeneration of Skudai.
Identify general concepts in regeneration of Skudai town centre that would be
injected to selected site.
1.21.2 Location of SkudaiLocation of Skudai
Skudai a suburb of Johor Bahru is the largest city in and the capital of the state of
Johor in southern Malaysia. Skudai is part of the new growth corridor of southwest
Johor, which includes the Senai International Airport, Tanjung Pelepas Port and the
proposed new administrative capital of Johor, Bandar Nusajaya.
Its population ranges between 160,000 and 210,000. It is the headquarters of the
Johor Bahru Central Municipal Council and located 8 km, 4 km and 16 km from
Kulai, Senai and Johor Bahru city (bandaraya) respectively.
1.31.3 Potential of SkudaiPotential of Skudai
Johor Bahru and Nusajaya was included in Iskandar Malaysia Development Region. Accord-
ing to South Johor Economic Region Plan, Skudai is a part of Flangship E which planned to be
as the hub for agro and food processing, ICT and retail tourism.
Johor have stated that Skudai is the Sub-Regional Growth Centre and is located along the
pathway from north to south before entering Johor Bahru. The main function of Skudai is to
support the developments in Johor Bahru City Centre.
The other functions of Sub-Regional Growth Centre are:-
The main administrative center of the district.
Medium service standards.
Commercial activity centers at the district level.
As the impact of SJER and Iskandar Malaysia, Nusajaya and Johor Bahru rapidly growth and
somehow the developments starts to pack in the city. The lack of vacant lands in the city
caused the developments change towards the outer city. Skudai as one of the nearest town
centre can play its role to cater these excessive development demands.
The map shows the location of Skudai SkudaiThe map shows the location of Skudai Skudai
DEVELOPMENT PROPOSAL REPORT
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
In November 2012, total cumulative committed investment for Iskandar Malaysia
since its debut stood at RM105 billion, up 24% from 2011 (source: IRDA), and it ex-
pects this countrys first economic growth corridor will continue to spur the growth of
Johor Bahrus economy thus benefiting the property industry.
Based on the property market 2013, the main sector such as demand for space and
rental of shopoffices, residential and industrial in Johor Bahru, the market will see an
upward trend in demand based on the previous year 2012.
1.51.5 Existing Land Use of SkudaiExisting Land Use of Skudai
The existing land uses of proposed site involved residential (Taman Sri Putri, Taman Har-
moni, Kampung Laut, Kampung Melayu) , commercial (Skudai Parade), institutional (SJK
(c) Pu Sze) , open space, facilities and amenities , infrastructure and utility, road and river.
The proposed site is situated well within the good accessibility through the Skudai high-
way that provide a continuity of development to support the existing town centre activi-
ties. Table 6.2.1 show that commercial is the highest land use which is 21% (111 acres) af-
ter road.
Land Use Percentage (%) Area
(Acre)
Residential 11.06 58.04
Commercial 21.19 111.19
Institutional 7.10 37.25
Open Space 7.27 38.13
Facilities and Amenities 5.06 26.55
Infrastructure andUtility 1.02 5.34
Road 35.16 184.48
River 12.14 63.69
Total 100.00 524.67
The table below shows the existing land use component
DEVELOPMENT PROPOSAL REPORT
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
Hotel
Plot Ratio Maximum 6:1
Plinth Area Maximum 60 % of the site
Setback More than 20m
Car Park
1 parking lot for every 3 rooms (hotel)
Parking lot for disabled people is 2% of the total vehicle park-
ing spaces.
