figures - jicabed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255...
TRANSCRIPT
![Page 1: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/1.jpg)
Figures
![Page 2: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/2.jpg)
Bou Heurtma Dam
Kasseb R.
Kasseb Dam
Sidi Salem Dam
Jedeida
Meje
rda R
�
Sea
(Gulf of Tunis)
Mejez El Bab
Highway
Tessa R.
Mellegue R.
Mellegue Dam
Mellegue2 Dam
Bou Salem
K13
Ghardimaou
El Battane
Tessa Dam
Jendouba
Bou Salem
Rarai R.
Mejez El Bab
Mliz R.
Jendouba
Beja R.
Khalled R.
Slouguia
Zerga R.
Algeria
Alg
eri
a
LEGEND
Figure 4.1.1 Schematic Locations of Major Stream Gauging Stations, Tributaries,
Dams and Cities/Towns
Laroussia Dam
Note:This is a simplified schematic chart.Not all dams and gauging stations arepresented here.
Andalous Bridge
Tobias Dam
El Battane Weir
Chafrou R.
Bajer R.
Sarrath R.
Lahmar R.
El Herri
Rm
el R
.
Ben Metir Dam
Dam (Existing)( ): Year started operation
Dam (Planned)
Dam (under Construction)
Major WL / dischargegauging stations
Major cities/towns
River
Old river course of Mejerda
Testour
Sarrath DamBarbara Dam
flood water
for water supply(non-flood periods)
Bou Heurtma R.
Alg
eri
a
(1954)
(1999)
(1954)
(1976)
(1968)
(1981)Siliana Dam
(1987)
Rmil Dam(2002)
Lakhmes Dam(1966)
(1965)
(1990) (Closed 1990)
(Opened 1953)
Sidi Medien
Jebel Laoudj CoteSiliana R.
Rmil R.
F-1
![Page 3: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/3.jpg)
GAFOUR
SILIANA
MAKTAR
OUESLATIA
EBBA KSOUR
THALA
LE KEF
JENDOUBA
GARDIMAOU
BEJA
BOU SALEM
TESTOUR
JEDEIDA
TUNIS
MEJEZ EL BAB
M E JE
RD
A
H
SI L
I A N
A
ME
LL
EG
UE
SA
R
R AT H
Me s k i a
n a
ME
J E R D A H
M E J E RD A H
T
ESS
A
BE
JA
BOU H E U R TM
A
KA
SS
EB
elK
se
ub
Ksabel Kebir
ch abroP
Haïdra
Z araa
el Kohol
Rem
e l
Me
lsis
Tessae l Am
irel
R oum el
Oussafa
Jebara
Massouje
Lakhm
es
S e j aB enali
Mahdi
el Slima n
elH
adia
Tadjera
Je
d eïd a
Melah
e l Tou b
Ech C hé
Kanana
Mé
r i rel G
ug iua
el Me l a
ez R a gr ou
be
Bourachrach
Ra
yd
So ua
ni
D
ma ine
elm
aidho
ur
Si e rd
Er mel
Tin e
el Bi
ejo
B ou Egou
el K
harrou
ba
Las ouag
Zouar aMe
l a
Fkis
in
e
Bou
A nou
Salsat
Se
cc a
Bo uGnd
e l Ahe la m
B
ouhaja r
Rh
ac
sa Ja
rou
dS
ou
ha
De
ba
Jourmar
el
Die
r i l
el
Kebe
To
urd
a
Masso
u
elA
llao Orf
a
Strah
Zoff
e lA
d
el H
amadia
Ha
ma
dia
Sm
ara
Gu
reB
art
M
efahGue ntata
Mera h e l B
el
Rhedra
Damo
u
Si
Sa
lah
Bo
uSesso
el
Be
r b ag
e
l Bahia
el Ba
ïda
St
Fiedi
el M
elah
Ezz
arga
Melah
Ba
siou
Ain
bouD
a
bb
Na
hola
Jarta
Bav
ad
Ain S ïdBou Pail
AinC
hattl
el H
am
mam
el Zuoum
Tagla
M
eng
oub G
u e radie
B ou Kaia
BouH
arbe
me
lBer
ich
Jedial erre ne
Tagrura
e l Graret
Mougtas
S
oul
Za rzour
St
Men
dir
ez Zana
Mefeje
Cha
rch
ou el Alleg
M
lizel A
hmar
Henares
Guett ed
Feraou
S amchG hrich
Bou Rhara
Fell
M gnassei
Kedim e
Mass i ta
Thib
Ca rrbu
N
ejia
R
mel
En
Memi
ZitounaSo un
ras
Kha
lle
dE R
Mo uc
hel MelahKrilel O
uah
ar
Bouchebi
Ed
Dfa
ll
Ba
ri na
Zarga
Bou N e
Gul
lour
elM
ela
h
elL
outan
t
Zera
Zao
uia
el Har ch
aB
ouK
radr
aBo
uS
baa
Hor
ais
Alle
gue
elR
hrha
el Zao uche
Aiou
el Jourr
Hajar
Rarai
Soutti
Ecnchaay
Krouitra
el Mela
h
el HatobBarer
Zoltaur
Me
lah
Halir
at
Gheib
GhezalaE
s skila
el Kebire l Aled
Zrinaz
M
ena
St
Sa
l ah
el Lil
El l ouhSe mane Bello
uFat hall
el Leb
enel Hammam
