final lcp najeehah farahen pricilla

16
REGENERATION OF SKUDAI REGENERATION OF SKUDAI

Upload: fina

Post on 16-Sep-2015

7 views

Category:

Documents


0 download

DESCRIPTION

Laporan Cadangan Kemajuan Skudai..

TRANSCRIPT

  • REGENERATION OF SKUDAIREGENERATION OF SKUDAI

  • UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    1.01.0 INTRODUCTIONINTRODUCTION

    This report is prepared for proposal development of regenerating the parcels of land

    in Skudai Town. Skudai is part of the new growth corridor of Southwest Johor and it

    will thrive through the recommendations of the proposed development part of BPK

    1.1, BPK 1.2 and BPK 1.4 .

    This development proposal will generate Skudai Town Centre as a sub-region

    growth centre in enhancing the physical, economic, sosial and environmental sur-

    rounding of Skudai.

    1.11.1 Scope of Study Scope of Study

    From the earlier study, we have discovered:

    Regional framework and policies for the proposed site.

    Area includes existing and surrounding elements in Skudai which include physical,

    social and economy on site.

    Future projects that might benefit the regeneration of Skudai.

    Identify general concepts in regeneration of Skudai town centre that would be

    injected to selected site.

    1.21.2 Location of SkudaiLocation of Skudai

    Skudai a suburb of Johor Bahru is the largest city in and the capital of the state of

    Johor in southern Malaysia. Skudai is part of the new growth corridor of southwest

    Johor, which includes the Senai International Airport, Tanjung Pelepas Port and the

    proposed new administrative capital of Johor, Bandar Nusajaya.

    Its population ranges between 160,000 and 210,000. It is the headquarters of the

    Johor Bahru Central Municipal Council and located 8 km, 4 km and 16 km from

    Kulai, Senai and Johor Bahru city (bandaraya) respectively.

    1.31.3 Potential of SkudaiPotential of Skudai

    Johor Bahru and Nusajaya was included in Iskandar Malaysia Development Region. Accord-

    ing to South Johor Economic Region Plan, Skudai is a part of Flangship E which planned to be

    as the hub for agro and food processing, ICT and retail tourism.

    Johor have stated that Skudai is the Sub-Regional Growth Centre and is located along the

    pathway from north to south before entering Johor Bahru. The main function of Skudai is to

    support the developments in Johor Bahru City Centre.

    The other functions of Sub-Regional Growth Centre are:-

    The main administrative center of the district.

    Medium service standards.

    Commercial activity centers at the district level.

    As the impact of SJER and Iskandar Malaysia, Nusajaya and Johor Bahru rapidly growth and

    somehow the developments starts to pack in the city. The lack of vacant lands in the city

    caused the developments change towards the outer city. Skudai as one of the nearest town

    centre can play its role to cater these excessive development demands.

    The map shows the location of Skudai SkudaiThe map shows the location of Skudai Skudai

    DEVELOPMENT PROPOSAL REPORT

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    In November 2012, total cumulative committed investment for Iskandar Malaysia

    since its debut stood at RM105 billion, up 24% from 2011 (source: IRDA), and it ex-

    pects this countrys first economic growth corridor will continue to spur the growth of

    Johor Bahrus economy thus benefiting the property industry.

    Based on the property market 2013, the main sector such as demand for space and

    rental of shopoffices, residential and industrial in Johor Bahru, the market will see an

    upward trend in demand based on the previous year 2012.

    1.51.5 Existing Land Use of SkudaiExisting Land Use of Skudai

    The existing land uses of proposed site involved residential (Taman Sri Putri, Taman Har-

    moni, Kampung Laut, Kampung Melayu) , commercial (Skudai Parade), institutional (SJK

    (c) Pu Sze) , open space, facilities and amenities , infrastructure and utility, road and river.

    The proposed site is situated well within the good accessibility through the Skudai high-

    way that provide a continuity of development to support the existing town centre activi-

    ties. Table 6.2.1 show that commercial is the highest land use which is 21% (111 acres) af-

    ter road.