Building Height Maximum 25 floors
Entrance and Exit Width 30m
Jalan Susurfor from the main road
15m
Buffer zone Minimum 20m integrated with inner-circulation, pedestrian
walkway, landscape or recreational area
Condominium
Plot Ratio Maximum 6:1
Plinth Area Maximum 60 % of the site
Minimum Lot Size 0.4 hectare ( 1 acre )
Minimum Floor Area 92.9 mp (1000kp)
Density Unit Maximum 80 units per acre
Setback
Minimum requirement of front setback is 15.2m
(50) Minimum requirement of side or rear setback is
6.1m (20) which also serve as as fire break. Minimum requirement: Building by building
Front to front : 24.4 m (80) Side to front : 12.2 m (40) Side to back : 12.2 m (40) Back to back : 12.2 m (40) Side to side : 9.1 m (30)
Minimum Size 6.1m x 19.8m (20x 65)
Car Park
1 parking lot for vehicles is required for two unit of
room and one parking lot for motorcycle is re-
quired for 84 m2 (905 square feet )
20% of parking lot is required for visitors
Parking lot for disabled people is 2% of the total
vehicle parking spaces.
Building Height Walk up apartment: Maximum 5 floor
With Lift: Maximum 20 floor
Shopping
Complex
Plot Ratio Maximum 6:1
Plinth Area Maximum 60 % of the site
Minimum Lot Size more than 0.4 hectare (1 acre)
Setback
Minimum requirement for the shopping complex setback is 12.2m (40) that facing to the main road
Minimum requirement for the shopping complex for side or back
boundaries that near to the line of landscape zone is 6.1m (20)
Car Park
The provision of parking spaces is based on the total floor area of the
shopping complex
Parking lot need to be provided sufficiently or one can choose to make
payment for lack of number of parking spaces.
Either is on-street parking or off-street parking
1 parking lot for vehicles is required for 50 m2
1 parking lot for motorcycle is required for 200 m2
Parking lot for disabled people is 2% of the total vehicle parking spaces.
Building Height Maximum 20 floors
Entrance and Exit Width 30m
Open Space 10 % from the overall site
2.02.0 Planning StandardsPlanning Standards
Shop Office
Plot Ratio Maximum 3:1
Plinth Area Maximum 60 % of the site
Minimum Lot size 6.1m x 19.8m (20x 65)
Setback
Minimum requirement of setback is 15.2m (50) between the two rows of buildings (2-storey) facing each other, between two boundaries of
corner lots and also for side boundary that next to the road reserve line
as well as front boundary that face to road reserve line. It also serves as
the service road connects each other.
Minimum requirement between end lots is 6.1m (20) which serve as side lane or fire break.
Setback for two row of back side of buildings (backlane) is 6.1m (20)
Car Park
1 parking lot for vehicles is required for 46.4 m2 (500 square feet)
1 parking lot for motorcycle is required for 84 m2 (905 square feet )
Parking lot for disabled people is 2% of the total vehicle parking spaces.
Type of development Maximum 15 lots of shop office in a row
Open Space 10 % from the overall site
POLICIES AND PLANNING STANDARDS
Johor Development Policies
Comprehensive economic development and integrated
Controlled development at agricultural area
Strengthening of existing industrial corridor
Sufficiently available trade development based on population distribu-tion and function of hierarchy settlement centers.
Enhancing and diversifying tourism attraction area
Permitted development area
Control of water catchment areas
Preservation area forest reserve
Upland development planning
Surrounding development corridor development and until 2020 to be driven to balanced development concepts distribution
Development by hierarchy settlement centre
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
ECO-URBANISM
Skudai Regeneration will co-exist with natural environment to embed
high environment quality.
Include sustainable Design and Rainwater Management
INCLUSIVE AND IDENTITY
Create a vibrant, rich and lively Centre with a sense of place. Provide
inviting and safe public spaces accessible to all people. Encourage
mixed-use development that will be designed with varying intensity.
Great emphasis on local identity.
WALKABILITY AND PEDESTRIAN-ORIENTED
Strengthen and provide a walkable compact core with mixed com-
mercial. Pedestrian, Cycling and Public Transportation Connections.
Provide attractive pedestrians, cycling path, streetscapes and a lively
high street with active store fronts. Promote cycling among community.
SMART LOCATION
Skudai (Skudai Highway) a main access to connect North area and South
area is a catalyst development creating high impacts to the regional and
local economy.
Clusters of economic activities that will benefit the local business as well
as provide opportunities for the emergence of new economies will be
created.
