F HE CO R Consulting Engineers

New Valencia CF Stadium

FHECOR Ingenieros Consultores is a consulting company specialized in structural engineering. Originally created by several associated professionals in 1979, it became a limited share company in 1986. The activities developed by FHECOR include a wide scope of typologies and structural materials, as well as life stages of structures. Regarding structural types, FHECOR has acquired broad experience in: • Road and Railway bridges • Pedestrian and cycling bridges • Underground structures (tunnels and car parking) • Hydraulic Structures (canals, power stations, etc) • Buildings • Light roofs (bull rings, sport facilities, etc) • Special structures (natural gas tanks, industrial plants) • Historical constructions (bridges, cathedrals, singular

buildings). The projects developed by FHECOR have also comprised the use of a variety of structural material, such as concrete, steel, composites, modern and ancient masonry, wood, fabric coating and covering materials, fiber reinforced concrete, etc. Finally, according to life stages of structures, FHECOR Consulting Engineers takes part in each one of the involved activities:

• Conception (design) • Technical Assistance during construction • Service life (management: inspections, assessment, etc) • Regeneration (strengthening and repair projects) • Deconstruction (demolition) Investigation, acquisition of knowledge and experience through daily work (LEARN IN ORDER TO WORK – WORK IN ORDER TO LEARN), together with the exchange of problems and solutions with other professionals are the seed of creative and innovative work.

Board of Directors Hugo Corres Peiretti – President – PhD in Civil Engineering José Romo Martín – Vicepresident – Civil Engineer CIVIL WORKS DEPARTMENT Javier Torrico Liz – Civil Engineer BUILDING DEPARTMENT Eduardo Romero Rey – Civil Engineer STRUCTURAL MAINTENANCE ENGINEERING DEPARTMENT Javier León González – Technical Director – PhD. in Civil Engineering Francisco Prieto Aguilera – Civil Engineer R&D DEPARTMENT Alejandro Pérez Caldentey – PhD. In Civil Engineering KNOWLEDGE DEPARTMENT Fernando Rodríguez García – Civil Engineer

ADMINISTRATION National Agencies AENA, Adif, Ministerio de Fomento, Puertos del Estado, RENFE Regional Comunidad de Madrid, Comunidad Foral de Navarra, Generalitat Valenciana, Xunta de Galicia, Diputación Foral De Guipúzcoa, GIASA Town Council Ayuntamiento de Madrid, Ayuntamiento de Nájera, Ayuntamiento de Balaguer ARCHITECTS Estudios Lamela –SLP + Rogers Stirk Harbour & Partners SL , Palerm y Tabares de Nava, S.L. , Rafael Moneo, Richard Rogers partnership, Santiago Calatrava, Isabelino Martín Servicios de Arquitectura, AMP Arquitectos, S.L., Solid Arquitectura, S.L., SicArquitectura, Andrés Perea, Estudios Cano Lasso, S.L, Selgas- Cano, Zaha Hadid

CONSULTING COMPANIES Arup, Ayesa, Bowman, Consulbaires, Cowi, Cygsa, Esteyco, Dr Tech Olav Olsen, Egis Eyser, Euroconsult, Euroestudios, Eurofinsa, GOC , Idom, Ineco, Ingeniería Cuatro, Intemac , JSJ Consultoría e Projectos, MS Ingenieros , Ofiteco, Parsons Brinkerhoff, Prointec , Sener, Sestra, Schlaich Bergemann Und Partners, Typsa, WSP CONSTRUCTION COMPANIES Spanish Acciona, Copasa, Dragados, FCC, Ferrovial, Isolux-Corsan, OHL, Sacyr. Tecsa International Alpine , American Infrastructures, Bilfinger Bergen, Boodai, Brotec, Commodore, Habtoor Leighton Group, Hochtief , Hyundai, Judlau, Kier, Impregilo, Morgan Sindall, Odebrecht, Rizzani Deccher, Queiroz Galvão, Samsung, Sir Robert McAlpine, Shimmick, Skanska, SNC Lavalin, Trevi, Yüksel PREFABRICATORS Drace , Pacadar, Prainsa, Precon, Castelo, Aceprepor