Bika
Has
sen
Chelita
Bagrou
h al
Djo
itane
Bard
in
Farfout
el
lil
el
M
a dz
el A
n
mor
Brid
a
Sikrad er
el A zrea el Kso
Oum
Aro uL
aha
mel A
joun
e l Ziloun
Aïn el Hatier
Beuf e
ran
o
el
Rtu
p
Kame lle l
Mou Me b
Bo
u
Di s
Hal l oula
S erdies
F aied el Obb a
Fellah
Z it ounaZ itounaTa
ga
Bo ulata
Mil
lek
Zie
da
el Brad
Ro
ue
la
e l ma
Bou
Sa
leh
Tia
l is
Soudr i
Hantas a
N aoup uss
el Mirta
SangmaJa bia
D ebaxb
i
k
nol
el
Amazö
Lab
i od
el Msire
Fell eo
el Ha
mum
iabouG
oum
Kioussu
Mechale
Muicie
Kr i ta
Gourllacia
Seiarioum
Delia Z arga
Oum teba
Becculla
el Gial
el Ammeje
Izid
el Malah
e l Kambr
a
el Abmar el Mema
el Arel
Chaflou
BouS
oum
t
el M
alah
Hanech
Algérie
La Méditerranée
Tunisie
Figure 4.2.1 River Network in the Mejerda River Basin
N
Legend
River
Basin boundary
International border
F-2
![Page 4: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/4.jpg)
Bed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120
i = 0.0000000 0.0004255 0.0003571 0.0008929
Topographic Survey Applied : Survey in 2007 by JICA Study Team
Figure 4.2.2 Present Riverbed Profile and Flow Capacity (Mejerda, Upstream of Sidi Salem)
Flow Capacity (Mejerda, Upstream of Sidi Salem)
En
d o
f S
idi
Sale
m
Reserv
oir
Kasseb
Riv
er
Bo
u S
ale
m
Bo
u H
eu
rtm
a R
iver
Tessa R
iver
Mell
eg
ue R
iver
Jen
do
ub
a
Rara
i R
iver
Gh
ard
imao
u
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0 20000 40000 60000 80000 100000 120000 140000 160000
Distance from Sidi Salem Reservoir (m)
Dis
ch
arg
e (
m3/s
)
Flow Capacity (enlarged) (Mejerda, Upstream of Sidi Salem)
En
d o
f S
idi
Sale
m
Reserv
oir
Kasseb
Riv
er
Bo
u S
ale
m
Bo
u H
eu
rtm
a R
Tessa R
iver
Mell
eg
ue R
iver
Jen
do
ub
a
Rara
i R
iver
Gh
ard
imao
u
Sid
i Is
0
250
500
750
1000
1250
1500
1750
2000
0 20000 40000 60000 80000 100000 120000 140000 160000
Distance from Sidi Salem Reservoir (m)
Dis
ch
arg
e (
m3/s
)
Profile : Mejerda, Upstream of Sidi Salem Dam
Kasseb
Riv
er
Bo
u H
eu
rtm
a R
iver
Tessa R
iver
Bo
u S
ale
m
Mell
eg
ue R
iver
Jen
do
ub
a
Rara
i R
iver
Gh
ard
imao
u
En
d o
f S
idi
Sale
m R
eserv
oir
Sid
i Is
100
120
140
160
180
200
220
240
260
0 20000 40000 60000 80000 100000 120000 140000 160000
Distance from Sidi Salem Reservoir (m)
Ele
vati
on
(m
.NG
T)
Left Bank
Right Bank
Lowest BedLowest Bed
250400 m3/s �500400250-350 200-250Capacity
m3/s
F-3
![Page 5: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/5.jpg)
Bed slope : 1/ 1900 1/ 3000 1/ 2200 1/ 1800 1/ 2500 1/ 2300 1/ 2200
i = 0.0005263 0.0003333 0.0004545 0.0005556 0.0004000 0.0004348 0.0004545
Figure 4.2.3 Present Riverbed Profile and Flow Capacity (Mejerda, Downstream of Sidi Salem)
Flow Capacity of River Channel (Survey in 2007 by MARH)
Bri
dg
e
GP
5
Bri
dg
e P
.An
darr
ou
s,
Meje
z E
l B
ab
El
Batt
an
e w
ei r
Bri
dg
e
Bri
dg
e (
near
Teb
ou
rba)
Bri
dg
e G
P7
Old
bri
dg
e i
n J
ed
eid
a)
Bri
dg
e
Hig
hw
ay
Bri
dg
e
Bri
dg
e G
P8
Bri
dg
e T
ob
ias
Bri
dg
e
Larr
ou
sia
Dam
Sid
i S
ale
m D
am
Estu
ary
El
Herr
i W
eir
& p
um
pin
g
st.
0
400
800
1,200
1,600
2,000
0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000
Distance from Sidi Salem Dam (m)
Dis
ch
arg
e (
m3/s
)
Flow Capacity of River Channel (Survey in 2007 by MARH)
Sid
i S
ale
m D
am
Bri
dg
e G
P5
Co
nf.
wit
h S
ilia
na R
.