    Land Use Percentage (%) Area

    (Acre)

    Residential 11.06 58.04

    Commercial 21.19 111.19

    Institutional 7.10 37.25

    Open Space 7.27 38.13

    Facilities and Amenities 5.06 26.55

    Infrastructure andUtility 1.02 5.34

    Road 35.16 184.48

    River 12.14 63.69

    Total 100.00 524.67

    The table below shows the existing land use component

    DEVELOPMENT PROPOSAL REPORT

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • Hotel

    Plot Ratio Maximum 6:1

    Plinth Area Maximum 60 % of the site

    Setback More than 20m

    Car Park

    1 parking lot for every 3 rooms (hotel)

    Parking lot for disabled people is 2% of the total vehicle park-

    ing spaces.

    Building Height Maximum 25 floors

    Entrance and Exit Width 30m

    Jalan Susurfor from the main road

    15m

    Buffer zone Minimum 20m integrated with inner-circulation, pedestrian

    walkway, landscape or recreational area

    Condominium

    Plot Ratio Maximum 6:1

    Plinth Area Maximum 60 % of the site

    Minimum Lot Size 0.4 hectare ( 1 acre )

    Minimum Floor Area 92.9 mp (1000kp)

    Density Unit Maximum 80 units per acre

    Setback

    Minimum requirement of front setback is 15.2m

    (50) Minimum requirement of side or rear setback is

    6.1m (20) which also serve as as fire break. Minimum requirement: Building by building

    Front to front : 24.4 m (80) Side to front : 12.2 m (40) Side to back : 12.2 m (40) Back to back : 12.2 m (40) Side to side : 9.1 m (30)

    Minimum Size 6.1m x 19.8m (20x 65)

    Car Park

    1 parking lot for vehicles is required for two unit of

    room and one parking lot for motorcycle is re-

    quired for 84 m2 (905 square feet )

    20% of parking lot is required for visitors

    Parking lot for disabled people is 2% of the total

    vehicle parking spaces.

    Building Height Walk up apartment: Maximum 5 floor

    With Lift: Maximum 20 floor

    Shopping

    Complex

    Plot Ratio Maximum 6:1

    Plinth Area Maximum 60 % of the site

    Minimum Lot Size more than 0.4 hectare (1 acre)

    Setback

    Minimum requirement for the shopping complex setback is 12.2m (40) that facing to the main road

    Minimum requirement for the shopping complex for side or back

    boundaries that near to the line of landscape zone is 6.1m (20)

    Car Park

    The provision of parking spaces is based on the total floor area of the

    shopping complex

    Parking lot need to be provided sufficiently or one can choose to make

    payment for lack of number of parking spaces.

    Either is on-street parking or off-street parking

    1 parking lot for vehicles is required for 50 m2

    1 parking lot for motorcycle is required for 200 m2

    Parking lot for disabled people is 2% of the total vehicle parking spaces.

    Building Height Maximum 20 floors

    Entrance and Exit Width 30m

    Open Space 10 % from the overall site

    2.02.0 Planning StandardsPlanning Standards

    Shop Office

    Plot Ratio Maximum 3:1

    Plinth Area Maximum 60 % of the site

    Minimum Lot size 6.1m x 19.8m (20x 65)

    Setback

    Minimum requirement of setback is 15.2m (50) between the two rows of buildings (2-storey) facing each other, between two boundaries of

    corner lots and also for side boundary that next to the road reserve line

    as well as front boundary that face to road reserve line. It also serves as

    the service road connects each other.

    Minimum requirement between end lots is 6.1m (20) which serve as side lane or fire break.

    Setback for two row of back side of buildings (backlane) is 6.1m (20)

    Car Park

    1 parking lot for vehicles is required for 46.4 m2 (500 square feet)

    1 parking lot for motorcycle is required for 84 m2 (905 square feet )

    Parking lot for disabled people is 2% of the total vehicle parking spaces.

    Type of development Maximum 15 lots of shop office in a row

    Open Space 10 % from the overall site

    POLICIES AND PLANNING STANDARDS

    Johor Development Policies

    Comprehensive economic development and integrated

    Controlled development at agricultural area

    Strengthening of existing industrial corridor

    Sufficiently available trade development based on population distribu-tion and function of hierarchy settlement centers.

    Enhancing and diversifying tourism attraction area

    Permitted development area

    Control of water catchment areas

    Preservation area forest reserve

    Upland development planning

    Surrounding development corridor development and until 2020 to be driven to balanced development concepts distribution

    Development by hierarchy settlement centre

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • ECO-URBANISM

    Skudai Regeneration will co-exist with natural environment to embed

    high environment quality.

    Include sustainable Design and Rainwater Management

    INCLUSIVE AND IDENTITY

    Create a vibrant, rich and lively Centre with a sense of place. Provide

    inviting and safe public spaces accessible to all people. Encourage

    mixed-use development that will be designed with varying intensity.

    Great emphasis on local identity.

    WALKABILITY AND PEDESTRIAN-ORIENTED

    Strengthen and provide a walkable compact core with mixed com-

    mercial. Pedestrian, Cycling and Public Transportation Connections.

    Provide attractive pedestrians, cycling path, streetscapes and a lively

    high street with active store fronts. Promote cycling among community.

    SMART LOCATION

    Skudai (Skudai Highway) a main access to connect North area and South

    area is a catalyst development creating high impacts to the regional and

    local economy.

    Clusters of economic activities that will benefit the local business as well

    as provide opportunities for the emergence of new economies will be

    created.

    3.23.2 Design PrinciplesDesign Principles 3.0 Development Proposal3.0 Development Proposal

    3.13.1 Regeneration of SkudaiRegeneration of Skudai

    Regeneration is concerned with the re-

    growth of economic activity where it has

    been lost; the restoration of social func-

    tions where there has been dysfunction or

    social inclusion where there has been ex-

    clusion; and the restoration of environ-

    mental quality or ecological balance

    where it has been lost. Thus urban regen-

    eration is an aspect of the management

    and planning of existing urban areas ra-

    ther than the planning and development

    of completely new urbanization (Couch,

    Fraser and Percy, 2003).

    Regeneration Objectives of Skudai :

    Redevelop some areas in Skudai to

    support Skudai as sub-region growth

    centre

    To inject economy into Skudai in line

    with the purpose of Skudai as trade

    and services for sub-region growth

    centre

    Focusing new development at accessi-

    ble locations near transit stations

    and major centre.

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • Management of rainwater in one of the sustainability goals that for the MPJBT Centre.

    Throughout the MPJBT Centre, water feature is applied and integrated in the

    development to make the site more liveable and attractive. The rain will be collected

    from roofs to irrigate green roofs and other building landscapes. Cisterns for rainwater stor-

    age will be integrated into open space design to make water storage and use visible to

    the public. The streets and pedestrian movement corridors are intended to feature rain-

    water collection in rain gardens or rainwater pond located within the public realm..

    Rainwater Pond within the Community Park

    The rainwater collected from hard surfaces could be directed to a pond

    within the park. This pond could both retain and bio remediate rainwater

    while providing a water feature integrated with the park program.

    Rain Gardens within the Streetscapes

    Rain Gardens will be interspersed between on-street parking bays that located at

    intervals along the streets. Rain falling within the public realm will be flow directed

    into rain garden which is landscaped with permeable materials and plants that

    are tolerant of occasional 'wet feet'. The Rain Gardens allow the rainwater to re-

    charge slowly into the groundwater after a rainfall.

    Rainwater pond

    Rainwater Garden

    HeightHeight

    Building enclosure, or the relationship of building height to building separation, is proba-

    bly one of the most important of these concepts. In order to create spaces and travel

    ways that feel comfortable spatially, this ratio should range from 1:1 to 1:4 and should

    not exceed 1:6 (APA 165). This ideal range for building enclosure will create the percep-

    tion of an enclosed space that is more comfortable and scaled correctly to pedestrians

    and create better cross street connections.

    2:1 Street Ratio (APA 165) 1:1 Street Ratio (APA 165)

    Quality of Public Spaces Quality of Public Spaces

    An attractive and functional public space with connection of pedestrian walkways is

    essential to be applied. It is a place for people to interact and carry out activities

    together , take advantages from it and make the area lively.

    Sources: http://cincinnati.com/

    Rainwater Management StrategyRainwater Management Strategy

    3.33.3 Design CriteriaDesign Criteria

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • Sources: http://www.math.utsa.edu/

    Pedestrian Path Pedestrian Path

    The pedestrian path is designed continuously to connect each other with shared landscape

    in order to encourage walking activities. The easily access from the building to building is

    possible provided with physical activities.

    The following shows general concept of pedestrian network that functions as continuous pe-

    destrian walkway. The sitting area or rest station is provided along the street with at least 10

    minutes.

    The pedestrian walkway is designed along the building to protect pedestrian from the

    traffic and it is provide convenient to the people especially disable people, children

    and folks.

    Sources: http://www.planetizen.com/ Sources: http://www.mwcog.org/

    Landscape Elements Landscape Elements

    The purpose of enhancing the landscape elements at the proposed site is creat-

    ing sense of place-making to all different kinds of people. The landscape ele-

    ments are discusses for both hardscape and softscape elements. Hardscape Ele-

    ments

    For recreation area, there is some of the pavement which suitable to walk con-

    veniently by people.

    Softscape Elements Softscape Elements

    Sources: http://tungkinfoongsblog.blogs

    Samanea Saman

    The big trees are planted along the

    road to calm the environment and

    provide shading to the pedestrian.

    Sources: http://garden-frenzy.blogspot.com/

    Dalbergia Oliveri is one the suitable

    trees that used for parking spaces at

    proposed site area

    Hardscape Elements Hardscape Elements

    For recreation area, there is some of the pavement which suitable to walk

    conveniently by people.

    Sources: http://marrickvillegreens.files.wordpress. Sources: http://www.axisjiku.com/

    The pavement for pedestrian walkway along the street is used of Red Blend-

    London and Natural Grey-Holland

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • LEGENDLEGEND

    UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Cycling PathCycling Path

    Cycling PathCycling Path

    Pedestrian WalkwayPedestrian Walkway

    Bicycle parking StandBicycle parking Stand

    Focal pointFocal point

    Public SpacePublic Space

    Pedestrian CrossingPedestrian Crossing

    Access with Access with

    pedestrian pavementpedestrian pavement

    LEGENDLEGEND

    Design Design

    ConceptConcept

    Provide Provide

    Conducive Walking Conducive Walking

    environmentenvironment

    Increase Increase

    PermeabilityPermeability

    Improve Improve

    and Create and Create

    ConnectivityConnectivity

    Promote Promote

    CyclingCycling

    Source: Planning and Design Data, David

    Circular array with a capacity Circular array with a capacity Basic Sheffield parking Basic Sheffield parking

    standstand

    The Parking Stand The Parking Stand will be provided a spe-

    cific location for people convenience. It

    will be located at a destinations where is

    visual supervision.

    http://www.carfreeinbigd.com/

    An access is paved with comfortable and

    suitable pavement such as asphalt or stabi-

    lised earth are materials commonly

    used. The access with be closed for the ac-cess of vehicles after 6pm and fully used as

    pedestrian walkway

    Pedestrian Crossing Pedestrian Crossing is proposed for pedestrian

    and bicycle passing through safely. This

    increase and encourage the interaction be-

    tween the area which has been separate by

    the road. The activities between the two zone

    will be inter-connected and create a more

    inclusive and active area.

    The four main approaches regarding to the

    Pedestrian-Oriented Concept will focus

    mainly at the connection and circulation of

    pedestrian movement which is more envi-

    ronment friendly. The existing pedestrian

    walkway or physical elements will be up-

    graded to improve the design or usage.

    The strong connectivity create a lively and

    vibrant area as it attract more people.

    The renting of bicycle also promote

    to encourage people to cycling.

    The Touch n Go Touch n Go concept will be

    promoted to easy the payment of

    the bicycle parking stand as a

    locker.

    Pedestrian Oriented ConceptPedestrian Oriented Concept 4.0 4.0 Development ProposalDevelopment Proposal

    4.14.1 MPJBT AreaMPJBT Area

    DEVELOPMENT PROPOSAL REPORT

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086

    http://fortworthbikesharing.files.wordpress.com/

    Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • 4.1.14.1.1 Commercial ZoneCommercial Zone

    The commercial zone provided for live (short living period), work and fun purposes. It

    is an important zone as it act as catalyst for the development of the Skudai and

    provides for generating profit and enhance the economy .The total development

    areas of commercial zone cover 11.75acres . The area are zoned for free standing

    and non-free development (shopping complex, specialized commercial, showroom,

    sport centre).

    The different types of components of commercial areas shown as following:

    2 units of Shopping complex (2.4 acre and 3.01 acre)

    16 units of 3-storey specialized centre (8m x 20m) (1.4 acres)

    9 units of 2-storey showroom (20m x 8m) (2.15 acres)

    Sport Centre ( I.78acre)

    The proposed of double frontage shopping complex( 3.01acre) is designed link

    by each other via pedestrian bridge. In order to promote walkability and sense

    of safety and security, in front of the shopping complex will priority for pedestrian

    only.

    Sources: http://www.ritzcarlton.com/

    Double Frontage shopping complex

    connected by sky bridge illustration

    The proposed of 5-storey double frontage shopping complex( 2.4acre).

    The shopping complex is fronting a

    huge open or leisure space with differ-

    ent activities.

    Double Frontage shopping complex with variety of

    colour to revel the unique of the place and

    increase the robustness

    The level of the buildings will be proposed in different level to have better

    skyline and more interesting view. The concept used is to created a lei-

    sure/open space between commercial zone (CPTED principle). Variety of

    activities will be carry out in the open space. The septic tank with 0.27acre

    also provided for the commercial zone (with two access and a unloading

    place has been provided for the maintenance).

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • Development Component Gross Floor

    Area (m2) Parking Spaces

    Total Required

    Parking

    Proposed

    Parking

    Shopping Complex A

    (5-storey) 9664

    Vehicles 193 195

    Motorcycle 48 50

    OKU 4 4

    Shopping Complex B

    (7 and 3-storey-connected

    with Sky Bridge

    12184

    Vehicles 244 245

    Motorcycle 61 62

    OKU 5 5

    3-storey Specialized

    Commercial 8336

    Vehicles 167 168

    Motorcycle 42 42

    OKU 3 3

    2-storey Showroom 8666

    Vehicles 173 175

    Motorcycle 43 43

    OKU 3 3

    The requirement and proposed of parking spaces.

    The proposed of 2-storey double frontage showroom is to maximum it potential

    to be seen. The showroom is potential to be proposed as the building can be de-

    sign by the owner and show their own identify or uniqueness for thei showroom.

    Double frontage showroom illustration http://www.timothywells.net/

    Three storey double frontage specialized centre. (8mx20m).

    Two lot with 8 units for each lot. A flexible event space hase been provide beween

    the two lot of buildings.

    http://www.visitpenang.gov.my/

    Site Area : Site Area : 8.44 acre

    Total Gross Floor Area Total Gross Floor Area = 38,850 m2

    Plot Ratio Plot Ratio = 38,850 m2 / 34155 m2

    = 1.1

    Plinth Area Plinth Area = (8847 m2 / 34155m2) x100%

    = 26%

    The frontage and environment illustration

    DEVELOPMENT PROPOSAL REPORT DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • Figure : Sport Centre Illustration

    4.1.24.1.2 Sport CentreSport Centre

    Creating exciting and sustainable places for sport and the continuing legacy for the wider community.

    The total areas of sport centre cover 3.1acres out of .. acres of the MPJBT zone. It is

    very essential to provide a safe and inclusive place for the community to carry out sport

    activities. A dramatic curved canopy roof serving as a beacon of health and fitness

    inspiring the local population to good health and wellbeing. The proposal emphasize on

    the building design so that views are fully exploited and enjoyed.

    Site Area : Site Area : 3.1 acre (12,581.4 m2))

    Total Gross Floor Area :Total Gross Floor Area :

    = 2,404 m2 x 3 level

    = 7212 m2

    Underground Parking: 3 levelsUnderground Parking: 3 levels

    Car park= 927 nos.Car park= 927 nos.

    Motorcycle Park= 233nos.Motorcycle Park= 233nos.

    OKU= 18nos.OKU= 18nos.

    Plot Ratio Plot Ratio = 14424m2 / 12,581.4 m2

    = 1.2

    Plinth Area Plinth Area

    = (2,404 m2 / 12,581.4 m2) x100%

    = 19%

    Development

    Component

    Gross Floor Area

    (m2)

    Parking Spac-

    es Total Required Parking

    Proposed Park-

    ing

    Sport Centre

    7212 m2 +

    (commercial

    area)

    Vehicles 927 nos. 930 nos.

    Motorcycle 233 nos. 230 nos.

    OKU 18 nos. 18 nos.

    The requirement and proposed of parking spaces.

    The sport centre consist a extensively landscaped leisure open spaces and it provide a landmark

    leisure facility. The building is proposed in the middle of water feature to provide better view and

    environment. The underground parking is proposed to accommodate and fulfill the demand of

    the parking for the sport centre and the commercial zone at the MPJBT area.

    The sport complex is private facilities whereas the extensive landscape surrounded the sport

    complex is public facilities. Community can interact with each other and carry out activities at

    the wide landscape. The parking lots will be provided underground the sport centre.

    Storey Development Component Units Area (m2)

    1 Swimming pool ( Infinity pool

    and kiddie pool) 1 1,200

    Futsal Court 6 64m2 X 6 = 384

    2 Badminton court 6 81.74m2 x 6 = 490

    Gymnasium 1 708

    3 Roof landscape Park 1 2,404

    The component of indoor games proposed inside the sport complex

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • 4.1.34.1.3 CondominiumCondominium

    The total development areas of condominium covers 2.14 acre. This condominium is surrounded with a sense of nature. Even though

    it is at the heart of the city, community still can feel its real trees, grass, and blue water. The condominium consist of 3 blocks of build-

    ing with different levels and a clubhouse is provided. Two block (Block A and C) are in 8 levels and the middle block (Block B) is in

    10 levels. The services and facilities will be provided. For example, swimming pool (kiddie pool and infinity pool), small children play-

    ground, open air restaurant, pathway, nursery, gate house and other service.

    Site Area : Site Area : 2.14 acre

    Gross Floor Area:Gross Floor Area:

    Block A : 670.25m2 x 8 =5362 m2

    Block B: 627 m2 x 11 = 6,897 m2

    Block C: 670.25m2 x 8 =5362 m2

    Clubhouse: 177 m2 x 2 =354 m2

    Total Gross Floor Area Total Gross Floor Area = 17,348 m2

    Plot Ratio Plot Ratio = 17,975 m2 / 8660 m2

    = 2.1

    Plinth Area Plinth Area = (2144.5 m2 / 8660 m2) x100%

    = 25%

    Number of Units proposed Number of Units proposed

    = 2.14 acre x 50 unit per acre

    =107 units

    Sources:

    A unique gateway design gateway design of the

    condominium will be proposed to be

    more visibility and legibility.

    Sources:

    Infinity pool and kiddie pool Infinity pool and kiddie pool that integrated

    with the green environment is created. The

    infinity pool that created is surrounded the

    condominium building to give a natural sense.

    Sources: http://travel.cnn.com

    Open Air Restaurant Open Air Restaurant is provided to create a

    comfortable and fresh environment for the

    community to enjoy with the natural and the

    beauty of Skudai with family especially during

    night.

    The condominium has been proposed based on the

    Crime prevention through environmental design (CPTED) Crime prevention through environmental design (CPTED)

    principle. The placement of physical features by placing

    the activities where is surrounded by the buildings has

    maximized the visibility. The selectively placing entranc-

    es and exits, fencing, lighting and landscape limit the

    opportunity for crime by clearly differentiate between

    public space and private space.

    http://

    marrickvillegreens.files.wordpress.com/

    Tress such as Tamalan Tree is provid-

    ed to provide green view

    Fence is proposed in 2m

    for control the access

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • The requirement and proposed of parking spaces.

    Development

    Component

    Gross Floor Area

    (m2)

    Parking Spac-

    es Total Required Parking Proposed Parking

    Condominium 17,337m2

    Vehicles

    107units /2 = 54nos.

    20% for visitors = 11nos.

    Total car park = 65nos.

    88nos.

    Motorcycle 21nos. 22nos.

    OKU 65nos. X 2% = 2nos. 5nos.

    1,290 sq.ft. / 119.8 sq.m.

    3 Bedrooms & 2 Bathrooms Type LAType LA

    1,060 sq.ft. / 98.5 sq.m.

    2 Bedrooms & 2 Bathrooms Type LBType LB

    1,120 sq.ft / 104 sq.m

    2 Bedrooms & 2 Bathrooms

    Type LCType LCType LC 1,356 sq.ft. / 126 sq.m.

    3 Bedrooms & 2Bathrooms

    Type LDType LD

    Block Type LA Type LB Type LC Type LD Total Units of Room

    Condominium

    A - 13 - 14 27

    B 18 18 18 - 54

    C - 13 - 13 26

    Total 18 44 18 27 107

    For type of room have been proposed for the condominium ,as shown as

    below

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • 4.34.3 Terminal BusTerminal Bus

    New terminal bus will be proposed at Taman Sri Putri with the site area of

    Terminal Bus will be proposed with a good accessibility and design as it is an important component of transportation mode in Skudai area where it serves as a pick and drop place

    where passengers mainly from UTM students act as primary consumers . The proposal help to solve connection issues between both sides of the area which are separated by a road-

    way. The new Terminal will provide systematic circulation which can improve the areas accessibility.Creating a ripple effect which affecting nearby economic growth

    Development

    Component

    Gross Floor Area

    (m2)

    Parking Spac-

    es Total Required Parking

    Proposed Park-

    ing

    Terminal Bus

    Vehicles

    Motorcycle

    OKU

    Bus 20nos.

    The requirement and proposed of parking spaces.

    Component proposed in Terminal bus:

    Ticketing counter

    Retail shops

    Parking lots

    Bank

    Government-based

    office (permanent tenureship)

    Food Court

    BRT station for intercity linkages

    Site Area : Site Area : 6.1 acre (23,106m2))

    Total Gross Floor Area :Total Gross Floor Area :

    = 27701.67 m2 x 3 level

    = 23,105 m2

    Plot Ratio Plot Ratio = 0.9

    Plinth Area Plinth Area

    = (7701.67 m2 / 24,606m2) x100%

    = 31%

    Sources: http://www.onlydesigns.net/

    A traffic Calming is emphasize on the entrance

    of the tterminal.

    Food Court Food Court is proposed at the second level of

    the terminal bus to provide convenience for

    the people to buy things.

    Three level of Terminal Bus Terminal Bus with modern

    design and good accessibility.

    The bus parking is provided and with

    shelter for the convenience and comfort-

    able of people

    Ticker counter Is proposed at ground Ticker counter Is proposed at ground

    floorfloor

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • 4.44.4 Linear Automative Commercial & Services (LACS) Linear Automative Commercial & Services (LACS)

    The purpose of Linear Automative Commercial & Services is to support Skudai as

    Sub-Regional Growth Centre. The existing linear automotive services along the

    main Skudai Highway serve as potential proposal to develop Linear Automative

    Commercial & Services at the study area.

    A variety automotive franchise dealer automotive franchise dealer for services will

    be proposed on the development ( used cars, heavy

    vehicles such as buses and lorry )

    Workshop of joint ventures Workshop of joint ventures with

    smart- partnership will be I mple-

    mented(UTM, Perodua, NAZA)

    Showroom Showroom for all automative vehicles brand Proton, Mitsubishi, Toyota dan Yamaha will be

    proposed at the site.

    No. Development

    component

    Area Percentage

    (%) Acre Hectare

    1 Commercial building

    (8 vacant buildings)

    Acquire 5 of

    (22 x 72) commercial lot size Acquire 3 of

    (21 x 80) commercial lot size

    0.18 0.07 52.94

    0.12 0.05 35.29

    2 Showroom of 21 x 80 0.04 0.02 11.76

    Total development 0.34 0.14 100

    4.5 Community Spaces (Institutional)4.5 Community Spaces (Institutional)

    Regenarate the existing institutional that give benefit and profit to property market

    development for future in term of local tourism and promote community cultural.

    Project Concept

    The concept for upgrading instituitional area will provide the components needed such

    as economy, sosial and environment aspect to fulfill the present and future needs.

    The religious district for Buddha temple and Hindu temple will be upgraded, to pro-

    mote the religious cultural in term of local tourism.

    The existing Telecoms Malaysia will be converted to Telecoms Academy, and can

    attract many people to get the services and training as well as generate econo-

    my growth.

    To create

    Institution Area 4.67 acres Telecoms : 2 acre Hindu T 0.4 acre Buddha T: 0.2 acre Vacant Land : 2 acre

    Development Area 4.67 acres

    Land Status Semi-Government (Telecom) Vacant Land (Government)

    Ilustration for mini pocket park

    Greenery linear concept will

    be proposed as a buffer zone

    for drain reserves as well as

    beautify the scenery area by

    landscaping.

    Telecoms Academy Proposal

    Part of the Telecom convert to academy training and landscaping the area.

    Telecoms can be a complex that have other GLC that related like TNB, Astro and etc.

    Integration network between Community

    Spaces to Academy

    The buildings in this site is upgraded in the form of design. Then

    soft and hard landscape is proposed to create a continuity

    among the various institutional . The landscape improve and

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM

  • 5.05.0 CONCLUSION CONCLUSION

    In a nutshell, the proposed area has strategic located near to access of

    Skudai Highway which potentially provide high accessibility to the peo-

    ple. According to the health places organization, a well-connected road

    is very crucial to attract more people. With the implementation of the pro-

    posed mix developments of commercial, sport, social and environmental

    amenities developments, it will provide more interesting activities and at-

    tract more investment to this area as businessman nowadays more inter-

    ested if the know the relationship between economic and environmental

    benefits.

    The development will be integrating with the green elements, so a

    sense of place making would achieve. Indirectly, the social interaction will

    be promoted. Therefore, this proposed new development will achieve to

    fulfill not only the current generation but also future generation to allow

    them still able to enjoy with the nature.

    DEVELOPMENT PROPOSAL REPORT UNIVERSITY TECHNOLOGY MALAYSIA (UTM)

    Nurul Farahen AB 100083Nurul Farahen AB 100083 Najeehah binti Roslan AB 100075Najeehah binti Roslan AB 100075 Priscilla Yong Chang Hua AB 100086Priscilla Yong Chang Hua AB 100086 Supervisor: Supervisor: HJ ABDUL RAHIM MD RAHIMHJ ABDUL RAHIM MD RAHIM