F HE CO R Consulting Engineers

Pro

ject d

ata Project Pedestrian Bridge over Glomma River

location Sarpsborg Kommun

2013date

tipology stressed ribbon

characteristics 1 span, total length 125.0m, depth: 0.42m

(slenderness=1/300)

scope of works detailed design

client Ayuntamiento de Sapsbourg

Norway/2013 Pedestrian Bridge over Glomma River

Pro

ject d

ata Project Pedestrian bridge ‘San Jan de la Cruz’ over river

Carrion

location Palencia

2004date

tipology cable stayed pedestrian bridge, curved in plan,

70.7m span

scope of works detailed design and technical assistance to works

direction

client Payd / Copasa

proprietor Aguas del Duero

construction budget 54,000.00 €

Spain/2004 Pedestrian bridge ‘San Jan de la Cruz’ over river Carrion

Pro

ject d

ata Project Pedestrian cable stayed bridge over the Fuengirola

River

location Fuengirola, Malaga

2006date

tipology cable-stayed footbridge

characteristics prefabricated pylon and deck sections. main span:

68,2m

scope of works detailed design and technical assistance

client Dragados

construction budget 1,750,000.00 €

Spain/2006 Pedestrian cable stayed bridge over the Fuengirola River

Pro

ject d

ata Project Pedestrian bridge over Segre River in Balaguer II

location Balaguer. Lleida

2010date

tipology arch bridge with composite deck and steel arch.

main span 62.8 m

scope of works detailed design and technical assistance to works

direction.

client Ayuntamiento de Balaguer

construction budget 900,000.00 €

Spain/2010 Pedestrian bridge over Segre River in Balaguer II

Pro

ject d

ata Project Shell Pedestrian bridges ‘Invernadero’ and

‘Matadero’. Madrid Rio

location River Manzanares - Madrid

2006date

tipology reinforced concrete shell arch with lower composite

deck footbridge

characteristics concrete shell arch supporting a composite deck

scope of works detailed design and technical assistance to works

management

client Excmo. Ayuntamiento de Madrid – Acciona

Infraestructuras

construction budget 3,500,000.00 €

Spain/2006 Shell Pedestrian bridges ‘Invernadero’ and ‘Matadero’. Madrid Rio

Pro

ject d

ata Project Pedestrian bridge over Najerilla River

location Najera. La Rioja

2010date

tipology suspension footbridge

characteristics composite deck , lateral cables on an inclined

plane 18 º with the vertical

scope of works detailed design and works management

client Excmo. Ayuntamiento de Nájera

construction budget 633,000.00 €

Spain/2010 Pedestrian bridge over Najerilla River

Pro

ject d

ata Project Pedestrian bridge ‘Puente de los Franceses’ over

M-30 Motorway

location Madrid

2011date

tipology composite deck., 34m main span

characteristics steel box girder fixed to 0.50 x 0.50m piers.

scope of works detailed design and technical assistance to works

management

client Excmo. Ayuntamiento de Madrid

construction budget 760,000.00 €

Spain/2011 Pedestrian bridge ‘Puente de los Franceses’ over M-30 Motorway

Pro

ject d

ata Project Pedestrain bridge ‘Nudo Sur’ over m-30 Motorway

and Manzanares River

location Madrid

2011date

tipology composite deck with variable thikness

characteristics spans of 50 m

scope of works detailed design and technical assistance to works

direction

client Excmo. Ayuntamiento de Madrid

construction budget 13,000,000.00 €

Spain/2011 Pedestrain bridge ‘Nudo Sur’ over m-30 Motorway and Manzanares

River

Pro

ject d

ata Project Pedestrian Bridge ‘Almuñecar’

location Madrid

2011date

tipology ‘u’ shaped carbon fiber deck

characteristics 39.7 m span fixed to the abutments

scope of works detailed design and technical assistance to works

direction

client Excmo. Ayuntamiento de Madrid

construction budget 2,000,000.00 €

Spain/2011 Pedestrian Bridge ‘Almuñecar’