Bri
dg
e
El
Batt
an
e w
eir
La
rro
usia
Da
m
To
bia
s M
ob
Da
m
Hig
hw
ay
Bri
dg
e
Bri
dg
e
Bri
dg
e G
P8
Estu
ary
El
Herr
i W
eir
&
pu
mp
ing
st.
Brid
ge P
.An
da
rro
us,
Meje
z E
l B
ab
Bri
dg
e
Old
bri
dg
e i
n J
ed
eid
a
0
100
200
300
400
500
600
700
800
900
1,000
0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000
Distance from Sidi Salem Dam (m)
Dis
ch
arg
e (
m3/s
)
150-200 m3/s400m3/s 250-350 m3/s 300-150m3/s250-300m3/s
Longitudinal Profile of Majerda River (Survey in 2007 by MARH)
Sid
i S
ale
m D
am
Bri
dg
e
GP
5
Co
nf.
wit
h S
ilia
na R
.
Bri
dg
e
El
Batt
an
e w
eir
La
rro
usia
Da
m
To
bia
s M
ob
Da
m
Hig
hw
ay
Bri
dg
e
Bri
dg
e
Bri
dg
e G
P8
Estu
ary
,
El
Herr
i W
eir
& p
um
pin
g s
t.
Brid
ge P
.An
da
rro
us,
Meje
z E
l B
ab
Bri
dg
e
Old
bri
dg
e i
n J
ed
eid
a
-20
0
20
40
60
80
100
120
0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000
Distance from Sidi Salem Dam (m)
Ele
vati
on
(m
.NG
T)
Lowest Bed
River bank
(Left and Right)
F-4
![Page 6: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/6.jpg)
O
.Mejerda
O. Kasseb
O. Bou H eurtm
a
O. Rarai
O. M
elle
gue
O.Te
ss
a
O. Silia
na
O. C
haflo
u
La Méditeranée
Tunisie
Algérie
Legend
Inundated Area of 1973 Flood
Major River
Basin Boundary
International Border
Figure 4.3.2 Inundation Map of 1973 Mar Flood
F-5
![Page 7: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/7.jpg)
Melila
Ben M’Tir
Kasseb
Towns along
Pipeline
Greater
Tunis
Cap
Bon
Medjerda River
Bou
Heurtma
Mellegue
Figure 5.1.1 Schematic Diagram of Dams and Water Transfer Schemes of the Mejerda River Basin
Tessa
Sarrat
Zouitina
BarbaraComplex
Sidi Salem
Mellegue II
El Aroussia
Sahel
Sfax
(Chafrou)
Mateur
Bejaoua
P
R’Mil
Lakhmes
Siliana
Khaled
Cap Bon Canal
Joumine -Sejnane
Pipeline
1.0 m3/s
0.9 m3/s
4.6 m3/s
7.0 m3/s
16.0 m3/s 8.8 m3/s
Beja
5.0 m3/s
3 x 4.0 m3/sDam (existing)
Dam (in
progress)
Dam (proposed)
River
Pipeline
Legend
(Zerga) independent reservoir
F-6
![Page 8: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/8.jpg)
Figure 5.1.2 Schematic Diagram of the Dams and Water Transfer Schemes of the Extreme North
El Kebir
(Zerga)
El Moula
Sidi Barrak Sejnane
Joumine
Bizerte
ZiatineGamgou
m El Harka
P
Douimis
Melah
(Ghezala)
Tine
Mateur
P
P
P
Joumine -Sejnane
Pipeline
3 x 4.0 m3/
s
3 x 4.0 m3/
s
2 x 4.2 m3/
s2.0 m3/s1.4 m3/s
MEDITERRANEAN SEA
0.68 m3/s 0.4 m3/s 2.35 m3/s 4.0 m3/s
1.25 m3/s
0.87 m3/s
Dam
(existing)Dam (in
progress)
Dam (proposed)
River
Pipeline
Legend
(Zerga) independent
reservoir
F-7
![Page 9: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/9.jpg)
Figure 5.5.1 Locations of Sub-catchments in Mejerda River Basin
F-8
![Page 10: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/10.jpg)
Fig
ure 5
.6.1
Ov
era
ll FF
WS
in th
e M
eje
rd
a R
iver B
asin
Instruction
Ministry of Agriculture
Ministry of Interior
DGBGTH
National Disaster Commission
Reporting
Civil Protection
National Security
National Guard
Coordination among representatives of the respective Ministries
Instruction
Instruction
Control
Coordination at Central Level
Regional Disaster Commission
Governorate Office
Regional C.P.
Regional Police
Regional N.G.
Dam
CRDA
IRESADatabase
DGRECall
Center
Data Transmission
Store
Minister of Agriculture
Coordination
Minister of Interior
NationalPolice
Police
WarningWarning
GovernorRequisitionManpower
Equipments
Engines
Buildings
Cooperation at Private Level
Civil volunteers
Summons
Coordination at Regional Level
Technical instruction
AccessC.P. Warning
Announcement
Warning
N.G.
