The existing transmission line begins at the Fieldale Substation along Appalachian Drive and exits the substation to the east. The line continues south, crosses Route 220 at two separate points and travels through Sheffield Substation off Joseph Martin Highway. The upgrades travel through Ridgeway Substation on Old Mill Road and conclude at a pole near the Virginia-North Carolina border.
This project involves rebuilding approxi-mately 15 miles of 138-kilovolt transmission line in or near existing right-of-way.
The improvements: • Upgrade equipment that caused multiple
service interruptions in the last few years for customers served by Appalachian Power's Sheffield and Ridgeway substations.
• Replace deteriorating 1940s wooden poles with steel poles.
• Increase electric reliability in the area.
WHAT WHY WHERE
FIELDALERIDGEWAY TRANSMISSION LINE REBUILD PROJECT
Appalachian Power representatives plan to increase electric
reliability in Henry County by updating the local electric
transmission system. The Fieldale - Ridgeway Transmission Line
Rebuild Project involves upgrading approximately 15 miles of
transmission line. Company representatives expect to file an
application with the Virginia State Corporation Commission in fall
2021, with approval expected within one year. If approved,
construction begins in fall 2023 and concludes in summer 2025.
PROJECT SCHEDULE
PROJECT IN SERVICESummer 2025
TREE CLEARING/PRE-CONSTRUCTION ACTIVITIESFall 2023
ANTICIPATED APPROVAL FROM THE SCC*Fall 2022
PROJECT ANNOUNCEMENT & VIRTUAL OPEN HOUSEMarch 2021
SCC* FILINGFall 2021
**Timeline subject to change.**Timeline subject to change.*SCC: Virginia State Corporation Commission.*SCC: Virginia State Corporation Commission.
LANDOWNER COMMUNICATION/SURVEY WORKSummer 2021
2021 2022 2024 20252023 2026
RIGHT-OF-WAY DISCUSSIONS BEGINSpring 2022
TRANSMISSION LINE CONSTRUCTIONWinter 2023
MARRO
WBO
NE CR
EEK
MARRO
WBO
NE CR
EEK
SMITH RIVERSMITH RIVER
BUS220
58
220
87
174
457
SHEFFIELDSUBSTATION
FIELDALESUBSTATION
RIDGEWAYSUBSTATION
FIELDALEFIELDALE
COLLINSVILLECOLLINSVILLE
MARTINSVILLEMARTINSVILLE
HORSE PASTUREHORSE PASTURE
RIDGEWAYRIDGEWAY
VILLAHEIGHTS
VILLAHEIGHTS
JOSE
PH M
ARTI
NHI
GHW
AY
JOSE
PH M
ARTI
NHI
GHW
AY
WILLIAM F STONE
HIGHWAYWILLIAM F STONE
HIGHWAY
MAGN
A VISTA
SCHOOL RD
MAGN
A VISTA
SCHOOL RD
OLD
MIL
L RD
OLD
MIL
L RD
APPALACHIANDRIVE
APPALACHIANDRIVE
FIELDALEPARK
FIELDALEPARK
MAGNA VISTAHIGH SCHOOLMAGNA VISTAHIGH SCHOOL
MARTINSVILLESPEEDWAYMARTINSVILLESPEEDWAY
FORMERDUPONT PLANTFORMERDUPONT PLANT
VIRGINIAVIRGINIA
NORTH CAROLINANORTH CAROLINA
220
BUS
*Exact structure, height and right-of-wayrequirements may vary
Crews plan to rebuild the power line using primarily steel H-frame poles and single poles depending on the location.
Structure Height: Approximately 90 feet*Right-of-Way Width: Approximately 100 feet*
At Appalachian Power, we are committed to meeting the energy needs of customers while protecting the environment and natural beauty of the region.
TYPICAL STRUCTURES
APPALACHIAN POWER VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:
03/16/202103/16/2021
CORTNEY MUSTARDProject Outreach [email protected]/Fieldale-Ridgeway
FIELDALERIDGEWAY TRANSMISSION LINE REBUILD PROJECT
SUBSTATIONEXISTING TRANSMISSION LINE TO BE REBUILT(IN OR NEAR EXISTING RIGHTOFWAY) N
*VISIT APPALACHIANPOWER.COM/FIELDALERIDGEWAY TO VIEW AN INTERACTIVE MAP
Approximately90 feet
Approximately100 feet
Approximately90 feet
Approximately100 feet