feedback from ncc registration services
DESCRIPTION
Feedback From NCC Registration Services. Alex Le Heux RIPE NCC September 27 2012 RIPE65 - Amsterdam. 2007-01 Report. Total number of assignments: 51071 70% under contract 52% of “ old ” resources brought under contract 35675 contracts processed 15396 assignments still pending. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/1.jpg)
Feedback From NCC Registration ServicesAlex Le HeuxRIPE NCC
September 27 2012RIPE65 - Amsterdam
![Page 2: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/2.jpg)
Alex Le Heux, 27-09-2012
2007-01 Report
• Total number of assignments: 51071• 70% under contract• 52% of “old” resources brought under
contract• 35675 contracts processed• 15396 assignments still pending
2
![Page 3: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/3.jpg)
Alex Le Heux, 27-09-2012
2007-01 Report
• Steady progress• 2 FTEs work on this• It is often hard to get into contact with
end-users• Still a lot of emailing back and forth
– Unsigned contracts
– Incorrect company names
3
![Page 4: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/4.jpg)
Alex Le Heux, 27-09-2012
Allocations from the last /8
• We are allocating:
4
![Page 5: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/5.jpg)
Alex Le Heux, 27-09-2012
Allocations from the last /8
“LIRs may only receive one allocation from this /8. The size of the allocation made
under this policy will be exactly one /22”
5
![Page 6: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/6.jpg)
Alex Le Heux, 27-09-2012
Allocations from the last /8
• Allocate one /22 per LIR, one and one only
• No “request, transfer to another, request again”
• One member may have multiple LIRs• An LIR may still obtain multiple /22s
through mergers
6
![Page 7: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/7.jpg)
Alex Le Heux, 27-09-2012
Deja-vu…
7
NOW
![Page 8: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/8.jpg)
Alex Le Heux, 27-09-2012
RIPE NCC ASN32 Assignments
8
![Page 9: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/9.jpg)
Alex Le Heux, 27-09-2012
Actual ASN pools
9
![Page 10: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/10.jpg)
Alex Le Heux, 27-09-2012
Actual ASN pools - prediction
10
![Page 11: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/11.jpg)
Alex Le Heux, 27-09-2012
ASN32 Runout
• Will happen in a few months• Will be only temporary: +/- 2 months• In that period we will only assign 16 bit
ASNs• It will happen again• We have a choice:
– Run out of 16 bit or 32 bit ASNs
• Proposal:– Run out of 32 bit ones while possible
11
![Page 12: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/12.jpg)
Alex Le Heux, 27-09-2012
IPv4 Address Policies & Procedures
• We are now operating under the last /8 policy
• Everything is going to be different!• …right?
12
![Page 13: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/13.jpg)
Alex Le Heux, 27-09-2012
IPv4 Address Policies & Procedures
• What has changed?– No more IPv4 PI and Anycast assignments
– All allocations are /22
13
![Page 14: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/14.jpg)
Alex Le Heux, 27-09-2012
IPv4 Address Policies & Procedures
• The AW is still 0 for any new LIR• It will still be raised to a /21 when 6 months
old• The 80% rule is still in effect• Request forms for PA Assignments are still
used• Broadband verification is still required• 50% of an assignment must still be used half-
way the assignment period• … which is still three months
14
![Page 15: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/15.jpg)
Alex Le Heux, 27-09-2012
IPv4 Address Policies & Procedures
• Discussed alternatives:– Prop-103 in APNIC
– IPv4 Maintenance Policy
15
![Page 16: Feedback From NCC Registration Services](https://reader036.vdocuments.site/reader036/viewer/2022070417/5681555d550346895dc325a3/html5/thumbnails/16.jpg)
Questions?