Pro

ject d

ata Project Pavillion_bridge. Expo Zaragoza2008

location Zaragoza

2008date

tipology two span composite bridge

characteristics main span 150.00m

scope of works detailed design and technical assistance

client Dragados

construction budget 45,000,000.00 €

Spain/2008 Pavillion_bridge. Expo Zaragoza2008

Pro

ject d

ata Project Balaguer I Pedestrian Bridge

location Balaguer. Lleida

2000date

tipology pre-stressed concrete contiunous beam with

dorsal fin

characteristics two 46.60 + 46.60m spans and 5.00m wdth deck

client Ayuntamiento de Balaguer

Spain/2000 Balaguer I Pedestrian Bridge

Pro

ject d

ata Project Pedestrian and ciclying Bridges for the South

Metropolitan Highway Bypass. Bilbao

location Bilbao. Spain

2009date

tipology pedestrian Bridge with mixed steel-concrete

structure deck

characteristics total length: 205m / six 17+34+40x3+34m spans

with 5,00m width

client Saitec

Spain/2009 Pedestrian and ciclying Bridges for the South Metropolitan Highway

Bypass. Bilbao

F HE CO R Consulting Engineers

Pro

ject d

ata Project Hospital Pedestrian Bridge over GI-636 road in

Hondarribia. Gipuzkoa

location Gipúzcoa. Spain

2014date

tipology steel pedestrian bridge with "U" shaped cross

section

characteristics one main 28,94m span with two 59 and 58,5m

access ramps and 5.00m width deck

client SESTRA / Ayuntamiento de Guipúzcoa

construction budget

Spain/2014 Hospital Pedestrian Bridge over GI-636 road in Hondarribia. Gipuzkoa

F HE CO R Consulting Engineers

Pro

ject d

ata Project New Manzanal del Barco Bridge

location Ricobayo Reservoir

2008date

tipology prestressed concrete box girder bridge

characteristics main span 190.0m – cantilever construction

scope of works tender, detailed design and technical assistance

client FCC Construcción

construction budget 11,300,000.00 €

Spain/2008 New Manzanal del Barco Bridge

Pro

ject d

ata Project Viaduct over the Ensenada de Engano

location Ensenada de Engano. Noia, A Coruña.

2010date

tipology prestressed concrete box girder bridge

characteristics main span 70.0m

scope of works detailed design and technical assistance

client Copasa

construction budget 5,018,800.00 €

Spain/2010 Viaduct over the Ensenada de Engano

Pro

ject d

ata Project Bridge over the River Sil

location A-6 Motorway Between San Roman de Bembibre

and Villafranca del Bierzo. León

2000date

tipology steel/concrete composite truss

characteristics main span 170.0m

scope of works construction and repair projects; technical

assistance

client ACS Proyectos Obras y Construcciones. Lastra

Ibérica (operaciones de empuje)

construction budget 12,000,000.00 €

Spain/2000 Bridge over the River Sil

Pro

ject d

ata Project Bridge over the Tajuña River

location Alcarria Motorway Guadalajara

2009date

tipology Balanced cantilever concrete box girder bridge

characteristics 14 spans, total length 1980 m.

scope of works detailed design

client INECO

construction budget 72,300,000.00 €

Spain/2009 Bridge over the Tajuña River

Pro

ject d

ata Project Picado Bridge Cádiz

location Cadiz

1999date

tipology composite double girder deck

characteristics 50+5x70+50 m spans

scope of works detailed design and technical assistance

client ACS Proyectos Obras y Construcciones

Spain/1999 Picado Bridge Cádiz

Pro

ject d

ata Project Jamal Abdul Nasser Street Viaduct

location Kuwait

2013date

tipology continuous viaducts with segmental construction

characteristics overall length 11 km, typical span: 45.00 m.

