i | P a g e

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA

Ministry of Agriculture

Agricultural Growth Project 2 (AGP 2)

PROGRAM IMPLEMENTATION MANUAL

(PIM)

August 2015

Addis Ababa

ii | P a g e

Agricultural Growth Program 2 (AGP 2)

Program Implementation Manual (PIM)

Table of Content

LIST OF ACRONYMS .......................................................................................................... V

1 INTRODUCTION.................................................................................................. 1

1.1 PURPOSE OF THE PROGRAM IMPLEMENTATION MANUAL .......................................... 1

2 PROJECT OVERVIEW ....................................................................................... 2

2.1 PROJECT DEVELOPMENT OBJECTIVE AND PDO INDICATORS .................................... 2

2.2 PROJECT SCOPE ......................................................................................................... 2

2.2.1 Project Beneficiaries ................................................................................................ 2

2.2.2 Project Geographical Coverage and Selection Criteria ........................................... 3

2.3 PROGRAM COMPONENTS: - ....................................................................................... 5

2.3.1 Component I: Public Agricultural Support Services (US$129 million) – ............... 5

2.3.2 Component II: Agricultural Research (US$51.4 million) – ..................................... 5

2.3.3 Component III: Smallholder Irrigation Development (US$218.6million):- ............ 6

2.3.4 Component IV: Agriculture Marketing and Value Chains (US$120 million)– ....... 6

2.3.5 Component V: Project Management, Capacity development, Monitoring, and

Evaluation (US$62.8 million). ................................................................................. 7

3 INSTITUTIONAL ARRANGEMENTS .............................................................. 7

3.1 OVERALL APPROACH ................................................................................................ 7

3.2 INSTITUTIONAL FRAMEWORK ................................................................................... 8

3.3 ROLES AND RESPONSIBILITIES ................................................................................. 11

3.3.1 Steering Committees .............................................................................................. 11

(a) The Federal SC:- ............................................................................................ 11

(b) The AGP Regional SC ................................................................................... 12

(c) The AGP Woreda SC: .................................................................................... 13

3.3.2 Technical Committees ........................................................................................... 13

(i) Federal Technical Committee: ....................................................................... 14

(ii) Regional Technical Committees: - ................................................................. 15

(iii) Zonal Technical Committees .......................................................................... 16

(iv) Woreda Technical Committees ...................................................................... 17

3.3.3 Program Coordination Units .................................................................................. 18

(i) Federal AGP 2 Coordination Unit: - .............................................................. 18

(ii) Research Component Coordination ................................................................ 19

(iii) Regional AGP 2 Coordination Unit ............................................................... 20

(iv) Project Implementation Support Team (PIST) ............................................... 21

(v) Zonal level AGP Coordination ....................................................................... 22

(vi) Woreda AGP 2 Coordination Unit ................................................................. 22

(vii) Kebele Development Committee /KDC ......................................................... 23

(viii) Kebele Planning Team ................................................................................... 24

4 COORDINATION MECHANISMS WITH ALIGNED AND PARALLEL

PROJECTS AND IMPLEMENTING AGENTS .............................................. 24

5 THE PROGRAM IMPLEMENTATION CYCLE ........................................... 26

5.1 OVERVIEW OF THE IMPLEMENTATION CYCLE ......................................................... 26

5.2 YEAR 1: SITUATIONAL ASSESSMENT AND NEEDS ASSESSMENTS ............................ 28

iii | P a g e

5.2.1 Investment and activities eligible to Program’s financing .................................... 28

5.2.2 Woreda Level Situational Assessment................................................................... 29

5.3 ANNUAL PLANNING ................................................................................................ 39

5.3.1 Kebele Level Planning ........................................................................................... 41

5.3.2 Woreda Work Plan and Budget ............................................................................. 44

5.3.3 Regional Work Plan and Budget............................................................................ 46

5.3.4 Planning of the AGP Supported Research Activities ............................................ 47

5.3.5 Planning of the Federal Work Plan and Budget..................................................... 47

5.3.6 Preparation of the Work Plan and Budget for Successive Years ........................... 48

5.3.7 Capacity Development for Adoption of the AGP Planning Process ..................... 48

5.4 BUDGET AND WORK PLAN APPROVAL .................................................................... 50

5.4.1 AGP 2 Budget Planning Approach ........................................................................ 50

5.4.2 Budget Preparation................................................................................................. 51

5.4.3 Budget Approval Process ....................................................................................... 52

5.5 WORK PLAN IMPLEMENTATION MECHANISMS ........................................ 53

5.5.1 COMPONENT 1: AGRICULTURAL PUBLIC SUPPORT SERVICES ............ 53

5.5.1.1 Sub Component 1.1: Institutional Strengthening and Development ............. 53

5.5.1.2 Sub- Component 1.2: Scaling Up of Best Practices ...................................... 72

5.5.2 COMPONENT 2: AGRICULTURAL RESEARCH ............................................ 75

5.5.2.1 Sub-Component 2.1: Technology Adaptation/Generation ............................ 78

5.5.2.2 Sub-Component 2.2: Pre-Extension Demonstration of Technologies and

Establishment of FREGs ............................................................................... 81

5.5.2.3 Sub-Component 2.3: Support to Source Technology Production for Crop,

Livestock/Forage, Soil and Water and Farm Implements ............................. 84

5.5.2.4 Sub-Component 2.4: Capacity Development (Physical and Human ............ 86

5.5.3 COMPONENT 3: SMALL-SCALE IRRIGATION ............................................. 89

5.5.3.1 Sub-Component 3.1: SSI Infrastructure Development and Improvement .... 93

5.5.3.2 Sub-Component 3.2: Integrated Crop and Water Management (ICWM) for

Irrigated Agriculture .................................................................................... 109

5.5.3.3 SSI Development Component Planning and Implementation Mechanisms 120

5.5.4 COMPONENT 4: AGRICULTURAL MARKETING AND VALUE CHAINS 145

5.5.4.1 Sub Component 4.1: Supporting Agricultural Input Supply System ......... 145

5.5.4.2 Sub Component 4.2: Support to Farmers’ Organizations ........................... 154

5.5.4.3 Sub-Component 4.3: Support Agribusiness Development .......................... 166

5.5.4.4 Sub Component 4.4: Support Market Infrastructure Development and

Management ................................................................................................ 177

5.5.5 COMPONENT 5 : PROGRAM MANAGEMENT ,M & E AND LEARNING 184

5.5.5.1 Sub Component 5.1 Program Management & Institutional Arrangements 184

5.5.5.2 Sub Component 5.2 Monitoring and Evaluation ......................................... 188

5.5.5.3 Sub Component 5.3 Capacity Development ............................................... 192

5.6 MONITORING EVALUATION AND LEARNING .......................................... 195

5.6.1 Inputs, Outputs and outcomes Progress Monitoring ............................................ 196

5.6.2 Outcome and Impact Evaluation .......................................................................... 203

5.6.3 Participatory M&E and Internal Learning ........................................................... 204

6. SOCIAL AND ENVIRONMENTAL MANAGEMENT ISSUES ................. 206

7. PROGRAM FINANCIAL MANAGEMENT ................................................. 208

7.1 PROGRAM COSTS AND FINANCING PLAN .............................................................. 208

7.2 ALLOCATION OF AGP 2 RESOURCE ...................................................................... 208

7.3 FINANCIAL MANAGEMENT (FM) .......................................................................... 209

iv | P a g e

7.3.1 Budget preparation ............................................................................................... 209

7.3.2 Fund flow arrangements ...................................................................................... 210

7.3.3 Accounting system ............................................................................................... 211

7.3.4 Internal control ..................................................................................................... 211

7.3.5 Financial reporting ............................................................................................... 211

7.3.6 Action Plan to Mitigate Financial Management Risk .......................................... 211

8 PROCUREMENT PROCEDURES AND MANAGEMENT ........................ 213

8.1 PURPOSE OF PROCUREMENT GUIDELINES ............................................................. 214

8.2 PROCUREMENT ENVIRONMENT ............................................................................. 214

8.3 SCOPE AND APPLICABLE PROCUREMENT GUIDELINES .......................................... 214

8.4 THE APPLICABLE PROCUREMENT METHODS FOR AGP 2 ...................................... 217

8.4.1 Procurement of Works, Goods and Non-consultancy Services ........................... 217

8.4.1.1 Procurement of works and goods ................................................................. 217

8.4.1.2 Procurement of Agricultural Inputs .............................................................. 218

8.4.1.3 Procurement of non-consulting services ...................................................... 219

8.4.2 Procurement of Airtime ....................................................................................... 219

8.4.3 Selection of consultants ....................................................................................... 219

8.4.4 Training and Workshops ...................................................................................... 220

8.4.5 Operating Costs .................................................................................................... 220

8.4.6 Procurement Review ............................................................................................ 221

8.4.6.1 Prior review areas by the Bank ..................................................................... 221

8.4.6.2 Post Review .................................................................................................. 223

8.4.6.3 Frequency of Procurement Supervision ....................................................... 228

8.4.6.4 Procurement Performance Indicators and Risk Mitigation Action Plan ...... 230

8.4.6.5 Procurement Plan ......................................................................................... 236

8.4.6.6 Procurement Planning and AWPB Linkage ................................................. 237

ANNEXES…. ....................................................................................................................... 242

ANNEX 1 RESULT FRAMEWORK................................................................................. 242

ANNEX 2: LIST OF PROGRAM TARGET WOREDAS ............................................... 251

ANNEX 3: LIST OF STAND ALONE MANUAL AND GUIDELINES ........................ 257

ANNEX 4:- LIST OF INVESTMENTS THAT REQUIRES NEED ASSESSMENT AND

FEASIBILITY STUDY ..................................................................................... 258

LIST OF TABLES

TABLE1: DISTRIBUTION OF TARGET WOREDAS ACROSS REGIONAL STATES ............................... 4

TABLE 2: COMPOSITION OF THE FEDERAL AGP -II STEERING COMMITTEE .............................. 11

TABLE 3: COMPOSITION OF THE REGIONAL AGP 2 STEERING COMMITTEE .............................. 12

TABLE 4: COMPOSITION OF THE WOREDA AGP 2 STEERING COMMITTEES. ............................ 13

TABLE 5: COMPOSITION OF FEDERAL AGP 2 TECHNICAL COMMITTEES ................................. 14

TABLE 6:- COMPOSITION OF THE REGIONAL AGP 2 TECHNICAL COMMITTEES. .................... 16

TABLE 7: COMPOSITION OF THE ZONAL AGP 2 TECHNICAL COMMITTEES .............................. 16

TABLE 8: COMPOSITION OF THE WOREDA AGP 2 TECHNICAL COMMITTEES. ......................... 17

TABLE 9. FEDERAL AGP 2 PCU STAFF .................................................................................... 18

TABLE 10. COMPOSITION OF RCCU AND RRCCU STAFF ......................................................... 20

TABLE 11:- REGIONAL AGP 2 COORDINATION UNIT STAFF COMPOSITION AND NUMBER........ 20

v | P a g e

TABLE 12. PROJECT IMPLEMENTATION SUPPORT TEAM FOR IMPLEMENTATION OF SSI ............ 21

TABLE 13. WOREDA AGP 2 PCU STAFFS ................................................................................... 22

TABLE 14 SECONDARY DATA COLLECTION FROM GOVERNMENT SOURCES AND VALIDATION

THROUGH COMMUNITY CONSULTATION FOR A COMMON PLANNING PLATFORM ........ 30

TABLE 15.AGP 2 PLANNING TIMETABLE .................................................................................. 40

TABLE 16. AGP 2 TRAINING AND PLANNING TIMETABLE ........................................................ 49

TABLE 17. FTC CRITERIA BY FUNCTIONALITY LEVEL .............................................................. 55

TABLE 18:- LIST OF ITEMS TO BE PROCURED FOR RESEARCH COMPONENT ............................... 87

TABLE: 19: EXISTING SSI SUBPROJECTS IMPLEMENTATION TIMETABLE .................................. 99

TABLE: 20: MHIS SUB PROJECTS IMPLEMENTATION TIMETABLE ........................................... 101

TABLE: 21: NEW SSI SUBPROJECTS IMPLEMENTATION TIMETABLE ....................................... 103

TABLE 22: SSI SYSTEMS ESTABLISHMENT GUIDELINES ON INDICATIVE INVESTMENT COST .. 122

TABLE 23 : ACTIVITIES AND IMPLEMENTING AGENCIES FOR SMALL-SCALE IRRIGATION

DEVELOPMENT...................................................................................................... 138

TABLE 24: SELECTED VALUE CHAIN PRODUCTS .................................................................... 167

TABLE 25:AGP 2 PROGRAM COST BY COMPONENT AND SUB COMPONENT ............................. 209

TABLE 26: PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS ............................... 225

TABLE 27 : SUMMARY OF PROCUREMENT RISKS /FINDINGS AND ACTIONS (RISK MITIGATION

MATRIX) ............................................................................................................... 233

LIST OF FIGURES

FIGURE 1: MAP OF THE AGP- II WOREDAS ................................................................................. 4

FIGURE 2:- SCHEMATIC PRESENTATION OF THE AGP2 INSTITUTIONAL ARRANGEMENTS ............ 9

FIGURE 3:- ACCOUNTABILITY OF KEBELE DEVELOPMENT COMMITTEE .................................... 23

FIGURE 4: THE PROGRAM IMPLEMENTATION CYCLE ................................................................ 27

FIGURE 5: INPUTS FOR SWOT ANALYSIS AND OUTPUTS FOR LOCAL LEVEL

(WOREDA/KEBELE) PLANNING ............................................................................... 39

FIGURE 6: AGP 2 WOREDA AGRICULTURAL DEVELOPMENT PLAN .......................................... 46

FIGURE 7:- IMPLEMENTATION PROCESS AND FLOW OF ACTIVITIES OF THE RESEARCH

COMPONENT ............................................................................................................. 77

FIGURE 8 :-REPORT FLOW ARRANGEMENT .............................................................................. 202

FIGURE 9: FUND FLOW ARRANGEMENT .................................................................................. 212

List of Acronyms

ADPLAC Agriculture Development Partners Linkage Advisory Council

AECID Agencia Española de Cooperación Internacional para el Desarrollo (Spanish

Agency for International Development)

AETAD Agricultural Extension, Training and Advisory Directorate

AGP1 First Agricultural Growth Project

AGP2 Second Agricultural Growth Project

AGP2-FP AGP2 Focal Person

AHD

Animal Health Directorate

AIMD

Agricultural Input marketing Directorate AMD Agricultural Mechanization Directorate

APFRDD Animal Production and Feed Resources Development Directorate

ARCC Agricultural Research Component Coordinator

ARCCU Agricultural Research Component Coordination Unit

ATA Agricultural Transformation Agency

vi | P a g e

AWP&B Annual Work Plan and Budget

BoA Bureau of Agriculture

BOQ Bill of Quantities

BoW Bureau of Water

CAADP Comprehensive Africa Agriculture Development Program

CASCAPE Capacity development for scaling up of evidence based best practices in

agricultural production in Ethiopia

CBSP Community Based Seed and forage Production Groups

CDSF Capacity Development Support Facility

CED Crop Extension Directorate

CIG Common Interest Group

CLPP Community Level Participatory Planning

CPAR Country Procurement Assessment Review

CRGE Climate Resilience Green Economy

CSA Central Statistical Agency

CSA Climate Smart Agriculture

CSQAC Construction Supervision and Quality Assurance Committee

CU Coordination Unit

CVDFQCL Central Veterinary Drug and Feed Quality Control Laboratory

DA Development Agent

DFATD Department of Foreign Affairs, Trade and Development of Canada

DOC Day Old Chick

DP Development Partners

DSM Direct Seed Marketing

EAB Ethiopian Apiculture Board

EC European Commission

EHBEA Ethiopian Honey & Beeswax Exporters Association

EIAR Ethiopian Institute of Agriculture Research

ESMF Environmental and Social Management Framework

ESMP Environmental and Social Management Plan

ETB Ethiopian Birr

FAO Food and Agriculture Organization of the United Nations

FCA Federal Cooperative Agency

FPCU Federal Coordination Unit

FGD Focussed Group Discussion

FHH Female Headed Household

FM Financial Management

FMS Financial Management Specialist

FREG Farmer Research and Extension Group

FSC Federal Steering Committee

FSDD Feasibility Study and Detail Design

FTC Federal Technical Committee

FTC MC Farmer Training Center Management Committee

FTCs Farmer Training Centres

GAFSP Global Agriculture and Food Security Program

GAP Good Agricultural Practice

GDP

Gross Domestic Product

GHG Green House Gas

GoE Government of Ethiopia

GTP Growth and Transformation Plan

vii | P a g e

GTP2 Growth and Transformation Plan2(second Phase)

Ha Hectare

HACCP Hazard Analysis and Critical Control Points

HDI Human Development Index

HHI Household Irrigation

HQ Headquarters

IA Implementing Agency

IBRD International Bank for Reconstruction and Development

IC Individual Consultant

ICB International Competitive Bid

ICWM Integrated Crop and Water Management

ID Input Directorate

IDA International Development Association

IDA Irrigation Development Agency/ Authority

IFR Interim Financial Report

IPM Integrated Pest Management

ISO International Organization for Standard

ISP Implementation Support Plan

ISSD Integrated Seed Sector Development

IT Information Technology

IWUA Irrigation Water User Association

JRIS Joint Review and Implementation Support

KDC Kebele Development Committee

KDP Kebele Development Plan

KII Key Individual Informant

LUAD Land Use and Administration Directorate

M&E Monitoring and Evaluation

MC Multiplication Center

MCMC Market Center Management Committee

MDG Millennium Development Goal

MDTF Multi – Donor Trust Fund

MFI Micro Finance Institutions

MFIs Micro-Finance Institutions

MHH Male Headed Household

MHIS Micro Household Irrigation Systems

MIS Market Information System

MoA Ministry of Agriculture

MoFA Ministry of Foreign Affairs

MoFED Ministry of Finance and Economic Development

MoI Ministry of Industry

MoT Ministry of Trade

MoU Memorandum of Understanding

MoWIE Ministry of Water Irrigation and Energy

MSP Multiple Stakeholder Platform

MTR Mid Term Review

NACF National Agricultural Cooperative Federation

NAHDIC National Animal Health Diagnostic and Investigation Center

NAIC National Artificial Insemination Center

viii | P a g e

NARS National Agricultural Research System

NBE National Bank of Ethiopian

NCB National Competitive Bidding

NICETT National Institute for the Control and Eradication of Tsetse &Trypanosomasis

NNP National Nutrition Program

NPV Net Present Value

NRM Natural Resources Management

NRMD Natural Resources Management Directorate

NSL

National Soil Laboratory

NSTC National Soil Testing Center

NVI National Veterinary Institute

O&M Operation and Maintenance

OFAG Office of the Federal Auditor General

OIE Office International des Epizooties (World Organization for Animal Health)

PCU Program Coordination Unit

PDO Project Development Objective

PFM Public Financial Management

PHC Plant Health Clinics

PHL Plant Health Laboratory

PHRD Plant Health Regulatory Directorate

PIF Policy Investment Framework

PIM Project Implementation Manual

PMIS Performance Management Information System

PRA Participatory Rural Appraisal

P-RAMS Procurement Risk Assessment Management System

QCBS Quality and Cost Based Selection

RARI Regional Agricultural Research Institute

RCA Regional Cooperative Agency

RPCU Regional Coordination Unit

RED&FS Rural Economic Development and Food Security

RFSDAC Regional Feasibility Study and Design Approval Committee

RLSA Regional Livestock Agency

RMCB Regional Marketing and Cooperative Bureau

RMP Residue Monitoring Plan

RPCU Regional Programme Coordination Unit

RPF Resettlement Policy Frame work

RRA Rural Rapid Appraisal

RRCCUs Regional Research Component Coordination Units

RSC Regional Steering committee

RSTL Regional Soil Testing Laboratory

RUSACCOs Rural Saving and Credit Cooperatives

RWH Rain Water Harvesting

SA Social Assessment

SBD Standard Bidding Document

SBMC Small Bridge Management committee

SC Steering Committee

SHDD Smallholder Horticulture Development Directorate

SHF Smallholder Farmer

SHIS Smallholder Irrigation System

ix | P a g e

SIFMD Soil Information and Fertility Management Directorate

SKDC Sub-Kebele Development Committee

SMISP Small Scale and Micro Irrigation Project

SMS Subject matter Specialist

SNNPR Southern Nations, Nationalities, and People's Region

SoEs Statement of Expenditures

SSI Small Scale Irrigation

STC Short Term Consultant

SWG Sector Working Group

TA Technical Assistant

TAD Trans- boundary Animal Disease

TAG Technology Adaptation and Generation

TC Technical Committee

THH Total Households

ToT Training of Trainers

TTL Task Team Leader

UNDP United Nations Development Program

USAID United States Agency for International Development

VC Value Chain

VDFACA Veterinary Drug and Feed Administration & Control Authority

WB World Bank

WCIG Women Common Interest Group

WCU Woreda Coordination Unit

WDC Woreda Development Committee

WDP Woreda Development Plan

WFP Woreda Focal Person

WOA Woreda Office of Agriculture

WOCP Woreda Office of Cooperative Promotion

WOFED Woreda Office of Finance and Economic Development

WSC Woreda Steering Committee

WTC Woreda Technical Committee

ZOA Zonal Office of Agriculture

1 | P a g e

1 INTRODUCTION

1.1 Purpose of the Program Implementation Manual

As presented on the design document the purpose of Program Implementation Manual (PIM)

is to guide the implementers and partners in executing the AGP 2. The PIM is designed to

provide a detailed and time bound procedures and plan to assist the stakeholders to undertake

project-related activities at different levels (Federal, Regional, Zonal, Woreda, Kebele and

community) and other beneficiary groups. It is also meant to provide guidance to senior

managers within different agents and departments tasked with program implementation. The

PIM is also designed to serve as a tool for supervision and monitoring by the steering

committees at all levels and the development partners.

This PIM includes, among others, responsibilities for project execution, financial management,

procurement, disbursement, monitoring and evaluation, environmental and social safeguards

arrangements, and reporting arrangements for the project.

The PIM defines its geographic coverage and eligible beneficiaries. It provides an overview of

the project and describes the overall approaches for implementation. It details the project

structure, together with the institutional arrangements and the implementation mechanisms. It

depicts the process for the elaboration and approval by the Government of Ethiopia (GoE) and

the World Bank of the Annual Work Plan and Budget (AWP&B). The PIM details the

implementation mechanisms for each project’s intervention. Among others, this include for

each intervention activities to be undertaken, the sequence and period of these activities, and

the responsibilities for carrying out each activity.

The PIM is developed based on the government project design as well as the World Bank

project documents, including the Project Appraisal Document, the environmental and social

safeguards, Social Assessment (SA), Environmental and Social Management Framework

(ESMF), the Procurement and Financial Management Manual, the M&E manual, the

Resettlement Policy Framework (RPF), and the Governance and Anti-Corruption (GAC).

However, these aspects are addressed in specific manuals or documents, which remain the

official reference for the implementation of these aspects during the project.

The PIM is not a rigid blueprint document and hence will be subjected to updating periodically

in consultation with the program stakeholders to ensure that it will remain relevant and useful

overtime.

2 | P a g e

2 PROJECT OVERVIEW

2.1 Project Development Objective and PDO indicators

The Program Development Objective (PDO) is to increase agricultural productivity1 and

commercialization2 of smallholder farmers targeted by the program and contributes to dietary

diversity and consumption at HH level.

The project would also contribute to the higher-level objectives of poverty reduction, and

climate change mitigation and adaptation through supported climate smart agriculture

initiatives.

The PDO indicators are:

1) Percentage increase in yield for selected crops in targeted households (benefiting

directly from the project; disaggregated by Male Headed Households (MHH) and

Female Headed Households (FHH));

2) Percentage increase in yield for selected animal products in targeted households

(benefiting directly from the project; disaggregated by MHH and FHH);

3) Proportion of production sold by targeted households for selected crops (targeted

households are benefiting directly from the project; disaggregated by MHH and

FHH));

4) Proportion of animal production sold by targeted beneficiaries for selected products

(targeted beneficiaries are benefiting directly from the project; disaggregated by

male and female (FHH and married female).

5) Household dietary diversity: - increase in average number of food groups

consumed at HH level3.

6) Number of direct project beneficiaries.

2.2 Project Scope

The scope of the project is defined in term of the geographical coverage and targeted

beneficiaries.

2.2.1 Project Beneficiaries

The primary target of the project is smallholder farmers, who live in areas located in the AGP2

targeted 157 Woredas. Smallholder farmers are defined by the Central Statistics Agency as

farmers living in a village, registered as a resident in Kebele administration, conducting

agricultural production activities (crop production, livestock husbandry and agro-forestry) and

owning land of variable size; the average holding sizes of land per household in Ethiopia is

around 1 ha.

1 Agricultural productivity is defined as yields for selected key crops and animal products. 2 Commercialization is defined in terms of proportion of marketed production of selected key crops and animal

products by smallholder farmers. 3 This Indicator will be monitored by the additional fund by the EU for Complimentary Action to promote

Nutrition in to AGP 2 conducted by consultant

3 | P a g e

The target number of direct beneficiaries will be 1.6 million. The project will also specifically

target women farmers with tailor made innovations, activities and technical assistance. The

target proportion of female direct beneficiaries (both female head of household and married

female) will be 40 percent. The direct beneficiaries will include smallholder farmers benefiting

from:

– trainings and demonstrations leading to adoption of new technologies;

– farmers in Common Interest Groups (CIGs), farmers benefiting from small scale

irrigation and HHI including those in Irrigation Water User Associations (IWUAs),

– farmers in Farmer Research Extension Groups,

– Farmers being linked to the market by the project, farmers using animal health services

and farmer members of cooperatives supported by the project;

In addition, the project will reach a significant number of indirect beneficiaries, including

household members and farmers benefitting from overall improved public agricultural services

and access to some markets.

2.2.2 Project Geographical Coverage and Selection Criteria

In addition to AGP1 Woredas, AGP2 will expand to 61 new Woredas of similar agro-ecological

conditions. Overall, AGP2 will therefore operate in 157Woredas located in seven regional

states and one administrative council.The distribution of number of AGP 2 Woredas among

Regional’s States is in accordance to the share of population of respective regions considering

the 2007 census. Within regional States, new Woredas have been selected applying the same

criteria used in AGP1 including:

(i) Access to markets (access to cities of 50,000 population or over in less than 5

hours);

(ii) Natural resource endowment (including good rainfall distribution and annual

average of 700 mm or over);

(iii) Suitable rainfall and soil for crop and fodder production;

(iv) Potential for development of small-scale irrigation;

(v) Institutional plurality of service providers, including good basis and growth of

viable cooperatives and farmer groups and existing partnership engagements with

private sector, and

(vi) Willingness and commitment to participate (supportive environment; performance

of programs/programs supported by other donors).

In addition to the above selection criteria, AGP2 has been responsive to region’s request to

consider the Woredas covered by the PSNP that have demonstrate high potential for growth.

AGP2 also considered Woreda clustering as a criterion for selection to develop synergies for

growth as well as Woredas capacity to manage the multiple funding.

The Table 1 and Figure 1 below summarize the distribution of AGP2 targeted Woredas across

Regional States of Ethiopia. A detailed list of AGP2 Woredas and respective number of Kebele

is provided in Appendix 2.

4 | P a g e

TABLE1: DISTRIBUTION OF TARGET WOREDAS ACROSS REGIONAL STATES

Regions AGP1 New Woredas AGP2

Woreda Kebele Woreda Kebele Woreda Kebele

Oromiya 39 1030 23 610 62 1,640

Amhara 26 641 15 425 41 1,066

SNNPR 22 668 13 364 35 1032

Tigray 9 130 4 75 13 205

Benishangul-Gumuz - - 2 53 2 53

Gambella - - 2 35 2 35

Harari - - 1 17 1 17

Dire Dawa Adm. - - 1 21 1 21

Total 96 2469 61 1600 157 4,069

Figure 1: Map of the AGP- II Woredas

ETHIOPIA: SECOND AGRICULTURE GROWTH PROGRAM

5 | P a g e

2.3 Program Components: -

The paragraphs below provide a brief description of the five Program components. For a

detailed Program description, see Annex 2 of the PAD

2.3.1 Component I: Public Agricultural Support Services (US$129 million) –

The objective of this component is to increase access to public agricultural services for

smallholder farmers, the program will support:

(i) The identification of local priorities for public services through the establishment,

operation and strengthening of Agriculture Development Partners Linkage

Advisory Councils (ADPLACs), and linkages to other planning mechanisms

including community consultation and local strategic planning;

(ii) The strengthening of public services delivery, including for agricultural extension

service, animal production and animal health services, crop production and plant

health services, natural resource management services, soil fertility management

services, and agricultural mechanization;

(iii) The scaling up of “best” practices of agricultural technologies and management

practices in agricultural production and post-harvest activities. This would include

the identification (through a community consultation process), validation and

verification of local practices.

2.3.2 Component II: Agricultural Research (US$51.4 million) –

The objective of this component is to increase the supply of demand driven agricultural

technologies that directly link to the other components. Under this component, the project will

support:

(a) Technology adaptation and generation:- This focuses on the release of improved

technologies to the agricultural extension system. It is implemented through:(i) the

release of selected pipeline technologies from end stage trials, including for crop

varieties and management practices, poultry breeds, forage crops, irrigated crop

management, acid soil and Vertisol management, integrated nutrient management,

and soil and water conservation technologies; and ii) design and implementation of

a research program based on assessment of farmers demand in the framework of

AGP2 objectives, AGP2 selected value chain commodities and considering cross

cutting issues (nutrition, gender and Climate Smart Agriculture).

(b) Pre-extension demonstration and participatory on-farm technology piloting through

FRGs for recommended agricultural technologies and supporting and facilitation of

Farmer Research and Extension Groups (FREGs) to enhance adoption and use of

agricultural technologies generated by the research systems.

(c) Source technology production, including the production of breeder and pre-basic

seeds for major crop varieties, multiplication of disease and insect free tissue

6 | P a g e

culture, production of source livestock and forage technologies and multiplication

of land and water resources technologies.

(d) Capacity development: supporting the development of physical and human capacity

of the agricultural research system to enhance the capacity of the national and

regional research centres to effectively respond to technology needs for selected

and priority agricultural commodities and high value crops.

2.3.3 Component III: Smallholder Irrigation Development (US$218.6million):-

The objective of this component is to increase the access to and efficient utilization of irrigation

water by smallholder farmers. Under this component, the Program will support:

(a) Increased availability of irrigated water through: i) the rehabilitation, upgrading

and/or improvement of existing Small-scale Irrigation Schemes; ii) establishment

of new SSI systems integrated with access roads where necessary; and iii) HHI

systems.

(b) Improved water management services through establishing and/or strengthening

IWUAs and the introduction of improved irrigated agricultural management.

2.3.4 Component IV: Agriculture Marketing and Value Chains (US$120 million)–

The objective of this component is to increase the commercialization of agricultural products

through increased smallholder farmers access to input and output markets. Under this

component, the Program would support:

(a) The promotion and distribution of agricultural inputs, specifically seed through

support to Community Based Seed Production groups and the scale up of Direct

Seed Marketing and strengthening the input tracking system.

(b) Strengthening the input and output marketing regulation and certification;

(c) Farmer’s organizations, including formal farmer organizations (Unions, Primary

Cooperatives) and informal, commercially oriented farmer groups (informal groups

establishment would be focused on women and youth groups). The project would

support business plan preparation and implementation, including through the

provision of equipment and inputs to qualifying groups. Service providers,

including the Cooperative Agency, would receive capacity support. Improved

access to credit (both rural savings and credit cooperatives (RUSACCOs) and

Micro-finance Institutions (MFIs)) would be facilitated.

(d) The strengthening of selected livestock and crop value chains (VCs), to be identified

through a market analysis process and consistent with commercialization clustering,

including a range of activities including technical assistance to cooperatives and

market buyers (including processors and exporters), linkages between VC

participants, including from importing markets (such as participation in trade

7 | P a g e

shows); competitive matching grants and innovation grants. This sub-component to

be financed through a parallel financing mechanism funded by USAID; and

(e) Market infrastructure development and management, including (i) construction and

modernized management of public market centres at Woreda level; (ii) where clear

rationale and exit strategy for public sector investment is demonstrated, to support the

construction of warehouses, storage and grading facilities; and (iii) foot bridges which

address critical market access bottlenecks for communities.

2.3.5 Component V: Project Management, Capacity development, Monitoring, and

Evaluation (US$62.8 million).

The objective of this component is to ensure the timely implementation of the Program

according to its core principles and PDO, effective monitoring and evaluation (M&E) of

results, including results related to crosscutting issues, and a consistent and effective approach

to capacity development. Under this component, the Program would support:

(i) Project management and coordination,

(ii) Monitoring, evaluation and learning,

(iii) Capacity Development Support Facility, to improve the quality of capacity

development interventions; and strengthen the institutional capacity of

Implementation Agencies (IAs).

(iv) Mainstreaming cross-cutting issues (gender, nutrition and Climate Smart

Agriculture) throughout the above components and through specific activities of the

cross-cutting issues.

3 INSTITUTIONAL ARRANGEMENTS

3.1 Overall Approach

Institutional arrangement under AGP 2 will be built on those established under AGP- I. The

project will rely on existing Government structures for the coordination and implementation of

the project. Public servants assigned to work for AGP 2 will do it as part as his/her normal

duty. The AGP tasks will be part of his/her Program of work and will be considered within the

GoE staff evaluation system. The exception is for parallel funding of market linkage activities

through the United States Agency for International Development (USAID) under component

4 and the Canadian Department of Foreign Affairs, Trade and Development (DFATD) for the

Capacity Development Support Facility (CDSP) under component 5 that will be channelled

through specific implementation arrangements. In the new Regions and Woredas, similar

structures will be established with some modifications taking into account the smaller number

of Woredas4.

The project will be implemented following the MoA structure at Federal, Regional, Zonal,

Woreda and Kebele; and the Research institutions at federal, regional and research centres. The

MoA will be the lead executing agency with the overall responsibility for coordinating all

4Only two Woredas in each Benishangul Gumuz and Gambella, and one Woreda each in Dire Dawa and Harari

are included

8 | P a g e

aspects of the project including contributions by the different ministries and agencies

participating in the project’s implementation. With the exception of the staff directly recruited

by AGP 2, all other public servants assigned to work for AGP2 will do it as part as his/her

normal duty. The AGP tasks will be part of his/her Program of work and will be considered

within the GoE staff evaluation system”.

The main responsibilities of the MoA will include project oversight, coordination, planning,

technical support (Including on agreed upon cross cutting issues), financial management,

procurement support, monitoring, and evaluation. The MoA will be accountable for authorizing

and verifying all project transactions and will work closely with the World Bank’s project Task

Team during project implementation.

Implementation of the project will be decentralized. Federal IAs will provide guidance and

support to regions, spearhead most institutional Capacity Development activities and undertake

monitoring, evaluation and communication activities. At regional and Woreda levels, the

Bureaus/Offices of Agriculture will assume primary responsibility for execution of the project.

Relevant service providers and institutions will also support implementation of AGP 2 at the

regional level. At the Zonal level, the Zonal office of Agriculture (ZoA) will provide technical

support, extension services and M&E to the group of Woredas under its authority. The ZOAs

will coordinate with the Woreda offices of Agriculture (WoA).

3.2 Institutional Framework

To fulfil its responsibilities, the MoA will use the institutional mechanisms established for the

implementation of AGP- I and will establish in the targeted new regional states. AGP 2

institutional arrangements as indicated in Figure 3 include (i) AGP Steering Committees (SCs),

(ii) the AGP Technical Committees (TCs), and (iii) the AGP Coordination Units (CUs). The

composition of these Committees will be adapted to include the new implementing agencies

such as the Ethiopian Institute of Agricultural Research (EIAR) and Regional Agricultural

Research Institutions (RARIs).

Arrangements have been made to keep strong working linkages within and between the

institutional set ups. These are: (i) there is a direct vertical institutional linkage among the

Steering Committees structured at federal, regional and Woreda levels, and the same is true for

Technical committees. (ii) The chairpersons of the regional SCs are automatically the members

of the federal SCs. This is to ease communication between the regional and federal SCs, and

create transparent and participatory decision-makings process at federal levels. In the same

fashion, the Zonal chairs of the TCs are the members of the regional SCs. Through the Zonal

Chair of the TC, the Regional SCs will have up to date information about the project

implementation performances, challenges and areas of support needed at Woreda levels.

Moreover, the projects CUs are connected to the SC and TCs. The project coordinators at

federal, regional and Woreda level are respectively the secretary of the FSC, RSC and WSC;

and the chairperson of the TCs at regional and Woreda levels. Such arrangement is expected

to create fast and up to date information flow all through federal, regional and Woreda levels.

9 | P a g e

Figure 2:- Schematic presentation of the AGP2 institutional arrangements

10 | P a g e

11

3.3 Roles and responsibilities

3.3.1 Steering Committees

Steering Committees at federal, regional and Woreda levels play key roles for oversight and major

decision-making. Steering Committees’ key roles and functions across the different project levels (all

from federal to Woreda level) will include:

(a) providing overall oversight, decision making and strategic guidance for project

implementation;

(b) review and approve the Annual Work Plans and Budgets (APW&Bs) submitted by the

respective Project coordination Units (PCUs),

(c) review and approve annual implementation performance report prepared by the PCUs and

overseeing the implementation of corrective actions, and

(d) ensure inter-sectoral coordination, harmonization and alignment among donors,

(e) Will ensure cross cutting issues of gender, climate, nutrition and youth are given enough

support throughout the implementation process

(a) The Federal SC:-

Oversight of the program at the federal level will be provided by the Federal AGP SC. The steering

committees will be chaired by the Minister of Agriculture or his representative and the Federal Project

Coordination Unit will serve as a Secretary. FSC will meet bi-annually in August and February and

the venue would move around the regions.

Federal SC key roles and functions will include: (i) review and approval of annual work plans and

monitoring of performance for re allocation of budget as well as corrective actions, and (ii) ensure

inter-ministerial coordination, harmonization and alignment among donors. It comprises high-level

key officials from relevant line ministries, agencies and stakeholders as indicated in Table 2 below.

Developments Partners will be observer of the SC and are not actual members

Table 2: Composition of the Federal AGP -II Steering Committee

1. 1 Minister, MoA - Chair 2 Federal AGP Coordinator- Secretary

2. 3 Agricultural Development Sector

State Minister

3. 4 4. Natural Resource Development Sector State

Minister

5. 5 Livestock Development Sector

State Minister

6. 6 7. Training and Advisory service Directorate

8. 7 Crop development directorate 9. 8 10. Agricultural Mechanization Directorate

11. 9 Smallholder Horticulture

Development Directorate

12. 10 13. Varity realise, protection and seed Quality

control Directorate

14. 11 Coffee, Tea and Spice Development

Directorate

15. 12 16. Plant Health and Quality control Directorate

17. 13 Plant Health Regulatory Directorate 18. 14 19. Agricultural Input directorate

20. 15 Animal Health Directorate 21. 16 22. Animal Production & Feed resources Directorate

23. 17 Irrigation Development Directorate 24. 18 25. Water shade Development Directorate

12

(b) The AGP Regional SC

Regional Steering Committees (RSCs) will be established at regional level to ensure institutional

coordination. The Regional President or his /her designee will chair the regional SC, and the regional

AGP coordinator will be the secretary. The AGP Regional SC will meet bi annually and the meeting

time is immediately prior to the FSC meeting. Member of the regional committee varies depending on

the government structures of the regions. The composition of the committee members is shown in

Table 3 below.

Table 3: Composition of the Regional AGP 2 Steering Committee

19 Land Use and Administration

Directorate

26. 20 27. Soil fertility Improvement Directorate

28. 21 Women’s Affair Directorate 29. 22 30. Planning and Programming Directorate

31. 23 Emerging Regions coordination

Directorate

32. 24 33. Public Relation Bureau

34. 25 National Artificial Insemination

centres

35. 26 36. National Institute for the Control and Eradication

of Tsetse & Trypanosomasis

37. 27 Veterinary Drug and Feed Quality

Control Authority

38. 28 39. National Animal Health Diagnostic and

Investigation canter

40. 29 Ethiopian Institute of Agricultural

Research(EIAR)

41. 30 42. Federal Cooperative Agency

43. 31 Agricultural Transformation

Agency (ATA)

44. 32 45. Ministry of Finance and Development (MoFED)

46. 33 Ministry of Trade (MoT) 47. 34 48. Ministry of Industry (MoI)

49. 35 Ministry of Health (MoH) 50. 36 51. Ministry of women Children and Youth Affairs

(MoCYA)

52. 37 Central Statistic Agency ) 53. 38 54. Regional AGP-SC Chairperson

55. 39 Regional Agricultural Research

Institute

56. 57.

1. 1 Regional President or his /her designee -

Chair

2. 2 3. Regional AGP Coordinator- Secretary

4. 3 Regional Bureau Agricultural 5. 4 6. Regional Livestock Development Agency

7. 5 Regional Government institution

responsible for women and youth affairs

8. 6 9. Regional Government institution responsible for

cooperative promotion

7 Regional Bureau of Land Administration

and Environment

8 10. Regional Government institution responsible for

Trade/Marketing

9 Regional Agricultural Research

Institutions

10 11. Regional bureau of Finance and Development

(RBoFED)

13

To maintain the integrity between the regions and Woredas, the zonal administrators will be the

member of the Regional Steering Committee. The Zonal administrator will be responsible to

technically support, monitor and evaluate the AGP activities in the respective Woredas.

(c) The AGP Woreda SC:

The Woreda Administrator or his /her representative will chair the Woreda SC and the Woreda AGP

focal person will serve as a secretary. Members of the Woreda Steering Committee are indicated in

table 4. The Woreda SC will undertake at least two meetings annually with additional meetings as

deemed necessary. The appointment of Woreda SC will not include Harari Regional state and the

Dire Dawa City Administration

Table 4: Composition of the Woreda AGP 2 Steering Committees.

1. 1 Woreda administrator or his /her

designee - Chair

2. 2 3. Woreda AGP Focal person - Secretary

4. 3 Woreda Office of Agricultural 5. 4 6. Woreda Livestock Development office

7. 5 Woreda Government institution

responsible for women and youth

affairs

8. 6 9. Woreda Government institution

responsible for cooperative promotion

10. 7 Woreda Government institution

responsible for Land Administration

and Environment

11. 8 12. Woreda Government institution

responsible for Trade/Marketing

13. 9 Woreda office of Finance and

Economic Development (WoFED)

14. 10 15. Woreda Government institution

responsible for water and irrigation

Development 16. 11 Woreda Health Office 12 Other relevant institution involved in

AGP implementation

3.3.2 Technical Committees

AGP Technical Committee will be established at federal, regional , zonal and Woreda level. At all

level, additional staff will be added in order to address new technical aspects, including cross-cuttings

issues. The responsibility of the Technical Committees at all levels will specifically include:

(i) Reviewing, providing recommendations and advising on improving the AWP&Bs

submitted by the respective CUs,

(ii) Providing technical advisory services on implementation modalities,

(iii)Providing institutional capacity building to CUs and relevant implementation entities,

11 Regional Government institution

responsible for water and irrigation

Development

12. 12 13. Zonal Administrators (AGP implementing

zones)

13 BoA Planning and Programming Process 14 14. Bureau of Health

14 Other relevant institution involved in

AGP implementation

15.

14

(iv) Reviewing and analyzing all documents prepared under the project’s responsibilities;

(v) Providing recommendations and advising on general improvement.

(vi) Provide advice to SCs on AGP2 activities; as well as to produce reports on

implementation progress.

(vii) Support the program to integrate cross cutting issues in all program components.

(viii) Support the AGP2 CUs and AGP 2 focal persons in technical backstopping and

supervision at lower levels, to coordinate AGP2 implementation within their respective

institutions (including institutional Capacity Development as appropriate).

It should be noted that as in AGP I, the Federal Technical Committees will be made up of senior

technical staff from relevant implementing institutions. At the regional, zonal and Woreda levels, the

TCs will be established with high-level experts from the relevant implementing institutions. The

technical committee will conduct meetings monthly at the federal, regional, Zonal and Woreda levels.

(i) Federal Technical Committee:

The Federal Technical Committee (FTC) will be chaired by the FPCU. The composition of the federal

TC committee includes focal persons drawn from each implementing and service providing agencies

including the contracted implementing firm for parallel funding. The FTC established for AGP-I

would continue to serve for AGP 2.

The composition of the federal TC includes focal persons drawn from each implementing and service

providing agencies including the contracted implementing firm for parallel funding. The FTC

established for AGP-I would continue to serve for AGP 2 and the composition would be as depicted

in Table 5.

The venue for the federal technical committee meeting and responsibility for organizing meetings

rotates among TC members as agreed in TC meetings. The hosting organizations chair the meeting,

take and distribute the minute of the meeting. The major role of the Federal AGP TC is to:

Review federal level annual work plan and performance report and provide feedback to the

CU;

Recommend the draft work plan to the steering committee;

Recommend changes to the technical design and implementation modalities of the program

including cross cutting issues to the SC, and

Provide technical review of project implementation

Table 5: Composition of Federal AGP 2 Technical Committees

1. FPCU 2 AGP 2 Financing Development Partners (WB, ,

DFATD, EKN, EU, Spanish Coop., Italian Coop.,

USAID, UNDP)

3. Focal person Crop development

directorate

4 Focal person Training and Advisory service

Directorate

5. Focal person Smallholder horticulture

development Directorate

6 Focal person Agricultural Mechanization

Directorate

15

7. Focal person Coffee, Tea and Spice

Development Directorate

8 Focal person Varity realise, protection and seed

Quality control Directorate

9. Focal person Plant Health Regulatory

Directorate

10 Focal person Plant Health and Quality

control Directorate

11. Focal person Agricultural

Input directorate

12 Focal person Animal Production & Feed resources

Directorate

13. Focal person Animal Health

Directorate

14 Focal person Water shade Development

Directorate

15. Focal person Irrigation

Development Directorate

16 Focal person Soil fertility Improvement

Directorate

17. Focal person Smallholder horticulture

development Directorate

18 Focal person Women’s Affair Directorate

19. Focal person National Artificial

Insemination centres

20 Focal person National Institute for the Control and

Eradication of Tsetse & Trypanosomasis

21 Nutrition case team focal person

22 Focal person National Animal Health Diagnostic

and Investigation canter

23. Focal person Veterinary Drug and

Feed Quality Control Authority

24 Focal person Federal Cooperative Agency

25. Research Component Coordination

Unit (RCCU )

26 Focal person EIAR Livestock Research

27. Focal person EIAR Crop Research 28 Focal person EIAR Socio economic Research

29. Focal person EIAR NRM Research 30 Focal Person Ministry of Trade (MoT)

31 Focal persons from Agricultural

Transformation Agency (ATA)

32 Focal Person Ministry of Industry (MoI)

33. Focal Person Ministry of Health

(MoH)

34 Focal person Ministry of Women Children and

Youth affairs

35. Parallel funded projects of USAID

and DFATD (CDSF) and aligned

projects (CASCAPE, SMISP and

ENGINE)

(ii) Regional Technical Committees: -

The coordinators of the respective PCUs will be the chairperson of the regional TC and meetings will

be conducted monthly. The regional AGP TC will acquire the following responsibilities:

Review regional level annual work plan and performance report and provide feedback to

the RPCU;

Recommend the draft work plan to the regional steering committee,;

Recommend changes to the technical design and implementation modalities of the program

including cross cutting issues to the RSC, and

Provide technical review of project implementation of the region.

16

Members of the regional AGP TC are the relevant departments from the regional bureaus and the

detail is indicated in Table 6 below.

Table 6:- Composition of the Regional AGP 2 Technical Committees.

1. 1 Regional PCU 2. 2 3. Focal persons from Regional Bureau

Agricultural technical work processes

4. 3 Focal persons from Regional Livestock

Development Agency technical work

processes

5. 4 6. Focal Person from regional government

institution responsible for cooperative

promotion

7. 5 Focal Person from Regional Government

institution responsible for Women and

Youth Affairs

8. 6 9. Focal Person from regional government

institution responsible for

Trade/Marketing

7 Focal Person from Regional Bureau of

Land Administration and Environment

8 10. Regional Research Component

Coordination Unit (RRCCU)

9 Focal persons from RARI commodity

research sectors (Crop, Livestock, NRM,

Socio economics)

11. 10 12. Focal Person from Regional bureau of

Health

11 Focal Person from Regional Government

institution responsible for water and

irrigation

12 Focal Person from ATA Offices

13 BoA Planning and Programming Process 14 Regional Representatives of Parallel

funded projects of USAID and DFATD

(CDSF) and aligned projects

(CASCAPE, SMISP and ENGINE)

13. 15 Focal Persons from other relevant

institution involved in AGP

implementation

16 14.

(iii) Zonal Technical Committees

AGP 2 will utilize the existing government structure at Zone level. AGP coordination and management

would be the responsibility of Zonal Agriculture Development Office, but supported by zone sector

offices like cooperative, trade and industry, rural roads and the like who will assign staff that represent

their respective institutions in matters pertinent to AGP. This institution would be responsible for zone

level oversight and facilitation of implementation, including inter-agency cooperation/coordination

during implementation, facilitation and monitoring and evaluation of the AGP. List of zonal AGP TC

are indicated in Table 7 below.

Table 7: Composition of the Zonal AGP 2 Technical Committees

1. 1 Zonal AGP focal 2. 2 3. Focal persons from Zonal office of

Agricultural technical work processes

17

4. 3 Focal persons from zonal Livestock

Development office technical work

processes

5. 4 6. Focal Person from zonal government

institution responsible for cooperative

promotion

7. 5 Focal Person from zonal Government

institution responsible for Women and

Youth Affairs

8. 6 9. Focal Person from zonal government

institution responsible for Trade/Marketing

7 Focal Person from zonal office of Land

Administration and Environment

8 10. Focal persons from Agricultural Research

Center commodity research sectors (Crop,

Livestock, NRM, Socio economics) (If

available)

9 Focal Person from zonal government

institution responsible for water and

irrigation Development

11. 10 12. Focal Persons from other relevant institution

involved in AGP implementation

(iv) Woreda Technical Committees

The Head of Woreda Agriculture Development Office will be the chair of the Woreda AGP TC, and

the Woreda Agriculture Extension process owner will be the Secretary of the committee. The

composition of Woreda AGP TC is indicated in Table 8. The Woreda AGP TC will bear the following

responsibilities:

Review Woreda level annual work plan and performance report and provide feedback to

the WCU,

Recommend the draft work plan to the Woreda steering committee, and

Provide technical review of project implementation of the Woreda.

Table 8: Composition of the Woreda AGP 2 Technical Committees.

(i) 1 Woreda AGP focal 2 Focal persons from Woreda office of Agricultural

technical work processes

3 Focal persons from Woreda Livestock

Development office technical work

processes

4 Focal Person from Woreda government institution

responsible for cooperative promotion

5 Focal Person from Woreda

Government institution responsible

for Women, children and Youth

Affairs

6 Focal Person from Woreda government institution

responsible for Trade/Marketing

7 Focal Person from Woreda office of

Land Administration and

Environment

8 Focal persons from Agricultural Research Center

commodity research sectors (Crop, Livestock,

NRM, Socio economics) (If available)

9 Focal Person from Woreda

government institution responsible for

water and irrigation Development

(ii) 10 (iii) Focal Person from Woreda health office

18

11 Focal Persons from other relevant

institution involved in AGP

implementation

(iv) (v)

3.3.3 Program Coordination Units

The existing AGP I, PCUs will continue to serve the AGP 2 (Table 9). In the three new regions and

one City Administrative, PCUs will be established at Regional and Woreda level. In Harari region and

Dire Dawa City Administrative, only one technical focal person within their respective Bureau of

Agriculture will be established at each Region.

At Federal, Regional and Woreda levels, AGP 2 PCUs will comprise project’s recruited staff and will

be strengthened by the project with equipment, vehicle, and training to address the expanded project

scope and increased workload. With the exception of the staff directly recruited by AGP2, all other

public servants assigned to work for AGP2 will do it as part as his/her normal duty. The AGP tasks

will be part of his/her Program of work and will be considered within the GoE staff evaluation system

(i) Federal AGP 2 Coordination Unit: -

The federal PCU is responsible for the overall coordination (inter-agency and within MoA/BoA),

planning, monitoring, and reporting on implementation performance. The Federal Program

Coordinator reports to the Minister of Agriculture, and has overall responsibility for the AGP.

The Federal AGP-CU will be primarily responsible for activities implemented through the pooled

funding. Day to day management of the activities under the parallel funding by USAID, Netherlands

and Canada will be the responsibility of a third party, but obligated to submit reports of the activities

as per the reporting schedule of the program. More specifically, the PCUs will have the overall

responsibility to coordinate and ensure the timely and effective execution of the project across the

different project levels. The PCUs will ensure supervision, coordination and monitoring of program

activities and specific responsibilities include:

(i) The overall coordination of the project;

(ii) Preparation of consolidated AWP&Bs and progress reports;

(iii) Follow-up and reporting on project implementation, including the M&E and learning,

the supervision and monitoring of the activities and the evaluation of project impacts;

(iv) The fiduciary management and reporting (FM and procurement);

(v) Monitor and support crosscutting issues are mainstreamed and implemented

(vi) Monitor and ensure the project to comply with safeguard;

(vii) Day to day follow up of project implementation; and

(viii) Overall knowledge management, and the strategic staff Capacity Development and

mobilization.

Table 9. Federal AGP 2 PCU Staff

SN Staff Quantity

1 Coordinator 1

19

2 Senior Infrastructure specialist 1

3 Infrastructure specialist 2

4 Gender specialist 1

5 Nutrition specialist 1

6 Environment and safeguard 1

7 Capacity development Specialist 1

8 Agricultural production and commercialization specialist 1

9 Senior Monitoring and evaluation specialist 1

10 MIS expert 1

11 Irrigation Agronomist 1

12 Monitoring and evaluation specialist 2

13 Senior Procurement specialist 1

14 Procurement specialist 1

15 Junior procurement specialist 1

16 Senior Financial management specialist 1

17 Financial management specialist 2

18 Accountant 2

19 Casher 1

20 Secretary 1

21 Office assistance 1

22 Driver 5

Total 30

(ii) Research Component Coordination

To ensure the effective coordination of the research component, a Research Component Coordinated

Unit (RCCU) comprising of 5 staffs will be established at the EIAR (Table 10). It would be responsible

to coordinate the research component at both the EIAR and RARIs. The RCCU will comprise of one

coordinator for the Agricultural Research, one financial specialist, one accountant, one procurement

specialist and M & E specialist. The coordinator will be accountable to the EIAR and reports to the

EIAR as well as to Federal AGP 2 CU. In addition, at regional level, Regional Research component

Coordination Units (RRCCU) will be established in each of the five regions where the RARIs are

located; namely, Amhara, Oromiya, SNNPR, Tigray and Gambella.

The Research Component Coordination Units at Federal and Regional level will perform the following

tasks:-

“Will have the overall responsibility to coordinate and ensure the timely and

effective execution of the AGP 2 research component.

“Will be responsible of reviewing the progress and performance of the component

towards its objective and advice on correctives actions to be taken;

20

”Will ensure supervision, coordination and monitoring of the component

activities”.

“Will ensure the participation of the representatives of the research component to

contribute to the planning and budgeting process according to the role,

responsibilities and mechanism described in chapter 4 “The Program

implementation cycle”.

Table 10. Composition of RCCU and RRCCU staff

SN Staff Total Quantity

EIAR For each RARI

1 Coordinator 1 5

2 Finance Specialist 1 5

3 Accountant 1 -

4 Procurement person 1 -

5 M and E specialist 1 5

Total 5 15

(iii) Regional AGP 2 Coordination Unit

The Regional AGP 2 CU will be responsible for the overall regional coordination, planning,

monitoring, and reporting on implementation performance at regional level. The regional CU will

report to the Regional Agriculture Bureau Head and to the Federal AGP CU. The regional PCUs will

ensure:

(i) The overall coordination of the project at regional level;

(ii) The regional annual planning and the preparation of consolidated AWP&Bs and progress

reports;

(iii) Follow-up and reporting on project implementation, including the M&E and learning, the

supervision and monitoring of the activities and the evaluation of project impacts

(iv) Monitor and support crosscutting issues are mainstreamed and implemented

(v) Monitor and ensure comply with safeguard;

(vi) Day to day follow up of project implementation; and

(vii) Overall knowledge management, and the strategic staff Capacity development and mobilization.

Table 11:- Regional AGP 2 Coordination Unit Staff Composition and Number.

SN Regional AGP 2 CU Staff

Total

Quantity

1 Regional Coordinator (one for each) 8

2 Infrastructure specialist (one for each) 8

3 1. Gender specialist (one for the 6 regions) 6

4 2. Environment and safeguard (one for each the 4 AGP1 regions) 4

5 3. Capacity development (one for each the 4 AGP1 regions) 4

21

6 4. Agricultural production and commercialization specialist (for each

the 4 AGP1 regions) 4

7 5. Nutrition specialist (for each of the 4 AGP1 regions) 4

8 6. MIS Expert (for each of the 4 AGP1 regions) 4

9 7. Irrigation Agronomist (for each of the 4 AGP1 regions) 4

10 8. Monitoring and evaluation specialist (for each of the 4 AGP1

regions)

4

11 Assistant Monitoring and evaluation specialist (two for Oromiya,

and one each for the rest 3 AGP1 regions and 2 new regions )

7

12 Procurement specialist (for each the 4 AGP1 regions) 4

13 9. Financial management specialist (for each the 4 AGP1 regions) 4

14 Accountants (2 each for 3 regions and one for the rest 5 regions) 11

15 Secretary (for each the 4 AGP1regions) 4

16 Casher (for each the 4 AGP1 regions) 4

17 10. Drivers 20

18 Office assistant (for each of the 4 AGP1 regions) 4

Total 108

(iv) Project Implementation Support Team (PIST)

For implementation of component III at regional level Project Implementation Support Team (PIST)

will be established under the previous four regional Bureau of Water resources/Irrigation Development

Authority. BOWR/IDA will benefit from technical assistance to enhance its capacity for the timely

execution of the component. Thus, during project implementation, Technical Assistants who would

support the SSI subprojects planning, design and execution would assist the BOWRD/IDA. Irrigation

Engineers and other experts will be recruited as required for technical assistance to strengthen the

PIST. The Project Implementation Support Team (PIST) is a group of staff members designated

officially to work together full-time, with separate accountability, to coordinate and manage AGP

supported SSI subprojects implementation. The PIST would be responsible for coordinating SSI

Subprojects preparation and construction management activities mainly programming and supervising

subprojects, evaluation for quality assurance, and implementation as well as overall administration of

budgeting, procurement, record-keeping, and reporting matters related to component implementation.

The PICT is also responsible to identify and address cross cutting issues (Gender, Climate Smart

Agriculture and Nutrition) in the planning, design and implementation of SSI sub projects. The

infrastructure specialist in the regional coordination unit will link the PIST with Regional AGP CU.

Table 12. Project Implementation Support Team for implementation of SSI

No Job Title Quantity

22

1 Team Leader 1

2 Contract Administration Engineers 2

3 Design and Supervision Engineers 2-85

4 Senior Geotechnical Engineer/Senior Engineering Geologist 1

5 Senior Accountant/Financial Specialist 1

6 Procurement Specialist 1

7 Senior Economist 1

8 Senior Agronomist 1

9 Community Mobilization Specialist 1-2

10 Safeguards Specialist 1

11 Senior Surveyors 2

Total 14-21

(v) Zonal level AGP Coordination

The Zonal Agriculture and Rural Development Office will assign a focal person who will coordinate

Zonal AGP and liaison with implementing institutions and experts. Concerned zone institutions and

experts will prepare annual plan and present it to the zone focal person who will compile/consolidate

and present to the AGP-RPCU. The zone program implementing sector offices and experts will then

incorporate zone AGP activities into their regular work plan and undertake implementations as per the

approved action plan and budget

(vi) Woreda AGP 2 Coordination Unit

At Woreda level, AGP will have a agriculture focal person, finance focal person and infrastructure

specialist fully dedicated to AGP. The agriculture focal person will be from within the Woreda

Agriculture Office for coordination of implementation technical activity; and, finance person from

within the Woreda Finance and Economic Development for financial management and financial

reporting. In addition, there will be one rural infrastructure specialist. The composition of the Woreda

AGP staffs is detailed in the Table 13.

Table 13. Woreda AGP 2 PCU staffs

SN Staff Total Quantity

1 Focal personnel 157

2 Finance focal personnel 157

3 Infrastructure specialist 157

5The number of engineers depends on the volume of AGP supported SSI design and supervision work in that particular regional state

23

Total 471

(vii) Kebele Development Committee /KDC Kebele Development Committee (KDC) are established at Kebele level as part of the government

structure to cascade development strategies and projects of the government at the grassroots level.

This organ is also useful to support the implementation of the project down at Kebele level. Most

importantly, the KDC will play key role in Community Level Participatory Planning and

Implementation.

\

Figure 3:- Accountability of Kebele Development Committee

The KDC will perform the following activities:-

a) Preparation of development plans based on community (ensuring the priorities of women and

youth are considered) priorities; including

Consolidation and appraisal of individual plans from sub-Kebeles,

Seeking approval from Kebeles council,

Follow-up with Woreda development committee (WDC) for approval of Kebeles

development plans and individual sub-projects,

b) Carrying out and, overseeing implementation of approved activities,

c) Ensuring the priorities of women and youth are considered during the planning and

implementation

d) Keeping records and preparing necessary reports,

e) Follow-up the proper utilization of AGP resources,

f) Assist in Capacity development initiatives at Kebele levels.

The Kebele Chairperson chairs the KDC and the lead DA will be the secretary of KDC. The KDC will

have representation from the Primary Cooperatives, a maximum of two representatives from any other

agric-sector based farmers groups, three representatives each from the farmers’ households, women

and youth in the community.

KDC

WDC

Technical

support and

value

addition

Participatory

plan

development

WAC

Accountability

Technical support

24

(viii) Kebele Planning Team

Kebele planning Team is an ad hock committee to be constituted to speed up the AGP 2 planning

conducted at kebele level using CLPP process. The aim is to support KDC with woreda technical staffs

with better capacity. The KDC, in consultation with the WTC, would constitute and authorize the

Kebele Planning Team. KPT will be composed of two technical staff (SMSs) nominated by the

woreda TC, all DAs covering the kebele, including Health (for inputs related to nutrition) and

Cooperative (for coverage of input/output markets). KDC Chair would also be a member to facilitate

interactions with the community. The KPT together with the KDC will perform the following

activities:-

Collection of secondary data pertaining to the kebele from the woreda office and findings of

the woreda level analysis from the woreda TC,

Collect additional data from kebele administration, cooperatives, FTCs and or kebele

agricultural offices to supplement the woreda supplied data,

Collect on-farm primary data using PRA/RRA techniques to fill the remaining gaps and/or

to verify the secondary information,

Use findings of the woreda level SWOT analysis to guide preparation of the kebele plan,

Analyze kebele level data to identify project interventions, which are expected to cluster in to

three areas, namely; women/youth CIG sub-projects, community sub-projects and group-

based support to increase production, marketing, linking with higher level (woreda, cluster)

value chains where appropriate and capacity building of farming community, as well as

service providers,

Identify farmers innovations that have potential for scaling up as ‘best practices’;

Identify and prioritize listing of important researchable issues;

Identify community level perceptions and mitigation or adaptation measures taken by

communities through their own initiatives on cross-cutting themes (gender, nutrition, climate

change/variability), and

Estimated budget for prioritized activities of the kebele work plan.

