federal energy regulatory commission item no. c- 7 weaver’s cove energy & mill river pipeline...

6
Federal Energy Regulatory Commission Item No. C- 7 Item No. C- 7 Weaver’s Cove Weaver’s Cove Energy & Mill River Energy & Mill River Pipeline Pipeline June 15, 2005

Upload: delilah-freeman

Post on 18-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005

Federal Energy Regulatory Commission

Item No. C- 7Item No. C- 7

Weaver’s Cove Energy Weaver’s Cove Energy & Mill River Pipeline& Mill River Pipeline

June 15, 2005

Page 2: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005

Material on this page is consider Non-Internet Public (NIP)

You would like a copy of this slide, please contact:

Public Reference RoomTelephone: 202-502-8371Toll-free 1-866-208-3676Email: [email protected]

Page 3: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005

Item No. C- 7 - DetailsItem No. C- 7 - Details

Weaver’s Cove Energy, LLC Weaver’s Cove Energy, LLC

Proposed Facilities & ServiceProposed Facilities & Service

• marine berth, an marine berth, an • LNG storage tankLNG storage tank• vaporization facilities vaporization facilities • LNG truck distribution facilityLNG truck distribution facility • base-load deliveries of 400,000 Dth per daybase-load deliveries of 400,000 Dth per day • peak day deliveries of up to 800,000 Dth peak day deliveries of up to 800,000 Dth

per day.per day.

Page 4: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005

Item No. C- 7 - DetailsItem No. C- 7 - Details

Mill River Pipeline, LLCMill River Pipeline, LLC

two 24-inch diameter laterals two 24-inch diameter laterals Western LateralWestern Lateral: 2.52 miles from the : 2.52 miles from the

Weaver’s Cove LNG facility to Algonquin’s Weaver’s Cove LNG facility to Algonquin’s existing 20-inch diameter G-22 lateral existing 20-inch diameter G-22 lateral

Northern LateralNorthern Lateral: 3.59 miles from the LNG : 3.59 miles from the LNG terminal to Algonquin’s existing 12 and 20-terminal to Algonquin’s existing 12 and 20-inch diameter G-1 laterals.inch diameter G-1 laterals.

Page 5: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005

July 29, 2003 – Joint Public Scoping Meeting July 29, 2003 – Joint Public Scoping Meeting with MA Executive Office of Environmental with MA Executive Office of Environmental Affairs in Swansea, MAAffairs in Swansea, MA

May 4, 2004 – FERC staff conduct a publicly May 4, 2004 – FERC staff conduct a publicly noticed inspection of the proposed terminal noticed inspection of the proposed terminal sitesite

June 30, 2004 – FERC staff participate in a June 30, 2004 – FERC staff participate in a public meeting in Tiverton, Rhode Islandpublic meeting in Tiverton, Rhode Island

September 1, 2004 – FERC staff participate September 1, 2004 – FERC staff participate in a public meeting in Bristol, Rhode Islandin a public meeting in Bristol, Rhode Island

September 8-9, 2004 – Public comment September 8-9, 2004 – Public comment meeting on the DEIS in Swansea, MA and meeting on the DEIS in Swansea, MA and Middletown, RIMiddletown, RI

Item No. C- 7 – DetailsItem No. C- 7 – DetailsPublic MeetingsPublic Meetings

Page 6: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005

initial emergency response plan; initial emergency response plan; identify emergency evacuation routes identify emergency evacuation routes

prior to construction;prior to construction; develop emergency response plans develop emergency response plans

with local officials throughout the with local officials throughout the construction period. construction period.

numerous final design improvementss numerous final design improvementss regarding the safe operation of the regarding the safe operation of the facility.facility.

Item No. C- 7 - DetailsItem No. C- 7 - DetailsAdditional Security & Emergency PlansAdditional Security & Emergency Plans