scope of works independent checking engineer + construction

technical assistance

client Rizzani de Eccher, OHL, BC, TREVI

Kuwait/2013 Jamal Abdul Nasser Street Viaduct

Pro

ject d

ata Project Bridge over the Cavalls Ravine

location Southern local distributor of Valencia

1998date

tipology mixed lattice with exterior 56,00 m pre-stressed

span

scope of works construction project and technical assistance

client Dragados

proprietor Generalitat Valenciana

Spain/1998 Bridge over the Cavalls Ravine

Pro

ject d

ata Project Sheikh Jaber Al Ahmad Al Sabah Causeway -

Doha Link.

location Kuwait

2013date

tipology continuous viaducts with segmental construction

characteristics overall length: 7.70 km. Appraches typical span:

40.00-45.00m. Main bridge: 60.00m

scope of works tender project

client OHL

Kuwait/2013 Sheikh Jaber Al Ahmad Al Sabah Causeway - Doha Link.

F HE CO R Consulting Engineers

Pro

ject d

ata Project Riudellots Railway Bridge

location Barcelona-French Border High Speed Railway

Line at Ruidellots

2009date

tipology lateral steel trusses supporting a steel deck

characteristics main span 53.0m

scope of works detailed design and technical assistance to

launching

client Adif

construction budget 5,000,000.00 €

Spain/2009 Riudellots Railway Bridge

Pro

ject d

ata Project Viaduct Over The Ulla River

location High-Speed railway line between Pontevedra and

Santiago

2009-2013date

tipology composite truss

characteristics main span 240.0m

scope of works constructability review and modifications, launching

design and technical assistance to the contractor

client Rio Ulla Cjv (Dragados-Tecsa)

construction budget 95,000,000.00 €

Spain/2009-2013 Viaduct Over The Ulla River

Pro

ject d

ata Project Viaduct Over The River Ulla

location High-Speed railway line between Pontevedra and

Santiago

2006date

tipology circular composite deck section

characteristics main span 420.0m

scope of works tender competition

client Adif. Ministerio de Fomento

construction budget 95,000,000.00 €

Spain/2006 Viaduct Over The River Ulla

Pro

ject d

ata Project Bridge over the Beauharnois Canal

location Nouvelle Autoroute 30 in Montreal

2012date

tipology steel and concrete composite double deck

launched with stay tower

characteristics overall length 1456.00 m, typical span 81.90 m,

main span over the Canal 150.00 m, width 2x14.22

m

scope of works launching detailed design, including capacity

check of the deck during the launching process,

design of auxiliary launching elements, launching

control, and on-site technical assistance

client MTQ

Canada/2012 Bridge over the Beauharnois Canal

Pro

ject d

ata Project HSL Córdoba – Málaga. Section: Cártama –

Apeadero de los Remedios.

location Malaga

2004date

tipology prestressed concrete slab bridges

characteristics typical span 32.0m

scope of works detailed design and technical assistance

client OHL

construction budget 1,450,000,000.00 €

Spain/2004 HSL Córdoba – Málaga. Section: Cártama – Apeadero de los

Remedios.