4 COORDINATION MECHANISMS WITH ALIGNED AND PARALLEL PROJECTS AND IMPLEMENTING

AGENTS

To ensure efficient and successful coordination of AGP2 with other projects, the followings elements

will be implemented under the responsibility of the FPCU:

I. The platform for the programmatic coordination with other projects and Program will

take place within the Rural Economic Development and Food Security (RED&FS)

Sector Working Group (SWG) and, more specifically, within the Technical Committee

for Agricultural Growth (AG TC) of the RED&FS SWG.

25

II. DPs financing aligned or parallel projects will be invited to participate in the AGP2

Technical Committee at all levels.

III. To ensure close coordination with aligned and key parallel projects and Program and,

in particular with the followings :

1.CASCAPE

2.Capacity Development Support Facilit (CDSF)

3.Small Scale and Micro-Irrigation Project (SMISP)

4.USAID Agricultural Value Chain Project

5.Integrated Seeds Sector Development Program (ISSD)

6.Empowering New Generations to Improve Nutrition and Economic

(ENGINE Project)

a. A Memorandum of Understanding (MoU) detailing the objective of the

collaboration, the rights and duties and the respective contributions of each party,

the roles and responsibilities, the main activities, expected outputs and

mechanisms of implementation, will be signed between AGP2 and the aligned

and parallel projects and programs;

b. Join Planning exercise will be carried out and described in the MoU in order to

ensure complementarities and synergies;

c. A regular reporting mechanism will be agreed upon and detailed in the MoU;

IV. At the federal level, partnership with government IAs will be established. Federal IAs

will provide guidance and support to regions, spearhead most institutional Capacity

Development activities and undertake monitoring, evaluation and communication

activities.

V. For IAs outside the Ministry of Agriculture, whenever possible and justify by the level

of activities, a MoU similar to the one prepared for aligned and parallel projects will

be signed between the relevant CUs and the concerned IA(s), and in particular with :

a. The Agricultural Transformation Agency;

b. The Central Statistical Agency;

c. Ministry of Trade

d. Ministry of Health

e. Ministry of Industry

VI. As appropriate, similar arrangements will be established at the regional and woreda

levels.

26

5 THE PROGRAM IMPLEMENTATION CYCLE

5.1 Overview of the Implementation Cycle

Program Implementation Cycle.

This section provides an overview of the implementation process of AGP2. Note that it refers only to

those activities to be implemented by Government, and not the parallel financed activities financed

and implemented directly by USAID and DFATD, for which the detailed design and implementation

mechanisms is still under preparation.

The component and activities described in the Design Document will primarily be implemented based

on annual (Ethiopian Financial Year) work plans, approved by the Federal Steering Committee. Plans

will be prepared during the second half of the previous EFY, based on procedures set out below.

Implementation of work plans will be closely supervised by federal and regional coordination units,

and adjusted as necessary at mid-year. Feedback from the monitoring and evaluation of

implementation will provide an input into subsequent planning processes.

Broadly, there are two levels of activities under the project, which have separate implementation

arrangements: (i) regional institutional investment, typically at regional level, supporting the capacity

of institutions provided agricultural services; and (ii) woreda and kebele level activities directly

supporting smallholders in the project activities.

The different stages of the Program implementation cycle are schematized (fig 4) and introduced

below and described later in this chapter.

27

Figure 4: The Program Implementation cycle

Situation Assessment and Planning:-

As shown diagrammatically above, Year 1 of the project differs from the subsequent years as two sets

of assessments will be conducted to inform the more detailed annual planning. For the regional level

institutional investments, needs assessments and feasibility studies may need to be conducted in order

to determine the nature of the project investment and to ensure that the investments are feasible and

sustainable. For the woreda and kebele investments, detailed situational assessments will be done that

will set out the overall framework for AGP2 support in every woreda under the program, including

with consultation in program communities.

Annual work plan preparation

Based on the Year 1 Situational Assessment and Needs Assessments, annual plans will be developed.

These will be developed by all implementation agencies. For woreda and kebele level activities, plans

will be screened and endorsed at woreda level before consolidation at regional level.

Budget and Work Plan Approval

The proposed annual work plan will be matched with available financial resources before seeking

approval. The planning and approval process will follow an agreed timeframe synchronized with the

28

Ethiopian financial year (8th July-7th July) starting at the Kebele level by mid-March and finishing

with approval by the FSC by mid-August.

Implementation:-For Woreda and Kebele level activities the project will adopt a decentralized

approach to implementation with Woredas playing a central role. At the regional and Woreda levels,

the Bureaus/Offices of Agriculture, with support from relevant service providers and organizations,

will have primary responsibility for implementation. The Federal IAs will provide guidance and

support to regions, lead Capacity development activities, monitor progress and take responsibility for

reporting progress, communicating lessons and organizing impact evaluation

Monitoring and Evaluation and Learning. The Results Framework of the project, including

outcome indicators and findings from studies, as well as on-going evaluations (of the project

implementation and processes), will be at the centre of the planning, implementation and reporting, as

well as for effective monitoring of progress and learning.

5.2 Year 1: Situational Assessment and Needs Assessments

Overview

During Year 1, detailed assessments will be conducted both at the field level and for institutions to be

supported under the project to determine a clear vision and framework for support to under AGP2.

For institutional support, needs assessments and feasibility studies will be conducted to determine the

exact investments to be supported and to ensure that suitable management and capacity building plans

are in place to support the investment. For kebele / woreda level investments, a situational analysis

will be conducted to develop a clear vision for AGP2 support based on community preferences, local

agro-ecology, market demand and institutional capacity. Details are provided below.

5.2.1 Investment and activities eligible to Program’s financing

Being a “framework” Program, a number of possible investments and interventions have been pre-

identified during the preparation of the Program with the objective to estimate the budget of the

Program. For a number of these investments and interventions, Needs Assessment or Feasibility

Studies (NA or FS) will be conducted before implementation. The Annex 4 provides the lists of the

investments/interventions for which it was agreed to conduct (a) a need assessment or (b) a feasibility

study. NA and FS will be financed by the Program. The Annex also provides indications on key

specific aspects to be addressed.

In the context of AGP2, the Needs Assessments (NA) will aim at determine the gaps existing between

the current situation and the desired future state by the end of the Program. Therefore, in addition to

a description and analysis of the current and desired future situation, the NA will detail all the

interventions and associated costs, to arrive to the desired future state. The action plan will include

physical, human and training gaps as well as the steps and activities to be implemented,

responsibilities, method of acquisition of the goods and services, and a timeline. In case of physical

29

investment, the needs assessment will include a detailed plan for how facilities and equipment would

be operated, managed and maintained.

The feasibility study, in turn, will aim at objectively and rationally uncover the strengths and

weaknesses of a proposals, identify the opportunities and threats, the resources required to carry

through, and ultimately the prospects for success. It will aim at demonstrate sound evidence that the

investment will contributes directly to the PDO of the Program. It will include a description of the

required steps, activities and resources needed to arrive to an operational and sustainable investment

as well as a time line, a risk analysis, a financial/economic feasibility, a social and environmental

impacts’ assessment including a gender analysis. The FS will describe how facilities and equipment

would be operated, managed and maintained and, in relation to this, provide a clear staffing and human

capacity development plan needs.

5.2.2 Woreda Level Situational Assessment

For Woreda/Kebele level activities, the Woreda will be the focal point for decentralized local level

(Woreda and Kebele) planning of annual work Program and budget within the overall framework of a

5 year plan and budget based on a local situational assessment. The Woreda planning process will

aggregate and approve Kebele plans, identify its own ‘strategic’ investment needs and facilitate

convergence between needs and priorities of key stakeholders of the AGP. Since the local plans will

require intensive assessment of the local situation (good understanding of socio-economic including

gender equality dynamics, bio-physical and farming systems, including current practices and

constraints, and market opportunities etc.), the starting point for the planning process will be the

collection of secondary data from the government sources on a number of themes relevant to the

planning process.

Further, given the inter-related information needs of many activities, the data collected will provide a

common platform to draw information for analysis and preparation of local plans. However, it is

recognized that in some situations it may be necessary either to collect some primary data to bridge

information gaps or to verify the secondary data. These gaps could be related to weak coverage of

some geographic areas (e.g. Kebeles) and/or sectoral discipline (e.g. emerging threats to crop/livestock

production systems). There may also be limited information on key cross cutting issues of importance

to the project (gender, nutrition, climate smart agriculture). In such situations, WTC, through KDCs

and Kebele level functionaries, as well as local communities, will organize collection of additional

information using appropriate PRA/RRA tools such as focus group discussions (FGDs),

social/resource mapping etc. The required capacity development support will be given to the

committees and communities to properly execute their responsibility. Table 15 below gives examples

of themes and the type of information to be collected and their relevance to the planning of several

inter-related activities. Data collection will only be necessary one time at the start of the project.

30

Table 14 Secondary data collection from government sources and validation through community consultation for a common

planning platform

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

SWOT Analysis for

local level planning

Identification of

issues for matching

with released

technologies and/or

for further

adaptive/validation

research

Identification of

farmer

innovations/‘best

practices’ for up-

scaling

Information on farming community

practices and/or perceptions

on cross-cutting issues to facilitate

mainstreaming

Gender Nutrition Climate

Land use pattern

Total geographical

area

Total Arable land

Total community land

(Non-Arable,

including common

grazing) land

Current status of

arable and common

land (Highly

degraded/Moderately

degraded/Not

degraded)

Resource mapping

(Kebele)?

Helps in improving

understanding and

prioritization of on-

farm and off-farm

actions for more

productive and

sustainable use of

land resource and

identifies potential

for expansion of

cultivable area

Helps in improving

understanding of the

local situation for

more appropriate

technical

recommendations to

improve land and

water management

practices (for reduced

erosion and improved

moisture conservation)

and to identify areas

for further adaptive

research to develop

improved practices,

e.g. no-

tillage/minimum-

Community can

help to identify

individual/group

that they consider

has innovated to

improve land

management

Women’s

views should

be sought

during

planning on

any specific

role they can

play and/or

action should

be included in

the work plan

that helps

them to

promote

sustainable

use of land

Highlights

importance of

protecting/

treating

catchment

areas to

safeguard

against extreme

climate events

leading to

flooding,

increased

erosion and/or

drought

31

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

tillage planting

practices

and water

resources

Socio-economic Profile

Total and M/F/Y

Population

Total and M/F Headed

Households

Social mapping

(Kebele)?

This information

helps in

understanding of the

socio-economic

position of the

Woreda/Kebele

population and

availability of labor

in relation to

cropping calendar

and M/F roles, as well

as in planning gender

specific interventions

Same as SWOT

analysis

Views of

women and

women

headed

households

should be

sought during

planning to

understand

their specific

requirements

Agro-climatic Situation

Agro-climatic zone

classification

Total rainfall and its

distribution

Soil types, depth and

water holding capacity

Helps in preparation

of an effective crop

and fodder

production planning,

e.g. variety selection,

cropping density and

nutrient management,

for appropriate

utilization of soils

and available

Helps with

understanding of the

local situation for

more appropriate

technical

recommendations to

improve land and

water management

practices and

identifying areas for

further research

Knowledge of

local agro-

climatic

situation, e.g.

vulnerability to

drought, soil

erosion, flood,

can help in

planning of

specific

mitigation

and/or

32

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

moisture for optimum

productivity

adaptation

measures to

climate change/

variability

Water resource

Rating of overall water

potential (H/M/L)

Total Irrigated Area

Source of Irrigation

(River, Well. Tank,

other)

Helps to prioritize

investment planning

to develop/maintain

irrigation

schemes/systems

Helps to prioritize

planning of research

activities to support

irrigated agriculture

Involve

women in

planning of

water

resource

development

to

improve

access to

drinking

water and

irrigation for

homestead

area

Promote

production

of nutrient

rich food by

women in

homestead

area

Crop and Livestock

production and

productivity

listing to cover major

crops (including fruits and

vegetables) and livestock (

sold/produced as live

animals and/or milk, meat,

Helps in identifying

production potential

and prioritizing target

crop/commodity for

the project

interventions based

on yield gap

Helps to prioritize

delivery of current

recommendations and

planning of future

research to increase

productivity of

targeted

crop/commodity based

Community can

help to identify

individual/group

that they consider

has innovated to

improve

crop/commodity

productivity

through changes

Consider

nutritional

value of

traditional

and

improved

crop/variety

/

Consider

resilience to

climate change

and/or

variability of

crop/variety/co

mmodity

prioritized for

support

33

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

egg) with average yields

over last three years

on assessment of yield

gap

in management

practices and/or

selection of

traditional and/or

improved variety.

Quantify benefits

in terms of yield

and/or income.

commodity

prioritized

for support

Specific constraints

related to

weed/diseases/pests of

major crops and current

status of control

measures

Helps to identify

priority areas for

interventions,

wherever possible

using IPM practices

to improve and/or to

maintain productivity

Helps to identify

priority targets for

research support either

using existing

technologies or

through further

research with a focus

on IPM approaches

Community can

help to identify

individual/group

that they consider

has innovated to

improve

crop/commodity

productivity using

indigenous

technologies.

Validate and

quantify benefits

in terms of yield

and/or income

Views of

female

farmers

should be

asked

Current fertilizer use

practices and other

fertility management

practices in relation to

major crops

Helps to prioritize

areas for intervention

with a focus on

integrated

approaches,

Helps to identify

priority targets for

research support in the

context of improving

knowledge on crop-

Community can

help to identify

individual/group

that they consider

has innovated to

Female

farmers

should also

be consulted,

as they are

34

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

including crop

rotations and use of

FYM to improve

productivity

nutrient requirements

and soil fertility status

either using existing

technologies or

through further

research with a focus

on integrated

approaches

improve

crop/commodity

productivity using

indigenous

technologies.

also source of

information.

Constraints (diseases,

nutrition, breed) to

livestock production and

current status of

mitigation measures

Helps to identify

priority areas for

interventions,

including promotion

of high nutritive

value fodder

cultivation and

management of

diseases using

integrated approaches

to improve

productivity

Helps to identify

priority targets for

research support either

using existing

technologies or

through further

research with a focus

on integrated

approaches

Community can

help to identify

individual/group

that they consider

has innovated to

improve livestock

productivity using

indigenous

technologies

Validate and

quantify benefits

in terms of yield

and/or income

Female

farmers

should also

be consulted,

as they are

also source of

information

Rural Infrastructure

(Markets, Connecting

roads and Storage)

Helps to prioritize

areas for the project

interventions to

improve access to

market by the

targeted communities

35

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

Location and distance

of Primary, Secondary

and Tertiary markets

Connectivity to

markets by roads and

their status

Type and adequacy of

local storage facilities

Input and Output

Marketing

No of active

Cooperatives

No of financial service

(credit) providers and

total credit provided

No of active private

traders

Total amount of seed,

fertilizer and crop

protection products

utilized/sold

Volume, Value of

different commodities

sold (over last 3 yrs., if

information available)

Helps to identify

target markets (local

or export) and areas

needing project

interventions to

increase sales of

marketable surpluses

based on comparative

advantage of selected

commodity and

support to improve

access to inputs,

including support to

community based

seed and forage

production groups

and linkages with

local/export value

chains

Helps to understand

researchable targets

related to quality of

products demanded by

markets. Issues

needing

technical/research

support could be

related to

variety/breed

demanded by market

and/or post-harvest

handling, including

processing and storage

(grain, fruit,

vegetables, milk,

meat)

36

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

in domestic and/or

export markets

Quality of marketed

commodities

Local Level Value

Addition/Processing

(include comments on the

private sector

involvement)

Helps in identifying

specific interventions

to support CIGs

(women) in handling

and/or processing of

agricultural

commodities

Helps in identifying

targets for introduction

of improved

technologies

Consultation

with women

to include

responses to

their

concerns/prio

rities in the

work plan

Highlights

potential for

linkages

with

intervention

s to

improve/pre

serve

nutritive

value of

locally

processed

products/co

mmodities

Status of key public

services of relevance to

the AGP 2

(crop/livestock

extension, land admin.,

women, etc.)

Staff No.

Helps in aligning pre-

identified ‘strategic’

investments in

institutional

development with

local

demand/priorities,

including farmer

information on the

37

Theme for data

collection

Role of farm-level information/data and community consultations under different interventions

Skills, Qualification

Functionality of

infrastructure (e.g.

FTC, AHC etc.) L/M/H

Farmer perception on

priorities for services

provided

priorities as

perceived by the

farming community

Listing of other

development projects

and potential areas of

complementarities

Helps to enhance

impact/efficiency of

the project through

knowledge/resource

sharing and

avoidance of

duplication

Other considerations

(strength/weakness) with

implication for

agricultural growth

38

Influence of Outputs of Situational Analysis on the planning of inter-related activities

As shown in Fig. 5, the main use of findings from the local situation assessment will be for preparation

of the Woreda and Kebele work plans and budgets. The findings of such an analysis will allow the

Woreda to prioritize and plan the work Program based on its comparative advantages and address

weaknesses while building on strengths to exploit opportunities and minimizing threats.

In addition, findings of this analysis will also be helpful in planning of many inter-related activities of

other components. Some examples of such activities include:

Inclusion of demands for demonstration of improved technologies on FTCs and/or on-farmer’s

fields in the local plans, which is an activity of Component 1 (extension service delivery), but

also require support of Component II (research) to access appropriate released and/or pipeline

technologies from the research system.

Proposals for small-scale irrigation development, which is an activity of Component III, will

need research support (Component II) for accessing proven technologies for irrigated

agriculture such as appropriate varieties, efficient water management and improved agronomic

practices, as well as of Component I by inclusion of effective extension service delivery

responsive to needs of the irrigated agriculture. Similarly, organizing of CIGs around income

generating activities related to produce high value crop and animal production will need

inclusion of appropriate support for CIG activities through joint activities under components

I, II and IV taking a value chain approach.

Demand to intensify crop/livestock production systems to achieve higher yields under rain fed

and irrigated agriculture, will need support under Component I for improved extension, as well

as natural resource management practices, including erosion control and fertility management

of degraded lands and effective treatment of catchment areas to sustain small scale irrigation

schemes being developed under Component III. At the same time, support of Component II

(research) would be needed to develop innovative natural resource management practices that

could be demonstrated and scaled up under Component I.

Demonstration of technologies linked to value chain commodities described under component

IV will need inclusion of relevant support activities under Components I and II.

Demand for establishment and strengthening of Community Based Crop and Forage Seed

Production Groups (CBSPs), to be supported under Component IV, will need relevant work

under Component II to generate new technologies and production of basic/source seed.

Development of regulatory guidelines for agricultural mechanization technology imports,

manufacturing and distribution under Component IV will benefit from complimentary work

under Component I and II to support agricultural mechanization.

39

Figure 5: Inputs for SWOT Analysis and Outputs for Local Level (Woreda/Kebele) Planning

5.3 Annual Planning

Based on the needs assessments and the situational analysis and the preparation of the 5 year plan for

the project, annual work plan and budgets will be drawn. This section describes the process for

developing these plans.

Planning Timeframe

The annual planning exercise will be synchronized with the Ethiopian fiscal year (8th July to 7th July

or Hamle 1 to Sene 30). Thus, each year, all IAs (Directorates /Agencies) will need to prepare their

work plan and budget and submit it to their respective AGP-CU by the middle of April. The CU at all

levels will announce planning time each year to remind all IAs the exact time for completion and

submission of the approved work plans and budget. At all level, the CU will also provide the required

administrative and technical support for timely preparation of the work plan.

Table 14 shows the proposed timetable, which requires each Kebele to complete, consolidate and

submit their development plan to the Woreda office before March 15. The Woreda will consolidate

Input to planning of various inter-linked component/ activities

Input to planning of the Kebele work plan

Local (Woreda/Kebele) secondary and primary data (Bio-physical, Farming systems, Input/output markets

etc.)

Input to planning of the Woreda Work Plan

Pre-identified investments for

institutional development

Situation Assessment /SWOT Analysis

Interventions to mainstream cross-

cutting issues (Gender, Nutrition,

CSA)

Input to planning of higher level

(Regional/Federal)support

40

plans for all Kebeles and send it to regional PCU before April 15. The FPCUwill consolidate the plans

received from the regional PCUs, EIAR and Federal IAs and send consolidated work plan and budget

to technical committee for review before submitting it to the Federal Steering Committee (FSC) for

review and approval before August 15. Once approved by the FSC, an official copy will be submitted

to the World Bank.

TABLE 15.AGP 2 PLANNING TIMETABLE

No Activity Time frame

1 Kebele work plan and budget finalized and sent to Woreda

office

March 15

2 Sending Woreda work plan and budget to RPCU April 15

3 Sending regional work plan and budget to F- CU May 30

4 AGP 2 work plan and budget approved by FSC August 15

Cascading of the approved AGP 2 annual work plan and budget

The FSC approved work plan and budget will be communicated to the respective federal implementing

agencies and to the RPCUs. The IAs will then cascade the annul AGP 2 work plan and budget to

responsible directorates, core process and units and thereby to individual responsible experts following

the Balanced Scorecard (BSC) modus operandi of the MoA. All implementing organizations,

institutions and responsible officials, experts, DAs and KDCs will incorporate AGP 2 activities in to

their annual, quarterly, monthly and weekly operational work plans.

Each responsible organization will be monitored and evaluated based on the mainstreamed AGP 2

annual work plan, including setting of targets and aligning resources with implementation of activities

to reach the agreed targets. This will help to align activities of the program to its objectives and

strategy, improve internal and external communications, to keep track of implementation of activities

by the staff within their control and allow close monitoring of progress. This will assist to mainstream

objectives of the AGP 2 within each implementing organization and develop coherent understanding

and consensus.

Contents of the Annual Work Plan and Budget

The annual work plan and budget at each level should concisely put justification and clarification.

Therefore, such annual work plan and budget prepared at all levels should include:

Background

Outputs and activities categorized in to components and sub components

Milestone of activities and implementation schedule,

Proposed budget by program components and sub components, including community

contributions,

41

A financial plan schedule with quarterly breakdowns for budget planning and monitoring

purposes—by program component and sub components,

Capacity development detail plan which include: training objective, target group, venue,

evaluation criteria, delivery methods, and expected outputs,

Estimated number of beneficiaries by sex and impact on women and youth,

Gender, climate and nutrition sensitive activities were deemed appropriate,

A procurement plan, methods, quantities of goods, civil works and service at each level in

order to deliver within appropriate schedule of requirement,

Responsible implementing agencies,

Monitoring, follow up and technical support modalities

In addition to the AWP&B there are ‘strategic’ interventions for institutional development such as

laboratories, constructions and the like that require detailed needs’ assessment. The need assessment

reports will be attached to the AWP&B at all levels. The interventions requiring detailed needs

assessment include:

Detailed review and inventory of the current situation (physical and / or human resources, as

appropriate),

It includes a detailed and exhaustive gaps analysis (physical, human and training gaps),

Method of acquisition of the goods and services, and timeline.

Program management capacity of the IAs,

Quantity, technical design and specifications if required

Details of activities by component and sub component and corresponding budget required,

How facilities and equipment would be operated, managed and maintained

A summarized disbursement schedule by quarter for the coming year and sources of funds,

Specific attention will have to be given to the cross-cutting issues (gender, nutrition and

Climate Smart Agriculture).

Beneficiaries

5.3.1 Kebele Level Planning

Planning Responsibility. The overall responsibility for preparation of the Kebele work plan would

rest with the KDC. The KDC, in consultation with the WTC, would constitute and authorize the Kebele

Planning Team (KPT) to undertake this work. KPT will be composed of two technical staff (SMSs)

nominated by the Woreda TC, all DAs covering the Kebele, including Health extension workers (for

inputs related to nutrition) and Cooperative (for coverage of input/output markets). KDC Chair would

also be a member to facilitate interactions with the community. As the planning work in all Kebeles

would take place around the same time, Woreda TC working KDCs will prepare a schedule of

activities and oversee its implementation to ensure that all Kebeles get the needed support including

on cross cutting issues from the nominated Woreda technical staff.

42

The Planning Process

The Kebele level planning will be guided by the Woreda level work on situation assessment and follow

community level participatory planning approach as outlined in the CLPP guidelines. Key steps in this

process will include:

Collection by KPT of secondary data pertaining to the Kebele from the Woreda office and

findings of the Woreda level analysis from the Woreda TC. Where necessary, additional

information will be collected to supplement the Woreda supplied data by working with the

Kebele administration, cooperatives, FTCs and or Kebele agricultural offices. Further, to

bridge any remaining gaps and/or to verify the secondary information, on-farm primary data

may also be collected using PRA/RRA techniques. Where necessary, the KDC and the

Development Group Leaders (DGs) will help to facilitate involvement of the farming

community. The KDC together with the DGs will agree on the date, time and venue to conduct

meetings with the community taking women’s reality in to consideration. Moreover, female

co facilitator will be assigned during the meeting. During these meetings, the community will

be informed about AGP II and the type of development processes envisaged by the program

including planning, implementation and monitoring processes as well as its focus on cross

cutting issues.

KPT, together with KDC, will use findings of the Woreda level SWOT analysis to guide

preparation of the Kebele plan. This will involve analysis of the Kebele level data to identify

project interventions, which are expected to cluster in to three areas: women/youth CIG sub-

projects, community sub-projects and group-based support to increase production, marketing,

linking with higher level (Woreda, cluster) value chains where appropriate and Capacity

development of farming community, as well as service providers . Fig. 6 provides an overview

of the Kebele level planning process and its key outputs.

Prioritization (screening) of community needs and interventions. The KDC together with KPT

will use the framework in the CLPP guidelines to analyse the relationship between the

identified problems and socio economic conditions, potentials and opportunities. For example,

value chains of selected commodities will be assessed using the following criteria:

o Economic/Competitiveness of activities: Market Demand/Potential; Potential for value

addition (product differentiation); and Potential for improving production volume &

quality.

o Mandate/Impact of activities: Income generation & distribution ability of more number

of smallholder farmers; and Economic Empowerment of women members of

community.

o Consideration of crosscutting issues: Less risky to be adopted by the community;

Synergy with other development programs; Friendly to environment; and Supports

vulnerable communities.

43

Phasing. . To keep the workload at a manageable level, in the first year the work Program planning

using the new process may be limited to 50 percent of the Kebeles in AGP 2Woredas and the

completed in the following year by including all the remaining Kebeles. AGP I Woredas (on-going

project) will be brought under the proposed planning process starting from the second year of AGP 2.

Outputs of Woreda/Kebele level analysis to be used directly for preparation of the Kebele work plan:

Sub-projects proposed by the women and youth Common Interest Groups (CIGs): Farmer

Common Interest Groups (CIGs) sub projects are group based investment proposals that are

planned along value chain to generate income for interest group members. Detail planning and

implementation of the CIG sub projects will follow CIG guideline. To ensure that the sub-

projects proposed by women and youth meet their specific needs, their livelihood will be

separately analysed. The participants will focus on those agricultural growth related problems

and or opportunities/potentials, that they think can be addressed through sub-projects for which

they will be fully responsible to implement and monitor.

Community level sub-projects: Community investment sub projects will be small scale

community asset building investments, which will not directly generating income for farmer

groups or individual farmer households. In the long run, this type of investment will benefit

the whole community. Community participation on the actual planning of small-scale

irrigation will be conducted after the potential irrigable sites are identified by the Woreda and

regional responsible agencies. In addition, the proposal should also by supported by assessment

of catchment areas jointly with the Woreda experts and a supporting treatment plan is included

with each and every proposal to ensure long-term sustainability. Similarly, community sub-

projects for productivity enhancement identified through the CLPP process, will need

assessment of the status of watersheds covered by the Kebele and propose the necessary

actions, which can be coordinated with NRD, to ensure that no gaps are left behind in

addressing watershed related issues. The interest of female farmers will be reviewed and the

multiple use aspect of small scale irrigation schemes is included

Group-based activities dealing with crop/livestock production issues and market/marketing

needs: Theses are group based activities needing extension service support to enhance

production, marketing, and capacity of community/service providers. These types of sub

projects are productivity improvement and market access activities that are private in nature

and will only be provided extension service support, including training, facilitation of access

to inputs, support to community seed multiplication, on farm and FTC demonstrations and the

like. In addition, Interventions to enhance capacity/skills, including experience sharing visits,

of both the farming communities and the service providers will also be supported. Women

farmers will be consulted separately to identify women’s interest and needs to inform

intervention selection.

Outputs of Kebele level findings to be used at higher level (Woreda and/or regional/national levels)

include:

44

Listing of farmer innovations including those identified by women that have potential for

scaling up as ‘best practices’;

Listing of important researchable issues and of priority crops with critical shortage of seed for

planning of the research component;

Listing of HH/community level perceptions and mitigation or adaptation measures taken by

communities through their own initiatives on cross-cutting themes (gender, nutrition, climate

change/variability)

Estimated budget for prioritized activities of the Kebele work plan and sending the plan to Woreda

TC. The KPT will estimate the total project budget including community contributions and detailed

breakdown, taking help from the Woreda experts (SMSs and/or TC members) as needed. The draft

plan would then be reviewed by KDC and sent to Woreda TC after approval by the Kebele Council.

Reporting formats: The reporting formats for information to be directly used to prepare the Kebele

plan are included in the CLPP guideline. The reporting formats for information to be used at a higher

level include: (a) researchable issues; (b) CASCAPE farmer innovations; and (c) gender, nutrition and

climate change will be developed.

5.3.2 Woreda Work Plan and Budget

Responsibility

The work Program planning at the Woreda level will be the responsibility of the Woreda TCs and SCs.

To strengthen the TC and to facilitate the planning work, research system would nominate a person to

join the Woreda TC and guide the work for identification/prioritization and aggregation of

researchable issues. In addition, CASCAPE focal person will also be invited to join the WTC as a

member. CASCAPE staff will work closely with Woreda AGP focal person as well as the Woreda

TC to jointly plan CASCAPE’s input to the Woreda plan and help the TC in monitoring progress of

the Woreda and Kebele planning work.

The Planning Process

The work Program planning process at the Woreda level will involve the following actions:

Review , refinement, and approval of Kebele plans for consolidation in to the Woreda plan;

Development of actionable work plan based on findings of the SWOT analysis reflecting its

own comparative advantages and priorities not addressed under Kebele proposals, e.g.

interventions to support integration of production areas in to value chains of selected

crop/livestock, commodities being promoted by partner projects/organizations, gaps in the

demonstration proposals from Kebeles (technology, management practices, others);

Addition of missing strategic investment proposals for institutional development mandated by

the Region/Federal levels not already part of needs identified at the Woreda level, including

capacity development initiatives for the Woreda/Kebele staff and actions on cross-cutting

45

issues (gender, nutrition, and climate change) provided by Federal and Regional initiatives

and/or based on information generated by Kebeles;

Ranking and prioritization of the Kebele level listing of researchable issues and aggregation

for matching with: (a) released technologies; or (b) pre-release technologies to identify targets

for verification trails and demonstrations using the FREG approach; or (c) recommendation

for technology generation through adaptation/verification trials. Integration of extension

support ( through Kebele plans with SMSs supporting DAs) to: (a) demonstrate/promote

existing technologies matched with identified constraints; and (b) verification trials and/or

demonstrations using the FREG approach on pre-release technologies matched with the

remaining problems in the list.

Consolidation of approved proposals for adaptation/validation trials from research

(Component II) and aligned projects, e.g. CASCAPE, to be implemented in the Woreda in to

the Woreda plan. For example, the CASCAPE proposal may include up scaling of ‘best

practices’ involving ranking/prioritization, and if necessary validation, of farmer innovations

identified by Kebeles;

The consolidation exercise involving actions outlined above will involve review and screening by the

WTC in close collaboration with the IAs, and the WSC. The screening mechanisms and eligibility

and/or priority criteria among others will consider the technical feasibility of the proposed activities,

the social, environmental and nutritional impacts, and synergy between components.

Output

The key output of the planning process at the Woreda level will be the Woreda work plan and budget

for AGP 2 consolidating all the proposals outlined above (see Fig 6). The supporting documents (for

the plan) are the proposals received from Kebeles and the information/proposals of other

sources/partners. Approval of the Woreda Steering Committee would be sought and the Woreda

Council will be informed before sending the final plan and budget to the Regional Program

Coordination Unit (RPCU) for approval and inclusion in the Regional Plan.

46

Figure 6: AGP 2 Woreda Agricultural Development Plan

5.3.3 Regional Work Plan and Budget

The approved annual work plan and budget received by the R-CU from different Woredas will be

consolidated with the regional strategic investments and development activities by involving the

Regional TC, and the Regional IAs. The R-CU will also incorporate plans from Regional

Implementing Agencies and prepare RWP&B.

The review by the RTC will assess of the proposed plan and budget in terms of:

Required work load and actual implementation capacity;

Beneficiaries number and degree of women participation;

Community participation and contribution;

Program management capacity of the IAs;

Technical design and specifications;

Details of activities by component and sub component along with the proposed budget by

project components and sub-components;

Inclusion of cross cutting issues

A summarized disbursement schedule by quarter for the coming year and sources of funds;

and

A procurement projection profile indicating the type, method and quarterly imported local

goods, services and civil works.

The Regional WP&B proposal will then be submitted to the RSC for review and endorsement and

finally sent to FPCU.

AGP Woreda Work Plan

Woreda's own input based on strategic

needs and findings from SWOT analysis

'Best Practices' identified based on Kebele info. on

Fearmer Innovations

Kebele plans

Pre-identified Federal/Regional Investment

proposals for institutional development

Research input on priority researchable

issues

Inputs from AGP aligned

projects

(e.g CASCAPE)

Kebele info. on cross-cutting issues

47

5.3.4 Planning of the AGP Supported Research Activities

Planning of research activities are also categorized in to ‘demand driven’ and ‘strategic’ investments.

Ready to release technologies, source technology production and capacity development activities will

be conducted using ‘strategic’ (pre-identified) planning approach.

Kebele level listing of researchable issues will be ranked and prioritized at the Woreda level and

aggregated for matching with: (a) released technologies; or (b) pre-release technologies to identify

targets for verification trails and demonstrations using the FREG approach; or (c) recommended for

technology generation through adaptation/verification trials. As indicated under 5.3.2 above, such an

approach would allow the Woreda planning process to integrate extension support to: (a)

demonstrate/promote existing technologies matched with identified constraints; and (b) verification

trials and/or demonstrations using the FREG approach on pre-release technologies matched with the

remaining problems in the list. This process is also expected to pay attention to issues related to

crosscutting themes (gender, nutrition and climate change/variability) that merit research technologies

and interventions.

To facilitate the planning work at the Woreda level, research system would nominate a person to join

the Woreda TC and lead the work for identification/prioritization and grouping of researchable issues

in to one of the three categories described above. The Woreda TC will then send the prioritized and

consolidated list of Woreda researchable issues to the Regional Research Component Coordination

Unit (RRCCU). The RRCCU will review and prioritize consolidated proposals from Woredas in all

three groups. Moreover, the proposals assigned to regional centres will also be sent to respective

RRCCU. The RRCCU, along with the regional ADPLAC and the TC, would review and consolidate

Woreda and regional research centers proposals, adding further research work where necessary, to

develop the regional research Program (by commodity category/Woreda clusters based on agro-

ecology) and send it to RCCU at EIAR.

Similarly, proposals assigned to Federal Centres will be sent to RCCU at EIAR. Research proposals

from RRCCU and federal research centres will be technical reviewed and consolidated by RCCU at

EIAR and submitted to the AGP 2 FPCU for incorporation in to the national annual work plan and

budget of AGP for approval by the FSC.

5.3.5 Planning of the Federal Work Plan and Budget

The FPCU, in close collaboration with the Federal TC, will consolidate the regional WP&Bs and add

federal level activities and budgets to it. In addition, each IA will prepare WP&B and transfer to the

FPCU for consolidation. The consolidated WP&B will estimate funding requirements for all

interventions and plan for Capacity development and technical support as well as participatory

monitoring and learning events. The FPCU will submit the consolidated WP&B with a summary of

the overall analysis for review and endorsement to the FSC. It will then be submitted for non-objection

to the World Bank not later than mid -August. The final approved AWP&B will be officially

communicated.

48

5.3.6 Preparation of the Work Plan and Budget for Successive Years

In the successive years, Woreda development plan will be prepared using information and decisions

from the Woreda and higher level ADPLACs and Woreda strategic plan as well as the Kebele

development plan prepared during CLPP. A consultative planning process will be conducted and

centred at Woreda level after consultation of the development committees and leaders of the

communities at Kebele and sub-Kebele levels.

These consultations will be the occasion for the project and the IAs to report to the communities on

their activities, review the progress done and suggest the priorities for the WP&B in the coming year.

It will be also the occasion to collect lessons learned, discuss failure and success and best practices.

As in the first year, the planning process will involve at Woreda level the Woreda IAs and the support

of the WTC and a similar screening process will be implemented. The same process as that of the first

year for consolidation and approval by SCs will be followed. The approved Woreda WP&B will then

be sent annually to the RPCU and FPCU following the same preparation and approval process

mentioned earlier.

5.3.7 Capacity Development for Adoption of the AGP Planning Process

Weak capacity, especially at Kebele and Woreda levels, is a constraint to adoption of the proposed

decentralized planning process. To address this concern, the following actions are:

Strengthening of the Woreda TC by including representatives from research and CASCAPE,

and possibly by the proposed Capacity development Support Facility (CBSF) to be funded by

DFATD. New members will pay particular attention to enhancing technical capabilities of the

local plans and have direct involvement in Capacity development activities, including on-the-

job training of Woreda and Kebele staff and monitoring of the local level planning process;

including the cross cutting issues.

Training in decentralized planning process under AGP. Overall approach and

implementation strategy will include:

Development of Training Module: A ‘tailor-made’ training module on decentralized

planning will be developed by a team drawn from FPCU, Research, CASCAPE and

Universities. The module will include critical skill development on how to integrate cross

cutting issues during planning process. The duration of training will be around one and a half

day and include preparation of Woreda/Kebele plans using ‘real’ data as an ‘on-the-job’

training activity...

Trainers: Each region will have a dedicated team of trainers drawn from BoA, RARI,

CASCAPE and Universities.

Trainees: At the Woreda level, training will be provided to all TC members and all SMSs. At

the Kebele level, all KPT members and the KDC, Chair will be trained. Consideration will be

49

given to integrate planning module with the CLPP training for the Kebele level staff with

emphasize on ‘on-the-job’ training.

Timetable:

AGP 2 Woredas: November 2015 – February 2016

AGP I (on-going project) Woredas: May – December 2016

Monitoring of training activities. Monitoring and on-going support to field staff will be

provided through regular visits by the trainers supported by the CBSF experts. The focus of

these visits will be to review progress/effectiveness of Capacity development interventions and

suggest changes to strengthen the planning training activities based on implementation

experience. Intensive and dedicated monitoring will be maintained until the end of 2016.

Thereafter, monitoring will be part of the regular M&E Program of the project.

Table 16. AGP 2 Training and Planning Timetable

20

15 2016 Months for the First Year

Activities

10

11

&

12

1 2 3 4 5 6 7 8 9 10 11

1

2

2nd

Year.

5th

Year

Training

Training module

development

10

/

15

Training of AGP 2

Woreda and Kebele

staff

Training of AGP I

Woreda and Kebele

staff

Dedicated

Monitoring of

training activities

PLANNING

Kebele work plan &

Budget

Woreda work plan &

budget

50

Regional work plan

and budget

Federal work plan

and budget

Plan Implementation

5.4 Budget and Work Plan Approval

Overview

AGP 2 budget is a detail plan expressed in quantitative terms that specifies how IAs will acquire and

use resources during project lifetime. It indicates what the organization plans to do next year and what

result it expects. It states how available resources will be needed and priority would be placed and the

performance required. Annual budget preparation must be framed within a sound available resource,

and should be organized along the following lines:

5.4.1 AGP 2 Budget Planning Approach

AGP 2 Budget preparation would be a combination of a top-down approach, with the FPCU giving

guideline to IAs, and a bottom-up approach, with IAs presenting requests for budget allocation to the

AGP CU at all level. The articulation of the top-down and bottom-up approach is crucial since it

determines how priorities and financial targets will be taken into account over the budget preparation

process.

i. Budget Ceilings and Allocation of AGP Resource

The starting points for budget preparation are a clear definition of financial targets and a strategic

framework consisting of a comprehensive set of outputs and activities. Thereafter, strong coordination

of the budget preparation is required to avoid major departures from the initial framework. IAs require

clear indications on available resources and are notified of the component ceilings at the very start of

the budget preparation process. Generally, the FPCU is responsible for setting the ceilings, but it

should of course coordinate with the FSC which shall also review the ceilings in detail and approve

them. The FPCU will set annual budget ceilings based on the notional annual budget indicated on the

project design document for each component, sub component and activities.

The resources that would be implemented by regions would be allocated based on population figures

(based on last census) except for component II (research). Specifically, the allocation to each of the

AGP regions would be proportional to the share of their population in the total population of all AGP

regions. Subsequently, the notional allocation by Woreda within a region would be proportional to its

population share among all AGP Woredas within the region except for component III (small scale

51

irrigation). For component III (small scale irrigation) regions will allocate resources for small scale

irrigation based on the irrigation potential of the Woredas which would be materialized through

planning process. Resource would be allocated to research based on the amount of work each of the

federal and regional research would conduct.

The population-based allocation to a specific Woreda would be an initial step in the first program year,

and this could change in accordance with the specific Woreda’s performance in the subsequent years.6

The performance measures will be related to (i) progress in terms of planning and implementation in

line with previous plans, and (ii), effectiveness in budget utilization. Of course too many factors can

affect the performance of the Woredas such as initial states (like availability of qualified and adequate

government staff in relevant areas, existing working facilities, leadership and good governance), and

natural factors (like climatic and physical conditions. A detail of performance measurement guide is

indicated in M&E Chapter.

Based on the ceiling budget estimation for the community sub-project should be done at KDC level,

as these projects, planning of community level investments must be done with technical input and

support from Woreda experts to ensure synergy with overall Woreda plans.

ii. Budget Requests

IAs are responsible for preparing their requests on annual and quarterly basis within the spending

limits provided. The request should be consistent with the notified ceilings or guidelines, and costs of

programs. It should be clear and adequate for proper implementation, without any under or over

estimation. IAs budget requests should clearly indicate the amount necessary to undertake planned

activities and programs. IAs must coordinate the preparation of the budget of their subordinate

agencies and give them appropriate directives.

AGP CU receives the requests of IAs and reviews their conformity with overall approach and targets

and compliance with the spending limits; these reviews lead the AGP CUs at all level to suggest

modifications in the IAs’ budget requests if deemed necessary.AGP CU staffs, therefore, should hold

discussion with IA staff to avoid misunderstandings.

5.4.2 Budget Preparation

The program will follow the government’s budget system7, recorded in the government’s budget

manual. The budget preparation process of the project both in the regional and Woreda levels will be

clearly defined and participatory that enhances commitment of the various stakeholders. The budget

6 No inter-regional performance mechanisms would be developed for the AGP. 7The Ethiopian budget system is complex, reflecting the fiscal decentralization structure. Budget is processed at federal, regional, zonal

(in some regions), Woreda and municipality levels. The budget preparation procedure and steps are recorded in the government’s

budget manual. The budgets are reviewed at first by MoFED then by the Council of Ministers. The final recommended draft budget is

sent to parliament around early June and expected to be cleared at the latest by the end of the fiscal year.

52

preparation process generally follows the physical plan indicated under the planning process of the

PIM.

Budget preparation will start from the Woreda level. The Kebele plan will be prepared and submitted

to the Woreda Technical Committee. The Woreda Technical Committee reviews the plan submitted

by each Kebele for consistency and prioritization. Plans reviewed by the Technical Committee of the

Woreda will then be submitted to the WSC for approval. Once approved by the WSC, it is submitted

to region for review, approval and consolidation. Each regional BoA reviews the budgets submitted

by the Woredas, BoW and other IAs for consistency with the program objectives and components and

prepare a consolidated annual work plan and budget of the region by incorporating its own plan and

having it approved by the RSC for submission to FPCU.

RCCU will be responsible for consolidating of the annual work plan and budget for the research

component from all EIAR and RARI centres and get it agreed between EIAR and RARIs and submit

to FPCU for final consolidation. FPCU consolidates the budget it received form regions, incorporates

its own plan as well as that of research and prepares one final annual budget and work plan for the

project. MoA has a responsibility to ensure that the budget prepared are realistic and in line with the

development objectives of the project.

5.4.3 Budget Approval Process

The consolidation exercise will involve a screening process to be conducted by the WTC in close

collaboration with the IAs, and the WSC. The screening mechanisms and eligibility and/or priority

criteria among others will consider the technical feasibility of the proposed activities, the social and

environmental impacts and the synergic effect between components. A high consideration will also be

given to the cross-cuttings issues: gender, nutrition and climate change.

After the above screening process, the Woreda WP&B will be finalized by consolidating the K-

WP&Bs of the Woreda and integrating the Woreda strategic investment and development activities.

At Woreda level budget will be prepared for the approved Kebele plan. Approval of the Woreda

Council would also be sought before the final plan is sent to Regional Program Coordination Unit

(RPCU) for approval and inclusion in the Regional Plan for funding

The Woreda steering committee will send the approved Woreda annual work plan and budget to the

RPCU. The W-WP&Bs will then be consolidated with the regional strategic investments and

development activities by involving the Regional TC, and the Regional IAs.

The RPCU will also incorporate plans from Regional Implementing Agencies and prepare RWP&B.

The Regional WP&B proposal is then submitted to the RSC for review and endorsement and finally

sent to FPCU.

53

The FPCU, in close collaboration with the Federal TC, will consolidate the regional WP&Bs and add

federal level activities and budgets to develop on consolidated WP&B. At federal level, each IA will

prepare WP&B and transfer to the FPCU for consolidation. The consolidated WP&B should properly

estimate funding requirements for all interventions and should adequately plan for Capacity

development and technical support as well as participatory monitoring and learning events. The FPCU

will submit the consolidated WP&B with a summary of the overall analysis for review to the FTC and

send with recommendation to the FSC for endorsement. It will then be submitted for non-objection to

the World Bank not later than mid-August. The final approved AWP&B will be officially

communicated to all stakeholders.

5.5 WORK PLAN IMPLEMENTATION MECHANISMS

5.5.1 COMPONENT 1: AGRICULTURAL PUBLIC SUPPORT SERVICES (US$ 129 M)

The objective of this component is to increase access to public agricultural services for smallholder

farmers. It complements the ongoing activities under AGP-I through strengthening and enhancing

capacity at the institutional level and building relevant skills and knowledge of key stakeholders,

including establishment and strengthening of laboratories for soil, plant and animal health;

management of natural resources and scaling up of best agricultural practices. Under this component,

support will be provided to cross cutting issues, which include climate smart agriculture, nutrition and

gender. In this section, the implementation mechanisms of each sub component and activities are

detailed.

5.5.1.1 Sub Component 1.1: Institutional Strengthening and Development (US$74.0 m)

The objective of this sub component is to improve public agricultural delivery services to make more

effective, efficient and demand driven. Activities under this sub-component are discussed in the

following sections.

A. Establishing and Strengthening ADPLACs

The objective of this component is to increase access to public agricultural services for smallholder

farmers. It complements the ongoing activities under AGP-I through strengthening and enhancing

capacity at the institutional level and building relevant skills and knowledge of key stakeholders,

including establishment and strengthening of laboratories for soil, plant and animal health;

management of natural resources and scaling up of best agricultural practices. Under this component,

support will be provided to cross cutting issues, which include climate smart agriculture, nutrition and

gender. In this section, the implementation mechanisms of each sub component and activities are

detailed.

Review and approval of the ADPLAC guideline;

Organizing regional, zonal and Woreda level ADPLAC meetings including identifying and

announcing meeting schedule and venue for the ADPLAC executive committee members;

54

Assisting development of by laws for the establishment of new ADPLACs,

Setting meeting agenda including on cross cutting issues of concern for the communities,

Organizing and conducting regular meetings,

Documenting decisions and recommendations of the ADPLAC executive committee;

Documenting and disseminating ADPLAC decisions to IAs; and

Organizing and conducting joint field monitoring.

AETAD will undertake reviewing and updating the ADPLACs’ guideline in collaboration with ATA

in order to provide clarity on roles, responsibilities, accountability and functional processes, and

increase awareness of the guidelines. Members of ADPLAC executive and general assembly

committee as well as frequency of meetings and detailed objectives and operating rules are detailed in

the ADPLAC guideline

B. Agricultural Extension Service

This intervention will be implemented under the responsibility of Agricultural Extension Directorate

at federal level and extension core process at regional, zonal and woreda levels. The intervention will

primarily focus on: i) upgrading FTCs to the level of functionality; (ii) demonstration of improved

agricultural technologies; and (iii) capacity development of extension services. The intervention will

give due consideration to crosscutting issues (gender and youth, climate, nutrition).

(i) Upgrading of FTCs to the intermediate level of functionality

The program will strengthen FTCs with facilities and demonstration equipment such as farm

mechanization (that addresses women and men’s specific needs) and audio visual aids with an aim to

take FTCs to the intermediate level of functionality as shown in Table X. FTCs’ will also be equipped

with classroom, office equipment, cooking facilitates and demonstration materials as well as purchase

and distribution of the plastic rain gauges to establish mini meteorology station in selected FTCs. The

program will also develop water sources for FTCs. The AED, Woreda extension core process in

collaboration with the regional extension directorate will take the responsibility of implementing this

intervention. ATA will provide technical support for implementation of this activity. Upgrading FTCs

to the level of functionality require:

Conducting FTC need assessment to identify needs and existing gaps, participating both men

and women farmers,

Prioritizing the identified needs and establishing the type of facilities and equipment required

in each FTC,

Preparation of specification and getting approval, and

Undertaking procurement, dissemination and equipping of the FTCs.

55

Table 17. FTC criteria by functionality level

Minimum requirements by level

Basic Intermediate Advanced

• At least 3 DAs

• Moderately furnished FTC

building

• Demonstration area of less

than 2.5 ha

• FTC management

committee

• Active community

management structure

• Adequate level of

facilities/equipment in place

for FTC training and

demonstrations

• At least 3 FTC trainings and

demonstrations conducted

• FTC trainings sufficiently

linked to demonstrations of

2.5 ha

• FTC training materials,

manuals and guidelines

• Provide competence based

training

• Revenue generation from

multiple crop and livestock

enterprises for self-

sufficiency

• Active linkage with

cooperatives, MFIs,

research centers and

ATVETs

• Handle training of level 1, 2

and 3

• Operational resource

centers (connectivity,

information)

(ii) Demonstration of Improved Agricultural Technologies

Demonstrations will cover technologies identified in line with the demand-driven planning process in

Chapter 4 of the PIM. On the basis of the results of this process, the final identification of the

technologies will be the responsibility of the respective technical departments of crop, animal, natural

resource, agricultural mechanization and soil fertility directorates and core processes at all levels.

Production manuals of the identified technologies will be prepared by the respective directorates and

sent to extension for implementation.

Main tasks to be performed include:

Technology identification and prioritization to respond to farmers demand and also addressing

the concerns/needs of female farmers, technologies that are nutrition sensitive and

environmentally sustainable.

Compiling and packaging of the identified research proven technologies by respective

technical department including research;

Preparing extension materials and providing training;

Site selection based on the type of technology to be demonstrated;

Assessing and procuring the identified technologies; and

Conducting demonstration of the identified technologies on FTC compound and on farmers’

fields, and

Organizing and conducting field days.

56

The Program will support demonstration of improved agricultural technologies both in FTC compound

and on male and female farmers plot. The following criteria would be employed for selection of

farmers that host demonstrations:-

Being voluntary and willing to actively participate to the demonstration and to share his

experience with the community ;

Being a trusted member of the community and residing in the Kebele;

Having agriculture and/or livestock as primary source of revenue;

Being well recognized as a good farmer by the community; and

Being selected together with the leaders of the community ;

Demonstrations will be linked to value chain commodities identified in component IV. It includes

research proven yield increasing crop and animal technologies, irrigation agronomic practices and

efficient irrigation water management, demonstration of model aquaculture, improved animal feed,

hide and skin production, beekeeping, improved farm machineries, improved land management,

gender sensitive women friendly devices, nutrition dense crops and animal products, food preparation,

food utilization and preservation methods. Improved crop promotion will also include bio fortified

crops such as sweet potato, potato, beans which would be identified and promoted in collaboration

with ATA.

The Program will also support demonstration of yield improving Climate Smart Agriculture

technologies and practices that are known for increasing soil carbon sequestration and reducing GHG

emission such as composting, crop rotation, crop residue management, intercropping, bio fertilizers,

agro-forestry, and Integrated Pest Management (IPM) technologies. Soil carbon sequestration can also

be enhanced through improving nitrogen-use efficiency (NUE) by applying precise amounts of

nitrogenous fertilizer or manure to crops.

On-farm technology demonstrations will include the provision of inputs, training and experience-

sharing visits to bring attitudinal change and encourage them to adopt improve practices and

technologies. The interventions will be designed to encourage female farmers through recognizing the

social responsibilities and expectations on women (timing, content, mode of communication etc)

(iii) Capacity Development of Extension Services

The activity will focus on bridging physical and skill gaps for smallholder farmers, FTC’s

Management Committees, DAs and Subject Matters Specialist (SMS). Before implementation, a

human and physical needs assessment will be conducted to ensure that the extension services are

responsive to farmer’s needs. The needs assessment will be conducted under the responsibility of the

AED and extension core process at all level. It will aim at identifying gaps and prepare a human and

physical capacity development plan for the duration of the Program. As for all capacity development

activities under the Program, the approach would follow the guidelines on Capacity Development.

57

Human Capacity Development: This activity will focus on bridging knowledge and skill gaps for

smallholder farmers, FTC’s Management Committees, DAs and Subject Matters Specialist (SMS)

through identifying female and male’s needs separately and CD planned to respond to identified gaps.

Physical Capacity Development: Physical capacity development will centre on furnishing and

equipping offices, mobility support and the establishment of IT centers, including internet connectivity

and creation of a website and information databases.

C. Animal Production & Animal Health Services

The project will assist in improving the animal health status in smallholder farming systems in order

to reduce animal mortalities and morbidities and improve production and reproduction parameters.

Support would address physical and human capacity gaps, finance goods, and staff training, based on

detailed needs’ assessments, supported by the project. Key areas of interventions in AGP 2 are

proposed as described below.

(i) Animal Production Services

The project will support activities aiming at improving the smallholders’ access to improved livestock

production services. With the exception of the establishment small-scale queen rearing demonstration

& training centers for which no feasibility study will be requires as pre-requisites, investments under

this intervention would be based on detailed feasibility and management plans, which would be

financed under the project. Potential identified investments include:

(a) Establishing small-scale queen rearing demonstration & training centers

The activity will be implemented under the overall responsibility of the Regional Livestock Agencies

(RLA) and/or Regional BOA and the technical responsibility of the Animal Production and Feed

Resources Development Directorate (APFRDD) of the MoA. Before implementation of this activity,

a feasibility study will be conducted

It is anticipated that four modern queen rearing demonstration & training centers will be established

to demonstrate and offer skill development training on modern queen bee rearing techniques mainly

the grafting method for all stakeholders including the private sectors. The centers will be established

in Oromiya, Tigray, Amhara and the SNNP Regional States. While no detailed feasibility, study will

be conducted, before implementation the APFRDD will prepare an Implementation Plan which will

provide a description of the facilities and operation, a description of the required steps, activities and

resources needed, and a time line for achievement. The OP will describe how facilities and equipment

would be operated, managed and maintained and provide a staffing and human capacity development

plan needs.

It will be the responsibility of the APFRDD to:

58

Prepare the Terms of Reference of the feasibility study, supervise the study and provide all

information needed, review the report and submit the report to AGP CU,

Design the rearing houses and training rooms,

Provides support in supervising the constructions,

Preparing specification for the necessary rearing equipments and training facilities to be

procured,

Developing curriculum for the training agreeable to both male and female farmers.

Provide Training of Trainers (ToT) for the staffs of all the centers, and

Distributing the items after procurement.

The responsibility of RLA or BoA will be to:

Identifying a potential Woredas for the activity,

Securing land for the set up of apiaries ensuring compliance with the OP4.12 (Resettlement

Policy Framework [RPF]);

Ensure the construction of the grafting and training rooms;

Ensure the management and the maintenance of facilities and equipment;

Ensure the staffing with qualified agents and in required number;

Organizing and providing training and,

Undertaking technical support and monitoring.

(b) Establishing of fish hatchery centre

The fish hatchery centre will be established in the Amhara Regional State. The activity will be

implemented under the overall responsibility of the Regional Livestock Agencies (RLA) and/or

Regional BOA and the technical responsibility of the Animal Production and Feed Resources

Development Directorate (APFRDD) of the MoA.

Before implementation of this activity, a feasibility study including a management plan that considers

cross cutting issues will be conducted. The APFRDD will be responsible to prepare the ToRs of the

study, supervise the study and provide all information needed, review the report and submit the report

to the Federal AGP CU. The APFRDD will also prepare the technical specification for the building,

equipment and gearing facilities, prepare the ToRs for procuring an international consultant for the

development & management of the hatchery unit and supervise the status of the hatchery center.

The major tasks to be performed by the Agency in the course of the establishment include:

Site selection and acquisition of land,

Conducting engineering survey for full-scale planning and designing layout of the physical facilities (buildings,

roads, rivers, canals, bridges, etc),

Procuring and awarding of contractors for the construction of hatchery ponds, farm buildings,

farm roads and fish tanks,

Technical support and supervising the construction,

59

Preparation of the hatchery ponds such as disinfecting, filling ponds with water and

fertilization of the pond,

Brood stock collection & stocking,

Transferring the fry to nursery ponds from hatchery, and undertaking fry management,

Harvesting & distributing of fingerlings for pond fish farmers,

Staffing the centre with technical & supportive personnel, and

Capacitating staffs at all level and identifying of inputs

(c) Strengthening National Artificial Insemination Centre (NAIC)

Before implementation, the National Artificial Insemination Centre will take the lead in finalizing and

submitting for approval a breeding strategy for dairy sector together with an action plan which would

include, among others, the development and the establishment of a dairy herd performance recording

system and an electronic data management at semen production centers as outline below.

Dairy Herd Performance Recording

This activity will be implemented under the overall responsibility of the RLA / BOA and the technical

responsibility of the NAIC. It will be implemented in the following four regions: Oromiya, Tigray,

Amhara and the SNNP. The final objective will be to identify and acquire superior dairy sires to be

selected for semen collection and breed improvement.

The NAIC will be responsible for the conception and the design of the system (including templates of

record sheets) and for all activities related to the supervision of the data collection, the analysis of the

results, the identification and the purchase of the dairy sires. The NAIC will also ensure the necessary

training of the staff of the RLA / BoA for animal identification and data collection

Electronic data management at semen production centres

Electronic data management system will be implemented at Kaliti, Nekemte, Bahirdar, Mekele, and

Hawassa semen production centers: The NAIC will be responsibility for the conception and the design

of the system, the identification and specification of the equipment to be purchased by the program.

NAIC is responsible for the supervision of the establishment of the system at Kaliti while the regional

Livestock Agencies and BoA take the responsibility in their respective regions. The installation of the

electronic system at Kaliti will be effected in the first year of the program while the remaining centers

in the first two consecutive years. Moreover, the NAIC capacitates the laboratory technologists of all

the centers on the operation of the system in agreement with the winner of the bid.

(ii) Support Animal Health Services

To ensure national and regional harmonization and avoid duplication, the program will implement the

intervention in collaboration with the Regional Pastoral Livelihood Resilience Project (RPRLP) which

include: study on the status and capacity of all national laboratories, the strengthening of disease

60

diagnosis, laboratory equipment and materials, implementation of digital pen technology with mobile

phone.

Prior to implementation of the animal health intervention, a detailed needs’ assessment will be

conducted in order to clearly identify the physical and human capacity gaps to be addressed by the

program through financing goods and staff training. It will provide detailed plans for how facilities

and equipment would be operated, managed and maintained and, in relation to this, clear staffing plans,

including a commitment to provide resources for staffing, and if necessary a plan for human capacity

development. The needs assessment will be using the Performance of the Veterinarian Services (PVS)

and the Gaps Analysis conducted by the OIE as a starting point. It will provide an exhaustive analysis

of the physical and human support already exiting or in pipe line. It will consider the following:

(a) National & regional laboratories: (i) poultry disease diagnostic laboratory; (ii) Central Veterinary

Drug and Feed Quality Control Laboratory (CVDFQCL); and (iii) establishing molecular biology

laboratory;

(b) Strengthening capacity on semen producing bulls reproductive health management;

(c) Regional animal health laboratories, clinics and health posts in the regions targeted by the program,

and

(d) Surveillance of Major Trans boundary, zoonotic diseases and diseases information system.

(iii)Human resources and physical capacity development

Human Resource Capacity Development:

This intervention will focus on training of trainers on animal production and product processing,

animal disease surveillance and health management, animal health climate adaptation and mitigation

practices, good manufacturing and control practices of veterinary drugs and animal feed, machines

and equipment maintenance (e.g. maintenance semen & liquid nitrogen equipment). The program will

also finance short-term trainings, experience sharing and study tours (abroad), and workshops on

adapting production’s quality to market requirements. It will finance the production of training

manuals and the production of video film that also considers gender issues for extension services.

Physical Capacity development :

The diagnostic test performed at NAIC shall comply with the recommendation of the Office

International des Epizooties (OIE). This is meant to raise the quality of NAICs’ genetic material

against OIE standard. This intervention will be managed by the NAHDIC and NAIC. The NAHDIC

identifies the diagnostic equipment, prepares specification, evaluates bid documents and undertakes

installation of the equipment. Test samples and diagnosis will be carried out by NAHDIC in

collaboration with the NAIC.

D. Crop Production and Plant Health Services

(i) Promotion of crop productivity enhancing technologies

61

This intervention will assist in accessing released crop technologies from component 2 and develop

manual on good agronomic practice that can easily understood by female farmers for use by extension

services. A strong emphasis will be given to gender sensitive, nutrition-smart (nutrient dense crops,

postharvest handling techniques and the like) and climate smart technologies and practices such as

organic agriculture, composting, crop rotation, intercropping, bio fertilizers and agro-forestry.

AETAD and the Crop Extension Directorate (CED) with the relevant regional and Woreda core

process will be responsible for implementation of this activity.

(ii) Establishing and Strengthening Vegetable and Fruit Nurseries

The program will use approaches developed under AGP1 to promote and support the establishment of

coffee, vegetable and fruit nurseries. It will provide the critical equipment and supplies for the

nurseries and support on-site demonstrations, training and technical advice to male and female farmers

in both Male Headed and FHH.

It will be implemented under the overall responsibility of the Smallholder Horticulture Development

Directorate (SHDD) in collaboration with regional and Woreda responsible offices. The activity will

be implemented with experience gained from USAID-Mashav initiative currently undertaking fruit

nursery developed in some Woredas.

The SHDD will have the responsibility to design the intervention including the shade houses and

prepare technical specification of equipment and farm tools and planting materials. It will also ensure

ToT to the assigned SMSs on nursery management. Monitoring and evaluation will be conducted

through the regional BoAs in coordination with the AETAD.

The regional BoAs in collaboration with WoA will hold the responsibility of acquisition of land in

compliance with Resettlement Policy Framework and Procurement Manual. The WOA will follow up

the construction, provide training to both male and female and youth farmers on preparing and

handling of seedlings and provide technical assistance.

