Interchangeable carpet tiles self-adhere to a set of four pedestals. This allows fl ex, so they fl oat on the fl oor without laser leveling.
Universal outlet ports for power, data, AV or pass-thru may be located in any of the pedestals. Pedestals are 3” high, providing a generous cable way capacity. Weight capacity tested to 50,000 lbs for each pedestal. 25 US tons.
Assembled right over carpet or foam pad for bare fl oors. No demolition.
UL Approved power cables and outlets are snapped together and placed on the fl oor. The outlets get snapped into place and cable is buried under the fl oor. If an outlet location needs to be changed, simply lift the outlet tile, move it, and bury the cable back into the fl oor.
SMARTdesks® FFIT™ Computer Floor lets you locate power & data in any architectural space for unlimited fl exibility and design freedom.
SMARTdesks® furnishings are mobile, making re-arrangement possible for any activity.
The FFIT™ Floor and furniture move together, to support changes in the room arrangement. You are not locked-in to a static fl oorplan. Power and data cables are hidden under the fl oor.
Any change can be accomplished instantly because these issues are not involved:
• no core drilling• no special tools• no specialized “trades”• no demolition• no material waste• no time waste• no coordination• no environmental impact!
SMARTdesks® now gives you the freedom to change how you utilize space. You are never locked-in to a static arrangement.
Power and data locations may be moved instantly and at no cost.Furniture can move to suit any new arrangement and the power and data wiring will adapt accordingly.
Changes can be made instantly—on the fl y. Smartdesks® can provide a coordinated plan that encompasses power, network wiring, space planning, and furnishings.
A fl exible, complete solution.
Floor + Furniture Integration Technology Better power and data cable management from the ground up
When the cable is laid out on the fl oor, it is easy to visualize the circuit plan and make it look like the installation wiring diagram.
FFIT floor GPON.indd 2 5/30/14 5:53 PM
PROJ
ECT
NAM
E
SHEE
TTI
TLE
DRAWN
DATE
SCALE
SQUARE FT.
APPROVED
DATE
NO.
REVISIONS
NO.
NO.
ISSUE DATE
PROJECT NUMBER
SHEET 1 OF 1 DSIZE
DATE
DATE
DATE
GENERAL INSTALLATION NOTES:INSTALLATION CONTRACTOR WILL BE RESPONSIBLE FORCOORDINATING THE STAGING AREA FOR POWERFLOR ANDINSPECTING CARPET PANELS FOR VISIBLE DEFECTS PRIOR
THE FLOOR MUST BE FREE FROM ALL PROTRUDING OBJECTS,FOREIGN MATTER, DIRT, CRACKS, HOLES AND DEPRESSIONS.OBVIOUS DEFECTS MUST BE REPAIRED BEFORE INSTALLING
INCREMENTAL OUT OF LEVEL FLOOR CONDITION SHALL BE 1/8INCHES IN ANY 10 FEET, AS MEASURED WITH A STRAIGHTEDGE.INSTALL FOAM SHEETING OVER THE EXISTING SUBFLOORBEFORE LAYING POWERFLOR PANELS. FOAM EDGES SHOULDNOT BE ALLOWED TO OVERLAP. REFER TO POWERFLORINSTRUCTION SHEET 408-3396 FOR ADDITIONAL DETAILS.CONTRACTOR WILL BE RESPONSIBLE FOR FIELD VERIFYINGALL DIMENSIONS ON THE JOB SITE TO ENSURE AN ACCURATEINSTALLATION. PRINT DIMENSIONS ARE TO BE USED FOR
YELLOW ARROWS ARE PLACED ON THE SIDES OF EACH PANELTO INDICATE CARPET PILE DIRECTION. ALIGN PANELS WITH
POWERFLOR INSTALLATIONS MUST CONFORM TO APPROPRIATENATIONAL ELECTRICAL CODES AS WELL AS ANY STATE, CITY,COUNTY OR LOCAL BUILDING CODE REQUIREMENTS. AMPWILL NOT BE RESPONSIBLE FOR ANY CODE VIOLATIONSRESULTING FROM MISUSE OR IMPROPER APPLICATION OF
COMPETENT AND AUTHORIZED PERSONNEL SHOULD INSTALL
ANY ELECTRICAL WORKING DRAWINGS OR LAYOUTS MUST BEREVIEWED AND APPROVED BY A LICENSED PROFESSIONALELECTRICAL ENGINEER IN ACCORDANCE WITH APPROPRIATEFEDERAL AND STATE LAWS GOVERNING SUCH PRACTICES.POWERFLOR USA RESERVES THE RIGHT TO MAKE PRODUCT REVISIONS
AS STATED HEREIN. IF ANY QUESTIONS EXIST, CONTACT
AMPINNERGY MODULAR DISTRIBUTION SYSTEMS USED WITH
COMMERCIAL AND INDUSTRIAL LOCATIONS. THE SYSTEMCOMPLIES WITH SECTION 604 OF THE NATIONAL ELECTRIC
ELECTRICAL TIE-IN FROM SINGLE ENDED CABLE ASSEMBLIESTO EXISTING BUILDING PANELBOARDS BY OTHERS. REFER TOPOWERFLOR INSTRUCTION SHEET 408-3396 FOR CIRCUIT
MANUFACTURING WIRING SYSTEMS.