Pro

ject d

ata Project HSL Madrid – Alicante. Alpera By-pass. Alpera

Viaduct

location Alpera - Alicante

2001date

tipology prestressed concrete box girder bridge

characteristics main span 45.00m

scope of works detailed design and technical assistance

client OCP-COMSA

Spain/2001 HSL Madrid – Alicante. Alpera By-pass. Alpera Viaduct

Pro

ject d

ata Project Genoa-Ventimiglia Line. Andora-San Lorenzo

section

location Liguria

2009date

tipology Imperia Station and access bridges. Prestressed

and reinforced concrete slabs, suspended

pedestrian footbridge over Impero river

characteristics 2.271m long. the longest urban tunnel in Italy at the

time of construction

scope of works detailed design of structures and tunnels

client Ferrovial Agroman

Italy/2009 Genoa-Ventimiglia Line. Andora-San Lorenzo section

Pro

ject d

ata Project HSL Madrid- Alicante. Stretch: Villena – Sax

Acequia del Rey & Cordel de Sax Viaducts

location Villena- Alicante

2010date

tipology prestressed concrete box cirger bridges

characteristics main span 32.0 m, total length 1.394 y 1.498 m

scope of works detailed design and technical assistance

client Adif (proyecto de construcción) FCC Construcción

(asistencia técnica)

Spain/2010 HSL Madrid- Alicante. Stretch: Villena – Sax Acequia del Rey & Cordel

de Sax Viaducts

Pro

ject d

ata Project HSL Atlantic Axis. Stretch Rialiño – Padrón. Rialiño

& Sar Viaducts

location A Coruña

2011date

tipology prestressed concrete box girder bridge

characteristics main span 55,0 m. total length 2,411 m

scope of works detailed design and technical assistance

client Dirección General de Infraestructuras Ferroviarias.

Ministerio de Fomento

construction budget 40,000,000.00 €

Spain/2011 HSL Atlantic Axis. Stretch Rialiño – Padrón. Rialiño & Sar Viaducts

Pro

ject d

ata Project HSL Málaga – Granda. Stretch: Arroyo de la

Viñuela – Quejigares Arroyo de la Viñuela Viaduct

location Granada

2010date

tipology precast concrete box girder bridge

characteristics main span 55,0 m.

scope of works detailed design and technical assistance

client Dragados - Tecsa

Spain/2010 HSL Málaga – Granda. Stretch: Arroyo de la Viñuela – Quejigares Arroyo

de la Viñuela Viaduct

Pro

ject d

ata Project Ferrol-Gijón Railway. Stretch: Aboño-Sotiello

By-pass

location Asturias

2009date

tipology viaducts 1&2. composite structures, 2 lateral steel

variable depth girders

characteristics 55.00 m máximum span

scope of works detailed design and technical assistance

client OHL

Spain/2009 Ferrol-Gijón Railway. Stretch: Aboño-Sotiello By-pass

Pro

ject d

ata Project Altea Railway Viaduct

location Altea. Alicante

2003date

tipology prestressed concrete slab with a central concrete

inverted beam

characteristics 330m in length, 8 spans of 30 + 45 x 6 + 30m

scope of works detailed design

client Constructora Levantina

Spain/2003 Altea Railway Viaduct

Pro

ject d

ata Project Marina de Badalona Bridge

location Badalona. Barcelona

2003date

tipology prestressed concrete slab with a central concrete

inverted beam

characteristics 207m in length, 6 spans of 39 + 78 + 39 + 30 +

21m

scope of works detailed design

client Marina de Badalona

Spain/2003 Marina de Badalona Bridge

Pro

ject d

ata Project Bridge over Sheik Zayed Road

location Dubai

2012date

tipology solution 1. Main bridge: truss of variable depth

characteristics overall length 1,5 km, main bridge span: 55.30m

scope of works tender project

client FCC, Yüksek, Commodore

Dubai/2012 Bridge over Sheik Zayed Road

F HE CO R Consulting Engineers

Pro

ject d

ata Project Hai Sabah Railway Viaduct In Orán, Argelia

location Orán, Argelia

2009-2010date

tipology pre-stressed reinforced concrete slab calculated for

anti-seismic conditions

characteristics 140m total length / 15 + 5x22 + 15m spans

client Corsan - Corviam Construcción, S.A.