3.23.2 Design PrinciplesDesign Principles 3.0 Development Proposal3.0 Development Proposal
3.13.1 Regeneration of SkudaiRegeneration of Skudai
Regeneration is concerned with the re-
growth of economic activity where it has
been lost; the restoration of social func-
tions where there has been dysfunction or
social inclusion where there has been ex-
clusion; and the restoration of environ-
mental quality or ecological balance
where it has been lost. Thus urban regen-
eration is an aspect of the management
and planning of existing urban areas ra-
ther than the planning and development
of completely new urbanization (Couch,
Fraser and Percy, 2003).
Regeneration Objectives of Skudai :
Redevelop some areas in Skudai to
support Skudai as sub-region growth
centre
To inject economy into Skudai in line
with the purpose of Skudai as trade
and services for sub-region growth
centre
Focusing new development at accessi-
ble locations near transit stations
and major centre.
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
Management of rainwater in one of the sustainability goals that for the MPJBT Centre.
Throughout the MPJBT Centre, water feature is applied and integrated in the
development to make the site more liveable and attractive. The rain will be collected
from roofs to irrigate green roofs and other building landscapes. Cisterns for rainwater stor-
age will be integrated into open space design to make water storage and use visible to
the public. The streets and pedestrian movement corridors are intended to feature rain-
water collection in rain gardens or rainwater pond located within the public realm..
Rainwater Pond within the Community Park
The rainwater collected from hard surfaces could be directed to a pond
within the park. This pond could both retain and bio remediate rainwater
while providing a water feature integrated with the park program.
Rain Gardens within the Streetscapes
Rain Gardens will be interspersed between on-street parking bays that located at
intervals along the streets. Rain falling within the public realm will be flow directed
into rain garden which is landscaped with permeable materials and plants that
are tolerant of occasional 'wet feet'. The Rain Gardens allow the rainwater to re-
charge slowly into the groundwater after a rainfall.
Rainwater pond
Rainwater Garden
HeightHeight
Building enclosure, or the relationship of building height to building separation, is proba-
bly one of the most important of these concepts. In order to create spaces and travel
ways that feel comfortable spatially, this ratio should range from 1:1 to 1:4 and should
not exceed 1:6 (APA 165). This ideal range for building enclosure will create the percep-
tion of an enclosed space that is more comfortable and scaled correctly to pedestrians
and create better cross street connections.
2:1 Street Ratio (APA 165) 1:1 Street Ratio (APA 165)
Quality of Public Spaces Quality of Public Spaces
An attractive and functional public space with connection of pedestrian walkways is
essential to be applied. It is a place for people to interact and carry out activities
together , take advantages from it and make the area lively.
Sources: http://cincinnati.com/
Rainwater Management StrategyRainwater Management Strategy
3.33.3 Design CriteriaDesign Criteria
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
Sources: http://www.math.utsa.edu/
Pedestrian Path Pedestrian Path
The pedestrian path is designed continuously to connect each other with shared landscape
in order to encourage walking activities. The easily access from the building to building is
possible provided with physical activities.
The following shows general concept of pedestrian network that functions as continuous pe-
destrian walkway. The sitting area or rest station is provided along the street with at least 10
minutes.
The pedestrian walkway is designed along the building to protect pedestrian from the
traffic and it is provide convenient to the people especially disable people, children
and folks.
Sources: http://www.planetizen.com/ Sources: http://www.mwcog.org/
Landscape Elements Landscape Elements
The purpose of enhancing the landscape elements at the proposed site is creat-
ing sense of place-making to all different kinds of people. The landscape ele-
ments are discusses for both hardscape and softscape elements. Hardscape Ele-
ments
For recreation area, there is some of the pavement which suitable to walk con-
veniently by people.
Softscape Elements Softscape Elements
Sources: http://tungkinfoongsblog.blogs
Samanea Saman
The big trees are planted along the
road to calm the environment and
provide shading to the pedestrian.
Sources: http://garden-frenzy.blogspot.com/
Dalbergia Oliveri is one the suitable
trees that used for parking spaces at
proposed site area
Hardscape Elements Hardscape Elements
For recreation area, there is some of the pavement which suitable to walk
conveniently by people.
