field operations - united states army
TRANSCRIPT
2
Field Operations Current Support Contracts
Field OPS currently uses two contracts to accomplish its mission:
Warfighter FOCUS (WFF) Artillery and Chemical Training (ACT)
3
• This acquisition was competitively awarded under full and open competition to a large business
• Single Award, Indefinite Delivery/Indefinite Quantity (IDIQ)
Prime Contractor: Raytheon Information and Intelligence Services (formerly Raytheon Technical Services Company)
Warfighter FOCUS provides worldwide integrated training systems sustainment and training services for the Army, Air Force, Marines, Navy, SOCOM and Multinational Coalition Forces
• Local and Regional contract managers concentrate manpower seamlessly maximizing efficiency • Generates substantial efficiencies by providing cross-trained technicians within a site and across sites in various
disciplines across numerous systems • Warrior Training Alliance led by Raytheon Information and Intelligence Services executes through extensive
teaming - 183 team members including 134 small business team members• Field OPS provides contract oversight• Transition planning for non-maintenance training services on-going• Work will be allowed to stay on WFF as long as necessary to prevent break in training services
Warfighter FOCUS Contract (WFF)
• Two-year base and eight one-year options
• Bridge Contract-extends WFF up to 2 years
31 OCT 2017
Ordering period ends
1 NOV 2007
Ordering period began
• WFF contract has a NEW ceiling of $13.77B
• Net increase of $2.57B• $10.7B obligated through current date
Organization: Field OPSPhone: 407-384-3735Email: [email protected]
4
Field Operations Future Support Contracts
Post 31 Oct 2018, Field OPS will use at least four contracts to accomplish its mission:
ATMP ETSC TRIOSS ACT
5America’s Force of Decisive Action
WFF Transition Contracts Status
ATMP
ETSC
NTC MSN SPT
Phase-In (6 months)
TRIOSS
MTCCS
ScheduleRisk
Jul 17 – Sep 174QTRFY17
Oct 17 – Dec 171QTRFY18
Jan 18 – Mar 182QTRFY18
Apr 18 – Jun 183QTRFY18
Jul 18 – Sep 184QTRFY18
Oct 18 – Dec 181QTRFY19
Jan 19 – Mar 192QTRFY19
WFFWFF Ordering Period
Ends 31 OCT 17
JRTC MSN SPT
JMRC MSN SPT
HTASC
CIO-G6
Projected Contract AwardLegend: Phase-In Contract Full
PerformancePM/COR within PEO STRI
PM/COR outside PEO STRI
WFF Period of PerformanceEnds 31 OCT 18
MAC TOsCompetition
ContractTimeline
Phase-In
UAS IMS
Field OPS Requirements
owner
ACC-Orlando working with non-PEOSTRI Requirements
owners
TO Competitions Phase-In
Full Performance
Full Performance
Full Performance
Full PerformancePhase-In
Phase-In (6 months) Full Performance
Phase-In Full Performance
Full Performance
Phase-In Full Performance
Phase-In Full Performance
TO Competitions – Begin Oct FY conclude Late 4th Qtr FY18
TBD
Provided to Industry in ACC-O PALT Session17 October 2017
6
PdL Combat Training Centers (CTC)National Training Center
Joint Readiness Training Center (JRTC)
Joint Pacific Multinational Readiness Capability (JPMRC)
Joint Multinational Readiness Center (JMRC)
7
PdL Soldier Non-Systems (SNS)
I-MILES Combat Vehicle (CV) TESS
I-MILES IWS 2010 (IWS/2)
Improved Target Acquisition System (ITAS)I-MILES TVS
8
PdL Sustainable Range Program (SRP)
Integrated-MOUT Training Systems (I-MTS)
Fort Campbell CACTF
Digital Range Training System (DRTS)
9
PdL Soldier Systems (SS)
Joint High Speed Vessel Engine Room Simulator (JHSV ERS)
UH-72A Cockpit Procedures Trainer (CPT)
Longbow Crew Trainer (LCT)
Construction Equipment
Virtual Trainers
AH-64E Avionics Visionics Survivability Weapons Trainer
STRYKER Maintenance
Trainer