Argelia/2009-2010 Hai Sabah Railway Viaduct In Orán, Argelia

F HE CO R Consulting Engineers

Pro

ject d

ata Project Bridge Over The Najerilla River

location Najera – La Rioja

2005date

tipology arch bridge with composite deck and steel arch

characteristics 45.00m span

scope of works detailed design and works management

client Excmo. Ayuntamiento de Nájera

construction budget 960,403.00 €

Spain/2005 Bridge Over The Najerilla River

Pro

ject d

ata Project Bridge over El Burguillo Reservoir

location El Burguillo Reservoir. El Tiemblo. Ávila

1999date

tipology concrete Arch Bridge

characteristics main span 165.0m

scope of works detailed design and technical assistance

client Ute Construcciones Sobrino y Tapusa

construction budget 1,900,000.00 €

Spain/1999 Bridge over El Burguillo Reservoir

Pro

ject d

ata Project Arch Bridge over the Dambovita River Roman

location Bucharest

2011date

tipology twin strigbow steel arch

characteristics main span 117.70m

scope of works detailed design and technical assistance to the

contractor

client FCC Construcción - Astaldi

construction budget 8,000,000.00 €

Romania/2011 Arch Bridge over the Dambovita River Roman

Pro

ject d

ata Project New access to Montoro. Bridge over the River

Guadalquivir

location Over Guadalquivir Rivir in Montoro. (Córdoba)

2009date

tipology Composite bridge with steel box and central steel

arch over the river Guadalquivir

scope of works construction project and works management

client Gestión de Infraestructuras de Andalucía S.A

proprietor Gestión de Infraestructuras de Andalucía S.A.

Dirección General de Carreteras

Spain/2009 New access to Montoro. Bridge over the River Guadalquivir

F HE CO R Consulting Engineers

Pro

ject d

ata Project Third Tagus River crossing

location Lisbon

julio / 2014date

tipology cable stayed bridge

characteristics 540.00m main span

scope of works tender project in JV with Ideam+Adif

client FCC Construcción – Im Pregilo – Conduril

construction budget 811,000,000.00 €

Portugal/2009-2010 Third Tagus River crossing

Pro

ject d

ata Project Bridge over the Orio River. Guipuzcoa

location Guipuzcoa

2010-2011date

tipology hybrid suspension/cable-stayed bridge

characteristics 180.00 m main span

scope of works detailed design

client Diputación Foral de Gipuzkoa

construction budget 16,905,214.00 €

Spain/2010-2011 Bridge over the Orio River. Guipuzcoa

Pro

ject d

ata Project Arbizelai Viaduct

location Arrasate-Mondragón

2006-2009date

tipology cable-stayed viaduct

characteristics main span 140.40m

scope of works detailed design and technical assistance to the

constructor

client Laurena Cjv (Dragados-Moyua-Ossa

construction budget 14,887,000.00 €

Spain/2006-2009 Arbizelai Viaduct

Pro

ject d

ata Project Cable Stayed Bridge Over the Valencia By-Pass

location Torrent (Valencia)

