figure 116026-10 - preferred route option · project no: date: 04/11/2016 report on consultation...

1
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Title: Project: Drawn by: Drawing: LT91 EM 116026/ROC/1 Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database right 2015 all rights reserved. Ordnance Survey Licence number EL273236. Project No: Date: 04/11/2016 Report on Consultation Figure 1 Preferred Route Option Fort Augustus - Skye Project Key: Corridor Section Divider Route Options Preferred Route Option 0 4 8 12 ,16 20 Kilometers Scale - 1:400,000 120 120000m. E 130 130 140 140 150 150 160 160 170 170 180 180 190 190 200 200 210 210 220 220 230 230 240 240 7 60 000m. N 760 770 770 780 780 790 790 800 800 810 810 820 820 830 830 840 840 850 850 860 860

Upload: others

Post on 18-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Figure 116026-10 - Preferred Route Option · Project No: Date: 04/11/2016 Report on Consultation Figure 1 Preferred Route Option Fort Augustus - Skye Project Key: Corridor Section

Section 1

Section 2

Section 3

Section 4

Section 5

Section 6

Title:

Project:

Drawn by:

Drawing:

LT91

EM

116026/ROC/1

Reproduced by permission of Ordnance Survey on behalf of HMSO.Crown copyright and database right 2015 all rights reserved.

Ordnance Survey Licence number EL273236.

Project No:

Date: 04/11/2016

Report on Consultation

Figure 1

Preferred Route Option

Fort Augustus - Skye Project

Key:

Corridor

Section Divider

Route Options

Preferred Route Option

0 4 8 12 ,16 20Kilometers

Scale - 1:400,000

120

120000m.E

130

130

140

140

150

150

160

160

170

170

180

180

190

190

200

200

210

210

220

220

230

230

240

240

760

000m

. N

760

770 770

780 780

790 790

800 800

810 810

820 820

830 830

840 840

850 850

860 860