CRDA
Source: Interviews with MARH
F-9
![Page 11: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/11.jpg)
MINISTER OF AGRICULTURE AND
HYDRAULIC RESOURCES (MARH)
STATE SERCRETARY TO THE MINISTRY OF
AGRICULTURE AND HYDRAULIC
RESOURCES IN CHARGE OF FISHERY
SECRETARY GENERALPRINCIPAL PRIVATE SECRETARY
General Direction of
Organisation Computers, the
Management of Documents
and Documentation
General Direction of the
Administrative and Financial
Services
General
Direction
of Judicial
and Land
Affairs
38irection of
Financing,
Investments
and
Professional
Organisms
General
Direction of
Studies and
Agricultural
Development
General
Direction of
Agricultural
Production
General
Direction of
Protection and
the Quality
Control of the
Agricultural
Products
General
Direction of
Veterinary
Services
General
Direction of
Fishery and
Fish
Farming
General
Direction of
Forest
General
Direction of
Development
and
Preservation
of
Agricultural
Lands
General
Direction of
Rural
Engineering
and Water
Exploitation
(DGGREE)
General
Direction of
Water
Resources
(DGRE)
General
Direction of
Dams and
Large
Hydraulic
Works
(DGBGTH)
Regional Services
24 Regional
Commissaries for
Agricultural
Figure 5.8.1 Organizational Structure of Ministry of Agriculture and Hydraulic Resources (MARH)
F-10
![Page 12: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/12.jpg)
Figure 7.2.1 Zone Divisions for Estimate of Basin Average Rainfall (1/3)
Overall Division of Study Area for Flood Control Planning
U1 : Algerian border - Mejerda & Mellegue Conf. (Mejereda)
M : Mellegue & Sarrath Conf. - Mejerda & Mellegue Conf. (Mellegue)
U2 : Mejerda & Mellegue Conf. - Sidi Salem Dam
D1 : Sidi Salem Dam - Larrousia Dam
D2 : Larrousia Dam - Estuary
M
U2 D1
D2
U1
Runoff Zone: HY-M (4561 km2)
Base Point: BP-M Mejerda & Mellegue Conf.
Legend
Runoff directly
drained to the
F-11
![Page 13: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/13.jpg)
Runoff Zone: HY-U1 (1154 km2)
Base Point: BP-U1 Mejerda & Mellegue Conf.
Runoff Zone: HY-U2 (10414 km2)
Base Point: BP-U2 Sidi Salem Dam
Figure 7.2.1 Zone Divisions for Estimate of Basin Average Rainfall (2/3)
Legend
Runoff directly
drained to the
F-12
![Page 14: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/14.jpg)
Runoff Zone: HY-D1 (14172 km2)
Base Point: BP-D1 Larrousia Dam
Runoff Zone: HY-D2t (15645 km2)
Base Point: BP-D2 Estuary
Figure 7.2.1 Zone Divisions for Estimate of Basin Average Rainfall (3/3)
Legend
Runoff directly
drained to the
F-13
![Page 15: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/15.jpg)
AF
- 25
Figure 7.2.2 Basin Division for Runoff Analysis
F-14
![Page 16: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/16.jpg)
Figure 7.2.3 Schematic Diagram of River Network for Probable Flood Computation
HY-AU1
BP-AU1(Ghardimaou)
BP-U1(Mejerda& Mellegue
Conf.)
HY-D2p12
BP-D1(Larrousia)
HY-D2tp13
BP-D2t(Estuary)
HY-**
Legend
Sub-catchment(Natural runoff computed)
BP-**
River reaches
Base point(Hydrograph to be derived)
HY-**Sub catchmentin Algeria
BP-** Base point(Hydrograph given)
BP-** Base point(Not downstream end)
Probable Flood for U1
Design Flood for M
Design Flood for U2
Design Flood for D1 and D2t
HY-U1
Basin average
rainfall applied
HY-U1
HY-M
HY-U2
HY-U2
Selected Seven Dams
HY-AM
BP-AM(Mellegue&
Sarrath Conf.)
BP-M(Mejerda& Mellegue
Conf.)
HY-Mp1HYd-Sr
HY-Mp2
BPd-Sr
BPd-Mg(Mellegue Dam)
HY-AU1
BP-U2(Sidi Salem)
HY-U2p13
BP-AU1(Ghardimaou)
HY-AM
BP-AM(Mellegue&
Sarrath Conf.)
HY-Mp1HYd-Sr
BPd-Sr
BPd-Mg(Mellegue Dam)
BP-U1
(Mejerda& Mellegue
Conf.)
HYd-Bh
BPd-Bh(Bou Heurtma Dam)
HYd-Ts
BPd-Ts(Tessa Dam)
Upstream of the Sidi Salem :
Same to the model for U2
HYd-Sl
BPd-Sl(Siliana Dam)
HY-U2p11
HY-U2p12
HY-U2p11
BP-U2
(Sidi Salem)
F-15
![Page 17: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/17.jpg)
Excess
D : Duration of excess rainD
V / 2
TcvLg
Lg + D/2
Dimensionless Unit Hidrograph
32.5
0.01
0.1
1
10
100
0 100 200 300 400 500 600
% of (Lg + D/2)
log
q x
(L
g+
D/2
)/V
q: Discharge(Lg+D/2) : Lag time (Begining ofexcess rain - 1/2 of total volume ofexcess runoff)V : Volume
(1) Dimensionless unit hydrograph applied
Lg+D/2 can be taken equal to Tcv whenrainfall data availability is limited.