2005date

tipology cable-stayed viaduct

characteristics main span light 57.0 m

scope of works construction and technical assistance project

client UTE FCC-PAVASAL

Spain/2005 Cable Stayed Bridge Over the Valencia By-Pass

Pro

ject d

ata Project Gerald Desmond Bridge Replacement Project

location Long Beach, CA

2012date

tipology cable stayed bridge

characteristics main span: 305m. total length of approach

viaducts: 3600m

scope of works tender design supervision

client Shimmick - Fcc Construcción – Impregilo Cjv

USA/2012 Gerald Desmond Bridge Replacement Project

Pro

ject d

ata Project Mersey Gateway Bridge

location Liverpool

2011 - 2015date

tipology cable stayed bridge

characteristics main span: 318m. total length 2200m

scope of works tender design in JV with flint &neill

client FCC Construcción – Hyundai - Kier

United Kingdom/2011 - 201 Mersey Gateway Bridge

Pro

ject d

ata Project Centura Cable-Stayed Bridge

location Dn1. Northbound Motorway Bucharest

2011date

tipology cable-stayed bridge. Concrete pylon. Composite

twin

characteristics main span 85.00m

scope of works detailed design and technical assistance to

contractor

client FCC Construcción

Romania/2011 Centura Cable-Stayed Bridge

Pro

ject d

ata Project Vidin Calafat

location Buglaria- Romania

2013date

tipology cable stayed bridge

characteristics total length 1800 m. main span 180 m

scope of works independent checking

client FCC Construcción

Romania/2013 Vidin Calafat

Pro

ject d

ata Project Noia Viaduct

location Variant of Noia A Coruña

2010date

tipology cable-stayed main span concrete continuous

bridge

characteristics total length 1,470 m divided into 46 spans; main

span 102m, typical approach spans 29 & 30m

scope of works detailed design

client Xunta de Galicia

Spain/2010 Noia Viaduct

Pro

ject d

ata Project Usk Crossing Cable Stayed Bridge

location Newport, Wales (United Kingdom)

2014date

tipology cable stayed bridge

characteristics main span: 500m. total length 2.500m

client CJV: Sir Robert McAlpine – FCC Construcción –

Morgan Sindall

United Kingdom/2014 Usk Crossing Cable Stayed Bridge

F HE CO R Consulting Engineers

Pro

ject d

ata Project Wear River Cable Stayed Bridge

location Sunderland, United Kingdom

2014date

tipology cable stayed bridge

characteristics main span: 148m. total length 334m

client FCC Construcción S.A

United Kingdom/2014 Wear River Cable Stayed Bridge

F HE CO R Consulting Engineers

Pro

ject d

ata Project Cuatro Vientos Bridge In Pamplona

location Pamplona

2011date

tipology suspension bridge

characteristics self anchored

scope of works preliminary project and detailed design

client Ayuntamiento de Pamplona

construction budget 6,500,000.00 €

Spain/2011 Cuatro Vientos Bridge In Pamplona

Pro

ject d

ata Project Elche Suspension Bridge

location Ronda Norte de Elche. Alicante

2000date

tipology suspension bridge

characteristics main span 164.50m

scope of works detailed design and technical assistance

client FCC Construcción

construction budget 13,225,270.00 €

Spain/2000 Elche Suspension Bridge

Pro

ject d

ata Project Suspension bridge over the Strait of Messina

location Strait of Messina

2005date

tipology large lightweight suspension bridge

characteristics 3.70 suspension bridge with a central span of

3.30 km

scope of works supervision of the project bidding process and

structural optimization

client Astaldi (Italia) y Ferrovial-agromán (España)

Italy/2005 Suspension bridge over the Strait of Messina

Pro

ject d

ata Project Bridge over the Chacao Channel

location Chacao Channel Region 10

2001date

tipology suspension bridge

characteristics two-span suspension bridge with 1,100.00m and

1,055.00m spans

scope of works tender project and feasibility study

client Mop. República de Chile

construction budget 670,000,000.00 €

Chile/2001 Bridge over the Chacao Channel

F HE CO R Consulting Engineers

Pro

ject d

ata Project Bridge Between Cangas and Vigo

location Vigo (Pontevedra)

2007date

tipology suspension bridge

characteristics total 2,700 m long, with a central span of 1,500 m

scope of works preliminary design

client Xunta de Galicia

Spain/2007 Bridge Between Cangas and Vigo

F HE CO R Consulting Engineers

Pro

ject d

ata Project Northbound approach to the Centenario Bridge

location Paraiso

2011date

tipology precast bridge

characteristics deck designed with continuous precast beams

scope of works detailed design project and technical advice during

the construction works

client FCC

Panama/2011 Northbound approach to the Centenario Bridge

Pro

ject d

ata Project Dr. Kwame Nkrumah Interchange

location Accra

2013-2014date

tipology composite viaducts

characteristics 7 viaducts, 2.2 km total length, max span 41 m

client Queiroz Galvão

Ghana/2013-2014 Dr. Kwame Nkrumah Interchange

F HE CO R Consulting Engineers

Pro

ject d

ata Project Panama subway. Line 1

location Panama City

2013date

tipology cut and cover and TBM tunnels, viaducts and

stations

characteristics 9 underground stations, 5 elevated stations, 5.0 km

viaducts, 1.5 km cut and cover tunnels and 7.3 km

TBM tunnels,

scope of works detailed design of cut and cover tunnels.