(iii)Strengthening Plant Health Services

This intervention is targeting plant health services with an aim to reduce smallholder crop loses, ensure

the supply of safe food for the citizens and support plant health for domestic and international trade of

plants, plant materials and their products. Activities will also support the up-scale of the IPM practices

implemented under AGP1 with the support of FAO.

This intervention will be implemented under the overall responsibility of the Plant Health Regulatory

Directorate (PHRD). Prior to implementation, a detailed needs’ assessment will be conducted in order

to clearly identify the physical and human capacity gaps to be addressed by the program through

financing goods and staff training. It will provide detail plans for how facilities, equipment and

training will be implemented, operated, managed and maintained and, in relation to this, clear staffing

62

plans, including a commitment of the public “owner” to provide resources for staffing, and a plan for

human capacity development. It will provide an exhaustive analysis of the physical and human support

already exiting or in pipe line. It will consider the following:

a. Crop loss (plant health) data-base development: the intervention would aim at

generating a database that will be used as a reference for initiatives including program

planning, extension package preparation, awareness creation and training in the area of

minimizing pre- and post-harvest losses;

b. Strengthening plant quarantine stations;

c. Strengthening the Federal Plant Protection Laboratory and regional plant health clinics

through the provision of the critical equipment and supplies; and,

d. Equipping Federal Plant Protection Laboratory and Regional Plant Health Clinics; and

e. Equipping regional seed quality analysis laboratory.

(iv) Human capacity development

Activities will initially include the assessment and identification of training needs including

workshops, awareness creation activities, experience sharing visits (local and abroad). Focus will be

given on improving the capacity of agronomists, entomologists, pathologists, crop production and

protection professionals. Emphasis will be made for equal participation of men and women farmers

(including married women), DAs and SMS.

E. Support to Natural Resources and Soil Fertility Management Services

The project would support the strengthening of services to build the productive assets of rural

communities in selected community watersheds, to sustainably increase productivity and curtail

degradation of fragile lands and ecosystems. In areas where the Sustainable Land Management Project

and other similar programs are operating, this intervention will be coordinated and linked. The

implementation processes and procedures of watershed management would be carried out based on

the widely used Community Based Participatory Watershed Development Guideline. Key activities

include:

(i) Local Level Community Land Use Planning

The preparation of community land use plans will be implemented by the Land Administration and

Use Directorate (LAUD) of the MoA in collaboration with regional and Woreda relevant institution.

The LAUD will be responsible for data processing, land use mapping and preparation of community

land-use plan. The Regional relevant institutions pertaining to land administration and use will be

responsible for the procurement of field equipment, organizing of workshops & experience sharing

and conduct data collection.

(ii) Support to Productivity Enhancing Interventions of Community Watersheds

It is generally accepted that a major contributor to low productivity in the AGP Woredas are the highly

degraded land and frequent moisture stress during growing season, as well as inadequate in-situ

63

moisture conservation (on-farm and on common land) in the context of the predominantly rain fed

agriculture of the country. This activity will support the implementation of best practices for soil and

water conservation to reduce soil erosion, improve soil fertility and soil moisture in the system at farm

land and communal land management levels. This will include female owned farm lands. The role of

women and youth in communal land management process will also be reviewed and support will be

given to ensure their benefit.

The Natural Resources Directorate (NRD) and the Soil Information & Fertility Management

Directorates (SIFMD) will be responsible for coordinating implementation of farmland and communal

land management activities such as gulley treatment, terraces and establishment and support to

community nurseries. Activities will be implemented according the Community Based Participatory

Watershed Development Guidelines.

(iii) Soil Fertility Management Services

Interventions under this activity are aimed at integrated soil fertility management to enhance crop and

livestock productivity. The activities will focus in addressing the capacity gaps in supporting and

improving soil fertility practices and services. Activities will be based on a detailed needs’ assessment

providing evidence of the gaps that the project could address. The NA will provide a detailed plan for

how facilities and equipment would be operated, managed and maintained and, in relation to this, a

clear staffing plan needs, including a commitment of the public “owner” to provide resources for

staffing, and if necessary a plan for human capacity development.

The National Soil Testing Centre (NSTC) will have the technical responsibility of the intervention.

The NSTC will also work in close collaboration with the Regional Soil Testing Laboratories (RSTL).

It will be responsible for the concept, approach and design of the activities, the preparation of the

necessary technical specifications (laboratory and field equipments, ToRs of studies, etc), the

supervision of the implementation and the technical backstopping, etc. The following activities will

be conducted:

(a) Strengthening Soil Testing Laboratories

This intervention is aimed at enabling the promotion of soil test based fertilizer application approach

to address variability of soil types and their nutrient contents. The National Soil Testing Centre and

the Regional Soil Testing Laboratories in collaboration with CASCAPE (to be mentioned in the MoU

between CASCAPE and AGP2 CU) will be responsible to undertake a detailed needs’ assessment in

order to clearly identify the capacity gaps in supporting and improving soil fertility practices and

services to be addressed by the program. It will also provide detailed plans for how facilities and

equipment would be operated, managed and maintained and, in relation to this, clear staffing plans,

including a commitment of the government to provide resources for staffing.

(b) Support to soil mapping and implementation

64

This intervention will be executed to finalize soil mapping commenced by the AGP I. The National

Soil Testing Centre will be responsible to hire a technical assistant who will support in soil mapping

& remote sensing. The centre will also prepare specification for digital soil mapping and information

dissemination, and evaluates the bid document as per the procurement procedure. ATA will also

provide technical assistance for implementation of this activity. Moreover, the same centre will fix the

procured equipments.

(c) Support to acid soil and vertisol management

Support in this intervention will be given to improve soil fertility through appropriate acid soil

reclamation advisory service including appropriate lime application techniques. Extension service

delivery will also give emphasis to promotion of improved vertisol management techniques for both

male and female farmers . The SIFMD and the regional relevant offices will be responsible for the

delivery of the advisory services.

(d) Support to Bio-fertilizer promotion

The promotion of wider use of bio fertilizer will be sustained throughout the program years. The

SIFMD will be responsible for undertaking promotional activities through training of SMSs, DAs and

male and female farmers ( both female headed and married women) in the project woredas.

(iv) Capacity Development for Natural Resource Management and soil fertility

management

Capacity Development for Natural Resources Management and Soil Fertility Management Services

start with the needs assessment. The need assessment will include the preparation of a detailed training

plan such as skill gaps, identification of trainers, training schedule, training venue and number and

type of participants. It will include activities such as trainings, workshops, awareness creation forums

and experience sharing visits (intra and inter regional/Woreda exposure visits and study tours) on

natural resources management and soil fertility management. It will also include the provision of hand

tools and field equipment such as GPS, Topo-maps and High Resolution Satellite Imagery.

F. Strengthening Promotion of Agricultural Mechanization Technologies

The aim of the agricultural mechanization intervention is to develop and promote appropriate tools

and machinery for pre and post-harvest agricultural production systems that can result in labor

efficiency and effectiveness resulted in sustained adoption of the yield-increasing technologies, reduce

post-harvest losses and create value addition. Specific attention will be given to the crosscutting issues

i.e. nutrition, gender and youth, and climate smart agriculture including labor saving women friendly

technologies, post harvest handling, animal feed processing technologies to improve nutritional value,

crop and animal processing technologies to improve nutritional quality of the products. The sub-

component will be implemented under the overall responsibility of the Agricultural Mechanization

Directorate (AMD). The AMD will design and organize all the activities, ensure implementation,

follow-up, supervision and achievement of the products and objectives. The sub-component will be

implemented in close collaboration with ATA. Details of the collaboration will be specify in the MoU

65

to be signed between AGP2 and ATA. Agricultural mechanization activities that would be

implemented include:

(i) Development of Standards for Agricultural Mechanization Technologies

Standardization will undoubtedly improve the quality of mechanization products. For this activity, the

AMD will work in close collaboration with ATA and the Ethiopian Standard Agency (ESA). The

AMD will:

Initiates and request the ESA for developing a standard for machinery for pre and post-harvest

agricultural production systems that can result in labor efficiency and effectiveness and lead

to sustained adoption of the yield-increasing technologies, reduce post-harvest losses and

create value addition;

Organizes a technical committee that would develop a draft document in coordination with

the ESA and chairs the technical committee;

The technical committee will be drawn from the Agricultural Transformation Agency (ATA),

Ethiopian Institute of Agricultural Research (EIAR), private sectors and from few other

pertinent stakeholders ; and

Capacitates manufactures of such technologies on the need of standards through provision of

training.

Both the AMD and the ESA will organize a consultative meeting on the drafted document,

incorporates constructive ideas and issues, finalizes the draft document and submits to the Council of

Standard.

(ii) Provision of Training to Manual Pump Manufacturers

The AMD will be responsible for the provision of the training on designing and manufacturing of the

manual pumps. Both parties will prepare the training material, identify potential manufacturers,

identify venue and organize the training.

(iii)Provide Technical Support for Agricultural Machinery Service Providers

The AMD will prepare guidelines and training materials; identify agricultural machinery producers,

distributors and mechanization service providers. Then, select potential trainers, organize and conduct

the trainings.

(iv) Organize and Support Operators & Maintenance Service Providers

AMD will be responsible for providing technical support to operators & maintenance service

providers. It assesses the experience of machine-maintenance service providers and organizes training.

In addition, the office will procure and supply maintenance kits to the trainers following the AGP

procurement procedure. The training will be conducted in different maintenance topics throughout the

project years.

(v) Provide Training for Private Sectors to Avail and Access Spare Parts

66

The program will support identification of the type of spare parts required and provide training and

awareness creation to interested potential private sector participants providing spare part services.

AMD and Regional BoAs will assess and identify potential private sectors providing spare part

services in their respective areas. In addition, the AMD will develop distribution network and

guidelines for spare part services provision and facilitates linking potential private sectors providing

spare part service with suppliers or manufacturers.

67

Summary Table: - 5.5.1.1. Sub-component 1.1 Institutional Strengthening and Development

Out puts and Institutions Responsible

Component 1 : Agricultural Public Support Services

Sub-component 1.1: Institutional Strengthening and Development

Responsible Department / Organization:

Lead Organization: AETAD, APFRDD, AHD, NAIC, NAHDIC, NICETT, VDFACA, NRD , PHRD, NRD,

LUAD, SIFMD, NSTC, AMD,

Main partners: , BoAs, Regional Soil Testing Laboratories, Regional Land Administration and Environment

Authorities, Regional Livestock Agencies/Core Processes, FTCs, Woreda Agricultural Offices

Supporting implementing bodies: ATA ,CASCAPE

Outputs

Four regional 5 zonal and 61 Woreda ADPLACs established.

Ten federal, 76 regional, 345 zonal, 1509 Woreda planning and review meeting conducted

One ADPLAC guideline reviewed and updated

Five federal, 80 regional, 350 zonal and 1570 Woreda level mission conducted

1580 new FTCs equipped with office and training equipment and facilities

1235 existing FTCs equipped with office and training equipment and facilities

Need based (including those of women) crop, livestock, natural resource, Climate Smart Agriculture and

nutrition technologies conducted on 1580 new FTCs

Need based (including those of women) crop, livestock, natural resource, Climate Smart Agriculture and

nutrition demonstration technologies conducted on 1235 existing FTCs

610 motorcycles for Woreda, 2981 motorcycles for FTC, 8098 pedal cycles for DA purchased and

disseminated

One federal, 8 regional, 35 zonal and 157 Woreda offices connected with IT service

Four regional, 15 zonal and 61 Woreda offices provided with necessary office facilities.

450 federal SMS 4DAs per FTC, 20 SMS per Woreda100 farmers per FTC per year, 5 FTC MC per FTC

trained twice in the program period trained

20 federal, 160 regional, 700 zonal and 9420 Woreda level technical supervision conducted. (federal 4 times

per year, regional 4 times per year, zonal 4 times per year, at Woredas level once in a month)

4 modern queen rearing demonstration & training centre established

One fish hatchery unit established

4 dairy herd performance recordings established

5 electronic data management system established

One molecular biology laboratory established and equipped,

One central quality control laboratory strengthened,

One poultry diagnostic laboratory strengthened,

14 regional animal health laboratories strengthened

68

61 animal health clinics strengthened

Out put

753 animal health posts strengthened

157 Woredas disease information systems strengthened

7 kits of bulls semen collection kits on reproductive health management purchased

250 people participated on federal level TOT for 4-10 days, 500 people participated on in country short term

training and 45 people participated on short term training and study tours abroad, and 387 people participated

on experience sharing in the country on animal production and animal health

950 people participated on workshop on adopting production to market requirements

6 manuals produced and printed, one documentary film produced

One set of office equipment procured & furnished

10 crop technology assessments that ensures gender, climate and nutrition issues conducted

35 fruit nurseries established and equipped

96 fruit nurseries strengthened

870 SMS and 4710 DAs trained on improved crop production package

157 Woredas supported with crop production field equipment

15 plant quarantine stations strengthened with field and office equipment

One federal plant protection laboratory installed and equipped

12 seed analysis laboratories equipped with filed and laboratory equipment

9 plant health clinics strengthened with office and laboratory facilities

One international standard pesticide laboratory established and equipped

491 people trained on seed inspection and pest management, 30 people participated on experience sharing

visit abroad.

Land use plan for 157 Woredas prepared

Community watersheds in 157 Woredas rehabilitated

110 community nurseries established

One community level (keble level) consultative meeting conducted

Field equipment supplied to 157 Woredas

19 soil testing laboratories strengthened

Soil mapping and implementation supported

Capacity developed on bio-fertilizer & acid-soil

30 training sessions conduced on manual pump manufacturing

50 private sectors training on machinery

Monitoring, Reporting and Evaluation Arrangements

Monthly report, quarterly report, annual report and field monitoring

69

Gant Chart: 5.5.1.1 Sub-component 1.1 Institutional Strengthening and Development

Main activities and Implementation Schedule

No Activity Implementation Schedule

Year 1 Year 2 Year

3

Year

4

Year

5 1 2 3 4 1 2 3 4

1.1 Institutional Strengthening and

Development

1.1.1 Reviewing and updating ADPLAC

guide line

Establishing and Strengthening

ADPLACs

Establishing regional, zonal and

Woreda ADPLACs

Conducting ADPLAC planning and

review meetings

Reviewing and updating ADPLAC

guide line

Conducting joint ADPLAC field

supervision

1.1.2 Agricultural Extension Services:

Rehabilitating and equipping new

FTCs

Rehabilitating and equipping existing

FTCs

Demonstration of improved need

based agricultural technologies

TOT for SMS and DAs on extension

service provision and improved

agricultural practices

Training of FTC-MC and farmers on

improved agricultural practices

Conducting Woreda level technical

supervision and monitoring

1.1.3 Animal Production & Animal Health

Services

Conduct feasibility study for fish

hatchery centre and submit to TC / SC

approval

Establishing modern queen rearing

demonstrations and training centres

70

No Activity Implementation Schedule

Year 1 Year 2 Year

3

Year

4

Year

5 1 2 3 4 1 2 3 4

Establishing and equipping fish

hatchery centre

Finalizing Breeding strategy for dairy

sector and submit for approval

Establishing herd performance record

centre

Establishing electronic data

management centre

Purchasing kits of semen producing

health

Establishing and equipping molecular

laboratory

Strengthening central quality control

laboratory

Strengthening and equipping poultry

diagnostic laboratory

Strengthening regional animal health

laboratories

Strengthening animal health clinics

and health posts

Surveillance of trans boundary and

zoonotic diseases

Human resource & physical capacity

development for animal production

and animal health services

1.1.4 Crop production and plant health

services

Conducting crop technology

assessment

Establishing and equipping fruit

nurseries

Strengthening fruit nurseries

Training SMS and DAs on improved

crop production package

Strengthening Plant Health Services

Establishment of plant quarantine

stations

71

No Activity Implementation Schedule

Year 1 Year 2 Year

3

Year

4

Year

5 1 2 3 4 1 2 3 4

Establishing crop loss data-base

Strengthening the Federal Plant

Protection Laboratory

Equipping regional seeds quality

analysis laboratory

Capacity development training &

experience sharing visits

1.1.5 Natural resources and soil fertility

management services

Conducting Community Level

Participatory Land Use Planning:

Support to Productivity Enhancing

Interventions of Community

Watersheds:

Strengthening Soil Testing

Laboratories

Conducting soil mapping and analysis

Capacity Development for Natural

Resource Management and soil

fertility management

1.1.6 Strengthening Promotion of

Agricultural Mechanization

Support the development of standards

for mechanization technologies:

Train manual pump manufacturers

Provide technical support for

agricultural machinery producers,

distributors and service providers:

Organize and support operators and

maintenance service providers:

Provide training for spare part

providers

72

5.5.1.2 Sub- Component 1.2: Scaling Up of Best Practices (US$ 55 M)

The objective of this sub component is to ensure the identification and wider use of best practices and

proven technologies to enhance and intensify agricultural production. In consultation with key

stakeholders, the extension service will identify improved technologies and management practices in

a range of thematic areas related to production, post-harvest handling, value addition and marketing.

Best practices are defined in terms of both proven technologies to increase productivity and value

added, and proven gender, nutrition, and climate change sensitive/friendly technologies. A best (or

good) practices according to Ethiopia agriculture portal is defined as superior method or innovative

practice that contributes to the improved performance of an organization under a given context, usually

recognized as ‘best’ by other peer organizations (for the detail see box 2). The project will support the

screening of identified technologies and the preparation of clear and detailed implementation

guidelines for each best practice.

The activities will be implemented in close collaboration and with the support of the aligned

Netherlands supported CASCAPE project which will provide support such as the provision of

evidence based to validate the technologies. In scaling up of best practices focal areas for technical

support include raising agricultural productivity by narrowing the gap between average farm yields

and those achieved by male and female model farmers through improved crop, livestock and natural

resource management practices.

The Agricultural Extension, Training and Advisory Directorate (AETAD) will be responsible for the

successful, timely, effective and coordinated implementation of this sub-component which include:

(i) identification and compilation of best practices; (ii) validation of best practices; and

(iii) implementation of best practices. The Technical Departments of the MoA will have the technical

responsibility of the sub-component.

CASCAPE will also provide support to stakeholders through training in both identification and

implementation of best practices. The CASCAPE along with AETAD, APFRDD and AHD capacitates

stakeholders involved in the implementation program. These institutions will also organize multi

stakeholder platform that will enable linking all the actors involved in scaling up of best practices.

A. Identification and compilation of best practices

This is identification of improved technologies and management practices in a range of thematic areas

related to production, post harvest and value addition. The identification process will consider the

environment in which the pilot program has been operating to make out contextual factors that may

have been essential to the success of the practice.

73

The scaling up guideline of the MOA indicates that any farmland with better crop husbandry with

strong crop stand as well as livestock husbandry that shows better performance than that of the

surrounding farmers can be identified as best practices.

Development agents (DAs) are responsible for identifying best practices within their working areas.

DAs can get the information on the existence of best practice through discussion by arranging

community meeting at FTC, seeking information from community. Besides, best practice

identification will be conducted during CLPP process through FGD, KII and individual observations.

The suggested best practices will be targeted for collection of data required for compilation and

development of guideline for each specific best practice.

B. Validation of best practices

Best practices require validation when they deviate from research recommendations. Validation is

testing of the identified candidate under similar environmental condition. The Netherlands supported

CASCAPE will provide support for the evidence based validation process and the preparation of

detailed validation procedure for the identified best practices.

C. Best practice implementation

Capacity development will be an essential component of implementation support. Capacity

development will focus on constraints that affect sustainability issues like attitude and behavior,

gender equality, skill and leadership commitments. It will focus on building implementation capacity

which is essential for over all transformation of agricultural development. Along this line there is a

need to assess the capacity needs to implement the program. In this regard capacity improvement

Box 2. Good Practice Criteria (FAO) Effective and successful:

A “good practice” has proven its strategic relevance as the most effective way in achieving a specific objective; it

has been successfully adopted and has had a positive impact on individuals and/or communities.

Environmentally, economically and socially sustainable:

A “good practice” meets current needs, in particular the essential needs of the world’s poorest, without

compromising the ability to address future needs.

Gender sensitive:

A description of the practice must show how actors, men and women, involved in the process, were able to improve

their livelihoods.

Technically feasible:

Technical feasibility is the basis of a “good practice”. It is easy to learn and to implement.

Inherently participatory:

Participatory approaches are essential as they support a joint sense of ownership of decisions and actions.

Replicable and adaptable:

A “good practice” should have the potential for replication and should therefore be adaptable to similar objectives in

varying situations.

Reducing disaster/crisis risks, if applicable:

A “good practice” contributes to disaster/crisis risks reduction for resilience.

74

should focus on the capacity improvement of male and female farmers (FHH as well as married

women), Development Agents and medium to high level officials with a particular attention to increase

the participation of women in the program implementation.

Implementation will also assess factors constraining input and output marketing and provide technical

support with major emphasis to creating favorable ground to input availability through strengthening

the capacity of grass root/community level input providers as well as creating multi stake holder

forums.

Summary Table 5.5.1.2: Sub-component 1.2 Scaling Up of Best Practices

Out puts and Institutions Responsible

Component 1 : Agricultural Public Support Services

Sub-component 1.2: Scaling up of best practices

Lead Organization: AED

Main partners: AETAD, APFRDD, Regional Livestock Agencies, RBoA

Supporting implementing bodies: CASCAPE, EIAR, Universities, ATA

Outputs

2010 SMS, 16196 DAs trained on best practice identification method

40 federal level, 320 regional level and 6280 Woreda level best practices identified

8,040 SMS, 64784 DAs trained on best practice implementation

1,012250 best practice demonstrations conducted

Audio visual aid facilities provided to 8 regional and 61 Woredas

15, 075 SMS and officials, 80980 DAs, 1000000 farmers participated on field

oriented knowledge sharing

20 federal, 160 Woreda, 700 zonal and 9420 Woreda level technical backstopping

and supervision conducted

Monitoring, Reporting and Evaluation Arrangements

Monthly report, quarterly report, annual report and field monitoring

Gant Chart 5.5.1.2: Sub-component 1.2 Scaling Up of Best Practices

Main activities and Implementation Schedule

No Activity Implementation Schedule

Year 1 Year 2 Year

3

Year

4

Year

5 1 2 3 4 1 2 3 4

Sub-Component 2: Scaling up of best

practices

1.2.1 Identification and compilation of Best

Practices

Training on identification and

compilation of best practices

Identification and observation

75

No Activity Implementation Schedule

Year 1 Year 2 Year

3

Year

4

Year

5 1 2 3 4 1 2 3 4

1.2.2 Validation of best practices

Training on validation of best

practices

Data collection and analysis

1.2.3 Implementation of Best Practices

Training on implementation of best

practices

Conducting multistakeholder forums

5.5.2 COMPONENT 2: AGRICULTURAL RESEARCH (US$ 51.4 M)

Overview

The aim of this component is to increase the supply of demand-driven agricultural technologies

which directly link to the other components that the project will support. It is expected that this

objective will be achieved through the implementation of four sub-components listed below:

a) Technology adaptation and generation. Adaptation/generation of crop,

livestock, soil and water management and farm implements technologies

through focused investment on ready for release technologies that are in final or

end (test) stage (with duration to release the technology to extension of a

maximum of two years) or on technology that has been released in other regions

and that could be tested and introduced in the project woredas. The intervention

will be comprised of two main groups of activities: (i) support to accelerate

release of selected in pipeline technologies and management practices; and

(ii) support to adaptation and generation of demand-driven technologies;

b) Pre-extension Demonstration and Participatory Research Schemes. To

support pre-extension demonstrations to farmers of newly recommended

agricultural technologies in order to assess their technical, social and economic

viability and enhance wider and rapid diffusion and adoption of the new

technologies and to support the establishment and strengthening of FREGs;

c) Source Technology Production to support the production of breeder and pre-

basic seeds and planting materials and animal breeds for further multiplication

and on-farm technology pre-extension demonstration;

d) Capacity development to enhance technology adaptation, generation,

maintenance and promotion focusing on physical and skill gaps in research

institutions to effectively implement the research program based on a detailed

76

human and physical capacity needs assessment of key commodity research

centers at federal and regional level.

The technology adaptation, generation and pre-extension demonstration activities are envisaged to be

implemented by taking into consideration principles of crosscutting issues such as nutrition, gender

and climate smart agriculture. The agricultural research component of AGP -II (Component 2) is

composed of four sub-components outlined below.

The proposed sub-components will be implemented by concerned directorates of the national and

regional research institutes. At national level, the Ethiopian Institute of Agricultural Research and its

research centers, located in different agro-ecologies, will be responsible whereas at regional level, the

research centers under the beneficiary Regional Agricultural Research Institutes will be the key

implementers. The project implementation process of the research activities is depicted in Figure 7

and details of the implementation mechanisms are elaborated in the sections that follow.

77

Figure 7:- Implementation Process and flow of Activities of the Research Component

Annual

review of

progress

and

planning

meetings

These flow

of activities

of the

research

component

are linked

with the

overall

CLPP

process of

the program

(1) Technolog

y

adaptation/

generation

Accelerated

release of ready-

for-release

technologies

Demand-driven

technology

adaptation/gene

ration

Year 1

Year 5

Year 4

Year 3

Year 2

Preparation of list of potential end stage

verification trials

Develop activity catalogue/protocol

Launch on-farm and on-station trials

Evaluate the candidate technologies

together with other actors

Pre-demonstrate and register the varieties

Regional level

Commodity level

Research Centre

National level

(2) Pre-extension

demonstration

and FREGs

(3) Source

technology

production

(4) Capacity

building

Identification of participant farmers

Input preparation

Technology delivery

Training of participant actors

Evaluation and farmers’ plots

Participatory need assessment

Purification of breeder/pre-basic

seeds Produce the seeds/technologies

Supply seeds

Follow up implementation

Capacity need assessment

Prepare implementation plan

Implement activities

Follow up for effective

implementation

Submission of Research Plans/Protocols to

FPCU

Implement upon approval

Participatory appraisal of production problems

(EIAR/RARIs)

Reporting back workshop on the survey

documents to identify critical research problems

Research protocol developed and review

workshop conducted for approval/scrutiny

78

At both federal and regional levels, linkages will be established among the different stakeholders to

identify priority research agenda linked to the selected commodities of national significance.

Partnering institutions may include the different directorates of the Ministry of Agriculture and

relevant development stakeholders in the other components of AGP 2.

.

5.5.2.1 Sub-Component 2.1: Technology Adaptation/Generation (US$16.3 M)

A. Accelerated Release of Agricultural Technologies from End Stage Verification Trials

Interventions ensuring accelerated release of in-pipeline agricultural technologies (for crop,

livestock/forage, and soil and water management and farm implements) are considered to be one of

the strategies to timely avail appropriate technologies for use. Supporting effective implementation of

such trials will indeed guarantee the timely delivery of improved technologies. The activities under

this sub-component will include the following:

Preparation of list of potential end/verification stage crop, livestock, soil and water

management and farm implement activities from existing research directories being run by the

NARS entities and identify potential activities that are anticipated to result in the development

of appropriate technologies for use by the beneficiaries of AGP –II; and this activities are

required to match with the problems to be identified during production system constraint

analysis;

Based on the quick review activities, develop an activity catalogue (document) with detailed

description of follow-up actions and submit for implementation to Federal Coordination Unit

(FPCU) and this will be undertaken by the national and regional research centers during the

second quarter of the first project year;

Launch on-farm multi-location evaluation of the candidate technologies in the target areas of

AGP 2 with relevant stakeholders such as members of ADPLAC platforms, through FREGs

and target farming communities in the respective AGP 2 districts;

Farmers and development agents (who specialized in crop, livestock, soil and water and home

economics disciplines) in the specific AGP 2 woredas will participate in candidate technology

evaluation in a manner which ensures considerations of cross-cutting issues in technology

selection (gender, nutrition and Climate Smart Agriculture);

The technologies will be finally evaluated and registered by concerned bodies/directorates in

the Federal MoA or recommended for use by the farming communities by research of NARS

depending on the nature of the technology identified;

The technologies released will be finally pre-demonstrated on FTCs and male and female

farmers’ plots in collaboration with implementers of the other components of AGP 2, mainly

79

that of first, third and fourth components to enhance their adoption and farm level economic

impact.

B. Adaptation/Generation of Demand Driven Agricultural Technologies

In view of emerging agricultural production challenges, sustained support to demand driven and

participatory technology adaptation/generation activities is very crucial. The activities under this

subcomponent are:

Develop research proposals according to the process described in the planning process section

;

Undertake on-station and on-farm testing of the potential agricultural technologies across

locations (according to the established on-farm research guideline of NARS) in potential AGP

2 target areas under the supervision of NARS entities;

Candidate technologies performing superior to the local/standard ones in yield, quality and/or

other parameters will be evaluated in a participatory manner through ADPLAC platforms and

FREGs and will be identified and recommended for release;

Source seed/prototype of the recommended technologies will be produced and supplied to

research-extension liaison wings of NARS, relevant ADPLAC members and actors in other

AGP 2 components for wider dissemination.

The activities proposed under sections 5.5.2.1. A and B is implemented by the Crop,, Livestock/forage,

Soil and Water, and Agricultural Implements Research Directorates of the Ethiopian Institute of

Agricultural Research and the same directorates under the Regional Agricultural Research Institutes.

In the implementation of the on-farm technology verification and piloting activities, the woreda

subject matter specialists, development agents and kebele development committee members will be

involved. Feedback of the farming communities (both male and female farmers) on the potential

technologies piloted or recommended for use will also be considered. To screen female friendly

technologies female farmers’ feedback will be solicited through organizing discussion with female

only groups. Technologies released from these activities will be tested further in pre-extension

demonstration sub-component to enhance their adoption rate.

Summary Table 5.5.2.1: Sub-Component 2.1 Technology Adaptation/Generation

Out puts and Institutions Responsible

Sub-component 2.1 Technology Adaptation/Generation:

(2.1.1) Accelerated release of “in-pipeline” Crop, Livestock, Soil and Water, and Farm Implement

Technologies from End Stage Technology Verification Trials; (2.1.2) Adaptation/Generation of

Demand Driven Agricultural Technologies

Responsible Directorates: Crop, livestock, soil and water, agricultural implements; socio-

economic; and research-extension directorates under EIAR and RARIs;

Main Partners:-, MoA, BoA

80

Supporting Implementing Organizations: CASCAPE; selected Universities working with CASCAPE.

Outputs: A total of 280 crop, livestock, soil and water and agricultural implement technologies

are envisaged to be released;

Monitoring, Reporting and Evaluation Arrangements: Smooth and effective implementation

of technology adaptation/generation of field research activities will be monitored by the different

research centres under the national and regional research institutes. The implementing units of the

different research centres will report their performance to their respective centres and the centres

will compile and consolidate centre level activity reports and submit to their respective institutes

on monthly, quarterly, bi-annually and annually. Overall activity performance evaluation will be

also made through field days, activity evaluation field missions and performance evaluation

workshops.

Gant Chart 5.5.2.1: Sub-component 2.1 Technology Adaptation/Generation

Main activities and Implementation Schedule

Activities Implementation Schedule (Y refers to Year)

Y1 Y2 Y3 Y4 Y5

1 2 3 4 1 2 3 4

2.1.1 Intervention: Accelerated Release of Crop, Livestock, Soil and Water Management, and Farm

Implement Technologies from End Stage Technology Verification Trials

Assessment of agricultural production

problems

Preparing list of potential end stage trials

in NARS that are hoped to result in

development of appropriate technologies

in the selected sub-sectors

Develop an activity catalogue with

detailed description of follow-up

activities and submit for implementation

Launch on-farm multi-location testing of

the candidate technologies in the target

woredas of AGP -II

Evaluate and register/recommend the

technologies by concerned bodies in the

Federal MoA

Pre-demonstrate the technologies on

FTCs’ and farmers’ plots in collaboration

with implementers of the other

components of AGP -II

Intervention 2.1.2 Adaptation/Generation of Demand Driven Crop, Livestock/Forage, Soil and

Water and Farm Implement Technologies

Planning Process to denvelop research

proposals according to the process

described in the planning process section

of the PIM

On-station and on-farm testing of the

potential agricultural technologies across

81

Activities Implementation Schedule (Y refers to Year)

Y1 Y2 Y3 Y4 Y5

1 2 3 4 1 2 3 4

locations (per the guideline of NARS) in

potential agro-ecologies of AGP 2 target

areas under the management of NARS

entities

Technologies performing better than the

local/standard ones in yield, quality

and/or other parameters will be evaluated

in participatory schemes through

ADPLAC platforms and FREGs and will

be recommended for release

Source seed/prototype of the

recommended technologies will be

produced and supplied to research-

extension liaison wings of NARS,

relevant ADPLAC members and actors of

the other AGP -II components for wider

dissemination in AGP -II target woredas

5.5.2.2 Sub-Component 2.2: Pre-Extension Demonstration of Technologies and Establishment

of FREGs (US$ 5.5 Million)

In this research sub-component, technologies generated in the first sub-component will be evaluated

on FTC plots and on farmers’ fields. The evaluation criteria will include project’s eligibility and

prioritization criteria (as described in the planning section). It will also consider suitability to the bio-

physical niches and yield performance. In the context of AGP2, pre-extension demonstration of newly

released technologies is defined as the first stage of the extension phase where newly recommended

agricultural technologies are demonstrated to the farmers to enhance rapid diffusion and adoption of

new technologies in wider areas. Pre-extension demonstration is, by and large, carried out in a specific

location for a period of 1 to 2 seasons depending on the uptake and nature of the technology.

The activities under this subcomponent include:

Researchers will identify participating farmers (both male and female) in the target areas

together with woreda and kebele level extension workers;

New technologies with their associated inputs to be demonstrated will be prepared and

delivered to farmers selected to host the on-farm pre-extension demonstrations in the target

areas by the technology generating entities at national and regional levels; the selection of

farmers will be based on willingness, availability of land and other resources to effectively

showcase the technologies, innovativeness and ability to communicate his observations with

other farmers, among others.

The participating farmers will be given the recommended technology; for example, for crop

varieties, the research centers will provide the initial seed while the participating farmers will

82

supply other necessary inputs (land, labour and so on) for effective implementation of the pre-

extension demonstration activities;

Prior to the actual implementation of the pre-extension demonstrations, farmers and other

stakeholders will then be given a brief training on the characteristics and management aspects

of the new technology research staff and other actors from the other components of AGP 2;

To properly showcase the performance of the new technologies, a minimum of a quarter of a

hectare per participating farmer will be allotted and the demonstration will be done based on

group scheme, for example in crop and forage technologies, using FREGs approach;

FREGs used for pre-extension demonstration purpose will be strengthened through continual

training, experience sharing and facilitation of regular meetings, workshops and information

and communications where the research centres’ staff, CASCAPE staff and subject matter

specialists from focal districts will be involved;

These activities will be implemented based on work plan approved by FSC and will be

mainstreamed in the regular EIAR and RARIs activity plans;

The pre-extension demonstration through establishment/facilitation of FREGs will be implemented by

the different research centres under the national and regional research institutes. The implementing

wings in the different research centres (socio-economic and research-extension-farmer linkage wings)

will report their performance to their respective centres and the centres will compile centre level

activity reports to their institutes on monthly, quarterly, six-monthly and annual basis. Overall activity

performance evaluation will be also made through field days, performance evaluation missions and

workshops.

Summary Table 5.5.2.2: Sub-component 2.2 Pre-extension Demonstration

Out puts and Institutions Responsible

Sub-component 2.2 Pre-extension Demonstration and Support to Establishment of

FREGs

Responsible Directorates: mainly socio-economic; and research-extension directorates of

EIAR and RARIs in collaboration with sectoral directorates (Crop, livestock, soil and water,

agricultural implements);

Main Partners: CASCAPE, MoA, BoA and Universities

Outputs: A total of 700 FREGs will be established for on-farm technology pre-extension

demonstration activities;

Monitoring, Reporting and Evaluation Arrangements: The efficiency of technology pre-

extension demonstration and establishment and facilitation of FREGs will be implemented by

the different research centres under the national and regional research institutes. The

implementing wings in the different research centres will report their performance to their

respective centres and the centres will compile centre level activities and report to their

institutes monthly, quarterly, six-monthly and annually. Overall activity performance

evaluation will also be made taking crosscutting issues (gender, climate and nutrition )

responsiveness in to consideration through field days, activity evaluation tours and workshops .

Gant Chart 5.5.2.2: Sub-component 2.2 Pre-extension Demonstration

83

Main activities and Implementation Schedule

Activities Implementation Schedule

Y1 Y2 Y3 Y4 Y5

1 2 3 4 1 2 3 4

INTERVENTION 2.1 Pre-extension demonstration of technologies and establishment of

FREGs

Researchers in collaboration other actors

will identify participating farmers; the

number of participating farmers could vary

depending on the nature of the technology;

Necessary amount of inputs will be prepared

and delivered to collaborating actors (target

areas)

The participating farmers will receive the

technology on a revolving scheme so that

more farmers will further be reached with

the new technology.

Prior to the pre-extension demonstrations,

farmers and other stakeholders will be given

a brief training on the characteristics and

management aspects of the new technology.

To clearly showcase the performance of the

new technologies, a minimum of a quarter of

a hectare per participating farmer will be

allotted and the demonstration will be done

on a clustering basis where 20 to 30 farmers

with adjacent plots, for example in crop and

forage technologies.

The activities will be implemented based on

annual activity proposal prepared by the

research actors based on the local demand

obtained from the Agricultural Development

Partners Linkage Councils.

Continual establishment and strengthening

of FREGs in such a way that the smallholder

farmers actively participate in the

technology development and transfer.

FREGs will be strengthened through

training, experience sharing and facilitation

of regular meetings, workshops and

information and communications.

84

5.5.2.3 Sub-Component 2.3: Support to Source Technology Production for Crop,

Livestock/Forage, Soil and Water and Farm Implements (US$ 6.8 Million)

The objective of this sub-component is to support the production of breeder and pre-basic seeds and

planting materials; source livestock and forage technologies, bio-fertilizer technologies and soil and

water conservation based agro-forestry species and farm implement technologies for further

multiplication and for on-farm technology pre-extension demonstration. Prior to implementation, need

assessment will be conducted for the indicated categories of source technologies. For each type of

source technology, the need assessment will include a demand/supply analysis in order to assess the

production gap.

(a) Production of breeder seed and pre-basic seeds of major crop varieties. The activities to be

implemented for breeder and pre-basic seeds; source livestock and forage technologies; bio-

fertilizer technologies and soil and water conservation based agro-forestry species and farm

implement technologies include:

Conduct participatory demand assessment together with woreda level technical team and other

relevant stakeholders;

Undertake purification (of breeder seeds) and produce pre-basic seeds for the demanded crop

varieties and produce demanded prototypes, animal breeds, forages, soil and water source

technologies by concerned NARS entities; production of source technologies with due care on

quality;

Deliver the produced source technologies to multipliers/users in AGP 2 woredas on payment

bases defined by the producing centres; and in these processes stakeholders in the other

components of AGP 2 will be involved.

(b) Mass multiplication of disease and insect free tissue culture materials The activities for the

production specifically of tissue culture materials include:

Participatory identification of type and quantity of planting material by researchers, woreda

level relevant actors and other AGP 2 component actors;

Multiplication of plantlets/mini tubers in tissue culture (TC) laboratories;

Acclimatization of TC derived materials in screen houses;

Nursery establishment and multiplication of mini-tubers /plantlets under field condition;

Dissemination of the TC materials to research centres, commercial vine/mini-tuber multipliers

and farmers for wider use.

(c) Production of source livestock and forage technologies. The activities to be implemented for

production of source livestock and forage technologies include:

Conduct participatory demand assessment together with woreda level technical team and

other relevant stakeholders;

Produce source livestock and forage source technologies by concerned NARS entities;

production of source technologies with due care on quality;

85

Deliver the produced source livestock and forage technologies to multipliers/users in AGP 2

woredas on payment bases defined by the producing centres; and in these processes

stakeholders in the other components of AGP 2 will be involved.

d) Land and water resources technology multiplication

The activities to be implemented for land and water resources technology multiplication include:

Conduct participatory demand assessment together with woreda level technical team and other

relevant stakeholders;

Produce the demanded land and water resources technology multiplication by concerned

NARS entities; production of source technologies with due care on quality;

Deliver the produced source technologies to multipliers/users in AGP 2 woredas on payment

bases defined by the producing centres; and in these processes stakeholders in the other

components of AGP 2 will be involved.

Implementation of source technology production will be undertaken by the different research centres

under the national and regional research institutes. The source technology multiplication wings in the

different research centres will report their performance to their respective centres and the centres will

compile the centre level technology production activities and report this to their respective institutes

monthly, quarterly, six-monthly and annually. Overall activity performance evaluation will also be

made through field days, activity evaluation missions and performance assessment review meetings.

Summary Table 5.5.2.3: Sub-component 2.3 Source Technology Production

Out puts and Institutions Responsible

Sub-component 2.3 Source technology production

Responsible Directorates: Crop, livestock, soil and water, agricultural implements; socio-

economic; and research-extension directorates under EIAR and RARIs;

Main Partners: EIAR; RARIs;

Supporting Implementing Organizations: Federal MOA; Regional Bureaus of Agriculture;

Ethiopian Seed Enterprise; Regional Seed Enterprises; Seed Producing Farmers’ Cooperatives;

Outputs: A total of 6,290 quintals of breeder and pre-basic seed of food and feed crops will be

produced; In addition, demand based multiplication of animal breeds, implement prototypes

and tissue culture materials will be undertaken and the quantity will be detailed through demand

assessment.

Monitoring, Reporting and Evaluation Arrangements: Source technology production

activities will be implemented by the different research centres under the national and regional

research institutes. The source technology multiplication wings in the different research centres

will report their performance to their respective centres and the centres will compile the centre

level technology production activities and report to their institutes monthly, quarterly, six-

monthly and annually. Overall activity performance evaluation will also be made through field

days, activity evaluation tours and performance assessment review meetings.

Gant Chart 5.5.2.3: Sub-component 2.3 Source Technology Production

86

Main activities and Implementation Schedule

Activities Implementation Schedule

Y1 Y 2 Y3 Y4 Y5

1 2 3 4 1 2 3 4

2.3 Source Technology Production for Crop, Livestock/forage, Soil and Water and Farm

Implements

Participatory assessment of breeder and

pre-basic seed (food and feed crops) and

agricultural implement prototype

demand

Undertake regular purification of breeder

and pre-basic seeds for the identified

varieties

Produce the seeds with due emphasis on

seed quality (viability, germination and

genetic purity)

Supply the produced technologies to

target farming communities in

collaboration with other relevant actors

5.5.2.4 Sub-Component 2.4: Capacity Development (Physical and Human (US$ 22. 7 M)

The sub-component will focus on physical and skill gaps in research institutions to effectively deliver

the research program based on a detailed human and physical needs assessment of key research

institutions at federal and regional level.

Prior to implementation, needs assessment will be conducted for each of the elements in the list (ref.

table 19 below). The needs assessments will focus on bridging physical and skill gaps (including

capacity needs for cross cutting issues ) to allow the research component to increase the supply of

demand-driven agricultural technologies to extension services. Needs assessments will provide

detailed plans for how facilities and equipment would be operated, managed and maintained, clear

staffing plans, and human capacity development. It will take into account exhaustive inventory of the

supports received through GoE or other projects / programs or in pipe line to avoid overlap. In the

process of need assessment, similar elements will be group on the basis of the expertise needed to

conduct the assessment at one go. The assessment reports will be attached to the relevant APW&B.

87

Table 18:- List of Items to be Procured for research component Items to be procured COSTAB

Base Costs

Institutions responsible for need

assessment

Modality of

Implementation

(own, national

consultant,

international

consultant) Field vehicles 4,000,000 EIAR, RARIs, FPCU, RCCU, RRCCU Own team

Agricultural machineries (Tractors ,

planters and combine harvesters)

1,200,000 EIAR and RARIs Own team

Strengthening of plant protection

labs

650,000 Crop research directorates of EIAR and

RARIs

Own team

Strengthening of soil labs 1,250,000 Soil and water research directorates of

EIAR and RARIs

Own team

Biotechnology labs equipment &

supply

1,000,000 Biotechnology research directorates of

EIAR and RARIs

International

consultant

Animal health research lab

equipment & supply

1,000,000 Livestock research directorates of EIAR

and RARIs

Own team

Fishery research lab equipment &

supply

500,000 Fishery research wing of EIAR and

RARIs

Own team

Food science lab equipment &

supply

500,000 Agricultural and Nutritional Research

Directorate of EIAR and RARIs

Own team

Animal nutrition lab equipment &

supply

500,000 Agricultural and Nutritional Research

Directorate of EIAR

Own team

Agronomy and physiology lab

equipment & supply

500,000 Agricultural and Nutritional Research

Directorate of EIAR and RARIs

Own team

Forage seed cleaning and grading

equipment

750,000 Livestock Research Directorate EIAR

and RARIs

Own team

Seed cleaning and grading

equipment

500,000 Crop Research Directorate of EIAR and

RARIs

Own team

Seed lab equipment & supply 600,000 Source Technology Multiplication and

Seed Research Directorate of EIAR

Own team

Mechanization engineering labs 1,500,000 Agricultural Implements Research Wing

of EIAR and RARIs

Own team

Computational facilities for NARS 500,000 ICT department of EIAR Own team

Automated weather station and

remote sensing facilities

450,000 Agro-metrology and GIS Department of

EIAR and RARIs

International

consultant

Poultry house construction 250,000 Livestock Research Directorate of EIAR

and RARIs

Own team

Irrigation facilities 2,746,000 Crop Research Directorate of EIAR and

RARIs

Own team

Cold store 500,000 Crop Research Directorate of EIAR and

RARIs

Own team

Short term trainings (researchers

and technicians)

2,000,000 Human Resource Training Unit of EIAR

and RARIs

Own team

Experience sharing 700,000 EIAR and RARIs Own team

Scientific workshops 650,000 EIAR and RARIs Own team

88

The concerned implementing actors of this sub-component will report to their respective supervisors

on monthly, quarterly, six-monthly and annually. Overall activity performance will be also evaluated

through field days, activity evaluation missions and workshops.

Summary Table 5.5.2.4: - Sub-Component 2.4 Capacity Developments

Out puts and Institutions Responsible

Sub-component 2.4 Capacity development (human and physical)

Responsible Directorates: Crop, livestock, soil and water, agricultural implements; socio-

economic; and research-extension directorates under EIAR and RARIs;

Main Partners: MoA (Mainly FPCU), federal and regional research coordination units;

CASCAPE;

Supporting Implementing Organizations: MoA; CASCAPE;

Outputs: Physical facilities for mobility, farm operations and laboratories, and human capacity

of the national and regional research institutes will be upgraded to effectively respond to

emerging technology supply needs.;

Monitoring, Reporting and Evaluation Arrangements: Implementation of physical and

human capacity development activities will start with appraisal of the needs of the different

research centres by the national and regional institutes in collaboration with other stakeholders.

The concerned implementing actors will report to their respective supervisors on monthly,

quarterly, six-monthly and annually. Overall activity performance can be also evaluated

through field days, activity evaluation missions and workshops. Human capacity development

will look at the capacity of the research institutes to integrate gender, climate and nutrition.

Gant Chart 5.5.2.4: Sub-Component 2.4 Capacity development

Main activities and Implementation Schedule

Activities Implementation Schedule

Y1 Y2 Y3 Y4 Y5

1 2 3 4 1 2 3 4

2.4 Capacity development (human and physical)

Needs Assessment to identify the critical

physical and skill gaps

Plan resource requirements for the

identified capacity development

activities gaps (human and physical)

Implement human capacity and facility

enhancement activities according to the

set plan

Follow up effective implementation and

sustainability

89

5.5.3 COMPONENT 3: SMALL-SCALE IRRIGATION (US$ 218.6 MILLION)

Overview

The component will promote the development, expansion, improvement, upgrading and/or

rehabilitation of small-scale irrigation (SSI) subprojects8 where technically feasible, economically

viable, socially acceptable and environmentally friendly. It will focus on the development of new and

rehabilitation/improvement of existing smallholder irrigation systems including household irrigation

as well as support to Irrigation Water Users Associations (IWUA) and other farmer

organizations/groups for irrigation development. Priority will be given to the SSI systems, with strong

community demand, serve the highest possible number of women farmers, technically simple to

design and cheap to implement, without major environmental and social barriers.

Therefore, the objective of this component is to increase access to and efficient utilization of irrigation

water by smallholder farmers through (i) increased irrigation infrastructure development and

improvement; and (ii) introduction of improved irrigated agriculture management services. To achieve

this objective, the component has two sub-components:

Small-scale Irrigation Infrastructure Development and Improvement; and

Integrated Crop and Water Management for Irrigated Agriculture;

Box 3A. Definitions of Terms

Definition of terms is crucial for illustrative institutional responsibilities and accountabilities at

each level based on their mandates. Hence, for clear understanding and accountability during

implementation, in this document, the following working definitions shall apply:

Small-scale Irrigation (SSI) Systems: The term “small-scale” refers not so much to the

physical size of the command area of the irrigation system, or farm plot (although these are

generally small), but rather to the fact that the plots and the irrigation schemes (where a

scheme is present) are managed and owned by the farmers themselves. Therefore, the term

small-scale irrigation (SSI) systems refer to a wide range of approaches and techniques for

catching, storing and using rainfall at or near the place where it falls (usually called

rainwater harvesting); diverting flowing water by gravity usually using diversion weirs

(concrete or masonry), or simple diversion structures (stone/earth/brushwood structures),

intake structures, run-of-river or spate irrigation systems, lifting/diverting surface water or

ground water by human or motor power (lift irrigation), conveying water by canal or pipe,

and applying water to land by controlled or uncontrolled flooding (gravity), overhead

sprinklers (pressurized), or low pressure drip irrigation.

8Under the AGP, an "SSI subproject" is an SSIsystems proposed by a group of farmers or an irrigation community (who

will form an irrigation water users association (IWUA), if it hasnot already done so), selected by the Woredaor region,

endorsed by and determined feasible bythe implementing agency.

90

New Small-scale Irrigation Systems: It comprises new small-scale irrigation systems (with

command area greater than or equal to 20ha) established to use surface water, groundwater

water and rainwater sources to irrigate existing cultivated land or to convert uncultivated

new land to irrigated land.

Micro-Irrigation Systems: Micro-Irrigation Systems (MIS) comprise command area less

than 20 ha for plots of greater than or equal to ten households.

Household Irrigation Systems: Household Irrigation Systems (HIS) comprise command

area less than 5 ha, for plots of fewer than ten households (individual or group irrigators).

Revitalization: Revitalization is an all-embracing approach, including the development of

both hard ware (physical investment) and software (social investment) aspects that provide

complex systems to use irrigation water. It refers to the re-design and

restoration/reconstruction of existing infrastructure components and also comprises

engagement with the organizational and social dynamics of water allocation and

distribution, the agricultural production system, human capital development and

empowerment, finances, business strategy development and marketing.

Hardware: It refers to physical infrastructures developed/installed in an irrigation system

for the purpose of facilitating availability of irrigation water from a water source for crop

production. In a gravity flow irrigation system these include abstraction structures,

conveyance structures, distribution structures, drainage structures and on-farm service

roads. It also refers to stationary or movable facilities employed for supply of irrigation

water in pressurized irrigation systems.

Software: It refers to the non-tangible aspects of an irrigation system such as

irrigator(s),organisations, institutions, management, by-laws, and Capacity

Development(trainings).

Rehabilitation: Rehabilitation is mainly the restoration of physical structures to original

design and specifications and it then includes engineering- centred re-construction of

dilapidated infrastructure and is focused primarily on securing the water supply by repairing

the irrigation abstraction, conveyance and distribution and application system. It mainly

involves the rebuilding/restoration of non- functional/damaged structures of existing SSI

subprojects to regain the services as per prior design.

Expansion/Extension: It includes expanding the command area through redesigning for

provision of additional structures such as improvement of heads works, extension of canal

networks, night storage, etc. on existing SSI subprojects.

Upgrading: It includes replacing traditional irrigation structures with modern structures to

improve the durability of the structure, improve conveyance efficiency and hence increase

the command area or improve the reliability, equity and adequacy of water delivery.

Improvement: It includes redesigning and reconstructing of structures (with new works

being constructed or design changes made to improve and modernize the irrigation systems

(head works, off-farm and/or on-farm such as canal lining, construction of crossing

91

structures, etc.) in order to improve efficiency, operation and management of existing SSI

subprojects through improved water conveyance, distribution and application systems.

Complementarities to other components-These interventions will contribute to the PDO by

promoting investment in the irrigated agriculture through SSI infrastructure development, efficient

water delivery irrigation practices, and improved agronomic practices (crop diversification, crop

management, use of inputs, etc.) which will result in enhanced agriculture productivity and market

access for smallholder farmer. In addition, the SSI Development Component would have

complementarities with other core components. The SSI Development Component would directly

benefit to from the strengthened public advisory services in component-I, which would directly

contribute to the strengthening of the irrigated agriculture extension. Component-II specifically of

adaptation and generation of land and water resources technologies and crop technologies would

directly contribute to strengthening SSI Development Component through generation of irrigation

technologies. While the Component-IV activities would improve access to quality seeds, increase local

wholesalers as well as improve storage facilities and market linkages, which would contribute to the

development of market for irrigated agricultural produce. It also contributes to the program’s cross

cutting issues particularly women empowerment as well as improved HH nutrition.

Box 3B. Component Key Performance Indicators

Objective and key performance indicators are:

(i) Total number of irrigation water users provided with new/improved irrigation and

drainage services (disaggregated by gender- Total, Male and Female) -This indicator

assesses the expansion in access to irrigation and drainage of farmers. Water users refer to

smallholder farmers who are recipient of irrigation and drainage services from the program.

“Irrigation and drainage services” refers to the better delivery of water to, and drain water

from, arable land, including better timing, quantity, quality, and cost-effectiveness for the

water users.

(ii) Percentage of functional Irrigation Water User Associations managing effectively

irrigation and drainage infrastructures -This indicator used to assesses the functionality of

IWUAs and their effective management of irrigation and drainage infrastructures of the

program as a proxy for measuring their efficient use of irrigation water. The efficiency of

water use will also be assessed more in depth through a qualitative study; specifically

through performance assessment of a sample of irrigation water user associations and

irrigation and drainage infrastructures. Pleases note that

a. Functional IWUA refers to an association with (i) registration

by supervising body (to be designated by each regional states); (ii) its own bylaws

(rules for consumption of irrigation water and collect fees); (iii) trained members

(water management, dispute resolution, irrigation farming methods, new irrigation

technologies, maintenance of infrastructure, book keeping, financial management,

92

leadership assertiveness, negotiation specifically targeted at female members etc.)

;

(iv) Adequate capacity to collect O&M fees; and (v) 30 per cent women members

(if sufficient women have land use right in the specific SSI scheme) with at least

50 per cent of the women members in leadership position;

b. Managing effectively refers to (i) effective maintenance and operation of the

irrigation and drainage system; (ii) development of specific scheduling of water

delivery; and (iii) delivery of water to farmers plots in the right quantity and at an

appropriate time. (iv) the anticipated additional use of the water (drinking,

washing, cattle trough).

(iii)Area (ha) provided with sustainable irrigation and drainage services disaggregated by new

SSI, improved SSI and MHI systems.

Area (Hectare) provided with new irrigation and drainage services. New irrigation and

drainage services” refers to the provision of irrigation and drainage services in an area that

has not had these services before. The area is not necessarily newly cropped or newly

productive land, but is newly provided with irrigation and drainage services, and may have

been rain fed land before.

Area (Hectare) provided with improved irrigation and drainage services disaggregated by

Rehabilitation of Existing Modern SSI and Upgrading of Existing Traditional SSI Systems).

“Improved irrigation and drainage services” refers to the upgrading, rehabilitation, and/or

modernization of irrigation and drainage services in an area with existing (both traditional

and “modern”) irrigation and drainage services.

Area (Hectare) provided with Micro-and Household Irrigation (MHI) services. “Micro-and

Household Irrigation services” refers to the provision of irrigation services in an area

(command area less than 20 ha for a system) that has not had these services before. The area

is not necessarily newly cropped or newly productive land, but is newly provided with

irrigation and drainage services, and may have been rain fed land before.

Guiding Principles for SSI Component-The main principles underlying component design are:

Irrigation systems shall be developed from the three sources of water (rainwater, ground water,

surface water) depending on the potential and comparative advantage of the intervention to the

target area;

SSI subprojects will be prioritized based on the principle of strategic investment decision

making processes in which beneficiary communities are consulted for the investment, but the

final decision will be made by regions considering technical, social, environmental and

financial feasibility criteria even if demand is high for the investment in that particular

community;

SSI is multi-disciplinary by its nature. Thus, SSI improvement or development is an

intervention in which the integration of social, institutional, policy, engineering, agricultural,

economic and environmental issues is paramount.

93

A balanced pragmatic approach including SSI infrastructure investment, irrigation systems

governance improvements, and agricultural extension services improvements. Improving

agricultural productivity, ensuring access to agricultural technologies and practices and

facilitation of market linkages for agricultural producers are as important as improving access

to water.

Ensuring community ownership and involvement in planning, design and construction

supervision is vital for SSI sustainability during operation. These are brought about by building

on existing farmer knowledge and demand. Significant effort will be exerted to meaningfully

engage women in the process. In order to pay more than lip service to farmer participation, there

may also be a need to examine the assumptions and attitudes of professional staff and, where

necessary, re-orient them to design upward from farmer knowledge and practice rather than

downwards from their professional norms.

A participatory and decentralized setting where the local level (Woreda and kebele) experts

and beneficiaries play an active role in the planning, implementing and sustaining project

interventions;

The rehabilitation and new construction works meet technical quality design standards, and

pays adequate attention to environmental and social considerations; and

5.5.3.1 Sub-Component 3.1: SSI Infrastructure Development and Improvement (US$ 211.0 M)

The main objective of this subcomponent is increase availability of irrigated water for smallholder

farmers” through: (i) the rehabilitation, upgrading and/or improvement of existing SSI schemes;

(ii) establishment of new SSI systems integrated with access roads where necessary; (iii) the

development of HHI systems; and (iv) capacity building.. The following are tasks to be performed as

the basis for the success of the subcomponent major interventions:

– Conduct small-scale irrigation potential9 assessment and SSI subprojects identification of

intervention woredas through surface and shallow groundwater water as well as other water

source options;

– Inventory and assessment of revitalization needs of existing SSI systems;

– Undertake needs assessment and action plan preparation for capacity development

interventions;

– Subproject preparation and implementation;

During the initial years of development, priority will be given to the expansion, improvement,

rehabilitation and/or upgrading of existing potential Small Holder Irrigation Systems, with strong

community demand, technically simple to design and cheap to implement, without major

environmental and social impacts.

There are four major interventions to be performed under this sub-component:

9 Surface water availability and land suitability

94

Rehabilitation and/or Improvement of Existing SSI Systems

Establishment of Micro- and Household Irrigation Systems

Establishment of New SSI Systems

Capacity Development

During the initial years of development, priority will be given to resource and potential assessment,

subproject preparation, and implementation (expansion, improvement, rehabilitation and/or

upgrading) of existing potential Small Holder Irrigation Systems, with strong community demand,

technically simple to design and cheap to implement, without major environmental and social impacts.

A. Rehabilitation and/or Improvement of Existing SSI Systems

This intervention is to make fully functional to its design capacity and/or beyond through

rehabilitating, improving and/or extension of existing irrigation infrastructure and keeping the

infrastructure functional. Rehabilitating, improving and/or upgrading the physical infrastructure is

include a combination of both “hardware” and “software” solutions. The hardware development

involves improving/rehabilitating existing water structures (off-farm10 and on-farm) to improve

reliability of supply as well as developing groundwater to augment lean season water supply. The

intervention of “software” solutions is critical and requires the development of more efficient

mechanism for delivery and management of irrigation system up to the field level through a clear

delineation of responsibilities between the regional government, in charge of infrastructure

development, and the Irrigation Water Users Associations (IWUAs), in charge of delivering irrigation

services to farmers. This intervention focuses primarily on revitalization of existing (both modern and

traditional) SSI systems.

Box 3C. Guidelines for assessing feasibility of revitalization interventions

The rehabilitation/improvement of existing SSI subprojects shall be feasible for financing if and

only if the following requirements are jointly satisfied:-

Overall operational irrigated area shall be increased by at least 25%or 20 ha (whichever is

applicable) from existing operational/functional command area due to revitalization;

Overall cropping intensity shall be increased by at least 30% from current cropping

intensity;

The subproject shall be re-designed and revitalized to increase in high-value crops, in

particular vegetables, and other high-value crops occupying at least 25% in total of the

command area during the course of the year; and

Subproject unit cost shall be up to Birr 30,000 per ha (unit cost is computed for increased

command area due to revitalization intervention, not for the whole command area).

10 Head work structures and conveyance canals with associated structures

95

Key activities and Implementation Approaches- Key activities and procedures include the

following:

(i) Key Activities:- The following are major activities in revitalization of existing SSI subprojects:

(a) Developing SSI rehabilitation and revitalization guidelines: The rehabilitation and/or

revitalization work should be led by standards and guidelines. The guidelines/procedures are

based on the understanding that an irrigation scheme consists of four mutually interlinked

systems: the physical system, the cropping system, the economic system and the social-

organizational system. It combines both hardware and software rehabilitation processes to lead

to a comprehensive revitalization of an irrigation scheme. Therefore, issues related with

technical, social, environment and economic aspects will be included in the guideline. This

guideline shall be developed by professionals at federal level or recruiting consultants and

validated by relevant stakeholders, and will be shared to all implementing

partners/stakeholders.

(b) Inventory of existing SSI subprojects: Inventory of existing SSI subprojects for

rehabilitation and/or improvement including operation and management will help to identify

existing SSI schemes with problems that are functioning under capacity and don’t serve the

planned beneficiaries as per the design. It shall also include identification existing SSI

subprojects that have potential for improvement, expansion/extension and upgrading. It will

have the objective to develop Woreda Inventory Map of Existing SSI systems, which clearly

shows the location, type and coverage of the existing small-scale irrigation systems in the

Woreda. Also, develop Woreda Existing Small-scale Irrigation Renovation Plan, which shows

the prioritized list of all existing small-scale irrigation systems in the Woreda to be

rehabilitated and improved within the program period.

(c) Conduct diagnosis of the existing schemes and design the rehabilitation/improvement of

schemes: Based on the inventory result and extent of the problems, prioritized implementation

plan will be prepared considering the impact of the rehabilitation and feasibility of

implementation of the rehabilitation. The biophysical and socio-economic conditions of the

existing SSI systems will be thoroughly evaluated, redesigned and planned as per the actual

need. Regional and woreda experts will do this work with strong support from national FPCU

in case of complex rehabilitation work.

(d) Rehabilitating, improving, and expanding existing modern SSI systems: This include the

following:-

reconstruction of damaged/non-functional head works, conveyance systems, and/or on-

farm infrastructures;

repair/maintenance of partially functional leaking headwork, conveyance systems, and/or

on-farm infrastructures;

improvement of canals through lining or changing in to closed canal systems;

96

construction of additional canals/structures for expansion of command areas;

improvement of water distribution structures at the field level such as additional off-takes,

crossing structures, etc.; and

Changing the current water application methods to more efficient one such as surface

irrigation systems into sprinkler and/or drip irrigation systems (water saving

technologies).