(2) Definition of Tcv and (Lg+D/2)
Figure 7.2.4 Dimensionless Unit Hydrograph
Instead of Lg+D/2 (Time from the centre of the excess rain totime of occurrence of on-half volume of hydrograph, Tcv (timefrom the beginning of rise of net hydrograph to time ofoccurrence of on-half volume of hydrograph) can be applied .The lag time can be explained by the following equation.
Tcv = C x (L x Lca / �Sst)0.38
where; Tcv: Lag time. Time from the beginning of rise of nethydrograph to time of occurrence of on-half volume ofhydrograph . C: Constant, 0.72 for foothill drainage area L: Mainstream length from outlet to watershed Lca: Mainstream length from outlet to watershed centroid Sst: Overall slope of mainstream
F-16
![Page 18: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/18.jpg)
Unit Excess Rain : 10 mm Unit Excess Rain : 10 mm
Unit rainfall duration: 1 hr Unit rainfall duration: 1 hr
qmax : 527 m3/s qmax : 983 m3/s
Runoff Zone : HY-U1 (1154 km2) Runoff Zone : HY-U2p12 (1664 km2)
Base point : BP-U1 Mejerda & Mellgue Conf. Base point : BP-U2up Mejerda & BouH. Conf.
Unit Excess Rain : 10 mm Unit Excess Rain : 10 mm
Unit rainfall duration: 1 hr Unit rainfall duration: 1 hr
qmax : 653 m3/s qmax : 1053 m3/s
Runoff Zone : HY-U2p13 (1630 km2) Runoff Zone : HY-D2tp11 (1626 km2)
Base point : BP-D2 Sidi Salem Dam Base point : BP-D1up2 Mejerda & Siliana Conf.
Unit Excess Rain : 10 mm Unit Excess Rain : 10 mm
Unit rainfall duration: 1 hr Unit rainfall duration: 1 hr
qmax : 441 m3/s qmax : 678 m3/s
Runoff Zone : HY-D2tp12 (1092 km2) Runoff Zone : HY-D2tp13 (1473 km2)
Base point : BP-D1 Larrousia Dam Base point : BP-D2 Estuary
Unit Hydrograph
0
100
200
300
400
500
600
0 20 40 60
t (hour)
q (
m3
/s)
0
10
20
30
40
50
60
70
Exc
ess
Ra
in (
mm
)
Excess Rain
Unit Hydrograph
0
200
400
600
800
1000
1200
1400
0 20 40 60
t (hour)
q (
m3
/s)
0
10
20
30
40
50
60
70
Exc
ess
Ra
in (
mm
)
Excess Rain
Unit Hydrograph
0
500
1000
1500
2000
2500
0 20 40 60
t (hour)
q (
m3
/s)
0
10
20
30
40
50
60
70
Exc
ess
Ra
in (
mm
)
Excess Rain
Unit Hydrograph
0
500
1000
1500
2000
2500
0 50 100 150 200
t (hour)
q (
m3
/s)
0
10
20
30
40
50
60
70
Exc
ess
Ra
in (
mm
)
Excess RainUnit Hydrograph
0
500
1000
1500
2000
2500
0 50 100 150 200
t (hour)
q (
m3
/s)
0
10
20
30
40
50
60
70
Exc
ess
Ra
in (
mm
)
Excess Rain
Unit Hydrograph
0
100
200
300
400
500
600
700
0 20 40 60
t (hour)
q (
m3
/s)
0
10
20
30
40
50
60
70
Exc
ess
Ra
in (
mm
)
Excess Rain
Figure 7.2.5 Examples of Unit Hydrographs for Sub-catchment
F-17
![Page 19: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/19.jpg)
Bou Heurtma Dam
Kasseb R.
Sidi Salem Dam
Sea
(Gulf of Tunis)
Highway
Tessa R.
Mellegue R.
Mellegue Dam
Bou Salem
K13
El Battane
Jendouba
Bou Salem
Rarai R.
Mejez El Bab
Mliz R.
Beja R.
Slouguia
Zerga R.
Algeria
Alg
eria
Figure 7.2.6 Probable Discharge Distribution (1/3)
Present Condition : Standard Dam Operation )
Laroussia Dam
Tobias Dam
Chafrou R.
Sarrath R.
Lahmar R.
Jedeida
Mejez El Bab
El Herri
Rm
el R
.
Testour
Bou Heurtma R.
Alg
eria
Siliana Dam
Sid
i Me
die
n
Siliana R.
Rmil R.
Me
jerd
a R
�
Ghardimaou
Bajer R.
Khalled R.
60
10
42
50
23
20
13
30
93
0
53
50
28
00
12
40
68
04
30
57
70
33
00
18
00
60
03
30
Estuary
22
50
18
30
11
50
79
05
20
63
00
41
90
22
60
10
50
68
0
13
20
89
05
20
34
02
10
12
30
85
04
80
31
01
90
24
30
17
30
10
80
75
04
90
16
50
11
80
74
05
10
33
0
66
00
45
30
24
50
15
40
10
40
U1
55
00
30
30
13
00
71
04
90
JendoubaM
U2
D1 & D2
BP
-AM
44
20
33
00
21
20
13
70
93
0
48
60
28
70
12
30
68
04
50
42
30
26
70
11
60
65
04
40
61
00
44
50
28
20
18
80
12
60
Flood Discharge
100-year50-year20-year10-year5-year
Major WL / dischargegauging stations
Dam (Existing)
Major cities/towns
River
Dam (Notconsidered forflood control)
Zone division for floodcontrol planning
LEGEND
Basic Flood Dishcarge(20-year for U2, 10-yearfor U1, D1 and D2)
F-18
![Page 20: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/20.jpg)
Bou Heurtma Dam
Kasseb R.
