fedex warehouse deliveryaesc210-web/systems/project_06/6_fede… · you are a logistics planner for...

15
FedEx Warehouse Delivery: “Keep it on the streets” FedEx Warehouse Delivery: “Keep it on the streets” GLOBAL SYSTEMS Spring 2018

Upload: others

Post on 09-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

FedEx Warehouse Delivery:

“Keep it on the streets”

FedEx Warehouse Delivery:

“Keep it on the streets”

GLOBAL SYSTEMSSpring 2018

Page 2: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

The Problem

You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs from the warehouse, travels to each of a set of stores, and returns to the warehouse.

The objective is to find a delivery route that minimizes the total distance traveled from start to end. We assume that the lowest total distance route is also the lowest-cost route.

2

Page 3: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

UPS makes no left turns

Q. How have you tried to cut carbon from transportation?

3

Bloomberg Business, Sep.20, 2012. “UPS Makes No Left Turns in Quest to Deliver Sustainability.“

Page 4: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Street Map

4

Streets run east-west. Avenues run north-south. Addresses are given as 334 2nd St SW, for example.

N

NE

Main St

1st A

ve S

E

2nd St SWC

entra

l Ave

2nd St NW

3rd

Ave

NW

Page 5: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Street Map grid

5

Streets are separated by 0.1 miles. Avenues are separated by 0.2 miles.

N 0.1

0.2

Page 6: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Stores labeled: Map 1

6

The warehouse (square) is located at Central Ave and Main St. The stores are noted by circles and located as shown below.

N

NE

1

23

45

6

7

Page 7: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Store locations labeled: Map 1

7

The warehouse (square) is located at Central Ave and Main St. The stores are noted by circles and located as shown below.

N

NE

(0,0)

6

7

1

2

5

3

4

(-3,3)

(2,2)

(1,-2)

(-2,-1)

(-1,-3)

(3,-4)

Page 8: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

FedEx delivery conditions

8

(1) Leave from the warehouse.

(2) Visit each store only once.

(3) Return to the warehouse.

(4) Stay on the streets at all times.

Page 9: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Inter‐store distance data

9

(1) Assume all streets can be driven in both directions.

(2) The inter-store distance is the smallest distance on the grid between a pair of stores.

(3) The smallest distances between pairs of stores can be stored in an array. Call it Darr for convenience.

Page 10: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Example Darr array (size 4)

10

Store 1 2 3 4

1 0 D(1,2) D (1,3) D(1,4)

2 D(2,1) 0 D(2,3) D(2,4)

3 D(3,1) D(3,2) 0 D(3,4)

4 D(4,1) D(4,2) D(4,3) 0

Read array as:From store i (row) to store j (column).

Page 11: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Find the delivery route with the shortest distance, using Map 1

a. Find the shortest distance between each pair of stores.

b. Generate each possible delivery route.c. Find the total distance for each route.d. Identify the route with the smallest total 

distance. Give its total distance.e. Sketch the route on Map 1.

11

Page 12: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Store locations: Map 2

12

Odd streets are one-way West. Even streets are one-way East.Main Street is two-way. All avenues (N-S) are two-way.

N

NE

Page 13: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Stores labeled: Map 2

13

Odd streets are one-way west; even streets are one-way east.Main Street is two-way.

N

NE

671

2

5

3

4

Page 14: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Find the delivery route with the shortest distance, using Map 2

a. Find the shortest distance between each pair of stores.

b. Generate each possible delivery route.c. Find the total distance for each route.d. Identify the route with the smallest total 

distance. Give its total distance.e. Sketch the route on Map 2.

14

Page 15: FedEx Warehouse Deliveryaesc210-web/systems/Project_06/6_fede… · You are a logistics planner for FedEx. Your goal is to plan a route for a delivery truck in a city. The truck departs

Any questions for the sys_gu?

15