Sources: http://marrickvillegreens.files.wordpress. Sources: http://www.axisjiku.com/
The pavement for pedestrian walkway along the street is used of Red Blend-
London and Natural Grey-Holland
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
LEGENDLEGEND
UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Cycling PathCycling Path
Cycling PathCycling Path
Pedestrian WalkwayPedestrian Walkway
Bicycle parking StandBicycle parking Stand
Focal pointFocal point
Public SpacePublic Space
Pedestrian CrossingPedestrian Crossing
Access with Access with
pedestrian pavementpedestrian pavement
LEGENDLEGEND
Design Design
ConceptConcept
Provide Provide
Conducive Walking Conducive Walking
environmentenvironment
Increase Increase
PermeabilityPermeability
Improve Improve
and Create and Create
ConnectivityConnectivity
Promote Promote
CyclingCycling
Source: Planning and Design Data, David
Circular array with a capacity Circular array with a capacity Basic Sheffield parking Basic Sheffield parking
standstand
The Parking Stand The Parking Stand will be provided a spe-
cific location for people convenience. It
will be located at a destinations where is
visual supervision.
http://www.carfreeinbigd.com/
An access is paved with comfortable and
suitable pavement such as asphalt or stabi-
lised earth are materials commonly
used. The access with be closed for the ac-cess of vehicles after 6pm and fully used as
pedestrian walkway
Pedestrian Crossing Pedestrian Crossing is proposed for pedestrian
and bicycle passing through safely. This
increase and encourage the interaction be-
tween the area which has been separate by
the road. The activities between the two zone
will be inter-connected and create a more
inclusive and active area.
The four main approaches regarding to the
Pedestrian-Oriented Concept will focus
mainly at the connection and circulation of
pedestrian movement which is more envi-
ronment friendly. The existing pedestrian
walkway or physical elements will be up-
graded to improve the design or usage.
The strong connectivity create a lively and
vibrant area as it attract more people.
The renting of bicycle also promote
to encourage people to cycling.
The Touch n Go Touch n Go concept will be
promoted to easy the payment of
the bicycle parking stand as a
locker.
Pedestrian Oriented ConceptPedestrian Oriented Concept 4.0 4.0 Development ProposalDevelopment Proposal
4.14.1 MPJBT AreaMPJBT Area
DEVELOPMENT PROPOSAL REPORT
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086
http://fortworthbikesharing.files.wordpress.com/
Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
4.1.14.1.1 Commercial ZoneCommercial Zone
The commercial zone provided for live (short living period), work and fun purposes. It
is an important zone as it act as catalyst for the development of the Skudai and
provides for generating profit and enhance the economy .The total development
areas of commercial zone cover 11.75acres . The area are zoned for free standing
and non-free development (shopping complex, specialized commercial, showroom,
sport centre).
The different types of components of commercial areas shown as following:
2 units of Shopping complex (2.4 acre and 3.01 acre)
16 units of 3-storey specialized centre (8m x 20m) (1.4 acres)
9 units of 2-storey showroom (20m x 8m) (2.15 acres)
Sport Centre ( I.78acre)
The proposed of double frontage shopping complex( 3.01acre) is designed link
by each other via pedestrian bridge. In order to promote walkability and sense
of safety and security, in front of the shopping complex will priority for pedestrian
only.
Sources: http://www.ritzcarlton.com/
Double Frontage shopping complex
connected by sky bridge illustration
The proposed of 5-storey double frontage shopping complex( 2.4acre).
The shopping complex is fronting a
huge open or leisure space with differ-
ent activities.
Double Frontage shopping complex with variety of
colour to revel the unique of the place and
increase the robustness
The level of the buildings will be proposed in different level to have better
skyline and more interesting view. The concept used is to created a lei-
sure/open space between commercial zone (CPTED principle). Variety of
activities will be carry out in the open space. The septic tank with 0.27acre
also provided for the commercial zone (with two access and a unloading
place has been provided for the maintenance).