Sidi Salem Dam
Sea
(Gulf of Tunis)
Highway
Tessa R.
Mellegue R.
Mellegue Dam
Mellegue 2 Dam
Bou Salem
K13
El Battane
Jendouba
Bou Salem
Rarai R.
Mejez El Bab
Mliz R.
Beja R.
Slouguia
Zerga R.
Algeria
Alg
eria
Figure 7.2.6 Probable Discharge Distribution (2/3)
(After Project : Recommended Improved Dam Operation 2030 )
Laroussia Dam
Tobias Dam
Chafrou R.
Sarrath R.
Lahmar R.
Jedeida
Mejez El Bab
El Herri
Rm
el R
.
Sarrath Dam
Testour
Bou Heurtma R.
Alg
eria
Siliana Dam
Sid
i Me
die
n
Siliana R.Rmil R.
Me
jerd
a R
�
Ghardimaou
Bajer R.
Khalled R.
53
60
35
80
17
70
10
90
67
0
34
00
20
90
70
04
10
17
0
44
50
24
20
11
00
41
01
20
35
60
21
90
81
04
90
34
0
33
70
20
60
93
06
50
44
0
Estuary
22
50
18
30
11
50
79
05
20
52
40
33
30
14
90
89
04
80
68
03
10
40
30
30
12
10
83
04
60
28
01
60
24
30
17
30
10
90
75
04
90
16
50
11
80
74
05
10
33
0
58
60
38
70
18
40
11
30
67
0
66
90
48
50
30
50
20
10
13
20
U1
37
50
23
30
88
06
00
42
0
JendoubaM
U2
D1 & D2
BP
-AM
44
20
33
00
21
20
13
70
93
0
Tessa Dam
14
10
94
05
20
31
01
80
Flood Discharge
100-year50-year20-year10-year5-year
Major WL / dischargegauging stations
Dam (Existing)
Major cities/towns
River
Dam (Notconsidered forflood control)
Zone division for floodcontrol planning
LEGEND
F-19
![Page 21: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/21.jpg)
(Bou Heurtma Dam)
Kasseb R.
(Sidi Salem Dam)
Sea
(Gulf of Tunis)
Highway
Tessa R.
Mellegue R.
(Mellegue Dam)
Bou Salem
K13
El Battane
Jendouba
Bou Salem
Rarai R.
Mejez El Bab
Mliz R.
Beja R.
Slouguia
Zerga R.
Algeria
Alg
eria
Figure 7.2.6 Probable Discharge Distribution (3/3)
(Assumed to be without Dam)
Laroussia Dam
Tobias Dam
Chafrou R.
Sarrath R.
Lahmar R.
Jedeida
Mejez El Bab
El Herri
Rm
el R
.
(Sarrath Dam)
Testour
Bou Heurtma R.
Alg
eria
(Siliana Dam)
Sid
i Me
die
n
Siliana R.Rmil R.
Me
jerd
a R
�
Ghardimaou
Bajer R.
Khalled R.
65
50
48
20
30
50
20
70
13
80
69
00
43
00
27
20
18
50
12
30
52
00
37
90
24
00
16
40
10
90
Estuary
22
50
18
30
11
50
79
05
20
67
50
50
30
31
90
21
50
14
30
24
30
17
30
10
80
75
04
90
16
50
11
80
74
05
10
33
0
71
10
52
70
33
40
22
50
15
00
U1
65
60
48
10
30
50
20
70
13
80
JendoubaM
U2
D1 & D2
BP
-AM
44
20
33
00
21
20
13
70
93
0
(Tessa Dam)
21
50
15
40
96
06
60
43
0
61
00
44
50
28
20
18
80
12
60
Flood Discharge
100-year50-year20-year10-year5-year
Major WL / dischargegauging stations
Dam (Existing)
Major cities/towns
River
Dam (Notconsidered forflood control)
Zone division for floodcontrol planning
LEGEND
F-20
![Page 22: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/22.jpg)
Figure 7.2.7 Specific Discharge
0.01
0.1
1
10
100 1000 10000 100000Catchment Area (km2)
Spe
sific
Dis
char
ge (
m3/
s/km
2)
200y
100y
50y
20y
10y
5y
2y
5y
2y
10y
20y
50y
100y
200y
Ghardimaou G/S
K13 G/S
AF
-32
F-21
![Page 23: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/23.jpg)
GP5
GP7
GP
8
GP6
To Tunis
To Tunis
To Bou Salem
Highw
ay
HighwayGP5
To Tunis
GP5
GP7
GP
8
GP6
To Tunis
To Tunis
To Bou Salem
Highw
ay
HighwayGP5
To Tunis
Inundation Depth
(m)
0
0.001-0.5
0.5 - 1
1 - 2
2 - 3
3 - 4
4 or more
Legend
Proposed River Improvement
Major Road
Railway
Channel Excavation/
Widening
(B: Bottom width)
Embankment *
Bypass Channel
Retarding Basin
* : Not all reaches along this symbol require embankment.