WIRING SCHEMATIC.
POWERFLOR ARE APPROVED FOR INSTALLATION IN
CODE, (REF: UL 183), REGARDING THE USES OF
12.
11.
REFERENCE ONLY.
THE POWERFLOR SYSTEM.
ARROWS RUNNING IN THE SAME DIRECTION.
AT ANY TIME WHICH MAY AFFECT LAYOUT METHODS
POWERFLOR USA PRIOR TO PERFORMING ANY LAYOUT WORK.
6.
8.
10.
9.
7.
THE PRODUCT.
5.
4.
2.
3.
1.
TO INSTALLATION.
POWERFLOR.
CARPET DIRECTION
FOUR (4) CIRCUITS, TWO (2) GROUNDS
AMPINNERGY LINE ENTRY CABLESCONCEALED SINGLE-ENDED CABLE HARNESS INSTALLATION
*REFER TO AMPINNERGY DRAWING NO. CS556148FOR ADDITIONAL DETAILS.
20AR
250V125/
UP
NEUTRAL21
GRAYWHITE
GREEN/YELLOW
LINE 3LINE 2LINE 1LINE 4
87654
BLUERED
BLACKPINK
ISOLATED GROUNDNEUTRAL 43
CABLE LENGTH
PIGTAIL NOT USED
GREEN/BARE GROUND
SINGLE ENDED POWER/LINE ENTRY CABLE
DUPLEX CIRCUIT #1,2,3 OR 4 ISOLATED GRD.
AMPINNERGY JUNCTION BOX UNDER FLOOR
DATA INSTALLATION KIT/ RJ45 INSERTS & COVER
38
96S
AMPINNERGY POWER CABLE LENGTH
OPEN POWERPORT WITH LID P
AMPINNERGY POWER CABLE ASSY.
DUPLEX CIRCUIT #1,2,3 OR 4
CAT5 TEL/DATA CABLE-UTP
CARPET TILES APPLIED ON FLOOR
PERIMETER CUT TO FIT
GROMMET 4"
J
1 G
1
C
X STARTING SOLID PANEL ARRAY
POWERFLOR KEY
POWERFLOR PANEL ASSY 50Cm X 50Cm
25 CENTIMETER PEDESTAL
Saves money & time:• Installs in hours, not days• Specialized labor not required
for installation• Easily coordinates with other trades• Not a part of the building, depreciates like
furniture: 7yrs vs 39 yrs• Lower cost alternative to conventional carpet
& electrical contracting
GREEN: Low environmental impact• Reusable! Accommodate move, add, change
and churn without waste• Put power and data anywhere• Relocate power and data any time• Move the fl oor system to another
room or building• Reuse and re-arrange
as you would the furniture
This fl oor plan shows the placement of SMARTdesks furniture aligned with power and data outlets in the FFITfl oor.
The architectural space is located in a late 19th Century historic building, which was updated for a large scale video teleconferencing meeting room.
The historic building could not be altered in any way. The FFITfl oor was used because installation was completely non-invasive and no demolition was required. FFITfl oor was laid down on existing carpet installed on original hardwood.
FFITspace2525™ with full access lid and cable pass wings can replace a pedestal quadrant to accept components and junc-tion boxes. 12 gauge steel. Inside dimensions 24.13cm x 24.13cm x 6cm / 9.5” x 9.5” x 2.375”
The interchangeable carpet tile sections feature four pedestals: each pedestal has the capabilitiy of being fi tted with an outlet for power, data or cable pass-through.
Custom cutouts
FFIT floor GPON.indd 3 5/30/14 5:54 PM
FFITspace2550™ is sized to replace 2 of 4 pedestals under a single carpet tile. The lid allows access to components, such as those used for GPON fi ber optic network, distributing data to users throughout the space.
NOW supports GPON fi ber networks• Effi cient power consumption• Greater bandwidth• Greater security
Floor + Furniture Integration Technology Better power and data cable management from the ground up
Bring your IT integration requirements to SMARTdesks. Let’s collaborate to make your space work for your mission today and whenever you need to change to accomplish the mission tomorrow.
SMARTdesks off ers complete interior design services with no cost or obligation. Furniture designs are customized and produced for each customer. The FFITfl oor is designed to work as one with the furniture, the space and the technology. Backed by a 10 year manufacturer’s warranty, FFITfl oor may be purchased separately from the furniture.
www.smartdesks.com800 770 7042
www.smartdesks.com
©2014 CBT Supply, Inc. dba SMARTdesks® All rights reserved. SMARTdesks® and FFITfl oor® are registered trademarks of CBT Supply, Inc.
FFITspace2550™Inside dimensions:24.13cm x 48.9cm x 6cm9.5” x 19.25” x 2.375”12 gauge steelCutouts may be customized.
FFIT floor GPON.indd 4 5/30/14 5:54 PM