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
Development Component Gross Floor
Area (m2) Parking Spaces
Total Required
Parking
Proposed
Parking
Shopping Complex A
(5-storey) 9664
Vehicles 193 195
Motorcycle 48 50
OKU 4 4
Shopping Complex B
(7 and 3-storey-connected
with Sky Bridge
12184
Vehicles 244 245
Motorcycle 61 62
OKU 5 5
3-storey Specialized
Commercial 8336
Vehicles 167 168
Motorcycle 42 42
OKU 3 3
2-storey Showroom 8666
Vehicles 173 175
Motorcycle 43 43
OKU 3 3
The requirement and proposed of parking spaces.
The proposed of 2-storey double frontage showroom is to maximum it potential
to be seen. The showroom is potential to be proposed as the building can be de-
sign by the owner and show their own identify or uniqueness for thei showroom.
Double frontage showroom illustration http://www.timothywells.net/
Three storey double frontage specialized centre. (8mx20m).
Two lot with 8 units for each lot. A flexible event space hase been provide beween
the two lot of buildings.
http://www.visitpenang.gov.my/
Site Area : Site Area : 8.44 acre
Total Gross Floor Area Total Gross Floor Area = 38,850 m2
Plot Ratio Plot Ratio = 38,850 m2 / 34155 m2
= 1.1
Plinth Area Plinth Area = (8847 m2 / 34155m2) x100%
= 26%
The frontage and environment illustration
DEVELOPMENT PROPOSAL REPORT DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
Figure : Sport Centre Illustration
4.1.24.1.2 Sport CentreSport Centre
Creating exciting and sustainable places for sport and the continuing legacy for the wider community.
The total areas of sport centre cover 3.1acres out of .. acres of the MPJBT zone. It is
very essential to provide a safe and inclusive place for the community to carry out sport
activities. A dramatic curved canopy roof serving as a beacon of health and fitness
inspiring the local population to good health and wellbeing. The proposal emphasize on
the building design so that views are fully exploited and enjoyed.
Site Area : Site Area : 3.1 acre (12,581.4 m2))
Total Gross Floor Area :Total Gross Floor Area :
= 2,404 m2 x 3 level
= 7212 m2
Underground Parking: 3 levelsUnderground Parking: 3 levels
Car park= 927 nos.Car park= 927 nos.
Motorcycle Park= 233nos.Motorcycle Park= 233nos.
OKU= 18nos.OKU= 18nos.
Plot Ratio Plot Ratio = 14424m2 / 12,581.4 m2
= 1.2
Plinth Area Plinth Area
= (2,404 m2 / 12,581.4 m2) x100%
= 19%
Development
Component
Gross Floor Area
(m2)
Parking Spac-
es Total Required Parking
Proposed Park-
ing
Sport Centre
7212 m2 +
(commercial
area)
Vehicles 927 nos. 930 nos.
Motorcycle 233 nos. 230 nos.
OKU 18 nos. 18 nos.
The requirement and proposed of parking spaces.
The sport centre consist a extensively landscaped leisure open spaces and it provide a landmark
leisure facility. The building is proposed in the middle of water feature to provide better view and
environment. The underground parking is proposed to accommodate and fulfill the demand of
the parking for the sport centre and the commercial zone at the MPJBT area.
The sport complex is private facilities whereas the extensive landscape surrounded the sport
complex is public facilities. Community can interact with each other and carry out activities at
the wide landscape. The parking lots will be provided underground the sport centre.
Storey Development Component Units Area (m2)
1 Swimming pool ( Infinity pool
and kiddie pool) 1 1,200
Futsal Court 6 64m2 X 6 = 384
2 Badminton court 6 81.74m2 x 6 = 490
Gymnasium 1 708
3 Roof landscape Park 1 2,404
The component of indoor games proposed inside the sport complex
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
4.1.34.1.3 CondominiumCondominium
The total development areas of condominium covers 2.14 acre. This condominium is surrounded with a sense of nature. Even though
it is at the heart of the city, community still can feel its real trees, grass, and blue water. The condominium consist of 3 blocks of build-
ing with different levels and a clubhouse is provided. Two block (Block A and C) are in 8 levels and the middle block (Block B) is in
10 levels. The services and facilities will be provided. For example, swimming pool (kiddie pool and infinity pool), small children play-
ground, open air restaurant, pathway, nursery, gate house and other service.