Embankments are to be partially installed on reaches
whose bank elevation is lower than design water level.
AFTER PROJECT (Step 2)
(Improved Dam Operation
+ River Improvement)
AFTER PROJECT (Step 1)
(Improved Dam Operation)
BEFORE PROJECT
(Present Condition)
With
Present standard dam operation of
selected existing dams :
Sidi Salem Dam
Siliana Dam
With
Improved Dam Operation (2030) of
selected dams :
Sidi Salem Dam
Siliana Dam
With
Improved Dam Operation (2030) of
selected dams :
Sidi Salem Dam
Siliana Dam
River Improvement :
Channel excavation/widening
Embankment
Bypass channel
Retarding basin
N
Jedeida
El Battane
Larrousia Dam
El Herri
Tobias Dam
Mejez El Bab
Slouguia
Sidi Salem Dam
Siliana Dam
da R
iver
Meje
r
Chafrou River
N
Jedeida
El Battane
Larrousia Dam
El Herri
Tobias Dam
Mejez El Bab
Slouguia
Sidi Salem Dam
Siliana Dam
da R
iver
Meje
r
Chafrou River
Retarding Basin
Inlet Channel
Sidi Salem Dam
Tobias
Mobile Dam
Siliana Dam
B = 2
5 m
Bypass
Channel
B = 15mB = 20 m
B = 20m
GP5
GP7
GP8
GP6
To Tunis
To Tunis
To Bou Salem
Jedeida
Meje
rda R
iver
Slouguia
Mejez El Bab
El Herri
Larrousia Dam
El Battane
N
Chann
elExc
avat
ion/
Wid
enin
gB =
25m
B = 3
5m
B =
25m
Channel Exc
avat
ion/
Wid
enin
gC
hann
el Excavation/
Widening
B = 25 m
Channel Excavation/W
idenin
g
Figure 7.3.1 Inundation before and after Project (1/3) : Zone D1 and D2 (for Selected Flood Protection Level : 10 year probability)
F-2
2
![Page 24: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/24.jpg)
Channel Excavation/Widening
B = 10m
Channel Excavation/W
idening
B = 10m
Chann
el Exc
avat
ion/W
idenin
g
B = 1
5m
Chan
nel E
xcava
tion/
Wid
en
ing B
= 1
5m
Inundation Depth
(m)
0
0.001-0.5
0.5 - 1
1 - 2
2 - 3
3 - 4
4 or more
Legend
Channel Excavation/
Widening
(B: Bottom width)
Proposed River Improvement
Railway
Major Road
Embankment *
Bypass Channel
* : Not all reaches along this symbol require embankment.
Embankments are to be partially installed on reaches
whose bank elevation is lower than design water level.
Figure 7.3.1 Inundation before and after Project (2/3) : Zone U1 and M (for Selected Flood Protection Level : 10 year probability)
AFTER PROJECT (Step 2)
(Improved Dam Operation
+ River Improvement)
AFTER PROJECT (Step 1)
(Improved Dam Operation)
BEFORE PROJECT
(Present Condition)
Mellegue Dam and Sarrath Dam
Mellegue Dam
With
Present standard dam operation of
selected existing dams :
Mellegue Dam
With
Improved Dam Operation (2030) of
selected dams :
Mellegue Dam
Sarrath Dam
With
Improved Dam Operation (2030) of
selected dams :
Mellegue Dam
Sarrath Dam
River Improvement :
Channel excavation/wideningMellegue Dam and Sarrath Dam
Mellegue R
iver
Rarai River
Mejerda River
GP6
Jendouba
Ghardimaou
Meje
rda R
iver
To Bou Salem
N
N
Mellegue R
iver
Rarai River
Mejerda River
GP6
Jendouba
Ghardimaou
Meje
rda R
iver
To Bou Salem
N
Mellegue R
iver
Rarai River
Mejerda River
GP6
Jendouba
Ghardimaou
Meje
rda R
iver
To Bou Salem
F-2
3
![Page 25: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/25.jpg)
To B
eja
GP6
To B
eja
GP6
To B
eja
GP6
N
Channel Excavation/Widening
B = 10m
Bypass Channel
B = 25m
8.0 km
Channel E
xcava
tion/
Wid
enin
g B
= 1
5 m
Channel Excavation/
Widening B = 50 m
+ Embankment
Channel Excavation/Widening
+ Embankment B = 40m
Channel Excavation/
Widening B = 50 m Embankment (+ No Excavation)
Inundation Depth
(m)
0
0.001-0.5
0.5 - 1
1 - 2
2 - 3
3 - 4
4 or more
Legend
Channel Excavation/
Widening
(B: Bottom width)
Proposed River Improvement
Railway
Major Road
Embankment *
Bypass Channel
* : Not all reaches along this symbol require embankment.
Embankments are to be partially installed on reaches
whose bank elevation is lower than design water level.
