figure 2. composite longitudinal projection of the co-o...
TRANSCRIPT
Figure 2. Composite longitudinal projection of the Co-O Mine showing the diatreme and the 979 drill holes not yet included in the resource model.
TRANSCRIPT
Figure 2. Composite longitudinal projection of the Co-O Mine showing the diatreme and the 979 drill holes not yet included in the resource model.