Site Area : Site Area : 2.14 acre
Gross Floor Area:Gross Floor Area:
Block A : 670.25m2 x 8 =5362 m2
Block B: 627 m2 x 11 = 6,897 m2
Block C: 670.25m2 x 8 =5362 m2
Clubhouse: 177 m2 x 2 =354 m2
Total Gross Floor Area Total Gross Floor Area = 17,348 m2
Plot Ratio Plot Ratio = 17,975 m2 / 8660 m2
= 2.1
Plinth Area Plinth Area = (2144.5 m2 / 8660 m2) x100%
= 25%
Number of Units proposed Number of Units proposed
= 2.14 acre x 50 unit per acre
=107 units
Sources:
A unique gateway design gateway design of the
condominium will be proposed to be
more visibility and legibility.
Sources:
Infinity pool and kiddie pool Infinity pool and kiddie pool that integrated
with the green environment is created. The
infinity pool that created is surrounded the
condominium building to give a natural sense.
Sources: http://travel.cnn.com
Open Air Restaurant Open Air Restaurant is provided to create a
comfortable and fresh environment for the
community to enjoy with the natural and the
beauty of Skudai with family especially during
night.
The condominium has been proposed based on the
Crime prevention through environmental design (CPTED) Crime prevention through environmental design (CPTED)
principle. The placement of physical features by placing
the activities where is surrounded by the buildings has
maximized the visibility. The selectively placing entranc-
es and exits, fencing, lighting and landscape limit the
opportunity for crime by clearly differentiate between
public space and private space.
http://
marrickvillegreens.files.wordpress.com/
Tress such as Tamalan Tree is provid-
ed to provide green view
Fence is proposed in 2m
for control the access
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
The requirement and proposed of parking spaces.
Development
Component
Gross Floor Area
(m2)
Parking Spac-
es Total Required Parking Proposed Parking
Condominium 17,337m2
Vehicles
107units /2 = 54nos.
20% for visitors = 11nos.
Total car park = 65nos.
88nos.
Motorcycle 21nos. 22nos.
OKU 65nos. X 2% = 2nos. 5nos.
1,290 sq.ft. / 119.8 sq.m.
3 Bedrooms & 2 Bathrooms Type LAType LA
1,060 sq.ft. / 98.5 sq.m.
2 Bedrooms & 2 Bathrooms Type LBType LB
1,120 sq.ft / 104 sq.m
2 Bedrooms & 2 Bathrooms
Type LCType LCType LC 1,356 sq.ft. / 126 sq.m.
3 Bedrooms & 2Bathrooms
Type LDType LD
Block Type LA Type LB Type LC Type LD Total Units of Room
Condominium
A - 13 - 14 27
B 18 18 18 - 54
C - 13 - 13 26
Total 18 44 18 27 107
For type of room have been proposed for the condominium ,as shown as
below
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
4.34.3 Terminal BusTerminal Bus
New terminal bus will be proposed at Taman Sri Putri with the site area of
Terminal Bus will be proposed with a good accessibility and design as it is an important component of transportation mode in Skudai area where it serves as a pick and drop place
where passengers mainly from UTM students act as primary consumers . The proposal help to solve connection issues between both sides of the area which are separated by a road-
way. The new Terminal will provide systematic circulation which can improve the areas accessibility.Creating a ripple effect which affecting nearby economic growth
Development
Component
Gross Floor Area
(m2)
Parking Spac-
es Total Required Parking
Proposed Park-
ing
Terminal Bus
Vehicles
Motorcycle
OKU
Bus 20nos.
The requirement and proposed of parking spaces.