independent , checking engineer for the rest of

structures

client FCC – Odebrecht

Panamá/2013 Panama subway. Line 1

Pro

ject d

ata Project Tunnel Connection between Maria de Molina street

and Velázquez street with N-II highway

location Madrid

2004date

tipology tunnel

characteristics 2.271m long. the longest urban tunnel in Spain at

the time of construction

scope of works structures and tunnels detailed design

client Ayuntamiento de Madrid. Premios de Urbanismo,

Arquitectura y Obra Pública. Edición XVIII. Premios

2003.

construction budget 50,000,000.00 €

Spain/2004 Tunnel Connection between Maria de Molina street and Velázquez street

with N-II highway

Pro

ject d

ata Project Transportation Exchange Building in Avenida de

América

location Madrid

2002date

tipology underground structure, top – down construction

characteristics expansion-joint free building 208 m

scope of works structure detailed design

client Prointec - Comunidad de Madrid

construction budget 30,000,000.00 €

Spain/2002 Transportation Exchange Building in Avenida de América

Pro

ject d

ata Project Sants Station, Extension and Improvement Works

location Barcelona

2007date

tipology extension and adaptation of existing structure

scope of works technical assistance to works management.

client Dragados

proprietor Administrador de Infraestructuras Ferroviarias (Adif)

construction budget 30,000,000.00 €

Spain/2007 Sants Station, Extension and Improvement Works

Pro

ject d

ata Project New short-haul railway line at Sabadell Nord

location Barcelona

2009-2010date

tipology reinforced concrete slabs in vestibule and solid

slabs over platforms

characteristics new vestibule and platform accesses

scope of works works management and technical assistance for

the structure

client INECO-TIFSA

proprietor ADIF

construction budget 5,700,000.00 €

Spain/2009-2010 New short-haul railway line at Sabadell Nord

Pro

ject d

ata Project Renovation Passeig de Gràcia Station

location Barcelona

2009-2014date

tipology reinforced concrete slabs in vestibule and solid

concrete vaulted roofs over platforms

characteristics vestibule extension, new vestibule on seaward side

and new access ways to platforms.

scope of works works management and technical assistance for

the structure

client INECO-TIFSA

proprietor ADIF

construction budget 12,000,000.00 €

Spain/2009-2014 Renovation Passeig de Gràcia Station

Pro

ject d

ata Project New short-haul railway station at

Sagrera-Meridiana

location Barcelona

2009-2011date

tipology composite slabs in vestibule, roof built with

prefabricated beams and solid slab vaulted roof to

be demolished

characteristics composite slabs in vestibule, roof built with

prefabricated beams and solid slab vaulted roof to

be demolished

scope of works techincal assistance for the structure in relation to

works management

client INECO-TIFSA

proprietor ADIF

construction budget 34,300,000.00 €

Spain/2009-2011 New short-haul railway station at Sagrera-Meridiana

Pro

ject d

ata Project Car Park for Nuestra Señora del Recuerdo School

architec Antonio Ruiz Barbarin & Javir Ruiz Barbarin

location Madrid

2009date

tipology concrete structure

characteristics underground car parking. 14.0m spans.

scope of works detailed design and technical assistance

client Dragados

construction budget 5,000,000.00 €

Spain/2009 Car Park for Nuestra Señora del Recuerdo School

F HE CO R Consulting Engineers

Pro

ject d

ata Project Stations 1 to 7, line 3 of Madrid Underground

location Madrid

2005date

tipology retaining walls and reinforced solid slab

client FCC

proprietor Comunidad de Madrid

Spain/2005 Stations 1 to 7, line 3 of Madrid Underground

F HE CO R Consulting Engineers