(e) Upgrading and/or improvement of existing traditional SS irrigation systems: This would

be done through replacing temporary diversion structures with permanent ones; improving

canal alignment and lining with masonry to improve conveyance efficiency; construction of

on-farm irrigation structures such as off-takes, and crossing structures; etc. Woreda and

regional experts will take the responsibility for the execution of this activity with close support

from the federal.

Key Implementation Procedures and Approaches for Rehabilitation/Improvement. The

following are the key steps and approaches for the revitalization of an existing SSI system:

Steps 1 - Identify stakeholders and conduct extensive stakeholder consultations: Stakeholder

consultations are conducted to enlist vital stakeholder support and input in the implementation of the

revitalization process. The diagnostic analysis workshops shall identify the major constraints to

optimum system performance and, give recommendations on how to alleviate the constraints. The

other important reason for stakeholder consultations is to ensure that there is effective buy-in of the

project by all levels. Project ownership by beneficiary institutions and communities is crucial to its

success. Identification of and consultations with stakeholder should be initiated at the start of the

revitalization intervention.

Step 2 –Carry out site visit: The diagnostic studies shall be conducted by teams of professionals

representing disciplines such as irrigation engineering, sociology, economics, environment and

agronomy. The site visit helps to define what and how the diagnostic work shall be carried out. Based

on the field visit findings, Terms of Reference (TOR) shall be developed. The TOR outlines the details

of the diagnostic work. Such work may require the services of competent consultants. Hence, the

procurement of such services involves preparation of Request for Proposal (RFP) and bidding process

which has to be conducted according to Selection and Employment of Consultants Guidelines of

World Bank. In the RFP, it needs to be stressed that sustainable revitalization can be achieved only

when both the software and hardware components of the scheme are worked on.

Step 3–Carry out diagnostic analysis11 and baseline studies: The baseline diagnostic and analytical

studies provide an objective basis for defining the most favourable social-economic conditions and the

11Diagnostic analysis is an interdisciplinary methodology for defining the existing state of an irrigation system and identifying its strengths and

weaknesses.

97

most appropriate methodology for rehabilitating the schemes in a sustainable and profitable manner.

At this stage, we need to consider the following main study areas:

Conduct Water Resources Assessment: It involves water availability assessment, water

demand analysis and irrigation water utilization analysis.

Conduct Irrigation System Infrastructures Analysis: It involves assessment of the

conditions of the physical infrastructure, the amount of physical damage on the physical

infrastructure and quantify amount and cost of repairing or replacing physical infrastructure

(BOQ),to assess the practicability of irrigation system layout, the compatibility of distribution

system with the community needs, and assess O&M options and models.

Conduct Socio-economic Analysis: Assess historical perspectives of the scheme, assess

governance structures (scheme management/IWUA, institutional and legislative frameworks),

assess gender issues, assess social-economic constraints (including land tenure and water

rights), market linkages, assess needs and options for multiple-use water services (MUS) and

develop appropriate governance/management model for the scheme.

Agricultural Resource Assessment: It involves conducting crop production system analysis,

and assessing value addition opportunities and options including assessment of existing

agricultural and livestock resources, land-use, farming systems and cropping patterns, input

supply and product marketing, other economic activities. It shall also include assessment of

existing Agricultural Development Plan and suggest alternative production methods and

models, crop suitability, cropping alternatives, cropping rotations, and mechanisation.

Note that it is imperative to stress that availability of sufficient water to meet the needs of the

revitalized irrigation scheme as a pre-condition for proceeding with the revitalization intervention.

Step 4 - Define the bidding documents for the restoration of the SSI system: The tendering/bidding

document provides the basis for defining how and what should be revitalized in the scheme.

Revitalization process involves working on the hardware and software components of the scheme. The

bidding document shall be prepared based on World Bank Standard Bidding Documents for small

works.

Step 5 - Carry out software and hardware renovation work: Hardware rehabilitation as part of

revitalization process may involve rebuilding, upgrading, improving or modernizing existing

infrastructure. Such work requires services of competent contractors. Hence, the procurement of such

services involves tendering process which has to be conducted according to small works guidelines

and procedures of World Bank. The software restoration involves implementation of diagnostic

findings such as establishing and/or strengthening scheme governance structures which includes

establishing and operationalizing a viable IWUA to manage the scheme. It also involves overhauling

and strengthening the IWUA based on the diagnostic recommendation. Software revitalization also

involves reviewing and putting in place appropriate integrated crop and water management including

mainstreaming gender issues in scheme operations. It also involves reviewing market linkages and

98

linking the SSI scheme to viable and sustainable markets for its produce as well as inputs. The final

activities in software rehabilitation involve developing scheme operation, management and

maintenance models which will characterize the functions of the rehabilitated irrigation scheme.

Carry out hardware rehabilitation works: Produce bidding and contract documents for contractors,

and advertise physical works, evaluate contract bids, select the best contractor based on selection

criteria, and engage contactor. Establish contract administration mechanisms to support the contractor

who carries out detailed physical rehabilitation works which may involve redesigning, and then

repairing, upgrading or modernising existing infrastructure.

Carry out software rehabilitation works: Develop/strengthen scheme governance structures

including IWUA; develop/strengthen O&M systems; implement agricultural development plan;

mainstream gender in irrigation operations to remove gender inequalities; and integrate MUS of water

into scheme water infrastructure.

Capacity Development: Train extension workers in entrepreneurial skills; train farmers in irrigation

farming as a business; and train farmers in O&M of irrigation and water supply infrastructure.

Step 6 - Develop and put in place a sustainability exit strategy: This step involves developing and

implementing appropriate strategies that will sustain of the expected improved productivity of the

rehabilitated/improved/modernized irrigation scheme. Proposed strategies include:

Putting in place a monitoring and evaluation (M&E) system: To be able to constantly track the

performance of the rehabilitated scheme against predetermined baseline conditions. This is done by

putting in place a monitoring and evaluation (M&E) system.

Capacity Development: To develop the capacity of the farmers so that they will be able to utilize and

benefit socially and economically from the rehabilitated/improved/modernized irrigation scheme. A

very important capacity element is to inculcate entrepreneurial skills into the irrigation farming culture

so that farmers are able to take irrigation farming as a business. The farmers are also trained in all

basic O&M principles and practices. Hence, training of farmers in irrigation farming as a business as

well as in O&M is an essential component of Capacity Development of the farmers which will

contribute to sustainability of the rehabilitated irrigation scheme. Development and implementation of

sustainability strategies are generally on-going processes.

Identify viable and sustainable market linkages: Establish sustainable input and output markets for

the scheme; and establish value addition processes.

Implementation Time Table:- This intervention shall be mainly implemented at Woreda level except

complex rehabilitation works (require critical diagnosis and redesign work, mobilization of

machineries, involves significant volume of RCC concrete, mass concrete and masonry works) and

works contract values above the threshold limit of shopping (national competitive bid is not feasible

at Woreda level) for works, which should be handled at regional level; otherwise the role of the region

is limited to technical support and supervision work. MOA shall support in potential identification and

need assessment (inventory of existing SSI subprojects), but not in design and construction

management.

99

The subprojects will be implemented in four batches. At the beginning of the project year, inventory

of existing traditional and modern SSI Schemes will be done. Community request, identification and

detail design will be carried out from project year-1 (PY-1) to project year-3 (PY-3) whereas

procurement and construction management mainly project year-2 (PY-2) to project year-4 (PY-4) as

summarized in the following table.

Table: 19: Existing SSI Subprojects Implementation Timetable

No Activity Batch 1 Batch 2 Batch 3 Batch 4

1 Inventory of existing SSI systems PY-1

2 Selection by and request from beneficiaries PY-1 PY-1 PY-2 PY-3

3 Identification, screening and reconnaissance level

study

PY-1 PY-1 PY-2 PY-3

4 Feasibility studies and detailed design PY-1 PY-2 PY-2 PY-3

5 Subproject design review and approval PY-1 PY-2 PY-2 PY-3

6 Construction Procurement process including bid

document preparation, advertising, bid evaluation

and contract award

PY-2 PY-3 PY-3 PY-4

7 Construction work and contract administration PY-2 PY-3 PY-3 PY-4

B. Micro and Household Irrigation Systems

The development of micro-irrigation and household irrigation systems is principally designed to

provide water for crop production as supplementary or full irrigation. It could also be used for

domestic and/or livestock water supply. Micro12 and Household13 Irrigation Systems (MHIS)

comprise the full set of simple technologies that set up farmers for irrigation at the group or household

level. For the implementation of MHIS, small stream diversions, ponds, hand-dug shallow wells, tube

shallow wells, engine and manual pumps, check dams, development of springs, water harvesting and

micro-irrigation technologies/structures are planned and envisaged in AGP 2. As such, projects are

supposed to be independently managed by a household or smallholder farmer groups. In this case,

public efforts to promote household irrigation will necessarily rely on interventions on a systemic

level to facilitate smallholders’ independent access points to irrigation at the household level.

Key Activities and Implementation Approaches-The implementation of the micro-irrigation and

household irrigation systems will include the following interventions:

(i) Water Resource Identification for MHIS Development: Identification of potential water

resources for MHIS will remove a key obstacle to the adoption of micro and household

irrigation. This intervention focuses on identification of available water resources (surface

12Micro-Irrigation Systems (MIS) comprise command area less than 20 ha for plots of greater than or equal to ten

households.. 13Household Irrigation Systems (HIS) comprise command area less than 5 ha, for plots of fewer than ten households.

100

water, ground water, rainwater) to identify the potential of AGP Woredas and invest on the most

feasible option; and to allow smallholder farmers of all AGP Woredas to have access to

irrigation water at least through MHIS. The potential assessment shall be mainly implement the

respective regional implementing institutions.

(ii) Development of Small Stream Diversions and springs: Streams with minimum flow and with

seasonal behaviours can be used for MHIS development. This is possible using different

techniques like diverting the stream using local and industrial materials or storing for later use.

AGP 2 would assist in availing technical equipment, hand tools, and training of experts. In

addition, springs would be developed to be used for MHIS. The development of springs with

minimum flow and seasonal by their nature would be coupled with storage technologies and

used during the actual irrigation time. Springs with relatively higher flow and perennial in their

nature, they will be diverted using gravity system or pumped to the command area. AGP 2 will

support the investment cost, the development of skill and provision of technical equipment and

hand tools for construction.

(iii)Development of Shallow Groundwater (<30m): The development of ground water includes

shallow hand dug wells and shallow tube wells and will be carried out based on available data.

The implementation of this activity will be led by Woreda with technical support from the regions.

(iv) Promotion of Water Harvesting Technologies: Water-harvesting technologies shall be

promoted to catch and store water from various sources (rainwater, surface and/or ground water).

Storage of harvested water can occur in soils by diverting floodwater to the farmlands, small tanks

if water supply is regular (e.g., groundwater pumping), or large, underwater tanks for longer

periods (as common with rainwater). Plastic sheeting and other lining methods will be used to

line tanks and reduce seepage. This intervention includes the introduction and construction of

different ponds, surface and sub-surface water tanks, and ground water recharge structures

(percolation tanks)… etc.

(v) Promotion of Low Cost Water Lifting Technologies: These include different types of irrigation

pumps such as portable diesel/petrol and electric irrigation pumps, manual pumps, and other water

lifting mechanisms (like pulleys), and can tap into surface water or groundwater made accessible by

a shallow tube and hand dug wells. Since pump standard has been developed during AGP I irrigation

pump manufacturing, and importation shall be guided based on this standard.

(vi) Promotion of Low Cost Drilling Technologies: There are several potentially suitable low-cost and

sustainable drilling solutions for smallholder private irrigation; the choice of the technique depends

on the intended application and on environmental and hydro-geological conditions. Manual auger

and wash-bore drilling techniques are commonly used in areas where the soil is soft, whereas

peRPCUssion and slugging techniques are more suitable for harder soil. The program will also look

for other low cost drilling techniques and promote for their implementation.

(vii) Promotion of Water Saving Technologies: Water-saving technologies to promote in AGP II

include drip, micro sprinkler, bubbler, mulching with plastic sheets and/or micro-jet irrigation

101

systems. In addition to reducing water use, these systems can preserve soil conditions, increase

productivity per unit use of land and water and improve product quality.

(viii) Enhance Women Participation: To enhance women participation in this intervention, AGP 2

will empower women by:

– Enhancing their skills in MHIS irrigated farming through providing targeted capacity

development support;

– Targeting specific activities/technologies for women such as hand-dug wells, lift pump

schemes, drip irrigation units (which are found to be friendly);

– Will encourage women to involve in decision making bodies such as IWUAs and

providing specific skill training (leadership, negotiation, etc) to women members ;

– Ensuring the integration of facilities for clean water as part of the subproject in order to

reduce the time and labour women spends collecting water.

– Will involve both married and female headed households

– Invest in capacity building activities of the women to ensure a good use of the

technologies made available to them

(ix) Demonstration of New Technologies: Where appropriate, demonstrations in drilling, storage,

lifting, and water application technologies (through manual flexible hoses, drip, or sprinklers) will

be provided, and the AGP 2 will facilitate the procurement and installation of these irrigation

equipment, as requested by households. While the beneficiaries themselves are expected to make

maximum contributions towards these activities, the AGP 2 will finance demonstration of

technologies, purchases of industrial materials required to build water storage, water lifting units,

conveyance facilities, and irrigation water application equipment, as well as skilled labour, and will

provide start-up spare parts and hand tools that are important for O&M.

Implementation Time Table- The subprojects will be implemented in four batches. At the beginning of

the project year, the focus will be will be on identification of technology options. Community request,

identification and detail design will be carried out from project year-1 (PY-1) to project year-3 (PY-3)

whereas procurement and construction management mainly project year-2 (PY-2) to project year-5 (PY-

5) as summarized in the following table.

Table: 20: MHIS Sub Projects Implementation Timetable

No Activity Batch 1 Batch 2 Batch 3 Batch 4

1 Identification of technology options PY-1 to PY-5

2 Selection by and request from beneficiaries PY-1 PY-1 PY-2 PY-3

3 Identification, screening and reconnaissance level

study

PY-1 PY-1 PY-2 PY-3

4 Feasibility studies and detailed design PY-1 PY-2 PY-2 PY-3

5 Subproject design review and approval PY-1 PY-2 PY-2 PY-3

102

No Activity Batch 1 Batch 2 Batch 3 Batch 4

6 Construction Procurement process including bid

document preparation, advertising, bid evaluation

and contract award

PY-2 PY-3 PY-3 PY-4, PY-5

7 Construction work and contract administration PY-2 PY-3 PY-3 PY-4, PY-5

C. Establishment of New Small-scale Irrigation Systems

This intervention seeks to increase irrigated agriculture by establishing new14 smallholder irrigation

systems (with command area greater than or equal to 20ha) from surface and groundwater water sources,

improving, and encouraging the use of agricultural water management practices that improve the return

to irrigation infrastructure investments. Design documents shall be prepared, reviewed, certified and

awarded to various local contractors for construction. The following activities will be performed:

Preparation of design and construction quality assurance and control guidelines;

Conduct surface water availability assessment to identify indicative irrigation development potential

which clearly indicates the SSI potential of each Woreda;

Identification and reconnaissance survey;

Detail design and construction of SSI systems

o Establishment of new gravity diversion SSI systems from surface water sources;

o Establishment of new pump irrigation from surface water sources;

o Establishment of new pump irrigation systems from ground water sources (depth less than or

equal to 100m); and

o Establishment of small dams (dam height less than 15m) of gravity SSI systems;

Access road Construction for SSI systems

Access roads would be built, where needed, for the construction and efficient operation of irrigation

systems. For the rehabilitation/extension of systems, only minor improvement of existing access roads

would be needed, but most new SSI systems and cluster MHIS would require the construction of access

roads, which would be simple tracks for micro systems and roads conforming to the URAP standard/for

the larger SSI systems. Mainly local contractors and unskilled labour would carry out construction of

access roads. In this regard, detail activities include identification of schemes that required access road,

preparation of design and bid document of access road, selection of contractor and construction

management.

Implementation Time Table - The subprojects will be implemented in four batches. At the beginning of

the project year, inventory of existing traditional and modern SSI Schemes will be done. Community

request, identification and detail design will be carried out from project year-1 (PY-1) to project year-2

(PY-2) whereas procurement and construction management mainly project year-2 (PY-2) to project year-

5 (PY-5) as summarized in the following table.

14

Converting unused land and rain fed fields into irrigated ones

103

Table: 21: New SSI Subprojects Implementation Timetable

No Activity Batch 1 Batch 2 Batch 3 Batch 4

1 Potential assessment PY-1

2 Selection by and request from beneficiaries PY-1 PY-1 PY-2 PY-3

3 Identification, screening and reconnaissance level

study

PY-1 PY-1 PY-2 PY-3

4 Feasibility studies and detailed design PY-1 PY-2 PY-2 PY-3

5 Subproject design review and approval PY-1 PY-2 PY-2 PY-3

6 Construction Procurement process including bid

document preparation, advertising, bid evaluation

and contract award

PY-2 PY-3 PY-3 PY-4

7 Construction work and contract administration PY-2 PY-3 PY-3 PY-4, PY-5

D. Capacity Development

(i) Physical Capacity Development

The intervention will support for the strengthening of regional, zonal and Woreda offices

(BOWR/IDA/IDSAA/BOA). These include:

Purchase and provide Office facilities and field equipment;

Purchase and provide four wheel vehicles;

Purchase and provide technical books;

Prepare, print and distribute technical training materials on irrigation design and management;

The implementation will follow the following procedures:

Conducting capacity needs assessment

Preparation of physical and financial action plan as per need assessment findings and

recommendations

Procurement planning, implementation and contract administration

Equipping implementing institutions

(ii) Human Resources Capacity Development

Training will be useful at all levels including the smallholder farmers in broadening the irrigation sub-

sector's capabilities in planning, design and construction management, in introducing new ideas from

other countries, in codifying existing procedures and in upgrading the standard of operation and

maintenance for SSI systems. Small-scale irrigation systems are mainly designed and constructed by

local consultants and contractors who lack necessary skills and experience.

Upgrading the attitude, knowledge and skills of local consultants and contractors to assure quality

control shall also be undertaken within the framework of the project, where necessary. In addition, the

program will support review meetings, short-term training programs to raise the knowledge and skill

104

of technicians at all levels specialized in SSI development. It will also include support to short-term

overseas study tours on the planning, design, construction management, and management of irrigation

systems for federal and regional experts.

The program will support technical assistance to improve the implementation capacity of

implementing agencies at all levels specialized in SSI development. The technical assistance

intervention will include engagement of national technical assistants, who will assist implementing

agencies at all levels in the planning, engineering design, procurement, construction management and

technical monitoring of SSI irrigation systems.

In summary, the key activities to be performed will be:

Conducting training need assessment (TNA);

Prepare physical and financial action plan as per need assessment findings and

recommendations;

Procurement planning, implementation and contract administration;

Practical training of public staffs at all levels in Reconnaissance Survey, Feasibility Study and

Detail Design, Construction Management/Contract Administration, etc.;

Training of consultants and contractors mainly on procurement, contract management and

design work;

Organize and conduct experience sharing tours to experts and to male and female farmers;

Provision of technical assistance

Summary Table 5.5.3.1: Sub-component 3.1: Small-Scale Irrigation Infrastructure

Development and Improvement

Out puts and Institutions Responsible

Component 3: Small-scale Irrigation Development

Sub-component 3.1: Small-scale Irrigation Infrastructure Development and Improvement

Responsible Department / Organization:

Small-scale Irrigation Development Directorate/MOA at federal level

BOWR, IDA, BOA and IDSAA at regional level including respective Zonal Offices

WOWR, WOA and WOID at Woreda level

Supporting implementing bodies: ATA, SMISP, EIAR, Universities

Outputs

157 Woredas benefited with SSI infrastructure development;

55,000 ha (20,000 ha new SSI, 10,000 ha Rehabilitation/Upgrading/Improvement of Existing SSI, 25,000

ha MHI systems) of irrigated land equipped with irrigation facilities by PY5;

Office and field facilities purchased and provided;

Enhanced15 participation of farmers to plan and implement small-scale irrigation systems;

15Low level of achievements suggest possible weaknesses in training, mobilization, and advisory services

105

Enhanced16regional and Woreda institutional capacity for improved irrigation service delivery to plan,

design and implement smallholder irrigation projects effectively by PY5;

1100 demonstrations (water lifting technologies, low cost drilling technologies and water saving

technologies) established and conducted;

2000 field days organized on HITs demonstration;

No of farmers (sex disaggregated) benefited out of SSI intervention

Monitoring, Reporting and Evaluation Arrangements

Monthly report, quarterly report, annual report and field monitoring

16Low level of achievements suggest possible weaknesses in lack of commitment or capacity

106

Gant Chart: 5.5.3.1:- Sub-Component 3.1 Small-scale Irrigation Infrastructure Development and Improvement

Main activities, and Implementation Schedule

Component 3 : Small-scale Irrigation Development

Sub-component 3.1: Small-scale Irrigation Infrastructure Development and Improvement

No Description PY-1 PY-2 PY-3 PY-4 PY-5

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

3.1.1 Schedule for Planning and Implementation of Rehabilitation and Improvement of Existing SSI Projects

1 Preparation of revitalization guideline

2 Inventory of existing SSI systems

3 Selection by and request from beneficiaries

4 Identification, screening and

reconnaissance level study

5 Feasibility studies and detailed design

6 Subproject design review and approval

7 Construction Procurement process

including bid document preparation,

advertising, bid evaluation and contract

award

8 Construction work and contract

administration

3.1.2 Schedule for Planning and Implementation of MHIS Subprojects

1 Potential assessment

2 Selection by and request from beneficiaries

3 Identification and reconnaissance level

study

4 Feasibility studies and detailed design

5 Subproject design review and approval

107

Gant Chart: 5.5.3.1:- Sub-Component 3.1 Small-scale Irrigation Infrastructure Development and Improvement

Main activities, and Implementation Schedule

Component 3 : Small-scale Irrigation Development

Sub-component 3.1: Small-scale Irrigation Infrastructure Development and Improvement

No Description PY-1 PY-2 PY-3 PY-4 PY-5

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

6 Construction Procurement process

including bid document preparation,

advertising, bid evaluation and contract

award

7 Construction work and contract

administration

3.1.3 Schedule for Planning and Implementation of New SSI Subprojects

1 Potential assessment

2 Selection by and request from beneficiaries

3 Identification and reconnaissance level

study

4 Feasibility studies and detailed design

5 Subproject design review and approval

6 Construction Procurement process

including bid document preparation,

advertising, bid evaluation and contract

award

7 Construction work and contract

administration

3.1.4 Capacity Development

3.1.4.1 Physical Capacity Development

Capacity needs assessment

108

Gant Chart: 5.5.3.1:- Sub-Component 3.1 Small-scale Irrigation Infrastructure Development and Improvement

Main activities, and Implementation Schedule

Component 3 : Small-scale Irrigation Development

Sub-component 3.1: Small-scale Irrigation Infrastructure Development and Improvement

No Description PY-1 PY-2 PY-3 PY-4 PY-5

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Prepare physical and financial action plan as

per need assessment result

Procurement planning and implementation

Implementation of physical capacity

development

3.1.4.2 Training

Capacity needs assessment of experts, DAs

& farmers .(sex disaggregated).

Prepare training plan preparation as per

need assessment result

Procurement planning, implementation and

contract administration

Training of experts at all levels

Training of consultants and contractors

Training of IWUAs committee members

Training of farmers

109

5.5.3.2 Sub-Component 3.2: Integrated Crop and Water Management (ICWM) for Irrigated

Agriculture (US$7.6 Million)

The main objective of this subcomponent of the proposed project is to improve irrigated agriculture

productivity and management of SSI systems. Moreover, it aims at enhancing institutional capacity for

integrated irrigation water and crop management through introduction of improved on-farm irrigation

water management, agronomic practices and Capacity Development interventions for smallholder

irrigation systems.

The farmers themselves will be the focal actors and mainly implement integrated crop and water

management. To have the farmers adopt the new technology and to achieve their participation in

operations and maintenance of the irrigation system, an intensive process of training and support need to

be implemented over the period of the project.

The major activities to be implemented under this sub-component include:

Formation of Irrigation Water Users Associations;

Introduction of Improved Irrigated Agriculture Management (Integrated Crop and Water

Management); and

Human Resources Capacity Development;

A. Formation of Irrigation Water Users Associations

Under this intervention, the AGP will focus on the following main activities:

(i) Introduction of the new IWUA proclamation: The AGP 2 will work to introduce the new

proclamation to program regions and Woredas to reorient the IWUAs according to the new

proclamation. Thus, support publicizing, communication and awareness campaigns for the

implementation of the newly enacted legal framework for IWUAs to regional and Woreda level

high-level officials and technical personnel.

(ii) Formation of IWUAs: The primary activity of this intervention is establishment and

strengthening of IWUAs as per the newly enacted IWUAs proclamation.

Establishment of new IWUAs-In establishing IWUAs, the following criteria should be used for

selecting IWUA Committee members:

Must have good general knowledge, understanding and judgments;

Must have local knowledge of irrigation, water supply and water rights in the area;

Must be able and willing to represent the collective interests of farmers in the upstream,

middle or tail-end of the IWUA area (not just motivated by self-interest);

Encourage women to involve in decision-making bodies such as IWUAs. Membership

should be open for women from both male headed and female-headed households.

Must have time to attend meetings and discuss issues with the farmers; and at least 33% of

the committee members should be women (committee membership should be open for

women from both male headed and female-headed households).

110

Strengthening of existing IWUAs-Strengthening of IWUAs focuses mainly on supporting:

Help the IWUA to frame rules and regulations in a participatory manner for water allocation

and distribution; developing bye-laws; re-orienting/improving the by-laws

Manage to registration as legal entity by the supervising body

facilitating general assembly and election of executive committee members

financially and technically selected IWUAs to have improved storage, agro-processing and

other market facilities;

re-establishment and re-organizing/restructuring including assisting in legalizing of the

organizations/associations/cooperatives;

training of committee members on leadership, conflict management, record keeping, financial

management, etc.;

training of committee members on irrigation water scheduling (water allocation, water

distribution, application methods);

awareness creation training to committee members about climate and environmental problems

associated with irrigation; and

Training of members on irrigation water and irrigation crop management

In order to improve functioning of the Irrigation Water User Associations Committees, and make the

IWUA committee members specifically women members more confident, it is advisable to include a

general training program on leadership, covering aspects like legal status of the committee, conflict

resolution, team management, running a meeting, elementary bookkeeping, public speaking, etc.

However, training of IWUA committee members alone could not be considered as strengthening of them.

The support should be in all aspects. The SSI systems IWUA managing committee needs to be responsible

for water, infrastructure, agriculture and administration issues pertaining to the scheme. The managerial

and financial responsibilities of SSI systems IWUA Committee are substantial.

Box 3D. Definition of Membership for Irrigation Water Users' Associations (IWUA)

The definition of membership has important implications for equity. AGP encourages for organizational

structures that provide for the representation of tail-enders and women farmers increase equity. It may

also result in an increased efficiency. Mechanisms are needed to ensure that women are included in the

membership, decision-making committees of the IWUAs. Specifically, IWUAs can:

Reserve positions for women farmers in IWUAs to ensure proper representation of the needs of all

farmers;

Encourage and allow men to designate their wives as members and vice versa and establish liberal

membership recruitment procedures;

Set targets for the percentage of women members in IWUAs that correspond to the actual participation of

women in irrigated agriculture;

Ensure that the women members also play a decision-making role in the associations. This may require,

for example, specific training and support to overcome cultural constraints, e.g. women who are not used

to speaking in public or in mixed groups. It may also require separate preparatory meetings in which

111

women prepare their point of view and reach consensus on certain issues, which they can then present in

the mixed meetings; and

Make both women and men equally responsibility for water management, such as the operation of gates,

guarding the water flow or the distribution of water.

B. Introduction of Improved Irrigated Agriculture Advisory/Extension Services

Appropriate irrigated agriculture extension activities will be conducted in each functional SSI project

area based on the needs of the IWUAs and the potential for crop diversification towards higher value

crops. To achieve the on-farm irrigated crop development goals, irrigated agriculture

advisory/extension services have to be strengthened. Thus, the following activities will be

implemented:

(i) Introduction of integrated crop and water management: This intervention focuses on

introducing improved on-farm integrated irrigation crop and water management practices to

diversity the cropping pattern and enhance productivity through demonstrations on use of

modern seeds and inputs, improved agronomic practices, improved storage and marketing

facilities and improved on-farm irrigation water management practices in line with water

availability. The program shall also support the promotion of community or group level

investments in productive infrastructure (including access and water-use related) and equipment

that will serve to enhance efficient water use, crop production/productivity and/or marketability

of the produce, and thus strengthen the income of smallholder farmers.

(ii) Conduct irrigation performance assessment: This intervention would cover monitoring and

Evaluation (M&E) of the SSI subprojects performances and impacts to get continuous feedback

on the projects performance and impact. The M&E activities would cover three set of activities:

o evaluation of structural, hydraulic, managerial and agricultural performance of selected

SSI systems;

o the impact of the irrigation system development and improvements on irrigated land

area; on-farm water use; cropping patterns and yields;

o environment and social impacts assessment;

Box 3E. Demonstrations in irrigated agriculture

1. Technology Demonstrations: This intervention will mainly focus on intensification of the existing

major crops, and promotion of market led cropping systems through demonstration of high yielding

and high value crops, integrated nutrient and pest management, use of fertilizers, improved

agronomic and water management practices and introduction of new crops/varieties depending on

emerging market opportunities. The program considers the best way to build capacities of the SSI

subprojects farmers in terms of orientation on new technologies and adoption of improved

technologies is through demonstration and adoption, i.e. through the principles of ‘learning by doing”

and “seeing is believing”. The approach is designed to have training and other capacity development

112

interventions and demonstrations as integral part of the system. The demonstrations will be conducted

in the fields of selected lead/progressive farmer’s.

2. Establishment of on-farm demonstration plots: Demonstration plots are always an integral part of

any Irrigation Extension program but are not “one size fits all” and there is no formula for the “right”

Irrigation Demonstration Plot. The size, location, and technology composition of plots vary

depending on the extension agent’s reason for creating the plot, reflecting the program’s objective,

priorities and needs. Generally, as a guide for the purpose of AGP 2, a demonstration plot (DP) of

about 0.25 ha shall be considered. The number of demonstration plots depends on the nature and size

of command area and types of technologies to be demonstrated. It is planned to have at least one

demonstration with three replicates for one technology which could be agronomic practices, water

management, integrated soil fertility management, etc. Demonstration plots will be located in the

fields of a lead farmer’s/progressive farmers. Each DP will be provided with inputs from the project

covering seed, fertilizer, IPM and incremental operational costs. Lead farmer’s contribution will be

in providing land, labour and protection of DP. Selection of demonstration plots shall be guided by

the following objective criteria:

The plot owner is either a lead farmer or a progressive farmer and is willing to adopt the complete

package in a timely manner;

Easy accessibility from identified SSI schemes and road side plot; and

Plot soil type and other characteristics are representative of the majority in the SSI scheme command

area.

3. Types of Planned Demonstrations

(a) Integrated crop management (ICM): Integrated crop management demonstrations will be taken up

for major crops under the SSI subprojects in the project. This includes pre planting agronomic

operations, integrated pest management (IPM), integrated nutrient management (INM), post-harvest

practices etc. Integrated nutrient management is one of the intervention areas to solve the soil nutrient

problem and to enrich the soils with organic matter. The project supports the establishment of

compost production units at SSI subproject level to motivate the farmers to follow and establish their

own units. Other activities will include promotion of green manuring and bio-fertilizers. The

establishment of each and every ICM units is linked with one training session on the unit management

and technology. In Integrated Pest Management (IPM), for efficient pest management, farmers have

to learn to use a blend of chemical, biological and cultural methods to control pests. This is nothing

but integrated pest management. By identifying the importance of IPM in the production chain, the

project plans to build the capacities of the IWUA members through demonstrations for different crops

of that area. The project plans to provide support to the IPM demonstration plots in selected SSI

subprojects.

113

(b) Vegetable Cultivation: The objective of conducting vegetable demonstration is to improve the

productivity of existing vegetables crops and/or introducing new vegetables to increase its

productivity and the area under vegetables. The demonstration on intensification of existing

vegetables will help the farmers to adopt agronomic practices, nutrient management, and pest control

and value addition. Vegetable nurseries will be promoted. This will be linked to the demonstrations

of vegetable cultivation. The criteria to be used for selection of SSI subprojects for vegetable

promotion are proximity to the urban area and availability of adequate water. About 10% of SSI

subprojects shall be selected for promoting vegetable.

(c) Seed Production: One of the major constraints of the farmers of the program Woredas is the

availability of the right seed in right time at reachable place. To overcome this constraint, the program

plans to introduce seed production in business model. The strategy involves building the capacities

of the smallholder farmers of the SSI systems for seed production in their own scheme. The AGP

shall provide training; start-up seed and other materials to lead/progressive farmers to enable the

farmers sustainably produce seeds of their choices on a plot size of at least 200-1000m2.

(d) Fodder Demonstrations and Multiplication Plots: The program plans to increase fodder area and

create awareness among the smallholder farmers of SSI subprojects on the different varieties of the

fodder crops, cultivation practices and nutritional value of the fodder value. Fodder multiplication

shall be popularized through demand driven demonstrations and the purpose of the fodder

multiplication plots will be to supply the fodder slips/ seedlings to the interested farmers on cost

basis. The multiplication plots will be established in the lead farmers /progressive farmer’s field.

(e) Establishment of Home Garden Development: The AGP encourages the establishment of on-farm

home garden demonstrations which helps the farmers to change the feeding habit and nutritional

value of the family food. The AGP plans to put a major emphasis on the establishment of on-farm

demonstrations on women farmers’ fields to ensure women benefits.

1. Field days

A major constraint in adoption of any new technology is the accessibility of technology. It is proposed to

arrange at least one to three (sowing, growth stage, harvesting) field days for each demonstration at an

appropriate time before and during harvesting to demonstrate the improved situation on demonstration plot

compared to present farming practice. The field will be open for visiting of farmers from the adjacent areas

also. This is expected to encourage the farmers to adopt the demonstrated new practices. The staffs of

WOA/WOID or Kebele experts shall frequently visit and review the adoption plots of lead farmer as well as

the progressive farmers in order to provide the feedback to the farmers of other SSI subprojects. It is planned

that the staffs of WOA/WOID will randomly check the adoption rate of the demonstrated technologies.

2. Implementation Support and Supervision

114

The staffs of WOA/WOID shall be responsible for conducting demonstrations. The regional level staffs of

BOA/IDA will supervise the demonstrations and trainings conducted at SSI subprojects level. At regional

level an irrigation extension or irrigation agronomy officer in the BOA will coordinate the irrigation

agronomy activities in collaboration with the RPCU. Although the exact nature of demonstrations to be

organized will emerge from the agriculture development plan (ADP) prepared for a particular SSI subproject,

the likely DPs will be organized mainly for high yielding and high value crops for that locality. The crops

themes may change as per the needs of the community which will be reflected in the ADP. The WOA/WOID

will assign a resource focal person in the Woreda from existing staffs. Each focal person will be responsible

for conducting the DPs and training of farmers participating in respective DPs and review the adoption in

their fields through periodic field visits. He/she will conduct trainings on different aspects at the

demonstration plot at critical stages of cropping. The project assumes three training sessions in addition to

field day as maximum. The approach proposed for demonstrations and adoption plots in the program

Woredas is different from the present regular demonstration approach being conducted in the regional state

by the BOA as it intends to monitor adoption continuously and conduct trainings in the demonstration

plot/field itself.

3. Implementation arrangements

The program design focuses on improving productivity of the SSI subprojects by fulfilling strategic gaps in

irrigated agriculture extension and increasing outreach. This necessitates an arrangement that facilitates two

way information flows. The program thus starts from the grassroots level. The implementation arrangements

at the SSI subproject level include three different actors. They are lead farmer, the IWUA and the

Woreda/Kebele experts.

• Lead farmer: The lead farmer will be a person selected from the community and trained in the

concerned field. The advantage of this system, which has proved successful in a number of previous

interventions, is that, it helps to create a local cadre with technical knowledge, which remains locally

available beyond the project period. The selection of the lead farmer will be on the following basis:

Should be a practicing farmer, having own land

Member of IWUA

Should be willing to learn from and disseminate new technologies/practices to others

Irrigation Water User Associations: The program aims at promoting a more proactive role of the

IWUAs in improving agricultural productivity of its members. This can help to build more regular

interactions among the members and the Management Committees and can act as a common thread

in binding people together to generate more resources through water charges and other support

service charges. At the same time, collective action will provide more opportunities for improving

productivity and increasing production. The IWUAs will be involved in organizing

community/IWUA level exposure visits, monitoring demonstrations, maintaining community assets,

motivating the members for adoption of improved technology, etc.

115

C. Human Resources Capacity Development

Training shall be considered as the main strategy to improve the performance of an SSI scheme

through technical training of farmers and technical staff involved. It will be an integral part of an SSI

subprojects intervention. It may also be that the Training shall focus on improved technical practices

and on-farm water management practices. It is necessary that participation of different socio-economic

groups and women farmers in these specific training sessions is ensured, and that training programs

are flexible. Thus, the program will support short-term training programs to raise the knowledge and

skill of technicians at all levels specialized in SSI development. It would also include support to short-

term overseas study tours on the planning, design, construction management, and operation and

maintenance of irrigation systems and overall irrigated agriculture development for federal and

regional experts.

In summary, this intervention will support:

Conducting training need assessment (TNA);

Development of IWUA committee members training guidelines and farmers training

guidelines will be done as it helps to facilitate the Capacity Development effort.

Provide training of trainers programs will be provided in such topics as input supply, crop

variety and seed selection, soil preparation and fertility management, and on-farm water

management.

Provide other specific training programs may be conducted in crop husbandry (including pest

and disease management), seed production and multiplication, and marketing.

Training to DAs on on-farm irrigation-water management practices and crop husbandry

Training of farmers, DAs, and SMSs at the Woreda, zonal, regional, and federal levels in

improved irrigation water management and agronomic practices;

Training of farmers on improved irrigation water management and agronomic practices;

Practical training and experience sharing tours to experts and farmers;

Woredaand Kebele Government Staffs: The Kebele and Woreda level experts of WOA/WOID

shall be responsible for planning at the time of AGP annual plan preparation, coordination with

resource persons, farmers and line agencies for organizing demonstrations, organizing exposure

visits, conducting field level awareness campaigns, undertaking regular meetings for planning and

implementation, monitoring and reporting of progress on a regular basis. Activities relating to subject

specific interventions viz. irrigated agriculture extension will be implemented through the lead

farmer. The Agricultural Development Plan (ADP) preparation will be one of the important activities

at the SSI subproject level. The WOA/WOID will initiate the process of community level needs

identification and prioritization. The ADP preparation will need specific effort not only to understand

the needs and priorities but also to orient the community members on emerging opportunities and

technical feasibility of interventions for improving livelihoods. It is proposed to provide such support

to each IWUA during ADP preparation. The staffs of the WOA/WOID will be involved in planning

and ADP preparation with technical backup from the WOA/WOID staffs.

116

Provide technical assistance intervention would include engagement of national technical

assistants, who would assist implementing agencies at all levels in the planning, engineering

design, procurement, construction management and technical monitoring of SSI irrigation

systems.

Topics for short-duration trainings for farmers and IWUA committee members may include:- (i)

Production and use of organic and chemical fertilizers; (ii) Community-based seed production; (iii)

On-farm water management (irrigation methods, distribution, etc); (iv) improved variety and seed

selection; (v) Planting time and planting arrangements (including intercropping etc.); (vi) Vegetable

nursery establishment and management; (vii) Crop rotations for soil fertility and pest/disease

management; (viii) Record keeping; (ix) Negotiation and bargaining skills; (x) Quality standards and

food safety, grading and packing, safe transport; and (xi) Value adding at community level.

In addition, a two-day training will be delivered to IWUA committee members on topics which include

(i) drafting of the constitution, registration, and record keeping; (ii) internal resource mobilization and

fund raising; and (iii) share system development, and dispute resolution. Generally, preconceived ideas

about the training needs for different groups of farmers need to be avoided. Instead training

requirements and priorities should be assessed through a "training needs assessment". Trainings could

be organized for women and men separately, or they could attend jointly the same training. Ways need

to be found to achieve active participation by both women and men in the training.

Box 3E.Capacity Development

Capacity development of implementing agencies staffs at all levels, IWUA committee members

and beneficiary farmers will be undertaken. Important activities under this are exposure visits,

within and outside the regional state and trainings. Details are as follows:

Trainings of public staffs: It is proposed to organize training programs for agronomists,

DA’s and trainers who are involved in conducting the demonstrations. These trainers

will be trained on participatory technology development approach, participatory

training methods, and principles of hand holding along with the primary trainings on

technological aspects of crop cultivation. In addition, concerned staffs from

implementing entities and trainers will be taken for exposure visits outside the regional

state to expose them on recent advances on agricultural activities.

Exposure on technology adoption and market led production: IWUA members will be

taken for exposure visits both within as well as outside the kebele, Woreda or regional

state. Exposure visits will be planned to orient the farmers on improved production

related technologies practiced within the same agro-climatic regions. The exposure

visits will help farmers to have a first-hand interaction with practicing farmers and help

them to clear their doubts and improve their level of understanding. All this will

stimulate their desire for adoption of new techniques/practices. The project plans to

select 1-3 farmers every year from each SSI subproject for exposure visits within the

117

kebele, Woreda or regional state. In the project life, it will also take one farmer from

about 20-25% of total SSI subprojects for out of regional state exposure visit. Each batch

will consist of 20-30 farmers. They will be taken outside the regional state to expose

them to improved agricultural technologies and to replicate them back in their villages.

Vegetable cultivation visits: Farmers will be taken for exposure visits within the

regional state to explain to them the potential of the vegetable cultivation and motivate

them to cultivate vegetable through interaction with practicing fellow vegetable farmers

and sharing of experiences in production and marketing processes. Twenty visits will be

organized during the five years of project implementation. Each batch will consist of 30

farmers.

Site level trainings for farmers: Farmers will be trained at demonstration sites. The

trainings will be spread over the entire demonstration period. Two to threeon-farm

practical training sessions will be linked to each demonstration plot, in addition to the

field days. The WOA/WOID will coordinate the resource persons and facilitate farmers’

mobilization with the help of lead farmer.

Regional level trainings for farmers: It is planned to organize regional level trainings

in each region. Regional trainings will be organized for 25 batches (2-5 batches per

region) of farmers in the entire project period. Each batch will consist of 20-30 farmers.

Training in new technologies and exposure to regional institutions will be the objective

of this training. Progressive and enterprising farmers will be selected for regional level

trainings.

118

Summary Table 5.5.3.2: Sub-Component 3.2 : Integrated Crop and Water Management

Out puts and Institutions Responsible

Component 3: Small-scale Irrigation Development

Sub-component 3.2: Integrated Crop and Water Management in Irrigated Agriculture

Responsible Department / Organization:

Main partners:

Small-scale Irrigation Development Directorate, Agriculture Extension Directorate General/MOA

at federal level

BOA, BOWR, IDA, and IDSAA at regional level including Zonal Offices

WOA, WOWR, and WOID at Woreda level

Supporting implementing bodies: ATA, SMISP, EIAR, Universities

Outputs

The newly enacted legal framework for IWUAs implemented17;

400 new Irrigation Water User Organizations (IWUAs) established and legally registered;

Developing training materials for the training of IWUAs committee members and beneficiary farmers;

3500 (1050 female) IWUA committee members trained either in leadership or irrigation water and crop

management for at least 7 days;

SSI systems with command area of 50 ha equipped with non-conventional efficient irrigation water

application technologies (e.g., sprinkler irrigation, drip-irrigation);

20 smallholder irrigation systems equipped with community on-farm storage and processing facilities,

and small market yards for selected SSI systems established;

3000 public sector staffs (experts) trained in irrigation water and crop management;

10,000 (3000 female) farmers trained in improved irrigated agriculture management;

500 on-farm demonstrations on improved agronomic and water management established and

conducted;

500 field days organized on demonstrations and 25,000 (7500 female) farmers participated on the field

days;

50 farm exchange visits/ tours are conducted and 1000 farmers participated experience sharing visits;

Two SSI performance assessments conducted;

Monitoring, Reporting and Evaluation Arrangements

Monthly report, quarterly report, annual report and field monitoring

17 Per cent of IWUA strengthened and established based on the new proclamation and regulation

119

Gant Chart 5.5.3.2: Sub-Component 3.2: Integrated Crop and Water Management

Main activities and Implementation Schedule

Component 3: Small-scale Irrigation Development

Sub-component 3.2: Integrated Crop and Water Management (ICWM)in Irrigated Agriculture

No Description PY-1 PY-2 PY-3 PY-4 PY-5

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

3.2.1 Formation of Irrigation Water Users

Associations

Strengthening IWUAs X X X X X X X X X X

Establishment of new IWUAs X X X X X X X X X X

3.2.2 Introduction of Improved Irrigated

Agriculture Management

Conduct Demonstration of technologies in

agronomic practices and water management

X X X X X X X X X X

Conduct performance assessment X X X X X X

3.2.3 Human Resources Capacity Development

Capacity needs assessment X

Prepare training plan preparation as per need

assessment result

X

Procurement planning and implementation X X

Training of experts at all levels X X

Training of IWUAs committee members X X X X

120

5.5.3.3 SSI Development Component Planning and Implementation Mechanisms

A. SSI Subprojects Selection and Implementation

(i) Participatory Planning: In this approach both, the government assistance and community

participation at all stages of development are considered and one could not replace the role

of the other. In AGP 2, implementation would be based on the active participation and leading

role of the beneficiaries in the planning, design, construction and monitoring of SSI

subprojects. Lack of community involvement in decision-making processes related to

irrigation development projects will result in poor system design and operation; and has also

pushed farmers away from meaningful participation in IWUA and creates sustainability

problem. Therefore, this is an important approach in ensuring that the community has

understood the project and developed a sense of ownership towards the project.

(ii) Community Level Participatory Planning versus Strategic Approach: The identification

of SSI subprojects would be carried out either by Woreda or regional level experts. SSI

subprojects will be first identified through participatory and demand-driven process by

employing the CLPP (bottom up process) as a tool for participatory local level prioritization

of investments of public and community interest, leading to genuine participation in local

economic and social development. However, since implementation capacity and financial

resource is limited, prioritizing the strategic investments is critical. The Regional

BOWR/IDA/IDSAA will identify strategic investment SSI subprojects that will be shortlisted

and implemented. In cases where subprojects are identified directly (top - down) by the

Federal, Regional, Woreda through potential and needs assessment will be confirmed through

a consultation process with the concerned communities before embarking the feasibility and

detail design work.

(iii) SSI Systems Selection Criteria: Technical options and implementation modalities for the

development of SSI subprojects will draw on the long experience in the country and lessons

learned. Selection of SSI subprojects shall be carried out with particular attention to the

following objective priority setting criteria:

Social Criteria- Community demand and willingness to participate on the subproject

planning, design and implementation is the critical for sustainability. It should be a

priority need of the community, as reflected in eventual community development plans;

and clear community engagement and acceptance before embarking on the investment.

In addition, willingness of beneficiaries to participate in and contribute to the design,

construction, and construction supervision; and willingness of IWUA to ensure proper

operation and management of developed SSI subprojects; Evidence of the presence of

a WUA or an informal committee representing subgroups of the irrigation community;

Commitment of the beneficiary HHs to contribute in labour, cash, or kind according to

the Project's beneficiary cost share arrangements, and to collect an annual contribution

(in addition to regular maintenance) for structural replacement costs.

121

Water Resources Criteria- (i) Water Availability -Subprojects to be located in river

or other water sources with sufficient water resources for further irrigation

development, amount of discharge or annual water availability, available for how many

seasons)- perennial or with a stream flow of at least 9-10 months/year for

supplementary irrigation; (ii) Water source- priority shall be given to surface water

(river, spring, lake) than groundwater or rain water;(iii)Water balance-Subprojects

should not affect the water rights of downstream users and downstream eco systems;

subprojects that have the potential to cause disputes about water rights will not be

selected.

Economic criteria- including internal rate of return, benefit-cost ratio, and linkage and

access to markets;

Type of SSI subprojects- irrigation systems which are easy, cheap and simple to

develop, rehabilitate, upgrade and/or improve; for example simple river gravity

diversions than pump diversion or dam or shallow wells than deep wells; electric

motors to diesel motors; and eliminate SSI subprojects which necessitate too

complicated or too costly works;

Size of Command Area-SSI subprojects with bigger command areas shall be the

priority to smaller; and clustered (accumulated within one area) SSI subprojects shall

be the priority to scattered (divided in pockets)SSI subprojects;

Land Suitability (Varying slope of land with agriculture potential) – command

areas with slope less than 5%are ideal for surface irrigation, slope between 5% and

10%are less suitable for surface irrigation, slope between 10% and 20%aremarginally

suitable for surface irrigation and needs slope modification through terracing, slopes

more than 20% are suitable for hillside irrigation including drip irrigation, gravity fed

sprinklers and other methods for orchard development ;

Length of Idle Canal - Construction length as factor of economic investment; and in

this case idle main canal lengths less than 1 km is ideal, idle canal lengths more than 1

km and less than 2 km is appropriate, idle canal lengths more than 2 km and less than

4 km is moderately appropriate, idle canal lengths more than 4 km and less than 5 km

is marginally appropriate, and idle canal lengths more than 5 km is unsuitable for SSI;

Environmental and social safeguard issues - environmental and social safeguard

surveys during the identification, selection and design phases of SSI subprojects; with

minimal or no adverse environmental and social effects of development problems such

as property damage, displacement, land tenure conflicts or other uncertainties;

Proximity to electricity - The availability of electrical power to operate water pumps

and service production centres is significant. Distance threshold values of potential

sites to high voltage power lines shall be set to under 2-5km; and

Proximity to market infrastructure/Accessibility - accessibility (by

vehicle/motorbike or max 3-5 km distance from all-weather road including market

centers or to agriculture service centers.

122

Priority shall be given to SSI subprojects with high physical potential, high community demand, low

unit investment cost, high rate of return and minimal or no adverse environmental and social impacts.

(iv) Investment Cost: Based on the priority setting criteria to determine the most feasible and

least cost irrigation designs the following indicative budgetary ceilings (maximum allowable

cost) shall be used as a guideline for planning purpose. Unit cost rates above these ceilings are

not supportable and could be used with justification and endorsement from Regional and

Federal AGP-CUs. All subproject cost ceilings in this document may be revised during project

implementation annually based on review of changes in the prices of outputs and/or inputs.

Area is based on net command area of new schemes and after improvement under AGP for

existing SSI schemes.

Table 22: SSI Systems Establishment Guidelines on Indicative Investment Cost

No Type of technology/intervention Unit Unit cost (Birr)

1 Rehabilitation and/or Improvement of Existing Modern

SSI systems

Per ha 10,000-30,000

2 Upgrading and/or Improvement of Existing Traditional

SSI Systems

Per ha 10,000-30,000

3 Gravity diversion weir Per ha 40,000-80,000

4 Pump diversion Per ha 40,000-60,000

5 Micro-earth dam (small dam) Per ha 150,000-200,000

6 Deep tube bore wells (>= 100m depth) Per meter depth 2000-4000

7 Shallow tube bore wells (depth < 100m,

diameter=150mm), excluding motorized pump

Per meter depth 1000-2000

8 Hand dug wells including linings Per cubic meter

of excavation

30-100

9 Motorized pumps (power =2-5 HP, discharge = 2-15

lit/sec and 1-7 ha irrigation capacity)

Per unit set 4,000-15,000

10 Community ponds Per cubic meter

of excavation

30-100

11 Treadle pump (2500m2) Per unit set 1,500-4,000

B. Subprojects Identification and Selection Process

By complexity of its nature, implementation of SSI projects is process oriented and best done in a

step-by-step process, with some changes taking place immediately and others requiring separate time

for planning, Capacity Development and execution. For the purpose of better understanding,

operational convenience, efficiency and quality of outputs, the development of SSI subprojects

implementation process will consist of four distinct phases a bit different from the normal or

conventional project cycle. These are (i) irrigation potential assessment, (ii)project preparation and

design phase which includes prefeasibility (subproject identification and reconnaissance), feasibility

and detail design, (iii) implementation Phase (construction planning, construction and construction

123

management), and (iv) operation and management Phase (agricultural extension, water management

and performance assessment/monitoring and evaluation).

(i) Irrigation Potential Assessment Phase

Irrigation potential18is the physical potential which is merely considered as the proximity of suitable

water resources to suitable and. Therefore, irrigation potential assessment involves the identification

of primarily physical irrigation potential, i.e., suitable water sources and suitable land (topography and

soil) for irrigation. Other equally important issues, such as farmer demand, social, environmental,

agricultural, access to and size of input and output markets, etc. which are crucial for long-term

sustainability shall be considered in succeeding phases. Accordingly, an assessment of the availability

of suitable land including surface water, ground water and rain water resources in terms of quantity,

quality, reliability and accessibility at different sites shall be conducted. This could be done through a

mix of secondary data collection, from topo-maps, mapping of water sources, modelling and key-

informant interviews.

For revitalization of existing SSI systems, this phase includes the inventory of existing SSI systems

with their salient features and need for revitalization. Regional level Inventory Map of existing SSI

Systems which clearly shows the location, type and coverage of existing irrigation systems and

prioritized list of SSI systems in the AGP Woredas shall be prepared.

(ii) Project Preparation and Design Phase

This phase include several steps and important issues as described below

(a) Ensure Beneficiary Involvement: Project development must begin with the community and with

their concerns and needs to obtain the essential trust and support for a sustainable project. The

choice of technology should reflect community preferences and capacity, costs for construction,

operation and maintenance, and considerations of long-term sustainability. The community

should choose the technologies in light of its expressed needs and capacities. Unless the

community believes that it can influence the choice of technology and how it is used, it will not

develop a sense of ownership towards the resulting SSI systems. Implementers at all levels should

assist the community to understand the available technological options and help them to select

the technology best suited for their needs.

18Irrigation Potential means the total area which is technically feasible, economically and financially profitable, socially

viable and environmentally acceptable that has been brought under irrigation, plus that which can be planned for

irrigation on the basis of water availability, land availability and suitability.

124

Box 3F. Guidelines for Community Contribution and Their Involvement Selection of Technology

1. Community Contribution

Community contributions in terms of labour and/or local materials are an accepted practice in Ethiopia

for small-scale irrigation development subprojects. Such contributions help develop a sense of

community ownership of the project, enhance local responsibility for long-term operation, maintenance

and sustainability, and reduce overall project costs. Therefore, the design team should ensure that the

community remains fully involved during project planning, feasibility study and design. It should ensure

beneficiary involvement in the choice of technologies. Communities have to be properly consulted on

the (i) modality of community participation including contribution; (ii) location of water abstraction

sites and technologies choices; (iii) layout of irrigation infrastructure including location of off takes;

(iv) location of crossing structures such as footbridges and culverts; and (v) location of social structures

such as drinking water, washing basin, livestock drinking troughs, etc.;

2. Community Involvement in Technology Selection

The type of irrigation technology selected should correspond to the practical situations of both women

and men farmers. During the selection of a certain type of irrigation technology, all handling and

maintenance requirements need to be considered to ensure that the technology matches with the

operational capacity and strength of both male and female users. This can best be done through close

consultation with the users to avoid decision-making based on pre-conceived and possibly mistaken

ideas. Technology selection must take into account the following criteria in order to be appropriate for

both women and men farmers: (i) investment costs, in line with farmers’ financial means, including

availability and access to credit/saving plans to scale up for both women and men; (ii) available

cultivable area for both women and men; (iii) types of crops to be grown by both women and men; (iv)

amount of labour required and available, for both women and men; (vi) operation and maintenance

requirements, expenses and availability of spare parts; (vi) the durability of the technology;(vii)

familiarity convenience of the technology for beneficiaries for operation and maintenance; and (viii)

the physical strength needed for the operation of the technology for both women and men.

(b) Identification/Reconnaissance/Pre-Feasibility Stage: The first and probably most critical step

in SSI subprojects screening process is the resource availability assessment which is a

determination of the need for and suitability of irrigation in a given area. Once the long list of SSI

subprojects has been prepared in the potential assessment level, a reconnaissance will be carried

out by the Project Implementation Support Team (PIST) of BOWR/IDA/IDSAA. SSI subproject

identification investigations consist of reconnaissance level studies to identify the likely viability

of an intervention. The focus of the reconnaissance will be to further screen the proposed

subprojects during potential assessment against the AGP selection criteria. This includes a

confirmation of the availability of the stated water source and land, and willingness of the

community. At this stage in addition to the 'physical irrigation potential', the PIST has to

125

thoroughly consider agricultural, environmental, social, institutional and other factors/constraints

in order to guarantee a sustainable use of the available physical resources. This means that in most

cases the possibilities for irrigation development would be less than the physical irrigation

potential, and hence the most viable SSI subprojects shall be shortlisted for further consideration.

There should be objective selection criteria based on strategic objectives and beneficiary needs;

and hence SSI subproject identification should be supported by appropriate technical data. Proper

stakeholder19 identification, analysis and mobilization is also vital. Based on the criteria, list of

SSI subprojects will be prepared for further investigation at feasibility study and detail design

stage. Additionally it will be necessary to assess the presence of an effective and functioning

community organization, formal or informal, that will be responsible for the subproject as an

indicator of sustainability. The absence of any major conflict within the community and any

disputes relating to the water source with other communities will need to be confirmed. The

willingness to contribute to the subproject in accordance with the beneficiary cost share scheme,

and to collect an annual contribution for structural replacement costs, in addition to their regular

maintenance, will also be verified.

Box 3G. SSI Pre-feasibility and Feasibility Study Checklists

The following aspects need to be considered in an integrated way, and with full attention being paid

to engineering, agronomic, economic, social and institutional design issues.

Topography, Soils and Land Capability Assessments – The main focus of attention for new

development is likely to be the assessment of land suitability for the type of irrigation

proposed, and any potential drainage problems associated with this.

Preliminary assessment of water availability and demands, including preliminary

upstream and downstream studies based on the available data - After confirming at a

preliminary level the gross irrigation water requirements per hectare, the volume of water

reliably available on an annual or seasonal basis should be determined from the available

data, so that the various technical options can be conceptualized and compared.

Preliminary Estimates of Irrigation Water Requirements for Possible Crops - For new

irrigation developments, assess the climate database and local estimates of irrigation

requirements for the range of possible crops and planting dates being considered.

Hydrology and Irrigation System Design– Establish design criteria for water availability,

design flood, headwork hydraulic and structural design and design of irrigation systems and

structures to be used in the final design. Based on water supply-demand analysis which

include water supply (Water sources, Hydrology, Agro-meteorological data, Irrigation

efficiency) and water demand (Crop inventory, growing seasons, Evapo-transpiration),carry

out preliminary studies for headwork and canal location, layout, alignments etc. to arrive at

19A stakeholder is anyone who has a direct or indirect interest in, or is affected by, or can affect the output or outcome of

SSI intervention.

126

the best possible schemes. In addition, technology options and their implications, ensuring

construction quality, realistic design life shall be considered.

Agriculture -Farming systems, agronomic practices and cropping patterns, livestock

practices, extension requirements, input-output marketing, etc.

Social – population, cultural norms and practices, farmer demand and motivation, previous

experience of SSI, skills and labour availability, conflict and conflict resolution, risk, existing

community structures, Irrigation Water User Associations, health risks such as malaria,

schistosomaisis , etc.

Institutional Aspect- Community and local government institutional capacity, existing and

potential partnerships with government and others, extension services, competition with

other existing and planned SSI interventions, etc.,. In addition, the objectives, structures,

capacities and rules applicable to IWUAs; and the integration of ‘modern’ technologies with

existing social structures.

Economic -Assumed basis for economic analysis, source of finance, capital and maintenance

costs, markets and market access, input and output availability and prices.

Environmental -Water resources (surface, groundwater, rainfall, evapo-transpiration) and

water quality. Land form and topography, geology, soils, erosion and erosion risk, soil

conservation requirements. Water demands in the catchment (for irrigation and other

uses).Current ecosystems and ecosystem services, likely environmental impact, risks of water

logging, salinity, erosion and nutrient mining.

(c) Feasibility Study and Detail Designs Stage: Feasibility Study and detail designs stage is more

concerned on detailed investigations on technical matters including detail designs and economic

analyses, and concluding with a decision as to whether or not to move to the implementation

stage. All subprojects, no matter how simple or complex, require accurate technical data, such as

topographic information, social, institutional, environmental, rainfall, water flows, water

demands (upstream and downstream), geological data, soil characteristics, etc .Projects should

reflect generally accepted engineering feasibility study and design procedures and practices. The

SSI subprojects are generally built in rural areas on the farms of small holders and should be

implemented within the experience and technical skills of their host communities. If they are

designed and constructed beyond the understanding of the users, they are not likely to be properly

operated and maintained and the sustainability of the resulting SSI systems will be in doubt. The

SSI subprojects design team should ensure that appropriate data and information is collected, used

and saved for future reference. The result of the investigation is a project report, which may

contain three volumes: feasibility study and detail design reports, technical specifications and

estimates/BOQs, and album of drawings.

Feasibility. A feasibility assessment shall be conducted to determine the most feasible

(technically, environmentally and socially) SSI subprojects and appropriate least cost irrigation

design within the project's per hectare budgetary ceiling, which is also a threshold of economic

127

viability. Preparation of the feasibility and detailed designs will be carried out over a four to

six months period, and will be initiated during the dry season and culminate during the rainy

season. The feasibility study will commence with a joint walk-through survey of the current

and proposed system and consult intensively with the IWUA regarding their proposed

infrastructure development and agricultural enhancement aims. The feasibility study and

design team will collect baseline socio-economic and agricultural secondary and primary data.

At this stage, farmers will prioritize the structures to be constructed or rehabilitated, in

consultation with the design team. Due diligence will be exercised to verify and document that

land required for the subproject is given voluntarily. A feasibility assessment report and

subproject implementation plan will be produced which includes the proposed infrastructure

preliminary design, disaggregated socio-economic data, current and proposed cropping

patterns and proposed agricultural enhancement activities, proposed social empowerment

activities, microfinance activities, and a rough cost estimate. It is important that to ensure that

the subproject will have a wide coverage of irrigation communities, a least-cost design

approach will be adopted. To ensure quality, the feasibility report will undergo quality

assurance by the Senior Irrigation Design Engineers, Safeguard Specialist, Senior Socio-

economic Specialist, and Senior Agronomy Specialist, followed by the critical review of an in-

house/internal expertise. The Project Implementation Support Team (PIST) of

BOWR/IDA/IDSAA will present the report to the Feasibility Study and Detail Design

Approval Committee (RFDAC) for approval; and the RFDAC will approve feasibility

assessment reports.

Formation of Irrigation Water Users Association. An IWUA committee should be

established at the onset of the project to define and manage its operations. SSI activities need

a dedicated committee at the community level to oversee and be responsible for project

planning, implementation as well as system operation and long-term sustainability. The design

Team should introduce participatory methods as a means of ensuring the relevance of

committee inputs in the planning process. The committee should be representative of the

community. If the committee is to carry out its responsibilities on behalf of the entire

community, the members of the committee should be representative of all the main interest

groups, including women. This committee will later be transformed to IWUA as per the

Proclamation.

