federal energy regulatory commission item no. c- 7 weaver’s cove energy & mill river pipeline...
TRANSCRIPT
![Page 1: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005](https://reader036.vdocuments.site/reader036/viewer/2022072006/56649d1f5503460f949f2a7e/html5/thumbnails/1.jpg)
Federal Energy Regulatory Commission
Item No. C- 7Item No. C- 7
Weaver’s Cove Energy Weaver’s Cove Energy & Mill River Pipeline& Mill River Pipeline
June 15, 2005
![Page 2: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005](https://reader036.vdocuments.site/reader036/viewer/2022072006/56649d1f5503460f949f2a7e/html5/thumbnails/2.jpg)
Material on this page is consider Non-Internet Public (NIP)
You would like a copy of this slide, please contact:
Public Reference RoomTelephone: 202-502-8371Toll-free 1-866-208-3676Email: [email protected]
![Page 3: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005](https://reader036.vdocuments.site/reader036/viewer/2022072006/56649d1f5503460f949f2a7e/html5/thumbnails/3.jpg)
Item No. C- 7 - DetailsItem No. C- 7 - Details
Weaver’s Cove Energy, LLC Weaver’s Cove Energy, LLC
Proposed Facilities & ServiceProposed Facilities & Service
• marine berth, an marine berth, an • LNG storage tankLNG storage tank• vaporization facilities vaporization facilities • LNG truck distribution facilityLNG truck distribution facility • base-load deliveries of 400,000 Dth per daybase-load deliveries of 400,000 Dth per day • peak day deliveries of up to 800,000 Dth peak day deliveries of up to 800,000 Dth
per day.per day.
![Page 4: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005](https://reader036.vdocuments.site/reader036/viewer/2022072006/56649d1f5503460f949f2a7e/html5/thumbnails/4.jpg)
Item No. C- 7 - DetailsItem No. C- 7 - Details
Mill River Pipeline, LLCMill River Pipeline, LLC
two 24-inch diameter laterals two 24-inch diameter laterals Western LateralWestern Lateral: 2.52 miles from the : 2.52 miles from the
Weaver’s Cove LNG facility to Algonquin’s Weaver’s Cove LNG facility to Algonquin’s existing 20-inch diameter G-22 lateral existing 20-inch diameter G-22 lateral
Northern LateralNorthern Lateral: 3.59 miles from the LNG : 3.59 miles from the LNG terminal to Algonquin’s existing 12 and 20-terminal to Algonquin’s existing 12 and 20-inch diameter G-1 laterals.inch diameter G-1 laterals.
![Page 5: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005](https://reader036.vdocuments.site/reader036/viewer/2022072006/56649d1f5503460f949f2a7e/html5/thumbnails/5.jpg)
July 29, 2003 – Joint Public Scoping Meeting July 29, 2003 – Joint Public Scoping Meeting with MA Executive Office of Environmental with MA Executive Office of Environmental Affairs in Swansea, MAAffairs in Swansea, MA
May 4, 2004 – FERC staff conduct a publicly May 4, 2004 – FERC staff conduct a publicly noticed inspection of the proposed terminal noticed inspection of the proposed terminal sitesite
June 30, 2004 – FERC staff participate in a June 30, 2004 – FERC staff participate in a public meeting in Tiverton, Rhode Islandpublic meeting in Tiverton, Rhode Island
September 1, 2004 – FERC staff participate September 1, 2004 – FERC staff participate in a public meeting in Bristol, Rhode Islandin a public meeting in Bristol, Rhode Island
September 8-9, 2004 – Public comment September 8-9, 2004 – Public comment meeting on the DEIS in Swansea, MA and meeting on the DEIS in Swansea, MA and Middletown, RIMiddletown, RI
Item No. C- 7 – DetailsItem No. C- 7 – DetailsPublic MeetingsPublic Meetings
![Page 6: Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005](https://reader036.vdocuments.site/reader036/viewer/2022072006/56649d1f5503460f949f2a7e/html5/thumbnails/6.jpg)
initial emergency response plan; initial emergency response plan; identify emergency evacuation routes identify emergency evacuation routes
prior to construction;prior to construction; develop emergency response plans develop emergency response plans
with local officials throughout the with local officials throughout the construction period. construction period.
numerous final design improvementss numerous final design improvementss regarding the safe operation of the regarding the safe operation of the facility.facility.
Item No. C- 7 - DetailsItem No. C- 7 - DetailsAdditional Security & Emergency PlansAdditional Security & Emergency Plans