Figure 7.3.1 Inundation before and after Project (3/3) : Zone U2 (for Selected Flood Protection Level : 20 year probability)
AFTER PROJECT (Step 2)
(Improved Dam Operation
+ River Imrovement)
AFTER PROJECT (Step 1)
(Improved Dam Operation)
BEFORE PROJECT
(Present Condition)
Mellegue Dam and Sarrath Dam TessaDam
Tessa River
Jendouba
Mel
legu
e Riv
er
Mejerda River
Bou Heurtma Dam
Sidi Salem
Reservoir
Beja
Riv
er
Bou Salem
Tessa River
Jendouba
Mel
legu
e Riv
er
Mejerda River
Bou Heurtma Dam
Sidi Salem
Reservoir
Beja
Riv
er
Bou Salem
N
Mellegue Dam and Sarrath Dam TessaDam
Bou Heurtm
a River
N
Tessa River
Jendouba
Mel
legu
e Riv
er
Mejerda River
Bou Heurtma Dam
Sidi Salem
Reservoir
Beja
Riv
er
Bou Salem
Mellegue Dam
Bou Heurtm
a River
With
Present standard dam operation of
selected existing dams :
Mellegue Dam
Bou Heurtma Dam
With
Improved Dam Operation (2030) of
selected dams :
Mellegue Dam
Bou Heurtma Dam
Tessa Dam
Sarrath Dam
With
Improved Dam Operation (2030) of
selected dams :
Mellegue Dam
Bou Heurtma Dam
Tessa Dam
Sarrath Dam
River Improvement :
Channel excavation/widening
Embankment
Bypass channel
Kasse
b Ri
ver
Kasse
b Ri
ver
Bou Heurtm
a River
Kasse
b Ri
ver
F-2
4
![Page 26: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/26.jpg)
Figure 8.2.1 General Plan of Coordinated Operation of Dams (1/2)
Coordinated Operation of Sidi Salem Reservoir
Sidi Salem Reservoir (Existing)
reservoirs to be coordinated
discharge reference points
check point of coordination effect
55 to 70 %
effect of coordinated operation
(peak discharge under coordinated operation in target year 2030 / peak discharge under standard operation)
68 to 86 %
Bou Heurtma
Mellegue
Mellegue 2
Siliana
Legend
Bou SalemJendouba
Ghardimaou
Sidi Medienne
Jebel Laoudj
Slouguia
Coordinated Operation of Mellegue Reservoir
Mellegue Reservoir (Existing)
reservoirs to be coordinated
discharge reference points
check point of coordination effect
55 to 70 %
effect of coordinated operation
(peak discharge under coordinated operation in target year 2030 / peak discharge under standard operation)
Bou Heurtma
Sidi Salem
Mellegue 2
Tessa
Legend
Sarrath
64 to 88 %
66 to 85 %
Sidi Medienne
K 13
Algerian border
Sarrath Pont Route
Bou Salem
Jendouba
Coordinated Operation of Bou Heurtma Reservoir
Bou Heurtma Reservoir (Existing)
reservoirs to be coordinated
discharge reference points
check point of coordination effect
55 to 70 %
effect of coordinated operation
(peak discharge under coordinated operation in target year 2030 / peak discharge under standard operation)
Ben Metir
Mellegue
Tessa
Legend
64 to 88 %
Bou Salem
Fernana
Jendouba
Sidi Medienne
�
Coordinated Operation of Siliana Reservoir
Siliana Reservoir (Existing)
reservoirs to be coordinated
discharge reference points
check point of coordination effect
55 to 70 %
effect of coordinated operation
(peak discharge under coordinated operation in target year 2030 / peak discharge under standard operation)
68 to 86 %
Sidi Salem
Legend Lakhmes
Bou Salem Slouguia
Jebel Laoudj
Entree Plaine Siliana
�
F-25
![Page 27: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/27.jpg)
Figure 8.2.1 General Plan of Coordinated Operation of Dams (2/2)
Coordinated Operation of Mellegue 2 Reservoir
Mellegue 2 Reservoir (Future)
reservoirs to be coordinated
discharge reference points
Bou HeurtmaSidi Salem
Mellegue
Tessa
Legend
Sarrath
Jendouba
Sidi Medienne
K 13
RMel Pont Route
Algerian border
Sarrath Pont Route
�
Coordinated Operation of Sarrath Reservoir
Sarrath Reservoir (Future)
reservoirs to be coordinated
discharge reference points
Mellegue 2
Mellegue
Legend
Sarrath Pont Route
RMel Pont RouteK 13
Algerian border
Sidi Abdelkader
�
Coordinated Operation of Tessa Reservoir
Tessa Reservoir (Future)
reservoirs to be coordinated
discharge reference points
Bou Heurtma
Mellegue
Legend
Sers Ville
Bou Salem
Jendouba
F-26
![Page 28: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/28.jpg)
Figure 8.3.1
Division of Zones in
Priority at El Mabtouh Plain
F-27
![Page 29: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/29.jpg)
Figure 8.3.2 Present Conditions of Sluiceways along El Mabtouh Canal
F-28
![Page 30: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/30.jpg)
Figure 8.3.3 Present Conditions of Sluiceways along El Mabtouh Canal
F-29
![Page 31: Figures - JICABed slope : zero 1/ 2350 1/ 2800 1/ 1120 1/520, 1/280, 1/120 i = 0.0000000 0.0004255 0.0003571 0.0008929 Topographic Survey Applied : Survey in 2007 by JICA Study Team](https://reader035.vdocuments.site/reader035/viewer/2022071507/612830f9bcc10a215b6a2bd2/html5/thumbnails/31.jpg)
Figure 8.3.4 Location Map of Existing Sluiceways along El Mabtouh Canal
F-30