IWUA Confirmation. An IWUA committee will be established at the beginning of this stage,

if it does not already exist, or be reconstituted to include 33% women members and

proportional representation of social groups, at all sections of the command area. The design

team/consultant will present the findings of the feasibility assessment to the IWUA committee,

and confirm the proposed irrigation preliminary infrastructure design, layout and plan. The

IWUA will verify its commitment to provide its beneficiary contribution according to the

project beneficiary cost share scheme. IWUAs not formally registered will register under the

IWUA proclamation of the regional state.

128

Detailed Design. At this stage, the design engineer of the consultant shall carry out detail

analysis on irrigation system layout and design for hydrologic, hydraulic and structural designs

for the headwork, on-farm, cross-drainage and other appurtenant structures (flood protection

structures, retaining walls, intakes, under sluice and other gates) specifically hydraulic design,

to fix the overall dimensions and profiles of the structure, and structural design, where the

various sections are analyzed for stability under different loads and reinforcement or other

structural details are worked out. The design engineer of the consultant will conduct a detailed

irrigation design survey of the approved subproject, and prepare design drawings and the bill

of quantities based on the feasibility study report.

Box 3H. Critical requirements that the SSI design team should consider

The SSI design team should ensure that the SSI detail design:

Needs farmers involvement; and farmers' participation in the design and scheme

establishment/construction is not only possible, but it is a prerequisite for the

sustainability of the SSI scheme. It requires a an evolutionary approach to SSI

systems design involving clearly defined steps;

matches the users demand and aspiration that is the design (technology choice, head

work location, canal route, lay out, off-takes locations, social structures, etc.) needs

to fulfil to farmers’ wishes, because irrigation is a service to farmers, which should

be as convenient and efficient as possible;

final decision on infrastructure layout (head work, canal lay-out, drains, feeder

roads, social structures, etc.) and technology choice should be based on

consultations with all stakeholders and endorsed by farmers;

is institutionally workable or manageable for farmers;

is technically, environmentally and fiscally viable and sustainable;

is unlikely to result in any adverse environmental and social impacts without

adequate compensation; and

proper compensation mechanisms need to be developed and implemented for people

who: (i) will be displaced, because their land or houses will be flooded by a

reservoir, or their land will be needed for construction of embankments, canals and

roads; and (ii) whose livelihoods or occupation will be adversely affected.

Subproject Design Review and Approval Stage: Project Preparation and Design should be

based on standard TOR prepared by the MOA/FAGP-CU during the current AGP. Projects

should reflect generally accepted engineering, agronomic, socio-economic and environmental

129

practices. To assure the quality of designs and its constructability20, there will be design

review21based on standard guidelines. Therefore, quality project preparation and availability

of quality designs prior to project tendering for construction is considered a critical step in the

implementation of SSI subprojects. Design reports shall be reviewed and evaluated for social

acceptability, financial and economic feasibility, environmental compliance, technical

adequacy and general compliance with requirements, and the relative merits/weaknesses of

different concepts presented. Assumptions and calculations that led to conclusions shall be

reviewed. The AGP 2 plans to strengthen both internal review and review by a competitive

consultant. For effective in-house review purpose internal and external appropriate subject

matter experts/engineers who are not directly involved in the design but can review and

comment on the design shall be invited in a formal review workshop. In addition, to enhance

design quality through joint responsibility and accountability, a Regional Feasibility Study and

Design Approval Committee (RFDAC) will be established in the BOWR/IDA/IDSAA to

review and approve feasibility studies and detail designs (verify data collection methodologies,

verify drawings, verify BOQ, verify cost of subprojects, and check design quality). RFDACs

will have an overall responsibility for project design quality assurance and control in their

respective regions, including safeguard compliance requirements. The PIST Senior Irrigation

Design Engineers will also conduct quality assurance. If after conducting detailed design

substantial design modification has been required and the cost estimate has been increased, the

subproject would be re-submitted to and approved by the RFDAC. Otherwise, the PIST will

approve the detailed design.

Box 3I. Guidelines for Effective Quality Assurance and Control of SSI Designs

In the implementation of the SSI subprojects, design quality assurance and control mechanisms will be

effected:

To use the standard TOR and reporting format for SSI Subproject Feasibility Study and Detail

Design Subproject Preparation with minimal modification based on specific nature of the

subproject;

To outsource SSIPs Feasibility Study and Detail Design (FSDD) works to competent private

consultants following procurement guidelines with strong contract administration

arrangements;

To strengthen SSI design site adaptation supervision for adequate data collection and

verification exercise with full involvement of Woreda and kebele partners including beneficiary

farmers;

20The extent to which the design of an SSI infrastructure facilitates ease of construction, subject to the overall requirements

for the completed form

21

A formal, documented, comprehensive and systematic examination of an SSI design to evaluate the design requirements

and the capability of the design to meet these requirements and to identify problems and propose solutions

130

To establish feasibility study and design approval committee at each respective Regional

Irrigation Institutions;

To organize internal (in-house) SSIPs FSDD reports review forums by mobilizing in-house,

regional and national resource persons (expertise capacity) before endorsing the draft level

report;

To engage professional technical assistance (strengthen the regions with qualified engineers

and other experts as appropriate) for better technical support and supervision;

To review the SSI subprojects FSDD documents by deploying an independent external

consultant and improve the designs according to findings;

IWUA Agreement. After design approval, the PIST in consultation with the Woreda

stakeholders will facilitate agreement with the IWUA committee for the SSI subproject

construction. The PIST shall develop a simple format (in regional state language) to be signed

between the Woreda and the IWUA committee. It will also split the cost estimate and bill of

quantities into works that will be performed by the IWUA (both through voluntary contribution

and payment for services), materials that will be procured or collected by both the IWUA

and/or Woreda, and works to be performed by a private contractor through national

competitive bidding (if any). The PIST in close cooperation with Woreda stakeholders will

procure materials and prepare tender documents and manage the bidding process, where

necessary.

131

Box 3J. Multiple use water services

Multiple use water services (MUS) is a participatory, integrated approach to water management that

supports both agricultural production and domestic activities at or near the home and overcomes

traditional barriers between the domestic and productive water sectors. The AGP advocates for

irrigation-plus approach. Under irrigation-plus approach, SSI systems are developed or revitalized in

such a way that non-irrigation uses (both productive and domestic) can be accommodated; service

providers widen their mandates, but maintain the (implicit) priority for irrigation uses on irrigation

fields. The following are other uses of water to be addressed by the program as comprehensive part of

a single SSI subproject:

Drinking water: In cases of groundwater utilisation for irrigation, for example two wells could

be constructed or drilled simultaneously: one for irrigation and one for drinking water, for

hygienic reasons and convenience. Otherwise facilities could be equipped that water can be

drawn from the same well in a hygienic way. Important to guarantee is the reliability of the

drinking water well, especially in the dry season when all irrigation wells are running at full

capacity.

Irrigation of homestead agriculture: Possibilities could be studied to construct extra inlets or

pipe connections to facilitate and optimise homestead production.

Livestock: It can be expected that small animals and livestock are attracted by irrigated areas

because of the abundance of water and weeds growing around irrigation and drainage canals

and irrigated fields. Therefore it may be wise to study and plan some permanent structures for

livestock watering, for example concrete or metal water troughs that are filled automatically.

Additionally access routes may have to be planned to allow livestock to move freely between their

usual grazing grounds and the watering places. In addition fencing might be necessary. It can

also be studied whether there is land/water available to irrigate fodder crops. These measures

might avoid part of the disturbance expected to be created by the animals.

Washing of clothes and utensils and bathing: Possibilities could be studied to construct special

washing sinks, slabs or other constructions to facilitate washing activities, if possible also the

bathing of livestock. In addition, steps could be constructed at few places to make it easier to

reach the water level in the main canals.

Note that AGP 2 shall not support non-irrigation uses (both productive and domestic)such as domestic

water development as stand-alone subproject.

(iii)Implementation Phase

Implementation includes facilitation of social and institutional arrangements and construction or

improvements of physical infrastructure. From an engineering standpoint, implementation normally is

including the mobilization of the group responsible for construction, the procurement and collection

and stockpiling of materials, and actual physical construction of the infrastructure, detailed scheduling

of construction activities and construction quality control are important tasks with in this phase. Land

acquisition, resettlement (if necessary), and development of supporting physical and organizational

132

infrastructure should parallel this activity. Construction practices should be readily supported by the

community. SSI subprojects should be built using local materials and practices wherever possible. The

use of local materials and practices, including traditional construction methods and labour practices,

should be encouraged, where appropriate, as communities are familiar with them and can immediately

contribute to them. This is an important element in helping the community to develop a sense of

ownership towards the project.

(i) Modality of Community Contribution in construction: The beneficiary community shall

participate in either in kind (local material and/or labor) or money contribution. The Supervising

Engineer has to identify the type of activities and their quantities to be contributed by beneficiary

communities as per the design document and develop action plan for the involvement of the

beneficiary communities before the start of the construction work. The action plan shall also

include the types of local materials contributed from the community, the quantity of the

contribution (BOQ), labour requirement of each activity, how to implement each activity and

when to implement it. At this stage, the practicability of the plan has to be justified, verified and

agreed at Woreda and kebele level. Then after, the action plan should be notified to the Woreda

administration and to the community to its implementation. Before the onset of the community

work, the Supervising Engineer needs to work out the alignment and pegging. There shall be

adequate community mobilization, technical backstopping and follow up for effective and timely

community contribution. The amount of community contribution shall be 5-7% of the civil

works. But, for MHI systems it could be up to 50-100% of the civil works investment cost.

(ii) Supervision of Civil Works: Supervision of civil works would be carried out by in-house

engineers, to contracting to licensed firms or individual daily supervisors under the direct

guidance of the Regional Projects Implementation Coordination Team (PIST) under

BOWR/IDA/IDSAA. The Regional PIST would retain the role of Project Manager as stated in

the General Conditions of Contract and in this capacity would regularly visit sites during

implementation of construction works and be responsible for checking the quantities and

assuring the quality of implemented works. The PIST and on-site daily supervisors would verify

each completed Bill of Quantities, the cumulative Bill of Quantities, and requests for interim

payment (progress payments), as well as completion certificates prepared by Contractors. The

PIST would also ensure that all engineering design requirements and construction supervision

procedures (testing, material certification, laboratory checking etc.) as per the requirements of

construction norms and standards of Ethiopia are fulfilled by Contractors. In addition to the

PIST, Construction Supervision and Quality Assurance Committee (CSQAC) shall be

established at each region led by the Irrigation/Engineering Core Process Head to ensure

construction quality.

(iii)Construction Quality Assurance and Control: The construction of SSI infrastructure will

involve both the public and private sectors. The public sector will mainly engage on

133

construction management22. In addition, the public water works enterprises (design and

supervision enterprises) shall be engaged in the contract administration of SSI Sub projects

construction and Feasibility Study and Detail Design Preparation to help in improving quality

of outputs. The construction quality assurance and control procedures will be prepared and

employed at the first year of the program to ascertain that the works comply with the design

and specifications, and confirm the required standards of work and materials quality are

attained.

(iv) Ensure Woreda and IWUA Involvement in Construction Supervision: Implementers at

regional level should encourage Woreda stakeholders and IWUA members to be involved in the

SSI subproject implementation in their administrative boundary. As a key stakeholder in long-

term project sustainability, the Woreda and kebele administration through its technical offices

should be involved in overall subproject implementation, especially during project preparation

and construction. Regional Bureaus/Authorities should keep the technical offices of Woreda

informed of SSI subproject progress and actively engaged in major decisions and tasks of project

implementation. It should be the responsibility of the PIST to deliver the contract documents

including drawings to Woreda technical offices in order to enable the Woreda to be involved in

the supervision work. In addition, continuous orientation type of trainings at each stage of

construction are required for Woreda technical staffs to qualify and empower them to bridge the

supervision gap created in between Supervising Engineer site visits. It will be an opportunity to

Capacity Development to Woreda engineers for sustainability of the overall development and

reduces workload to regional engineers; and consequently improves quality of work. Regional

and Woreda implementing entities should encourage the community to remain engaged in

decision-making and in the various implementation activities. It also should remain patient with

the level of community interest and involvement and not delay implementation slower than the

rate at which the community is expecting to progress. They should remain sensitive to the

changing needs and preferences of the community. As the subprojects advance, communities

sometimes change their minds about the design, location and operation of the proposed system.

Implementing institutions should recognize the right of a community to request project

modifications. Changes in community preferences should be seen as a reflection of greater

understanding of the project’s potential on the part of the community. It is the joint responsibility

of the regional and Woreda implementing institutions to qualify and empower IWUA members

to be involved in the construction supervision work. Continuous orientation types of practical

trainings are vital specifically for checking material quality, mix ratio, depth of excavation and

the like.

22Construction Management can be defined as the coordination of actions (from procurement planning to construction

close out) required for the performance of site construction activities including procedures and elements of control and

monitoring necessary to assure that all contractual obligations under construction stage are fulfilled by the parties to the

contract.

134

(iv) Operation and Management Phase

Duration of support-The operation and maintenance is necessary for the continued functioning and

effective delivery of benefits of SSI investment for the near future. The community should be fully

responsible for the continued operations and management of the SSI systems. Responsibility for the

continuing management and operation of the SSI subproject system will be with the community, most

likely through the IWUA. Implementing agency should ensure that the community understands that,

unless it accepts this responsibility long-term, sustainability of the system is not possible; and hence

should continue to assist the community for an appropriate period of time following completion of the

SSI subproject implementation. Accordingly, the community and its IWUA committee will probably

need technical and advisory assistance for some time following implementation of the project.

Implementing agencies should be prepared to provide minor levels of assistance for perhaps at most

for two to five irrigation seasons, as may be needed, depending on the type of the scheme, the level of

awareness of the community and IWUA committee, accessibility to major towns, etc. For example,

the pump project needs continuous engagement of the government institution for operation and

maintenance of pumps.

Operation and maintenance plan-The beneficiary communities should have a plan to support and

carry out routine maintenance and repairs. A plan outlining routine maintenance and repairs should be

prepared and accepted by the community before handing over.

Monitoring plan for operation and maintenance-The community should also have a plan for the

routine monitoring of system operations and maintenance activities. The IWUA committee should be

responsible for carrying out the operation and maintenance plan. Woreda and kebele technical units

should help the community to prepare this plan and provide minor amounts of assistance in carrying

it out.

Accommodating women needs-At operation level, AGP advocates the implementation of irrigation

water allocation and delivery schedules which accommodate both male and female needs with respect

to quantity, timeliness, timing, equity and quality of water. Specific uses of water by women, like

domestic uses or watering cattle, also need to be included when operating systems.

C. Modality of Implementation

While the federal, regional and Woreda level government institutions are mainly responsible for

oversight and overall implementation of activities under AGP 2, including contract management and

preparation and evaluation of bids, most activities under SSI infrastructure will be outsourced to

consultants and contractors under three separate contracts as follows:

(i) Contracts for Feasibility Study, Design and Preparation of Bidding Documents: This

consultancy will be responsible for preparing detailed designs of SSI subprojects including

preparation of album of drawings, technical specifications, contract documents, BOQ with

detailed engineering cost estimates, and construction schedules for packages approved for

implementation. The design and construction activities of new SSI systems would be fully

135

managed at regional level where as rehabilitation and MHI systems would be handled at Woreda

level with strong back up from the region. For rehabilitation and MHI systems, the feasibility

study and detail design activities are to be approved at regional level before outsourcing to

contractors. Besides, complex rehabilitation and MHI systems would be handled at regional

level. Complex rehabilitation works include SSI subprojects with many structures (head work

and on-farm) requiring excavation in soil formations for which excavators and/or other

equipment/ machinery are to be deployed, structures that have major RCC components and

structures that have steel gates with mechanical hoisting devices

(ii) Contracts for Construction Work: Under this contract, construction works will be implemented

as per design in a timely manner. Contract values within the threshold limit of works shopping

shall be mainly handled at Woreda level where as those with in the threshold limit of NCB will

be handled at regional level.

(iii) Contracts for Construction supervisions: This consultancy will monitor and supervise work

to ensure that contracts are executed according to specifications through a reporting and

monitoring system, and it will keep the relevant implementing agency abreast of the progress

made and challenges faced in order to seek timely solutions.

D. SSI component Implementing Institutions and their role

(i) Federal Level

The MOA will be the lead Executing Agency. Federal MOA involved mainly in overall oversight

including technical backstopping, training, quality assurance, potential assessment and other technical

supports. Federal SSI Development Directorate (SSIDD) of the MOA will be responsible mainly for

SSI Infrastructure Development and Improvement (sub-component 3.1) and irrigated agriculture water

management aspects of subcomponent 3.2; whereas the Agricultural Extension Director General will

be responsible for overall oversight of Irrigated Agriculture Integrated Crop Management of

subcomponent 3.2. The FPCUwill be responsible for all these aspects of project management

specifically procurement, finance, safeguards and M&E.

(ii) Regional Level

The Regional Bureau of Agriculture (BOA) and Bureau of Water Resources (BOWR)/Irrigation

Development Authority (IDA)/Irrigation Development and Scheme Administration Agency

(IDSAA)will be the Implementing Agencies for this component at their respective regions within the

scope of their mandate under the technical support and control of the Federal SSI Development

Directorate (SSIDD of the MOA). The RPCUs will be responsible for all these aspects of project

management specifically procurement, finance and safeguards including monitoring and evaluation.

The Regional BOWR/IDSAA shall be responsible for the coordination, planning, execution and

monitoring of SSI Infrastructure Development and Improvement (subcomponent 3.1) and irrigated

water management aspects of subcomponent 3.2. The IDA of Oromiya National Regional State shall

be responsible for all-inclusive activities of the SSI Development Component including the

coordination, planning, and execution aspects.

136

For SSI Infrastructure Development and Improvement, project identification, preparation and

construction management will be managed by BOWR/IDA/IDSAA. The BOWR/IDA/IDSAA shall

be responsible for irrigation potential assessment of AGP supported Woredas. Regional

BOWR/IDA/IDSAA staffs will have a critical role in the identification, categorization and

prioritization of potential SSI subprojects to be developed or rehabilitated/improved, and to ensure

that works are properly designed. The zonal and Woreda staffs of BOWR/IDA/IDSAA and BOA in

the program area would be involved in the selection and planning of SSI subprojects according to the

criteria and guidelines developed under the program. New SSI systems shall be the sole responsibility

of and fully implemented at the regional level; of course with full involvement of Woreda and Kebele

staffs and beneficiary farmers during planning, design and construction supervision.

For the rehabilitation and improvement of existing SSI systems and development of new micro and

household irrigation systems, the regional entities role shall be limited to technical support and

supervision including capacity building, design approval and training. However, if the rehabilitation

and improvement of existing SSI systems and development of new micro and household irrigation

systems are too complex to procure and execute for Woreda staffs, it will be handled by the region.

Box 3K. Guidelines/indices for Complex Revitalization Works of Existing SSI Systems and

Establishment of MHI Systems

The rehabilitation and improvement of existing SSI systems and development of new micro and

household irrigation systems are considered complex for Woreda implementation with the

following guidelines:

If the existing SSI system requires full diagnosis, redesign and reconstruction of the

system;

If the reconstruction work needs machinery due to high volume of excavation, RCC

concrete, mass concrete, masonry work, etc.;

Improvement of existing modern SSI systems with new works being constructed or design

changes shall be made to improve and modernize the irrigation systems;

Existing modern SSI systems with structures that have major RCC components, structures

that have steel gates with mechanical hoisting devices;

Head works (weirs and intake structures)and canal excavation requiring excavation in

hard soil formations for which excavators and/or other equipment/ machinery are to be

deployed;

Canal Structures such as division boxes, drops, canal crossing structures/ bridges for

vehicle traffic with RCC are required and slabs to be casted in-situ or rehabilitated;

Aqua ducts and cross-drainage structures with RCC to be casted in-situ or rehabilitated

(but not small prefabricated culverts that can be procured locally);

If the MHI systems are new to the Woreda;

If the MHI systems are to be established in ragged topography that needs experienced

engineer to design.

137

BOA is responsible for irrigated agriculture integrated crop management aspect of subcomponent3.2;

irrigation water management excluding Irrigation Water Users Association which shall be taken care

of by BOWR/IDA/IDSAA. Therefore, the BOA oversees planning of irrigated agriculture extension

(irrigated crop and water management) program in subproject areas, monitor implementation, and

facilitate farm-to-market linkages, provide Capacity Development trainings to farmers on irrigated

agriculture management. In some regional states the BOA is also responsible for the planning, design

and construction work of rehabilitation/improvement of existing SSI systems and MHI systems.

(iii)Woreda level

The Woreda implementing institutions and arrangement include Woreda Office of Agriculture

(WOA), Woreda Office of Water Resources (WOWR) and Woreda Office of Irrigation Development

(WOID). The WOA and WOID staffs will have the primary responsibility of planning and

implementation of SSI subprojects irrigated agriculture interventions. Woreda technical offices of

WOA, WOWR and WOID shall also be responsible for the planning, design and construction and

rehabilitation/improvement works of existing SSI subprojects and MHIS in collaboration with the

participating farmers and with close support from regional experts. Woreda staffs may progressively

concentrate on initial social analysis and mobilization, consensus building to reach appropriate land

and related agreements before rehabilitation/new development works start.

The WOWR shall be mainly responsible for the coordination, planning and execution of SSI

Infrastructure Development and Improvement (subcomponent 3.1) and irrigated water management

aspects of subcomponent 3.2 within the scope of its mandate. The WOA shall be responsible for the

coordination, planning, execution and monitoring of irrigated agriculture integrated crop management

aspect of subcomponent 3.2. WOID shall be responsible for the coordination, planning, execution and

monitoring of all-inclusive activities of the SSI Development Component within its scope of mandate.

The WOA, WOWR and WOID staffs will be responsible to prepare Woreda level SSI Development

Component AWPB and detail implementation action plans. These will include joint planning and

implementation, working and collaboration areas with line offices and partner organizations. The

action plans will cover list of activities, major implementation risks, and mitigation measures,

methodology of implementation, and time of implementation and role of each institution involved in

the implementation process.

138

Table 23 : Activities and Implementing Agencies for Small-scale Irrigation Development

No Focal Activity At what administrative

level

Who is focal responsible to implement What is the modality of

implementation

3.1 Small Scale Irrigation Infrastructure Development and Improvement

3.1.1 Rehabilitation, Upgrading and/or Improvement of Existing SSI Systems23

Inventory of Existing SSI Systems

Federal/Regions FPCU/SSID at federal level,

BOWR/IDA/IDSAA at region

Consultant/own force

Revitalization Guideline Federal FPCU/SSIDD

Identification/Reconnaissance

survey/Pre-feasibility

Woreda

WOWR/WOID/WOA

Own force

Detail design Consultant

Construction Contractor

Construction contract administration Consultant/Own force

Operation and maintenance Woreda/IWUA

WOWR/WOID/WOA/IWUA Own force/IWUA24

Irrigated agriculture extension WOA/WOID//IWUA Own force/farmer25

3.1.2 Micro- and Household Irrigation Systems26

Potential assessment

Federal/Region FPCU/SSID (federal level),

BOWR/IDA/IDSAA (regional level)

Consultant/Own force

Identification/Reconnaissance

survey/Pre-feasibility

Woreda

WOWR/WOID/WOA

Consultant/Own force

Detail design

Construction Contractor/Own force27

Construction contract administration Own force

Operation and management Woreda/IWUA

WOWR/WOID/WOA/IWUA Own force/IWUA28

Irrigated agriculture extension WOID/WOA/IWUA Own force/farmer29

23This activityis mainly implemented at woreda level except complex rehabilitation works which should be handled at regional level. 24The main actor is the IWUAs; the role of Woreda implementing entity is limited to technical support including training. 25The main actor is the farmer; the role of Woreda implementing entity is limited to technical support specifically in demonstrating new technologies and training. 26Mainly implemented at woreda level except complex systems; otherwise the role of the region is limited to technical support including training. 27Water Harvesting and Household irrigation structures such as individual ponds and shallow wells shall be implemented using own force modality with direct labor 28The main actor is the IWUAs; the role of Woreda implementing entity is limited to technical support including training. 29The main actor is the farmer; the role of Woreda implementing entity is limited to technical support specifically in demonstrating new technologies and training.

139

No Focal Activity At what administrative

level

Who is focal responsible to implement What is the modality of

implementation

3.1.3 Establishment of New Small-scale Irrigation Systems30

Potential assessment Federal/Region FPCU/SSID (federal level),

BOWR/IDA/IDSAA (regional level)

Consultant/own force

Quality assurance and control guideline Federal FPCU/SSID

Identification/Reconnaissance

survey/Pre-feasibility

Region

BOWR/IDA/IDSAA

Consultant/own force

Detail design Consultant

Construction Contractor/own force

Construction contract administration Consultant/own force

Operation and management Woreda/IWUA

WOWR/WOID/WOA/IWUA Own force/IWUA31

Irrigated agriculture extension WOID/WOA/IWUA Own force/farmer32

3.1.4 Capacity Development

3.1.4.1 Physical Capacity Development

Capacity need assessment Federal/Region FPCU/SSID (federal level),

BOWR/IDA/IDSAA (regional level)

Consultant/own force

Prepare physical and financial action

plan based on need assessment findings

Own force

Procurement planning, implementation

and contract administration

Equipping implementing institutions Own force/supplier

3.1.4.2 Human Resources Capacity Development

Capacity needs assessment Federal/Region FPCU/SSIDD (Federal) and

BOWR/IDA/IDSAA (Region)

Consultant/own force

Prepare training plan preparation based

on need assessment findings

Federal/Region/Wored

a

FPCU/SSIDD (Federal),

BOWR/IDA/IDSAA (Region) and

WOWR/WOID/WOA (Woreda)

Own force

Procurement planning and

implementation

30Fully implemented at regional level; woredas and beneficiary farmers need be involved mainly in planning, design and construction supervision works. 31The main actor is the IWUAs with close support from the woreda; the role of regional implementing entity is limited to technical support including training. 32The main actors are the farmer, IWUA and woreda; the role of regional implementing entities is limited to technical support specifically in demonstrating new technologies.

140

No Focal Activity At what administrative

level

Who is focal responsible to implement What is the modality of

implementation

Training of experts at all levels Consultant/own force

Training of IWUAs committee

members

Woreda

WOWR/WOID/WOA own force

Training of farmers

3.2 Integrated Crop and Water Management for Irrigated Agriculture

3.2.1 Formation of Irrigation Water Users Associations

Promotion of the newly enacted IWUA

Proclamation

Federal/Region FPCU/SSIDD (Federal) and

BOWR/IDA/IDSAA (Region)

Own force

Support establishment and

strengthening of IWUAs

Region/Woreda FPCU/SSIDD (Federal),

BOWR/IDA/IDSAA (Region) and

WOWR/WOID/WOA (Woreda) Legal registration of IWUAs

Preparation of training material for

IWUAs

Federal/Region FPCU/SSIDD (Federal) and

BOWR/IDA/IDSAA (Region)

Consultant

Training of IWUAs committee Woreda WOWR/WOID/WOA (Woreda) own force

3.2.2 Introduction of Improved Irrigated Agriculture Advisory/Extension (Integrated Crop and Water Management) Services

Establishing and conducting technology

demonstrations

Region33/Woreda WOA/WOID Own force

Establishing community infrastructures Region BOWR/IDA/IDSAA Consultant/contractor

Irrigation Performance Assessment Federal FPCU Consultant

3.2.3 Human Resources Capacity Development

Capacity need assessment Federal/Region FPCU/SSIDD (Federal) and

BOA/IDA (Region)

Consultant/Own force

Prepare training plan preparation based

on need assessment findings

Own force

Procurement planning, implementation

and contract administration

Consultant/Own force

Training of experts at all levels Federal/Region/Wored

a

FPCU/AEDG (Federal), BOA/IDA

(Region) and WOA/WOID (Woreda)

Consultant/Own force

Training of IWUAs committee Woreda WOA/WOID Own force

Training of farmers

33Involvement of the region is limited to technical support

141

E. Roles and Responsibilities in the Implementation of New SSI Infrastructure

Subprojects

To harness capacity limitation of BOWR/IDA/IDSAA, special implementation arrangements through

technical assistance are supposed necessary to successfully manage implementation. Such units are

often seen as a temporary organizational structure to supplement the implementing agency

(BOWR/IDA/IDSAA) capacities during project implementation. It will include the following bodies:

Project Implementation Support Team (PIST)

Regional Feasibility Study and Detail Design Approval Committee (RFDAC)

Regional Construction Supervision and Quality Assurance Committee (RCSQAC)

(i) Regional BOWR/IDA/IDSAA

The roles and responsibilities of the Regional BOWR/IDA/IDSAA will be

Establish and manage the PIST team and ensure the hiring of suitably qualified staffs to PIST;

Identify key staffs to establish PIST, RFDAC and RCSQAC to accomplish implementation of

SSI subprojects

Monitor, manage, and guide the overall strategic implementation of the SSI component of the

project (planning, procurement, safeguards, contracts administration and supervision, finance

and operations related implementation);

Review project performance, monitor project progress (physical and financial) and evaluate

project benefits to achieve the intended project objective;

Ensure the review and compliance of environmental and social impacts to meet safeguard

requirements;

Liaise with RPCU/BOA, FPCU/MOA, WB and other agencies, as necessary.

(ii) SSI Projects Implementation Support Team (PIST)

SSI Subprojects Implementation Coordination Team will be established under the four regional states

(Oromiya, Amhara, SNNP, Tigray) BOWR/IDA/IDSAA. BOWR/IDA/IDSAA will benefit from

technical assistance to enhance its capacity for the timely execution of the SSI Infrastructure

Development and Improvement Subcomponent. Thus, during project implementation, Technical

Assistants who will support the SSI subprojects planning, design and execution would assist the

BOWRD/IDA/IDSAA. Irrigation Engineers and other experts will be recruited as required for

technical assistance to strengthen the SSI Subprojects Implementation Team. The Project

Implementation Support Team (PIST) is a group of staff members designated officially to work

together full-time, with separate accountability, to coordinate and manage AGP supported SSI

subprojects implementation. The PIST members shall be full-time engaged in AGP SSI subprojects

implementation. The Project Implementation Support Team would be responsible for coordinating

SSI Subprojects preparation and construction management activities mainly programming and

supervising subprojects, evaluation for quality assurance, and implementation as well as overall

administration of budgeting, procurement, record-keeping, and reporting matters related to SSI

142

Infrastructure Development and Improvement Subcomponent implementation. Specific Tasks of

PISTs will include, but not limited to, the following:

Support the BOWR/IDA/IDSAA for the execution of AGP supported SSI subprojects;

Prepare annual work plan and budget, and submit to the BOWR/IDA/IDSAA and RPCU

obtaining their endorsement;

Coordinate SSI subprojects implementation (identification, feasibility study and detailed

design and construction work of SSI subprojects); and ensure that all engineering design

requirements and construction supervision procedures (testing, material certification,

laboratory checking etc.) as per the requirements of construction norms and standards of

Ethiopia are fulfilled by Contractors;

Prepare standard bidding packages, RFP, bidding documents and specifications to evaluate,

enter into contracts, and oversee delivery; and coordinate procurement, recruitment,

management and supervision of contracts with consultants, suppliers and contractors; and

ensure its compliance with WB's procurement guideless;

Report on all procurement related matters and seek approval from RPCU/BOA, FPCU and/or

WB, as necessary for procurements of works, goods, and services;

Manage contracts and endorse payments to suppliers/consultants/contractors as per the agreed

conditions and terms of payment;

Monitor budgetary expenditure, and review disbursement requests, prepare payment certificate

and submit to the BOWR/IDA/IDSAA for approval;

Ensure compliance with WB's Environmental and Social Safeguards requirements; and report

on all safeguards related matters and obtain certificate of approval from Regional Expertise

Agency;

Ensure the proper integration of cross cutting issues

Ensure compliance with financial management and accounting requirements of AGP for SSI

subprojects; and report on finance and disbursement related matters;

Make site visits as required to monitor and correct implementation deficiencies of the SSI

subprojects;

Monitor the progress of project performance and project deliverables including progress

reporting (both physical and financial progresses) to the BOWR/IDA/IDSAA and

RPCU/BOA;

Identify and report reasons for any deviations from the work plan and budget to the

BOWR/IDA/IDSAA Management and RPCU for follow up action;

Develop and submit recommendations to the BOWR/IDA/IDSAA Management to resolve

issues which arise in the course of project implementation;

Manage all staffs, contractors and consultants directly working on the SSI subprojects,

including staff grievance procedures and make recommendations to the BOWR/IDA/IDSAA

Management on acquisition of decisions;

143

Implement recommendations of FPCU/MOA, RPCU/BOA, WB staffs and joint review &

implementation support supervision (JRIS) missions and associated aide-memoires, as agreed

by the RPCU/BOA & FPCU/MOA;

Liaise with FPCU/MOA, RPCU/BOA, WB staff and joint implementation support and

supervision missions to ensure successful completion of missions and ongoing project

monitoring;

Share implementation status with and coordinate among regional stakeholders; and liaise with

regional and Woreda government line offices participating in the overall project sustainability

to ensure successful implementation of project activities;

Support Woreda line offices in planning, design, contract administration, procurement and

construction supervision of SSI subprojects;

Plan, organize and manage necessary workshops, study tours, and training events for regional,

zone and Woreda staffs including beneficiaries in subproject areas; and

The PIST will be the main point of contact for working communication between RPCU/BOA

and BOWR/IDA/IDSAA.

The PIST shall be accountable and reporting to BOWR/IDA/IDSAA Head or his delegate. The list of

proposed PIST positions is shown under chapter 3 Institutional arrangement number 3.3.3 (iv).

(iii)SSI Subprojects Feasibility Study and Detail Design Review and Approval Committee

(RFDAC)

Each BOWR/IDA/IDSAA will establish and chair an RFDAC to provide technical review and approve

for SSI subprojects detailed feasibility study and design reports. The BOWR/IDA/IDSAA Irrigation

Process Head/Engineering Head will be the RFDAC chairperson and PIST Team Leader will be

RFDAC Deputy Chairperson and Senior PIST Team member will be secretary. Other members of the

RFDAC include the senior engineers and staffs of BOWR/IDA/IDSAA. A quorum will consist of the

chairperson, Deputy Chairperson, secretary and at least three other staffs. No SSI subproject shall be

transferred to construction phase without the approval of RFDAC.

Overall responsibility for ensuring technical quality of SSI subprojects design in their

respective regions, including safeguard compliance; and multiple use of water structures

Establish SSI subprojects design assurance and control mechanisms;

Ensure that quality assurance and control plan is prepared by consultants;

Lead the review and approval process of feasibility study and detail design reports of SSI

subprojects;

Check design quality of SSI subproject; and make final review and approval of SSI design

reports, and verify quantities and cost of SSI subprojects;

Conduct periodic assessment of SSI subproject feasibility study and detail design quality

assurance and control mechanisms (at identification and detail design preparation stages),

review SSI subprojects preparation procedures and approval mechanisms;

144

Based on assessment, identify gaps, prepare recommendations, get approval from management

and ensure its implementation;

The Committee shall be accountable and reporting to BOWR/IDA/IDSAA Head. The committee shall

conduct its meetings at least once every month or more frequently if required. It will have fixed date

and time to carry out its regular meetings. The minutes of the committee shall be properly documented

for future reference.

(iv) SSI Subprojects Construction Supervision and Quality Assurance Committee (RCSQAC)

Each BOWR/IDA/IDSAA will establish and chair a RCSQAC to provide technical SSI subprojects

construction supervision and follow up implementation. The BOWR/IDA/IDSAA Irrigation Process

Head/Engineering Head or his delegate will be the RCSQAC chairperson and PIST Team Leader will

be RCSQAC Deputy Chairperson and Contract Administration Engineer of PIST Team will be

secretary. Other members of the RCSQAC include the senior engineers and staffs of

BOWR/IDA/IDSAA. A quorum will consist of the chairperson, Deputy Chairperson, secretary and at

least five other staffs directly involved in construction supervision.

Support PIST in overall project implementation including procurement planning and

management, construction planning, contract administration and construction supervision;

Establish SSI subprojects construction quality assurance and control procedures;

Ensure that quality assurance and control plan is prepared by contractors;

Ensure establishment of site specific construction supervision teams (from region/zone,

Woreda, kebele, community) in each SSI subproject and follow up its operation;

Check construction physical progress and quality of SSI subprojects;

Periodic review of existing contract administration procedures to identify bottlenecks & best

practices and then develop hands-on procedures based on contract administration procedures

according to WB small works general conditions of contract guidelines and get approval from

the management;

Periodic review of existing payment procedures and develop hands-on payment procedures

based on WB small works general conditions of contract and get approval from the

management;

Periodic review of construction progress and resolve implementation issues to support PIST in

construction management;

Supervise SSI subprojects at field level to support supervising engineers;

Identify any construction related operational problems and in consultation with PIST raise

them with the BOW/IDA/IDSAA Management for guidance;

Assess the rationale and alternative technical solutions for variation requests, make

recommendation for management decision on contract variation requirements;

Ensure the quality and adequacy of supervision tasks made by BOWR/IDA/IDSAA regular

supervising staffs;

Establish and maintain a high profile with Woreda and kebele administration staffs and

beneficiary communities to ensure awareness of the aims and activities of the SSI subprojects;

145

Ensure adequate involvement of the Woreda respective offices, kebele administration and

beneficiary community in construction supervision;

Through field level supervision, receive feedback from the Woreda stakeholders and

beneficiary community and pass this on to the BOWR/IDA/IDSAA Management discussion

and guidance;

Ensure that the necessary measurements are taken to release payments to contractors;

This committee will also function as a grievance redress committee for beneficiaries and other

affected people including contractors.

The Committee shall be accountable and reporting to BOWR/IDA/IDSAA Head. The committee shall

conduct its meetings bi-weekly. It will have fixed date and time to carry out its regular meetings. The

minutes of the committee shall properly be documented for future reference.

5.5.4 COMPONENT 4: AGRICULTURAL MARKETING AND VALUE CHAINS (US$

120.00 M)

The objective of the component is to increase smallholder farmers’ access to input and output markets.

The value Chain development will leverage on farm productivity improvements through investments

in markets and agribusiness, as well as direct producer level interventions as needed. Specific attention

will be given to ensure FHHs and married women get benefit out of the interventions. The Agriculture

marketing and value chain component has four sub components; namely, (i) supporting agricultural

input supply system, (ii) support to farmers’ organizations (iii) supporting agribusiness development,

and (iv) supporting market infrastructure development and management. Several implementing

institutions at various levels of program implementation implement the component interventions based

on the objectives of the four sub components:-

5.5.4.1 Sub Component 4.1: Supporting Agricultural Input Supply System (US$ 6 M)

The component will support the availability of agricultural inputs and specifically for seed through

support to the scale up of Direct Seed Marketing and establishment and strengthening of community

based crop and forage seed production groups of improved varieties and planting materials in response

to local demand and suitability based on previous experiences. With regard to Animal Input Supply

and distribution, the activities conducted are provision of day old chickens to poultry multiplication

centers and support to artificial insemination centers. Liquid nitrogen production plants will be

established and semen distribution refrigerated trucks will be purchased for efficient provision of AI

service to increasing the number of improved animal breeds. The major activities and their

implementation arrangements are discussed below.

A. Support to Promotion and Distribution of Improved Agricultural Inputs

This sub-sub component aims to strengthen the seed supply through introduction of alternative supply

channels to the existing channels. The AGP 2 will support the implementation of the following

interventions.

146

(i) Establishment and Strengthening of Community Based Crop and Forage Seed Production

Groups (CBSPs)

The community Based crop and forage seed production groups will be established at kebele level

based on the interest of small-scale farmers based on the seed multiplication guideline prepared before

implementation. The criteria for the selection of farmers will be described in the guidelines which

includes a) willingness and interest of the farmers b) owning land adjacent to one another b) among

the members 50% should be female farmers (From FHH and women in MHH) among others.

Women only group will be considered if there is preference and they are found to be adjacent

Specific activities are shown on table below.

The responsible implementing institution is the Input Directorate of the MoA and the main partners

will be FCA and other relevant directorates of the MOA at federal level. The RBoA and Regional

cooperative promotion office are implementing institutions at regional level.

Summary Table 5.5.4.1.1 (i) : Sub-sub component 4.1.1 Support to Promotion and Distribution

of Improved Agricultural Inputs i) Establishment and Strengthening of CBSPs

Main activities, out puts and Institutions Responsible

Sub-Component 4.1: Supporting agricultural input supply system

Sub-sub component 4.1.1 Support to Promotion and Distribution of Improved Agricultural

Inputs i) Establishment and Strengthening of Community Based Crop and Forage Seed

Production Groups (CBSPs)

Responsible Organization/Department:

Lead Organization: MOA/Agricultural input marketing Directorate

Main partners :- FCA , Directorates of Extension, Livestock development, RBoA, and

RCP

Supporting implementing bodies:: EIAR, RARI, ESE, Crop Regulatory and

Certification directorate, MoWCYA at all levels

Main Activities:

Develop seed multiplication manual/guideline

Establish 314 new community seed producing group (two per Woreda) (at least 50% of the

group members will be women farmers) and strengthen 1194 CBSPs groups previously

established.

Provide training on relevance and modality of group establishment

Develop seed multiplication manual/guideline

Provide training on improved seed production techniques to regional and zonal SMS to

cascade to Woreda SMS, supervisors and development agents.

Provide training on improved seed production techniques to the CBSPs groups and

cooperatives, involved in seed multiplication and distribution.

Organizing experience sharing visits for experts , CBSP groups and cooperatives

Create strong linkage of the community based seed producers with public and private seed

growers, and cooperatives.

147

Provide basic seeds of crops and forages for the newly established CBSP groups

Assist in the certification of the improved seed produced by the groups and cooperatives to

ensure marketing.

Outputs

314 new CBSPs groups (two per Woreda) established and 1194 CBSPs groups

strengthened

Training provided to regional and zonal SMS, Woreda SMS, supervisors and development

agents

Training provided to CBSPs groups and cooperatives involved in seed multiplication and

distribution

experience sharing visits organized for experts , CBSP groups and cooperatives

Linkage of the CBSP groups with public and private seed growers, and cooperatives created.

basic seeds of crops and forages provided for 314 newly established CBSP groups

improved seed produced by CBSP groups and cooperatives certified

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Gant Chart 5.5.4.1.1 (i) : Sub-sub component 4.1.1 Support to Promotion and Distribution of

Improved Agricultural Inputs i) Establishment and Strengthening of CBSPs

Main activities, and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

i) Establishment and Strengthening of Community Based Crop and Forage Seed

Production Groups (CBSPs)

Provide training on relevance and modality of

group establishment

Establishing community seed producing

group

Strengthen CBSPs groups through provision

of training and technical support

Develop seed multiplication manual/guideline

Prepare and Provide training to regional and

zonal SMS on improved seed production

techniques

Preparation and Provide training to Woreda

SMS, supervisors and development agents

148

Preparation and Provide training to CBSPs

groups and cooperatives

Organizing experience sharing visits for

experts , CBSP groups and cooperatives

Create linkage of the CBSPs groups with

public and private seed growers, and

cooperatives

Provide basic seeds of crops and forages for

the newly established CBSP groups

certification of the improved seed

(ii) Support Animal Input Supply and Distribution

There are two major activities:

Provision of new parent stock for poultry multiplication centers in which support will be

rendered through purchase of 30,000 new day old chicks of parent flocks of dual purpose from

the EIAR and deliver to the regional multiplication centers only for one time to replace the old

stock. As an exit strategy, a study will be conducted on the pros and cons of transferring poultry

multiplication center to the private sector (exploit the experiences of Oromiya and Tigray

regions) and implement in the other regions based on the output of the study. The APFDD of

the MoA will be responsible for the overall procurement process and the regional Livestock

Agencies will be responsible for the distribution the day old chicks to the multiplication

centers.

Establishment and strengthening liquid nitrogen production plants -To make this activity

effective a detailed study will be conducted to assess the current capacity of liquid nitrogen

production (supply) in the country especially the newly established semen collection centers

in AGP I, the needs (demand) of liquid nitrogen for artificial insemination and the distribution

capacity. Based on the result of the study the already established semen collection centers will

be supported through purchase new liquid nitrogen machines and rehabilitation of existing

liquid nitrogen machines through purchase of spare parts. Moreover, 5 refrigerated trucks for

semen distribution will be purchased for the NAIC and four regional semen collection centers.

The overall implementation of these interventions will be done by the Regional Livestock Agencies

under the coordination and technical assistance of the NAIC.

Summary Table 5.5.4.1.1 (ii): Main activities, out puts and Institutions Responsible

Sub-Component 4.1: Supporting agricultural input supply system

Sub-sub component 4.1.1 Support to Promotion and Distribution of Improved Agricultural Inputs

ii)Support Animal Input Supply and Distribution

Responsible Organization/Department:

Lead Organization: MOA/ Animal production and feed resources development directorate, NAIC

149

Main partners :- RLS agency/BoA , RAIC and poultry multiplication centers

Supporting implementing bodies:: EIAR

Main Activities:

purchase of new day old chicks of parent flocks of dual purpose

conduct study on the transferring poultry multiplication center to the private sector as an exit strategy

conducted study to assess the current capacity of liquid nitrogen production (supply) and demand

purchase of new liquid nitrogen machines and spare parts for rehabilitation old machines

Purchase of refrigerated trucks for semen distribution.

Outputs

3o,ooo day old chicks of dual purpose purchased and distributed to 2 poultry multiplication centers

Study on the transfer of Poultry multiplication center to the private sector conducted.

Current capacity of liquid nitrogen supply and demand studied and document produced

4 new liquid nitrogen machines and spare parts for 17 old liquid nitrogen production plants purchased

5 refrigerated trucks for semen distribution purchased and distributed

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart 5.5.4.1.1 (ii) : Main activities and Implementation Schedule

Activity

Implementation schedule

Y 1 Y2 Y3 Y 4 Y 5

1 2 3 4 1 2 3 4

ii) Support Animal Input Supply and

Distribution

purchase of new day old chicks and distribute

to MC

conduct study on the transferring poultry

multiplication center to the private sector

Conducted study to assess the current capacity

of liquid nitrogen production

Purchase of new liquid nitrogen machines and

spare parts for rehabilitation old machines.

Purchase of refrigerated trucks for semen

distribution.

(iii)Establishing IT Based Input Tracking System

The System will be implemented in the 75 Woredas selected from the four regions (Oromiya, Amhara,

SNNP and Tigray) based on their consumption of inputs (improved seeds and fertilizer). The specific

150

activities associated with the establishment of the ITs based Input Tracking System are shown on table

below.

The lead implementer of this intervention will be the Input Marketing Directorate of the MoA, MoT

and FCA in collaboration with the regional BoA and technically assisted by ATA.

(iv) Support to Direct Seed Marketing (DSM)34

The Support to Direct Seed marketing (DSM) will be implemented in the Woredas selected from the

four regions. Major activities supported under this intervention are shown on table under. The Input

Marketing Directorate of the MoA in collaboration with the RBoA will implement the activities with

technical support provided by ATA.

Summary Table 5.5.4.1.1 (iii, iv): Main activities, out puts and Institutions Responsible

Sub-Component 4.1: Supporting agricultural input supply system

Sub-sub component 4.1.1 Support to Promotion and Distribution of Improved Agricultural Inputs

iii) Establishing IT Based Input Tracking System and iv) Support to Direct Seed Marketing

(DSM)

Responsible Organization/Department:

Lead Organization: MOA/ Agricultural input marketing Directorate (AIMD),MoT, FCA

Main partners :- RBoA, RBoT, RMCPB, RCP

Supporting implementing bodies:: ATA:

Budget Allocated: US$

Main Activities:

Input Tracking

• Conduct regional assessment and stakeholder consultation

• Register new Woredas, institutions, and users.

• Establish system forms and dashboards; Procure and distribute mobile devices;

• Update Input Tracking System training curriculum, conduct trainings for all stakeholders ,

• Provide online/offline support

Direct Seed marketing (DSM)

• Refine design of DSM program and implement in selected AGP Woredas.

• Organize awareness creation workshops at all levels on the basics of DSM program.

• Provide training for experts on technical and business skills, implementation mechanisms of DSM

• Provide training for seed producers on seed business management

• Facilitate identification of competent input marketing agents through outreach campaigns

• Expand DSM to other agricultural inputs beyond seeds

Outputs

Input Tracking

Regional assessment and stakeholder consultation conducted

34 DSM is a market-based seed distribution system that enables all qualified seed producers directly sell seed to farmers through multiple outlets in a competitive manner.

151

New Woredas, institutions, and users get registered.

• IT system forms and dashboards established , Mobile devices Procured and distributed

• Input Tracking System training curriculum updated and trainings conducted

• online/offline I T support provided

Direct Seed marketing (DSM)

• Design of DSM program refined and implemented in selected AGP Woredas.

• Awareness creation workshops organized

• Training on technical and business skills, implementation mechanisms of DSM program provided.

• Training on seed business management provided

• competent input marketing agents identified through outreach campaigns

• DSM expanded to other agricultural inputs beyond seeds

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart:5.5.4.1.1 (iii, iv) B Main activities and Implementation Schedule

Activity

Implementation schedule

Y 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Input Tracking

• Conduct regional assessment and stakeholder

consultation

• Register new Woredas, institutions, and users.

• establish system forms and dashboards;

Procure and distribute mobile devices;

• Update Input Tracking System training

curriculum, conduct trainings,

• Provide online/offline support

Direct Seed marketing (DSM)

• Refine design of DSM and implement in

selected AGP Woredas.

• Organize awareness creation workshops at all

levels on the basics of DSM program.

• Provide training for experts on technical and

business skills, implementation mechanisms

of DSM program.

• Provide training for seed producers on seed

business management

152

• Facilitate identification of competent input

marketing agents through outreach campaigns

• Expand DSM to other agricultural inputs

beyond seeds

B. Strengthen input /output Regulation and Certification

(i) Studies to update input/output regulation and certification systems

The purpose of this intervention is to develop, review and update the various inputs /output regulations

based on the feasibility/ need assessment to be conducted by the various implementing institutions

mainly the crop and livestock regulatory directorates, agricultural mechanization and agricultural input

marketing directorates. Thus, based on the result of the study the support will be rendered to review

and update input/output regulation and certification systems.

(ii) Development of regulatory guidelines for agricultural mechanization technology imports,

manufacturing and distribution.

The responsible institution for the implementation of the intervention will be the agricultural

mechanization directorate under MoA. Specific activities are shown on table below.

(iii) Preparation of Residue Monitoring Plan (RMP) for honey:- The program supports the

activities shown on table below and the Animal Health Directorate (AHD) of the MoA is responsible

for implementation of this activity in collaboration with the Ethiopian Apiculture Board and/ or the

Ethiopian Honey & Beeswax Exporters Association.

Summary Table 5.5.4.1.2: Main activities, out puts and Institutions Responsible

Sub-component 4.1: Supporting agricultural input supply system

Sub-sub component 4.1.2. Strengthen input /output Regulation and Certification

Responsible Organization/Department:

Lead Organization: Agricultural Input Marketing Directorates, Agricultural Mechanization

Directorate, Animal Production and Feed Resources Development

Directorate ,

Main partners : Other Pertinent MoA Directorates , RBoA,

Supporting implementing bodies: ATA

Main Activities:

(i) Develop, review and update the various inputs /output regulation

Organize sensitization workshop or stakeholder consultative forum

Develop, review and update the various inputs /output regulation

(ii) Develop regulatory guidelines for agricultural mechanization technology

Assess other countries experience with best regulatory guidelines

Identify activities and prepare TOR and bid document for consultant selection

Finalize selection of consultants and Sign contract agreement

Review the documents and validate guidelines produced

153

Establish technical team and prepare legislation and proclamation,Submit to

government

(iii) Development of Residue Monitoring Plan

• Prepare TOR for TA on development of Residue Monitoring Plan

• Procure TA based on the TOR prepared

• Produce the Residue Monitoring Plan document ( by TA)

• Collecting honey samples from designated exporter’s collection sites and coding the

samples.

• addressing the samples to an accredited laboratory for analysis and incorporating the test

result template to the RMP

Outputs

Various inputs /output regulation developed, reviewed and updated

Regulatory guidelines for agricultural mechanization technology developed

• Other countries experience with best regulatory guidelines Assessed and activities

identified

• TOR and bid document for consultant selection prepared

• Consultants selected and contract agreement Signed

• The guideline documents produced reviewed and validated

• Technical team establish and legislation and proclamation prepared and submitted to

government

– Development of Residue Monitoring Plan

• TOR for TA on development of Residue Monitoring Plan Prepared

• TA recruited based on the TOR prepared

• Residue Monitoring Plan document ( by TA) Prepared

• Honey samples from designated exporter’s collection sites collected and samples coded.

• Samples analysed and test result template incorporated to the RMP.

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart 5.5.4.1.2 Main activities and Implementation Schedule

Activity

Implementation schedule

Y 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

(i) Develop, review and update the

various inputs /output regulation

Organize sensitization workshop or

stakeholder consultative forum

154

Develop, review and update the various

inputs /output regulation

(ii) Develop regulatory guidelines for

agricultural mechanization

technology imports, manufacturing

and distribution

Assess other countries experience with best

regulatory guidelines

Identify activities and prepare TOR and bid

document for consultant selection

Finalize selection of consultants and Sign

contract agreement

Review the documents and validate

guidelines produced

Establish technical team and prepare

legislation and proclamation and Submit to

government and follow up

(iii)Development of Residue Monitoring

Plan

Prepare TOR for TA on development of

Residue Monitoring Plan

Procure TA based on the TOR prepared

Produce the Residue Monitoring Plan

document ( by TA)

Collecting honey and coding the samples.

Addressing the samples to an accredited

laboratory for analysis and incorporating

the test result template to the RMP.

5.5.4.2 Sub Component 4.2: Support to Farmers’ Organizations (US$ 21.0 M)

The objective of this sub component is to boost collective bargaining power of the small farmers as

well as efficient and sustainable service delivery. The major activities supported under this sub

component are the establishment of farmer common Interest Groups (CIGs) based on the guideline

developed by AGP, and engage them on viable agricultural sector business activities. The activities

conducted will be preparation of viable business plan and also technical support in the execution of

their selected business activity. The other major activities are establishing of primary farmer’s

organization and cooperative federation and strengthening of cooperative unions through Capacity

development activities of giving trainings, conducting of study tours, conducting feasibility studies,

preparation of bylaws and conducting workshops and consultative meetings.

155

A. Establishing and Strengthening of Common Interest Group (CIGs)

i) Establishment of Common Interest Group (CIGs)

Based on the experience of organizing farmer groups and lessons learnt in AGP I, the second phase of

the AGP will establish 3236 CIGs (2 CIGs per new Kebeles) on different agri-business activities based

on the revised CIGs guidelines. Unlike the first phase during the AGP 2 implementation only women

and youth will be supported to form CIGs. The specific activities shown on table below are

implemented for establishing the common interest groups (CIGs).

ii) Strengthening of Common Interest Group (CIGs)

The program will support the strengthening of 4936 formerly established and 3236 newly established

CIGs through implementation of specific activities mentioned on table below.

The key implementing institutions of these interventions will be FCA and MoA pertinent directorates

in collaboration with the regional FCP institutions and RBoA. Woreda/Kebele cooperative promoters

who have taken training on the community mobilization and group formation together with

development agents in respective Woredas will do group formation activities.

Summary Table 5.5.4.2.A Main activities, Outputs and Institutions Responsible

Sub-component 4.2: Support to Farmers’ Organizations

Sub-sub component 4.2.1: Establishing and Strengthening of Common Interest Group (CIGs)

Responsible Organization/Department:

Lead Organization:- FCA & MOA

Main partners: Regional, Zonal and Woreda Cooperative Promotion and Agricultural offices,

WCYA at all level

Supporting implementing organizations:

Main Activities:

For Establishment of common interest group (CIGs)

Finalize revising of CIGs guidelines.

Provide training on the community mobilization and group formation to Woreda/Kebele cooperative

promoters and Development Agents.

Identify business area for each group together with Development Agent (DA),

Conduct feasibility of the business for group together with development agents (DA),

Conduct awareness creation for communities on the concept of CIG

Conduct consultative meeting with all stakeholders on the concept of CIGs

Identify & select women, and youth who have common interest/needs and organize them in to Common

Interest Groups.

Conduct experience sharing visits for CIGs

Provide training to group members on business development skill, financial planning, etc.

Establish code of conduct & by laws for group members

Reorient the support that should go towards these groups who have additional and special needs

Outputs:

156

Training to Woreda/Kebele cooperative promoters and Development Agents provided

Business area identified together with Development Agent (DA).

feasibility of the business Conduct

awareness creation for communities on the concept of CIG provided

Women, and youth who have common interest/needs identified.

3236 Common Interest Groups organized.

Training to group members provided.

code of conduct & by laws for group members established

Main Activities : Strengthening of common interest group (CIGs)

Provide trainings on business and financial management and value addition (processing),

Update business plan of CIGs ,

Follow up and provide technical support on business activities

Provide assistance in linking the group to the market.

Outputs:

Trainings on business and financial management Provided

Business plan of CIGs updated

Technical support on business activities Provided

CIGs linked to market

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Bi-annual review meetings

Gant Chart 5.5.4.2.A: Main activities & Implementation Schedule

Activity

Implementation schedule

Y 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Establishing and Strengthening of Common

Interest Group (CIGs)

Establish common interest group (CIGs)

Provide training on the community

mobilization and group formation

Identify business area for each group together

with Development Agent (DA),

Conduct feasibility of the business for group

together with development agents (DA

Conduct awareness creation for communities

on the concept of CIG,

157

Conduct consultative meeting with all

stakeholders on the concept of CIGs

Identify & select women, and youth and

organize them in to Common Interest Groups.

Conduct experience sharing visits for CIGs

Provide training to group members on

business development skill, financial

planning, etc

Establish code of conduct & by laws for

group members

For Strengthening of CIGs

Provide trainings on business and financial

management and value addition (processing)

Update business plan of CIGs

Follow up and provide technical support on

business activities

Provide assistance in linking the group to the

market

B. Establishing and strengthening of Primary farmers ‘cooperative and Cooperative

Federation

(i) Establishing Farmers’ Primary Agriculture Cooperative

The establishment of primary cooperatives where they have not been established earlier and the

transition of CIGs into primary cooperatives will be implemented on the basis of willingness of

individual farmers’ as well as the feasibility of their business respectively according to the cooperative

establishment guideline . The specific activities listed on below will be supported and implemented

by the program. This activity will be capitalized on the success of AGP 1 regarding improving the

engagement of women.

The implementers of these activities will be regional, zonal and Woreda cooperative promotion

agency/bureaus/offices/desks with the support of FCA.

(ii) Supporting the Establishment of National agricultural Cooperative Federation

National Agricultural Cooperative Federation (NACF) : - will be established by the

cooperative unions and primary cooperatives with similar objectives and functions. The process for

the establishment involves the specific activities shown on table below.

The lead implementer of this intervention is FCA in collaboration, facilitation of regional, zonal, and

Woreda, cooperative promotion agencies/bureaus/offices/desks.

Summary Table: 5.5.4.2.B Main activities, Outputs and Institutions Responsible

Sub-component 4.2: Support to Farmers’ Organizations

Sub-sub component 4.2.2: Establishing of Primary Agricultural Cooperative and

Agricultural Cooperatives Federation

158

Responsible Organization/Department:

Lead Organization:- FCA

Main partners: Regional, Zonal, Woreda CP Agencies/Bureaus/Offices /Desks

Supporting implementing organizations: WCYA at all level

Main Activities: - For Establishment of Primary Agricultural Cooperatives

• Mobilize and conduct awareness creation among farming communities,

• Community submit Reqest to the Woreda coop.office,form establishment committees from

farming communities.

• Conduct feability studies on establishing farmers primary coperatives.

Calling the general meetings of the founding farmers and Kebele to register the established

P.Coops.

Provide support in the preparation of by-laws ,business plans and other requirements and

registered.

Train CIGs on the importance of being organized in to cooperatives, facilitate &support the

group to transform in to primary agricultural cooperative

For Establishment of National Agricultural Cooperatives Federation

• Organize sensitization workshop /meeting on the need and importance for CU and primary

cooperatives leadership and members.

• conduct consecutive consultative meetings

• submit request for the establishment of federation by the coop. unions and P. Coops to FCA,

• Form establishment committees,and Conduct feability study

• Establish National agricultural Cooperative Federation , Prepare by-laws, and business plans

• Call the general meetings and register the national cooperatives federation

Outputs :- For Establishment of Primary Agricultural Cooperatives

• Community mobilization and awareness creation on Primary Agriculture Coops. Provided

• General meetings of the founding farmers organized and election of establishment

committees from the farming communities conducted

• support in the preparation of by-laws , business plans for registration provided

• Feasibility studies on establishing farmers primary coperatives conducted

• 1120 primary agricultural cooperative established

• CIGs trained on importance of being organized in to primary agricultural Coops and

transformed.

Outputs :- For Establishment of National Agricultural Cooperatives Federation

Sensitization workshop /meeting on the need and importance for cooperative unions and

primary cooperatives leadership and members organized.

Consecutive consultative meetings conducted

Request for the establishment of the federation by the coop. unions and primary cooperatives

to FCA submitted and Establishment committee formed

Feasibility study on the establishment of National agricultural Cooperative Federation

conducted

159

National agricultural Cooperative Federation established , By-laws, and business plans

prepared

General meetings conducted and the National Agricultural Cooperative Federation registered

Monitoring, Reporting and Evaluation Arrangements.

• Monthly, quarterly and yearly progress reports; Field verification by project personnel ; Bi-

annual review meetings

Gant Chart: 5.5.4.2.B Main activities and Implementation Schedule

Activity Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Establishment of Primary Agricultural

Cooperatives

• Mobilize and conduct awareness creation among

farming communities,

• Community submit Reqest,Form establishment

committees from farming communities.

• Conduct feability studies on establishing farmers

primary coperatives

Calling the general meetings of the founding farmers

and Kebele to register the established primary

cooperatives.

Provide support in the preparation of by-laws ,

business plans for registration

Train CIGs on the importance of cooperatives &

facilitate &support the group to transform in to

primary agricultural cooperative

For Establishment of Agricultural Cooperatives

Federation

• Organize sensitization workshop /meeting for

cooperative unions and primary cooperatives

leadership and members.

• conduct consecutive consultative meetings

• submit request for the establishment of the

federation by the coop. unions and primary

cooperatives to FCA,

• Form establishment committees, Conduct feability

study

• Establish National Agricultural Cooperative

Federation, Prepare by-laws, and business plans

160

• Call the general meetings and register the national

cooperatives federation

C. Improving access to financial services: -

To address the problem of limited access to finance, the following major activities will be conducted

– Strengthen rural saving and credit cooperatives (RUSACCOS) through Provision of training

and Update the business plan and bylaws

– linking RUSACCOs with micro finance institutions (MFIs),

– linking primary cooperatives to RUSACCOs and MFIs,

– Provide Training to primary cooperatives, RUSACCOs, MFIs and cooperative development

agents on financial management skill.

The lead implementers of these activities will be FCA and MoA in collaboration with the Regional

Cooperative Promotion institutions and RBoA and Association of micro finance institutions of

Ethiopia.

Summary Table 5.5.4.2.C Main activity, Outputs and Institutions Responsible

Sub-component 4.2: Support to Farmers’ Organizations

Sub-sub component 4.2.3: Improving access to financial services

Responsible Organization/Department:

Lead Organization:- FCA

Main partners: Regional, Zonal and Woreda Cooperative Promotion,

Supporting implementing organizations: AEMFIs

Main Activities:

• Strengthen rural saving and credit cooperatives (RUSACCOS) through Provision of

training and update the business plan and bylaws of RUSACCOs

• linking RUSACCOs with micro finance institutions (MFIs), through organizing

consultation forum; and Identifying linkage issues /interventions b/n RUSACCOS and

MFIs

• linking primary cooperatives to RUSACCOs and MFIs through organizing consultation

forum, Identifying linkage issues /interventions and Develop MOU b/n Primary

cooperatives, RUSACCOs and MFIs

• Provide Training to primary cooperatives, RUSACCOs, MFIs and cooperative

development agents on financial management skill.

Outputs

• Training Provided to RUSACCOs and Business plan and bylaws updated

• Consultation forum among RUSACCOs and MFIs organized and conducted, linkage

Mechanisms identified

• Consultation forum between Primary cooperatives, RUSSACCOs and MFIs organized

and conducted and linkage Mechanisms identified

• 4916 agricultural marketing cooperatives linked with RUSSACCOs & MFIs, and MOU

b/n primary cooperatives, RUSSACCOs and MFIs developed

161

• Training on financial management skill provided to primary cooperatives, RUSACCOs,

MFIs and cooperative development agents.

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports

Field verification by project personnel

Bi-annual review meetings

Table 5.5.4.2.C: Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Improving access to financial services

• Strengthen rural saving and credit cooperatives

(RUSACCOS) through ,Provision of training ,

Update the business plan and by laws

• linking RUSACCOs with MFIs through

organizing consultation forum and Identifying

linkage Mechanisms b/n RUSACCOS and

MFIs

• linking primary cooperatives to RUSACCOs

and MFIs, through organizing consultation

forum, Identify linkage mechanisms and

Develop MOU b/n Primary cooperatives,

RUSACCOs and MFIs

• Provide Training to primary cooperatives,

RUSACCOs, MFIs and cooperative

development agents on financial management

skill.

162

D. Capacity Development

a) For cooperative unions

- Trainings

Board of directors and union managers will be provided a systematic, well-designed and periodic

Capacity development trainings and experience sharing. The Capacity development training will be

conducted by undertaking the specific activities shown on Table below. The lead implementers of the

Capacity development training intervention will be Regional cooperative promotion agencies, zonal

and Woreda cooperative promotion offices in targeted regions with support of FCA and regional

cooperative promotion agencies.

– Local Experience Sharing Visits

Inter and intra local experience sharing visits for cooperative board of directors and managers and

employees will be organized. Federal Cooperative Agency (FCA) will coordinate the inter-regional

experience sharing visits with the facilitation of the regional, zonal and Woreda cooperative promotion

agencies/bureaus/desks. The intra-regional experience sharing visits will be coordinated by regional

cooperative promotion agencies with the facilitation of the Woreda cooperative promotion desks.

Major activities for conducting Inter and intra local experience sharing visit are shown on table below.

Summary Table: 5.5.4.2.D (a) Main activities ,Outputs and Institutions Responsible

Sub-component 4.2: Support to Farmers’ Organizations

Sub-sub component: Capacity Development:- I. Human resource capacity development

(a)For cooperative unions

Responsible Organization/Department:

Lead Organization:- FCA

Main partners: Regional, Zonal and Woreda Cooperative Promotion,

Supporting implementing organizations: AEMFIs

Main Activities:

Trainings

conduct training needs assessment,

develop curriculum, prepare training modules, carry out the trainings (by considering

cross cutting issues)

follow-up, assess and report the implementation and the achievement of the training

program

• Exposure Visits

formulate criteria that relate to the existence of an improved/professional management

and governance structure, select well-functioning cooperatives on the basis of criteria and

field observation

Coordinate or lead inter and intra local experience sharing visits, and follow-up, assess

and report the implementation and achievement.

Outputs

124 agricultural cooperative broad of directors, 62 coop. managers & 128 coop.

employees trained

163

144 agricultural coop. broad of directors and managers as well as 128 cooperative

employees participated in exposure visits

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Bi-annual review meetings

Gant Chart 5.5.4.2 (a): Main activities and Implementation Schedule

Activity

Implementation schedule

Y 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

i). Human resource capacity development

(a)For cooperative unions

boards of directors, union managers &

employees training

conduct training needs assessment

develop curriculum, prepare training modules,

carry out the trainings

follow-up, assess and report the

implementation and the achievement of the

training program

Exposure visits for boards of directors,

union managers & employees

formulate criteria that relate to the existence

of improved/professional management and

governance structure ;and select well-

functioning cooperatives

coordinate or lead inter and intra local

experience sharing visits, follow-up, assess and

report the implementation and the achievement

b) For Agricultural Cooperatives Support Services

- Trainings

Capacity development trainings will be provided for concerned federal, regional, zonal and Woreda

level cooperative promotion agencies/bureaus/offices/desks experts on the basis of the results of the

training needs assessment to enhance the achievement of AGP 2 cooperative sub component

interventions. The need assessment will look at the capacity of the institutions to properly address

gender equality issues related to their responsibilities.

The major implementers of this intervention will be FCA, Regional and zonal cooperative promotion

agencies. FCA will be especially responsible for conducting training needs assessment, developing

164

curriculum and training modules and provision of TOTs. The trainings for the Federal Cooperative

Agency trainees will be outsourced to public universities with cooperative and relevant departments.

To implement the CB the activities lasted on table below will be conducted.

– Local Experience Sharing Visits

Local experience sharing visits for regional, zonal and Woreda office heads & experts will be

organized and implemented. The lead implementers of these specific activities will be Federal,

Regional and Zonal cooperative promotion agencies. The specific activities implemented under the

local experience sharing visits are shown on table below.

– Consultative Forums or Platforms

Consultative forums or platforms will be organized and implemented through conducting the

following major activities-:

– develop and approve relevant themes for the consultative forums or platforms,

– prepare papers by resource persons on the themes,

– select and invite relevant stakeholders,

– Conduct the consultative forums or platforms

– Take notes of the discussion, recommendations for further use.

– Distribute the notes and decisions for all stakeholders for implementation.

– Follow up the implementation and compile for continuous functioning of the forum.

– Exchange feedback and review implementation.

The lead implementer of this intervention will be Federal Cooperative Agency in collaboration with

MOA pertinent directorates, regional cooperative promotion agencies and its stakeholders.

– Bi annual monitoring and evaluation review meeting

FCA will organize bi annual monitoring and evaluation review meeting with the regional cooperative

promotion agencies from AGP targeted regions every six months annually during the whole AGP

period. The specific activities are indicated on table below.

Summary Table 5.5.4.2.D (b) Main activity , Outputs and Institutions Responsible

Sub-component 4.2: Support to Farmers’ Organizations

Sub-sub component 4.2.4: Capacity Development:- I. Human resource capacity development,

(b). For Agricultural Cooperatives Support services

Lead Organization: FCA

Main partners: Regional, Zonal, Woreda Cooperative Promotion Offices

Supporting implementing organizations: ATA

Main Activities:

For Trainings

conduct training needs assessment, develop curriculum, training modules, carry out the trainings

follow-up, assess and report the implementation and the achievement of the training program

For Exposure Visits

formulate criteria that relate to effective and efficient service delivery of regional, Zonal and

Woreda offices and their performance,

select regional, Zonal and Woreda offices ‘on the basis of criteria and field observation

165

coordinate local experience sharing visits,

Follow-up, assess and report the implementation and the achievement of the experience sharing

visit program.

For consultative forums/platforms

Develop and approve relevant themes for the consultative forums or platforms,

Prepare papers on the themes, select and invite relevant stakeholders, run the consultative forums

or platforms

Recommend practical solutions to address critical issues & share responsibilities for

implementation of the recommendations and

exchange feedback and review implementation

For bi-annual monitoring and evaluation review meeting

Prepare annual work plan &budget, prepare progress report, conduct field observation, organize

review meeting, exchange feedback and review implementation and

Develop action plan on corrective actions, if any and share responsibilities for its implantation.

Outputs

1236 Woreda, 310 Zonal, 400 regional and 96 federal cooperative promotion

agencies/bureaus/desks cooperative experts Trained

942 Woreda, 384 Zonal& regional cooperative promotion agencies/bureaus/desks cooperative

heads & experts Shared best practices through the experience share visits

15 Consultative Forums/platforms Held

15 Bi annual monitoring and evaluation review meeting

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Bi-annual review meetings

Gant Chart 5.5.4.2.D (b): Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

I. Human resource capacity development

b). For Agricultural Cooperatives Support

Services

Federal, regional, Zonal & Woreda

cooperative experts training

conduct training needs assessment, develop

curriculum, prepare training modules, carry out

the trainings

follow-up, assess and report the

implementation and the achievement of the

training program

166

Exposure visits for regional, Zonal

&Woreda cooperative heads & experts

formulate criteria and select Cooperatives

promotion agencies with improved service

delivery

Coordinate or lead inter and intra local

experience sharing visits, follow-up, assess and

report the implementation and the

achievements.

Organizing and conducting of consultative

forums or platforms

develop and approve relevant themes for the

consultative forums or platforms

prepare papers on the themes, select and invite

relevant stakeholders, run the consultative

forums or platforms, share responsibilities for

implementation

Exchange feedback and review

implementation

Bi annual monitoring and evaluation review

meeting

prepare annual work plan & budget

prepare progress report, conduct field

observation, organize review meeting ,

exchange feedback and review implementation

Develop action plan on corrective actions, if

any and share responsibilities for its

implantation.

5.5.4.3 Sub-Component 4.3: Support Agribusiness Development (US$40.7M)

The main objective of this sub-component is to increase small scale farmer market access, market

efficiency, and value adding products and services along selected VCs. AGP II support to markets

and agribusiness will be largely implemented at the national, regional and business level along the

selected commodity value chains. The activities will target 17 high growth potential commodities

including important staple crops and livestock with potential for new or improved domestic, regional

or international market linkages. The activities are expected to result in an increase in the value and

volume of (domestic or export) sales of the key (selected) value chain commodities targeted by the

project. The activities implemented includes technical assistance to cooperatives and market buyers

(including processors and exporters), linkages between VC participants, including from importing

167

markets (such as participation in trade shows); competitive matching grants etc.The value chain

commodities are selected using similar criteria as that of AGP I listed below:-

– Importance of potential marketable production and nutritional benefits;

– Number of farmers (women, men) involved in producing this commodity;

– Capacity to increase household profitability (increased value addition potential and revenue

growth);

– Potential to increase productivity/production in a sustainable manner (i.e., including

involvement of or potential for private sector) and reduce production risk;

– Potential for labour absorption in the value chain;

– Potential for direct and indirect positive effects in neighbouring Woredas.

– Selection of nutrient dense crops, animals and animal products for local consumption as well

as export

The final selection will also take notice of the following issues:- a balance between commodities (e.g.,

a mix of rain fed and irrigated commodities, crops and livestock, staple and cash commodities, or a

mix of durable and perishable commodities); availability of input supply for the commodity; gender

implications; ownership and commitment of the value chain actors’ (particularly private sector) to

allocate time and resources; fit with AGP Woreda level plans; potential for all AGP regions; and

capacity to respond to the needs and opportunities. Thus, VC commodities selected for AGP 2

intervention are indicated in the following table.

Table 24: Selected Value chain Products

No. Product Category Description of value chain

products

1. Cereals Teff, Wheat, Maize, Barley and

Sorghum

2. Pulses Chickpea, Faba Bean,

3. Oil crops Sesame

4. Stimulants Coffee

5. Vegetables Tomato, Potato and Onion

6. Fruits Banana and Mango,

7. Dairy products Milk

8. Meat/ live animals Poultry, Cattle, Shoats

9. Other products Hides and Skin

Honey

This sub component has several activities implemented by various institutions. The major activities

and their implementation arrangements are indicated as under (to be confirmed through the USAID-

parallel financing design process):

168

A. Support to the Coordination of Value Chain Actors

To implement this activity, VC actors will be identified; common challenges, problems and their

current capacity will be assessed. Thus based on the result of the assessment multiple stakeholders plat

form including women VC actors will be established and strengthened at federal level and regional

level. Activities to be conducted at both level of implementation (federal and regional) would include

the following:

– Identification and selection of MSP actors at federal and regional level

– Collection of basic data about MSP actors identified at federal and regional level

– Preparation of the MSP programming, regulations and plan of work,

– Establishment of national and regional MSP and facilitating committee

– Implementation of the MSP meeting decisions related to contractual, delivery of quality

product and market information issues,

– Follow up on decision of the MSP, and

– Technical and managerial assistance to the committee

The lead implementers of the intervention will be MoT and FCA, and involves other VC actors as

collaborators.

Summary Table: 5.5. 4.3. A: Main activities, out puts and Institutions Responsible

Sub-component 4.3: Support Agribusiness Development

Sub-sub component 4.3.1. Support to the Coordination of Value Chain Actors Inputs

Responsible Organization/Department:

Lead Organization: Ministry of Trade and Federal Cooperative Agency( FCA) , USAID

Main partners :, RBOT, RMCB/RCA, BOA , MoA Directorates

Supporting implementing bodies: ATA , chamber of commerce

Main Activities:

Identification and selection of MSP actors at federal and regional level

Collection of basic data about MSP actors identified at federal and regional level

Preparation of the MSP programming, regulations and plan of work,

Establishment of national and regional MSP and facilitating committee

Implementation of the MSP meeting decisions related to contractual, delivery of quality

product and market information issues,

Follow up on decision of the MSP, and provision of technical and managerial assistance.

Outputs

About 16 MSP actors based on VC (8 at federal and 8 at regional level) identified and

selected.

Basic data of the selected VC actors at federal and regional level collected.

Program, regulations and plan of work for MSP Prepared

MSP facilitating committee of national and regional Established

MSP meeting Implemented once every year at federal and regional level

Technical and managerial assistance provided to the MSP committee

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

169

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart 5.5 .4.3.A Main activities and Implementation Schedule

Activity

Implementation schedule

Y 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Identification and selection of MSP actors at

federal and regional level

Collection of basic data about MSP actors

identified at federal and regional level

Preparation of the MSP programming,

regulations and plan of work,

Establishment and conduct of national and

regional MSP and facilitating committee

Implementation of the MSP meeting

Follow up and provision of technical and

managerial assistance to MSP committee

B. Technical Support to Strengthen Competitive Agribusiness Actors

Agribusiness actors, which are competitive in the commodities identified, are to be supported in

different value addition, market linkage, Capacity development, trade shows & fair trade and other

business management and financial linkage to different macro and micro finance institutions. The

following intervention areas are supported to strengthen the agribusiness actors:-

(i) Facilitate Linkages Among Agribusiness Associations, Farmers, Cooperatives and Small

Business Groups

Agribusiness associations are expected to improve its outreach and service by supporting the

establishment of farmers and cooperatives at lower levels in different parts of the country, providing

training of trainers with proper recognition using a standard manual and curriculum, and providing

coaching and backstopping service to producers. The support will be provision of technical support

through Capacity development on developing viable business ideas and plans; and linking them to

financial institutions. Specific activities include but are not limited to-

– facilitating harmonized sharing of responsibilities and internalization among agribusiness

associations, and

– Facilitate linkages among agribusiness associations, male and female farmers, cooperatives

and small business groups, women entrepreneurs including CIGs

– providing support and follow up with respect to joint planning and implementation for

addressing critical sector issues

170

– Promote and strengthen existing women agribusiness association (women agribusiness

cooperatives, women entrepreneurs etc)

Summary Table 5.5.4.3.B(i): Main activities, out puts and Institutions Responsible

Sub-component 4.3: Support Agribusiness Development

Sub-sub component 4.3.2. Technical Support to Strengthen Competitive Agribusiness Actors

i) Facilitate Linkages Among Agribusiness Associations, Farmers, Cooperatives and Small

Business Groups

Responsible Organization/Department:

Lead Organization: Ministry of Trade (MoT) and Federal Cooperative Agency( FCA) ,

Main partners :RBoT, RBoA, RCPA, MoA Directorates

Supporting implementing organizations :- WCYA at all level

Main Activities:

Facilitate harmonized sharing of responsibilities and internalization among agribusiness associations

through establishing MoU.

Facilitate linkages among agribusiness associations, male and female farmers, cooperatives and

small business groups, women and youth entrepreneurs including CIGs.

Providing support and follow up with respect to joint planning and implementation

Promote and strengthen existing women and youth agribusiness association (women and youth

agribusiness cooperatives, women and youth entrepreneurs etc)

promote contract farming and out grower schemes Subscribe Market information

Outputs

Shared of responsibilities and internalization among agribusiness associations facilitated and

harmonized

Linkages among agribusiness associations, male and female farmers, cooperatives and small

business groups and women entrepreneurs including CIGs Facilitated.

Joint planning and implementation support and follow up Provided

Existing women agribusiness association (women agribusiness cooperatives, women entrepreneurs

etc) Promoted and strengthened.

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart 5.5.4.3.B (i): Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Facilitating harmonized sharing of responsibilities

and internalization among agribusiness associations

171

Facilitate linkages among agribusiness

associations, CIGs, farmers, cooperatives and

small business groups, women and youth

entrepreneurs.

Providing support and follow up with respect to joint

planning and implementation

Promote and strengthen existing women and youth

agribusiness association

Promote contract farming and out grower

schemes

Subscribe Market information

(ii) Support Quality, Traceability and Certification of Crops and Livestock

The support aims at establishment of a certification system that will help small scale farmers receive

premium prices for their products, access local, regional and international markets, protect natural

resources and support local economies. Specific activities are shown on the table under.

Summary Table 5.5.4.3.B (ii): Main activities, out puts and Institutions Responsible

Sub-component 4.3: Support Agribusiness Development

Sub-sub component 4.3.2 Technical Support to Strengthen Competitive Agribusiness Actors

ii) Support Quality, Traceability and Certification of Crops and Livestock

Responsible Organization/Department

Lead Organization: MoT, MoA , FCA

Main partners: RBoT, RBoA, RCA Supporting implementing bodies:

Main Activities:

• Provide technical support to value chain actors on implementing GAP, HACCP, ISO, and other

food safety and quality standards

• Provide technical support for identification of potential national and regional testing and

certification center • Support establishment of national and/or regional centers on certification including premium

certifications, e.g. organic, fair trade

• Provide support for the facilitation of the centers to make them fully operational (equipping with

necessary hard and soft ware, setting of standards, bench marks and operational guidelines).

• Support training for Skill development of the staffs on quality, traceability and certification and

international operational standards.

• Provide support in identifying required certificates, establish standards, procedures and regulations.

• Create Public awareness on economic and social benefits of commodity traceability and

certification both in the local and international markets.

Outputs

• Technical support to value chain actors on implementing GAP, HACCP, ISO, and other food safety

and quality standards provided

• Identification of potential national/regional centers identified.

172

• National and/or Regional centers on certification including premium certifications, e.g. organic, fair

trade established

• Centers equipped with necessary hard and soft ware materials and becomes fully operational

• Training on quality, traceability and certification and international operational standards provided

for the staffs.

• Support provided in identifying required certificates, establishing standards, procedures and

regulations.

• Public awareness on economic and social benefits of commodity traceability and certification (both

in the local and international markets) created.

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart :5.5.4.3.B (ii) Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y

4

Y

5

1 2 3 4 1 2 3 4

Support Quality, Traceability and Certification of

Crops and Livestock

• Provide technical support to value chain actors on

implementing GAP, HACCP, ISO, and other food

safety and quality standards

• Provide technical support for identification of

potential national and regional testing and

certification center.

• Support establishment of national and/or regional

centers on certification including premium

certifications, e.g. organic, fair trade

• Provide support for the facilitation of the centers to

make them fully operational (equipping with necessary

hard and soft ware, setting of standards, bench marks

and operational guidelines).

• Support training for Skill development of the staffs on

quality, traceability and certification and international

operational standards.

• Provide support in identifying required certificates,

establish standards, procedures and regulations.

• Create Public awareness on economic and social

benefits of commodity traceability and certification

both in the local and international markets.

173

(iii)Support through Innovation Competitive Grant and Demonstration Fund

The project will support the implementation of matching grant mechanisms aiming to unleash

innovation and investment. Matching grant mechanisms could include Innovation Competitive Grant

and Demonstration Fund. Specific attention will be given to women owned enterprises benefit from

the innovation grant. This activity will be implemented within the parallel project financed by the

AGP - AVC Project, a manual or guidelines for the implementation and administration of the grants

will be prepared by the AGP-AVC Project and the AGP2 jointly.

Innovation competitive grant: - The focus of the innovation fund is to support enterprises in the

selected value chains based on innovative activities taken by the enterprises. The support will focus

primarily on technology acquisition and transfer, identification of new markets and their segments,

and associated business support and services. Support, primarily will be provided to private sector on

a on a cost-sharing basis and demand-driven basis, on the following broad categories:

– Technology acquisition and transfer, including agricultural, processing, and marketing

equipment, productivity techniques, plant/animal improvements

– Support on identification of new markets and market segments, through improved access to

information, research and studies

– Capacity development through BDS such as business management and development, best

business practices, product promotion, and acquisition of technical and market information

Demonstration Fund: - is to support direct procurement of proven productivity enhancing

technology/ies or prototypes of broad public value, with potential to address gaps in the value chains.

In cases where private entrepreneur is a beneficiary of the Demonstration Fund, they should provide

two forms of contribution: (i) cost sharing; and (ii) written agreement that their premises may be used

under AGP as a demonstration and training venue for the technology. The Fund may finance the

following types of activities:

– Identification of technology

– Demonstration of technology

– Promotion

Summary Table 5.5.4.3 B(iii) : Main activities, out puts and Institutions Responsible

Sub-component 4.3: Support Agribusiness Development

Sub-sub component 4.3.2. Technical Support to Strengthen Competitive Agribusiness Actors

iii) Support through Innovation Competitive Grant and Demonstration Fund

Responsible Organization/Department

Lead Organization: MoT, MoA, FCA ,AGP –AVC (USAID)

Main partners: RBoT, RBoA, RCA Supporting implementing bodies: ATA

Main Activities:

Preparation of manual or guidelines for the implementation and administration of the grant(s);

Implementation of matching according to the guidelines.

174

Technology acquisition and transfer, including agricultural, processing, and marketing equipment,

productivity techniques, plant/animal improvements

Support on identification of new markets and market segments, through improved access to

information, research and studies

Capacity development through BDS such as business management and development, best business

practices, product promotion, and acquisition of technical and market information

Identification , demonstration and promotion of technologies

Outputs

Technology on agricultural production, processing, and marketing equipment, productivity

techniques, and plant/animal improvements attained and transferred.

New markets and market segments identified

Capacity development on business management and development provided through BDS.

New Technologies identified , demonstrated and Promoted

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports

Field verification by project personnel

Joint Review and Implementation Support (JRIS) Mission

Gant Chart 5.5.4.3 B(iii) Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y4 Y 5

1 2 3 4 1 2 3 4

Preparation of guidelines

Technology acquisition and transfer

Support on identification of new markets and

market segments, through improved access to

information, research and studies.

Capacity development through BDS.

Identification, demonstration and promotion of

technologies

(iv) Support Domestic Trade Fairs and Participation in International Trade Fairs and

Promotional Campaigns: - The focus of this activity will be carried out to ensure visibility and

facilitate necessary market linkages for cooperatives with local as well as international buyers. These

activities will include: (a) support to Domestic trade fair, and (b) support to International trade fair and

exhibition.

a. Support to Domestic Trade Show and Exhibition

The FCA and regional cooperative promotion agencies will help organize domestic trade shows and

exhibitions at regional and national level. Seven domestic trade show and exhibition will be arranged

annually at national and regional levels during the program period. To this end the FCA and regional

175

cooperative promotion agencies will be the lead implementers together with zonal and Woreda

cooperative promotion offices/desks to undertake the following specific activities.

Summary Table 5.5.4.3.B (iv a): Main activities, out puts and Institutions Responsible

Sub-component 4.3: Support Agribusiness Development

Sub-sub component 4.3.2: Technical Support to Strengthen Competitive Agribusiness Actor IV. Support Domestic Trade Fairs and Participation in International Trade show and

Promotional Campaign

a) Support to Domestic trade show and exhibition

Responsible Organization/Department

Lead Organization: MoT, MoA, FCA ,USAID

Main partners: RBoT, RBoA, RCA

Supporting implementing bodies: ATA

Main Activities:

organize domestic trade show and exhibition

Specific Activities:

• Identify and select appropriate place/venue where the cooperatives , private agric- business actors and the buyers can easily come together, communicate and create linkage

Select cooperatives with reliable and higher volume of tradable agricultural produce but whose

produce is not well promoted by buyers

Coordinate and facilitate trade show and exhibition

Promote the produces with appropriate promotional methods

Monitor the effectiveness of the domestic trade show and exhibition

Outputs

• 35 Domestic trade fair and exhibition conducted

Monitoring, Reporting and Evaluation Arrangements.

Progress reports

review meetings

Gant Chart 5.5.4.3.B (iv a) Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

IV. Support Domestic and Participation in

International Trade Fairs

a. Support to Domestic trade fair

Identify and select appropriate place/venue where

the cooperatives and the buyers can easily come

together, communicate and create linkage

Select cooperatives with reliable and higher volume

of tradable agricultural produce but whose produce

is not well promoted by buyers

Coordinate and facilitate trade show and exhibition

Promote the produces with appropriate promotional

methods

176

Monitor the effectiveness of the domestic trade

show and exhibition

b. Support to International trade show and exhibition.

Some agricultural cooperatives that can involve in export markets lack exposure and experiences to

penetrate international markets. To address this issue, the program will support the participation of

agricultural cooperatives unions in two international trade shows and exhibitions to be organized each

year. This will provide the opportunity to agricultural cooperatives to promote their produces, get

feedbacks and create market linkages. To this effect, Federal Cooperative Agency in collaboration

with Ministry of Trade and Ministry Foreign Affairs will handle the international trade shows and

exhibitions intervention. The following specific activities will be implemented to accomplish this

intervention.

Identify and select outlet market where the cooperatives and the international buyers or importers

can easily come together, communicate and create linkage

– Develop selection criteria for participating cooperative union and primary agricultural

cooperatives

– Select cooperatives based on the criteria developed

– Coordinate and facilitate participation on the international trade show and exhibition

– Promote the exportable crops with appropriate promotional methods

– Monitor the effectiveness of the international trade show and exhibition

The lead implementer is Federal Cooperative Agency with regional, zonal and Woreda cooperative

promotion organs in collaboration with Ministry of Trade and Ministry of Foreign Affairs.

Table: 5.5.4.3.B (iv b): Main activities, out puts and Institutions Responsible

Sub-component 4.3: Support Agribusiness Development

Sub-sub component 4.3.2: Technical Support to Strengthen Competitive Agribusiness Actors

IV. Support Domestic Trade Fairs and Participation in International Trade Fairs and Promotional

Campaigns b) Support to International trade show and exhibition

Responsible Organization/Department:

Lead Organization; MoT, FCA

Main partners: RBoT, RCP

Supporting implementing organizations: ATA, MoFA

Main Activities:

Identify and select outlet market where the cooperatives and the international buyers or importers

can easily come together, communicate and create linkage

Select cooperatives with reliable and higher volume and quality of exportable agricultural produce

but whose produce is not well promoted by international buyers well

Coordinate and facilitate domestic trade show and exhibition

Promote the exportable crops with appropriate promotional methods

Monitor the effectiveness of the international trade show and exhibition

Outputs

10 International trade fair and exhibition facilitated/organized for participating agricultural

cooperatives

177

Monitoring, Reporting and Evaluation Arrangements.

Progress reports

review meetings

Gant Chart: 5.5.4.3.B (iv b) Main activities and Implementation Schedule

Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

b. Support to International trade fair and

exhibition

Identify and select outlet market where the

cooperatives and the international buyers or

importers can easily come together, communicate

and create linkage

Select cooperatives with reliable and higher

volume and quality of exportable agricultural

produce.

Coordinate and facilitate the trade show and

exhibition

Promote the exportable crops with appropriate

promotional methods

Monitor the effectiveness of the international trade

show and exhibition

5.5.4.4 Sub Component 4.4: Support Market Infrastructure Development and Management

(US$52.3 M)

The objective of the sub component is to improve market access through development of market

infrastructure and management. The major activities conducted under the sub component will be

Constructing and Modernizing Management of Market Centers, Construction of Warehouses

Infrastructure, Development of small bridges and development of Market Information Systems (MIS).

A. Constructing and Modernizing Management of Market Centers

Interventions under this activity include construction of market centers, market shades, collection and

processing centers for animal products as well as provision of technical support to promote effective

use and management of market centers. For the management of the various markets, management

committees will be established through involving the community and the nearby administration as per

the guideline/ for the establishment of Market Center Management Committee (MCMC). For the

utilization of the market shades and collection centers for animal products priority will be given to

women and youth groups organized based on the guideline for CIGs establishment to give the

opportunity of engaging them in the processing of the animal products (milk and Honey) for value

addition and increased income. Business oriented skill training to members will be provided on

processing, packaging, and management of packed products.

178

Though details will be shown on the market development manual the selection criteria for the targeted

market places include, among others: (a) high potential to enhance productivity and value addition;

(b) provide at least one weekly market day; (c) availability of land for construction of market

infrastructure and willingness of the community to undertake construction; (d) adequate supply of

marketable agricultural products ( cereals, vegetables and fruits); and (e) willingness of the

municipality (if any) to contribute in terms of cash, labour and/or local materials. For the

establishment of the various market centers the following specific activities shown on the table below

will be conducted:-

The lead implementer of these interventions will be MoT and main partners are various pertinent

directorates of the MoA, RBoT, RCP, and RBoA. The regional and zonal construction design, control

authorities for the overall management of the construction. The construction works will be carried out

by outsourcing to public enterprises or private contractors.

Summary Table 5.5.4.4.A: Main activities, out puts and Institutions Responsible

Sub-component 4.4: Support Market Infrastructure Development and Management

Sub-sub component: 4.4.1 Support Constructing and Modernizing Management of Market Centers

Responsible Organization/Department:

Lead organization: MoT,

Main partners: Regional, Zonal &Woreda Trade offices

Supporting implementing organizations: Municipality, Regional & zonal design and control offices

Main Activities:

Mobilizing community and conduct awareness creation

Reach consensus on market center construction arrangement with the community (cost sharing)

Selection of market place based on the selection criteria

Establishment of Market Center Management Committee

Training of MCMC on market infrastructure management and marketing

Prepare the design & specification/bill of quantity

Specific Site selection for construction along with MCMC

Notify the bid and award contract

Handover the site to the contractor and undertake the construction

Supervise the construction and make payments

Carry out the 1st and final handover of the constructed market center/ shade/collection center

Official transfer/handover of the constructed market center/ shade/collection Center to the MCMC and

community

Outputs

Awareness creation and mobilization of community conducted

Consensus on market center construction arrangement (cost sharing) reached with the community (cost

sharing)

Market place selected based on the selection criteria

Market Center Management Committee established

179

Training of Market Center Management Committee on market infrastructure management and marketing

Conducted

Design & specification/bill of quantity prepared

Specific Site selection for construction along with MCMC conducted

Announcement for bid, selection of contractor and awarding of contract conducted

The site for construction handed over to the contractor and construction started

Construction supervision conducted and payments made

1st and final handover of the constructed market center/ shade/collection center conducted

Official transfer/handover of the constructed market center/ shade/collection center to the MCMC and

community conducted

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Bi-annual review meetings

Gant Chart: 5.5. 4.4. A: Main activities & Implementation Schedule Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Support Constructing and Modernizing Management of

Market Centers

Mobilizing community and conduct awareness creation

Reach consensus on market center construction

arrangement with the community (cost sharing)

Selection of market place based on the selection criteria

Establishment of Market Center Management Committee

Training of Market Center Management Committee on

market infrastructure management and marketing

Prepare the design & specification/bill of quantity

Specific Site selection for construction along with MCMC

Notify the bid , select contractor and award contract

Handover the site to the contractor and undertake the

construction

Supervise the construction and make payments

Carry out the 1st and final handover of the constructed

market center/ shade/collection center

Official transfer/handover of the constructed market

center/ shade/collection center to the MCMC and

community conducted

180

B. Support Construction of Warehouses Infrastructure

The construction of the warehouses will be implemented in the first two years the program. The

specific activities for the warehouses construction are listed on the table below. The FCA will be the

lead institution to implement these activities in collaboration with MOA & MOUC concerned

directorates, RCP and RBoA, regional and zonal design and construction and control authorities for

the overall management of the construction. The construction works will be carried out by outsourcing

to public enterprises or private contractors.

Summary Table 5.4.4.4.B: Main activities, out puts and Institutions Responsible

Sub-component 4.4: Support Market Infrastructure Development and Management

Sub-sub component: 4.4.2 Support Construction of Warehouses Infrastructure

Responsible Organization/Department:

Lead organization : FCA

Main partners: MoA, Regional and zonal MOUC, Regional, Zonal and Woreda Cooperative

Promotion offices

Supporting implementing organizations: ATA

Main Activities:

Prepare the design & specification/bill of quantity

Prepare selection criteria for site/cooperative

Select the site/cooperatives

Reach consensus on warehouses construction arrangement(cost sharing)

Notify the bid and award contract

Handover the site to the contractor and undertake the construction

Supervise the construction and make payments

Undertake the 1st handover of the constructed warehouses between contractor and FCA

Conduct the final handover of the constructed warehouses between contractor and FCA

Transfer/handover officially the constructed warehouses to the primary cooperative and /or

cooperative union.

Training provided to the cooperatives on warehouse handling and management

Outputs

Design & specification/bill of quantity prepared

Site selection criteria prepared and site selected

consensus reached with cooperative on warehouses construction arrangement(cost sharing)

Bid announcement, selection of contractor and awarding of contract conducted

The site for construction handed over to the contractor and construction started

Supervise the construction supervision conducted and payments made

The 1st and final handover of the constructed warehouse undertaken between contractor and FCA

The constructed warehouses officially transferred/handed over to primary cooperatives and

cooperative unions conducted.

Training provided to the cooperatives on warehouse handling and management

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

181

Bi-annual review meetings

Gant Chart: 5.5.4.4.B:Main activities & Implementation Schedule Activity

Implementation schedule

Year 1 year 2 Y

3

Y 4 Y 5

1 2 3 4 1 2 3 4

Support Construction of Warehouses Infrastructure

prepare the design & specification/bill of quantity

Prepare selection criteria for site/cooperative

Select the site/cooperatives

Reach consensus on warehouses construction

arrangement(cost sharing)

Notify the bid and award contract

Handover the site to the contractor and undertake

the construction

Supervise the construction and make payments

Carry out the 1st handover of the constructed

warehouses between contractor and FCA

Conduct the final handover of the constructed

warehouses between contractor and FCA

Official transfer/handover of the constructed

warehouses to the primary cooperative and /or

cooperative union.

Provided Training to the cooperatives on

warehouse handling and management

C. Development of Small Bridges

Under the AGP 2 support to construction of two standard widths of small bridge is proposed:

1.2 m for pedestrians, bicycles, livestock, pack animals, wheelbarrows, handcarts, and

motorcycles for suspension bridges, and

2.5m to include occasional light motorized vehicles for RCC Bridge.

The MoA will be the lead institution to implement these activities in collaboration with RBoA and

WoA and the construction works will be carried out by outsourcing to public enterprises or private

contractors.

Summary Table: 5.5.4.4.C: Main activities, out puts and Institutions Responsible

Sub-component 4.4: Support Market Infrastructure Development and Management

Sub-sub component: 4.4.3 Development of small bridges

Responsible Organization/Department:

Lead organization: MoA/FPCU

Main partners: Regional, Zonal &Woreda Agricultural Offices

Supporting implementing organizations:

182

Main Activities:

Mobilizing community and conduct awareness creation

Selection of areas for small bridge construction

Reach consensus on Small Bridges construction arrangement with the community (cost sharing)

Establishment of Small Bridge Management Committee (SBMC)

Training of Management Committee on bridge infrastructure management and maintenance

Prepare the design & specification/bill of quantity

Notify the bid and award contract

Handover the site to the contractor and undertake construction

Supervise the construction and make payments

undertake the 1st and final handover of the constructed bridge

Official transfer/handover of the constructed small bridge to the community

Outputs

Awareness creation and mobilization of community conducted

small bridge construction area Selected

Consensus on small bridge construction arrangement (cost sharing) reached with the community (cost

sharing)

Small Bridge Management Committee (SBMC) established

Training of Management Committee on bridge infrastructure management and maintenance

Conducted

Design & specification/bill of quantity prepared

Announcement for bid, selection of contractor and awarding of contract conducted

The site for construction handed over to the contractor and construction started

Construction supervision conducted and payments made

1st and final handover of the constructed bridge conducted

Official transfer/handover of the constructed small bridge to the SBMC and community conducted

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Bi-annual review meetings

Gant Chart: 5.5.4.4.C: Main activities & Implementation Schedule Activity

Implementation schedule

Year 1 Y 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Development of small bridges

Mobilizing community and conduct awareness

creation

Selection of areas for small bridge construction

Reach consensus on Small Bridges construction

arrangement with the community (cost sharing)

183

Establishment of Small Bridge Management

Committee (SBMC)

Training of Management Committee on bridge

infrastructure management and maintenance

Prepare the design & specification/bill of quantity

Notify the bid and award contract

Handover the site to the contractor and undertake

construction

Supervise the construction and make payments

undertake the 1st and final handover of the

constructed bridge

Official transfer/handover of the constructed small

bridge to the community

D. Support the development of Market Information Systems

The market information system will be established to serve the VC activities for all types of crop and

livestock commodities selected in the previous four regions. The program will support the specific

activities listed on the table below.

Summary Table: 5.5.4.4.D: Main activities, out puts and Institutions Responsible

Sub-component 4.4: Support Market Infrastructure Development and Management

Sub-sub component: 4.4.4 :Support the development of Market Information Systems

Responsible Organization/Department:

Lead organization: MoT/FCA

Main partners: Regional, Zonal &Woreda, Trade Bureaus /Offices /Desks , RCP office

Supporting implementing organizations: ATA

Main Activities:

Support diagnostic study of existing market information status, ownership, efficiency and gaps. This

would also include review of capacities and gaps of institutions that are engaged in collection and

dissemination of market information,

Establishing national and local market information systems which includes price forecasting, market

actor information etc,

Providing technical support to design, test and implement market information system that will serve

all market actors particularly SHF.

Promoting awareness on benefits and application of market information system including prices and

trends, market outlets, demand situation, buyers preferences and timing

Strengthen existing regional market information centers

Capacity development for implementing agencies Outputs

Diagnostic study of existing market information status, ownership, efficiency and gaps

conducted

National and local market information systems which includes price forecasting, market actor

information Established

184

Technical support to design, test and implement market information system Provided

Awareness on benefits and application of market information system including prices and trends,

market outlets, demand situation, buyers preferences and timing Promoted

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Field verification by project personnel

Bi-annual review meetings

Gant Chart: 5.5.4.4.D: Main activities & Implementation Schedule Activity

Implementation schedule

Year 1 year 2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Support the development of Market Information

Systems

Supporting diagnostic study of existing market

information status

Establishing national and local market information

systems which includes price forecasting

Providing technical support to design

Promoting awareness on benefits and application of

market information system including prices and trends

Strengthen existing regional market information

centers

Capacity development for implementing agencies

5.5.5 COMPONENT 5 : PROGRAM MANAGEMENT ,M & E AND LEARNING

(US$62.8M)

5.5.5.1 Sub Component 5.1 Program Management and Institutional Arrangements

(US$37.4 Million)

This sub component will deal with the overall program management and coordination through a

decentralized management system and ensuring integrated and coordinated implementation among all

program components and between different stakeholders at the federal, regional, Woreda and

Community levels. The purpose of this component is to properly manage resources and implement the

activities in accordance with the program objectives and procedures.

Key activities includes

overall program planning, over sighting

ensure quality control systems by forming program steering committees at all level

provision of technical assistance, training, office equipment and vehicles

strengthening procurement and financial management capacity at all levels

Coordination of AGP 2 activities will be undertaken through a high level Steering Committee,

Technical Committee and Program Coordination Units that are established/strengthened at, the

185

federal, regional and Woreda levels which has been discussed under Institutional Arrangement topic

above under Article number 3.

Summary Table: 5.5.5.1: Main activities, out puts and Institutions Responsible

Sub-component : 5.1Program coordination /management

Responsible Organization/Department:

Lead Organization:- FPCU,

Main partners :- FSC, Federal Implementing Institutions, Federal TC, RPCU, RTC, W Focal person

, WTC

Supporting implementing organizations: S.N. Major Activities Out put

a Strengthen/establish SC and TC

1 Steering committee meeting

Federal level 10 Federal SC meeting conducted

Region level 80 regional SC meeting conducted

Woreda level 9420 Woreda SC meeting conducted

2 Technical committee meeting

Federal level TC/once in month 60Federal TC meeting conducted

Regional level TC/once in month 480 regional TC meeting conducted

Zonal level TC/once in month 700 Zonal TC meeting conducted

Woreda level TC/twice a month 1800 Woreda TC meeting conducted

b. Planning

Prepare five year program plan through CLPP 1 Five year program plan prepared

Prepare Annual physical and budget plan through

community consultation

5 annual program plan prepared

Major Activities Out put

Prepare annual procurement plan 5 annual procurement plan prepared

c Program sanitization and awareness creation

workshop

Federal 1 federal sanitization workshop conducted

Region 8 regional sanitization workshop conducted

Woreda 157 Woredas

d. Implementation follow up (mobile team)

Federal Mobil team 20 federal supervision conducted

Regional Mobil team 160 regional supervision conducted

Zonal Mobil team

Woreda Mobil team 628 Woreda supervision conducted

e Provision of physical inputs

Vehicles station wagon 10 station wagon vehicles procured

Vehicles double cabin 82 double cabin vehicles procured

186

Sub-component : 5.1Program coordination /management

Responsible Organization/Department:

Lead Organization:- FPCU,

Main partners :- FSC, Federal Implementing Institutions, Federal TC, RPCU, RTC, W Focal person

, WTC

Supporting implementing organizations: S.N. Major Activities Out put

Office furniture (computer, LCD, Photocopy,…..) 77 Program office equipped

f. Staff salary ,PF and Other benefits

Salary and other benefits paid for staffs Staffs paid their monthly pay

g Capacity development and HRD and management

Training on program financial management and

procurement guideline(FPCU,RPCU and Woreda)

1705 staffs trained on FM and Procurement

Training on new finance soft ware 500 staffs trained financial soft war

Training on RBME and program MIS 1023 staffs trained on M and E

Training on ESMF / safeguard (FPCU Woreda) 10476 staffs trained on ESMF

Training on ESMF/Safeguard for kebele 10,000 staffs trained on ESMF

Training Communication and facilitation skill 1426 staffs trained on communication

Experience sharing program/study tour / 12 PC and 28 M &E officers participated

h Update program implementation manuals (CLPP,

Finance, Procurement, M and E, safeguard )

program implementation manuals

updated

i CLPP (refresher and awareness) creation training

Federal 148 federal staffs trained on CLPP

Regional 996 regional staffs trained on CLPP

Woreda

30,000 staffs trained on CLPP

Gant Chart 5.5.5.1. Main activities and Implementation Schedule

Major Activities

Time frame for implementation

Year –one Year-two Year-

three

Year-four Year-five 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

5

.

1

Program coordination

/management

a Strengthen/establish SC and

TC

1

Steering committee meeting

Federal level x x x x x X x x x x

187

Major Activities

Time frame for implementation

Year –one Year-two Year-

three

Year-four Year-five 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Region level . x x x x x X x x x x

Woreda level x x x x x x x x x x x X x x x x x x x x

2

Technical committee meeting

Federal level TC/once in month x x x x x x x x x x x X x x x x x x x x

Regional level TC/once in

month

x x x x x x x x x x x X x x x x x x x x

Zonal level TC/once in month x x x x x x x x x x x X x x x x x x x x

Woreda level TC/twice a month x x x x x x x x x x x X x x x x x x x x

b

.

Planning

Prepare five year program plan

through CLPP

x

Prepare Annual physical and

budget plan through community

consultation

x x x X X

Prepare annual procurement

plan

x x x X x

c Program sanitization and

awareness creation workshop

Federal x x

Region x x

Woreda x x

d

.

Implementation follow up

(mobile team)

Federal Mobil team x x x x x x x x x x x X x x x x x x x x

Regional Mobil team x x x x x x x x x x x X x x x x x x x x

Zonal Mobil team x x x x x x x x x x x X x x x x x x x x

Woreda Mobil team x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

X

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

e Provision of physical inputs

Vehicles station wagon x x x x

Vehicles double cabin x x x x

Office furniture (computer,

LCD,Photocopy,…..)

x x x x

f

.

Staff salary ,PF and Other

benefits

188

Major Activities

Time frame for implementation

Year –one Year-two Year-

three

Year-four Year-five 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Salary and other benefits paid

for staffs

x x x x x x x x x x x X x x x x x x x x

g Capacity development and

HRD and management

Training on program financial

management and procurement

guideline(FPCU,RPCU and

Woreda)

X X X

Training on new finance soft war x x

Training on RBME and program

MIS

X X X

Training on ESMF / safeguard

(FPCUWoreda)

X Training on ESMF/Safegured

(keble level

x Training Communication and

facilitation skill

X X

Experience sharing

program/study tour

x x x x x

h Update program

implementation manuals

X

i CLPP (refresher and

awareness) creation training

Federal x x

Regional x x

Woreda x x

5.5.5.2 Sub Component 5.2 Monitoring and Evaluation (US$11.4Million)

The main objective of the Monitoring Evaluation and Learning System of AGP is to Support

information gathering and analysis for the program management and other stakeholders on the quality

of program implementation to facilitate appropriate and timely program decisions, institutionalize a

learning mechanism and set up social accountability mechanism, assess the outcomes and impact of

the program toward its objectives. Detail description of this sub component is given under article 5.5

and the main activities to be performed during the program period are as shown on the table below.

The lead implementing institutions are the FPCU in collaboration with the various implementing

institution.

Summary Table: 5.5.5.2: Main activities, out puts and Institutions Responsible

Sub-component :- 5.2 Monitoring and Evaluation

189

Lead Organization:- FPCU, Federal IA

Main partners:- FTC,RPCU, RTC, Woreda focal person, WTC, KDC,DAs

Supporting implementing organizations:- FSC,RSC,WSC

Budget Allocated: US$

s.n Major Activities Out put

a Monitoring input output and out comes (monitoring

mission )

Federal level 3320 Program implementation monitoring report

collected (20 federal,160 regional and 3140

Woreda)

Region level

Woreda level

Monitoring ,auditing ESMF 4020 ESMF monitoring report collected

Conduct ESPR federal 5 federal level ESPR collected

Conduct ESPR regional 40 regional level ESPR collected

Program indicator progress monitoring 10 report collected on program indicators

Financial audit

Federal level Internal audit (annual) 5 federal level internal audit report collected

Federal external audit (annual) 5 federal level external audit report collected

Regional level internal (annual) 40 regional level internal audit report collected

Technical support on program MIS and data quality 20 technical support report collected

b Evaluation of outcome and impact

Conduct Program baseline survey 1 program base line report collected (external)

Conduct program Midterm evaluation 1 program midterm report collected (external

Conduct program terminal evaluation 1 program terminal report collected(external)

Conduct evaluation on selected thematic areas

(gender/environment / infrastructure)

11 assessment report collected on program

thematic areas (internal assessment)

Prepare Program Implementation Compilation

Report (PICR)

2 program implementation compilation report

collected (internal )

c Participatory M& E ,social accountability and

internal learning

Training on internal learning ,knowledge

management and dissemination

2046 staffs trained on internal learning

Training on basic M&E tools and

methodologies(abroad)

16 (4 coordinators and 12 M&E ) participated on

M and E training

Organize community learning forum 40,490 report collected on community forum

Conduct success history on program activities to

enhance internal learning (FTC,CIG’s …)

60 success history report produced on selected

areas

190

Gant Chart: 5.5.5.2: Main activities and Implementation Schedule

Major Activities

Time frame for implementation

Year –one Year-two Year-three Year-four Year-five

5.2. Monitoring and Evaluation

a Monitoring input output and out

comes(monitoring mission)

Federal level x x x x x x x x x x x x X x x X x x x x

Region level x x x x x x x x x x x x X x x X x x x x

Woreda level x x x x x x x x x x x x X x x X x x x x

Monitoring ,auditing ESMF X X X X X X X X X X

Conduct ESPR federal X X X X X

Conduct ESPR regional X X X X X

Program indicator progress monitoring x x x x x x x X x x

Financial audit

Federal level Internal audit (annual) X X X X

Federal external audit (annual) X X X X

Regional level internal (annual) X X X X

Technical support on program MIS and data

quality

x x x X x

b Evaluation of outcome and impact

Conduct Program baseline survey x

Conduct program Midterm evaluation x

Conduct program terminal evaluation x

Conduct evaluation on selected thematic areas

(gender/environment / infrastructure)

x x x X x

Prepare Program Implementation Compilation

Report (PICR)

x x

191

Major Activities

Time frame for implementation

Year –one Year-two Year-three Year-four Year-five

c Participatory M& E ,social accountability

and internal learning

Training on internal learning, knowledge

management and dissemination

X X X X

Training on basic M&E tools and

methodologies(abroad)for M & E team

X X

Organize community learning forum (1/keble

annually)

x x x x x

Conduct success history on program activities to

enhance internal learning (FTC,CIG’s …)

x x x x x x x X x x

192

5.5.5.3 Sub Component 5.3 Capacity Development (US$14.0million)

Mainstreaming of gender, nutrition and climate smart practices within agriculture is a critical aspect

in recognition of their substantial contribution to agriculture development. In addition to the various

specific Capacity development activities of cross cutting issues being mainstreamed in all AGP 2

components, this intervention will support implementation of the following activities.

Awareness creation forum and training on gender, nutrition and climate smart agriculture

at all levels to officials of program implementing agencies as well as to decision makers at

federal, regional and Woreda level will be conducted.

Development of printed material: leaflets, posters and documentary films on gender,

nutrition and climate smart agriculture will be developed and distributed.

Human Resource Development: to upgrade the skill of experts at all level ToT training on

gender analysis, gender and youth responsive planning, nutrition, climate smart agriculture,

etc will be given by federal relevant directorates’ experts and cascaded to regional, zonal,

woreda and kebele level.

Training and mainstreaming tools: training tools will be reviewed, revised and developed to

ensure the standards of training on cross cutting issues are adhered to. In addition existing

mainstreaming guidelines (for example the gender mainstreaming) will be revised based on

the findings of the gender analysis (AGPI) to include additional components and issues

included in the project areas.

Mobile support team- will be established to make sure there is constant follow up and support

to established groups of women, focused on monitoring and supporting nutrition related issues.

It will also provide support to TC members, IA in actual implementation if need be.

Revitalize GE taskforce-The gender equality taskforce will be revitalized with proper ToR

and composition which includes the gender expert of all IAs as well as parallel projects to

provide strategic support to the technical committee as well as the PCU

Consultative Meeting: Consultative meeting will be organized and conducted at federal,

regional, zonal and Woreda levels. The respective IAs; i.e., MoA-Women Affairs Directorate (WAD),

Natural Resource Management and Extension Directorate at federal level and their counterpart

institutions at regional, zonal and Woreda level will handle implementation of this activity.

Capacity Development Support Facility (CDSF), which will provide technical support to all

human capacity development, throughout the project in order to (i) improve the quality of capacity

development interventions; and (ii) strengthen the institutional capacity of Implementation Agencies

(IAs). Note that this sub-component would be financed through a parallel financing provided by

Department of Foreign Affairs, Trade and Development of Canada (DFATD)

193

Summary Table 5.5.5.3 Main activities and Outputs

Sub-sub component. Capacity Development

Capacity Development on Cross Cutting Issues

Responsible Organization/Department:

Lead Organization: MOA pertinent Directorate, FCA, WAD

Main partners :- Regional BoA, Zonal and Woreda Office of Agriculture, RCP, RIA, MoH,

RBoH, CASCAPE

Supporting implementing bodies: ATA,

Main Activities:

Awareness creation forum and training on gender, nutrition and climate smart agriculture will

be provided to officials of program implementing agencies as well as to decision makers at all

level.

Development of printed material like leaflets, posters and documentary films on gender,

nutrition and climate smart agriculture

upgrading the skill of experts through ToT training on gender, nutrition and climate smart

agriculture by federal relevant directorate experts will be given to regional experts , and

cascaded to zonal, Woreda and Kebele level

Consultative meeting to assess how cross cutting issues addressed in AGP 2 major and sub

component activities will be organized and conducted at federal, regional, zonal and Woreda

levels.

Training and mainstreaming tools: training tools will be reviewed, revised and developed

to ensure the standards of training on cross cutting issues,

Existing gender mainstreaming guidelines will be revised based on the findings of the gender

analysis (AGPI),

Mobile support team- will be established to make sure there is constant follow up and support

to established groups of women, focused on monitoring and supporting nutrition related issues.

It will also provide support to TC members, IA in actual implementation if need be.

Revitalize GE taskforce-The gender equality taskforce will be revitalized with proper ToR

and composition which includes the gender expert of all IAs as well as parallel projects to

provide strategic support.

Outputs

Awareness creation forum and training on gender, nutrition and climate smart agriculture

provided to officials of program implementing agencies as well as to decision makers at all

level.

Printed material like leaflets, posters and documentary films on gender, nutrition and climate

smart agriculture developed and distributed

ToT training on gender, nutrition and climate smart agriculture provided by federal relevant

directorate experts to regional experts , and cascaded to zonal, Woreda and Kebele level

194

Consultative meeting to assess how cross cutting issues addressed in AGP 2 major and sub

component activities organized and conducted at federal, regional, zonal and Woreda levels

Gender mainstreaming tools reviewed, revised and developed,

Mobile support team established to make sure there is constant follow up and support to

established groups of women, focused on monitoring and supporting nutrition related issues.

GE taskforce revitalized with proper ToR and composition which includes the gender expert

of all IAs as well as parallel projects,

Monitoring, Reporting and Evaluation Arrangements.

Monthly, quarterly and yearly progress reports.

Supportive field supervision reports

Gant Chart: 5.5.5.3:Main activities & Implementation Schedule

Activity

Implementation schedule

Year 1 Y2 Y 3 Y 4 Y 5

1 2 3 4 1 2 3 4

Capacity Development on Cross Cutting Issues

Awareness creation forum and training on

gender, nutrition and climate smart agriculture

will be provided to officials of program

implementing agencies at all level.

Development of printed material like leaflets,

posters and documentary films on gender,

nutrition and climate smart agriculture

Upgrade the skill of experts at all level through

ToT training on gender, nutrition and climate

smart agriculture.

Consultative meeting organized at all levels to

assess how cross cutting issues addressed in AGP

2 major and sub component activities.

Gender mainstreaming tools reviewed,

revised and developed,

Mobile support team established to make sure

there is constant follow up and support to

established groups of women, focused on

monitoring and supporting nutrition related

issues

GE equality taskforce revitalized with proper

ToR and composition which includes the gender

expert of all IAs as well as parallel projects,

195

5.6 MONITORING EVALUATION AND LEARNING

A strong M&E system is critical for effective management of the Agricultural Growth program 2. The

AGP 2 M&E system will build on the existing AGPI system and will have the following

characteristics:

It generates continuously information on progress, some processes, and performance through

the project cycle from design to end of project;

The continuous flow of information generated by the M&E system is useful for project

management at all levels of the project (national, region, woreda, kebele) and external partners;

It validates, analyzes and aggregates data generated at various levels to track progress, assess

if specific targets are met and monitor process quality, outputs, outcomes, program impacts,

and sustainability:

It identifies implementation gaps and challenges for proactive corrective actions as well as

documents and incorporates lessons learned into program implementation.

It includes effective channels of communication from the field to the national level and back

to: (i) inform management decisions and ensure that corrective action are taken if necessary;

(ii) disseminates key lessons from evaluations to project implementers, beneficiaries and

external partners; and (iii) provides access to and displays project key information at all levels

to enhance transparency and accountability.

It supports continuous M&E capacity building of implementers and PCU staff.

It pays particular attention to gender, nutrition and CSA.

A system that establishes an effective M&E system and creates a learning environment is an important

element of the AGP design. The AGP’s M&E activities will: (a) generate information on progress,

processes, and performance; (b) analyze and aggregate data generated at various levels (regions,

woredas, kebeles, and sub-kebeles) to track progress and monitor process quality, program impacts,

and sustainability; and (c) document and disseminate key lessons to users and stakeholders. The

system will ensure that: (a) clear responsibilities and procedures for M&E are established; (b) M&E

capacity building is emphasized from the start and throughout implementation; (c) the M&E system

functions in a timely manner; and (d) data are collected and used starting from a baseline and all

through the implementation processes. The main objective of the Monitoring Evaluation and Learning

System of AGP is to Support information gathering and analysis for the program management and

other stakeholders on the quality of program implementation to facilitate appropriate and timely

program decisions. Institutionalize a learning mechanism and set up social accountability mechanism.

Assess the outcomes and impact of the program toward its objectives.

Key Activities include

196

- Monitoring of input, output, selected outcome and process

- Results Framework indicators baseline data collection and target setting

- Safeguards monitoring

- Implementation Progress Reporting

- Gender

- Preparing Program implementation compilation report to the World Bank (including

Results Framework)

- Evaluation of outcomes and impact

- Gender impact evaluation

Internal learning/knowledge sharing and participatory M&E

The activities are implemented are shown under Component 5.5.5 Sub Component 5.5.5.2

5.6.1 Inputs, Outputs and outcomes Progress Monitoring

A. Regular Monitoring of Program Implementation

Monitoring program implementation performance, including tracking of inputs and outputs, process

and outcome will rely on the M&E system for AGP-I with some refinements. The central objective of

monitoring of inputs/activities and outputs is to ensure that they are delivered in a timely fashion and

that the processes through which the stated objectives are to be realized are in place.

To do this the program will focus on keeping the M &E system simple and interactive allowing regular

reporting and learning by stakeholders at all levels. As part of this program, result chain (theory of

change) will be developed (See M&E Guideline). The result chains help to create clear causal linkages

(between inputs, activities, outputs and outcomes) to simplify program monitoring and planning.

Essentially field supervision and communication through report writing is the methodology to be

employed to monitor program implementation.

Program input-output monitoring will focus to the regular assessment and checking of achieved

outputs vs planned activities prior to reporting to the next level using reporting template (includes

progress in physical activity and financial expenditure). The indicators to be tracked in the input-output

monitoring are more of quantitative. Examples of outputs to be assessed are number of ADPLC’s

established/supported, number of FTC equipped /rehabilitated, SMS ,DA and farmers trained, number

of IWUAS established/strengthened, SSI developed , CIG’s established/strengthened..etc. Monitoring

will also include assessment of AGP 2 implementation processes: technical application audit of the

CLPP, physical audit of small scale investments, approach of trainings provided, study of profitability

and rates of return on investments by CIGs, environmental and social safeguard management, etc

Monitoring of program outcomes will focus on the analysis of implementation progress against stated

annual work plans and budgets and, qualitative information (case studies on thematic areas) will be

collected to track progress towards program intermediate outcome indicators. Especially to monitor

progress toward achieving program intermediate outcome indicators (for list of indicators refer ME

197

guideline) case studies will be conducted on selected thematic areas on annual base. This will conduct

by team of expertise represented from FPCU/RPCU based on the subject selected for study and

mobilized by FPCUM & E specialist. Program implementation monitoring will be conducted at all

level (federal, region, Zone, Woreda and Kebele) by implementing agencies and implementation

progress report will be produced. Though it is conducted, at all level PCUs will take responsibility of

monitoring program implementation and checking progress towards stated objective. Workshop will

be organized on bi-annual base at federal level and regional level to share lesson (obtained on

reporting, field supervision, and studies) and give direction to improve performance. Mobilization of

issues for the workshop will generated focusing on program implementation progress and progress

towards reaching anticipated result. Facilitation is the responsibility of program coordination units.

Joint Review and Implementation Support mission (JRIS) is conducted basically to provide support

to the implementation process. It is partly a kind of progress review mission and considered as part

of the AGP-2 M&E system. JRIS is jointly organized and led by the development partners financing

AGP-2 and the MoA. It will be conducted four times (once in quarter) in a year and the objective will

be to assess what extent the implementation of AGP-2 is being carried out in accordance with AGP-

2 agreements and recommend actions that enhance effectiveness. Implementation mission in the first

quarter and third quarter will come back with technical support and write technical comment to

coordination unit, while the bi-annual and annual JRIS team will expect to write report (aid-memoir)

on progress of program implementation on selected and critical issues to the bank and steering

committee.

Result framework :- The Results Framework will be used to monitor progress towards achieving the

PDO (Annex X). The current targets of the RF indicators are not final, they will be updated once a full

fledge baseline is conducted (for the indicators requiring a baseline) the 1st year of the program. The

indicators of the results framework under the PCU responsibility will be reported regularly and

frequency of reporting on the indicators will be defined in the M&E manual. The indicators to track

progress towards PDO won’t be limited to the RF as additional indicators will be developed in the

M&E manual and other evaluations (quantitative, qualitative, and quality of implementation and

processes) will be conducted (see M&E manual for details). In addition, gender, nutrition and CSA

results will be tracked through a consistent disaggregation across relevant indicators and specific

evaluations.

Safeguards monitoring :- The quality implementation of safeguards has been an issue under AGP1. Therefore,

AGP2 will carry out safeguard monitoring throughout the implementation to ensure that the program brings

intended benefits. It will ensure that potential adverse environmental and social impacts are avoided or

minimized. Safeguard monitoring will include environmental and social performance reviews on a regular basis

to assess compliance with safeguard instruments, determine lessons learnt and provide guidance for improving

future performance. Reporting formats will also include indicators on safeguards.

B. Institutional Roles and responsibilities for M &E

198

Program implementation monitoring and evaluation will take place at all levels (federal; regional;

Woreda; Kebele; and sub-Kebele) by program implementing sectors. The M&E system will allow the

review of the implementation of activities to be reviewed against annual work plans and budgets, and

ensure that corrective measures are quickly implemented.

Federal level

The overall M&E activities will be coordinated at the federal level by a Monitoring and Evaluation

specialist of FPCU in collaboration with M&E officers based at the regional project offices. The

coordination of all M&E activities of the program comprises overseeing data collection, analysis, and

reporting on the implementation and progress of each component and subcomponent of the project.

Monitor program implementation progress through mobilizing program implementation mobile team

at least twice in a year. The mobile team is a team of expertise from different discipline that will give

technical support to check quality and quantity of reported outputs and selected outcomes. The federal

M and E specialist support regions, zones and Woredas M&E staff with regard to M&E requirements,

capacity development and IT equipment’s.

The federal M & E specialists will also conduct planned field assessment in selected program regions,

Woreda and Keble to cross check data on outputs reported. Conduct annual based case studies on

selected thematic areas as important to have qualitative information on intermediate outcome

indicators. Manage and coordinate project evaluations and impact evaluations carried out. The AGP-

CU will submit quarterly report for review by the Steering Committee and World Bank. In addition,

the content of the quarterly M&E reports will be summarized in annual reports whose release will be

timed to coincide with the completion of the financial year.

Regional level

At Regional level, a Monitoring and Evaluation Officer will coordinate M&E for the region ensuring

that M&E data are collected regularly in accordance with agreed upon procedures. Conduct annual

based case studies on selected thematic areas as important to have qualitative information on

intermediate outcome indicators. The M&E Officer will compile and cross-check reports submitted

by zones/Woredas. They will also provide M&E technical assistance and training. It will also conduct

once a year a qualitative analysis of participatory M&E data. The RPCU will submit quarterly report

to FPCU. Participating Organizations includes Bureaus of water resources, Regional Rural Roads,

Regional Marketing Agencies, Soil Fertility Laboratories, Bureaus for Cooperative Promotion, and

others will report quarterly on their activities following the required reporting format to RPCU.

At ZoA, the zonal AGP focal person will manage M&E activities for the pro ject. The Zonal Office

of Agriculture will ensure timely delivery, compile and crosscheck reports submitted by Woreda

Office of Agriculture and Rural Development. They will work closely with WoA. The ZoA will submit

monthly report to AGP-Regional-CU.

• Implementation Agencies (IAs).

EIAR, BoWs, Soil Fertility Laboratories, Bureaus for Cooperative Promotion, and others IAs will

report quarterly on their activities following the required formats to the regional M&E Officers.

199

Woreda level

Monitoring program implementation of output at Woreda level is mainly the responsibility of program

implementing sectors, program focal personal, DA and community representatives. At this level,

monitoring and reporting relays on quantitative information focusing to input, output, and qualitative

information on proxy outcome indicators.

The Woreda level program focal person that is accountable to the WoA will; receive report from

implementing sectors ,DAs; and community and along with the Woreda program implementers

verifies the output reported from DA’s and community. Then, the focal person aggregates verified

outputs information, enters them to the reporting template after obtaining approval from the Woreda

Steering Committee, and submit. Further than this is responsible to cross-check information in the

field, provide M&E technical assistance, training and advice on inputs and outputs reported to DAs,

conduct regular field visits to Kebeles and sub-Kebeles to verify that project activities are being

implemented properly, and also participate as team member of Participatory Monitoring Mission

(PMM).

In this regard, program focal personal employed by WoA and focal person employed by WOFED are

responsible to report (on program physical progress, financial information and procurement

information) on monthly base (to Zonal AGP focal person) and consolidated quarterly report to RPCU.

Kebele

Monitoring program implementation output at Kebele level is mainly the responsibility of DA and

community representatives. Development agents are responsible to collect data on project information

from beneficiaries using required reporting format and submit the reports to their respective

supervisors. They also collect participatory M&E data at FTCs, post social accountability information

on FTCs board and facilitate and train beneficiaries in participatory M&E, this will be used as an

internal learning tool for project staff and beneficiaries and submit data collected on program progress

on bi-weekly base to his close supervisor and WoA and WoFED. Community representatives at

Kebele level are also responsible to participate on participatory M&E and social accountability

activities and provide feedback on project activities.

C. Program implementation completion report (ICR)

Parallel to those evaluation reports (MTR and Program End) program level implementation

compilation report will be prepared, in the third year of program implementation (3 EY) and Program

end (5 EY). The responsibility mainly relay on program coordination units and Woreda office of

Agriculture (program focal person).The report will mainly relay on annual reports collected

(secondary data) and survey (qualitative and quantitative studies) as source of information.

D. Reporting

In AGP 2 though is agreed to limit the complexity of the program M&E system. Reporting on the

program implementation performance is mandatory (is must) and is a formal requirement. Reports

collected from stakeholders are also required to meet the standard and reporting deadline so that it can

be timely consolidated at FPCU and timely distributed. At federal level, the FAGP-2 CU will write

200

call up letter to each implementing sector on quarterly base to collect report and federal level AGP 2

quarterly and annual progress reports will be compiled and submitted to MOA, MOFED and World

Bank.

Though each program implementing partners are expected to produce report on program progress by

focal person. Consolidated program progress report (physical activity and financial) will be prepared

by Woreda focal person, regional and federal PCU’s. Each program Woreda focal person will endorse

official quarterly program progress reports to regional program coordination unit five days letter after

end of each quarter. RPCU’s unit will prepare consolidated official program progress report and

endorse to FPCU on quarter base (within twenty-five days after end of each quarter). FPCU will

consolidate and endorse official program implementation performance report to stakeholders within

forty-five days (EFY) after end of each quarter (refer to reporting and information fellow matrix table

below).

The main functions of quarterly progress reports are to inform implementation progress compared to

planned physical activities and budgets. Mainly bi-annual report will expected to include proxy

information on indicators beside progress information on plan VS achieved output. The annual

program progress report is expected to provide information on the overall progress of the program.

This includes progress towards program intermediate outcome indicators (quantitative and qualitative

progresses) as well as physical progress and expenditure. It also identifies problems, remedial actions

taken; analyze strength and weaknesses, opportunities and threats; and provide strategic direction for

the next planning cycle (next budget year).

The project will use automated excel based reporting formats, which can be completed with simple

software (MIS). This will serve as a major source of information for quarterly and annual reports

submitted. The reporting templates (quarterly) will be prepared by AGP 2 and communicated to all

regions within two months after effectiveness. The template will also be included in the program

monitoring and evaluation manual of AGP 2 and training will provided on the formats.

Addition reporting formats will also use depending on specificity of the program component (See

reporting formats in M&E Guideline). Further than this FPCU will use increased triangulation of data

and methods of analysis combined with monitoring. Provide training as necessary to help address

issues related to data quality as identified by the assessment. Using mixed methods of data collection

(Having information from different angle) and triangulation helps CU’s to produce enriched (annual

and bi-annual) program progress report to the next level. Further than this each program regions

finance and M and E officers will came to FPCU with finalized soft and hard copy of quarterly report

on quarter and discussed in presence of FPCU’ line expert.

Reporting matrix

201

Implementing

agency

Responsible

officer

Information (Data )

Source

Report to Reporting

frequency

Keble

community

/keble DA

DA or Head of

Keble office of

Agriculture

Report from community,

direct observation and

keble record of AGP 2

activities

WOA and or

Woreda focal

person

Monthly (10

days before end

of each month)

Woreda Line

Office

Focal person Direct observation and

Woreda record of AGP 2

activities

WOA and

Woreda focal

person

Monthly (10

days before end

of each month)

Woreda office

off Agriculture

Woreda AGP

2 focal person

Report from (community,

& sector focal person)

AGP 2 record & Direct

observation

Zone AGP 2

focal person

and RAGP 2

CU

Quarterly

(within 5 days

after end of each

quarter)

Regional

Program

coordination

unit

Regional

M&E officer/

specialist

Report from : Woreda

focal person, regional

implementing sector

,RPCU specialists & field

supervision and

assessment) and RAGP 2

records

FAGP 2 CU

and regional

Steering

committee

Quarterly(within

25days after end

of each quarter)

Federal Program

coordination

unit

Federal M&E

officer

/specialist

Report from (RAGP 2

M&E officer, federal

implementing sector,

FPCU specialist,

supervision and

assessment ) FAGP 2

records

PPD,

MOFED, WB

Quarterly(within

45 days after end

of each quarter)

RRCCU RARI-Coo Research centres report

and field observation

Regional

PCU and

EIAR

Quarterly(within

20 days after end

of each quarter

RCCU EIAR-Unit

Coo

RC and RARI report, field

observation

FPCU

202

Figure 8 :-Report flow arrangement

E. Program Management Information System (MIS)

After program, MIS is fully functional in all Woredas, the quarterly performance data is communicated

through the system for easy analysis, aggregation and reporting. PMIS is designed to speed up the

planning and reporting process (harmonized format and standardized budgeting figures), automate data

aggregation at all levels, and facilitates instant visibility from all locations with internet infrastructure.

The tool is used for quarterly reporting at Woreda level by the Woreda focal person with little Capacity

development and technical support from regional coordination unit.

The activity and output level performance information are entered to the MIS separately for each

Woreda covered by AGP 2. Thus, the Woreda level information should be first received from the DAs

or Community Facilitator on monthly basis. The Woreda AGP 2 focal person after summarizing the

verified performance by quarter will enter the data in to the MIS. The focal person is also expected to

prepare brief description on the process of implementation, on the challenges faced and

recommendations for improved performance. The reporting template that will be used by DA or

community facilitator should be similar with the one used in the MIS and will be simple for use.

However continues capacity development training will provided to staffs until the MIS adopted well.

MOFED

DPs (WB) MoA- PPD

Federal AGP implementers

Federal CU

Regional CU

RC RCCU

Regional AGP implementers

Zone FP

RRCCU Woreda Implementers

RC WOA-FP

Keble DA

203

5.6.2 Outcome and Impact Evaluation

Conducting independent surveys (MTR and End year evaluation) by external consulting firm is

another monitoring and evaluation system for AGP 2. In addition to the baseline, two impact

evaluations will be conducted during program life. These are a mid-term impact evaluation. A

midterm evaluation will be conducted in FY3 (household survey and qualitative surveys) and a final

survey and evaluation in FY5 (household survey and qualitative surveys). Key indicators in the

Results Framework and the number of direct planned project beneficiaries will provide the lead in

designing of evaluation (midterm and end of project) questions, data collection and data analysis

methodology used. List of Key indicators that will be monitored and methodology to be used is

explained in the M & E guideline. The purpose of those evaluations is to assess efficiency,

effectiveness, impact and overall AGP 2 coordination. The evaluation team will draw on results from

the internal monitoring system (secondary data) and on other data sources. The team would also

substantiates the information gained from secondary sources by conducting its own observations and

skill with AGP 2 key stakeholders at all level as well as conducting focus group discussions with

beneficiaries including representatives of the communities. The evaluations are also expected to show

the analysis of the cost and benefit aspect of investments.

Those independent surveys will be conducted in collaboration with central statistical authority and

consulting firm that to be executed through competitive bidding and organized by the federal PCU in

consultation with the development partners (World Bank). The data collections for the mid-term and

final impact evaluation will conduct by the Central Statistical Agency (climate smart agriculture),

where the Agency has a focal person to support AGP 2. The independent consulting firm would

develop the survey instrument building on an existing climate smart agriculture instrument such as

the Agricultural Sample Survey (ASS) and the sampling process, as well as to analyze the data and

write the evaluation reports. Both the Mid-term (third year of implementation) and final evaluations

(program end evaluation) will be initiated by the FPCU in consultation with development partners

(World Bank).

In addition, further qualitative surveys will be conducted as required on selected thematic areas. For

example, studies could include studies on the adoption and impact of agricultural technologies

promoted by the program, nutritional impacts in terms of household dietary consumption, profitability

and rates of return on investments by CIGs, and qualitative studies on changes in service delivery

(extension, animal health, plant health, soil health).

A rigorous impact evaluation of gender innovations under AGP2 and other complementary initiatives

for scale up in the latter years of the project will be carried out. The impact evaluation will help

determine whether pre-identified constraints limiting the project beneficiaries' and in particular

women's ability to realize their agricultural and commercial potential were effectively improved by

the project's activities/innovations. Thematic areas for the study will be determined based on list of

intermediate outcome indicators that need qualitative studies.

204

Those assessments will conduct at the outset of each fiscal year. The finding reports also reported to

steering committee, incorporate to MTR, and end project evaluation report. Those complementing

thematic assessment will be conducted either by team of expertise from FPCU or by outsourcing to

independent firms through competitive bidding. Both approaches are expected to use both primary

(qualitative and quantitative) and secondary information. Though the design and methodology that

will used to conduct those assessments will relay on information needs to track those intermediate

outcome indicators primary information’s will be collected by preparing questioner and taking sample

areas for study for selected issues (this will elaborated on M &E guideline) .

Base Line Data Development

In AGP 2, results will be measured as indicators of the Results Framework (see M & E guideline).

The end of program evaluation of AGP-I will serve as the preliminary baseline. However, a more

comprehensive baseline survey is planned for the first year of AGP 2 to capture new elements of the

program design. The baseline survey will be conducted before launching of AGP 2 or it can be

conducted within the first year of AGP 2 implementation. To conduct the survey sample Woreda will

select in the way that it represent current futures of all program Woredas (157 Woreda).

Data collection for the study is the mandate of central statistical authority but the firm that is

responsible for data analysis will be selected through competitive bidding. Independent consulting

firm would develop survey instrument building on AGP-1 experience, to analyse the data and write

the evaluation reports

The specific objective of the baseline serve is to collect preliminary information on the results

framework indicators (output, intermediate outcome, outcome and proxy) to quantify the baseline,

establish target values for mid-term, and project end-evaluation. Information on indicators in the RFW

includes:

– accessibility of farmers to public agricultural service,

– different types of technologies demonstrated and adoption of improved agricultural

technologies,

– types of technologies under research,

– estimating productivity of land by types of crop category (cereals ,pulse ,oil seed ,vegetables,

fruits and stimulant ) and livestock product,

– proportion of crop and livestock product sold and sources of household incomes, assessing

infrastructures such as water supply,

– micro and small scale irrigation, marketing canters, etc.

Thus, the results of the baseline surveys will expect to provide comprehensive socio-economic and

demographic information of the program area.(refer to M and E guide line)

5.6.3 Participatory M&E and Internal Learning

A. Participatory M &E

Participatory M &E is a monitoring instrument that allows participation of key stakeholders in the

progress assessment process. It is important because the regular output monitoring and reporting via

205

the reporting template does not yield adequate information on the quality and use of outputs and may

not adequately involve relevant stakeholders and communities on program progress monitoring. Thus,

the objective is to assess the quantity and quality of reported outputs and selected outcomes and share

lesson. It also ensures that farmer groups/beneficiaries are self-assessing the progress towards their

objective that set for themselves. To do this PM&E mission team will:

– Organize participatory monitoring and evaluation mission team (PM&EM). The team will be

representation of members from Woreda technical committee members, community

representatives (Men, Women and Youth), Kebele leaders (including the DA) and other

development partners working in the Woreda. The team should be established in each program

Woreda. The Woreda level PM&E team members will be led and supported by the zonal

Program focal person or other technical expert assigned from the Zone. National and regional

program monitoring and evaluation specialist will participate in a rotational manner

among Woreda. In PM&E mission, the primary stakeholders (community) are not only the

information sources but also they became joint users of information.

– Train PM&E team members at all levels and familiarized with the PM techniques, methods,

formats and indicators to be measured.

– Expert observation, measurement and focus Group discussions (FGD) will be the basic

methodology used.

Trained PM&E mission team in each Woreda will carry out two PM&E mission annually (in

December and June). During PM&E mission, selected outcome indicators such as ‘increase in per cent

of households adopted and applied new technologies demonstrated in the target Kebele (FTC),

households adopting new technologies after participating in training, AI and/or animal health service,

CIG’s and member of Irrigation water user associations (benefiting from micro irrigation schemes

developed by the program) will monitored. Households (disaggregated by gender) visited will be sex

disaggregated. Questions, tools and methodologies will be tailored to household type, cultural setting,

and level of understanding

– The selection of representative Keble administration to be visited will be done by the PM&E

team in each Woreda. The Keble should be selected based on balanced, representative samples

of well performing, medium performing and poor performing Kebeles. The number of Keble to

be selected should be from 3-7 during each PM mission based on the number of Kebeles in the

Woreda. The Woreda program focal person is expected to advise the team during the Kebele

selection process. The decision to include or exclude Kebele where PM&E mission already took

place is left up to the Woreda PM&E team. The sampling should be done in a way that each Keble

is covered by PM&E mission at least every two years.

This would provide a learning and feedback mechanism to allow adaptation of the project design as

necessary, especially in early stages. Information collected from participatory M&E will be kept at

FTCs and the Regional AGP M&E Officer will compile and submitted to Federal program

coordination unit as part of annual program progress report. The FPCU will compile and document

information/finding from participatory monitoring and evaluation and share across regions for lesson.

206

B. Internal learning

AGP2 will promote internal learning by organizing community learning in combination with the

annual CLPP exercise, during which farmers will discuss results achieved, progress on intended

objectives and implementation problems and/or best practices following simple visual formats.

Community learning fora would be organized annually by the Kebeles manager and supported by

trained community facilitators. It will include cross-farmer monitoring (farmers monitor other

farmers’ activities/sub-projects) so as to take advantage of the opportunities that this provides for

learning from each other. Knowledge sharing is necessary for the Program as a whole and to ensure

that beneficiaries learn from other beneficiaries’ experiences and best practices. To do this:--

Identify lesson to learn from (that to be shared) from Program implementation: Stocktaking,

finding of case studies, findings of M&E and other relevant thematic studies undertaken within

the Program will be used as source of information.

Consolidate identified lessons, best practices, success histories…...

Develop communication approach to share lesson to majority /community.

The communication approach that will be selected will focus on its importance to improving

knowledge and understanding (awareness), improving understanding of areas of challenges, good

practice and lessons learned of the AGP1 shared and improve program accountability and transparency

through effective communication of beneficiaries’ rights and responsibilities. Thus in AGP1 as

approach to communicate:

Workshops will organize at national and regional level once a year.

Community learning fora would be organized annually by the Kebeles manager and supported

by trained community facilitators including cross farmers monitoring (post on FTC…).

Pamphlet, brochures, banners and other will be developed through facilitation of program

coordination units.

Those documents will produce on bi-annual base and distributed to program stakeholders. The

responsibility of knowledge sharing is the responsibility of program coordination unit officer and

M&E officers and capacity building officers.

6. SOCIAL AND ENVIRONMENTAL MANAGEMENT ISSUES

The Environmental Category assigned to AGP 2 is Category B, predicated on the fact that

environmental risks and social impacts may be minimal, manageable and, in most cases, reversible.

The proposed operation will largely impact positively on the biophysical environments since it will

support land management (improvement of soil and water as well as watersheds). The Program has

triggered eight World Bank safeguard policies, namely: Environmental Assessment (OP/BP 4.01),

related to possible risks associated with the biophysical attributes of the environment; Pest

Management (OP/BP 4.09), predicated on the possibility of agrochemical application and disposal;

Physical Cultural Resources (OP/BP 4.11), because “chance finds” seem likely; Involuntary

207

Resettlement (OP/BP 4.12), predicated on the assumption that the subprograms are likely to result in

land take, loss of income and sources of livelihood; OP/BP 4.10, because potential impacts on

vulnerable and historically underserved people; Safety of Dams (OP/BP 4.37), because although

construction of dams above 15 meters will not be funded, AGP 2 will finance check dams or small

dams or finance activities that may rely on the performance of existing larger dams; and Programs on

International Waterways (OP/BP 7.50); because although impacts are deemed unlikely, in view of the

small amounts of water abstraction for small scale irrigation purposes, AGP 2 has informed riparian

countries in accordance with OP/BP 7.50. Natural Habitats OP/BP 4.04, because some of the program

intervention areas may include natural habitats.

Environment: AGP 2 will finance activities such as ground water development, small-scale irrigation

schemes, construction of footbridges, establishment of product storage facilities and large-scale

adoption of innovative agricultural and livestock productivity-enhancing approaches. Likely

environmental risks may be associated with pre-construction, construction/rehabilitation and operation

of storage facilities, use and disposal of agrochemicals, inappropriate use of groundwater resources

(through over-use, agrochemical seepage, etc.) could result in aquifer depletion and contamination,

affecting water quantity and quality in neighbouring communities and downstream. An ESMF has

been formulated that describes in broad terms how potential program related environmental risks and

impacts associated with all the World Bank safeguard policies would be mitigated and addressed

before and during implementation of program activities. In addition, it describes the institutional

responsibilities, capacities, financial resources and monitoring needs essential to implement mitigation

measures.

Social: The program is anticipated social impacts have triggered OP4.12 and OP4.10 and in line with

the Bank's safeguard policies, this program has to put in place mitigation mechanisms acceptable to

the World Bank to mitigate these impacts. For impact on land use and structure, a RPF, has been

prepared, consulted upon and disclosed to address any potential impacts, which is expected to be site

specific and minor.

The Bank’s OP4.10 is triggered, based on the screening conducted by the World Bank and reinforced

by the constitution of Ethiopia, which indicates that the target population identify themselves as having

the characteristics defined under OP4.10. Therefore, SA was conducted to complement the RPF.

Specially, access to and use of common or natural resources need to be safeguarded in a process of

"free, prior and informed consultation". Consultations have taken place between all those traditionally

inhabiting an area with those external people who made agricultural investments in the area. As was

done in AGP-I, the program will set up at the Kebele level, grievance redressing mechanism and issues

related to the implementation of sub-programs that affect private and community properties will be

incorporated in participatory subprogram planning guidelines and set up screening criteria in the in

the program ESM Guideline (Annex). Substantial numbers of community level sacred and ritual sites

of religious and cultural importance, (sacred trees, springs, rivers, ritual sites, etc.) have been identified

by SA in all target locations, thereby triggering OP4.11 Physical Cultural Resources. Implementation

of AGP 2's sub-components in the area of small irrigation schemes, water reservoir and dam

208

excavation and rural roads construction may likely affect physical cultural resources. A set of

procedures for ensuring that these resources are considered in the designing process of AGP 2 sub-

programs is part of the ESMF. Mandatory measures are detailed once a PCR safeguard is triggered

during a sub program screening process.

7. PROGRAM FINANCIAL MANAGEMENT

7.1 Program Costs and Financing Plan

The total cost of the project is estimated at US$581.8 million including beneficiaries’ contribution.

This would be financed through an IDA allocation, joint and parallel co-financing from DPs and

beneficiaries’ contributions. This excludes the contribution from the Government of Ethiopia through

the exemption of taxes and duties on vehicles and equipment, the participation of its staff in program

coordination and implementation, and operating costs of road, market and other infrastructures.

Out of the total US$581.8 million, US$350 million is expected to be provided through a combination

of grants and loans from IDA. The rest will be from joint and parallel co-financing from DPs: Canada

Department of Foreign Affairs, Trade and Development (DFATD), USAID, the Netherlands, the

European Commission (EC), Spanish Agency for International Development (AECID); and Italy

International Development Cooperation.

7.2 Allocation of AGP 2 Resource

The resources for the activities that would be implemented by regional and Woreda-level would be

allocated based on recent projected population census by Central Statistics Agency (Climate Smart

Agriculture). Specifically, the allocation to each of the seven AGP national regional states and one

city administration would be proportional to the share of their population. Subsequently, the notional

allocation by Woreda within a region would be proportional to its population share among all AGP

Woredas within the region. The financial allocation to EIAR and RARI will be based on the research

projects related to national agricultural development priority agenda and activity volume as well as

activities on the selected value chain commodities.

Thematically, the program fund is allocated for the various components based on the priority given

and extent of activities within the intervention areas. Based on this the highest percentage is

allocated for component III (Small-Scale Irrigation Development and Management)followed by

component I (Increasing Agricultural production and productivity) which is 34.56 % and 21.10%

respectively. Detail allocation of program cost by Component and Sub Component is shown on

Table 25 below.

209

Table 25:AGP 2 Program cost by component and sub component

Component Component and sub components US $

1 PUBLIC AGRICULTURAL SUPPORT SERVICES 129.0

1.1 Institutional Strengthening and Development 74.0

1.2 Scaling up of best practices

55.0

2 AGRICULTURAL RESEARCH

51.4

2.1 Support to Agricultural Technology Adaptation and Generation 16.3

2.2 Support to Pre-extension Demonstration and Participatory Research

Schemes

5.5

2.3 Support to Source Technology Production 6.8

2.4 Support to capacity development to enhance technology adaptation,

generation, maintenance and promotion 22.7

3 SMALLHOLDER IRRIGATIONDEVELOPMENT

218.6

3.1 Small-scale Irrigation Infrastructure Development and Improvement 211.0

3.2 Integrated Crop and Water Management (ICWM) 7.6

4 AGRICULTURAL MARKETING AND VALUE CHAINs

DEVELOPMENT

120.0

4.1 Support Agricultural Input Supply System 6.0

4.2 Support to Farmers’ Organizations

21.0

4.3 Support Agribusiness Development 40.7

4.4 Support Market Infrastructure Development and Management 52.3

5 PROGRAM MANAGEMENT, MONITORING, EVALUATION AND

LEARNING 62.8

5.1 Program management and institutional arrangements 37.4

5.2 Monitoring and Evaluation (M&E) 11.4

5.3 Capacity Development 14.0 Total project cost 581.8

7.3 Financial Management (FM)

AGP will have its own financial management manual which dePISTs the budgeting, accounting, and

internal control, fund flow, financial reporting etc of the program.

7.3.1 Budget preparation

The program will follow the government’s budget system35, recorded in the government’s budget

manual. The budget preparation process of the project both in the regional and Woreda levels will be

clearly defined and participatory that enhances commitment of the various stakeholders. The budget

35The Ethiopian budget system is complex, reflecting the fiscal decentralization structure. Budget is processed at federal, regional, zonal

(in some regions), Woreda and municipality levels. The budget preparation procedure and steps are recorded in the government’s

budget manual. The budgets are reviewed at first by MoFED then by the Council of Ministers. The final recommended draft budget is

sent to parliament around early June and expected to be cleared at the latest by the end of the fiscal year.

210

preparation process generally follows the physical plan and budget processes indicated above under

chapter 4 sections 4.3 of the PIM. Budget preparation will continue to start from the Woreda level.

The Kebele plan will be prepared and submitted the Woreda Technical Committee. The Woreda

Technical Committee reviews the plan submitted by each Kebele for consistency and prioritization.

Plans reviewed by the Technical Committee of the Woreda will then be submitted to the WSC for

approval. Once approved by the WSC, it is submitted to region for review, approval and consolidation.

Each regional BoA reviews the budgets submitted by the Woredas, BoW and other IAs for consistency

with the program objectives and components and prepare a consolidated annual work plan and budget

of the region by incorporating its own plan and having it approved by the RSC for submission to MoA.

RCCU at EIAR will be responsible for reviewing and consolidating of the annual work plan and budget

for the research component from all EIAR and RARI centres and get it agreed between EIAR and

RARIs and submit to FPCU for final consolidation. FPCU consolidates the budget it received form

regions, incorporates its own plan as well as that of the research component received from RCCU and

prepares one final annual budget and work plan for the project. FPCU has a responsibility to ensure

that the budget prepared are realistic and in line with the development objectives of the project. The

AWP&B will be prepared as per the physical plan stated. The detailed financial manual is prepared

for implementation as a separate stand alone document.

7.3.2 Fund flow arrangements

The FM arrangements for AGP -II, follow the government’s Channel 2 fund flow mechanism whereby

funds from donors flow directly to the sector ministry, in this case MoA, and are overseen by the same

Ministry. Funds flow into the project and within the project among various institutions is depicted in

the Figure below. IDA funds and other DPs funds will be deposited in to a separate designated account

to be opened at the National Bank of Ethiopia (NBE). The authorized ceiling of the Designated

Account would be two quarters forecasted expenditure based on the approved annual work plan and

budget. Funds from the various separate accounts will be further transferred in to pooled Birr account

to be held by MoA. From the pooled local-currency account, MoA will transfer funds to separate local-

currency accounts to be opened by EIAR and the regions. EIAR will transfer the funds to the RARI.

One cash forecast for the program will be used which will be consolidated at MoA after getting the

relevant input from EIAR and the other implementers.

Each of the BoAs existing Woreda finance offices and regional implementing institutions will open

separate bank accounts for the program to ensure that expenditures of the new phase are reported in

their appropriate period. BoAs will transfer funds to Woredas and regional implementers. All the new

Woredas under the program will open separate local-currency accounts to receive funds from their

respective regions. The fund flow to each implementing entity will be made according to its respective

annual work plan and budget. Any implementing entity that does not report in a timely manner on how

the advance is expended will not receive additional funds until the initial advance is reasonably settled.

The FM manual will indicate in detail the fund flow to each tier of implementing entity. MoU will be

signed with other service deliver entities such as Central Statistics Agency and ATA on a need basis.

211

7.3.3 Accounting system

MoA, BoAs and Woredas use the government’s accounting system IBEX for recording and reporting

on government fund whereas EIAR uses the in house developed FM system. A standalone IBEX

system will be developed for the project and rolled out to regions and Woredas as well as other IAs.

Intensive training will be provided for all implementers on IBEX. However, until the system is up and

running, the project will continue to use Peachtree accounting software.

7.3.4 Internal control

Given the significant resource that the project will have, based on the risk assessments to be conducted

by the internal audit units, the internal audit department of MoA, EIAR, RARIs and BoAs will include

in their work plans activities of the AGP -II to ensure that internal control aspects of the project are

strengthened. MoA will increase the staff complement of internal audit department within one year of

the projects effectiveness. Reports of project activities produced by internal audit will be shared with

senior officials of the ministry for their action.

7.3.5 Financial reporting

The project will prepare quarterly consolidated unaudited Interim Financial Report (IFR). These will

be submitted to the World Bank (DPs) within 60 days of the end of the quarter. A common single IFR

will be used for all the finances of the program by all DPs. In the quarterly IFR, MoA will ensure that

advances received as well as documentation of expenditure for each financier are separately identified

and reflected. At a minimum, the report will include (i) a statement of sources and uses of funds and

opening and closing balances for the quarter and cumulative;(ii) a statement of uses of fund that shows

actual expenditures, appropriately classified by main project activities (categories, components, and

sub-components), actual versus budget comparisons for the quarter and cumulative will also be

included;(iii) a statement on movements (inflows and outflows) of the project Designated Account,

including opening and closing balances, expenditure forecast for the next two quarters together with

the cash requirement and notes and explanations, other supporting schedules and documents.

7.3.6 Action Plan to Mitigate Financial Management Risk

In order to mitigate the risks associated with high turnover and a shortage of qualified accountants and

auditors, delays in reporting, limited focus of internal audit, and delay in submission of quarterly

reports and Statement of Expenditures (SoEs), the federal and regional PCUs will be staffed with

competent FM specialists, who will furthermore be trained by the project. Similarly, the Woreda will

be staffed with accountants who will be responsible for overseeing the financial transactions and

related reporting requirements of the project. In general mitigating measures are shown on the FM

manual under action plan to reduce the risk of the project once implemented and applied during project

implementation.

212

Figure 9: Fund flow arrangement

IDA

Separate US$ Designated Account at

NBE

Pooled Birr account at MoA

BoAs (RPCU)

DPs

prepares

WoFEDs

RCPAs, BoWR and LSA

Other DPs

RARI

FUND FLOW REPORTING

ZoFED

Separate Foreign currency Account at NBE

EIAR FCA

WoA

ZoA

213

8 PROCUREMENT PROCEDURES AND MANAGEMENT

Overview

Implementation of projects means the process of turning a project into real outputs. This needs the

procurement of works, goods and services. A procurement manual shall be prepared and intended to

provide guidelines with which to administer the procurement of works, goods, services and trainings.

The manual shall also provide guidelines, which recipients use in handling procurement. As the AGP

program is designed, the procurement activities are decentralized. As a result, many procuring entities

will be involved. The AGP-CU procurement staffs will be handling procurement of larger value items

whose nature would also require technical expertise. Larger value procurements are one that is to be

procured through International Competitive Bid (ICB).

There are three main stages in project procurement management:

(i) Procurement Planning: The purpose of procurement planning is for the Procuring Entity to

schedule its procurement activities in advance. It should be consistent with its approved budget

and its target date of implementation including list of procurement of works, goods, and

services to be procured under the program yearly with estimated cost and method of

procurement shall be detailed in appropriate formats for each budget year.

(ii) Procurement Implementation: Procurement means preparation of bids, advertising,

evaluation and selecting a contractor, a service provider or a supplier, and making a clear

agreement about what the contractor, service provider or supplier will do, when they will do

it, what the price will be, and what other conditions apply. The result of the procurement

process will be a contract document signed by the procuring entity, and the contractor or

service provider or supplier.

(iii)Contract Management: After the procurement process is complete, the contractor or service

provider must implement the contract. The Procuring Entity will be responsible to monitor

implementation of the contract, to solve any problems that occur during implementation and

to approve payments to the contractor. These activities continue until the end of the

maintenance period, for a works contract, or until the services have been provided and all

payments made, for a service.

Procurement Policy: The aim of procurement is to obtain right quality of works, goods and services

at reasonable and competitive prices, giving equal opportunities to all individuals, companies, firms,

manufacturers, contractors, who are capable of delivering the goods, works and non-consulting and

consultancy services to the laid down specifications, standards and provisions of bid documents. The

AGP 2 Procurement Policy is also intended to provide incentive and encouragement for development

of national manufacturers, contractors, institutions and consultancy firms, etc. The procurement policy

is based on the following principles:

Economy and efficiency in the implementation of program

214

Economy and efficiency in the procurement of goods, works and services involved

Equal opportunity to all eligible bidders in providing goods works and services by providing

timely and adequate notification of bid documents

To encourage development of domestic contracting and manufacture industries and consulting

firms

Importance of transparency in the procurement process

8.1 Purpose of Procurement Guidelines

The Purpose of this “Procurement Guideline” is to provide a comprehensive guidance of and

introduce applicable Bank procurement procedures for works, goods and services by explaining the

policies and procedures of World Bank as given in the Guidelines, Legal Agreement and Standard

Bidding Documents (SBDs). The Bank Guideline gives the various steps involved in the procurement

process, the documentation required, and guidelines for preparation of the bidding document, bid

evaluation report and other documents along with model formats, formats for submitting various

reports to be compiled, maintained, and submitted in compliance of the legal agreement provisions.

Details of review procedures and risk mitigation measures including checks and controls required to

maintain transparency in the process of procurement of goods, works and services will have been

adequately covered in the Procurement Manual. It will ensure that the procurement process,

documentation, is uniform, systematic and will help avoid Procurement delays.

8.2 Procurement Environment

For Federal budgetary bodies, the Public Procurement and Property Administration Proclamation No.

649/2009 regulate public procurement. The Proclamation establishes the Federal Public Procurement

and Property Administration Agency, which is responsible for regulation and monitoring of Federal

public procurement activities. The nine Regional States and two City Administrations do have their

own procurement proclamations and directives that are drafted using the Federal procurement

proclamation as prototype.

The Ethiopia 2010 Country Procurement Assessment Review (CPAR) identified weaknesses in the

country’s procurement system and recommended actions to address these areas. The government has

implemented many of the CPAR recommendations, but challenges remain in the areas of:

coordination of procurement reforms, shortage of qualified procurement staff, high level of staff

turnover, lack of proper institutional structures for procurement management, weak institutional

capacity, absence of systematic procurement performance M&E, and lack of organized effort in

Capacity development in the area of procurement. All such weaknesses identified in the 2010 CPAR

are prevalent in the FPCUof MOA, the focal organization for the implementation of AGP 2, as well

as the sub-national IAs including the regional bureaus of agriculture, water, livestock agencies,

cooperatives development agencies, zones and Woredas, as well as federal agencies such as the

Ethiopian Institute of Agricultural Research.

8.3 Scope and Applicable Procurement Guidelines

Procurement for AGP 2 will be carried out in accordance with the World Bank’s "Guidelines:

215

Procurement under IBRD Loans and IDA Credits" dated January 2011 (Revised July 2014)

Selection and Employment of Consultants by World Bank Borrowers, dated January 2011

(Revised July 2014)

Preventing and Combating Fraud and Corruption in Programs Financed by IBRD Loans and

IDA Credits and Grants, (the Anti-Corruption Guidelines), dated October 15, 2006 and revised

in January 2011 and the provisions stipulated in the Legal Agreement

For each contract to be financed, the different procurement methods or consultant selection methods,

the need for prequalification, estimated costs, prior review requirements, and period are agreed

between the Government and the Bank in the Procurement Plan. The Procurement Plan will be updated

at least annually or as required to reflect the actual program implementation needs and improvements

in institutional capacity.

Bank’s Standard Bidding Documents (SBDs) will be used for procurement of works, and goods under

International Competitive Bidding (ICB); and the Standard Request for Proposals will be used for

consultants’ contracts. In addition, the implementing agency will use Standard Bid Evaluation Form

for procurement of goods and works for ICB contracts, and Sample Form of Evaluation Report for

Selection of Consultants.

The Bank has reviewed the SBDs issued by the Federal Public Procurement and Property

Administration Agency (FPPA) and has found them acceptable with some modifications. National

SBDs FPPA could be used for procurement of goods, works and non-consulting services under

National Competitive Bidding (NCB) procedures subject to the exceptions indicated below.

Alternatively, the Bank’s SBDs would be used for NCB with appropriate modifications.

Generally, NCB shall follow the Open and Competitive Bidding procedure set forth in the Ethiopian

Federal Government and Procurement and Property Administration Proclamation No. 649/2009 and

Federal Public Procurement Directive issued by the MoFED dated June 10, 2010, provided that such

procedure shall be subject to the provisions of Section I and Paragraphs 3.3 and 3.4 of the “Guidelines

for Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits

& Grants by World Bank Borrowers” (January 2011) (the “Procurement Guidelines”) and with due

attention to the following additional provisions:

a) The Recipient’s SBDs for procurement of goods and works acceptable to the Association shall

be used. At the request of the Recipient, the introduction of requirements for bidders to sign

an Anti-Bribery pledge and/or statement of undertaking to observe Ethiopian Law against

fraud and corruption and other forms that ought to be completed and signed by him/her may

be included in bidding documents if the arrangements governing such undertakings are

acceptable to the Association.

b) If pre-qualification is used, the Association’s standard prequalification document shall be used.

c) No margin of preference shall be granted in bid evaluation on the basis of bidder’s nationality,

origin of goods or services, and/or preferential programs such as but not limited to small and

medium enterprises.

216

d) Mandatory registration in a supplier list shall not be used to assess bidders’ qualifications. A

foreign bidder shall not be required to register as a condition for submitting its bid and if

recommended for contract award shall be given a reasonable opportunity to register with the

reasonable cooperation of the Recipient, prior to contract signing. Invitations to bids shall be

advertised in at least one newspaper of national ciRPCUlation or the official gazette or on a

widely used website or electronic portal with free national and international access.

e) Bidders shall be given a minimum of thirty (30) days to submit bids from the date of

availability of the bidding documents.

f) All bidding for goods and works shall be carried out through a one-envelope procedure.

g) Evaluation of bids shall be made in strict adherence to the evaluation criteria specified in the

bidding documents. Evaluation criteria other than price shall be quantified in monetary terms.

Merit points shall not be used, and no minimum point or percentage value shall be assigned to

the significance of price, in bid evaluation.

h) The results of evaluation and award of contract shall be made public. All bids shall not be

rejected and the procurement process shall not be cancelled, a failure of bidding declared, or

new bids shall not be solicited, without the Bank’s prior written concurrence. No bids shall be

rejected based on comparison with the cost estimates without the Bank's prior written

concurrence.

i) In accordance with para.1.16(e) of the Procurement Guidelines, each bidding document and

contract financed out of the proceeds of the Financing shall provide that: (a) the bidders ,

suppliers, contractors and subcontractors, agents, personnel, consultants, service providers, or

suppliers shall permit the Association, at its request, to inspect all accounts, records and

documents relating to the bid submission and performance of the contract, and to have them

audited by auditors appointed by the Association; and (b) Acts intended to materially impede

the exercise of the Association’s audit and inspection rights constitutes an obstructive practice

as defined in paragraph 1.16 a (v) of the Procurement Guidelines.

In case of any ambiguity or discrepancy between the provisions of the procurement procedures of

government and the relevant Bank Guidelines; namely, (i) Procurement of Goods, Works and Non-

Consulting Services under IBRD Loans and IDA Credits and Grants (January 2011, revised July 2014)

by World Bank Borrowers; and (ii) Selection and Employment of Consultants under IBRD Loans and

IDA Credits and Grants (January 2011, revised 2014) by World Bank Borrowers, the provisions of

the Bank Guidelines shall prevail for all procurements under the Program.

As agreed between the GOE and the Bank, Section III of the Financing Agreement details the

following procurement procedures to be followed for the Program. These are as follows:

i. Goods, works and non-consulting services shall be procured in accordance with the

requirements set forth or referred to in Section I to III of the “Guidelines for Procurement of

Goods, Works and Non-Consultant Services under IBRD Loans and IDA Credits and

Grants by World Bank Borrowers” published by the World Bank in January 2011 (The

Guidelines) and the provisions of Section III of FA;

217

ii. All consultants’ services shall be procured in accordance with the requirements set forth or

referred to in Section I to V of “Selection and Employment of Consultants under IBRD

Loans and IDA Credits and Grants by World Bank Borrowers” published by the World

Bank in January 2011 (The Consultant Guidelines) and the provisions contained in Section

III of FA.

The implementation of the AGP 2 program entails procurement of goods, works and services of

various types but it generally comprises: (a) Goods including vehicles and motor cycles, office

furniture and equipment, IT equipment (i.e., computers, computer software, servers, and scanners),

improved breeds, hormones, and other agricultural inputs; (b) Consulting Services (technical

assistance (TA), feasibility studies and designs, program audits including financial and procurement,

baseline surveys and impact assessment, impact evaluations and etc.); (c) works including upgrading

and construction of small scale irrigation systems, pump stations, water harvesting schemes, market

centres, stores, access roads for SSI development and small bridges, etc; and (d) Training and

Workshops.

8.4 The Applicable Procurement Methods for AGP 2

8.4.1 Procurement of Works, Goods and Non-consultancy Services

The mode of procurement emanates from the strategy adopted and will be on the basis of the

procurement threshold as agreed between the Bank and the government for the program and this will

be reflected in the procurement plan. The following are the usual methods of procurement of works,

goods and non-consultancy services to be adopted in the Program:

a. International Competitive Bidding (ICB) for works and goods;

b. Limited International Bidding (LIB)for goods

c. National Competitive Bidding (NCB) for works and goods;

d. Shopping for works, goods and non-consulting services;

e. Framework Agreements for goods and non-consulting services;

f. Direct Contracting for works, goods and non-consulting services;

g. Force Account for works and non-consulting services;

h. Procurement from UN Agencies and (i) Community Participation in Procurement usually

for works.

8.4.1.1 Procurement of works and goods

The procurement of works and goods will be done using the Bank’s SBD for all ICB contracts and

National SBD agreed with or satisfactory to the Bank for NCB contracts. Contract packages for works

estimated to cost US$7 million equivalent per contract and above and contract packages for goods

estimated to cost US$1 million equivalent per contract and above will be procured through ICB

procedures. Works contracts estimated to cost less than US$7 million equivalent per contract and

goods contracts estimated to cost less than US$1 million equivalent per contract would be procured

through NCB procedures. Small works contracts estimated to cost less than US$200,000 equivalent

per contract and goods contracts estimated to cost less than US$100,000 equivalent per contract may

218

be procured through Shopping procedures by comparing quotations received from at least three (3)

reliable contractors or suppliers. In such cases, request for quotations shall be made in writing and

shall indicate the description, scope of the works, the time required for completion of the works and

the payment terms. All quotations received shall be opened at the same time. As a general rule, a

qualified supplier who offers goods or materials that meet the specifications at the lowest price shall

be recommended for award of the contract. Limited International Bidding (LIB) for goods may

exceptionally be used when there are only a limited number of known suppliers worldwide. Direct

contracting and single source selectioncan be used when it is considered beneficial to the Borrower.

Under AGP 2 there might be ciRPCUmstances which justify direct contracting by IAs, where there is

only a single supplier, labor contractor or service provider for the provision of small value goods,

works and services. For such contracts that fall below an estimated cost of US$5,000 the IAs can

undertake direct contracting but have to provide detailed justifications underlying the selection of such

a procurement method and have to obtain approval from the head of the IAs as per the procedures

provided in the Procurement Directives of the Federal Government and the respective Regions.

Documentations of the justifications provided and the approval by the head of agencies shall be

maintained for review by Bank staff or consultants during post procurement reviews and independent

procurement audits. Direct contracting below US$5,000 will require internal government review;

between US$5,000 and US$100,000 will require Task Team Leader review and above US$100,000

will require full Bank review.

8.4.1.2 Procurement of Agricultural Inputs

Market studies carried out as part of the procurement capacity assessment for AGP 2 as well as other

programs indicate that the market for agricultural inputs in Ethiopia is highly regulated. According to

the findings of the assessment the market outlets for agricultural inputs, which include improved seeds

and fertilizers, are government owned enterprises and farmers’ unions and farmers’ service

cooperatives. It should be acknowledged, however, that attempts are being made to arrange for sales

of improved seeds through a competitive process. However, such an attempt is currently at pilot stage

in limited Woredas only. Thus, in general, in Ethiopia the procurement of improved seeds and

fertilizers through a competitive process is not feasible at the local level where it is needed under the

program. According to data from AGP-I, the total amount expended on these inputs is insignificant

and such inputs are required in a decentralized manner for demonstration purposes at FTCs and the

consolidation of the procurement of these inputs would not be efficient. Hence, the procurement of

improved seeds and fertilizers under AGP 2 shall be carried out through direct contracting from

farmers’ unions or farmers’ cooperatives (with due diligence) or through shopping procedure

whenever possible. Moreover, basic seeds which are of proprietary nature and available only in Federal

and Regional research centres shall be procured on a direct contracting basis from the research centres

as per the procedures outlined above regarding direct contracting.

219

8.4.1.3 Procurement of non-consulting services

Depending on the nature of the services, procurement of non-consulting services, such as transport,

will follow procurement procedures similar to those stipulated for the procurement of goods. NCB

procedures acceptable to the Bank would be used for contracts above an estimated monetary amount

of US$100,000. Contracts valued at less than US$100,000 equivalent shall use Shopping procedures

in accordance with the provisions of paragraph 3.5 of the Bank’s Procurement Guidelines. The

procurement of non-consulting services shall follow the existing Bank’s SBD for ICB, or national

SBDs for NCB, with appropriate modifications.

8.4.2 Procurement of Airtime

IAs of AGP 2 may require broadcasting radio and television programs to disseminate information on

the objectives and achievements of the program, use of new technologies, etc. In Ethiopia, radio and

television programs with a wider coverage are limited to Ethiopian Broadcasting Corporation and

some regional radio and television stations, which are state owned enterprises. A study of the media

outlet in the country clearly indicates that there are no private sector alternatives in the provision of

air time services with wider coverage to reach the clientele of the program. In view of this program

IAs may procure air time for broadcasting services from EBC and National Regional States

Televisions on a Direct Contracting Basis as per the procedures above regarding direct contracting.

Works, goods and non-consultancy services (Paragraph 2.1-2.68 & 3.1-3.20 of Guidelines)

The following are the essential steps for the selection of works, goods and non-consultancy services

under NCB method:

a) Preparation of Standard Bidding Documents;

b) Notification and advertising;

c) Issue/sale of the bidding document to the prospective bidders;

d) Submission of bids by prospective bidders;

e) Opening and examination of Bids;

f) Evaluation and Comparison of Bids;

g) Selection of lowest evaluated responsive bid based on post-qualification;

h) Contract award and signing of the agreement with the selected Contractor/Supplier;

Margin of preference for goods and works

In accordance with paragraphs 2.55 and 2.56 of the Procurement Guidelines, the Borrower may grant

a margin of preference of 15 percent in the evaluation of bids under ICB procedures to bids offering

certain goods produced in the Country of the Borrower, when compared to bids offering such goods

produced elsewhere. Similarly, the Borrower may grant a margin of preference of 7.5 percent in the

evaluation of bids under ICB procedures to local contractors when compared to foreign contractors.

8.4.3 Selection of consultants

Depending on the nature of the services the program will use the following consultant selection

methods: Quality and Cost Based Selection (QCBS), Quality-Based Selection (QBS), Least Cost

220

Selection method (LCS), Selection under a Fixed Budget (FBS), Selection Based on the Consultants’

Qualifications (CQS), Single Source Selection (SSS) and Individual Consultants (IC)procurement of

non-consulting services The program will make use of consultant services for technical assistance,

capacity-building activities, studies, design and supervision of small scale irrigation systems and

roads, and annual financial, and procurement audits of program activities. Contracts above

US$200,000 will be awarded through the use of the Quality and Cost-Based Selection method

described under Sections 2 of the Consultant Guidelines. Consulting Services for audit and other

contracts of a standard or routine nature may be procured under the Least Cost Selection method (LCS)

described under Section 3.6 of World Bank Consultants Guidelines. Consulting services of small

assignments may be procured through the Selection Based on the Consultants’ Qualifications (CQS)

method. Shortlists of consultants for services estimated to cost less than US$300,000 equivalent per

contract may be composed entirely of national consultants in accordance with the provisions of

paragraph 2.7 of the Consultant Guidelines. Individual Consultants (IC) will be selected on the basis

of their qualifications by comparison of CVs of at least three candidates from those expressing interest

in the assignment or those approached directly by the Implementing Agency in accordance with the

provision of Section V of the Consultants Guidelines.

Selection of Consultants

The selection process for consultancy services shall include the following steps under QCBS method:

a) preparation of the TOR;

b) preparation of cost estimate and the budget, and short-listing criteria;

c) advertising;

d) preparation of the short list of consultants;

e) preparation and issuance of the RFP (which should include: the Letter of Invitation (LOI),

Instructions to Consultants (ITC), the TOR, and the proposed draft contract);

f) receipt of proposals;

g) evaluation of technical proposals: consideration of quality;

h) public opening of financial proposals;

i) evaluation of financial proposal;

j) final evaluation of quality and cost; and

k) Negotiations, award of the contract to and signing of the agreement with the selected firm.

8.4.4 Training and Workshops

The program will fund training activities including Capacity development . The training plan of the

program shall be approved by the Bank. The training plans would include details on: (i) type of training

to be provided; (ii) number of beneficiaries to be trained, duration of training, and estimated cost; (iii)

institutions selected based on their expertise; and (iv) expected learning outcomes. Workshops shall

be prior reviewed as part of the annual work-plans of the program.

8.4.5 Operating Costs

Incremental operating costs include expenditures for maintaining equipment and vehicles; fuel; office

supplies; utilities; consumables; workshop venues and materials; and per diems, travel costs, and

221

accommodation for staff when travelling on duty during implementation of this program, but

excluding salaries of civil/public servants. These will be procured using the Government's

administrative procedures, acceptable to the Bank. Operating expenditures are neither subject to the

Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are verified

by Task Team Leaders (TTLs) and Financial Management Specialists (FMSs).

8.4.6 Procurement Review

Procurement review refers to auditing of files and documents relating to the procurement of Goods,

works and consultancy services. Procurement review is basically carried out to ascertain whether the

procurement procedures were correctly and completely followed, both in letter and spirit. It brings out

omissions/commissions and lapses, whether on account of poor or inadequate understanding of the

procedures or wilful negligence including likely fraud/corruption evidence during the review. The

report and observation of procurement review therefore, also serve as a guide for taking remedial

measures to streamline and improve the procurement system. The procurement review covers the

following aspects:-

Whether the procurement plan was prepared?

Whether the procurement was made as per the procurement plan?

Whether the method adopted for procurement was as per the threshold limits given in the

procurement manual?

Whether the overall procurement was done within a reasonable time?

Whether there was any avoidable delay at any stage/ stages of the procurement process?

Whether the necessary approval was taken from appropriate authority wherever required?

Whether proper and adequate documents relating to procurement were maintained?

Whether the technical and financial evaluation was done properly and in a fair manner?

Whether the contracted firm, supplied the goods or executed the work as per the quality,

quantity and price agreed upon?

Whether the goods were supplied or works executed in time and properly recorded in stock

books/works registers after inspection?

Whether the payment was made to the supplier/ contractor in time? If not, reasons for delay.

All the contracts should be awarded strictly as per procedures outlined in the Guidelines and the Legal

Agreements. In the case of prior review contracts, the procurement is reviewed by the Bank at every

stage and “no-objections” are issued by the Bank. The Bank issues the no-objection on the basis of the

information provided by the IA. In order to avoid complications at a later stage, the IAs should provide

all information and also ensure that they are factually correct.

8.4.6.1 Prior review areas by the Bank

All ICBs;

All procurement values above the threshold limit;

All works executed on Force Account irrespective of contract value;

222

Short lists of consultants for services estimated to cost more than US$300,000 equivalent per

contract composed entirely of national consultants in accordance with the provisions of

Consultant Guidelines.

Single source selection of consultants (firms);

Direct contracting;

Rebidding of contracts;

Contracts estimated to cost above US$1,000,000 for Goods and non-consulting services will

be subject to prior review by the Bank;

Consultancy services estimated to cost above US$300,000 for design and supervision;

Contract administration of works, and contracts to cost above US$200,000 per contract for

other consultancy assignments;

All consultancy services for the selection and employment of procurement and legal

consultants, regardless of the contract amount, shall be subject to Bank’s prior review;

TORs for all contracts shall be cleared by the Bank;

The prior review thresholds are stipulated in the legal agreements and procurement plan. For all such

packages, prior review of the Bank will be required at the stages mentioned in the prior review

paragraphs. Prior Review of Goods and works consists review of:

Procurement plan;

Bidding documents including invitation for bids;

Minutes of pre-bid conference (if any);

Bid evaluation report; and

Final contract(s) with checklists and Contract Amendments (if any);

The Bank at following stages during the process of procurement shall carry out prior review for

Procurement of Consultancy Services:

Procurement Plan;

Terms of Reference (technical review);

Short list of Consultant;

RFP document containing Letter of Invitation, Information to Consultants, Formats for

submission of Information, Conditions of Contract and cost estimate;

Minutes of pre-proposal conference (if any);

Amendments to RFP (if any);

Evaluation report of the technical proposals;

Report after financial/combined evaluation report and recommendation of the winning firm

(for information only);

Minutes of Negotiation and Negotiated draft contract with all appendices; and

Final contract and amendments (if any)

Once Bank staff have reviewed the documents relating to each stage of the selection process and found

them to be satisfactory, or suggested amendments have been effected, the Bank issues its “no

223

objection.” The task team leader and the procurement specialists assigned to the program carry out the

reviews. If the Bank refuses to issue a “no objection” to a proposed contract award, but the Borrower

decides to go ahead with the award, the Bank will declare mis procurement, and its policy will be to

cancel that portion of the loan allocated to the services in question.

For all agreements requiring prior review as well as for those which would increase the value of

contract to the prior review threshold and above, before agreeing to any material modification or

waiving of the terms and conditions, or granting a material extensions of the stipulated time for

performance of such contract, or issuing any change order under a contract, which would in aggregate

increase the original amount of work by more than 15% of the contract price, Banks clearance shall

have to be obtained.

Regarding Prior Review Cases, the communication with the Bank for prior review contracts and the

approval of procurement plans shall normally be the responsibility of the FPCU. However, based on

experience under AGP-I, RPCUs can also submit prior review cases and approval of procurement

plans directly to the Bank with copies made to the FPCU.

8.4.6.2 Post Review

In the case of the Post-review contracts, the responsibility of the government is much more. Even

though the cases are not sent to the Bank for review, they have to be prepared with utmost care and

decided as though they are to be sent to the Bank. Detailed evaluation reports in the prescribed formats

are to be prepared and kept in file. The files should be maintained properly. The CUs and IAs shall

retain all documentation about each contract, including the signed contract original, the evaluation

report, and the recommendation for award, for review by the Bank or its consultants. Post review

would include review of the final concluded contract (s) and supporting documents for all other cases.

Copies of agreements of the contracts subject to post review are not be forwarded to the Bank.

However, the relevant information and documentation shall be compiled at all levels (federal, regional,

zone and Woreda) by the AGP 2-CUs and implementing agencies. Bank will seek this information

when ever required for post review as per the Guidelines. These may be reviewed selectively by

visiting Bank’s Supervision Mission or by Auditors appointed by the Bank or government.

Post Review of Works and Goods

Post Review by Bank of contracts other than prior review cases will consist of review of final

concluded Contract(s) with checklist and supporting documents. For all other cases, Federal and

regional CUs shall carry prior reviews. CUs and IAs at all levels shall maintain complete files of all

documents to be available for periodic reviews by the Bank.

Post Review of Consultancy Services

All cases of procurement that do not come under the ambit of Prior Review shall be post reviewed by

the Bank. Post review covers the final contract along with appendices and copy of evaluation

note/award recommendations, which should be submitted along with the Checklist. However, Terms

of Reference and Consultants contracts for assignments of critical nature, as decided by the Bank at

the time of reviewing the procurement plans and signing the loan agreement, will be reviewed by the

Bank in all cases, regardless of value.

224

Bank’s Review Thresholds :-The Borrower shall seek World Bank prior review in accordance with

Appendix 1 of both Procurement and Consultant Guidelines for contracts above the thresholds as

agreed in the Procurement Plan. For purposes of the initial Procurement Plan, the Borrower shall seek

Bank prior review for:- (i) works contracts estimated to cost US$5 million equivalent per contract and

above; (ii) goods contracts estimated to cost US$1,000,000 equivalent per contract and above; (iii) all

consultancy contracts for services to be provided by consulting firms of US$200,000 equivalent per

contract and above; (iv) for ICs contracts estimated to cost US$100,000 equivalent per contract and

above; (v) direct contracting of goods and non-consulting services as stipulated as above, and single

source selection contracts; and (vi) annual training plan. In addition, a specified number of contracts

to be identified in the procurement plan for the procurement of goods and works below the ICB

threshold may also be subject to prior review. These prior review thresholds may be re-visited annually

and any revisions based on the assessment of the IAs capacity will be agreed with the Bank and

included in an updated Procurement Plan.

For Prior review by the Bank, FPCUwill carry out quality check on all procurement documents to be

prepared by the IAs and then forward the same with its recommendations to the Bank for prior review.

FPCUshall be responsible for prior review of all procurement cases up to the threshold in the table

below for which the IA shall forward the complete procurement documents to FPCU. Prior review is

generally necessary in the following conditions but each activity will be dealt with as per provisions

in the Procurement Plan and Legal Agreement.

Change from Post Review to Prior Review: A contract whose cost estimate was below the Bank’s

prior review threshold indicated in the Procurement Plan shall fall under prior review if the price of

the lowest evaluated bidder exceeds such threshold. All related procurement documentation already

processed, including the evaluation report and recommendation for award, shall be submitted to the

Bank for its prior review and no objection before the award of contract. When, to the contrary, the

price of the selected bidder falls below the prior review threshold, the prior review process shall

continue. Under certain ciRPCUmstances, the Bank may require the Borrower to follow a prior review

process for a contract below the Bank’s prior review threshold in the case of a complaint it has

determined to be of a serious nature. Also, when the procurement method requires change due to

higher or lower cost estimates than previously assessed, for example from NCB to ICB or inversely,

the Procurement Plan shall be modified by the Borrower and submitted to the Bank for review and no

objection.

225

Table 26: Procurement Methods and Prior Review Thresholds

Procurement Method Authorized Per

Contract Value

(Threshold in

US$)

Prior Review

(Threshold per

contract Value

in US$)

National36

Shortlist

Maximum per

contract Value

(US$)

Review procedures

Works, Goods and Non-consultancy Services

ICB (Works)

≥ 7,000,000 ≥ 7,000,000 NA All ICB (works) contracts subject to prior review

NCB (Works)

≥ 200,000

< 7000,000

≥ 5,000,000 NA As indicated in the Procurement Plan selected

contracts will be prior reviewed. All other

contracts subject to post review

Shopping (Works)

< 200,000

NA NA By comparing quotations received from at least

three (3) reliable contractors. All contracts will be

subject to post review. A register of works

shopping shall be prepared and kept for audit.

ICB (Goods) ≥ 1,000,000 ≥1,000,000 NA All contracts will be subject to prior review

NCB (Goods)

As per paragraphs 3.3

and 3.4 of Guidelines

≥ 100,000 and

< 1,000,000

NA NA As indicated in the Procurement Plan selected

contracts will be prior reviewed. All other

contracts subject to post review

Shopping (Goods)

As per paragraph 3.5

of Guidelines

< 100,000 NA NA By comparing quotations received from at least

three (3) reliable suppliers. All contracts will be

subject to post review by the Bank.

Shopping (Non-

consultancy services) As

per paragraph 3.5 of

Guidelines

< 100,000 NA NA By comparing quotations received from at least

three (3) reliable service providers. All contracts

will be subject to post review by the Bank.

36A threshold for which a shortlist may comprise only national consultants and the Borrower does not publish in UNDB online.

226

Procurement Method Authorized Per

Contract Value

(Threshold in

US$)

Prior Review

(Threshold per

contract Value

in US$)

National36

Shortlist

Maximum per

contract Value

(US$)

Review procedures

Force Account as per

paragraph 3.9 of

Guidelines

Works that

meet the

requirement of

Guidelines

All contract

values

NA All contracts will be procured with Bank prior

clearance irrespective of value. All Force Account

procurement shall be approved on a case by case

basis subject to satisfactory justification

Direct Contracting

(Goods, works and non-

consultancy services) as

per paragraph 3.7 and

3.8 of Guidelines

< $5,000

equivalent

≥ 5,000

equivalent.

.

NA All other contract values subject to post review. A

register of such petty purchases shall be

maintained by CUs and IAs. Documentations of

the justifications provided and the approval by the

head of agencies shall be maintained for review

by Bank staff.

Contract values less than $ 5,000 shall be

reviewed at FPCUand RPCUs levels. Between $

5,000 and 100,000 by WB Task Team Leader and

above $ 100,000 requires full WB Prior Review

Consultancy Services

Consultants (Firms) as

per paragraph 2.1 to 2.35

and 3.1 to 3.15

of Guidelines

NA ≥200,000 ≥ 300,000

Consultants (Engineering

and works supervision)

NA ≥ 300,000 ≥ 300,000

Direct Contracting

(Single source selection

method for consultants) as

< $5,000

equivalent

≥ 5,000

equivalent.

NA All other contract values subject to post review. A

Register of such petty purchases shall be

maintained by CUs and IAs. Documentations of

227

Procurement Method Authorized Per

Contract Value

(Threshold in

US$)

Prior Review

(Threshold per

contract Value

in US$)

National36

Shortlist

Maximum per

contract Value

(US$)

Review procedures

per paragraph 3.8

of Guidelines

the justifications provided and the approval by the

head of agencies shall be maintained for review

by Bank staff.

Contract values less than $ 5,000 shall be

reviewed at FPCUand RPCUs levels. Between $

5,000 and 100,000 by WB Task Team Leader and

above $ 100,000 requires full WB Prior Review

Annual Training Plan of the

program

NA All training

plans as part

ofAWPB.

Na All Training Plans will be implemented with

Bank prior clearance of the plans. The training

plans would include details on: (i) type of training

to be provided; (ii) number of beneficiaries to be

trained, duration of training, and estimated cost;

(iii) institutions selected based on their expertise;

and (iv) expected learning outcomes.

Workshops NA All workshop

plans as part of

AWPB.

228

8.4.6.3 Frequency of Procurement Supervision

In addition to the prior review supervision to be carried out from Bank office, as per the capacity

assessment findings it has been recommended semi-annual supervision missions to conduct field

visits, of which at least one mission will involve post review of procurement actions. The dedicated

procurement staffs at the CUs will undertake periodical (at least quarterly) review of the procurements

done by IAs and lower government functionaries on a sample basis and take corrective measures as

may be necessary. The report and observations of procurement review therefore shall be used as a

guide for taking corrective measures to streamline and improve the procurement system.

Besides, government shall select and appoint a procurement auditor, acceptable to IDA, to carry out

annual independent procurement audits of AGP 2 and shall submit the report to IDA annually six

months after the end of the fiscal year for its consideration. The TOR of the auditor shall be approved

by the bank before appointing the auditing firm. The procurement review shall be done at all levels.

The Bank shall also undertake both Prior and Post Reviews for procurement process at all stages to

ensure that Guidelines of the Bank are being strictly complied with and those proper procedures are

being followed at each stage of the contracts by CUs and its implementers at all levels (Federal,

Regional, Zonal and Woreda). The bank staff shall conduct post award review during supervision

missions.

Procurement Process Flow Arrangements

The FPCUat MOA, which is the focal organization for the implementation of AGP 2, shall coordinate

all procurement activities of the program. It shall also be responsible for procurement of strategic

goods and equipment, which shall be procured through ICB centrally. Regional IAs shall be mainly

responsible for the procurement of goods and works, which are procured through NCB and shopping

procedures. It is only when goods and services unavailable at the regions or when categorizing and

aggregating alike purchases of all regions into one big purchase is found economical to gain from

discount that the federal AGP-CU will handle for them by delegation or request. Regional IAs shall

also carry out ICB contracts as well as selection of consultants as deemed necessary. Procurement at

Woreda level shall be limited to procurement of goods and works through shopping procedures.

Mis -procurement

The Bank does not finance expenditures for goods, works, and services, which have not been procured/

contracted in accordance with the agreed provisions of the financing agreement and as further

elaborated in Procurement Plan agreed with the Bank. In such cases, the Bank will declare mis

procurement, and it is the policy of the Bank to cancel that portion of credit/loan allocated to the goods,

works, and consultancy services that have been mis- procured. The Bank may, in addition, exercise

other remedies provided for under the Financing Agreement. Even when the contract is awarded after

obtaining “no objection” from the Bank, the Bank may still declare mis- procurement, if it concludes

that the “no objection” was issued on the basis of incomplete, inaccurate, or misleading information

229

furnished by the IA or the terms and conditions of the contract had been modified without Bank’s prior

approval.

Procurement Implementation

A procurement capacity assessment of the IAs of the proposed program was carried out in December

2014 and January 2015. The procurement capacity assessment was carried out at the FPCU, and in the

Bureaus of Agriculture, Water and Irrigation Development Bureaus, and Livestock Development,

Cooperative Development, and Market Development Agencies in Amhara, Oromiya, Tigray and

SNNP Regions. The capacity assessment was carried out using the P-RAMS questionnaires. The

findings of the capacity assessment and the recommended actions are posted in the P-RAMS of the

program portal. The assessment reviewed the organizational structure for implementing the proposed

AGP 2 program, the staff responsible for procurement in the IAs including the FPCU, the Regions,

Woredas and other Federal level IAs. The assessment also looked into the legal aspects and

procurement practices, procurement cycle management, organization and functions, record keeping,

planning and the procurement environment.

Although all the IAs reviewed have been implementing the AGP-I, the procurement capacity

assessment has revealed a number of challenges in the overall procurement capacity of the IAs which

were included in the procurement capacity assessment. Lack of qualified and procurement proficient

procurement staff remains a major challenge in all the IAs visited. Most of the procurement staff in all

IAs visited are not proficient in the procurement procedures of the Bank. This lack of qualified

procurement staff appears to be compounded with the challenge of high level of staff turnover which

is prevalent in all sub-national IAs. Although efforts are made by the Regional procurement

coordinators to provide procurement clinics to regional and Woreda procurement staff, this effort is

undermined by the high level of staff turnover in these IAs. The organization and staffing for

procurement under the IAs of the program does not appear to be harmonized. In some IAs there are

dedicated staffs responsible for procurement under the program whereas in others procurement is

streamlined. This clearly indicates the need for harmonization of the organization and staffing which

is critical for the procurement process.

Other key issues and risks for implementation of procurement under the proposed program include

lack of adequate capacity and lack of space for procurement record keeping; inadequate staffing of the

procurement units at the regional IAs and Woredas; lack of skill development schemes for

procurement personnel; the level of pay scale for procurement personnel, which is too low to attract

qualified procurement personnel; lack of systematic procurement planning and follow-up in

procurement, lack of experience in contract administration and management, and the inadequacy of

the procurement environment for implementation of programs. Moreover, the fact that new Regions

and Woredas – including Benishangul, Harari, Dire Dawa and Gambella, are included under AGP 2,

with lack of experience in procurement under Bank financed programs, increases the risk of

procurement under the program.

230

The overall risk for procurement under AGP 2 is rated ‘high’. Thresholds for prior review and ICB,

including the maximum contract value for which the shortlist may comprise exclusively Ethiopian

firms in the selection of consultants, are presented in Table 2. The procurement capacity of the AGP

2 IAs will be reviewed annually and the thresholds shall be revised according to the improvements in

procurement capacity.

To strengthen the Procurement capacity in the Program and mitigate fiduciary risks it is proposed to

recruit procurement specialists at all levels as required. The staffs will provide procurement assistance

(in areas of procurement planning, Bid/RFP document preparation, bid/proposal evaluation and

contract management and supervision, documentation, reporting, etc) to federal, regional and Woreda

level CUs and implementation Offices. The Procurement Specialist will handle and/or coordinate all

procurement under the Program. This Specialist may be supported by a part time Procurement

Consultant who has experience in handling Bank funded procurements. The government will facilitate

procurement training for procurement staffs on Bank Procurement Guidelines. The Procurement

Specialist will be responsible to:

ensure that consistent and correct methods of procurement as specified in the Procurement Plan

as per procedures outlined in Banks Guidelines are followed by all the procurement entities of

the Program;

develop and maintain Procurement filling and documentation of all procurement done in the

Program;

maintain records of all complaints received and their disposal;

collect, collate all procurement related information as may be required by the Bank and its

auditors;

ensure that all procurement related records and documents required by the Bank Guidelines are

properly maintained, kept by the various procurement entities;

8.4.6.4 Procurement Performance Indicators and Risk Mitigation Action Plan

An analysis of the performance indicators would lead to identify the risks involved and enable action

to be taken to mitigate them. The following actions would be taken by government to mitigate the

procurement risks identified during capacity assessment.

a) Ensure Use of Comprehensive Procurement Manual:To develop a comprehensive procurement

manual and ensure that the Procurement Manual containing formats for preparation of bid

documents/RFP, evaluation reports, pre-bid minutes, bid opening minutes, contract information,

checklists etc to remove lack of clarity on public procurement process is used regularly to ensure

consistency. The procurement manual of AGP-I which provides detailed step by step procedures

for the implementation of the procurement activities of the program shall be revised to reflect

changes in procurement procedures and the current revisions in thresholds and to include

procurement code of ethics in the procurement manual; and shall be disseminated the to all IAs of

the program at all levels.

231

b) Conduct Regular Procurement Trainings: Arrange a series of procurement training programs for

procurement specialists/experts to cover all the personnel involved in the implementing agencies.

The basic procurement training shall be offered at EMI in the procurement of goods and

equipment, works and consultancy services to procurement staff of Federal and Regional IAs as

appropriate. Staff involved in the implementation of procurement activities such as Bid Evaluation

Committee members and TAC members shall be provided procurement clinics on procurement

procedures under Bank financed programs.

c) Recruit Procurement Specialists: Recruit procurement specialists who will periodically inspect

the offices of the implementing agencies and guide them on the proper procurement planning,

implementation, maintenance of the documents and records as well as procurement procedures to

be followed. S/he will also support the procurement unit at the agency level, who will maintain the

procurement documentation and train the personnel involved in the procurement at implementing

agencies and lower levels on a continuous basis. S/he will provide guidance to all implementing

agencies officers to ensure that all records regarding procurement activities under the program are

kept in an indexed and safe manner and shall be readily available for auditing and Bank review.

d) Strengthen Contract Management Capacity: A Contract Management system shall be established

in the major IAs including FPCU and RPCUs. For this to happen, a Contract Management Staff

shall be recruited at the FPCU and RPCUs including BOWR/IDA to manage the contract

administration activities of the program. Training to staffs in contract administration shall be

provided at EMI.

e) Strengthen Procurement Planning Capacity: Thorough training of procurement staffs in the

preparation and updating and monitoring of procurement plans at all levels; and make procurement

planning a requirement as part of the annual work plan and budget. A simplified procurement

planning format and procedure mandatory for use in the Woredas shall be prepared.

f) Strengthen Record-Keeping Systems: Procurement clinic on procurement records keeping shall

be provided to procurement staff of the AGP 2. A rigorous procurement data management and

reporting system shall be established to ensure that all contract information and its related details

shall be developed and made available from all regions and Woredas. The FPCUof the AGP 2 as

well as all IAs of the program, at regional, Woreda and federal level shall be responsible for record

keeping and filing of procurement records for easy retrieval of procurement information. Adequate

facility, including office space, shelves and lockers, for safekeeping and storage of procurement

records shall be provided. Each contract shall have its own file and should contain all documents

on the procurement process in accordance with the requirements of the Bank and as described in

the national procurement Law.

g) Strengthen Procurement Monitoring and Reporting Systems: M&E of procurement performance

will be carried out through Bank supervision and post procurement review missions. In addition,

the procurement officers and finance officers of the program IAs at Federal, Regional and Woreda

level shall prepare and submit procurement implementation status reports regularly and during

such missions. Besides, to strengthen the oversight, MOA shall select and appoint an independent

232

consultant, acceptable to IDA, to carry out the Independent Procurement Audit of the program

annually. The Procurement Specialists shall analyze the reports to see the trends, issues,

procurement performance indicators etc and take proactive corrective steps as and when required.

h) Strengthen Disclosure Policy and Complaint Redressed Mechanism: The implementation of the

public disclosure policy as required under the Bank Guidelines shall be ensured for enhance

transparency. In order to deal with the complaints from bidders, contractors, suppliers, consultants

and general public at large a complaint handling mechanism shall be in place at all levels. The

Complaint handling mechanism shall be announced in MOA website. Immediate action shall be

initiated on receipt of complaints to redress the grievances. If any complaints have been received,

the details of the complaints and the findings of the procuring entity should be fully brought out in

the evaluation report submitted to the Bank. All complaints shall be registered and handled at a

level higher than that of the level at which the procurement process is being undertaken and the

allegations made in the complaints shall be thoroughly enquired into and if found correct

appropriate remedial/corrective measures shall be taken by the appropriate authorities. A register

of complaints redressed shall be prepared and maintained.

The register shall contain the following information.

o Serial number of the complaint;

o Date on which the complaint was made/received;

o Name of the complainant;

o Particulars of the person making the complaint;

o Brief details of the complaint;

o Complaint against whom if against a person;

o Details of actions taken and subsequent follow ups specifying on which action was taken;

o Whether the complainant has been satisfied, if not why;

o Action taken against the guilty, if warranted;

233

Table 27 : Summary of Procurement Risks /Findings and Actions (Risk Mitigation Matrix)

N

o Major findings/issues Actions proposed Responsibility Targeted date

1 Inadequate procurement

capacity in the Regional

and Woreda. IAs

particularly in the new

Regions and Woredas to

be included under AGP 2

o Employment of qualified and

procurement proficient staff

acceptable to the Association in

the Regional IAs (additional

staff), and all AGP 2 Woredas;

o Provide basic procurement

training offered at EMI in the

procurement of goods and

equipment, works and

consultancy services to

procurement staff of Federal and

Regional IAs as appropriate;

o Staff involved in the

implementation of procurement

activities such as tender

committee members and TAC

members should be provided

procurement clinics on

procurement procedures under

Bank financed programs;

o Provide procurement staff at the

FPCU, RPCUs and Woredas with

the necessary facilities to create

conducive working environment

including mobility to enable them

support procurement activities in

the Regions and Woredas.

MoA/FPCU,

Regions and

Woredas

At least before

two months

after program

effectiveness

234

N

o Major findings/issues Actions proposed Responsibility Targeted date

2

.

Inadequate procurement

planning and monitoring

and follow-up of

procurement activities

o Make procurement planning a

requirement as part of the annual

work plan and budget;

o Train procurement staff in the

preparation and updating and

monitoring of procurement plans

at all levels;

o Make the use of simplified

procurement plans mandatory for

use in the Woredas.

MoA/FPCU,

RPCUs, Woredas,

and other Federal

IAs

During

program

implementatio

n

3

.

Written procedural

manuals/systems in place

including code of ethics

o Revise the procurement manual

of AGP-I which provides

detailed step by step procedures

for the implementation of the

procurement activities of the

program to reflect changes in

procurement procedures and the

current revisions in thresholds;

o Include procurement code of

ethics in the procurement

manual;

o Disseminate the procurement

manual to all IAs of the

program.

MoA/FPCU During

program

implementatio

n

235

N

o Major findings/issues Actions proposed Responsibility Targeted date

4

.

Lack of capacity in

procurement data

management and

maintenance of

procurement audit trail

Inadequate facility for

storage of procurement

records

o Procurement clinic on

procurement records keeping to

be provided to procurement

staff of the AGP 2;

o Establish satisfactory

procurement data management

system;

o Provide adequate facility,

including office space, shelves

and lockers, for safe keeping

and storage of procurement

records.

MoA/FPCU,

RPCUs/Regional

IAs/Woredas/othe

r Federal IAs

During

program

implementatio

n

5

.

High level of staff

turnover

o Make employment in all IAs of

AGP 2 attractive to procurement

staff by providing the necessary

incentives.

MoA/FPCU During

program

implementatio

n

6

.

Lack of experience in

contract administration

and management in the

focal organization and

RPCUs

o Establish a CM system in the

major IAs including FPCUand

RPCUs;

o Recruit and employ contract

management staff at the

FPCUand RPCUs to manage the

contract administration

activities of the program;

o Provide training to staff in

contract administration at EMI.

MoA/FPCU During

program

implementatio

n

7

.

Lack of oversight bodies

in the Regions and

Woredas to monitor and

audit procurement

activities

o Government shall select and

appoint an independent

consultant, acceptable to IDA, to

carry out the Independent

Procurement Audit of the

program annually

MoA/FPCU Annually at

the end of each

fiscal year

236

8.4.6.5 Procurement Plan

The preparation of a realistic Procurement Plan for a program is critical for its successful monitoring

and implementation. As part of the program preparation, the Borrower shall prepare a preliminary

Procurement Plan, however tentative, for the entire scope of the program. At a minimum, the Borrower

shall prepare a detailed and comprehensive Procurement Plan including all contracts for which the

selection of firms and individuals is to take place in the first 18 (eighteen) months of program

implementation. An agreement with the Bank shall be reached at the latest during loan negotiations.

The Borrower shall update Procurement Plans throughout the duration of the program at least annually

by including contracts previously awarded and to be procured in the next 12 (twelve) months. All

Procurement Plans and their updates or modifications shall be subject to the Bank’s prior review27

and no objection before implementation. After loan negotiations, the Bank shall arrange the

publication on its external website of the agreed initial Procurement Plan and all subsequent updates

once it has provided a no objection.

Under Procurement Plan, works, goods and services (non-consultant and consultant services) to be

procured are identified year-wise over the implementation period. List of procurement of works,

goods, equipment, vehicles, furniture, etc., to be procured under the program, year-wise with estimated

cost and method of procurement shall be detailed in appropriate formats for each budget year. In

addition, the details of consultancy services to be hired in terms of estimation of estimated cost, and

method of selection of consultant, year-wise over the program period shall be Programd in appropriate

format. The Procurement Plan, including their updates, shall set forth at a minimum (i) a brief

description of goods, works, and/or services (non-consulting and consulting services) required for the

program for which procurement action is to take place during the period in question; (ii) the proposed

methods of procurement as permitted under the Loan Agreement; (iii) any provision for the application

of domestic preference in accordance with paragraph 2.55 for works and goods; (iv) the Bank review

requirement and thresholds; and (v) the time schedule for key procurement activities, and any other

information that the Bank may reasonably require. Large numbers of small and similar contracts may

be clubbed.

A Procurement Plan (tentative for the first 18 months of program period) has been prepared and

approved (Annex). The Procurement Plan provides the basis for methods of procurement and

categories of goods and works to which they apply are specified. This plan will be available at the

program implementation unit at FPCUof MOA. The Bank discloses the Procurement Plan to the public

after the related program has been approved including disclosing of additional updates after the Bank

has approved them. It will also be available in the Program’s database and in the Bank’s external

website. The Procurement Plan will be updated in agreement with the Bank annually or as required to

reflect the actual program implementation needs and improvements in institutional capacity. All

updated/revised procurement plans shall require Bank clearance. All procurement activities shall be

carried out in accordance with the agreed and cleared procurement plan.

237

8.4.6.6 Procurement Planning and AWPB Linkage

All procurement shall be within the approved budget of the AWPB of the procuring entity and should

be meticulously and judiciously planned by the procuring entity. Consistent with government fiscal

discipline measures, only those considered crucial to the efficient discharge of governmental functions

shall be included in the Annual Procurement Plan (APP). The APP shall be formulated and revised

only in accordance with the following guidelines:

a) At the start of every budget period, the procuring entity shall prepare its proposed budget for the

succeeding calendar year, taking into consideration the budget framework for that year in order to

reflect its priorities and objectives for the budget period.

b) The end-user units of the procuring entity shall prepare their respective APP for their different

programs and activities. The APP shall include:

o information on whether subprograms/activities will be contracted out, implemented by

administration in accordance with the guidelines issued by the Bank;

o the type and objective of contract to be employed;

o the extent/size of contract scopes/packages;

o the procurement methods to be adopted, and indicating if the procurement tasks are to be

outsourced;

o the time schedule for each procurement activity and for the contract implementation; and

o the estimated budget for the general components of the contract;

c) The APP shall require the approval of the Bank and must be consistent with its duly approved

yearly Annual Work Plan and Budget (AWPB).

d) The APP shall then be submitted to the CUs and then Bank for approval. The CUs shall evaluate

each IA’s submitted APP and include it in the budget proposal for approval by the PSC and Bank.

e) After the budget proposal has been approved by the PSC and/or other oversight bodies, the CUs

shall furnish a copy of the procuring entity’s APPs with the corresponding AWPB for

implementation.

f) No procurement shall be undertaken unless it is in accordance with the approved AWPB and APP

of the procuring entity.

Terms and Methods of Payment (Paragraph 2.34, 2.35 & 2.36 for works)

Payment terms shall be in accordance with the international commercial practices applicable to the

specific goods, works, and services.

Advance Payment

Advance payment as stipulated in the condition of contract may be paid to the contractor up on

submission of the employer of a bank guarantee or if acceptable, insurance guarantee. These funds

assist the contractor in the initial stage of implementation of the work such as payment of wages for

the first month and mobilization plant and materials. The supervising consultant should ensure that

the advance is repaid in accordance with the provisions of the contract.

238

a) Contracts for supply of goods shall provide for full payment on the delivery and inspection, if so

required, of the contracted goods except for contracts involving installation and commissioning,

in which case a portion of the payment may be made after the Supplier has complied with all its

obligations under the contract. The Employer will open the use of letters of credit so as to assure

prompt payment to the Supplier. In major contracts for equipment and plant, provisions shall be

made for suitable advances and, in contracts of long duration, for progress payments during the

period of manufacture or assembly.

b) Contracts for works shall provide, in appropriate cases for mobilization advances, advances on

Contractor’s equipment and materials, regular progress payments, and reasonable retention

amounts to be released upon compliance with the Contractor’s obligations under contract. Any

advance payment for mobilization and similar expenses, made upon signature of a contract for

goods, works, and non-consulting services, shall be related to the estimated amount of these

expenses and be specified in the bidding documents. Amounts and timing of other advances to be

made, such as for materials delivered to the site for incorporation in the works, shall also be

specified.

The bidding documents shall specify the arrangements for any security required for advance payments.

Bidding documents shall also specify the payment method and terms offered, whether alternative

payment methods and terms will be allowed, and, if so, how the terms will affect bid evaluation.

Generally, the Advance Payment shall be limited to 20-30% (twenty to thirty per cent) of the Contract

Price.

Validity of the Bids (Paragraph 2.13 of Guidelines): The usual period of validity to be stipulated in

the bidding document is 90 days. However it could be increased to 120 days in respect of complex

contracts, where the process of evaluation is likely to take more time and the decision for award of

contract is likely to take more time. Stipulating a longer period of validity will make the bid out of

date when the rates are fixed and not subject to price adjustment.

Bid Security (Paragraph 2.14 of Guidelines): Bidders are required to deposit (called as Bid Security)

an amount specified in the bidding document, along with their bid. Bid securityshall be about 2%

(should be specified amount of money not percent)of the estimated cost of works/goods, and a specific

amount of money be indicated. The bid security shall be in the form of Demand Draft/Bankers Cheque/

Bank Guarantee from a Scheduled/Nationalized Bank, which should be valid for 45 days beyond

validity period of bid in favor of the officer who has invited the bids or any other specified officer.

The bid security of unsuccessful bidders shall be returned within 45 days of the end of bid validity

period. The bid security shall be forfeited in the event of withdrawal of bid within original validity or

if the bidder does not accept the corrections to the Bid Price in pursuant of corrections as per provisions

of Bid Document, and in the case of successful bidder if the bidder fails to sign the agreement within

specified period or furnish the required performance security within specified time limit.

Performance Security and Retention Money (Paragraph 2.39 and 2.40 of Guidelines): In the case

of works, the Performance Security shall be ten percent (10%) of the Accepted Contract Amount in

239

US$ in the form of Unconditional Bank Guarantee acceptable to the Employer. In the case of goods

the initial performance security shall also be 10% of contract price. The performance security may be

in the form of unconditional bank guarantee from a Scheduled/Nationalized bank acceptable to the

Employer, valid up to 28 days after date of expiry of defect liability period/warranty period. Failure

of the successful bidder to furnish performance security shall constitute a breach of contract, cause of

annulment of the award, forfeiture of the bid security, and any other remedy the Purchaser may take

under the contract, and the Employer/Purchaser may resort to awarding the contract to next ranked

bidder. Contracts for works may provide for a percentage of each periodic payment to be held as

retention money until final acceptance. Retention Money for Works shall be 10% of contract price;

50% to be retained till completion of the whole of the works and 50% to be retained till the end of

defects liability period. Bank guarantees submitted by bidders/contractors/suppliers should be

unconditional and be in the specified formats. Bid and performance securities of Joint Ventures should

be in the name of all partners in the Joint Venture submitting the bid.

Liquidated damages (Paragraph 2.41 of Guidelines): Both for Works and Goods, liquidated damage

is specified as a fixed sum per day of delay. It is at 0.10% (percent) per calendar day or at 0.7% per

week of the value of works, goods and services delayed subject to a maximum of 10 (ten) percent of

final contract price. The liquidated damage is specified as a percentage only.

Property Management under AGP

Management of Government Property is the process of decision-making and implementation relating

to the acquisition, use, and disposition of real property. In the Government Property Guideline No

6/1991EC, Government Property is defined as Fixed Assets and Stock owned by the government

excluding money and land.

The fixed asset management starts when fixed asset is issued from store. In case of buildings and

similar constructions, the building becomes part of fixed asset when temporary acceptance is made.

Fixed assets in store are just stock. Similarly fixed asset management ends when the asset is returned,

for any reason, to used-stock store. Fixed asset could be damaged and no more be useful, the user of

the fixed assets might leave the PB and might have returned the asset to store, a project office might

be closed, and the asset might be no more useful. Such assets are received in to the store. From that

point on, the fixed asset becomes stock. At time of disposal, the asset is issued from store through a

store issue voucher (currently Model 22) to the buyer of the disposed asset.

Property identification number

Assigning property identification number and marking of fixed assets in use is necessary to monitor

and control properties of the project. Property identification number (PIN) as the name implies is used

to uniquely identify assets. It is not practicable to identify assets in words like “this chair is owned by

government, currently being used in MoFED Finance Department in Addis Ababa”. A logical and

systematic number is assigned to assets for ease of reference and for summarizing and analyzing

information on fixed assets. In Property Identification number (PIN) development, alphabets, numbers

and other characters are used; the name “number” should not be misunderstood.

Fixed assets in store

240

Fixed assets in store are not yet put to use or are returned after being used. These fixed assets are part

of stock and hence are managed by the stock management system.

Fixed assets under construction

Fixed assets under construction are not yet fixed assets, as they are not yet put to use. However, they

are not like those fixed assets in store. They are not covered by the stock management system. Hence

special procedure is needed to deal with them. The following tasks should be done. Identify all

construction works in progress. If Implementing Agency is not responsible for follow up of

construction in progress or it does not have full information on such assets, a ciRPCUlar letter to all

concerned departments of the PB has to be ciRPCUlarized requesting them to give details of

construction works in progress.

The necessary details are:

i. The type of asset (building, plant, road, etc)

ii. Location

iii. Ownership

iv. Date construction started

v. Percentage completed

vi. Expected date of completion

vii. Accumulated value of the construction, if not available estimated value

viii. If contracted out, the contract value and payments made so far

ix. All documents to support the above details.

Marking of Fixed Assets

Control over the custody of assets is only complete if PIN is marked on the assets. Marking of PIN

could serve the following purposes:

a) Fixed Assets without PIN could indicate that the fixed asset is not included in the FAR.

Annual Physical Count is completed with the help of PIN.

b) Employees of the PB can identify the asset issued in their name and they do not attempt to

put any other kind of mark on the assets.

Several techniques are available to physically mark fixed assets including:

a) Painting the property identification number

b) Pre-numbered plastic stickers

c) Marker pens

d) Pre-numbered metal plates riveted into the fixed asset

e) Bar codes

The PIN should be written on the body of the asset where the PIN can be checked without difficulty

at the time of annual physical count or at any time before that. Writing PIN at a place where it cannot

be seen without overturning or without disturbing the position of the asset should as much as possible

be avoided. If the PIN is written in such a difficult part of the body of the asset, physical count of the

asset becomes cumbersome and time taking.

Disposal of Fixed Assets

241

Council of Ministers Financial Regulation No 17/1997 states that disposal of public property shall be

done in accordance with directives of the Ministry of Finance. It also demands deletion of public

property where the property is considered to be of no use in the public body or elsewhere. Currently

Government owned fixed assets are disposed in accordance with the provisions in the Government

Property Guideline No 6/1998.

Assets for disposal should not contain material that is not intended for disposal. Examples of material

that should be cleared from assets before disposal are:

stationery—particularly printed stationery, which could be misused, or used for fraudulent

purposes;

software, the unauthorized movement of which could breach license agreements;

classified information contained in hard or floppy disks;

Records, files, papers or whiteboards containing information which, if disclosed, could breach

privacy legislation, and/or cause embarrassment or problems for the public body; and

Hazardous assets the transfer of which could create legal liabilities.

Ownership of assets

One of the difficulties that may be faced in the process of counting, valuing and recording fixed asset

is ascertaining ownership. All goods and materials purchased by AGP fund are the assets of the

program and hence it should be received, recorded and identified on the name of the project.

Insurance

According to the Council of Ministers Finance Regulations No 17/1997, Article No 62 provides that

“the Heads and employees of public bodies are responsible for the protection and preservation of

public property.”In the previous sections, how fixed assets can be recorded and controlled is explained.

One of the protection methods for fixed assets is purchasing appropriate insurance policy against

unforeseen calamities.

The Heads of PBs and the FAMU should assess for which of the assets the PB should buy insurance

cover and timely. Once purchased, the policy should be renewed every year in advance of its expiry

date.

Computerization of the fixed assets management

In addition to the procedures and formats for managing fixed assets manually, in the future, however,

the management system might evolve to computerized system. This manual could serve as a basis for

computerization of the system. Using fixed asset management software enables quick and accurate

inventory of fixed assets. It is possible to keep track of the current location of the assets and whom

they are currently assigned to. Software enables scanning and printing barcodes; maintain supplier

information, asset disposals, employee data, and maintenance records. Using the software it is possible

to manage large number of locations and assets.

ANNEXES

ANNEX 1 RESULT FRAMEWORK

A. PDO indicators

Development objective Program Development Indicators Use of outcome information

Increasing agricultural

productivity and

commercialization of small

holder farmers targeted by

the project

Percentage increase in yield for selected crops

in targeted households benefiting directly

from the project (Percentage)

This indicator enables to assess agricultural productivity by a

proxy with yield for selected key crops and livestock in targeted

households (MHH and FHH). Two indexes will develop based

on the selected crops (i) cereals and pulses and (ii)

vegetables/fruits and another one index for livestock on the

selected livestock products.

More specifically monitoring and evaluation of this indicator

tests the efficiency, effectiveness, impact of the program’s

activities at increasing agricultural productivity. It will further

capture the impact on women.

Percentage increase in yield for selected

animal products in targeted households

benefiting directly from the project

(Percentage) (liters day/cow)

Proportion production sold by targeted

beneficiaries for selected crops (Percentage)

Assess the level of commercialization of the crop and livestock

production by targeted beneficiaries for selected key crop and

livestock products.

More specifically this indicator assesses the effectiveness of the

AGP’s activities at increasing commercialization and value-

addition of agricultural and livestock products at the household

level. It will further capture the impact on women by a specific

analysis of women’s activities.

Proportion of animal production sold by

targeted beneficiaries for selected products

(Percentage)

Direct project beneficiaries

(Number) - (Core)

Number of direct project beneficiaries,

including women which should compose

minimum 40% of the beneficiaries”.

Program development objective Intermediate out comes Out put

243

Household dietary diversity Percentage increase in crop diversity in

targeted households benefiting directly from

the project

Production diversification (especially combined with increase

production of nutrient-dense crops and small-scale livestock)

plays an important role for nutrition. Qualitative studies will

also conduct to get information on those key issues including

quality of services accessed.

244

B. Intermediate outcome indicators

Intermediate outcome Outcome indicator Use of outcome information

Component one: Strengthening public agricultural service

Increased access to

public agricultural

service

Percentage increase in number of farmers using

public agricultural services (male farmers and

female farmers)

This is to measure the functional attractiveness of public

agricultural services and assess project contribution to

The expansion of service delivery, increase in number of

farmers using the service (male & female farmers )

No of farmers adopted different agricultural technologies

promoted by the project (disaggregated by gender). change in

practices compared to currently used practices or technologies

Production diversification (especially combined with increase

production of nutrient-dense crops and small-scale livestock)

plays an important role for nutrition. Qualitative studies will

also conduct to get information on those key issues including

quality of services accessed.

Number of gender sensitive technologies

demonstrated in the project area (Number)

Percentage increase in crop diversity in targeted

households benefiting directly from the project

Clients who have adopted an improved

agricultural technology promoted by the project

(Number) - (Core)

Clients who adopted an improved agricultural

technology promoted by project – female

(Number - Sub-Type: Breakdown) - (Core)

Public agricultural

extension service

provided with

improved

technologies

Number of technologies promoted to public

extension services (total and disaggregated by

gender sensitive, nutrition and climate smart)

(Number)

Information on technologies reached the stage of being promoted

to public extension services and candidate technologies to be

promoted in year 1 are technologies at verification trial stage; the

other years it will include technologies at verification stage and

based on demand (farmers, extension services

Number of demand-driven improved agricultural

technologies under research (total and

disaggregated by gender sensitive, nutrition and

climate smart technologies) (Number)

Information on the quality of the processes that led to the selection

of technologies under research. The terms demand driven and

improved refers to the quality of the processes to have the

technology under research

Collaborative research sub-projects under

implementation/completed (Number) - (Core)

To have information about the FREGs under implementation and

growth in formal collaboration between the public research,

extension services and farmers. To avoid the risk of double

counting, once FREGs have been completed, they should be

reflected as completed and not under implementation.

Collaborative research sub-projects - under

implementation

(Number - Sub-Type: Breakdown) - (Core)

Collaborative research sub-projects - completed

(number)

245

Intermediate outcome Outcome indicator Use of outcome information

(Number - Sub-Type: Breakdown) - (Core)

Volume of breeder seeds and pre-basic seeds for

crops produced by research centres

(quintals/cumulative)

Check the capacity of research centres to provide breeder seeds

and pre-basic seeds. The supply of breeder seeds and pre-basic

seeds is critical to ensure the production of seeds (under

component 4) by farmers, cooperatives and private agents.

Small holder

farmers accessed

and efficiently used

irrigation water

Water users provided with new/improved

irrigation and drainage services (number)

(Number) - (Core)

Assesses about the expansion in access to irrigation and drainage

of farmers: farmers who are using irrigation and drainage services

from the project. Quality of services” including better timing,

quantity, quality, and cost-effectiveness for the water users. “From

New irrigation, improved and other irrigation water sources

developed by the project. The area is not necessarily newly but is

newly provided with irrigation and drainage services, and may

have been rain fed land before. Percent of IWUA managing

effectively managing irrigation schemes

Water users provided with irrigation and drainage

services - female (number)(Number - Sub-Type:

Breakdown) - (Core)

Percentage of functional water user associations

managing effectively irrigation and drainage

infrastructures(Percentage)

Area provided with irrigation and drainage

services (ha) (Hectare(Ha)) - (Core)

Information about irrigation and drainage services (new and

improved). Schemes may not be necessary new but also improved

irrigation and drainage services” refers to the upgrading,

rehabilitation, and/or modernization of irrigation and drainage

services in an area with existing irrigation and drainage services.

The data are disaggregated by gender small-scale irrigation and

household irrigation, as women farmers are mostly beneficiary

from household irrigation.

Area provided with irrigation and drainage

services - New (ha) (Hectare(Ha) - Sub-Type:

Breakdown) - (Core)

Area provided with irrigation and drainage

services - Improved (ha) (Hectare(Ha) - Sub-

Type: Breakdown) - (Core)

Commercialization

of small holder

farmers supported

Percentage increase in volume of seeds supplied

through diversified channels (disaggregated per

supplier) (Metric ton)

Information on the volume of grain seeds produced per value

chains per type of channels (private agents; farmers groups; and

cooperatives).

Number of commercial partnerships or market

contracts signed between producer groups or

cooperatives (supported by the project) and

domestic/international agribusiness actors

Information about effectiveness of program at improving market

access and establishing commercial linkages between farmer

groups or cooperatives and domestic, regional and international

246

Intermediate outcome Outcome indicator Use of outcome information

(processors, wholesalers, retailers, exporters,

etc.) for selected value chains (Number)

agribusiness actors such as processors, wholesalers, retailers,

exporters, etc.

Percentage of CIGs undertaking a viable business

activity (disaggregated youth and female)

(Percentage)

Information about the sustainability of the business for the CIGs:

(i) the members of CIG’s that make profit with the activity they

undertake as an individual in CIG; (ii) the CIG itself makes profit;

(v) Reserves of the group are increased until they are sufficient to

cover costs of a full business

Arrangement for result Monitoring

Results Framework

Project Development Objective: Increase agricultural productivity and commercialization of small holder farmers targeted by the project

PDO Statement, These results are at Project Level

Project Development Objective Indicators

Cumulative Target Values

Indicator Name Baseline YR-1 YR-2 YR-3 YR-4 YR- 5

1. Percentage increase in yield for selected

crops in targeted households benefiting

directly from the project

(Percentage)

Cereals/pulses (quintals / hectare):

- THH: 15.3

- FHH: 13.7

Vegetables/Fruits: (quintals / hectare)

-THH: 67.42

-FHH: 55.79

-- --

11.1%

11.9%

14.3%

16.1%

--

21.8%

22.9%

28.6%

30.6%

2. Percentage increase in yield for selected

animal products in targeted households

benefiting directly from the project

(Percentage) (liters day/cow)

-THH: 0.70

-FHH: 0.71 -- --

11.1%

11.9% --

21.8%

22.9%

3. Proportion production sold by targeted Cereals/pulses: -- -- --

247

beneficiaries for selected crops

(Percentage)

- THH: 17.08 %/

- FHH: 15.29 %

Vegetables/Fruits:

-THH: 37.19%

-FHH: 30.77

22.36%

21.11%

41.29%

36.21%

26.55%

25.49%

44.49%

39.97%

4. Proportion of animal production sold by

targeted beneficiaries for selected

products (Percentage)

-THH: 26.97%

- Female: 27.36% -- --

31.27%

31.89% --

34.67%

35.30%

Direct project beneficiaries (Number) -

(Core) NA 1597730

Female beneficiaries (% - Sub-Type:

Supplemental) - (Core) NA 40%

Intermediate Results Indicators

Cumulative Target Values

Indicator Name Baseline YR-1 YR-2 YR-3 YR-4 YR-5

1. Percentage increase in number of farmers using public

agricultural services (male farmers and female farmers)

- Male: 26.9%

- Female: 20.1% -- --

39.45%

31.35% --

50.56%

40.56%

2. Number of gender sensitive technologies demonstrated in the

project area (per FTC ) (Number) 0 7 20 60 90 101

3. Percentage increase in crop diversity in targeted households

benefiting directly from the project (%)

26.5% HH cultivating

3 crops or more -- -- 36% -- 39.75%

4. Clients who have adopted an improved agricultural technology

promoted by the project (Number) - (Core) 0 -- -- 700,000 1,400,000 1,530,000

Clients who adopted an improved agricultural technology promoted

by project – female (No : Breakdown) - (Core) 0 -- -- 300,000 500,000 608,000

248

5. Number of technologies promoted to public extension services

(total and disaggregated by gender sensitive, nutrition and

climate smart) (Number)

Total:

Gender sensitive: 0

Nutrition: 0

Climate smart: 0

20

7

7

4

50

20

15

10

120

60

50

14

240

90

80

16

280

101

80

20

Indicator Name Baseline

Cumulative Target Values

YR-1 YR-2 YR-3 YR-4 YR-5

6. Number of demand-driven improved agricultural technologies

under research (total and disaggregated by gender sensitive,

nutrition and climate smart technologies) (Number)

Total: 0

Gender sensitive: 0

Nutrition: 0

Climate smart: 0

--

--

--

--

20

3

3

3

60

10

10

10

110

30

30

30

140

40

40

40

7. Collaborative research sub-projects under

implementation/completed(Number) - (Core)

Total FREGs: 0

Women FREGs: 0

200

100

450

200

600

240

700

280

700

280

Collaborative research sub-projects - under implementation

(Number - Sub-Type: Breakdown) - (Core)

Total FREGs: 0

Women FREGs: 0

150

75

250

100

150

40

100

40

0

0

Collaborative research sub-projects - completed (number)

(Number - Sub-Type: Breakdown) - (Core)

Total FREGs: 0

Women FREGs: 0

50

25

200

100

450

200

600

240

700

280

8. Volume of breeder seeds and pre-basic seeds for crops produced

by research centres (quintals/cumulative) 0 1,258 2,516 3,774 5,032 6,290

9. Water users provided with new/improved irrigation and drainage

services (number) (Number) - (Core) 0 20,000 86000 172,000 190,000 190,000

Water users provided with irrigation and drainage services - female

(number) (No - Sub-Type: Breakdown) - (Core) 0 8,000 36,400 71,000 78,000 78,000

10. Percentage of functional water user associations managing

effectively irrigation and drainage infrastructures (%) NA -- 40% 50% 60% 70%

11. Area provided with irrigation and drainage services (ha) 0 5,000 21,500 43,000 55,000 55,000

249

(Hectare(Ha)) - (Core)

Area provided with irrigation and drainage services - New (ha)

(Hectare- Sub-Type: Breakdown) - (Core) 0

5,000 20,215 41,715 45,000 45,000

Area provided with irrigation and drainage services - Improved (ha)

(Hectare - Sub-Type: Breakdown) - (Core) 0 3,715 4,000 8,000 10,000 10,000

12. Percentage increase in volume of seeds supplied through

diversified channels (disaggregated per supplier) (Metric ton)

Total:193212

Private agents: 107189

Farmers groups: 37661

Cooperatives: 48362

9%

9%

9%

9%

12%

12%

12%

12%

13%

13%

13%

13%

15%

15%

15%

15%

15%

15%

15%

15%

13. No of commercial partnerships or market contracts signed

between producer groups or cooperatives (supported by the

project) and domestic/international agribusiness actors

(processors, wholesalers, retailers, exporters, etc.) for selected

value chains (Number)

Number: TBD

--

TBD

TBD

TBD

TBD

14. Percentage of CIGs undertaking a viable business activity

(disaggregated youth and female) (Percentage) NA

--

--

--

--

35%

35%

45%

40%

65%

50%

15. Percentage of trainings delivered using AGP agreed capacity

development approach (Percentage) NA -- 70% 80% 85% 90%

16. Annual progress reports meets World Bank quality and timely

delivery requirements (Yes/No) NA Yes Yes Yes Yes Yes

The sources for the rapid baseline are from: AGP1 project data, IFPRI MTR report and CSA data. The missing rapid baseline data will be

collected at appraisal. The rapid baseline data will be updated through household survey and other studies/evaluation (full fledge baseline) as

needed after Board and indicators targets will be updated based on the new baseline value.

Indicator 1: Rapid baseline source IFPRI AGP MTR./GTP-1

Indicator 2: Rapid baseline value index only based on milk. Source IFPRI AGP MTR.

Indicator 3 and 4: Source CSA Agricultural sample survey 2013/2014 (2006 e.c.)(September – January 2013/2014) report on crop and livestock

product utilization (private peasant holdings, meher season). Data for Amhara, Oromiya and SNNPR.

Indicator 5: Rapid baseline only based on farmers visit by extension agents. Source IFPRI AGP MTR.

250

Indicator 7: For the rapid baseline crop diversity is defined as farmers cropping 3 or more crop types. A more developed index looking at the

different food groups will be developed for full fledge baseline data collection. Data source is IFPRI MTR AGP report.

Indicator 11: The current targets will be updated (potentially lowered) based on a rapid assessment of research capacity to support the

establishment of FREGs.

Indicator 14: A review of currently established WUA will be conducted to establish the baseline.

NA: not applicable.

MONITERING MATRIX

What to

monitor

Methodol

ogy of

monitorin

g

Woreda Zone Region federal

Bi-

weakly

Month

ly

Quarterl

y

Month

ly

Quarter

ly

Bi-

monthl

y

Quarter

ly

Bi-

quarterl

y

Bi-

monthly

Quarte

rly

BA

Input out Supervisi

on

xx Xx xx xx

Report Xx xx xx xx xx

process Supervisi

on

xx Xx xx xx

Report Xx xx xx xx xx

Outcome Supervisi

on

xx Xx xx xx

Report xx xx Xx xx

251

ANNEX 2: LIST OF PROGRAM TARGET WOREDAS

Regionn/Zone

Previous New Total

Total Woreda

No of

Kebel Woreda

No of

Keble

Wore

da

No of

keble

1. Oromiya

1.1 Arsi

L. Bililo 25 Tiyo 18 Munesa 32 Hetosa 23 Shirka 33 Digalu and Tijo 23

Tota

l 4 113 2 41 6 154

1.2 W/Arsi

Adaba 22 GedebAsasa 25 Dodola 23 Kofele 39

Tota

l 3 84 1 4 109

1.3 Bale

Agarfa 20 Ginir 28 Gasera 21 Sinana 20

Tota

l 3 61 1 28 4 89

1.4 E/Shewa

Ada'a 27 Dugda 36 Gimbichu 33 L.Chukala 18 Lume 35

Tota

l 4 113 1 36 5 149

1.5 N/Shewa

G. Jarso 17 Dera 33 Y.Gulale 17 Were Jarso 25 H. Abote 20

Tota

l 3 54 2 58 5 112

1.6 W/Shewa

Ambo 34 Ejere 27 Dendi 48 T.Kutaye 31 BakoTibe 28

Tota

l 4 141 1 27 5 168

1.7 S/W/Shewa

Becho 19 KersaMalima 31 Woliso 37

252

Regionn/Zone

Previous New Total

Total Woreda

No of

Kebel Woreda

No of

Keble

Wore

da

No of

keble

Wenchi 23

Tota

l 3 79 1 31

4 110

1.7 Special Zone of

Finine Surround. Welmera 24 0 0 1 24

Tota

l

1 24 1 24

1.8 I/Abba-Bora

Bedele 41 AlgeSachi 19 Dedesa 26 Gechi 32 Chora 32

Tota

l 4 131 1 19 5 150

1.9 Jimma

Gera 29 Omo Nada 39 Goma 36 Dedo 53 L. Seka 38

Tota

l 3 103 2 92 5 195

1.10 Horro-

Guduru W

Guduru 31 Jima Rare 18 Horo 22 JerdegaJarte 21 J. Genete 12

Tota

l 3 65 2 39 5 104

1.11 E/Wallaga

Diga 21 GidaAyana 22 G. Gida 21 W.Tuka 10 BoneyaBoshe 10

Tota

l 4 62 1 22 5 84

1.12 New Zone

KelemWellega

- Anfilo 23

Gidami 28

Jima Horo 21

Seyo 26

Total 4 98 4 98

1.13 New Zone

West

Wellega

Lalo Asabi 27

Genji 18

Haru 25

NoleKaba 24

253

Regionn/Zone

Previous New Total

Total Woreda

No of

Kebel Woreda

No of

Keble

Wore

da

No of

keble

Tota

l 0 4 94 4 94

TOTAL 39 1030 23 610 62 1640

2. Amhara

2.1 North Gonder

Alefa 28 Dembia 45 Takusa 25 GonderZurea 37 Metema 23 Wogera 41 Quara 21 Chilga 45

Tota

l 5 142 3 123 8 265

2.2 South Gonder

Dera

29

Farta 36 Andabet 22 Estie 37

Tota

l 1

29 3 95 4 124

2.3 East Gojam

Debre Elias 20 BasoLiben 23 Enemay 26 DebayTelatgin 21 Dejen 22 EnarjEnawga 27 Awabel 30

Tota

l 4 98 3 71 7 169

2.4 West Gojam

Wemberma 21 Dembecha 29 South Achefer 19 YilmanaDensa 34 Bure 24 JbiTihinan 39 North Achefer 27 Bahir Dar ketema 11

Tota

l 6 141 2 63 8 204

2.5 North Shewa

EfrataGidim 20 MinjarShenkora 29 AntsokiaGemza 17 MoretnaJiru 17 Kewot 23 SiyaDebrnaWayu 13 TarmaBer 21 BasoWorana 33

254

Regionn/Zone

Previous New Total

Total Woreda

No of

Kebel Woreda

No of

Keble

Wore

da

No of

keble

Tota

l 5 114 3 59 8 173

2.6 Awi

AnkeshaGuagusa 34 GuagusaShikudad 14 Zigem 15 Dangla 29 Guangua 18 Jawi 21

Tota

l 5 117 1 14 6 131

TOTAL 26 641 15 425 41 1066

3. SNNPR

3.1 Sidama

Wondo Genet 14 Arbegona 38 Melega 23 Bursa 28 Gorche 21

Tota

l 3 58 2 66 5 124

3.2 Gedio

Bule 30 Gedeb 16

Tota

l 2 46 0 0 2 46

3.3 Silite

MirabAzerenet 19 MisrakAzerenet 17 Alichowuriro 24

Tota

l 3 60 0 0 3 60

3.4 Dewaro Essera 29 Tocha 36

Total 1 29 1 36 2 65

3.5 DebubOmo

Debub Ari 49 Benetsemaye 30 Semen Ari 33

Tota

l 2 82 1 30 3 112

3.6 Kefa

Decha 58 Gimbo 31 Chena 43 Gawata 30

Dita 24

Tota

l 2 101 3 85 5 186

255

Regionn/Zone

Previous New Total

Total Woreda

No of

Kebel Woreda

No of

Keble

Wore

da

No of

keble

3.7 Gurage

EnemorEner 64 Gumer 18 Endegagn 17 Geto 16 Cheha 39

Tota

l 3 120 2 34 5 154

3.8 B/maji

Debub Bench 25 Semen Bench 31 Shey Bench 21 MehinitGoldia 29

Tota

l 2 46 2 60 4 106

Sheka Yeki 22 Andaracha 16

Tota

l 1 22 1 16 2 38

3.9 Special

Woreda

Konta (s/Woreda) 43 Basketo

(s/Woreda) 30 Yem (s/Woreda) 31

Tota

l 3 104 0 0 3 104

3.10 Gemugofa

Melkoza 37 37

Tota

l 1 37 1 37

TOTAL 22 668 13 356 35 1032

4. Tigray

4.1 West

Tsegede 23

Welqait 25

KaftaHumera 21

Tota

l 3 69 3 69

4.2 N.West

TahtayAdiabo 11 LaelayAdiabo 22

AsgedeTsimbla 12 Tselemti 22

TahtayKoraro 13

MedebayZana 18

Tota

l 2 23 4 75 6 98

4.3 South Tigray Endamokoni 10

256

Regionn/Zone

Previous New Total

Total Woreda

No of

Kebel Woreda

No of

Keble

Wore

da

No of

keble

Ofla 10

Raya Alamata 9

Raya Azebo 9

Tota

l 4 0 0 4 38

TOTAL

9 130 4 75 13 205

5. Benshangul–Gumuz

none 0 0 Madora

20 none 0 0 Wembera 33

TOTAL 2 53 2 53

6.Gambella

none 0

Etaniga/ Liyu

Woreda 23 none 0 Gambela 12

TOTAL 0 2 35 2 35

7. Harari

TOTAL None 0 0 1 17 1 17

8. Dire Dawa

Admi. Council none 0 0 1 21 1 21

TOTAL 0 0 1 21 1 21

GRAND TOTAL 96 2469 61 1631 157 4069

257

ANNEX 3: LIST OF STAND ALONE MANUAL AND GUIDELINES

1. Capacity building and Training Manual 2. Guideline on Agricultural Development Partners Linkage Advisory Council (ADPLAC) 3. Guideline on Physical Market Centres Development 4. Community Level Participatory Planning (CLPP)

5. Participatory Agricultural Extension system 6. Farmers’ Training Center (FTC) Operational Manual /Guideline 7. Scaling Up Best Practices Guideline 8. Small Scale Irrigation Planning and Implementation guidelines

9. Program Coordination and Administration Guidelines

10. Financial management manual

11. Procurement manual

12. Monitoring, Evaluation and Learning Manual

13. Environmental and Safeguard Guideline 14. Farmers’ common Interest Group (CIG) establishment Guideline

15. Warehouse establishment and management Guideline

16. Component Activity Based Gender Mainstreaming Guideline

17. Manual for establishment and facilitation of FREGs.

18. Manual for on-farm participatory technology verification

19. Capacity building and Training Manual

258

ANNEX 4:- LIST OF INVESTMENTS THAT REQUIRES NEED ASSESSMENT AND FEASIBILITY STUDY

Key Implementing

Agencies

Specificities on Needs Assessment (FA) and

Feasibility Study (FS)

(For details on NA and FS, refer to definition

provided in the PIM in section "Overview of the

Implementation Cycle"

Component 1. Public Agricultural Services

1. Institutional Strengthening and Development

1. Support to agricultural extension services

IT centers at all level

1,527,600

AETAD

Needs Assessment for capacity development of

extension services: NA (physical and human) and

detailed implementation plan for capacity

development of extension services: Capacitating of

Woreda Implementing Agents to be assessed

Capacitating of Woreda Implementing Agents

1,050,000

2.Animal Production &

Animal Health services

AHD / NAHDIC /

Reg. Labs / RLA or

BoA / Reg. Vet

Services

The study will identify critical gaps in human and

physical capacity as well as gaps in essential

equipment to be addressed by the Program. The

studies will take into account the other animal health

support received through GoE or other projects/

programs. It will prepare a implementation and

management plan for physical and human capacity

development. It will prepare detailed plans for how

each supported facilities and equipment would be

operated, managed and maintained.

Establishing and Equipping molecular biology

laboratory tse tse

50000

Building and Equipping Central Quality Control

Laboratory

150000

Strengthening of a poultry diagnostic capacity 190000

Strengthening regional animal health laboratories 700000

Surveillance of major trans boundary diseases (TADs)

and zoonotic diseases

1142800

Human and physical capacity development

733160

Establishing young stock mortality reduction system

380000

259

Key Implementing

Agencies

Specificities on Needs Assessment (FA) and

Feasibility Study (FS)

(For details on NA and FS, refer to definition

provided in the PIM in section "Overview of the

Implementation Cycle

Establishing of four modern queen rearing

demonstration and training centers

68000

APFRDD / RLA or

BoA

Implementation and management plan for the

establishment of four small-scale modern bees queen

rearing demonstration and training centers will be

prepared. The IP would focus in providing a

description of the facilities and operation, a

description of the required steps, activities and

resources needed a time line for achievement. It will

describe how facilities and equipment would be

operated, managed and maintained and provide a

staffing and human capacity development plan needs.

Establishing of a fish hatchery center 850,000 Feasibility Study on Establishment of a fish hatchery

center will be conducted. The study will consider

social and environmental impacts. The study will

provide a detailed implementation and management

plan for how facilities and equipment would be

installed, operated, managed and maintained, a clear

staffing plans, and a plan for human capacity

development.

Dairy herd performance record registration 719488

NAIC / RLA or

BoA

A breeding strategy for dairy sector together with an

action plan which would include, among others, the

development and the establishment of a dairy herd

performance recording system and an electronic data

management at semen production centers will be

prepared.

Electronic data management at semen production

centers

339000

260

Key Implementing

Agencies

Specificities on Needs Assessment (FA) and

Feasibility Study (FS)

(For details on NA and FS, refer to definition

provided in the PIM in section "Overview of the

Implementation Cycle

3. Crop production and Plant Health Services

Training DAs & SMS on crop package 483,750 AETAD/CED / BoA

Prior to implementation, a detailed needs’ assessment

will be conducted in order to clearly identify the

physical and human capacity gaps to be addressed by

the program through financing goods and staff

training. It will provide detail plans on how facilities,

equipment and training will be implemented,

operated, managed and maintained and staffing plans.

Support field equipment to crop production process

Strengthening plant quarantine station

196250

281250

Installing and equipping Federal plant protection

laboratory

750000

Equipping seed analysis laboratories 1389996

Strengthening plant health clinics 302130

Establishing and equipping international standard

pesticide laboratory

4721735

Capacity building seed & pest management 419805

Experience sharing abroad 60000

5. Soil Fertility Management services

Strengthening soil testing laboratories 190000

NSTC / RSTL

Activities will be based on a detailed needs’

assessment providing evidence of the gaps that the

project could address. The NA will provide a detailed

plan for how facilities and equipment would be

operated, managed and maintained and, in relation to

this, a clear staffing plan and if necessary a plan for

human capacity development..

Promotion of biofertilizer production 400000

Support to soil mapping and implementation 999000

Component 2. Agricultural Research

3. Support to Source Technology Production

A. Source technology multiplication of crops

Production pre-basic crop seeds 1487200

EIAR / RARIs

Prior to implementation, need assessment will be

conducted for the indicated categories of source

technologies. For e ach type of source technology, the

need assessment will include a demand/supply

analysis in order to assess the production gap.

Production of basic cuttings 269500

Production of basic of seedlings 405000

Multiplication of Tissue Culture (TC) materials

552500

261

Key Implementing

Agencies

Specificities on Needs Assessment (FA) and

Feasibility Study (FS)

(For details on NA and FS, refer to definition

provided in the PIM in section "Overview of the

Implementation Cycle

B. Production of source livestock and forage

technologies

Production of basic forage seed 83000

EIAR / RARIs

Prior to implementation, need assessment will be

conducted for the indicated categories of source

technologies. For e ach type of source technology, the

need assessment will include a demand/supply

analysis in order to assess the production gap.

Production of basic forage cuttings 837000

Production of selected poultry parent breeds 180000

Production of dairy heifers for on farm demonstration 360000

Production of fingerlings to support aquaculture

development

360000

Multiplication of improved small ruminants (sheep

and goats)

180000

C. Multiplication of land and water resource

technologies

Multiply bio-fertilizers 300000

EIAR / RARIs

The Na will asses the demand / supply gap of bio-

fertilizers technologies and agro-forestry species for

soil conservation in order to identify gaps to be filled

by the Program.

Multiply multipurpose tree species 600000

4. Capacity Development

Field vehicles 4000000 EIAR, RARIs,

FPCU, RCCU,

RRCCU

Prior to implementation, needs assessment will be

conducted for each of the elements. The needs

assessments will focus on bridging physical and skill

gaps (including capacity needs for cross cutting issues

) to allow the research component to increase the

supply of demand-driven agricultural technologies to

extension services. Needs assessments will provide

detailed plans for how facilities and equipment would

be operated, managed and maintained, clear staffing

plans, and human capacity development. It will take

into account exhaustive inventory of the supports

received through GoE or other projects / programs or

in pipe line to avoid overlap.

Agricultural machineries (Tractors , planters and

combine harvesters)

1200000 EIAR and RARIs

Strenghening of plant protection labs 650000

EIAR / RARIs

Strenghening of soil labs 1250000

Biotechnology labs equipment & supply 1000000

Animal health research lab equipment & supply 1000000

Fishery research lab equipment & supply 500000

Food science lab equipment & supply 500000

Animal nutrition lab equipment & supply 500000 EIAR

Agronomy and physiology lab equipment & supply 500000 EIAR / RARIs

262

Forage seed cleaning and grading equipment 750000

Seed cleaning and grading equipment 500000

Seed lab equipment & supply 600000 EIAR

Mechanization engineering labs 1,500,000

EIAR / RARIs Computational facilities for NARS 500,000 Prior to implementation, needs assessment will be

conducted for each of the elements. The needs

assessments will focus on bridging physical and skill

gaps (including capacity needs for cross cutting issues

) to allow the research component to increase the

supply of demand-driven agricultural technologies to

extension services. Needs assessments will provide

detailed plans for how facilities and equipment would

be operated, managed and maintained, clear staffing

plans, and human capacity development. It will take

into account exhaustive inventory of the supports

received through GoE or other projects / programs or

in pipe line to avoid overlap.

Automated weather station and remote sensing

facilities

450,000

EIAR / RARIs

Poultry house construction 250,000

Irrigation facilities 2,746,000

Cold store 500,000

Short term trainings (researchers and technicians) 2,000,000

Experience sharing 700,000

Scientific workshops 650,000

Component 3. Smallholder Irrigation Development

1. Small Scale Irrigation Infrastructure Development

and Improvement

RBOA +

BOWR/IDA

The NA will focus at identify critical physical and skill

gaps and gaps in small essential equipment of the

BoW/Irrigation Development Authority at regional,

zonal and woreda offices (physical and human). It

will prepare capacity development plan and a detailed

implementation plan for the duration of the Program

including (i) critical equipment such as office

equipment and facilities, field equipment, vehicles,

technical books, (ii) preparation, multiplication and

diffusion of technical training materials; (iii) training,

E. Capacity Development

Physical Capacity Development 2425000

Human Resources Capacity Development

Annual review meetings 18,750

Training of experts 3,807,300

Training of farmers on micro-and house hold

irrigation technologies

1,600,000

Study tour public staffs (abroad) 300,000

Training of consultants and contractors staffs

(procurement)

72,000

263

Technical Assistance and consultants

10,000,000 knowledge and skill development at all levels

including technicians and smallholder farmers; (iv)

experience sharing tours; and (v) short-term study

tours.

2. Integrated Crop and Water Management

C. Human Resources and Physical Capacity

Development

RBOA &

BOWR/IDA WOA

+ WOWR & WOI

The NA will focus at identify critical physical and

skill gaps and gaps in small essential Operation and

Maintenance(O&M) equipment of for smallholder

farmers, WUA, DAs and SMS to improve irrigation

water management and agronomic practices. It will

aim at identify priority gaps and prepare a human

capacity development plan for the duration of the

Program as well as an implementation plan for the

activities mentioned.

Physical capacity development 600000

Human resource capacity development

Training of experts in irrigation water and crop

management

3,220,100

Training of farmers on improved irrigated agriculture

management

1,500,000

Study tours abroad 300,000

Training of consultants and contractors staffs 72,000

Component 4. Agriculture Marketing and Value

Chains

1. Support Agriculture Input Supply System

Establishing new liquid nitrogen production plants 3,400,000

NAIC / RLA or

BoA

The NA will assess the current capacity of liquid

nitrogen production (supply) in the country, the

potential demand of liquid nitrogen for artificial

insemination and the distribution capacity. the NA

will assess the needs for additional capacity in (i)

liquid nitrogen machines, (ii) rehabilitation of

existing liquid nitrogen machines, and (iii) the needs

in trucks for semen distribution. The NA will also

provide an action plan for the implementation of

these activities.

Provision of refrigerated truck for semen

distribution 750,000

Strengthening of liquid nitrogen production plants 425,000

264

Key Implementing

Agencies

Specificities on Needs Assessment (FA) and

Feasibility Study (FS)

(For details on NA and FS, refer to definition

provided in the PIM in section "Overview of the

Implementation Cycle"

C. Human resource capacity building

Training on seed production

76,670

A detailed study will be conducted to assess the

current human resources capacity and skill gaps on

seed multiplication of advisory services providers

(SMS, DAs), Community Based Seed Production

groups and farmer’s organization involved in seed

production and distribution

2. Establishing and Strengthening Farmer

Organizations

A. Establishing and Strengthening of farmers

organizations

Establishing of primary cooperatives 112000

FCA / RCA

Feasibility study will be conducted on establishing

farmer’s primary coperatives in Kebeles where they

have not been established earlier and also the gaps of

the already established farmer’s primary coperatives

for strengthening. Similarly feasibility study will be

done on need for the establishment of a National

cooperative Federation (NACF).

Study on establishing national cooperative federation

53818

D. Human resource capacity development

Cooperative unions The NA will be conducted to identify critical skill gaps

in FCA and RCA as well as zonal, woreda and kebele

cooperatives promotion bureaus/offices, and that of

cooperative unions. Human capacity development

plan which includes training and Inter and intra local

experience sharing visits will also be prepare for the

Training (Directors, Managers) 126,480

FCA and RCA

Training employees 12,800

Exposure Visits for Cooperative Employees 28,800

Sharing experience for directors and Managers 32,400

Agricultural Cooperatives Support Services

Training Coop. experts (woreda, zonal, reg., fed.) 572,426

265

Sharing experience (Woreda, zonal, regional office

heads & experts)

609,636 duration of the Program for both the Agricultural

Cooperatives Support Services providers at all level

and cooperative unions

Consultative Forums/platforms 375,000

Bi anual monitoring and evaluation review meeting 20,000

3. Support Agribusiness Development

A. Support to the coordination of V.C actors

AGP–AVC

(USAID)

Prior to implementation, feasibility study and/or need

assessment will be conducted for each of the elements

based on the nature of the activities. The needs

assessments will focus on bridging physical and skill

gaps. VC actors will be identified; common

challenges, problems and their current capacity will be

assessed.

Federal and Regional Multiple Stakeholders Platform 9000000

B. Technical support to strengthen competitive

agribusiness actors

Facilitation of linkage 500,000

Establishment of centers for quality traceability and

certification

1,000,000

Innovation competitive grant for agribusiness 9,760,380

Demonstration for farmers groups 9,080,000 ≫

Domestic and international trade fair and exhibition 10,000,000 ≫

4. Support Market Infrastructure Development and

Management

A. Construction and modernizing of markets

Crop and horticulture primary markets 9,500,000

MoT ,FCU and

relevant technical

directorates and

RBoA, RBoT,

WoA

A feasibility study will be conducted for each

infrastructure to be implemented. FS will focus in

analyzing the market situation, the production

capacity of the areas selected. The FS will also

consider social and environmental impacts, and

provide evidence to recommend the implementation.

The study will provide a detailed implementation and

management plan for how facilities and equipment

will be installed, operated, managed and maintained,

a clear staffing plans, and a plan for human capacity

development.

Animal primary markets 6,800,000

Milk collection and processing centers 6,400,000

Honey collection and processing centers

600,000

266

Key Implementing

Agencies

Specificities on Needs Assessment (FA) and

Feasibility Study (FS)

(For details on NA and FS, refer to definition

provided in the PIM in section "Overview of the

Implementation Cycle"

B. Support the construction of warehouses, storage

and grading facilities

Construction of store for primary cooperatives 7,500,000

FCA , RCP/WoA

A feasibility study will be conducted for each

infrastructure to be implemented. FS will focus in

analyzing the market situation, and prepare a business

plan. The FS will also consider social and

environmental impacts, and provide evidence to

recommend the implementation. The study will

provide a detailed implementation and management

plan for how facilities and equipment will be installed,

operated, managed and maintained, a clear staffing

plans, and a plan for human capacity development.

Construction of warehouse for cooperative unions 14,000,000