Component proposed in Terminal bus:
Ticketing counter
Retail shops
Parking lots
Bank
Government-based
office (permanent tenureship)
Food Court
BRT station for intercity linkages
Site Area : Site Area : 6.1 acre (23,106m2))
Total Gross Floor Area :Total Gross Floor Area :
= 27701.67 m2 x 3 level
= 23,105 m2
Plot Ratio Plot Ratio = 0.9
Plinth Area Plinth Area
= (7701.67 m2 / 24,606m2) x100%
= 31%
Sources: http://www.onlydesigns.net/
A traffic Calming is emphasize on the entrance
of the tterminal.
Food Court Food Court is proposed at the second level of
the terminal bus to provide convenience for
the people to buy things.
Three level of Terminal Bus Terminal Bus with modern
design and good accessibility.
The bus parking is provided and with
shelter for the convenience and comfort-
able of people
Ticker counter Is proposed at ground Ticker counter Is proposed at ground
floorfloor
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
4.44.4 Linear Automative Commercial & Services (LACS) Linear Automative Commercial & Services (LACS)
The purpose of Linear Automative Commercial & Services is to support Skudai as
Sub-Regional Growth Centre. The existing linear automotive services along the
main Skudai Highway serve as potential proposal to develop Linear Automative
Commercial & Services at the study area.
A variety automotive franchise dealer automotive franchise dealer for services will
be proposed on the development ( used cars, heavy
vehicles such as buses and lorry )
Workshop of joint ventures Workshop of joint ventures with
smart- partnership will be I mple-
mented(UTM, Perodua, NAZA)
Showroom Showroom for all automative vehicles brand Proton, Mitsubishi, Toyota dan Yamaha will be
proposed at the site.
No. Development
component
Area Percentage
(%) Acre Hectare
1 Commercial building
(8 vacant buildings)
Acquire 5 of
(22 x 72) commercial lot size Acquire 3 of
(21 x 80) commercial lot size
0.18 0.07 52.94
0.12 0.05 35.29
2 Showroom of 21 x 80 0.04 0.02 11.76
Total development 0.34 0.14 100
4.5 Community Spaces (Institutional)4.5 Community Spaces (Institutional)
Regenarate the existing institutional that give benefit and profit to property market
development for future in term of local tourism and promote community cultural.
Project Concept
The concept for upgrading instituitional area will provide the components needed such
as economy, sosial and environment aspect to fulfill the present and future needs.
The religious district for Buddha temple and Hindu temple will be upgraded, to pro-
mote the religious cultural in term of local tourism.
The existing Telecoms Malaysia will be converted to Telecoms Academy, and can
attract many people to get the services and training as well as generate econo-
my growth.
To create
Institution Area 4.67 acres Telecoms : 2 acre Hindu T 0.4 acre Buddha T: 0.2 acre Vacant Land : 2 acre
Development Area 4.67 acres
Land Status Semi-Government (Telecom) Vacant Land (Government)
Ilustration for mini pocket park
Greenery linear concept will
be proposed as a buffer zone
for drain reserves as well as
beautify the scenery area by
landscaping.
Telecoms Academy Proposal
Part of the Telecom convert to academy training and landscaping the area.
Telecoms can be a complex that have other GLC that related like TNB, Astro and etc.
Integration network between Community
Spaces to Academy
The buildings in this site is upgraded in the form of design. Then
soft and hard landscape is proposed to create a continuity
among the various institutional . The landscape improve and
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM
-
5.05.0 CONCLUSION CONCLUSION
In a nutshell, the proposed area has strategic located near to access of
Skudai Highway which potentially provide high accessibility to the peo-
ple. According to the health places organization, a well-connected road
is very crucial to attract more people. With the implementation of the pro-
posed mix developments of commercial, sport, social and environmental
amenities developments, it will provide more interesting activities and at-
tract more investment to this area as businessman nowadays more inter-
ested if the know the relationship between economic and environmental
benefits.
The development will be integrating with the green elements, so a
sense of place making would achieve. Indirectly, the social interaction will
be promoted. Therefore, this proposed new development will achieve to
fulfill not only the current generation but also future generation to allow
them still able to enjoy with the nature.
DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)
Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM