    Turnkey projects and integrated

    services delivery

    At the core of ROMVEC INDUSTRIE capabilities are our on site

    construction / installation / erecting / repairing / commissioningand maintenance services. Unlike many of our competitors,ROMVEC INDUSTRIE is a multi-discipline contracting companycapable of self-performing large-scale projects and turnaroundsfrom the ground up. We continue to add complimentaryconstruction capabilities that allow us to offer a unique singlesource contracting option to our clients.Imagine the savings available from the elimination of multipleoverlays, management redundancy, scheduling conflicts and

    many of the other challenges associated with managingmultiple contractors. Our construction services arecomplimented by our in house engineering expertise givingROMVEC INDUSTRIE a unique technical component adding greatvalue to our project management teams.We believe the greatest compliment a construction

    organization can receive is repeat business.

    Our in house construction capabilities include a unique

    combination of mechanical, electrical and instrumentationexpertise:

    Civil Construction Structural Steel Installation Pipe in shop pre fabrication Piping System Installation Boiler erection, installation and Repair Containerized boiler house installing, commissioning and start up Containerized co / tri generation units installing and commissioning Steam and gas turbines installing

    Pressure vessel Erection / repairing Code Work (ISCIR, SR EN ISO 15614 / 1 : 2004, EN 287/1 :2004) Electrical Instrumentation Fieldbus Systems Distributive Control System Installation Calibration Loop Check Commissioning thermal power stations Maintenance of steam systems and boiler house equipment Any kind of welding jobs with high skilled and qualified / authoriyedwelders

    Technically Sound

    25 /

  • 7/30/2019 FINAL 26 -53

    2/34

    Our staff of experienced Automation and Electrical engineers

    has years of combined experience in the design and installation

    of process control and automation systems. From

    Programmable Logic Controllers (PLC) to Distributive Control

    Systems (DCS) and to Safety Shutdown and Security and

    Surveillance Systems, we have the hands-on knowledge

    necessary to evaluate, design, configure and install.

    PROCUREMENT AND ON SITE INSTALLATION

    Bi-Drum Water Tube Package Boilers

    Suitable for: Chemical refinery, food processing, Petrochemical plants,cogen plants, sugar refinery, edible oil plants, textile factory, pulp & paper.

    General DescriptionBi-drum D-Type with membrane tube construction. Convection banksuperheater with superheat temperature up to 5100C. The unit canbe installed with feed water economizer or air pre-heater to improvefurther the boiler efficiency. Depending on site accessibility andtransport limitation, most units can be fully assembled in oursuppliers partner factories and deliver as a unit, so on site

    installations works shall be reduced.

    26 /

    Steam

    Capacity : 5 tons/hr - 100 tons/hr

    Operating

    Pressure :Up to 110 bar

    Steam

    Temperature :Up to 5400C

    Fuel Oil / Gas or Dual Fuel

  • 7/30/2019 FINAL 26 -53

    3/34

    PROCUREMENT AND ON SITE INSTALLATION

    Fire Tube Package Boilers

    Steam Capacity :1,000 to 5,000 kg/hr 5 tons/hr - 31

    tons/hr

    Operating Pressure : Up to 20 bar

    Fuel fired : Fuel Oil / Natural gas / Dual fuel

    Suitable for: Wood processing, hotel, laundry, edible oil, packaging,plastic factory, textile factoryReverse Flame Series Wet Back Series

    RF Series are smaller range

    capacity boilers of reverse flame

    design. It is fully factory

    assembled package boiler.

    Standard burner installed is

    monobloc gas burner or liquid CLU

    fuel pressure jet burner.

    WB series are high efficient larger

    capacity boilers of wet back

    design. It is equipped mainly with

    high efficiency fully automatic

    control rotary cup burner of Saacke

    make. Single burner for boiler

    capacity up to 18 tons/hr. Above 18

    tons/hr are of twin furnace and

    twin burner. Boiler feed water

    economizer can be installed to the27 /

  • 7/30/2019 FINAL 26 -53

    4/34

    boiler.

    PROCUREMENT AND ON SITE INSTALLATION

    Heat Recovery Steam Generators (HRSG)

    Steam Capacity : 3 tons/hr - 50 tons/hr

    Operating Pressure : Up to 50 bar

    Steam Temperature : Saturated / Superheated

    Suitable for: Gas turbine exhaust heat recovery, industrial incinerator flue gasexhaustNatural circulation single pressuredesign. Each unit is individuallydesigned base on gas inlet conditionsand customers requirement on thefinal steam condition. Applicationincludes gas turbine exhaust heatrecovery for cogen plant andincinerator exhaust heat recovery. Theunit consists of steam & mud drum.Tube bank consists of high quality fintube or combination of plain tube andfin tube. Smaller units are factory

    assembled and ship as acomplete package. Optionalsuperheater and feed water

    Exhaust Gas Steam GeneratorHot flue gasses from engines and turbines, andexhaust air from catalytic processes offer hightemperatures and large flow and so high pressuresteam can be generated in an Exhaust Gas S.G.The EGSG is working like a normal steam boiler,oil-fired or gas-fired - and is consequentlyequipped with steam boiler armatures, safetiesand instrumentation. Only difference is that theheat load is adjusted

    in controlling the

    by-pass, internal orexternal.

    EGSGs aredelivered for saturated 28 /

  • 7/30/2019 FINAL 26 -53

    5/34

    economizer can be installed. steam, or forsuperheated steam .

    PROCUREMENT AND ON SITE INSTALLATION

    Flash coil steam boiler

    Steam Capacity : 150 to 3.000Kg/h

    Operating Pressure : Up to 12 bar

    Steam Temperature : Saturated

    Suitable for: hotel and hospitals laundries and small industries wheresteam production is needed prmptlyThe main reliable suppliers: FULTON and BONO ENERGIA

    29 /

  • 7/30/2019 FINAL 26 -53

    6/34

    Flash coil steam boiler type for theproduction of saturated steam,from 150 to 3.000Kg/h and designpressure 12 bar, forced circulation,evaporation coil, compact design,maximum efficiency, highreliability, steam production fromcold start up - 3 minutes afterignition, supplied as packagedunits,complete with all necessaryequipment ready to be connectedto site, up to 92% with airpreheater

    Rationality of the construction,Easy installationHigh thermal efficiency, nregulation2 Stages version: the regulation ofair/fuel ratio is progressive andrealized through on/off valvesfitted on the fuel feeding linesModulating version: realizedthrough an electronic controlsystem acting on the burner output

    by means of a modulating air/fuelservomotor

    Fulton standard efficient gas or oilfired combination gas/oil fired steamboilers. They come in a wide range ofsizes from 100kg/h to 4t/h and up to20 bar. Fulton steam boilersconstruction is based on theinvention of the vertical tubelessboiler. A vertical tubeless boiler is ofrelatively simple design offeringyears of trouble free operation.Fulton boilers over 30 years of ageare still in operation today. There are

    no tubes or coils to rust or burn outperiodically, therefore, no retubingcosts, no down time. Fulton featuresits own design and manufactured topmounted down fired forced draftburner which is far superior to mostother burner designs. They offer thehighest fuel efficiencies possible.These complete packaged boilers arefully assembled, trimmed and testfired at the factory.

    PROCUREMENT AND ON SITE INSTALLATION

    Waste heat recovery boilers suitable to be used with Gas Turbines from 1to 7 MWt

    Capacity : up to 15 MWt

    Operating Pressure : Up to 15 barSteam Temperature : Saturated / Superheated up to 2800C

    Suitable for: Waste heat recovery boilers are suitable to be used with GasTurbines from 1 to 7 MWt.The main suppliers: BONO ENERGIA Italy and Cochran Boilers - UK

    30 /

  • 7/30/2019 FINAL 26 -53

    7/34

    Waste Heat boilers are versatile steamor hot water boilers designed foroperation in conjunction with a widerange of heat generating equipment,such as gas turbines, reciprocatingengines, incinerators, gasefiers andother process heat plant. As well asunfired boilers, the Waste Heat rangefeatures composite boilers whichincorporate additional firing to givebetter flexibility and security of steamor water supply. A wide range of controland auxiliary plant solution areavailable to support the range. Usesrange from CHP schemes through tohospitals, petrochemical sites andmarine applications.Ratings: Steam up to - 65000 kg/hr;Hot-Water up to - 32000 kW ; StandardWorking Pressures: 10.34 bar g and 17bar g (Designs available up to 35 bar g)Total Package: The boiler is supplied

    complete with inlet and outlet ducts,control panel and all necessary valvesand fittings for safe operation. Theboiler is designed to maximise theoutput from the waste heat source, bethat a turbine, engine or incinerator.When output in excess of that availablefrom the waste gas source is requiredthe boiler can be fitted with auxiliary orsupplementary firing equipment.Steam / hot water/ warm water and CHP container units

    Steam

    Capacity :1 tons/hr - 10 tons/hr

    Operating

    Pressure :Up to 20 bar

    Steam

    Temperature :Up to 3500C

    Fuel Oil / Gas / LFG / biogas orDual Fuel

    Suitable for: Chemical refinery, food processing, Petrochemical plants,cogen plants, sugar refinery, edible oil plants, textile factory, pulp &paper.

    31 /

  • 7/30/2019 FINAL 26 -53

    8/34

    Biogas CHP Container Units - Compact all-in-one facilities forcapacities

  • 7/30/2019 FINAL 26 -53

    9/34

    Suitable for: Chemical refinery, food processing, Petrochemical plants,cogen plants, sugar refinery, edible oil plants, textile factory, pulp &paper.ROMVEC INDUSTRIE can supply and on site erect / commissionin the shortest installation time ever dreamt by a customer,

    the most competitive containerized thermo / power units,which can deliver steam, hot water, electricity, and evencooling energy , separately or all together, tailored exactlly forthe customers needs.

    A containerised steam boiler room is completely fitted withmachinery and electrical equipment housed in a transportablecontainer. The boiler room includes a water treatment plant with acorresponding capacity of treated and thermally deareated water

    with regards to the respective rate of the condensate-return. (In thestandard modification, the water treatment plant is designed for 80% condensate-return). The boiler room is fitted with the respectiveelectrical installations and system of measuring and control forautomated operation. The set also includes a self-supporting steelchimney.Containerized modules with co-generating units based on gasengines or diesel generator sets or the containerized modules withsteam turbo-generators, added to the containerised boiler room,generate power to be supplied into the distribution network or used

    to supply the boiler room operation in the case of non-stableelectricity supply or at locations without access to the electricitysupply system.If necessary , modules are added to the main container boiler roomto assure the boiler room "island" operation. Waste heat arisingduring the operation of these units can be used for heating utilitywater or within the heating system. The unit is supplied in aseparate container of the same type.The supply includes a gas regulating station and condensation

    water heating system. The outputs range up to 10 000 kg/hr.

    ROMVEC INDUSTRIE, however, is able to supply and on site install &

    commission containerized boiler rooms with outputs up to 30 000

    kg/hr.

    Boiler Room ModulationThe required thermal power unit may be obtained by combiningindividual containerised boiler rooms of a modular system. A

    containerised boiler room is supplied as a unit, including a case(boiler, water treatment plant, system protection, operating heavycurrent wiring, system of measuring and control) and a containerwith a co-generating unit, including a self-supporting steel chimney.

    33 /

  • 7/30/2019 FINAL 26 -53

    10/34

    To facilitate transport, the chimney is supplied in dismantled state,in sections approximately 6 m long.

    Container Boiler house componentsKK boiler room Units KK

    1000

    Boiler house components on a modular basis for simple planning,

    fast assembly and fully automatic, safe operation round off theboiler range in the best possible way. The individual modules areassembled completely at the factory and provided with electricalwiring. The ready-to-use modules only need to be connected to thesupply lines and joined up to each other. ROMVEC INDUSTRIE asspecialised erection company for modular technology considerablyreduces the number of interfaces required, thus increasing thebenefit to the customer.

    Complete boiler house, ready to operate, installed in ISO containersor in containers for specific requirements. Installation ofchimneys/extension chimneys is possible. On site, only a foundationis needed and supply and discharge

    The integrated control system for the containerized boiler houses

    consists of two sections: an integrated control system and the user

    panel (Human Machine Interface).

    The integrated control system performs many functions usually

    carried out by several components such as steam pressure, water

    level, alarm data acquisition, and it sees to thermal efficiency with

    the aid of the most advanced control systems: combustion control

    through electronic cams, control of the oxygen trim, of the flue gas

    re-circulation and of the air fan by means of an inverter. The

    automation system features are: synoptic screens with multi-

    language texts; high-resolution colour touch screen display; real-

    time and historical tracking of selected process trends; alarm

    reports log; navigator system; multilanguage editor. Automation

    system connects to the modern communications systems: it sends

    SMS and e-mail in case of alarms event; it is displayed on both theIntranet and the Internet; it connects to supervision systems

    via OPC server. Automation system's main benefits are:34 /

    http://www.directindustry.com/prod/loos/boiler-house-component-7270-50112.htmlhttp://www.directindustry.com/prod/loos/boiler-house-component-7270-50112.html
  • 7/30/2019 FINAL 26 -53

    11/34

    the performance equivalent to the most advanced DCS systems at a

    lower cost, the optimised combustion, the reduction of

    environmental impact, of fuel and energy consumption, and of the

    time for starting and checking the boiler.

    Portable steam / hot water/ warm water and CHP container

    units

    Suitable for: manufacturing plants

    Manufacturing plants sometimeshave :

    - seasonal needs ;- work to do in the boiler house ;- requirements for additional

    safety equipment ;- planned shutdown for a routine

    maintenance ;- unplanned shutdowns ;- or any other snag which

    might interfere with the plantproduction process.

    o ROMVEC INDUSTRIE offers a selection of more than 10types of mobile boilers and boiler houses from 90 kW to 12000kW, new and recently equipped, entirely automatic, fullyserviced and controlled by the approved organisations and

    tested before each new use.o ROMVEC INDUSTRIE, based on

    its supplier / collaborators technicalsupport , also offers complete

    solutions : boilers, burners, technicalaid, water treatment, spare parts,training. ROMVEC INDUSTRIE is able

    35 /

    Steam

    Capacity :1 tons/hr - 10 tons/hr

    Operating

    Pressure :Up to 16 bar

    Steam

    Temperature :Up to 350 0C

    FuelOil / Gas / LFG / biogas or

    Dual Fuel

  • 7/30/2019 FINAL 26 -53

    12/34

    The Altek 1.2MW AT1200 is a state of theart electrical generator capable ofoperating in various climates, using bothliquid and gaseous fuels of many types.It is fully capable of continuous dutyapplications. The unique designfacilitates efficient heat recovery for amultitude of applications in addition to

    to organise & perform , according to customer needs', theinstallation of the boiler house, its start-up, the technical aidand the staff training.

    o ROMVEC INDUSTRIE can supply for customers needs eventrailerised mobile boilers for emergency or long term hire.

    Both steam and hot water boilers are available, in outputs upto 18000 kgs/hour for steam and 10 Gcal/h for hot water.

    o Boilers can be quickly connected to existing services to

    minimise production losses if the existing boiler has failed.

    o Self drive units can be supplied for use on remote sites

    with fully self contained boiler plant installed in a box van.

    Both steam and hot water versions are offered and can include

    fuel tanks and generators. Widely used for "no dig" pipeline

    technology and also provision of hot water for showers etc inremote locations.

    Gas turbines- Combined Heat &Power Generation Units

    Suitable for: co / tri generation units

    Industrial gas turbine

    package Compact, integrated

    package providing ease of installation36 /

    Capacity :

    0,5 1,2 MW

    Fuel: NaturalGas / LFG / biogas

    or Dual Fuel

  • 7/30/2019 FINAL 26 -53

    13/34

    Factory tested, withperformance test certificate

    Liquid or gaseous fuelcapability

    On-skid PLC control system

    This aero-derivative engine has an impressive40 million hour history of excellent performanceand reliability. The engine has been built with allengineering and adaptation carried out by theOrenda division of Magellan Aerospace ofCanada.Its Description is as follows: Split-shaft design with a five-stage axialcompressor One-stage centrifugal compressor Two-stage gas producer turbine

    Two-stage power turbine with onboardreduction gearing

    Output of 1200 KW at ISO conditions Sub-Systems

    Steam turbines- Combined Heat &Power Generation Units from SIEMENS

    These innovative but economical machines have a simple modular designwhich facilitates optimization of performance for the required application.For optimal configuration to meet customers needs, ROMVEC INDUSTRIEcan install different but fully compatible design series, personalizedprocured as to match the customers requestsas exactly as possible. The special rotor

    bearing design allows extremely rapid start-up times to reach full load, even from coldstart. These SIEMENS pre-designed steam

    37 /

    Pre designed steam turbines

    Capacity : 45 kW 10 MW

    Main steam pressure: 3 -131 bar abs.

    Main steam temperature: dry,superheated

    steam, up to 530 C

    Exhaust steam pressure: 0.08 -29 bar abs.

    Speed: 500

    23,000 rpm

  • 7/30/2019 FINAL 26 -53

    14/34

    turbines operate in diverse applications, for example, in power generation such as combined heat and power plants (CHP) and renewable energyplants, primarily biomass and geothermal plants.

    For the conventionaldesign with externalgearbox, the gearbox is

    located between thebearings. The design ofthe SST-050 with integralgearbox is exceptionallycompact, andapproximately half thesize of the conventionaldesign. With this

    overhung design, the turbine, gearing and oil reservoir are all combinedin a single unit, with the turbine wheel mounted on one end of the shaft.

    It can be used for:Generator and mechanical drive, Cogeneration,Industrial power plants for e.g. sugar industry,textile industry, steel works and mines. Backpressure or condensing turbines, where the steampath is adapted to the needs of the individualcustomer, provide an optimal solution when medium

    pressure and temperature conditions are available.

    Gas turbines- Combined Heat &Power Generation Units from

    SIEMENS

    SST-050 single-stage steam turbineCapacity : 45 kW 10 MW Single casing, two rim action turbine Single-stage turbine, pre-engineered

    including blading Reduced number of wearing parts Low gland steam leaks available with external and with integral

    gearbox

    SST-100 Steam TurbineCapacity : up to 8,5 MW Single casing, multi-stage steam turbine providing geared drive to 1,500 and

    1,800 rpm generators packaged in a base frame-mounted

    design Exhaust flange on side, bottom half of

    the casing

    38 /

  • 7/30/2019 FINAL 26 -53

    15/34

    Fields of Application: simple / combined cycle power generation

    ideal for combined heat and power (CHP), because of itsexcellent exhaust heat dataSiemens Gas Turbine SGT-100Power output: ISO 4.35 MW(e) up to 5.25 MW(e)

    Fuel: Natural gas / liquid fuel / dual fuel and other fuelscapability on request

    Frequency: 50/60 Hz Electrical efficiency: 37.5 % Heat rate: 9,597 kJ/kW-hr (9,096 Btu/kWh) Turbine speed: 6,608 rpm Compressor pressure ratio: 19:1 Exhaust gas flow / temperature: 131.5 kg/s, 544C (287 lb/s,

    1,011 F)

    NOx emission capability (with DLE, corrected to 15% O2 dry): 15The SGT-100 is an industrial gas turbine with a power output range from 4.35 to 5.25 MW. It offerssimple construction along with the latest technology in a compact package. The SGT-100 is availablein both single- and twin-shaft configuration.

    Siemens Gas Turbine SGT-500The three shaft industrial gas turbine SGT-500 is a light weight, high efficiency, heavy dutymachine. It operates reliably in the 15-20 MW power range and can handle a variety offuels. For both, industrial power generation and mechanical drive, the SGT-500 is a provenunit. The SGT-500 is available as a factory assembled package and provides an excellentpower-to-weight ratio. Moreover, the SGT-500 has successfully undergone acomprehensive test program on heavy fuel oil for marine applications.Power output Base load: 17.18 MW(e) / Peak load: 18.60 MW(e)

    Fuel: Natural gas / liquid fuel / dual fuel and other fuelscapability on request

    Frequency: 50/60Hz Electrical efficiency: 32.2% Heat rate: 11,180 kJ/kW-hr (10,597 Btu/kW-hr) Turbine speed: 3,600 rpm Compressor pressure ratio: 12:1 Exhaust gas flow / temperature: 92.3 kg/s, 375C (203.7

    lb/s, 707F) NOx (with DLE, corrected to 15% O2 dry):

    42 ppmV

    Siemens Gas Turbine SGT-800 Poweroutput: ISO 47 MW(e)

    39 /

    Small scale industrial gasturbinesCapacity : 4,35 kW 50 MW

    Turbine types: SGT100 800

    Exhaust gas: 17,9 131kg/s at 5440C

    Electrical efficiency : up to37,5 %

    NOx emission (with DLE, corrected to15% O2 dry): 15

    Speed:

    3450 13,000 rpm

    http://www.powergeneration.siemens.com/products-solutions-services/products-packages/gas-turbines/small-scale/sgt-100-series/sgt-100-series-1s/sgt-100-1s.htmhttp://www.powergeneration.siemens.com/products-solutions-services/products-packages/gas-turbines/small-scale/sgt-100-series/sgt-100-series-2s/sgt-100-2s.htmhttp://www.powergeneration.siemens.com/products-solutions-services/products-packages/gas-turbines/small-scale/sgt-100-series/sgt-100-series-1s/sgt-100-1s.htmhttp://www.powergeneration.siemens.com/products-solutions-services/products-packages/gas-turbines/small-scale/sgt-100-series/sgt-100-series-2s/sgt-100-2s.htm
  • 7/30/2019 FINAL 26 -53

    16/34

    Designed for continuous, heavy-duty operation, the SGT-800 is the obvious choice wherereliability, harsh environments and low life-cycle costs are key factors.SGT-800 has a power output of 47 MW. It offers easy on-site maintenance and a wide fuelrange capability from liquid fuel to natural gas. Its powerful heat production capability in cogenerationinstallations makes it the ideal choice for the process industry.

    Gas turbines- Combined Heat &Power Generation Units from

    SIEMENS

    The SGT6 gas turbine serie is now an established high performance gasturbine for G-class applications. It provides maximum power output at

    high efficiency and low life-cycle costs, based on proven expierence

    SGT-1000F is based on proven SGT5-4000F technology.This single shaft machine with low-loss gearing can bematched to 50 Hz or 60 Hz grids.The SGT-1000F is designed for high-efficiency powergeneration in industrial and municipal applications - andfor island grids. The machine is characterized by highreliability, availability and serviceability.

    Annular combustion chamber with 24 hybrid

    burners Ceramic-coated heat shield 17-stage axial-flow compressor for optimum

    flow distribution Four-stage turbine Turbine blades with thermal barrier coating and

    film cooling Advanced cooling technology Inspection of hot-gas-path components without

    cover lift Optional multiple fuels capability Low-NOx combustion systems

    The SGT6-4000F is a proven gas turbine for the 60 Hz market, based on theefficient 4000F technology platform. Since 1997 over sixty units have beeninstalled world-wide and enable economical power generation at long maintenanceintervals. Together the fleet has more than 1.100.000 EOH.Technical features

    Annular, walk-in combustion chamber with 24hybrid burners

    Ceramic combustion chamber tiles 15-stage axial flow compressor with optimized

    flow distribution (controlleddiffusion airfoils) Single-crystal turbine blades with thermal barrier coating and film cooling

    Power Output 68 MW

    Efficiency 35,1 %

    Heat Rate10.265 kJ/kWh9.730 Btu/kWh

    Power Output 186 MW

    Efficiency 38.3 %

    Heat Rate9.384 kJ/kWh

    8.894 Btu/kWh

    40 /

  • 7/30/2019 FINAL 26 -53

    17/34

    Advanced cooling technology Optional multiple fuels

    capability Low-NOx combustion system

    Procurement & installation / commissioning

    Industrial burners / burner systems procurement, installation &

    commissioning

    ROMVEC can design, procure, install and commission a completely

    compatible new burner installation for any customers old boiler in order

    to revitalize the boiler performances. The burner system replacement

    provides maximum power outputat high efficiency for the boiler

    and low life-cycle costs

    Weishaupt gas, oil and dualfuel burnerswith multiflam technology.Low NOx emissions: it reduces NOxemissions from large plant by up to

    60%. Optimum combustion: Combustion

    takes place via a primary nozzle andconcentrically arranged secondary nozzles.

    Safe and simple principle: The primary flame guarantees a stable, reliableoverall flame over the whole control range. Great versatility: from 3,750 kW to 12,000 kW available on oil, gas anddual fuel burners.

    Digital combustion equipment: State-of-the-art equipment controls thefeed of fuel and air, and thus

    guarantees optimum combustion figures. Long life: Only the best materialsare used in manufacture.

    Riello industrial oil, gas anddual fuel burners

    The TI 10 14 series of burnersrange from 930/3000/5200 kW to6000/8500 /13000 kWThe industrial burners TI series aredesigned for big civil installations andindustrial processes

    41 /

  • 7/30/2019 FINAL 26 -53

    18/34

    with a remarkable thermal demand. These series allows to realise a modular andflexible combustion system adding a preparationfuel unit (regulation pressure group set, preheating/pumping oil station), a gastrain, a control panel and a fan. It can also be used a preheated air as in the oildiathermic generators and other heat recovery systems. The modulatingregulation, with a variable geometry head combustion, always allows

    to reach a wide modulation ratio and optimal fluid-dynamics conditions for a goodcombustion.

    Industrial burners / burner systems procurement, installation &

    commissioning

    PBS - Automatic gas burners APH - M type

    Designed as o monoblock burner to burn

    natural gas, propane butane, biogas,landfill gas and mine gas. The burnerworks fully automatically. Range ofpowers: 140 kW7000kW. The connectedregulation of heat output and low accessof air during combustion ensure highlyefficient operation.

    The starting cycle (ventilation of thecombustion chamber and valve tightnesscontrol), the regulation of heat output andall safety functions are controlled (afterreceiving impulses from operatingsensors) by MA-2 or MA-3 microprocessorautomatics. The MA-2 automatics can beplaced directly on the burner or on a special stand. Communication of the automatics withthe environment is possible manually by the operator or by a superior computer, or byremote control through RS-485 interface.

    SPECIAL BURNER SISTEMSFor large energetical steamboilers units ROMVEC cansupply and erect specializedburner types as the Unique

    low NOx coal burner withcenter air jet for use withoverfire air (OFA) systems Babcock WilcoxDesign features:Developed exclusively for usewith OFA systems for thelowest NOx emissions.Designed to accelerate coalignition and intensifycombustion for very rapidachievement of fuel richconditions in the burner zone -the key to minimizing NOx

    emissions. Secondary air is drawn from the windbox to produce an axial airjet, which is surrounded by the coal stream. The coal stream is, in turn, 42 /

  • 7/30/2019 FINAL 26 -53

    19/34

    surrounded by two air zones. This "inside-out / outsidein" ignition and combustion of thecoal produces a very stable, intense flame. Ceramic materials provide long wear life for thecore pipe and coal nozzle. A one-piece shop-assembled burner facilitates quality andsimplifies installation. In retrofit applications, generally plugs into existing wall openings.NOx removal efficiencies: Compared to other advanced low NOx burners in usewith OFA, the AireJet burner further reduces NOx by up to 30% with lower excess

    air for improved boiler efficiency.

    ON SITE WORKS / SERVICES

    Our company had started in 1998, and carried out to date

    several mechanical and electrical erection works, in the

    reconstruction and reppairs of Steam Boilers in Thermal Power

    Plants and other Industrial Enterprises.

    Over more than (10) years, we have mastered the requirements

    of boilers, burners, furnaces, soot blowers, air and fuel

    distributes, condensers, heat exchangers, high pressure

    vessels, tanks, steam / hot water pipe systems, steam and gas

    turbines, HRS and co/ tri generation units in addition to steel

    structures and supports, insulation and lining, together with all

    associated piping and valves, also we have a good experience

    in erection and maintenance of the air conditioning systemwith all associated piping , valves , pumps, control system and

    the electrical supply, also we can make a good jobs in Water

    treatment system , erection and operation of demi water

    system, softener system, and water supply system.

    All works we have executed so far had met with our clients

    satisfaction. All works were executed with best engineering

    standards and high skills featured by our technical teams in

    the jobs we were entrusted to perform.

    Our company possesses an excellent technical department

    consists of consulting engineers with high level of expertise &

    knowledge coupled with long experience gained in power

    plants, refineries and chemical plants, cement plant sites with

    specific qualifications in projects construction. This technical

    department carries out very careful and meticulous studies of

    tender documents and plans the implementation procedure andschedules and makes out comprehensive quality assurance and

    supervision of works until their handing over to our clients.43 /

  • 7/30/2019 FINAL 26 -53

    20/34

    We are the erection subcontractor executing the mechanical

    works required to rehabilitate boilers turbine Units in CET

    WEST Bucharest Power Station under the supervision of

    SIEMENS POWER GENERATION SERVICE. Our Company handed

    over last February to the client (CET GRIRO SA) the turn key

    project of a OKP 40 t/ h - 35MW (manufacturer of the boiler is

    CKD Czecs Republic) superheated power steam boiler -

    completely engineered, erected and commissioned by our

    company; We are installing two cogeneration gas turbine units

    of 5 MW at West Energo - Bucharest under the supervision of

    the vendor SIEMENS POWER GENERATION . Currently, we are

    erecting a turnkey district heating unit of 2 Gcal /h at Obregia

    hospital in Bucharest.Our company can handle complete projects on turn key basis including civil work , mechanical and electrical erection,and can take care to supply necessary equipment & auxiliaries.

    Experience & Qualifications

    Extensive Management, QA/QC and Supervision experience

    with the welding, construction, erecting, maintenance andfabrication industries comprising:

    Pressure Vessels and piping Boilers and burner systems Automation systems field instruments installation Gas and Steam Turbine installing Gas and steam turbines driven compressors,generators and pumps

    Steam and hot water pipelines Steel structures Fabrication and Erection Plant Construction Maintenance and Upgrades Power Stations Onshore pipelines

    The scope of maintenance / repairs / service works on site

    include:

    General maintenance in Thermal Power Plants, in Boilers,Air heaters, air ducts gas ducts.

    44 /

  • 7/30/2019 FINAL 26 -53

    21/34

    Replace boiler-burning systems consisting of burners,valves and soot blowers, automation instruments andcontrols.

    Maintenance of Attemperaters and Economizers Maintenance of thermal cycle valves including control

    valves and three ways valves Replacement of condenser tubes in power plants. Rehabilitation steam boiler units in Thermal Power Plants.

    Our work include:

    i) Chemical washing / cleaning of boilers, pipes, tanks and

    heat exchangers

    ii) Erection of scaffolding inside boilers furnaces to heightof (30 m).

    iii) Replace burners for multiburner boilers type. This job

    consists of removing / replacing air boxes, burners

    injectors / guns, reconstruction of refractory masonry

    apertures for burners, replacing the valves, registers and

    controls from automation system of the burner units.iv) Replacement of water walls. Water wall panels made of

    2.5 O.D high pressure tubes replacement needs Inert gas

    welding employed.

    v) Replacements front and rear water walls and screen for

    the boiler units in thermal

    power plants.

    Experience & Qualifications

    Supplying ROMVECs specialised working teams as localskilled manpower to our abroad colaborators (as SIEMENSPOWER GENERATION ) to carry out jobs under theirresponsibility in Romania, when the case. The tasks carried out byour manforce shall be:

    i) Setting out, cutting and welding of plate work for boiler / equipment partsand ducts, according to fabrication drawings of the contractor, thentransport & erect in position for the unit.45 /

  • 7/30/2019 FINAL 26 -53

    22/34

    ii) Remove & dismantle old boiler / equipmant parts and install & erect thenew ones.iii) Replace of Re-heater and super-heater tube coilsiv) Replace soot blowers including gas /fuel valves and all thermal cyclevalves.v) Maintain & replace air-heating coils if neccessary.vi) Clear old fuel leakage around various units of Thermal Power Plant.

    Within the scope of repairing / maintenance & serviceworks ROMVECs technology covers also design, on shop boiler/ pressure vessels component parts manufacture, on sitedemolition and after repairs / replacements reerection andrecommissioning of all types of smoke or water tube boilers forsolid, liquid and gaseous fuels as used in the process,technological lines and power industry.

    ROMVEC Management staff dealing with repairs /maintenance / service works are experienced professionals inthe contracting industry in Romania and overseas, includingstaff with accumulative experience in the boiler industryexceeding 30 years. ROMVEC staff has been involved in boilersrepairs / maintenance ranging from 600 MW power stationunits to boiler units of 35 t/h to 110 t/h for industrial users asmany of them have been selected from the prestigious boilerconstruction / erection / repairing companies as VULCAN ,

    IAMRCT, ENERGOMONTAJ which use to be the biggest profilecompanies in Romania before 1990.

    With respect to the imported boiler units and relatedequipment from the boiler houses which are in use in Romaniaand need repairs / maintenance works, ROMVEC have formeddifferent types of associations with OEMs (Original EquipmentManufacturer) including personnel specialised training tosuccessfully handle the repairing / maintenance works for the

    local industrial market for almost all the types of boilers andrelated appliances imported and still in use in Romania. Forsome producers delivered equipment, as Altek Power Co smallsize gas turbine units, we are able to provide repairings /maintenance works for customers located anywhere in Europeas the canadian producer does not have yet an europeansettled service department and found us as truthfull in thefield.

    ROMVEC INDUSTRIE staff, arranged in a task forceapproach are well qualified to design with In-House technology

    and execute repairs / maintenance works as an ISCIR

    46 /

  • 7/30/2019 FINAL 26 -53

    23/34

    authorizated company for industrial boiler plants and CHP unitsin a highly competitive and professional manner.

    ROMVEC INDUSTRIE has experience repairing in manyalloys from hot rolled carbon steel to Hastelloy, Inconel, Monel,etc. Whether you need boilers, incinerators, burner

    assemblies, tanks or pressure vessels, pipe and ductsrepairings or modifications, your specific requirements can beturned by ROMVEC into custom oriented designs

    Experience & Qualifications

    ISCIR approval, according to technical prescriptions in foree,included which then can be applied including all manufactureworks in shop and all erection works on the site. We supply thejob with top workmanship and pride to render the customer therepaired / modified equipment as good as brand new.We have the facilities and codeings to fabricated install, testand commission piping systems ranging from small bore lowpressure instrumentation and heat tracing pipework to 36" NBprocess lines with test pressures up to 132 barg in thefollowing materials; Carbon Steel, Low Temperature CarbonSteel, Stainless Steel (all grades), Kunifer, Inconel 625,

    Hastalloy, Chromium Molybdenum, Duplex, Polypropylene,P.T.F.E Lined Carbon Steel, High and Medium DensityPolyethylene, PVDF, PVC, A.B.S.

    Our squad of time served mechanical fitters and MechanicalEngineers have the skills and experience to assist clients inoverhauls and maintenance of mechanical equipment rangingfrom valves and pumps to more specialized equipment such assteam turbines and boilers.

    Our squad of platers and steel erectorshave all the skills and knowledge tofabricated and erect structuralsteelwork ranging from pipe supports toloading gantries and pipe bridges. Wecan also sub-contract large steelworkfabrication and erection projects andmanage there operations to produce aquality service.

    With decades of experience we havethe facilities and infrastructure to

    47 /

  • 7/30/2019 FINAL 26 -53

    24/34

    manage any customer project to the same standards asadopted in-house. Our team of project managers are fullyconversant with ISCIR regulations and PED essentialrequirements and their expectations when dealing withanything in the scope of boilers and pressure equipment, from

    small maintenance projects to turn key erection contracts. Ouraim would be to deliver the project safely, efficiently andwithin budget policies adopted throughout our everydayoperations.

    Outstanding repairings works we can provide

    Pressure Vessels repairings Tanks repairings Stacks and Transitions Autoclaves repairings Incinerators Combustion Chambers steam / hot water pipes Steam pipes and fittings Assemblies Boiler Parts

    In shop and on site specific worksfor repairs

    TUBE BENDINGWe bend and fabricate from 1/8" tubing to 20" pipe in carbon steel,stainless steel, copper, aluminum and many other metals torepairing project specifications. Pipe and tubing with single ormultiple bends, coils of all shapes and sizes also in any size or type

    of metal.

    BOILER REPAIRSHigh and low pressure boilers, condensers, tanks and heatexchangers repaired and reerected. Tubes provided just in time formost boilers repairings. Tubes bent and plate work fabricated in ourown shops for faster service. Certified welding. Service trucksequipped and ready to service the customer needs.

    PLATE FABRICATION

    Plate fabrication works, for replacements within the repairingdesign of a boiler / equipment, are performed in carbon steel,stainless steel, copper, aluminum, and many other metals torepairing design specifications. Facilities to roll, bend, 48 /

  • 7/30/2019 FINAL 26 -53

    25/34

    assemble, weld and test the fabricated replacement parts for theboiler / equipment which is under the repairs, are available in ourworkshop . We bend angles, tees, flat bars, channels, beams andstructural tubing to repairing design specifications.We provide for every particular repairing contract:

    Material joining solutions Welding procedure development and qualification for thespecific repair Welding procedure evaluation Welder evaluation and qualification Welding inspection - visual Welding administrative operational proceduredevelopment Review of repairing design specifications, procedures anddrawings

    All necessary and required reports, written proceduresand qualification records, customized to reflect theconformity of our execution of the designed repairing worksboth with the customer requirements and with the design /ISCIR technical prescriptions requirements Repairing works / Erection inspection & verification andsurveillance inspection during the works, troubleshooting,and investigation of weld failures Ascertain compliance to codes and repairing designspecifications

    All repairing contract works are conducted / surveyed by thetwo ISCIR authorized responsibles : RTS (welding workstechnical responsible / co- ordinator) and RSL (repairing workssupervision responsible)

    Our core competency in boiler / thermoenergetic equipmentrepairs lies not only in the manufacturing and replacement of theboiler damaged components but in the minute analyze of theunderlying causes which produced the destructions. This drives usup to the right repairing solutions and prevent further boilers

    running problems and down times. Many times an appropriateboiler repair means also an appropriate operating instructionsreview. And it is our pride to perform the ordered repairings in thisresponsible approach.

    All repairing works for boilers, pressure vessels andsteam pipes are performed under third party inspections(ISCIR), according to design provisions and customized toclients requirements.

    In shop and on site specific works for repairs

    49 /

  • 7/30/2019 FINAL 26 -53

    26/34

  • 7/30/2019 FINAL 26 -53

    27/34

    procedures, continuously revised and improved in order to becomplete updated quidances for repairing / maintenance worksperformed in strict accordance with the applicable ISCIR Boiler andPressure Vessel prescriptions - the National Boiler, Pressure vesselsand Hoisting equipment Inspection Body,and any jurisdictional requirements that may apply.

    ISCIR Certificates of Authorization, for repairing worksperforming:

    ROMVEC INDUSTRIE currently holds the following ISCIR Certificates ofAuthorization, for repairing works performing:

    C1 r: for performing repairing works for any type of steam and hot water boiler(including power boilers) which are designed and manufactured by others, withinthe range:

    Steam boilers: Dmax = 525 t/h, pmax = 196 bar; Tmax = 540 CHot water boilers: Qmax = 100 Gcal/h, pmax = 25 bar; Tmax = 160 C

    C1 rp:for the repairs design, alteration design, manufacture boiler replacementparts design, and for the compliance verification / validation of the boilers repairingdesigns, within the range:Steam boilers: Dmax = 525 t/h, pmax = 196 bar; Tmax = 540 CHot water boilers: Qmax = 100 Gcal/h, pmax = 25 bar; Tmax = 160 C

    C9 r: for performing repairing works for any type of warm water boiler and lowpressure steam boilers which are designed and manufactured by others, within therange:Low pressure steam boilers: Dmax = 10 t/h, pmax = 0,5 bar; Tmax = 110 CWarm water boilers: Qmax = 10 Gcal/h, pmax = 10 bar; Tmax = 110 C

    C9 rp:for the repairs design, alteration design, manufacture boiler replacementparts design, and for the compliance verification / validation of the boilers repairingdesigns, within the range:Low pressure steam boilers: Dmax = 10 t/h, pmax = 0,5 bar; Tmax = 110 CWarm water boilers: Qmax = 10 Gcal/h, pmax = 10 bar; Tmax = 110 C

    C4 r: for performing repairing works for any type of pressure vessel within therange:

    Vmax = 100 m3; pmax = 100 bar; perature: - 50 C T + 440 C;Fluids = air, steam, water, H2, oxygen, nitrogen, argon, CO2, LPG,

    acetylene, liquefyed chlorineor sulphur dioxide, other technical gases / liquids used

    in industrial processes

    C9 rp: for the repairs design, alteration design, manufacture pressure vesselsreplacement parts design, and for the compliance verification / validation of thepressure vessels repairing designs, within the range:

    Vmax = 100 m3;pmax = 100 bar;

    Temperature: - 50 C T + 440 C;Fluids = air, steam, water, H2, oxygen, nitrogen, argon, CO2,

    LPG, acetylene, liquefyed chlorineor sulphur dioxide, other technical gases / liquids usedin industrial processes

    51 /

  • 7/30/2019 FINAL 26 -53

    28/34

    C10 r: for performing repairing works on steam and / or hot water pipes,within the range:Steam pipes: pmax = 190 bar; Tmax = 540 C; max. = 800 mmHot water pipes: pmax = 25 bar; Tmax = 200 C; max. = 1 500 mm

    C10 rp:for the repairs design, alteration design, manufacture steam / hot waterpipes replacement parts design, and for the compliance verification / validation of

    the steam/h.w. pipes repairing designs, within the range:Steam pipes: pmax = 190 bar; Tmax = 540 C; max. = 800 mmHot water pipes: pmax = 25 bar; Tmax = 200 C; max. = 1 500 mm

    C11 r: for performing repairing works on automation systems for boilerhouses equipped withSteam boilers: Dmax = 525 t/h, pmax = 196 bar; Tmax = 540 CHot water boilers: Qmax = 100 Gcal/h, pmax = 25 bar; Tmax = 160 C- Automation systems for boiler houses equipped with boilers withoutconstant supervision (24h or 72h)

    C11 rp: for the repairs design, alteration design, manufacture automationsystems replacement parts design, and for the compliance verification / validationof the automation systems repairing designs, within the range:boiler houses equipped withSteam boilers: Dmax = 525 t/h, pmax = 196 bar; Tmax = 540 CHot water boilers: Qmax = 100 Gcal/h, pmax = 25 bar; Tmax = 160 CAutomation systems for boiler houses with boilers without constantsupervision (24h or 72h)

    On site installing / erecting works provided byROMVEC INDUSTRIE

    ROMVEC INDUSTRIE is a full service contractor which specializes in theconstruction, alteration, maintenance and repair of boiler and powerplant equipment

    ROMVEC SERVICES on site Services include:

    Installing / erection planning Installing management Mechanical equipment

    erection Pipe fabrication and

    installation Planned shutdown andemergency planning Maintenance and repair

    Shutdowns and rebuilds Boiler repair Pressure vessel repair Modifications and retrofit of

    steam generators Maintenance and inspection

    services

    Instrumentation calibration and

    installation

    52 /

  • 7/30/2019 FINAL 26 -53

    29/34

    ROMVEC INDUSTRIE's commitment toconstruction quality is backed by astaff of experienced constructionprofessionals. Extensive constructionplanning is conducted before theproject installation begins. Thisassures maximum productivity, on-

    time project completion andoutstanding quality in everyproject.

    Engineering

    ROMVEC INDUSTRIE's engineers are dedicated to providing engineeringand consulting services to the steam and power industry. Over theyears, the engineering effort has expanded to cover a wide range ofspecial projects, with steam and power engineering remaining the

    firm's primary focus.

    Engineering

    ROMVEC INDUSTRIE has gained experience on a wide range of steam andpower plant projects. The majority of these projects has enabled us tounderstand the special requirements of fuel handling, ash handling, and

    environmental control and also to get extensive experience withconventional boiler design and fuels including natural gas, fuel oil, and coal.

    53 /

  • 7/30/2019 FINAL 26 -53

    30/34

    We have established a highly motivated, experienced, and multi-disciplinedengineering staff specializing in mechanical, civil, structural, piping,electrical, estimating, process instrumentation, and control disciplines.

    Our engineers utilize advanced engineering and management tools to erect /

    repair thermo-energitical plants that provide high efficiency and availability.Each project phase is carefully planned to develop the best approach fromdetailed scheduling and cost control, to carefully monitored materialpurchasing and expediting methods, to detailed installation / erection /commissioning and testing procedures.

    Our engineering staff, through interaction with our on sites workingorganizations, understands the significance of value engineering and the

    importance of including spare parts and maintenance considerations as partof the design.

    Engineering Services Include:

    Project Management Project SchedulingInstallation Power Plants Design Repairing Power Plants Design

    Project Development Engineering Design Build / Detailed DesignISCIR installation Permit Support ISCIR operatimg Permit Support

    Performance Engineering Power Plant Optimization

    Plant Renovation Control System UpgradesOperation Manuals and Operator

    TrainingEquipment and Material

    SpecificationsEquipment and Material

    ProcurementStart-Up Assistance

    Troubleshooting / periodic inspectionsupport

    Condition Assessment

    54 /

  • 7/30/2019 FINAL 26 -53

    31/34

    We have well trained Engineers in BoilerInstallations, to provide Inspection and SiteSupervision support to Customer Companies incase they decide to contract project works withother specialised erection companies. Asbeneficiary of a thermo-energetical plant, a

    customer, who ordered such a plant for his own

    companysenergetical needs, mighthave no specialized personnel in thefield to assure the project progresson the site supervision and the finalreception. n such cases ROMVECcan provide specialized asistancebecause the main objective ofROMVEC is to providecomprehensive services for allpossible customers from the energy,industrial building and other enegineering / construction fields. Our engineers arewell specialised in heat & power plants and individually boilers

    design manufacturing assembly maintenance

    refurbishment service

    and they have experience with most of types ofmachineries supplied by prominent producers inthese branches:

    steam boilers gas and steam turbines pumps & compressors pressure equipment steam / hot water pipe systems safety valves steam traps and control valves gas regulating stations fittings and filters fans and blowers water treatment units automation systems instruments & controls

    All on site Inspection and site Supervision activities shall be carried on according toproven efficient procedures as ROMVEC has been certified for the SR EN ISO9001:2001 and SR EN ISO 14001:2005 standards in the field of designing,

    installing, erecting, assembly, commissioning, repairs, reconstruction and service ofpower engineering and metallurgical equipment.

    55 /

  • 7/30/2019 FINAL 26 -53

    32/34

    Our company specialists passed out many training and courses, they obtainedofficial qualifications in virtue of which we are able to provide high specializedactivities within the area of specified technical equipment.

    ISCIR AUTHORIZED RSVTI SERVIVES

    ROMVEC INDUSTRIE can provide specialized surveillance and periodic verificationsservices (RSVTI services) for all customers who owns and operates boilers, pressurevessels, steam / hot water pipes, process pipes, lifts and cranes and any otherequipment which are used under ISCIR prescriptionscompulsory runingauthorization, periodical controls and supervisions.Acording to Romanian lows ( Chief State Instectors ORDER No. 333 / 28.06.2006 and complementary orders no. 147/2006 and no. 253/2006) any owner of apressure equipment (boiler, vessel, pipe system) or / and hoisting equipment whooperate it, must have a nominated ISCIR authorized staff for supervision, periodictechnical verifications of the said equipment and operating personnel periodical

    training and competency reendorsment. This staff is called RSVTI (TechnicalResponsible for Surveillance and Periodic Verifications of the Own Equipment underoperation) and must be ISCIR authorized. If the Owner of such equipment (which isfrom ISCIR domains) has not his authorized RSVTI, ROMVEC INDUSTRIE can provideprofessional authorized services in this field.

    The RSVTI services include:

    pection of tubes, tube sheets and shell in Fire tube BoilerTesting of Stem drum, Mud Drum, Headers, Fire box and economizer tubes,efficiency of Water tube Boiler

    Leaking or malfunctioning verifications for shell and tube BoilersScheduling Repair works and shutdowns for tube replacement or pluggingSurveillance for Safety violations & AccidentsPeriodic examinations to evaluate boiler integrity. Evaluation Report include color coded tube sheet layout with indication of

    damage in the tubes, Tables and recommendationsRSVTI services are as follows:

    a) Identification and recording of all the equipment / installations owned by thecustomer which are from the ISCIR prescriptions domain and the communication of

    the recorded data to the local ISCIR district branch for registration according toISCIR prescriptions.a1) Supervision of the equipment procurement when the equipment are

    from ISCIR domains; 56 /

  • 7/30/2019 FINAL 26 -53

    33/34

    a2) Checking on the existence of the CE mark on the equipment from ISCIRdomains, and of all the other markings which are compulsory to be applied on theequipment needed to be continuously techically supervised by the owner as longas they are in operation, according to the legal provisions;

    a3) Checking on the existence of the associated documents of the equipmentfrom ISCIR domains, owned and operated by the customer, and conformity

    verifications of the said documents against the applicable legal provisions;a4) The Communication to ISCIR of all hunted out nonconformities ;

    a5) The Communication to the local ISCIR branch (where theequipment/installation are registered) of the cancellation / wipe out from the in-house records of the annulment equipment. The communication shall be made atmaximum 15 days after the annulment date, and the communication must beaccompanyed by theequipment annulment documents;

    ISCIR AUTHORIZED RSVTI SERVIVES

    a6) In written form communication to the local ISCIR branch (where theequipment/installation are registered) the identification data for the new owner ofthe equipment / installation in case of property or operation rights transfer for thesaid ISCIR registered equipment / installation;

    a7)Yearly organization of an examination session of the owner operating stafffor the equipment and the elaboration of the examination results reports;

    b) Scheduling and supervision of the maintenance and repairing worksperformed on the equipment / installations from ISCIR domains. These works shall

    be performed only by ISCIR authorized companies and they must be executedaccording to ISCIR technical prescriptions; c) Supervision of all rehabilitation works (parts replacement, retrofittings andrefurbishments) carried on the equipment / installations from the ISCIR domains, inorder to be executed according to ISCIR technical prescriptions and only by ISCIRauthorized companies ;

    d) Take up work of Preparatory services ( includingrequired men & material) for annual inspection of HRSGand IAEC make Package Boiler including obtainingoperation certificate from ISCIR Boiler Inspector andcompletion of boiler inspection as per the ISCIR

    prescriptions and fulfillment of recommendations of theISCIR Inspector to comply with the regulations. This activityis done every year.e) ROMVEC can provide in addition skilled personnel tocarry out HP TIG welding and radiography and other NDTfor repair & maintenance works and also minormodifications for improvement of plant performance, asand when required, to comply with ISCIR prescriptions

    procedures and shallhave to obtain certificate/clearance

    from the concerned authority.f)ROMVEC INDUSTRIE arranges for hydrotesting and /or NDT as applicable of Static

    57 /

  • 7/30/2019 FINAL 26 -53

    34/34

    vessels , Heat exchangers as per the requirement of statutory / regulatory ISCIRprescriptionsg) Operational spares inventory.h) Proper management of the Plant.i) Recommendations for improvement in Operational parameters and procedures.j) Preparation of O & M manuals and revisions of the same.

    k) Perform scheduled and preventive maintenance to minimize equipmentshutdown time, minimize equipment failures and reduce maintenanceexpenditures.l) Monitor performance & efficiency of the plant, systems and sub-systems

    included in the scope of the work regularly and work out action plan to improve.

    Hydrostatic Test Expanding Inspection Painting InspectionAlso, as an ISCIR authorized RSVTI services provider , ROMVEC INDUSTRIE shallundertake supervision of all pending jobs completion and the accomplishementof all disposal ordered by ISCIR officials on the occasion of the periodicalinspections carried out at the customers place forremoving all nonconformities found on the equipment inspected.